RAND MINING LIMITED Interim / Quarterly Report 2013

Apr 22, 2013

65721_rns_2013-04-22_14b42fce-41d7-4ff3-8bee-73346e0a8610.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [379 x 135] intentionally omitted <==

April 23, 2013

The Listing Manager Australian Securities Exchange Level 4 20 Bridge Street SYDNEY NSW 2000

Quarterly Report for March 2013

Highlights

  • During the quarter, 105,926 tonnes of EKJV ore were processed at the Kanowna Plant and 13,237 tonnes of Rand and Tribune share of EKJV ore were processed at the Greenfields Plant. 21,368.362 oz of gold and 4,059.953 oz of silver were credited to Rand and Tribune Bullion Accounts. (Rand’s share is 25%)

  • At the end of the quarter

approximately 10,500 tonnes of Raleigh ore at an estimated grade of 15.0 g/t remain as a Bed Blend Stockpile on the ROM pad at the Raleigh Mine (Rand’s entitlement is 12.5%)

approximately 11,500 tonnes of Rubicon ore at an estimated grade of 6.1 g/t remain as a Bed Blend Stockpile on the ROM pad at the Rubicon Mine (Rand’s entitlement is 12.25%)

the reconciliation of the difference of the Gold in Circuit at the start and end of Campaign 25 has not been completed (Rand’s share is 25%)

GEOLOGY AND MINING

EAST KUNDANA JOINT VENTURE

Raleigh Underground Mine Production

Stope production from the 5881, 5864, 5847, 5830, 5812, 5795, 5778, 5761, 5744, 5722, 5705, 5688, 5671, 5654 and 5631 levels continued during the quarter.

Contained gold in stope development and stope ore mined during the quarter, estimated by grade control face chip sampling, is tabulated below:

5688, 5671, 5654 and 5631 levels continued during the quarter.
Contained gold in stope development and stope ore mined during the quarter, estimated
grade control face chip sampling, is tabulated below:
5688, 5671, 5654 and 5631 levels continued during the quarter.
Contained gold in stope development and stope ore mined during the quarter, estimated
grade control face chip sampling, is tabulated below:
5688, 5671, 5654 and 5631 levels continued during the quarter.
Contained gold in stope development and stope ore mined during the quarter, estimated
grade control face chip sampling, is tabulated below:
5688, 5671, 5654 and 5631 levels continued during the quarter.
Contained gold in stope development and stope ore mined during the quarter, estimated
grade control face chip sampling, is tabulated below:
RALEIGH UNDERGROUND GRADE CONTROL ESTIMATES
Month Tonnes Grade Ounces
t g/t troy oz
January 13,012 17.48 7,313
February 11,841 18.18 6,921
March 10,609 14.89 5,079
March 13Q 35,462 16.9 19,313
December 12Q 47,869 13.4 20,737

Rand’s Entitlements (12.5%)

March 13Q 4,433 16.9 2,414
December 12Q 5,984 13.4 2,592

Approximately 10,500 tonnes remain as a Bed Blend Stockpile on the ROM pad at the Raleigh Mine and will be hauled in early April.

Raleigh Underground Mine Development

At the end of the quarter, the bottom of the Raleigh Decline is at 5618 m RL, 727 m from the surface.

Development has finished.

RALEIGH UNDERGROUND DEVELOPMENT
Month Capital Operating
Decline
(m)
Secondary
(m)
Waste
(m)
Ore
(m)
Paste Fill
(m)
January 0.0 0.0 0.0 0.0 30.0
February 0.0 0.0 0.0 0.0 15.0
March 0.0 0.0 0.0 0.0 30.0
March 13Q 0.0 0.0 0.0 0.0 75.0
December 12Q 0.0 0.0 0.0 0.0 115.0

The diagrams below show the status of the mine at the end of each month of the quarter.

==> picture [312 x 11] intentionally omitted <==

----- Start of picture text -----

January 13 Green indicates new development at Raleigh
----- End of picture text -----

==> picture [451 x 206] intentionally omitted <==

February 13 Green indicates new development at Raleigh

==> picture [451 x 223] intentionally omitted <==

March 13 Green indicates new development at Raleigh

==> picture [451 x 203] intentionally omitted <==

Mine operating costs incurred during the March 2013 Quarter were $243 per tonne mined or $446 per ounce mined compared with the December 2012 Quarter costs of $206 and $475 respectively.

Rubicon Underground Mine Production

Development of the Rubicon ore body has finished. During the quarter, development of the Hornet ore body progressed on the 6245, 6225, 6205, 6185, 6165, 6065, 6045, 6025 and 6005 levels. Stope production from the Rubicon 6175, 6155, 6135, 6115 and 6095 levels and Hornet 6145, 6125, 6105 and 6085 levels continued during the quarter.

Contained gold in stope development mined during the quarter, estimated by grade control face chip sampling, is tabulated below:

chip sampling, is tabulated below: chip sampling, is tabulated below: chip sampling, is tabulated below: chip sampling, is tabulated below:
RUBICON UNDERGROUND GRADE CONTROL ESTIMATES
Month Tonnes Grade Ounces
t g/t troy oz
January 22,015 11.11 7,861
February 24,865 11.92 9,527
March 16,903 8.44 4,587
March 13Q 63,783 10.7 21,974
December 12Q 66,708 11.8 25,348

Rand’s Entitlements (12.25%)

March 13Q 7,813 10.7 2,692
December 12Q 8,172 11.8 3,105

Approximately 11,500 tonnes remain as a Bed Blend Stockpile on the ROM pad at the Rubicon Mine and will be hauled in early April.

Rubicon Underground Mine Development

At the end of the quarter, the bottom of the Rubicon Decline is at 6067 m RL, 276 m from the surface, the bottom of the Hornet Decline is at 5980 m RL, 363 m from the surface and the top of the Hornet Incline is at 6244 m RL, 99 m from the surface.

RUBICON UNDERGROUND DEVELOPMENT
Month Capital Operating
Decline
(m)
Secondary
(m)
Waste
(m)
Ore
(m)
Paste Fill
(m)
January 131.4 69.5 10.0 269.8 15.0
February 69.1 95.9 18.6 307.0 10.0
March 75.3 56.2 14.8 153.1 30.0
March 13Q 275.8 221.6 43.4 729.9 55.0
December 12Q 396.0 278.2 52.6 727.4 30.0

The diagrams below show the status of the mine at the end of each month of the quarter.

==> picture [312 x 11] intentionally omitted <==

----- Start of picture text -----

January 13 Green indicates new development at Raleigh
----- End of picture text -----

==> picture [451 x 148] intentionally omitted <==

February 13 Green indicates new development at Raleigh

==> picture [451 x 143] intentionally omitted <==

March 13 Green indicates new development at Raleigh

==> picture [451 x 153] intentionally omitted <==

Mine operating costs incurred during the March 2013 Quarter were $150 per tonne mined or $435 per ounce mined compared with the December 2012 Quarter costs of $129 and $340 respectively.

Toll Processing

During the quarter, no EKJV ore was hauled to the Greenfields Plant. The twenty fifth and last toll treatment campaign at the Greenfields Plant started on January 10, 2013, and finished on January 19, 2013. 13,237 tonnes of EKJV ore were processed. At the end of the campaign, approximately 540 tonnes (wet) of Raleigh ore and 3,180 (wet) tonnes of Rubicon ore remained on the ROM pad at the Greenfields Plant and was hauled to the Kanowna Belle Plant in late January.

January. January. January. January.
Bullion accredited to RAND and TRIBUNE
Quarter Gold(oz) Silver(oz) Rand’s sharegold
March 13 3,682.258 628.492 920.564
December 12 22,468.286 4,785.890 5,617.069

During the quarter, 42,800 tonnes (wet) of Raleigh ore and 63,000 (wet) tonnes of Rubicon ore were hauled to the Kanowna Belle Plant. During the quarter, 105,926 tonnes of EKJV ore were processed.

Bullion accredited to RAND and TRIBUNE from Kanowna Belle
Quarter Gold(oz) Silver(oz) Rand’s sharegold
March 13 17,686.104 3,431.461 4,421.526
December 12 0.000 0.000 0.000

EKJV Exploration

The Quarterly Report of the EKJV exploration activities is expected shortly and will be released to the ASX when received.

OTHER EXPLORATION

Wongan Hills (Rand’s Interest 100%)

A drilling programme to test previously reported anomalies has been planned and will start when a drill rig is available.

Seven Mile Hill Joint Venture (Rand’s Interest 50%)

Discussions to farm out the Seven Mile Hill tenements are continuing.

Tapeta Iron Ore Project, Liberia, West Africa

Drilling is continuing.

Results will be announced when assays become available.

Appendix 5B Mining exploration entity quarterly report

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10.

Name of entity

Rand Mining Ltd

ABN
41 004 669 658
Consolidated statement of cash flows
Quarter ended (“current quarter”)
31 March 2013
Quarter ended (“current quarter”)
31 March 2013
31 March 2013
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Other (provide details if material)
Net Operating Cash Flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
7,082
(278)
(762)
(2,023)
(1,191)

18
(63)
(817)
21,837
(1,435)
(2,478)
(7,429)
(3,383)

56
(237)
(2,449)
1,966 4,482
Cash flows related to investing activities
1.8
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.10
Loans to other entities
1.11
Loans repaid to other entities
1.12
Loans from other entities
Net investing cash flows
1.13
Total operating and investing cash flows (carried
forward)


(111)







(503)





(111) (503)
1,855 3,979
  • See chapter 19 for defined terms.

Appendix 5B Page 1

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows (brought
forward)
1,855 3,979
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other (provide details if material)
Net financing cash flows



(875)




(2,375)

(875) (2,375)
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
980
2,309
1,604
1,685
3,289 3,289

Payments to directors of the entity and associates of the directors

Payments to related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
(65)
1.25 Explanation necessaryfor an understandingof the transactions
Directors fees and superannuation (included in administration 1.2(d)) (62)
Royalty payment (included in production 1.2(c)) (3)

Non‐cash financing and investing activities

  • 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

Not applicable

  • 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest

Not applicable

  • See chapter 19 for defined terms.

Appendix 5B Page 2

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Financing facilities available

Add notes as necessary for an understanding of the position.

Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000


Amount used
$A’000

5,000

Estimated cash outflows for next quarter

4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
$A’000
500
600
500
500
Total 2,100

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as Current quarter Previous quarter
shown in the consolidated statement of cash flows) to $A’000 $A’000
the related items in the accounts is as follows.
5.1
Cash on hand and at bank
3,104 2,124
5.2
Deposits at call
185 185
5.3
Bank overdraft
5.4
Other (provide details)
Total: cash at end of quarter(item 1.22) 3,289 2,309

Changes in interests in mining tenements

6.1
Interests in mining
tenements relinquished,
reduced or lapsed
Tenement
reference
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
  • See chapter 19 for defined terms.

Appendix 5B Page 3

30/9/2001

Appendix 5B Mining exploration entity quarterly report

6.2 Interests in mining
tenements acquired or
increased

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue price per
security (see note
3) (cents)
Amount paid up per
security (see note 3)
(cents)
7.1
Preference
+securities
(description)
7.2
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buy‐
backs,
redemptions
7.3
+Ordinary
securities
7.4
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buy‐
backs
60,841,209 60,841,209
7.5
+Convertible
debt securities
(description)
7.6
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
7.7
Options
(description and
conversion
factor)
7.8
Issued during
quarter
7.9
Exercised during
quarter
  • See chapter 19 for defined terms.

Appendix 5B Page 4

30/9/2001

Appendix 5B Mining exploration entity quarterly report

7.10
Expired during
quarter
7.11
Debentures
(totals only)
7.12
Unsecured
notes(totals
only)

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).

  • 2 This statement does give a true and fair view of the matters disclosed.

==> picture [79 x 39] intentionally omitted <==

Sign here: ............................................................ Date: 23 April 2013 (Director/Company secretary)

Print name: Anthony Billis

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

  • See chapter 19 for defined terms.

Appendix 5B Page 5

30/9/2001