Valence Industries Quarterly Activity Report

Valence Industries – Uley Graphite Phase I Plant Operations (2015)
Valence Industries owns the Uley Graphite facilities near Port Lincoln, South Australia.
Quarter Highlights
Operations
- On 2 December, the Company advised that it was suspending processing activities at its Uley Graphite site. The existing production rate was uneconomic.
- A grinding test work program carried out on site demonstrating the ability to produce 97% TGC and 98% LOI from existing low grade product using additional grinding and floatation stages.
Finance Facility
The company negotiated a lower bond obligation under the approved PEPR for the Uley Graphite operation. As a result of the lower obligation, the company was able to reduce its restricted cash by \$629,000.
. Corporate
The Company's Chief Operating Officer, Robert Mencel, was appointed Managing Director effective 1 December 2015.
V A L E N C E I N D U S T R I E S L I M I T E D A S X : V X L & V X L O w w w . v a l e n c e i n d u s t r i e s . c o m Released: 29 January 2016

Current Operations
PRODUCTION
During the December quarter 36 tonnes of saleable material was produced and transported to the Adelaide warehouse ranging from 91% to 96% LOI (Loss on Ignition).
During the quarter, the process plant input rate reached 25tph. The primary ball mill and the rougher float circuits operated at the design rate. However, at steady state, the installed re-grind circuit was found to be inadequate. As a result of insufficient regrind capacity, the average final product grade achieved was 75% TC.
By stopping new feed to the plant, and only regrinding and reprocessing the low grade product it was possible to make product grades up to 95%TGC. However the regrind rate was very slow and resulted in only 2 tonnes a day of product. This production rate is uneconomic.
On 2 December, the Company advised that it was suspending processing activities at its Uley Graphite site near Port Lincoln, South Australia.
The decision was made to preserve the Company's financial resources until a viable, long-term funding solution is achieved. Significant data regarding the plant's operation and costs were gained during the two months of production.
During the quarter, graphite sample preparation continued in support of sales and marketing efforts to potential and existing Valence Industries customers using existing stockpiled product at Uley.
As a result of the suspension of processing activities at Uley further redundancies took place on site and in corporate office in Adelaide, with only a core team of technical and marketing staff retained to ensure the processing plant is ready for a quick production restart once funding has been confirmed.
The immediate focus continues to be on rebuilding the capital of the Company and to re-establish it as a quality graphite producer.
PROCESSING IMPROVEMENTS
A limited Metallurgical test work program was carried onsite during the quarter.
The program primary aim was to identify, beyond the recognised grinding constraint, potential low cost process plant improvements, ideally utilising the original plant's equipment.
Results to date suggest further improvements in recovery and product grade could be achieved through the recommissioning of the existing Column Float Cell and Wet High Intensity Magnetic Separator.
A grinding test work program was also carried out onsite. The test work demonstrated the ability to produce 97 and 98% LOI in +35, +50, +150, +200 and +325 mesh sizes from existing low grade product using additional grinding and floatation stages. This is a significant technical achievement, with potential commercial implications.
The results from site test work will be used in scoping additional offsite metallurgical testing and flowsheet development.

Sales & Marketing
Valence Industries continues sales and marketing activities with ongoing qualifications of traditional flake graphite products in foils, lubricants, polymers, and agriculture under the brand names StratGraffTM and GraffPlusTM.
Domestic interest in Valence graphite products continues to grow with focus on polymers, lubricants, and agriculture markets including R&D activities in South and Western Australia.
Follow up qualifications of HEATPROTM Graphite products are planned with current refractory customers in response to changes in the global market and increases in the automotive industry.
These sales activities are intend to align with planned plant and process improvements to meet future sales agreements, new trial orders, and new customer interest both domestic and internationally.

EXPLORATION
During the reporting period, there were no exploration or production activities undertaken and no exploration or production is planned for the March 2016 quarter.
Expenditure on exploration activities amounted to \$1,000 and \$64,000 on development activities during the quarter.
| TENEMENT NUMBER | TENEMENT NAME | BENEFICIAL INTEREST1 |
CHANGES DURING THE QUARTER |
|---|---|---|---|
| ML 5561 | Uley Graphite Mining Licence 1 |
100% | No change |
| ML 5562 | Uley Graphite Mining Licence 2 |
100% | |
| RL 66 | Uley Graphite Retention Licence 1 |
100% | No change |
| RL 67 | Uley Graphite Retention Licence 2 |
No change | |
| EL 4778 | Uley South Exploration Licence |
100% | No change |
TENEMENT LISTING
1 Interests held as at the end of the quarter

Finance and Corporate
On the 16 October 2015 the company advised that Chris Darby resigned as Managing Director and CEO of Valence industries, effective 1 December 2015. The Company's Chief Operating Officer, Robert Mencel, was appointed Managing Director effective 1 December 2015.
On the 13 November 2015 the company requested a Trading Halt pending an announcement in relation to capital raising. The company subsequently sought voluntary suspension to allow it more time to finalise capital raising.
As at 31 December 2015, Valence Industries remains in suspension pending the outcome of its finance program to repay debt and fund its planned plant upgrade. A number of parties have been engaged in this process and their proposals are being assessed by the company. Valence Industries anticipates making further announcements with regard to its finance program during Q1 CY 2016.
During December the company negotiated a lower bond obligation under the approved PEPR for the Uley Graphite operation. This lower obligation reflects the Uley operations status moving to care and maintenance. As a result of the lower obligation, the company was able to reduce its restricted cash by \$629,000.
An updated PEPR is being prepared to reflect the care and maintenance status. Before operations can recommence, a further update to the PEPR will need to be submitted and approved prior to operations recommencing.
Capital Structure
Shares: 199,016,214 Listed options: 73,402,418 Unlisted options: 9,000,000
Board of Directors & Officers
Graham Spurling, AM Non-executive Chairman
Robert Mencel Managing Director
Glenister Lamont Non-executive Director
Ian Pattison Non-executive Director
Ian Schache Non-executive Director
Jaroslaw (Jarek) Kopias Company Secretary
For further information, please contact:
Robert Mencel Managing Director Valence Industries Jaroslaw (Jarek) Kopias Company Secretary Valence Industries
[email protected] +61 8 8418 8564
Media and Investor Relations
Rebecca Lawson, Media and Capital Partners p: +61 433 216 269 e: [email protected]
Q U A R T E R L Y R E P O R T – D E C E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m

Competent Persons Statement
Valence Industries confirms that it is not aware of any new information or data that materially affects the information included in this announcement and that all material assumptions and technical parameters underpinning the estimates in this announcement continue to apply and have not materially changed since the announcements previously released as "Valence Doubles Existing ROM Stockpiles" (6/8/14), "Uley Graphite Grade Increases to 11.7%" (17/11/14), "Maiden High Grade Graphite Ore Reserve" (17/12/2014) "VXL Feasibility Study Expansion and Adv Manufacturing" (2/1/15), "50% Increase in Uley Graphite Resource" (5/5/15), "Major Increase to Graphite Ore Reserve and Mine Life" (14/5/15) and "High Grade Graphite Mineralisation Continuity at Uley" (24/8/15).
Forward Looking Statements
All statements other than statements of historical fact included in this announcement including, without limitation, statements regarding future plans and objectives of Valence Industries Limited (Valence Industries) are forward-looking statements. When used in this announcement, forward-looking statements can be identified by words such as 'may', 'could', 'believes', 'estimates', 'targets', 'expects' or 'intends' and other similar words that involve risks and uncertainties. These statements are based on an assessment of present economic and operating conditions, and on a number of assumptions regarding future events and actions that, as at the date of this announcement, are expected to take place. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the company, its directors and management of Valence Industries, that could cause Valence Industries' actual results to differ materially from the results expressed or anticipated in these statements.
Valence Industries cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this announcement will actually occur and investors are cautioned not to place undue reliance on these forward-looking statements. Valence Industries does not undertake to update or revise forwardlooking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this announcement, except where required by applicable law.

6
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity
Valence Industries Limited
41 008 101 979 31 December 2015
ABN Quarter ended ("current quarter")
Consolidated statement of cash flows
| Current quarter | Year to date | ||
|---|---|---|---|
| Cash flows related to operating activities | \$A'000 | (6.months) | |
| \$A'000 | |||
| 1.1 | Receipts from product sales and related debtors | - | - |
| 1.2 | Payments for (a) exploration & evaluation |
(1) | (119) |
| (b) development | (64) | (1,008) | |
| (c) production | (672) | (2,277) | |
| (d) administration | (883) | (2,509) | |
| 1.3 | Dividends received | - | - |
| 1.4 | Interest and other items of a similar nature | 27 | 32 |
| received | |||
| 1.5 | Interest and other costs of finance paid | (18) | (21) |
| 1.6 | Income taxes paid | - | - |
| 1.7 | Other (provide details if material) | - | - |
| (1,611) | (5,902) | ||
| Net Operating Cash Flows | |||
| Cash flows related to investing activities | |||
| 1.8 | Payment for purchases of: | ||
| (a) prospects | - | - | |
| (b) equity investments | - | - | |
| (c) other fixed assets | - | (247) | |
| 1.9 | Proceeds from sale of: | ||
| (a) prospects | - | - | |
| (b) equity investments | - | - | |
| (c) other fixed assets | 45 | 45 | |
| 1.10 | Loans to other entities | - | - |
| 1.11 | Loans repaid by other entities | - | - |
| 1.12 | Other (provide details if material) | - | - |
| 45 | (202) | ||
| 1.13 | Net investing cash flows Total operating and investing cash flows (carried |
(1,566) | (6,104) |

| Appendix 5B | |
|---|---|
| Mining exploration entity and oil and gas exploration entity quarterly report |
| 1.13 | Total operating and investing cash flows (brought forward) |
(1,566) | (6,104) |
|---|---|---|---|
| Cash flows related to financing activities | |||
| 1.14 | Proceeds from issues of shares, options, etc. | - | - |
| Proceeds from subscriptions received | |||
| 1.15 | Proceeds from sale of forfeited shares | - | - |
| 1.16 | Proceeds from borrowings | 1,325 | 4,625 |
| 1.17 | Repayment of borrowings | (5) | (10) |
| 1.18 | Dividends paid | - | - |
| 1.19 | Other (share issue expenses) | (6) | (117) |
| Other (movement in restricted cash – bond) | 629 | 629 | |
| Net financing cash flows | 1,943 | 5,127 | |
| Net increase (decrease) in cash held | 377 | (977) | |
| 1.20 | Cash at beginning of quarter/year to date | 235 | 1,589 |
| 1.21 | Exchange rate adjustments to item 1.20 | - | - |
| 1.22 | Cash at end of quarter | 612 | 612 |
Note: Cash balance excludes \$1.709 million held against a bank guarantee for obligations under the approved PEPR for Uley Graphite operations which is treated as Restricted Cash in the Company's financial statements.
Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities
Current quarter
| \$A'000 | ||
|---|---|---|
| 1.23 | Aggregate amount of payments to the parties included in item 1.2 | 134 |
| 1.24 | Aggregate amount of loans to the parties included in item 1.10 | - |
1.25 Explanation necessary for an understanding of the transactions Directors' fees, superannuation and consulting fees paid to entities associated with Directors.
Non-cash financing and investing activities
2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
Nil
2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
Nil

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
| Amount available | Amount used | ||
|---|---|---|---|
| \$A'000 | \$A'000 | ||
| 3.1 | Loan facilities | 5,100 | 5,100 |
| 3.2 | Credit standby arrangements | - | - |
Estimated cash outflows for next quarter
| \$A'000 | ||
|---|---|---|
| 4.1 | Exploration and evaluation | - |
| 4.2 | Development | 1,000 |
| 4.3 | Production | 200 |
| 4.4 | Administration | 300 |
| Total | 1,500 |
Reconciliation of cash
| Reconciliation of cash at the end of the quarter (as shown in | Current quarter | Previous quarter | |
|---|---|---|---|
| the consolidated statement of cash flows) to the related | \$A'000 | \$A'000 | |
| items in the accounts is as follows. | |||
| 5.1 | Cash on hand and at bank | 612 | 235 |
| 5.2 | Deposits at call | - | - |
| 5.3 | Bank overdraft | - | - |
| 5.4 Other 30 to 90 day term deposits |
- | - | |
| Total: cash at end of quarter (item 1.22) | 612 | 235 |
Changes in interests in mining tenements and petroleum tenements
| Tenement reference and location |
Nature of interest (note (2)) |
Interest at beginning of quarter |
Interest at end of quarter |
||
|---|---|---|---|---|---|
| 6.1 | Interests in mining tenements and petroleum tenements relinquished, reduced or lapsed |
Not applicable | |||
| 6.2 | Interests in mining tenements and petroleum tenements acquired or increased |
Not applicable |

Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
| Total number | Number quoted | Issue price per security (see note 3) (cents) |
Amount paid up per security (see note 3) (cents) |
||
|---|---|---|---|---|---|
| 7.1 | Preference | ||||
| + securities |
|||||
| (description) | |||||
| 7.2 | Changes during | ||||
| quarter | |||||
| (a) Increases | |||||
| through issues | |||||
| (b) Decreases | |||||
| through returns | |||||
| of capital, buy | |||||
| backs, | |||||
| redemptions | |||||
| 7.3 | +Ordinary | 199,016,214 | 166,199,572 | ||
| securities | |||||
| VXL/VXLAI | |||||
| 7.4 | Changes during | ||||
| quarter | |||||
| (a) Increases | |||||
| through issues | |||||
| (b) Decreases | |||||
| through returns | |||||
| of capital, buy | |||||
| backs | |||||
| 7.5 | +Convertible | ||||
| debt securities | |||||
| (description) | |||||
| 7.6 | Changes during | ||||
| quarter | |||||
| (a) Increases | |||||
| through issues | |||||
| (b) Decreases | |||||
| through | |||||
| securities | |||||
| matured, | |||||
| converted |

| 7.7 | Options | Exercise price | Expiry date | ||
|---|---|---|---|---|---|
| (description and | |||||
| conversion | |||||
| factor) VXLO/VXLAK |
73,402,418 | 57,152,418 | 25.00 cents | 31 July 16 | |
| VXLAM | 3,500,000 | - | 25.00 cents | 31 July 16 | |
| (vested) | |||||
| VXLAP | 4,000,000 | - | 110.00 cents | 31 July 17 | |
| (unvested) | (KPI based) | ||||
| VXLAP | 1,500,000 | - | 110.00 cents | 31 July 17 | |
| (vested) | |||||
| 7.8 | Issued during | ||||
| quarter | |||||
| 7.9 | Exercised during | ||||
| quarter | |||||
| 7.10 | Expired during | ||||
| quarter | |||||
| 7.11 | Debentures | ||||
| (totals only) | |||||
| 7.12 | Unsecured | ||||
| notes (totals | |||||
| only) |

Compliance statement
- 1 This statement has been prepared under accounting policies, which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).
- 2 This statement does give a true and fair view of the matters disclosed.
Sign here: Date: 29 January 2016
Company secretary Print name: Jaroslaw (Jarek) Kopias
Notes
- 1 The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
- 2 The "Nature of interest" (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
- 3 Issued and quoted securities: The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities.
- 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
- 5 Accounting Standards: ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.