Valence Industries Quarterly Activity Report
==> picture [478 x 170] intentionally omitted <==
Valence Industries – Uley Graphite Phase I Plant Operations (2015)
Valence Industries is Australia’s only operating graphite company. Valence Industries currently mines and processes flake graphite products from its Uley Graphite facilities near Port Lincoln, South Australia for supply to customers globally.
Quarter Hi hli hts g g
Operations
-
Commissioning completed at Uley Graphite processing plant
-
Concentrate grades of up to 96% achieved on an intermittent basis
-
Completion of Tailings Storage Facility
-
Trucking commenced for transporting processed graphite above 92% from Uley operation to warehouse in Adelaide
-
Required process plant improvements identified
-
Additional grinding and screening capacity needed to maintain consistent level of higher grade product output
-
Modest capital expenditure estimate of $7m, subject to final design detail
-
Completion expected May 2016
-
Part revision of expansion strategy
-
Following installation of additional grinding and screen capacity, Uley processing plant capacity set to increase from current 14,000tpa to 21,000tpa by August 2016
==> picture [353 x 40] intentionally omitted <==
2
==> picture [47 x 49] intentionally omitted <==
Finance Facility
-
Completion of key technical due diligence for Initial Facility
-
Reduction of overall debt facilities from planned level of US$75m to US$40m
-
Draw down under Initial Facility will be up to US$20m
-
Bridging Facility increased to A$5m, with $4.5m currently drawn to meet current requirements
Graphite Sales
-
Binding three-year, multi-product graphite sales contract signed with new customer
-
Contract with Asia Pacific based customer provides for sales in excess of US$50m over next three years
Corporate
-
New Managing Director Robert Mencel appointed, effective 1 December 2015
-
Cost reduction program implemented
Current O erations p
PRODUCTION
During the reporting period, the Uley Graphite operation achieved plant capacity of 21 tonnes per hour (tph) feed-in rate, and production graphite grades of up to 96% LOI (loss on ignition) were reached, however continuous and consistent output over weekly operating periods are still required. During the quarter, approximately 250 tonnes of graphite concentrate was produced. Transportation of concentrate above 92% has commenced from the Uley site to the Company’s warehouse in Adelaide. Stock levels will continue to be progressively built up to match existing customer orders, with commercial export shipments to then follow.
Subsequent to the reporting period, the plant throughput rate at Uley has been reduced in the shortterm. The plant is currently generating approximately 2 tonnes per day (tpd) of 92%-96% LOI product. This product is being used to meet sales and marketing requirments and to build stocks for initial commercial sales.
PROCESSING IMPROVEMENTS
An assessment of the Uley production facility by independent engineers Orway Mineral Consultants and internal engineers has identified bottleneck issues preventing the continuous production of high-grade graphite concentrate. At nameplate capacity of 21tph, installed secondary grinding, screening and bagging capacity were found to be undersized. A remediation plan has been developed to remove the bottlenecks, which when completed, will increase production capacity to 21,000 tonnes per annum, ramping up from between April to August 2016.
In recognition of the temporarily reduced processing rate, the Company has delayed any further mining activities at Uley Pit 2 until Q1 CY2016.
COMPLETION OF TAILINGS STORAGE FACILITY
During the reporting period, the deposit of tailings from the graphite processing stage was transferred from the process water ponds to the completed tailings storage facility.
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
3
==> picture [47 x 49] intentionally omitted <==
==> picture [410 x 191] intentionally omitted <==
Uley Pit 2 – Mining Overburden Removal (2015)
EXPLORATION
During the reporting period, Valence Industries advised of further high-grade graphite drilling results from the targeted extensional drill campaign at the Uley Graphite operation.
The campaign is focused on the Uley Pit 2 area and was designed to confirm the dip and continuity of the Uley Graphite lodes. It will also provide data for a detailed mining schedule.
The latest assays confirm that near-surface mineralisation extends across the strike length of the resource area in a southerly direction and within the Exploration Target Area, and indicates a reduced volume of pre-stripping overburden removal prior to mining activities.
Notable near-surface intersections include:
| Hole_ID | Width (m) |
Graphitic Carbon Grade (gC%) |
From (m) |
To (m) |
|---|---|---|---|---|
| MD641 | 2.0 | 28.8% | 7.0 | 9.0 |
| MD642 | 5.4 | 13.0% | 11.8 | 17.2 |
| MD654 | 5.6 | 11.1% | 5.1 | 10.7 |
In addition, an initial review of current resource and reserves at Uley Pit 2 was completed during the reporting period and early analysis suggests the significant potential to generate lower cost, near surface reserves.
The review along with the latest assays will form part of an updated Uley Pit 2 mineral resource and reserve estimate, which, in line with recent updates to Valence’s activities schedule, is planned for release in Q1 CY2016.
Expenditure on exploration activities amounted to $118,000 and $944,000 on development activities during the quarter.
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
4
==> picture [47 x 49] intentionally omitted <==
TENEMENT LISTING
| TENEMENT NUMBER | TENEMENT NAME | BENEFICIAL INTEREST1 |
CHANGES DURING THE QUARTER |
|---|---|---|---|
| ML 5561 | Uley Graphite Mining Licence 1 |
100% | No change |
| ML 5562 | Uley Graphite Mining Licence 2 |
100% | No change |
| RL 66 | Uley Graphite Retention Licence 1 |
100% | No change |
| RL 67 | Uley Graphite Retention Licence 2 |
100% | No change |
| EL 4778 | Uley South Exploration Licence |
100% | No change |
1 Interests held as at the end of the quarter
Sales & Marketin g
==> picture [216 x 302] intentionally omitted <==
Valence Industries signed a binding three-year graphite sales contract with a new, Asia Pacificbased customer. The contract provides for sales in excess of US$50 million during the period, with benchmark pricing under the sales contract exceeding the Company’s weighted average price of US$1,335 per tonne and includes take or pay provisions.
The customer, which cannot be disclosed due to contract confidentiality clauses, will purchase graphite for use in a wide range of industries including aluminium, steel, metallurgical, chemical, refractory, construction and expandable graphite products.
Delivery of the graphite is timed to match production from Valence Industries’ existing Uley Graphite operation. First commercial sales are expected Q1 2016, once planned inventory build is complete.
Finance and Cor orate p
As a result of the lower capital expenditure required for the part expansion of production, Valence Industries advised of its intention to reduce its overall syndicated debt facilities from the previously planned level of US$75 million to no more than US$40 million. The draw down under the Initial Facility will be for an amount of up to US$20 million.
During the reporting period, key technical due diligence for the Initial Facility was completed. Discussions are ongoing regarding the completion of the remaining due diligence with no major issues arising. Valence Industries acknowledges that this process has taken longer than expected and the exclusivity period with the financier has lapsed. If talks with the debt provider are delayed further, the Company is considering alternate funding options to ensure development plans for the Uley operation are not further delayed.
The Company’s short-term financing requirements are currently being met through the secured bridging facility issued under the syndicated finance facilities. The bridging facility has been increased to A$5 million, with $A4.5m now drawn down by Valence Industries to meet current requirements.
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
5
==> picture [47 x 49] intentionally omitted <==
CAPITAL STRUCTURE
The Company carried out a renounceable rights issue of one new share for every six shares held at an issue price of $0.29 per share which raised $0.88m. During the quarter 167 listed options were exercised at $0.25.
Further, 2,062,500 shares were issued to Rio Tinto Exploration Pty Ltd with respect to concluding legacy royalties.
OVERHEAD COST REDUCTION PROGRAM
As part of remediation works to the Uley production facility, Valence Industries implemented an overhead cost reduction program during the quarter to reflect the lower throughput rate at the processing plant and to reduce site operating costs and cash outflows at both Uley and at the corporate office in Adelaide.
Under the program, the Company reduced workforce numbers by 60% and, together with corporate and plant operating efficiencies, the initiative is expected to deliver $265,000 monthly cost savings. Valence Industries has retained key staff required to operate the Uley production facility at the lower feed-in rate and will, in the short-term, implement new onsite organisational structure and manning levels.
The Company will further review the workforce structure as production ramps up to the increased capacity of 21,000tpa in 2016.
Capital Structure Board of Directors & Officers Shares: 199,016,214 Graham Spurling, AM Non-executive Chairman Listed options: 57,152,418 Christopher S. Darby Unlisted options: 25,250,000 Chief Executive Officer & MD Robert Mencel Deputy Managing Director Glenister Lamont Non-executive Director Ian Pattison Non-executive Director Ian Schache Non-executive Director Jaroslaw (Jarek) Kopias Company Secretary & CFO
Board of Directors & Officers
For further information, please contact:
Robert Mencel Jaroslaw (Jarek) Kopias Deputy Managing Director CFO & Company Secretary Valence Industries Valence Industries
[email protected] +61 8 8418 8564
Media and Investor Relations
Rebecca Lawson, Media and Capital Partners p: +61 433 216 269 e: [email protected]
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
6
==> picture [47 x 49] intentionally omitted <==
Competent Persons Statement
Valence Industries confirms that it is not aware of any new information or data that materially affects the information included in this announcement and that all material assumptions and technical parameters underpinning the estimates in this announcement continue to apply and have not materially changed since the announcements previously released as “Valence Doubles Existing ROM Stockpiles” (6/8/14), “Uley Graphite Grade Increases to 11.7%” (17/11/14), “Maiden High Grade Graphite Ore Reserve” (17/12/2014) “VXL Feasibility Study Expansion and Adv Manufacturing” (2/1/15), “50% Increase in Uley Graphite Resource” (5/5/15), “Major Increase to Graphite Ore Reserve and Mine Life” (14/5/15) and “High Grade Graphite Mineralisation Continuity at Uley” (24/8/15).
Forward Looking Statements
All statements other than statements of historical fact included in this announcement including, without limitation, statements regarding future plans and objectives of Valence Industries Limited (Valence Industries) are forward-looking statements. When used in this announcement, forward-looking statements can be identified by words such as ‘may’, ‘could’, ‘believes’, ‘estimates’, ‘targets’, ‘expects’ or ‘intends’ and other similar words that involve risks and uncertainties. These statements are based on an assessment of present economic and operating conditions, and on a number of assumptions regarding future events and actions that, as at the date of this announcement, are expected to take place. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the company, its directors and management of Valence Industries, that could cause Valence Industries’ actual results to differ materially from the results expressed or anticipated in these statements.
Valence Industries cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this announcement will actually occur and investors are cautioned not to place undue reliance on these forward-looking statements. Valence Industries does not undertake to update or revise forwardlooking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this announcement, except where required by applicable law.
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
7
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Rule 5.5
==> picture [47 x 49] intentionally omitted <==
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity
Valence Industries Limited
ABN Quarter ended (“current quarter”) 41 008 101 979 30 September 2015
Consolidated statement of cash flows
| Cash flows related to operating activities 1.1 Receipts from product sales and related debtors 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) administration 1.3 Dividends received 1.4 Interest and other items of a similar nature received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other (provide details if material) Net Operating Cash Flows |
Current quarter $A’000 |
Year to date (3.months) $A’000 |
|---|---|---|
| - (118) (944) (1,605) (1,626) - 5 (3) - - |
- (118) (944) (1,605) (1,626) - 5 (3) - - |
|
| (4,291) | (4,291) | |
| Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) Net investing cash flows 1.13 Total operating and investing cash flows (carried forward) |
- - (247) - - - - - - |
- - (247) - - - - - - |
| (247) | (247) | |
| (4,538) | (4,538) |
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
8
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
==> picture [47 x 49] intentionally omitted <==
| 1.13 Total operating and investing cash flows (brought forward) |
(4,538) | (4,538) |
|---|---|---|
| Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. Proceeds from subscriptions received 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (share issue expenses) Other (movement in restricted cash – bond) Net financing cash flows |
- - 3,300 (5) - (111) |
- - 3,300 (5) - (111) |
| 3,184 | 3,184 | |
| Net increase (decrease) in cash held 1.20 Cash at beginning of quarter/year to date 1.21 Exchange rate adjustments to item 1.20 1.22 Cash at end ofquarter |
(1,354) 1,589 - |
(1,354) 1,589 - |
| 235 | 235 |
Note: Cash balance excludes $1.709 million held against a bank guarantee for obligations under the approved PEPR for Uley Graphite operations which is treated as Restricted Cash in the Company’s financial statements.
Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities
| 1.23 1.24 |
Aggregate amount of payments to the parties included in item 1.2 Aggregate amount of loans to theparties included in item 1.10 |
Current quarter $A'000 |
|---|---|---|
| 157 | ||
| - | ||
| 1.25 | Explanation necessaryfor an understandingof the transactions | |
| Directors' fees,superannuation and consultingfeespaid to entities associated with Directors. |
Non-cash financing and investing activities
2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
Nil
- 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
Nil
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
9
==> picture [47 x 49] intentionally omitted <==
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
| Add notes as necessary for an understanding of the position. | ||
|---|---|---|
| 3.1 Loan facilities 3.2 Credit standby arrangements |
Amount available $A’000 |
Amount used $A’000 |
| 3,800 | 3,800 | |
| - | - |
Estimated cash outflows for next quarter
$A’000
| $A’000 | |
|---|---|
| 4.1 Exploration and evaluation 4.2 Development 4.3 Production 4.4 Administration |
20 |
| 4,500 | |
| 2,500 | |
| 1,200 | |
| Total | 8,220 |
Reconciliation of cash
| Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. |
Current quarter $A’000 |
Previous quarter $A’000 |
|---|---|---|
| 5.1 Cash on hand and at bank 5.2 Deposits at call 5.3 Bank overdraft 5.4 Other 30 to 90 dayterm deposits |
235 | 1,589 |
| - | - | |
| - | - | |
| - | - | |
| Total: cash at end ofquarter(item 1.22) | 235 | 1,589 |
Changes in interests in mining tenements and petroleum tenements
| 6.1 Interests in mining tenements and petroleum tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements and petroleum tenements acquired or increased |
Tenement reference and location |
Nature of interest (note (2)) |
Interest at beginning of quarter |
Interest at end of quarter |
|---|---|---|---|---|
| Not applicable | ||||
| Not applicable |
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
10
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
==> picture [48 x 49] intentionally omitted <==
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
| Total number | Number quoted | Issue price per security (see note 3) (cents) |
Amount paid up per security (see note 3) (cents) |
|
|---|---|---|---|---|
| 7.1 Preference +securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy- backs, redemptions |
||||
| 7.3 +Ordinary securities VXL/VXLAI 7.4 Changes during quarter (a) Increases through issues Rights Issue - Options exercised - Share based (b) Decreases through returns of capital, buy- backs |
199,016,214 | 166,199,572 | ||
| 3,032,270 167 2,062,500 |
3,032,270 167 2,062,500 |
29.00 cents 25.00 cents 20.00 cents |
29.00 cents 25.00 cents 20.00 cents |
|
| 7.5 +Convertible debt securities (description) 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted |
||||
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
11
==> picture [48 x 49] intentionally omitted <==
| 7.7 Options (description and conversion factor) VXLO/VXLAK VXLAM VXLAP VXLAP 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter |
73,402,418 3,500,000 (vested) 4,000,000 (unvested) 1,500,000 (vested) |
57,152,418 - - - |
Exercise price 25.00 cents 25.00 cents 110.00 cents 110.00 cents |
Expiry date 31 July 16 31 July 16 31 July 17 (KPI based) 31 July 17 |
|---|---|---|---|---|
| 1,516,193 | 1,516,193 | 25.00 cents | 31 July 16 | |
| 167 | 167 | 25.00 cents | 31 July 16 | |
| 7.11 Debentures (totals only) |
||||
| 7.12 Unsecured notes(totals only) |
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m
12
==> picture [48 x 49] intentionally omitted <==
Compliance statement
-
1 This statement has been prepared under accounting policies, which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).
-
2 This statement does give a true and fair view of the matters disclosed.
==> picture [135 x 41] intentionally omitted <==
Sign here: Date: 30 October 2015
Company secretary Print name: Jaroslaw (Jarek) Kopias
Notes
-
1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
-
2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
-
3 Issued and quoted securities: The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities.
-
4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
-
5 Accounting Standards: ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.
Q U A R T E R L Y R E P O R T – S E P T E M B E R 2 0 1 5 w w w . v a l e n c e i n d u s t r i e s . c o m