AI assistant
PRODIGY GOLD NL — Interim / Quarterly Report 2011
Oct 9, 2011
65615_rns_2011-10-09_36e7cb66-9304-43e6-b1e4-7ce7e5369e7c.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer

QUARTERLY REPORT
For the 3 Months Ended 30 September 2011
CORPORATE
- Strong Cash Position 30th September 2011 ~ $13.1 Million.
- Cornerstone Investment from Craton Capital LLC $8 Million.
BUSINESS – GOLD EXPLORATION AND DISCOVERY
- Twin Bonanza Gold Camp Discovery Success:
- Extensional Drilling Success at the 1.67Moz gold Buccaneer Porphyry Deposit.
- Caribbean Discovery Extended with 36 metres averaging 2.06g/t gold.
- New Discovery at Cypress Prospect with 26 metres averaging 5.53g/t gold including 7 metres averaging 20.13g/t gold.
- New Discovery at Empress Zone with 43 metres averaging 1.02g/t gold.
- Ultra-high grade drill intercepts at Old Pirate Northern Extensions including 9 metres averaging 100.9g/t gold including 2 metres averaging 413.5g/t gold.
- Bulk Trenching continues at Old Pirate with results pending.
• Regional Drilling Programs:
- Discovery confirmed at Kroda 3 Prospect at Barrow Creek with 29 metres averaging 6.38g/t gold.
- Drilling completed at various targets at Lake Mackay (pending assay).
- An additional 16,000 metres of drilling completed during the Quarter, awaiting assay, compilation and interpretation.
PROJECTS
ABM Resources NL ("ABM" or the "Company") is focussed on gold and gold-copper projects in the Northern Territory of Australia.
The Twin Bonanza Gold Camp with its multiple targets is showing considerable potential for both high-grade gold deposits and porphyry style (bulk tonnage) deposits. During the Quarter, drilling continued to test multiple targets at Twin Bonanza including extensions to the 1.67 million ounce maiden Inferred Resource at the Buccaneer Porphyry Gold Deposit.
ABM is the largest exploration license holder in the Tanami – Arunta regions of the Northern Territory. The Company firmly believes that the region is capable of further worldclass gold discoveries. ABM continues to prioritise its targets and a full target summary can be found in Appendix 1.

Figure 1. ABM Project Location Map in the Northern Territory.
Exploration Summary from September Quarter
During the Quarter, ABM:
-
- Received drill results extending the mineralised footprint of the Buccaneer Porphyry Gold Deposit.
-
- Extended the Caribbean Zone discovery located NW of the Buccaneer Porphyry Gold Deposit.
-
- Discovered a new high-grade gold zone at the Cypress Prospect located north of the Buccaneer Porphyry Gold Deposit.
-
- New discovery at the Empress Zone located southeast of the Buccaneer Porphyry.
-
- Extended the Old Pirate High Grade Zone with further high grade results, including 2 metres grading 413.5g/t gold.
-
- Confirmed a discovery at the Kroda Gold Project.

Figure 2. Location Map / Project Map of ABM's Projects.
Twin Bonanza Gold Camp
The Twin Bonanza Gold Camp contains more than thirty targets, including the Buccaneer Porphyry Gold Deposit and the Old Pirate Gold Prospect. Twin Bonanza is centred approximately 22 kilometres south of the Tanami Road and 14 kilometres east of the Western Australia – Northern Territory border. The Project spans the highly prospective "Trans Tanami Structure" – an inferred regional / tectonic geological feature which hosts numerous gold deposits including Newmont's multi-million ounce Callie Gold Mine.

Figure 3. Twin Bonanza Gold Camp - a cluster of >30 targets.
Buccaneer Porphyry Gold Prospect – Including 1.67Moz Gold Maiden Resource
The Twin Bonanza Gold Camp includes the 1.67Moz Gold Buccaneer Porphyry Deposit. The mineralisation extends from near surface to depths greater than 390 metres and is open in several directions. The current Inferred Resource estimate does not yet include any of the peripheral targets, such as the Old Pirate High Grade Prospect, Caribbean Zone, Empress Zone and Cypress Prospect. Details of the resource estimation are shown in Table 1 below (for full details refer to announcement 21st Feb 2011).
Table 1. Inferred Resource Tonnes / Grade Table at varying cut-offs (announced 21 February 2011).
| Cut-off Grade(g/t) | MillionTonnes(Mt) | Gold Grade(g/t) | Contained Gold(Million Ounces(Moz)) |
|---|---|---|---|
| 0.2 | 65.8 | 0.79 | 1.67 |
| 0.5 | 36.9 | 1.01 | 1.19 |
| 1.1 | 8.7 | 2.01 | 0.56 |
Note – Million Tonnes (MT) rounded to 3 significant figures; gold grade rounded to 2 significant figures and Million Ounces (Moz) rounded to 3 significant figures.
Extensions of the Buccaneer Porphyry Gold Deposit
During the Quarter ABM targeted extensions to the Buccaneer Porphyry Gold Deposit. New drill results announced include:
- Hole BCRC100002 (a follow up on a 2010 diamond hole at the Western Zone) intersected:
- o Visible coarse gold with 1 metre assaying 53.1g/t gold.
- o 427 metres averaging 0.52g/t gold (0.2g/t cut-off) including:
- 39 metres averaging 2.22g/t gold (0.5g/t cut-off)
- 32 metres averaging 1.44g/t gold (0.5g/t cut-off)
- 35 metres averaging 1.20g/t gold (0.5g/t cut-off).
- Hole BCRC100050 extended Buccaneer to the south east with:
- o 84 metres averaging 0.45g/t gold (0.2g/t cut-off) including:
- 25 metres averaging 0.93g/t gold (0.5g/t cut-off).
- o 181 metres averaging 0.44g/t gold (0.2g/t cut-off) including:
- 11 metres averaging 2.34g/t gold (0.5g/t cut-off).
- o 84 metres averaging 0.45g/t gold (0.2g/t cut-off) including:
- Hole BCRC100051 extended Buccaneer to the north east with:
- o 244 metres averaging 0.45g/t gold (0.2g/t cut-off) including:
- 28 metres averaging 0.86g/t gold (0.5g/t cut-off)
- 62 metres averaging 0.74g/t gold (0.5g/t cut-off)
- 30 metres averaging 0.77g/t gold (0.5g/t cut-off).
- o 244 metres averaging 0.45g/t gold (0.2g/t cut-off) including:
- Hole BCRC100047 targeted southern extensions of Buccaneer returning:
- o 251 metres averaging 0.33g/t gold (0.2g/t cut-off) including:
- 76 metres averaging 0.53g/t gold (0.5g/t cut-off).
- o 251 metres averaging 0.33g/t gold (0.2g/t cut-off) including:
- New zone on the eastern contact of the porphyry returned:
- o 104 metres averaging 0.39g/t gold (0.2g/t cut-off) including:
- 48 metres averaging 0.58g/t (0.5g/t cut-off).
- o 104 metres averaging 0.39g/t gold (0.2g/t cut-off) including:
The Buccaneer Porphyry Gold Deposit is hosted in a porphyritic syeno-monzonite (a rock similar to granite). Gold is hosted in quartz veins and fractures and is associated with other minerals such as pyrite, arsenopyrite and chalcopyrite. The higher grade zones are currently inferred to dip gently to the north-east and/or are steeper dipping north-south striking zones. Detailed geological work is still ongoing and this model may change.
The Buccaneer Porphyry is the only intrusive-hosted gold resource deposit identified to date in the Tanami region. Other deposits such as the Callie, Coyote and the Central Tanami mines are hosted primarily in quartz veins within metamorphosed sedimentary and mafic igneous rocks.
During the Quarter, ABM drilled several peripheral targets around Buccaneer which led to the extensions of the Caribbean Zone, discovery at the Empress Zone and discovery at the Cypress Prospect.

Figure 4. Plan view of the Buccaneer Porphyry Prospect showing drill hole locations and geology. Map includes inferred composite contours at various grade cut-offs from drilling projected from various levels to surface i.e. does not represent single level plan- slice. Refer to previous press releases for details of the various cut-offs and intercept calculations.
Extensions of the Caribbean Zone
ABM extended the Caribbean Zone of mineralisation located north-west of the Buccaneer Porphyry Gold Resource. This zone is thought to be a separate zone of mineralisation in a fault / shear zone along the western contact of the Buccaneer Porphyry body with the surrounding sedimentary rocks.
- Hole BCRC100054 at the Caribbean Zone extended the system 30 metres to the south with:
- o 47 metres averaging 1.67g/t gold (0.2g/t cut-off) including:
- 36 metres averaging 2.06g/t gold (0.5g/t cut-off) including:
- 11 metres averaging 3.16g/t gold (1.1g/t cut-off)
- 13 metres averaging 2.75g/t gold (1.1g/t cut-off).
- 36 metres averaging 2.06g/t gold (0.5g/t cut-off) including:
- o 47 metres averaging 1.67g/t gold (0.2g/t cut-off) including:
New Discovery at the Cypress Prospect
The Cypress Prospect covers the northern half of the Buccaneer Porphyry body. Drill results from the Cypress Prospect identified a new contact shear / vein related mineralised zone with:
- Hole CYRC100004 intersecting:
- o 26 metres averaging 5.53g/t gold (0.5g/t cut-off) including:
- 7 metres averaging 20.13g/t gold (1.1g/t cut-off).
- o 26 metres averaging 5.53g/t gold (0.5g/t cut-off) including:
The discovery in hole CYRC100004 is located 750 metres north along the contact from the Caribbean Zone.
Other results from the Cypress Prospect include porphyry-style mineralisation within the porphyry with:
- Hole CYRC100002 intersecting:
- o 40 metres averaging 0.83g/t gold (0.5g/t cut-off) including:
- o 2 metres averaging 10.68g/t (1.0g/t cut-off).

Figure 5. Caribbean to Cypress
New Discovery at the Empress Zone
During the Quarter ABM received assay results and announced a new sedimentary hosted oxide gold zone immediately east of the south-east contact of the Buccaneer Porphyry Body. Results from drilling include:
- Hole BCRC100049 intersecting:
- o 43 metres averaging 1.02g/t gold (0.5g/t cut-off) including:
- 26 metres averaging 1.43g/t gold (1.1g/t cut-off)
- 10 metres averaging 2.64g/t gold (2.0g/t cut-off).
- o 43 metres averaging 1.02g/t gold (0.5g/t cut-off) including:

Figure 6. Cross Section of drill hole BCRC100049 at the Empress Zone.
Old Pirate Gold Prospect (High Grade)
The Old Pirate High Grade Gold Prospect is a 3 kilometre long gold anomaly located approximately 1,800 metres from the Buccaneer Porphyry Gold Prospect.
Old Pirate consists of outcropping gold bearing quartz veins hosted by sediments. More than 15 individual veins have been mapped covering an overall area of 600 metres by 250 metres and range from 30cm to several metres in width. Drill results indicate gold extends from surface to at least 200 metres depth. Gold is very coarse and can be extremely high grade in the veins as indicated by some rock chip samples grading greater than 2000g/t gold (refer release 8 July 2010).
During the Quarter ABM received results for the northern extensions including:
- Hole OPRC100021 intersecting (refer to release dated 7th September 2011 for further details):
- o 9 metres averaging 100.9g/t gold (1.0g/t cut-off) including:
- 2 metres averaging 413.5g/t gold.
- o 5 metres averaging 13.34g/t gold (0.3g/t cut-off) including:
- 3 metres averaging 21.85g/t gold (1.0g/t cut-off).
- o 9 metres averaging 100.9g/t gold (1.0g/t cut-off) including:

Figure 7. High grade gold panned from split RC drill sample from hole OPRC100021
During the Quarter, ABM continued the bulk-trenching program of the Old Pirate surface vein system with results expected shortly.

Figure 8. Map of the Old Pirate system with significant intercepts labelled.
Twin Bonanza Gold Camp – Additional Targets
In addition to the Buccaneer Porphyry Gold Deposit, the Old Pirate High Grade Gold Prospect, the new Caribbean and Empress Zones and the Cypress Prospect, ABM has identified and prioritised a further 28 regional targets on the western and eastern side of the 40km x 40km Twin Bonanza Gold Camp. ABM has drilled several of these targets and intersected low-grade mineralisation warranting follow up work, with further assays pending.
Barrow Creek Regional Project
Kroda Gold Project
The Kroda Gold Project is located 18 kilometres west of the Stuart Highway, 30 kilometres north from the town of Barrow Creek and 200 kilometres south of Tennant Creek. The project consists of 4 individual prospects (Kroda 1 to 4) with a combined anomalous gold strike length of 14 kilometres. The principal target commodity is gold, however, Kroda 2 in particular has anomalous copper associated with the gold. The Project is well serviced with infrastructure and is located on pastoral land close to the Stuart Highway, the Ghan Rail Line and the Northern Territory Gas Pipeline.

Figure 9. Location of the Barrow Creek Regional Project and Kroda Gold Project.
Mineralisation at Kroda is hosted in inter-layered dolerite and schist and associated with quartz veins. Mineralised shoots are steeply plunging with Kroda 3 plunging approximately 50 to 70 degrees to the south east within an overall WNW-ESE striking structure.
ABM intends to follow up work in the area with a possible initial resource estimation at Kroda 3 and a search for other high grade mineralised shoots similar to Kroda 3 in order to form a camp of discoveries for a potential future mining operation.
The Kroda Gold Project is located within the Company's Barrow Creek Regional Project area. The Barrow Creek Regional Project consists of a 160 kilometre long geophysical gravity trend with associated metamorphosed sedimentary rocks, dolerite intrusions and large granite intrusions. The region has several known mineral occurrences including gold, copper, nickel, zinc, tin and tantalum.
During the Quarter ABM received assay results from Kroda including:
- KRRC100013 at Kroda 3 target with:
- o 57 metres averaging 3.83g/t gold (0.2g/t cut-off) including:
- 29 metres averaging 6.38g/t gold (0.5g/t cut-off) or
- 12 metres averaging 15.69g/t gold (1.0g/t cut-off).
- 29 metres averaging 6.38g/t gold (0.5g/t cut-off) or
- o 57 metres averaging 3.83g/t gold (0.2g/t cut-off) including:
- KRRC100014 at Kroda 3 target with:
- o 10 metres averaging 4.97g/t gold (0.2g/t cut-off) including:
- 6 metres averaging 8.09g/t gold (0.5g/t cut-off).
- o 91 metres averaging 1.44g/t gold (0.2g/t cut-off) including:
- 33 metres averaging 3.22g/t gold (0.5g/t cut-off)
- 24 metres averaging 4.28g/t gold (1.0g/t cut-off).
- o 10 metres averaging 4.97g/t gold (0.2g/t cut-off) including:

Figure 10. Kroda 3 cross-section (South-North) at 382625mE. Cross-section includes schematic contours of grade at 0.2g/t and 0.5g/t gold cut-off. Only ABM results labelled with intercepts. Refer to previous releases for historic results.
Priorities going forward include:
2011 Priority Discovery Stage Projects:
- Twin Bonanza Gold Camp :
- o Buccaneer Porphyry Gold Prospect further define extensions.
- o Follow up drilling on the Caribbean Zone discovery.
- o Follow up drilling on the Empress Zone discovery.
- o Follow up drilling on the Cypress Prospect discovery.
- o Old Pirate High Grade Gold Prospect extensional drilling and bulk trenching.
- o Continued mapping, sampling and testing of other regional targets.
- o Receive, compile and interpret >12,000 metres of drilling completed pending assay for targeting further extensions into 2012.
- o Planned resource upgrade work incorporating new gold discoveries and expanding Buccaneer Resource; planned for completion during Quarter 1, 2012.
2011 Other Planned Activities:
- Lake Mackay Gold-Copper Projects:
- o Phase 1 Drilling is complete at Tekapo, Manapouri and Te Anau with > 4,000 metres of assays pending.
- Kroda Gold Project:
- o Analysis of drill results and 3D targeting for possible initial resource estimation work.
- Hyperion Gold Project:
- o Follow up targeting / testing and possible initial resource estimation work.
- Regional Reconnaissance:
- o Mapping at the Northern Tanami targets including Soldier and Bogardus targets.
NON CORE ASSETS
ABM continues to look at divestment options for its non-core assets.
Discussions on the divestment are ongoing with several parties on the Erayinia volcanogenic massive sulphide target in Western Australia and the Mimosa Gold Project in Mozambique.
TENEMENT PORTFOLIO
ABM has 37 granted licenses and 79 exploration license applications in the Northern Territory totalling more than 30,000 square kilometres. ABM has developed a strong working relationship with the Central Land Council, the Traditional Owners and the Northern Territory Department of Resources, and anticipates the granting of several regional exploration project areas in the coming months.
CORPORATE
Cornerstone Investor
During the Quarter ABM welcomed Craton Capital LLC as a cornerstone investor with an un-brokered private placement of 177,777,778 shares at a price of $0.045 per share for gross-proceeds of $8M.
Cash Position
ABM remains in a strong cash position with $13.1M available at the end of the Quarter. Monthly expenditure, including multi-rig exploration, is currently approximately $1M to $1.2M, reducing significantly during the summer wet season (December to February).
Board Matters
During the Quarter Mr Imants Kins stepped down from his role as Executive Director and became a Non-Executive Director.
Managing Director Darren Holden purchased 714,285 shares in ABM on market for a total value of $30,000, bringing his and his related parties total holding to 20,880,952 shares.
Yours faithfully
DARREN HOLDEN Managing Director
Competent Persons Statement
The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Darren Holden who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Holden is a full time employee of ABM Resources NL and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves". Mr Holden consents to the inclusion in the documents of the matters based on this information in the form and context in which it appears.
For Further Information Please Contact
| Jutta Zimmermann | Darren Holden | Berdine Mastaglia |
|---|---|---|
| CFO / Company Secretary | Managing Director | Investor Relations Manager |
| +61 8 9423 9777 | +61 8 9423 9777 | +61 8 9423 9777 |
ASX ANNOUNCEMENTS
During the Quarter the following ASX announcements were released regarding the Company's activities and projects:
| 28/09/2011 | Broadcast - ABM Resources Confirms Gold Discovery at Kroda |
|---|---|
| 27/09/2011 | Drilling at Kroda Confirms Second Discovery Camp in the NT |
| 19/09/2011 | Annual Report Year Ended 30 June 2011 |
| 14/09/2011 | Updated Corporate Presentation |
| 13/09/2011 | Broadcast - ABM Announce New Gold Discovery at Cypress |
| 12/09/2011 | New Discovery at Cypress Prospect with 26m @ 5.53g/t Gold |
| 09/09/2011 | Change of Director Role |
| 07/09/2011 | Old Pirate Northern Extensions Further High Grade Results |
| 02/09/2011 | Broadcast - ABM Gold Assays over 400 Grams per Tonne |
| 31/08/2011 | Old Pirate Northern Extensions High Grade Drill Results |
| 31/08/2011 | Trading Halt |
| 24/08/2011 | Drilling Commences at Lake Mackay Copper-Gold Targets |
| 17/08/2011 | Caribbean Zone and Buccaneer Deposit Significantly Extended |
| 10/08/2011 | Updated Investor Presentation |
| 09/08/2011 | Broadcast Spectacular Gold at Old Pirate Northern Extensions |
| 08/08/2011 | Spectacular Gold at Old Pirate Northern Extensions |
| 02/08/2011 | Diggers and Dealers Presentation |
| 01/08/2011 | Further Extensional Buccaneer Drill Results |
| 28/07/2011 | Form 604 from TAM |
| 26/07/2011 | Notice of Initial Substantial Holder |
| 22/07/2011 | Cornerstone Investment Complete Section708ANotice and App3B |
| 21/07/2011 | Change of Director`s Interest Notice |
| 18/07/2011 | Further Extensions at Buccaneer and New Porphyry Discovery |
| 12/07/2011 | ABM Welcomes New Cornerstone Investor |
| 07/07/2011 | Quarterly Activities and Cashflow Report |
| 04/07/2011 | New Sedimentary Hosted Oxide Gold Discovery at Twin Bonanza |
Appendix 1. ABM Asset Summary. Note – readers are referred back to previous announcements for full reporting of exploration results on a particular prospect or project.
Discovery Stage Projects – Several mineralised intercepts confirmed continuous over strike length with at least one sub-project pending drill to define extents or resource.
| Sub-Project | Target Style | Infrastructure /Access | Extents | Best Intersections /Potential | 2010/2011Proposed andCompletedActivity | Refer ASXAnnouncement Date ForFurther Details | |||
|---|---|---|---|---|---|---|---|---|---|
| Twin Bonanza Gold Camp Project | |||||||||
| Buccaneer | Porphyry relatedgold. | 22km south ofTanami Road. Allweather tracks.60km fromCoyote Mill. | 3km by1.5kmextents. | 1.67Moz MaidenResource. | Test extensionsextensional areaswith view toresource updateQ4 2011 / Q12012 | 01/02/2010 ,03/03/2010,15/06/201019/08/2010,31/08/2010,13/09/2010,22/09/2010,18/10/2010,13/12/2010,13/01/2011,21/02/2011,22/02/2011,28/02/2011,22/03/2011,27/04/2011,09/05/2011,09/06/2011,16/06/2011,04/07/2011,18/07/2011,01/08/2011 &17/08/2011 | |||
| Old Pirate | High gradesedimentaryhosted veins. | 25km south ofTanami Road. Allweather tracks.60km fromCoyote Mill. | Extendableover 3km ofanomalieslargelyuntested tothe North andSouth ofCentral OldPirate area. | 43m @ 7.0g/t goldincl 17m @ 16.72g/tgold.9m @ 100.9g/t goldincluding 2m @413.5g/t gold.5 metres grading274g/t gold including1m 1360g/t gold.Surfacereconnaissance withrock-chip samples>2000g/t Au.Metallurgical testreveals high qualityore with 99.5%Recovery. | 2011 – furtherdrilling and bulktrenching Q3,2011. | 02/02/2010,03/03/2010,15/06/2010,08/07/2010,12/07/2010,27/07/2010,31/08/2010,15/11/2010,04/04/2011,08/08/2011,31/08/2011 &07/09/2011 | |||
| CaribbeanZone | High grade faultzone inporphyry. | 22km south ofTanami Road. | 120m to250m longfault / veinzone. | 36m @ 2.06g/t goldinc 11m @ 3.16g/tgold & 13m @2.75g/t gold historicresults including 2m@ 67.44g/t gold. | Further drilling toresourceestimation. | 16/06/2011 &17/08/2011 | |||
| Empress Zone | Oxide gold zonehosted by veinsin sedimentaryrocks. | 22km south ofTanami Road. | Not yetdefined. | 43m @ 1.02g/t goldincluding 26m at1.43g/t gold including10m at 2.64g/t gold. | Further drilling. | 04/07/2011 |
| Sub-Project | Target Style | Infrastructure /Access | Extents | Best Intersections /Potential | 2010/2011Proposed andCompletedActivity | Refer ASXAnnouncement Date ForFurther Details |
|---|---|---|---|---|---|---|
| CypressProspect | Shear / veinrelatedmineralisedzone. | 22km south ofTanami Road. | Not yetdefined. | 26m @ 5.53g/t goldincluding 7m @20.13g/t gold.40m @0.83g/t goldincluding 2m @10.68 g/t gold. | Further drilling. | 12/09/2011 |
| Twin BonanzaGold CampCompanionProjects –Marauder,Casa Anomaly19, Mavericks | Various. | 18 to 25km southof Tanami Road.18 to 45km fromCoyote Mill. | Combinedanomalismover 8 sq km.Largelyuntested bydrilling. | Total of 30 targets atthe Twin BonanzaGold Camp includingOld Pirate andBuccaneer. | Multiple targetstested pendingresults. | 03/03/2010,31/01/2011,03/02/2011 &18/04/2011 |
Northern Tanami Gold Project
| HyperionCentral | High gradesedimentaryhosted veins. | 18km NNE ofGroundrushMine. Allweather roads. | 500m x 100mdrilled zone inoverall 2km ofanomalies.Open atdepth (drilledto 60 to 100mso far). | 60m @ 2.57g/t Auending inmineralisation inc.21m @ 4.57g/t Auending inmineralisation.8m @ 2.86g/t Au5m @ 3.65g/t Au7m @ 2.26 g/t Au. | Phase 1 drilled 8holes to depths of390m, drilling atotal of 1,278m.Review andfurtherextensionaltesting ahead ofpossible resourceestimation 2011. | 09/03/2010 ,04/11/2010 &11/01/2011 |
|---|---|---|---|---|---|---|
| Hyperion South | High gradesedimentaryhosted veins. | 18km NNE ofGroundrushMine. Allweather roads. | 120m strikelength open. | 28m @ 5.07g/t Auinc. 13m @ 10.41g/tAu.[email protected]/t Au inc.11m @ 4.29g/t Au. | Phase 1 drilled 5holes to depths of222m, drilling atotal of 900m.Review andfurtherextensionaltesting ahead ofpossible resourceestimation. | 09/03/2010,04/11/2010 &11/01/2011 |
| HyperionJasper Hill | High gradesedimentaryhosted veins. | 18km NNE ofGroundrushMine. Allweather roads. | 120m strikelength open. | 25m @ 1.05g/t Auinc. 16m @ 1.30g/tAu. | Reconnaissance. | 09/03/2010 &04/11/2010 |
| HyperionCompanionProjects – HypWest; Grange,Brokenwood,Old Soldier | High gradesedimentaryhosted veins. | 18km NNE ofGroundrushMine. Allweather roads. | Multipletargets >6 sqkm ofanomalism. | 3m @ 8.53g/t Au,3m @ 6.42g/t Au. | Reconnaissanceand if successfultest multipletargets. | 09/03/2010 &11/01/2011 |
Kroda Gold Project
| Kroda 3High grade18km from540m by57m @ 3.83g/t goldReview currentsedimentaryStuart Highway300mincluding 29m @discovery tohosted veins.(near Barrowanomalous6.83g/t goldfollow up.Creek).zone definedincluding 12m @by shallow15.69g/t gold.drilling.91m @ 1.44g/t goldincluding 33m @3.22g/t gold. | 16/03/2010,17/03/2010,20/06/2011 &27/09/2011 |
|---|---|
| ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | ---------------------------------------------------------- |
| Sub-Project | Target Style | Infrastructure /Access | Extents | Best Intersections /Potential | 2010/2011Proposed andCompletedActivity | Refer ASXAnnouncement Date ForFurther Details |
|---|---|---|---|---|---|---|
| KrodaCompanionProjects 1, 2, 4 | High gradesedimentaryhosted veins. | 18km fromStuart Highway(near BarrowCreek). | More than14km ofcombinedstrike lengthof anomalismdefined withshallowdrilling /reconnaissance. | 9m @ 2.39g/t Au,6m @ 3.32g/t Au. | Drilling completepending results. | 16/03/2010,17/03/2010 &20/06/2011 |
| Stafford Gold Zone | ||||||
| Sabre | High gradesedimentaryhosted veins. | 200km NW ofAlice Springs,70km fromTanami Roadvia tracks fromYuendumu. | 600m by240m drilledzone. | 35m @ 2.02g/t Auincluding 17 m @3.93g/t Au including2m @ 18.15g/t Au. | Deep drill testcompleted Q2,2010. | 18/01/2010,24/05/2010,15/06/2010 &07/07/2010 |
| Falchion | High gradesediment hostedveins. | 200km NW ofAlice Springs,70km fromTanami Roadvia tracks fromYuendumu. | 400m x 270mdrilled zone. | 29m @ 2.32g/t Au,inc 12m @ 3.76g/tAu.32m @ 1.84g/t Au,inc 16m @ 3.67g/tAu. | Deep drill testcompleted Q2,2010. | 18/01/2010 &07/07/2010 |
| Stafford GoldZoneCompanionProjects –Yataghan,YataghanSouth, Assegai,Claymore | High gradesediment hostedveins. | 200km NW ofAlice Springs,70km fromTanami Roadvia tracks fromYuendumu. | 20 kilometresof anomalousstrike lengthof theStafford GoldZone.Companionprojectswidelyspaced /shallowdrilling. | Up to 2m @ 4.1g/tAu in shallow drilling. | Tested Yataghanand Assegai withno significantintercepts. | 18/01/2010 &07/07/2010 |
| RewardPolymetallicCompanionProject | Breccia hostedCu-Ag-Pb-Au. | 200km NW ofAlice Springs,70km fromTanami Roadvia tracks fromYuendumu. | 250m x 100moutcrop ofrock chips. | Rock-chips returnedup to 20.3% copperand 271g/t silver. | Reconnaissancereturned highgrade coppersilver in Q2 2010. | 18/01/2010 &13/05/2010 |
Emergent Projects – Large Scale Anomalies in New Districts Pending Drilling
| Sub-Project | Target Style | Infrastructure /Access | Extents | Best Intersections /Potential | 2010/2011Proposed andCompletedActivity | Refer ASXAnnouncement Date ForFurther Details | ||
|---|---|---|---|---|---|---|---|---|
| Lake Mackay Projects | ||||||||
| Tekapo | IronOxideCopper-Gold(Tennant Creek /Ernest HenryStyle). | 400km east ofAlice Springs,60km fromNyrripi. | 1.2km by600mgeochemanomaly CuAu-Ag-Bi-MoSb. | 16m @ 3.4g/t Auand 4m @ 2.67%Cu. No drilling inbedrock (surfaceregolith zone). | Drilling complete,pending assay. | 07/01/2010 &24/08/2011 |
| Sub-Project | Target Style | Infrastructure /Access | Extents | Best Intersections /Potential | 2010/2011Proposed andCompletedActivity | Refer ASXAnnouncement Date ForFurther Details |
|---|---|---|---|---|---|---|
| Dodger | Shear hostedgold + intrusionrelated basemetals. | 400km east ofAlice Springs,68km fromNyrripi. | Regolith(RAB)anomaly2.5km long. | 4m @ 3.56g/t Au.Untested in freshrock. Several parallelsystems. Majorunderlying intrusionas the potentialsource. | Pending permit. | 07/01/2010 |
| Taupo | IronOxideCopper-Gold(Tennant Creek /Ernest HenryStyle). | 400km east ofAlice Springs,99km fromNyrripi. | Regolith(RAB)anomaly 8kmby 1km CuAu-Pb-Zn-Bi. | No test of fresh rock.All regolith drilling indepleted horizon. | Pending access. | 07/01/2010 |
| Lake MackayCompanionProjects –Wakatipu,Manapouri, TeAnau | IOCG, Shearhosted gold,intrusive relatedgold. | 400km east ofAlice Springs. | Regolith(RAB &Vacuum)anomaliesover variableextents. | Large low levelanomalies. | Drilling at TeAnau andManapouricomplete,pending assay. | 07/01/2010 &24/08/2011 |
Tanami / Arunta Region Emergent Regional Projects
| NorthernTanami- Soldier/ Birrindudu | Sedimentaryhosted veins. | ~80km north ofTanami /GroundrushMines. | ExtensiveGeochemistryand magneticanomaliesover 8 sqkm. | No test of fresh rock. | Reconnaissanceand possible testQ3/Q4, 2011. | 23/11/2009 |
|---|---|---|---|---|---|---|
| North Arunta | Porphyry relatedgold andsedimentaryhosted veindeposits. | 70km north ofYuendumu. | UnprospectedELAsspanning theprolific TransTanamiGeologicalStructure. | No work to date.Regional structuraltargets. | Conversion ofELA to ELssubject toTraditional Ownerapprovalsreconnaissance. | 23/11/2009 |
| Lake Mackay | IronOxideCopper-Gold,High Grade Vein. | 450km east ofAlice Springs,100km fromNyrripi. | UnprospectedELAsspanningmajorstructures. | No work to date.Regional structuraltargets. RemoteAustralia. | Conversion ofELA to ELssubject toTraditional OwnerApprovalsReconnaissance. | 23/11/2009 |
Appendix 5B
Mining exploration entity quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10.
Name of entity
ABM RESOURCES NL
A.C.N. 009 127 020 30 September 2011
ABN Quarter ended ("current quarter")
Consolidated statement of cash flows
| Current quarter | Year to date | |||
|---|---|---|---|---|
| Cash flows related to operating activities | (3 months) | |||
| $A'000 | $A'000 | |||
| 1.1 | Receipts from product sales and related debtors - | |||
| 1.2 | Payments for(a) exploration & evaluation | (3,162) | (3,162) | |
| (b) development (business) | (65) | (65) | ||
| (c) production | ||||
| (d) administration | (324) | (324) | ||
| 1.3 | Dividends received | |||
| 1.4 | Interest and other items of a similar nature received | 227 | 227 | |
| 1.5 | Interest and other costs of finance paid | |||
| 1.6 | Income taxes paid | |||
| 1.7 | Other (provide details if material) | |||
| Net Operating Cash Flows | (3,324) | (3,324) | ||
| Cash flows related to investing activities | ||||
| 1.8 | Payment for purchases of: | (a) prospects | - | - |
| (b) equity investments | ||||
| (c) other fixed assets | (213) | (213) | ||
| 1.9 | Proceeds from sale of: | (a) prospects | - | - |
| (b) equity investments | ||||
| (c) other fixed assets | ||||
| 1.10 | Loans to other entities | |||
| 1.11 | Loans repaid by other entities | |||
| 1.12 | Other (provide details if material) | |||
| Net investing cash flows | (213) | (213) | ||
| 1.13 | forward) | Total operating and investing cash flows (carried | (3,537) | (3,537) |
- See chapter 19 for defined terms.
| Current quarter | Year to date | ||
|---|---|---|---|
| (3 months) | |||
| $A'000 | $A'000 | ||
| 1.13 | Total operating and investing cash flows (broughtforward) | (3,537) | (3,537) |
| Cash flows related to financing activities | |||
| 1.14 | Proceeds from issues of shares, options, etc. | 7,905 | 7,905 |
| 1.15 | Proceeds from sale of forfeited shares | - | - |
| 1.16 | Proceeds from borrowings/environmental bonds | - | - |
| 1.17 | Repayment of borrowings | ||
| 1.18 | Dividends paid | ||
| 1.19 | Other (provide details if material) | ||
| Net financing cash flows | 7,905 | 7,905 | |
| Net increase (decrease) in cash held | 4,368 | 4,368 | |
| 1.20 | Cash at beginning of quarter/year to date | 8,744 | 8,744 |
| 1.21 | Exchange rate adjustments to item 1.20 | ||
| 1.22 | Cash at end of quarter | 13,112 | 13,112 |
Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities
- 1.23 Aggregate amount of payments to the parties included in item 1.2 126
- 1.24 Aggregate amount of loans to the parties included in item 1.10
- 1.25 Explanation necessary for an understanding of the transactions
Non-cash financing and investing activities
- 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
- 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
| Current quarter |
|---|
| $A'000 |
Financing facilities available
Add notes as necessary for an understanding of the position.
| Amount available$A'000 | Amount used$A'000 | ||
|---|---|---|---|
| 3.1 | Loan facilities | ||
| 3.2 | Credit standby arrangements |
Estimated cash outflows for next quarter
| $A'000 | ||
|---|---|---|
| 4.1 | Exploration and evaluation | 2,800 |
| 4.2 | Development | 80 |
| 4.3 | Production | |
| 4.4 | Administration | 450 |
| Total | 3,330 |
Reconciliation of cash
| accounts is as follows. | Reconciliation of cash at the end of the quarter (as shown in theconsolidated statement of cash flows) to the related items in the | Current quarter$A'000 | Previous quarter$A'000 |
|---|---|---|---|
| 5.1Cash on hand and at bank | 811 | 646 | |
| 5.2 | Deposits at call | 12,300 | 8,098 |
| 5.3 | Bank overdraft | ||
| 5.4Other (provide details)Funds held in trust until shares will be issued | |||
| Total: cash at end of quarter (item 1.22) | 13,111 | 8,744 |
Changes in interests in mining tenements
| Tenement reference | Nature of interest(note (2)) | Interest atbeginningof quarter | Interest atend ofquarter | ||
|---|---|---|---|---|---|
| 6.1 | Interests in miningtenements relinquished,reduced or lapsed | Refer attached | |||
| 6.2 | Interests in miningtenements acquired orincreased | Refer attached |
- See chapter 19 for defined terms.
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
| Total number | Number quoted | Issue price persecurity (seenote 3) (cents) | Amount paidup per security(see note 3)(cents) | ||
|---|---|---|---|---|---|
| 7.1 | +securitiesPreference(description) | ||||
| 7.2 | Changes during quarter(a) Increases through issues(b) Decreases throughreturns of capital, buybacks, redemptions | ||||
| 7.3 | +Ordinary securities | 2,667,749,631 | 2,667,749,631 | ||
| 7.4 | Changes during quarter(a)Increases through issues | 177,777,778 | 177,777,778 | 0.045 | 0.045 |
| (b) Decreases throughreturns of capital, buy-backs | |||||
| 7.5 | +Convertible debtsecurities (description) | ||||
| 7.6 | Changes during quarter(a) Increases through issues(b) Decreases throughsecurities matured,converted | ||||
| 7.7 | Options (description andconversion factor) * | 580,500,000 | Exercise PriceVarious | Expiry dateVarious | |
| 7.8 | Issued during quarter | ||||
| 7.9 | Exercised during quarter | ||||
| 7.10 | Expired during quarter | ||||
| 7.11 | Debentures(totals only) | ||||
| 7.12 | Unsecured notes (totalsonly) |
* On exercise of these options up to a further 166,500,000 options will be issued ($0.015 @ 5 years from issue date).
Compliance statement
-
- This statement has been prepared under accounting policies, which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).
-
- This statement does give a true and fair view of the matters disclosed.
(Company Secretary)
Sign here: ............................................................ Date: 10 October 2011
Print name: Jutta Zimmermann
Notes
-
- The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
-
- The "Nature of interest" (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
-
- Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities*.*
-
- The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.
-
- Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.
SUMMARY OF MINING TENEMENTS AND AREAS OF INTEREST
| FOR THE QUARTER ENDED 30 September2011 | |||||
|---|---|---|---|---|---|
| Areas of interest | Tenements | EconomicEntity's Interest | Notes | ||
| * Northern TerritoryTANAMI | |||||
| Birrindudu | EL23523 | 100 | application | ||
| EL27705 | 100 | granted | |||
| EL28560 | 100 | application | |||
| EL28566 | 100 | application | |||
| EL5888 | 100 | granted | |||
| EL5889 | 100 | granted | |||
| EL8809 | 100 | granted | |||
| SEL28326 | 100 | application covers ELs 5888 and 8809 | |||
| Supplejack | EL26623 | 100 | application | ||
| EL27566 | 100 | granted | |||
| EL27570 | 100 | application | |||
| EL27812 | 100 | granted | |||
| EL27979 | 100 | application | |||
| EL27980 | 100 | application | |||
| EL9250 | 100 | granted | |||
| Matrix | EL26609 | 100 | revised application | ||
| SEL28333 | 100 | application covers ELs 8845 and 9474 | |||
| Cervantes | EL26619 | 100 | application | ||
| EL27125 | 100 | application | |||
| EL27126 | 100 | application | |||
| Bonanza | EL22178 | 100 | granted | ||
| EL22228 | 100 | granted | |||
| EL22848 | 100 | granted | |||
| EL22850 | 100 | granted | |||
| EL23208 | 100 | granted | |||
| EL24436 | 100 | granted | |||
| EL24437 | 100 | granted | |||
| EL25194 | 100 | application | |||
| EL25844 | 100 | application | |||
| EL26610 | 100 | application | |||
| EL26616 | 100 | revised application | |||
| EL27124 | 100 | revised application | |||
| EL27127 | 100 | revised application | |||
| EL27339 | 100 | application | |||
| EL27378 | 100 | application | |||
| EL27813 | 100 | application | |||
| EL28394 | 100 | application | |||
| EL8602 | 100 | granted | |||
| EL8825 | 100 | granted | |||
| SEL23659 | 100 | granted | |||
| SEL23661 | 100 | granted | |||
| SEL28322 | 100 | application covers western SEL23661 andEL2228 | |||
| SEL28323 | 100 | application covers eastern SEL23661 andEL22178 | |||
| SEL28324 | 100 | application covers western ELs 22178 and22848 | |||
| SEL28325 | 100 | application covers ELs 8825 and 8602 | |||
| SEL28327 | 100 | application covers ELs 8576 and 8932 | |||
| SEL28328 | 100 | application covers ELs 10139 and 8727 |
* Some Northern Territory tenements in process of transfer to ABM Resources NL
| FOR THE QUARTER ENDED 30 September2011 Continued | ||||
|---|---|---|---|---|
| Areas of interest | Tenements | EconomicEntity's Interest | Notes | |
| * Northern Territory | ||||
| TANAMI | ||||
| Pargee | EL10139 | 100 | granted | |
| EL24344 | 100 | granted | ||
| EL26608 | 100 | revised application | ||
| South Tanami | EL25191 | 100 | application | |
| EL25192 | 100 | application | ||
| EL28785 | 100 | application | ||
| Euro | EL25845 | 100 | application | |
| EL26590 | 100 | application | ||
| EL26591 | 100 | application | ||
| EL26592 | 100 | application | ||
| EL26593 | 100 | application | ||
| EL26613 | 100 | application | ||
| EL26615 | 100 | application | ||
| EL26618 | 100 | application | ||
| EL26620 | 100 | application | ||
| EL26621 | 100 | application | ||
| EL26622 | 100 | application | ||
| EL26673 | 100 | application | ||
| EL27604 | 100 | application | ||
| LAKE MACKAY PROJECT | ||||
| Taupo | EL8696 | 100 | granted | |
| Tarawera | EL10305 | 100 | application | |
| EL10306 | 100 | application | ||
| EL23898 | 100 | revised application | ||
| EL24299 | 100 | application | ||
| EL24473 | 100 | application | ||
| EL24492 | 100 | application | ||
| EL24567 | 100 | application | ||
| EL24915 | 100 | application | ||
| EL24949 | 100 | application | ||
| EL25630 | 100 | application | ||
| EL25632 | 100 | application | ||
| EL25866 | 100 | application | ||
| EL27780 | 100 | application | ||
| EL27872 | 100 | application | ||
| EL27894 | 100 | application | ||
| EL27906 | 100 | granted | ||
| EL8695 | 100 | application | ||
| EL9343 | 100 | revised application | ||
| Tekapo | EL24858 | 100 | application | |
| EL9442 | 100 | granted | ||
| EL9449 | 100 | granted | ||
| SEL28028 | 100 | application | ||
| Te Anau | EL8697 | 100 | granted |
* Some Northern Territory tenements in process of transfer to ABM Resources NL
| FOR THE QUARTER ENDED 30 September2011 Continued | |||||
|---|---|---|---|---|---|
| Areas of interest | Tenements | EconomicEntity's Interest | Notes | ||
| * Northern Territory | |||||
| NORTH ARUNTA | |||||
| Walkeley Project | EL22554 | 100 | revised application | ||
| EL22555 | 100 | revised application | |||
| EL26903 | 100 | application | |||
| Bonita | EL23926 | 100 | application | ||
| EL23927 | 100 | revised application | |||
| Reynolds Range | EL23655 | 100 | granted | ||
| EL23888 | 100 | granted | |||
| EL28083 | 100 | granted | |||
| Barrow Creek | EL23880 | 100 | granted | ||
| EL23883 | 100 | granted | |||
| EL23884 | 100 | granted | |||
| EL23885 | 100 | granted | |||
| EL23886 | 100 | granted | |||
| EL25030 | 100 | application | |||
| EL25031 | 100 | application | |||
| EL25033 | 100 | application | |||
| EL25034 | 100 | application | |||
| EL25035 | 100 | application | |||
| EL25036 | 100 | application | |||
| EL25041 | 100 | application | |||
| EL25042 | 100 | application | |||
| EL25044 | 100 | application | |||
| EL28515 | 100 | granted | |||
| EL28727 | 100 | granted | |||
| EL8766 | 100 | granted | |||
| SEL26825 | 100 | granted | |||
| Western Australia | |||||
| Dalgaranga | M59/106 | 100 | |||
| Erayinia | E28/1228 | 70 | Hawthorn Resources Ltd 30% | ||
| E28/1611 | 70 | Hawthorn Resources Ltd 30% | |||
| E28/1612 | 70 | Hawthorn Resources Ltd 30% | |||
| Mozambique | 1435L | 67.33 | JV with AYR Resources Africa and local | ||
| partners, ABM earning up to 86.33% | |||||
| 2295L | 67.33 | JV with AYR Resources Africa and local | |||
| partners, ABM earning up to 86.33% | |||||
* Some Northern Territory tenements are still in process of transfer to ABM Resources NL