Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

PRODIGY GOLD NL Investor Presentation 2012

Oct 30, 2012

65615_rns_2012-10-30_86b73864-d4a0-45df-9196-fed0c55952b6.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU

31st October 2012

Updated Technical & Corporate Presentation

ABM is pleased to present its latest updated technical & corporate presentation.

About ABM Resources NL

ABM Resources is an exploration company developing several gold discoveries in the Central Desert region of the Northern Territory of Australia. The Company has a multi-tiered approach to exploration and development with a combination of high grade potentially shortterm production scenarios such as Old Pirate and the Golden Hind, large scale discoveries such as Buccaneer, and regional exploration discoveries such as the Kroda Gold Project. In addition, ABM Resources is committed to regional exploration programs throughout its extensive holdings.

ABM Resources is well capitalised to achieve its exploration milestones in 2012 and into 2013 with $17.5M in cash (as of quarterly report dated 30 September 2012).

Signed

Darren Holden – Managing Director

For Further Information Please Contact

Jutta Zimmermann Darren Holden Berdine Mastaglia +61 8 9423 9777 +61 8 9423 9777 +61 8 9423 9777

CFO / Company Secretary Managing Director Investor Relations Manager

DISCLAIMER

  • This presentation has been prepared by ABM Resources NL ("ABM" or the "Company"). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this presentation.
  • This presentation contains forecasts and forward looking information. Such forecasts and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments will almost certainly differ materially from those expressed or implied. ABM has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent permitted by applicable laws, ABM makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement or opinion contained in this presentation.
  • You should not act or refrain from acting in reliance on this presentation material. This overview of ABM does not purport to be all inclusive or contain all information which its recipients may require in order to make an informed assessment of the Company's prospects. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation and making any investment decision.

TECHNICAL STATEMENT / COMPETENT PERSONS STATEMENT

  • The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Darren Holden who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Holden is a full time employee of ABM Resources NL and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves". Mr Holden consents to the inclusion in the documents of the matters based on this information in the form and context in which it appears.
  • Refer to previous Company Press-Releases for full resource estimation details, drill hole details, and intercept calculations. A full list is provided in Appendix C.

Corporate Snapshot

×. RESOURCES NL
---- --------------
ASX Code ABU
Shares on issue 3,241M
Share options (Ave Ex Price ~1.7c) 280M
Cash (30 September2012) $17.5M
Market Cap (at 5.2 cents) $168.5M
Fully Diluted EV (at 5.2 cents) $155.9M

Winner: Best Emerging Company Diggers + Dealers Mining Forum 2012

A S&P/ASX300 Company

ABM's Significant Landholding

Project Summary

  • The Central Desert of Australia is one the most underexplored Proterozoic Gold Provinces on the Planet.
  • 3.3 million ounces of gold in resource across multiple discoveries by ABM within the first two years of exploration.
  • High Grade Old Pirate Gold Project scoping study shows a robust low CAPEX project capable of generating significant near term free cash flow.
  • Buccaneer Porphyry Gold Deposit has grown to 2.67 million ounces gold with upside potential to grow to a very large scale bulk tonnage system.
  • ABM holds an extensive regional portfolio of exploration licences and licence applications covering +33,000km2.

Project Summary

OLD PIRATE HIGH GRADE GOLD PROJECT

  • Gold in quartz veins up to several metres wide.
  • Coarse visible gold from surface to depths >200m.
  • 427,400 ounce resource at 7.95g/t (top-cut).
  • 565,000 ounce resource at 10.5g/t (uncut).
  • $257m profit projected in scoping study with very low capex from open pit only.
  • Multiple extensions identified in 2012 pending drilling to resource.

BUCCANEER PORPHYRY GOLD DISCOVERY

  • First gold porphyry hosted ore body discovered in the district.
  • 2.67 million ounce resource at 0.65g/t (0.2g/t cut-off) including higher grade zones of:
    • 1.57 million ounce resource at 1.1g/t (0.6g/t cut-off).
  • Significant potential at depth and along strike with higher grade zones.
  • Re-optimisation of resource model focusing on higher grade zones in 2012.

REGIONAL EXPLORATION PORTFOLIO

  • 60+ Au and Au-Cu prospects providing multiple exploration targets.
  • Advanced exploration targets include:
    • Hyperion 202,200 oz gold resource.
    • Kroda pre-resource discovery with 29m @ 6.39g/t gold in drilling.
    • Tulsa major untested geochemistry anomaly.
    • Reynolds Range / Lake Mackay – regional exploration.

TWIN BONANZA GOLD PROJECT

1. Refer to Appendices for Resource Tables, and Competent Person statements

Old Pirate – High Grade Gold Resource

  • Multiple high grade / coarse gold bearing quartz veins in folded shale horizons over 600m x 250m.
  • Mineralisation from surface to a depth of >200m and open in several directions.
  • More than 15 individual high grade gold veins.
  • Does not yet include 2012 work.
300g/t Top-Cut Tonnes Gold (g/t) Ounces
Indicated 347,000 5.25 58,500
Inferred 1,327,000 8.65 368,900
Total * 1,673,000 7.95 427,400
No Top-Cut# Tonnes Gold (g/t) Ounces
Indicated 347,000 5.31 59,200
Inferred 1,327,000 11.86 505,800
Total 1,673,000 10.5 565,000

Old Pirate JORC Resource (Maiden Resource April 2012)

# Resource is significantly impacted by the high grade cut suggesting Old Pirate may mine at significantly higher grade

Old Pirate – An Exceptional Ore Potential!

  • Old Pirate has COARSE GOLD effect.
  • In essence <20% of the quartz contains >90% of the gold.
  • Our Innovation to solve this is detailed and systematic surface sampling along the strike of the veins.
    • Exposing and continuous sampling of all surface veins.
    • Detailed measurements of width and location.
    • Akin to grade control of the first bench.
    • Explains the "hit and miss" nature of the drilling.
  • Recent work shows up to 97.3% recovery via gravity methods:
    • No need for cyanide leach with environmental, energy and capital savings.
    • Simple and scale-able development with a risk-managed approach.

Table (right) shows all samples in mineralised veins up to 2012. The datasets are statistically comparable.

No. of Samplesin mineralisedvein. AverageGrade Uncut(1m) g/t Au AverageGradeTop Cut(1m) Au PeakValue (g/tAu) Samples>10g/t Samples>100g/t
Drilling 490 9.95 7.23 1360 54 (11%) 5 (1.1%)
Surface work 1427 11.25 10.6 784 274 (19%) 27 (1.8%)

Old Pirate – Stage 1 Scoping Study

Scoping Study highlights Old Pirate's robust economics and its significant free cash flow generation potential.

  • Independent Scoping Study by Entech Pty Ltd Mining Consultants in May 2012.
  • Based only on open pit Indicated and Inferred Resource to a depth of 100m.
  • Significant expansion potential at depth, along strike and in repeat veins identified by surface sampling and not currently factored in resource or scoping study.

Scoping Study Summary *

832,000 tonnes @ 11.5g/t Au extracted from open pit

261,000 ounces Au recovered over 2 years (85% grav recov)**

Stand-alone gravity plant (no chemical processing)

$27.1M capital expenditure***

~2500 ounces per vertical metre

~A$511 per ounce total costs

~A$383 per ounce cash costs

$257M positive cash flow after expenses, royalties and capex

** Recent test-work reveals recoveries up to 97.3% Au which would add a further ~37,000 ounces to production

9 *** Due to recent results on recovery quality, ABM is currently assessing if this can be considerably reduced via scalable development including trial mining. Refer Slide 15 for details.

*Scoping study based on A$1,600 per ounce Au price

Old Pirate – Growth Potential

  • Significant exploration potential remains in repeat quartz vein structures identified by ABM.
  • The 2012 exploration program has been designed to assess this extensional potential with a combination of trenching and drilling.

Old Pirate – Growth Potential – Western Limb

  • A single high grade structure located on the footwall of a shale unit.
  • Vein widths of 1m to <0.2m.
  • Western Limb Extensions not yet included in resource.
  • Extension of 197m strike length averaging 44.83g/t gold from systematic surface sampling.
  • Peak surface sample grade of 576g/t gold.
  • Recent drilling includes:
    • 4m @ 44g/t gold including 1m @ 156g/t gold.
    • 5m @ 52.17g/t gold

Old Pirate – Growth Potential - East Side Vein

  • New "East Side" Vein discovered 50m east of main Old Pirate area (outside existing resource).
  • East Side vein will likely be encompassed in a widened pit design.
  • Linking to OP South for total strike length of 343 metres averaging 28.9g/t gold in surface sampling of veins up to 3m wide.

Golden Hind – Surface Sampling

  • Located 800m south of Old Pirate.
  • 60m strike length averaging 103.23g/t gold from systematic surface sampling.
  • Best visible gold seen to date on the project.
  • Peak assay of 784g/t gold.
  • Zones of quartz vein up to 15m. Trenching at Golden Hind

13

Golden Hind – Drilling

  • Best intersection drilled to date:
    • 42m averaging 44g/t gold including:

Map View

  • 15m averaging 118.5g/t gold.
  • 3m averaging 546g/t gold.

  • Other drill results include**:**
    • 17m averaging 29.43g/t gold including:
      • 6m averaging 80.56g/t gold.
    • 25m averaging 7.62g/t gold including**:**
      • 8m averaging 14.28g/t gold.

Old Pirate – Bulk Sample / Trial Mining

  • Aim to trial mine / bulk sample 10,000 tonnes of material to validate mining methods, dilution management, grade, processing and recovery.
  • Dig up to 5 metres depth on exposed quartz veins.
  • Install a portable modular gravity gold plant:
    • 10 to 15tph taking ~10 weeks to complete processing.
    • Rent or purchase plant with capital cost to be finalised (budgeting ~$2M).
    • If purchased can be readily expanded into full plant at 30tph (+200,000tpa).
  • Estimated cash operating cost for bulk sample of ~$150 per tonne for mining and processing.
  • Targeting 10g/t recovered grade with cash cost of ~$440 per ounce producing ~3,200 ounces.
  • Gold will be held in secured storage / in trust until the mineral lease is granted.

ABM is waiting on permits which will be followed by further pilot plant cost assessment and design. Plant will be for gravity concentrate only and will likely include crushing / grind , concentrator and gold room. All numbers presented on this slide are guide-lines only. The start date for the bulk sample / trial mining is dependent on permits, wet-season and equipment delivery times. The aim is to start the processing in 3 to 6 months.

The bulk sample / trial mining is intended to be carried out under an Exploration License. It is intended to apply for a full scale mineral lease in the near future.

Buccaneer Gold Porphyry

  • The first intrusive related gold deposit discovered in the Tanami-Arunta Region.
  • Located only 2km from Old Pirate.
  • Has the scale potential to suggest low-strip ratio / bulk tonnage mining operation.
  • Targeting initial Scoping Study in late 2012 / 2013.

Significant Drill Results

  • 221m @ 0.95g/t gold including:
    • 172m @ 1.11g/t gold including:
      • 81m @ 2.03 g/t gold.
  • 435m @ 0.69g/t gold including:
    • 203m @ 1.07g/t gold
    • 41m @ 3.54g/t gold
    • 6m @ 19.84g/t gold.
  • 341m @ 0.69g/t gold including:
    • 93m @ 0.70g/t gold, and
    • 127m @ 1.18g/t gold including:
      • 67m @ 2.07g/t gold.

Buccaneer: visible free gold

Buccaneer Porphyry Deposit Map View

Buccaneer Gold Porphyry – Growth Potential

  • Open in several directions.
  • Further structural studies planned to redefine continuity of higher grade >1.5g/t Au.
  • Visible free gold observed regularly through mineralised sections.
  • Further extensional drilling along the Caribbean Cypress Zone aiming to extend >1.5km of structure not yet tested with 6m @ 20.37g/t recently hit at Cypress.

Buccaneer Resource (0.2g/t and 0.6g/t cut off)

Tonnes (m) Gold (g/t) Ounces (m)
34 0.64 0.702
93.9 0.65 1.97
127.9 0.65 2.672
Tonnes (m) Gold (g/t) Ounces (m)
12.3 1.04 0.412
31.8 1.13 1.154
44.1 1.1 1.566

Regional Projects - Overview

A multitude of advanced and high priority exploration targets throughout the Central Desert, NT

Regional Projects - Hyperion

  • 18km from Tanami Gold's Groundrush Deposit.
  • Deposit extends from near surface to ~200m depth.
  • Hyperion Central has confirmed mineralisation over a 600m strike length.
  • Hyperion South has confirmed mineralisation over a 250m strike length.
  • Drill results include:
    • 35m @ 5.43g/t gold including:
      • 10m @ 17.27g/t gold.
  • Several extensions and other targets to be tested in 2012.
Hyperion Resource utilising 50g/t top-cut
0.8g/t cut off Tonnes Gold (g/t) Ounces
Hyperion Central 2,209,000 2.06 146,600
Hyperion South 768,000 2.25 55,500
Total 2,977,000 2.11 202,200
2g/t cut-off Tonnes Gold (g/t) Ounces
Hyperion Central 875,000 3.17 89,100
Hyperion South 272,000 4.08 35,700

20

Regional Projects - Kroda

Kroda 3 Discovery

  • 400m strike main trend at Kroda 3.
  • 125m strike high grade breccia pipe 25 40m in width.
  • Confirmed to 200m+ depth.

Significant Drill Results:

  • 57m @ 3.83g/t gold including:
    • 29m @ 6.38g/t gold, including:
      • 12m @ 15.69g/t gold.
  • 91m @ 1.44g/t gold including:
    • 33m @ 3.22g/t gold including:
      • 24m @ 4.28g/t gold.

Extensional Gold + base metal potential

  • 14 km of surface anomalism around Kroda.
  • 10km of surface anomalism on nearby Tulsa Trend.
  • Close to Stuart Highway + Rail + Gas.
  • Recent airborne EM survey generated new sulphide targets at nearby Emma Prospect (drilling underway)

Summary

The Company

  • Strong management & passionate exploration team.
  • Strong cash position of $17.5M (September 30th, 2012).
  • Exceptional track record of identifying resources.

The Assets

  • Five new discoveries and 3.3Moz in resources defined in 2.5 years of operations.
  • The highest grade undeveloped gold deposit at surface in Australia.
  • ~60 regional targets across the largest junior gold land holding in the country.

The Future

  • Old Pirate Pilot Plant / Trial Mining proposed pending permits.
  • 2012 drill results from Old Pirate and Golden Hind pending.
  • Regional targets pending drilling.
  • Mining studies at Old Pirate with updated scoping study / resource Q4 2012 / Q1 2013.
  • Potential near term production and cash flow at Old Pirate and long term large scale project at Buccaneer.
  • Exploration running simultaneously at multiple locations providing exceptional optionality to upside of the region. ABM has delivered on all key milestones and provides investors compelling upside and optionality

For Further Information Contact ABM Resources NL

Managing Director – Darren Holden CFO / Company Secretary – Jutta Zimmermann Investors Relations Coordinator – Berdine Mastaglia

www.abmresources.com.au [email protected] Tel +61 8 9423 9777

Appendix A - Board and Management

Board of Directors

Dr Mike Etheridge Non-Executive Chairman

Mr Darren Holden Managing Director

Mr Imants Kins Non-Executive Director

Graeme Sloan Non-Executive Director

Andrew Ferguson Non-Executive Director

Senior Management

Brad Valiukas Chief Operating Officer

Jutta Zimmermann Chief Financial Officer & Company Secretary

Dr Etheridge is a geologist with over 40 years' experience in exploration, mining, consulting and research. Until 2004 he was Chairman of the consulting firm SRK Consulting (Australia), having co-founded its predecessor, Etheridge Henley Williams in 1990. Dr Etheridge is a former board member on Consolidated Minerals and Lihir Gold. Dr Etheridge is an Adjunct Professor at Macquarie University where he has led an industry collaborative resource project on risk and value in mineral exploration.

Mr Holden is a geologist with over 18 years experience in mining and exploration. Mr Holden has previously held the role of Senior Consultant at Fractal Geoscience and was involved in modelling and targeting on a wide range of deposit styles. Mr Holden was a leading member of the team that won the GoldCorp Challenge in 2001. Prior to ABM, Mr Holden was Vice President Exploration for a Vancouver based junior and oversaw the definition of several deposits including a multi-million ounce gold porphyry in Alaska.

Mr Kins is an Economist with over 25 years experience specialising in the resource sector. He has a Bachelor of Economics from the University of WA and a Master of Arts (Futures studies) degree from the Curtin University of Technology. Since 1987 Mr Kins has mainly worked as a consultant to the resource sector undertaking projects with exploration and mining companies, investors and brokers.

Mr Sloan is a Mining Engineer with extensive corporate and operational experience both within Australia and overseas and is currently a Non-Executive Director of Orion Gold NL. He has held senior roles with several ASX listed companies, including Managing Director/CEO of Tanami Gold NL, and has been responsible for the successful development, implementation and commissioning of various projects over a range of different commodity types. Mr Sloan is currently the CEO of Herencia Resources PLC.

Andrew Ferguson is an Executive Director and the Chief Executive Officer of APAC Resources Limited, which is a natural resources investment company listed on Hong Kong Stock Exchange. Mr Ferguson holds a Bachelor of Science Degree in Natural Resource Development and was a mining engineer in Western Australia in the mid 90's. In 2003, Mr Ferguson co-founded New City Investment Managers in England. He has a proven track record in fund management and was the former co-fund manager of City Natural Resources High Yield Trust, which was awarded best UK Investment Trust in 2006. He has also worked for CQS LLP (CQS) in Hong Kong as the Chief Investment Officer for New City Investment Managers CQS and a Senior Portfolio Manager for CQS.

Mr Brad Valiukas is a Mining Engineer with over 16 years management and technical experience in the mining sector. Mr Valiukas has previously held roles of Chief Operating Officer at Focus Minerals Ltd, Deputy Chief Mining Engineer at Mincor Resources and has worked in both open pit and underground mining environments, and is an expert in narrow vein mining. Mr Valiukas holds a Bachelor of Engineer (Mining) from the University of New South Wales and multiple industry based accreditations.

Ms Zimmermann has over twenty years experience in accounting, taxation and management in both Australia and Germany. She is an accountant with an Australian AQF diploma level and a equivalent Australian bachelor degree level from the Furtwangen Polytechnic in Information Technology and is a member of Chartered Secretaries Australia. Ms Zimmermann holds the position of Chief Financial Officer with the company and was appointed Company Secretary on 17 April 2007.

Appendix B – Resource Statement

Old Pirate Resource Estimation without utilising a top-cut. Old Pirate Resource Estimation with utilising 300g/t top-cut.
All Vein Models Tonnes Gold (g/t) Ounces All Vein Models Tonnes Gold (g/t) Ounces
Indicated 347,000 5.31 59,200 Indicated 347,000 5.25 58,500
Inferred 1,327,000 11.86 505,800 Inferred 1,327,000 8.65 368,900
Total 1,673,000 10.50 565,000 Total 1,673,000 7.95 427,400
High Grade Vein Tonnes Gold (g/t) Ounces High Grade Vein Tonnes Gold (g/t) Ounces
Models Only Models Only
Indicated 132,000 7.74 32,800 Indicated 132,000 7.62 32,200
Inferred 354,000 22.64 257,600 Inferred 354,000 17.52 199,400
Total 486,000 18.60 290,400 Total 486,000 14.84 231,600
Hyperion Gold Project Resource Estimation without top-cut. Hyperion Gold Project Resource Estimation with 50g/t top-cut.
0.8g/t cut off Tonnes Gold (g/t) Ounces 0.8g/t cut off Tonnes Gold (g/t) Ounces
Hyperion Central 2,209,000 2.14 152,100 Hyperion Central 2,209,000 2.06 146,600
Hyperion South 768,000 2.71 66,800 Hyperion South 768,000 2.25 55,500
Total 2,977,000 2.29 219,000 Total 2,977,000 2.11 202,200
2g/t cut-off Tonnes Gold (g/t) Ounces 2g/t cut-off Tonnes Gold (g/t) Ounces
Hyperion Central 875,000 3.36 94,400 Hyperion Central 875,000 3.17 89,100
Hyperion South 272,000 5.37 47,000 Hyperion South 272,000 4.08 35,700
Total 1,147,000 3.83 141,400 Total 1,147,000 3.38 124,800

*Note - totals may vary due to rounding. Refer press release 16th April, 2012 for full details.

Appendix B – Resource Statement

Buccaneer Porphyry Gold Deposit Resource Update at varying cut-offs.
0.2g/t cut off Million Gold (g/t) Million Ounces
Tonnes
Indicated 34.0 0.64 0.702
Inferred 93.9 0.65 1.970
Total 127.9 0.65 2.672
0.4g/t cut-off Million Tonnes Gold (g/t) Million Ounces
Indicated 24.2 0.77 0.600
Inferred 64.1 0.80 1.657
Total 88.3 0.80 2.257
0.6g/t cut-off Million Tonnes Gold (g/t) Million Ounces
Indicated 12.3 1.04 0.412
Inferred 31.8 1.13 1.154
Total 44.1 1.10 1.566

Appendix C – List of ASX Announcements

List of ASX announcements relating to technical results in this presentation.

Please refer for intercept calculation method, resource estimation, assay results and sampling techniques etc.

19/10/2012 OP WesternLimb Extends with Surface Sampling av. 52.3g/t
09/10/2012 Extensional Exploration Results with Assays up to156g/t Gold
02/10/2012 Golden Hind Spectacular Drill Intersections 42m @ 44g/t
17/09/2012 High-Grade Discovery Confirmed at Golden Hind 17m @ 29.43g/t
05/09/2012 Old Pirate Test Work –Exceptional gravity Gold Recovery
20/08/2012 Exploration Update Golden Hind and New Prospect
06/08/2012 High Grade Gold results from the Golden Hind Discovery
02/08/2012 Old Pirate High Grade Drill Results 5m @ 52.27g/t gold
01/08/2012 High Grade Gold Drill Results at Buccaneer
16/07/2012 Phase 3 Surface Vein Sampling Extends Old Pirate
09/07/2012 Phase 2 Surface Sampling on East Side Vein
28/06/2012 New Prospect with Coarse Visible Gold at Surface
15/06/2012 New High Grade Vein Uncovered at Old Pirate
14/06/2012 High Grade Gold Drill Results Extend Buccaneer
15/05/2012 Old Pirate Stage 1 Scoping Study Results
03/05/2012 2012 Exploration Season Underway
16/04/2012 3.3 Million Ounces Goldin Resources
12/03/2012 Hyperion Drill Results show wide mineralised zones
07/03/2012 Latest Results Extend Eastern Contact Zone
28/02/2012 Hyperion Best Ever Intercept 35m @ 5.43 g/t Gold
08/02/2012 Old Pirate Trenching Extendsto 726 metres @ 24.01g/t Gold
20/01/2012 ABM and Tanami Gold enter Memorandum of Understanding
20/01/2012 TAM: Tanami Gold NL and ABM enter MOU
19/01/2012 Impressive Drill Results from Buccaneer Porphyry
18/01/2012 Cypress Zone Drill Results [email protected]/t Au within [email protected]/t
5/01/2012 Old Pirate Trenching Update -582m strike @ 23.98g/t Gold
23/12/2011 BRR -ABM extends high grade trenching results at Old Pirate
22/12/2011 Old Pirate Trenching Extends to 427m Strike @ 21.85g/t Gold
5/12/2011 Technical and Corporate Update Presentation
30/11/2011 Broadcast -MD talks Gold from the Old Pirate
29/11/2011 High Grade Old PiratePhase 2a Trench Results
28/11/2011 Twin BonanzaDrill Results Extending Caribbean to Cypress
24/11/2011 Historic Access Agreement Signed for Lake Mackay Regional
24/11/2011 Lake Mackay Phase 1 Drill Results
09/11/2011 Drilling Commences at Hyperion
24/10/2011 Further Buccaneer Drill Results
13/10/2011 Old Pirate Trenching Combined Strike Length [email protected]/t Au
11/10/2011 Buccaneer Extension 26m @ 2.9g/t within 18m @ 4.05g/t Gold
27/09/2011 Drilling at Kroda Confirms Second Discovery Camp in the NT
12/09/2011 New Discovery at Cypress Prospect with 26m @ 5.53g/t Gold
07/09/2011 Old Pirate Northern Extensions Further High Grade Results
02/09/2011 Broadcast -ABM Gold Assays over 400 Grams per Tonne
31/08/2011 Old Pirate Northern Extensions High Grade Drill Results
24/08/2011 Drilling Commences at Lake Mackay Copper-Gold Targets
17/08/2011 Caribbean Zone and Buccaneer Deposit Significantly Extended
10/08/2011 Updated Investor Presentation
09/08/2011 Broadcast Spectacular Gold at Old Pirate Northern Extensions

Appendix C – List of ASX Announcements

List of ASX announcements relating to technical results in this presentation. Please refer for intercept calculation method, resource estimation, assay results and sampling techniques etc.

08/08/2011 Spectacular Gold at Old Pirate Northern Extensions
01/08/2011 Further Extensional Buccaneer Drill Results
18/07/2011 Further Extensions at Buccaneer and New Porphyry Discovery
04/07/2011 New Sedimentary Hosted Oxide Gold Discovery at Twin Bonanza
20/06/2011 Drilling Commences at the Kroda Gold Project
17/06/2011 Broadcast -ABM hits New Gold Zone and Extends Mineralisation
16/06/2011 Further Success at Buccaneer -Discovery at Caribbean Zone
09/06/2011 First 2011 Drilling Extends Buccaneer
10/05/2011 Updated Investor Presentation
09/05/2011 Exploration Update Twin Bonanza Program Ahead of Schedule
27/04/2011 Extensional Drilling Underway at Buccaneer Western Zone
04/04/2011 Metallurgical Tests Reveal High Quality Ore -99.5% Recovery
22/03/2011 Presentation -Twin Bonanza and 1.67 Moz Buccaneer Deposit
21/02/2011 Presentation -1.67 Moz Gold -And We`ve Only Just Begun
21/02/2011 Maiden Resource Estimation for Buccaneer
03/02/2011 Twin Bonanza Gold Camp Expands to 30 Targets
31/01/2011 New Targets at Twin Bonanza Gold Camp
13/01/2011 Buccaneer Porphyry Delivers Impressive Results
11/01/2011 Drill Results from the Hyperion Gold Project
13/12/2010 Buccaneer Continues To Grow With Step Out Drilling
15/11/2010 2010 Old Pirate Drilling and Screen Fire Assay Program
04/11/2010 ABM adds second drill rig to NT exploration programs

18/10/2010 Step Out Drilling at Buccaneer Delivers Excellent Intercepts 22/09/2010 ABM Continues to Expand Buccaneer Gold Porphyry 13/09/2010 Best Intersection at Buccaneer - 202m grading 1g/t Gold 31/08/2010 Update Old Pirate High Grade Gold Prospect at Twin Bonanza 19/08/2010 Buccaneer Porphyry Gold Drill Results Double Vertical Extent 27/07/2010 Bonanza Grades at Old Pirate - 5 metres at 274 g/t Gold 12/07/2010 Drill Results - 35m at 6.35g/t Au inc 8m at 21.78g/t Au 07/07/2010 Exploration Update - Visible Gold at Old Pirate South 15/06/2010 Exploration Update from Twin Bonanza 24/05/2010 First Drill Results - High Grade Intercept Extends Sabre 13/05/2010 Samples Return 20.3% Copper and 271 g/t Silver 27/04/2010 ABM Resources Announces the Commencement of Drilling 16/04/2010 Presentation - The Big 8 31/03/2010 Newmont Transaction Complete - Prioritising 8 Discoveries 16/03/2010 Kroda Gold Project - 6 Metres at 25.9g/t Gold 09/03/2010 Hyperion Gold Project with 60 m at 2.57 g/t Gold 02/02/2010 The Old Pirate High Grade Gold Project 01/02/2010 Detail on the Twin Bonanza Porphyry Gold Project 28/01/2010 Acquisition of Advanced Gold Prospects from Newmont 18/01/2010 Exploration Update for Reynolds Range Project Area 07/01/2010 ABM Provides Exploration Update for Lake Mackay Project