ASX ANNOUNCEMENT / MEDIA RELEASE

ASX:ABU

5[th] February, 2013

Buccaneer Higher Grade Zones Establish Growth Pathway for Twin Bonanza

ABM Resources NL (“ABM” or “The Company”) is pleased to announce a resource update on the Buccaneer Gold Project located adjacent to the Company’s high-grade Old Pirate Gold Deposit in the Northern Territory, Australia. This resource update has been focussed on the higher grade zones (Buccaneer HGZ) within the global 2012 Buccaneer resource model.

Table 1. Buccaneer HGZ Resource at 2g/t cut-off

Category Tonnes Grade (g/t Au)
top-cut
Grade (g/t
Au) uncut
Ounces Gold
top-cut
Ounces Gold
uncut
Indicated 2,261,000 3.39 4.17 246,200 303,000
Inferred 3,573,000 3.75 4.56 431,100 523,500
Total 5,834,000 3.61 4.41 677,300 826,500

Table 2. Buccaneer HGZ Resource at 1g/t cut-off

Category Tonnes Grade (g/t Au)
top-cut
Grade (g/t
Au) uncut
Ounces Gold
top-cut
Ounces gold
uncut
Indicated 7,117,000 2.00 2.25 458,500 515,300
Inferred 8,183,000 2.43 2.78 639,700 732,200
Total 15,300,000 2.23 2.54 1,098,200 1,247,500
  • Buccaneer HGZ Resource for main Buccaneer area includes mineralisation:

  • ~650 metres by 550 metres footprint with up to 100 metre wide true-width mineralised zones. Mineralisation from surface to depths of 400 metres.

  • 70% of the Buccaneer Porphyry remains to be tested with drilling.

This optimisation involves modelling of the higher-grade zones within the previous bulk tonnage resource model (April, 2012) which also remains valid and unchanged at:

  • 127.9Mt averaging 0.65g/t gold for 2.672 million ounces (0.2g/t cut-off).

Overall Twin Bonanza high-grade zones (Buccaneer HGZ (2g/t cut-off) plus Old Pirate Trend (1g/t to 3g/t cut-off & top-cut)) deliver a combined resource of:

  • 7.72Mt averaging 5.2g/t gold for 1.29 million ounces of gold.

==> picture [452 x 46] intentionally omitted <==

Notes for Table 1 and 2. Buccaneer HGZ Resource estimation consists of the high-grade zones located within the overall Buccaneer Porphyry Gold Bulk Tonnage Deposit. Top-cuts include 30g/t for the Buccaneer Main Zone and 50g/t for the Cypress Zone. The 2012 resource for Buccaneer totalled 127.9Mt averaging 0.65g/t gold for 2.67Moz gold at 0.2g/t cut-off or 44.1Mt averaging 1.1g/t gold for 1.566Moz gold at 0.6g/t cut-off and remains equally valid (refer release 16 April 2012). The Buccaneer HGZ Deposit Resource Estimation in 2013 used a higher cut-off, shorter drill hole composite, smaller block size, smaller search ellipse and higher cut-off grades compared to the previous model, and constitutes several higher grade zones within the overall low grade / bulk tonnage Buccaneer Porphyry Deposit.

Darren Holden, Managing Director of ABM Resources said, “We are very pleased at how well the higher grade zones at Buccaneer hold together. There are several continuous and wide high grade zones modelled extending from near surface to depth. Buccaneer is only a few kilometres from our high-grade Old Pirate Deposit. The reoptimised Buccaneer model, focusing on the higher grade zones only, has added a further million ounces to our 1g/t gold cut-off mineral resource for the Twin Bonanza Project. Whilst Old Pirate is the immediate development focus, clearly the new Buccaneer HGZ Resource adds the potential for increased mine life and/or production rates to this well-endowed camp.”

==> picture [475 x 184] intentionally omitted <==

Figure 1. Buccaneer HGZ Model - View East (Indicated Resource Blocks only, Inferred not shown). Grey transparent area is the 0.5g/t grade shell.

==> picture [378 x 321] intentionally omitted <==

Figure 2. Buccaneer Main Area block model at >1g/t oblique perspective 3D view to north-west.

2

==> picture [5 x 3] intentionally omitted <==

----- Start of picture text -----

.
----- End of picture text -----

==> picture [482 x 315] intentionally omitted <==

Figure 3. Slice through the Indicated and Inferred part of the Buccaneer block model, with a 1 g/t cut-off. Centred on 514550mE and 7772650mN and viewing towards the north-east.

==> picture [488 x 310] intentionally omitted <==

Figure 4. Cross section of the Buccaneer Indicated and Inferred resource at a 1 g/t cut-off centred on 514500mE, 7772650mN with a view towards the north-west.

3

Buccaneer HGZ Resource Modelling 2013

The Buccaneer Gold Deposit is a located approximately 3 kilometres from the Old Pirate High-Grade Gold Deposit. ABM, with the assistance of SRK Consulting, has previously issued two resource statements (16/04/2012 & 21/02/2011) that focussed on considering Buccaneer as a large bulk-tonnage system. The 2012 resource estimation remains valid for a bulk tonnage system. However, ABM has this year sought to re-optimise the resource focussing on the higher grade zones within the overall low-grade shell. This process has involved using a smaller drill hole composite length and block size with smaller search ellipse parameters and higher cut-off grades to effectively aim to reduce overall tonnes and increase the grade in the resource estimations. Details of the resource modelling are provided in Appendix 1.

As ABM moves towards a potential development phase at Old Pirate the amount of logistics and mining infrastructure will be increased. Whilst the two mineralised systems are different in style there are potentially some synergies between the projects. This is discussed further below.

Resource modelling consisted of both manually constructed 3 dimensional grade shells and automated grade shells generated from Leapfrog modelling software. All mineralised grade shells were constrained by a geological model constructed by ABM. Grade was interpolated based on multiple passes using inverse distance squared statistical interpolation. Further details are in Appendix 1.

The modelling at Buccaneer is based on information provided by more than 82,000 metres of drilling.

Domaining and Resource Category

The Buccaneer HGZ Resource Estimation involved sub-domaining the overall Buccaneer Porphyry body into several distinct zones. These include:

  1. Main Buccaneer Upper Zone – shallow northeast dipping quartz vein stockwork zones extending from surface to depths of approximately 150m and with a footprint of 500m x 500m.

  2. Main Buccaneer Lower Zone – quartz vein stockwork zones beneath 150m depth with 45 degree dip to the southwest.

  3. Peripheral Buccaneer Zones – multiple satellite zones of mineralisation including Caribbean Zones.

  4. Cypress Zone – a high-grade easterly dipping chlorite-quartz mineralised zone located close to the western contact of the Buccaneer Porphyry body.

Within the main Buccaneer Zone the mineralisation was separated into two domains, with the upper zone (within 150m of surface) consisting of north-easterly dipping structures; and the lower zone of steeper south westerly dipping structures. Mineralisation is hosted entirely within the main monzonite porphyry body and includes zones of quartz stockwork veining, chlorite-sericite alteration and generally low-sulphide content. Visible gold has been sighted in the shallowly dipping upper zone. A conservative top-cut of 30g/t was applied to the Buccaneer HGZ.

Peripheral to the main Buccaneer Zone are a number of smaller domains that make up the overall Caribbean trend located within the main Buccaneer Porphyry but close to the western contact. These zones are defined with multiple holes, but there is insufficient drilling to link them together. It is anticipated that with further drilling these higher grade structures will begin to merge to increase the overall tonnes in those areas. These zones are collectively modelled and interpolated using the same parameters as the main Buccaneer Zone.

The Cypress Zone is a separate zone of high-grade mineralisation defined by several holes including three holes that intersected assays greater than 100g/t gold within wider zones of 4 to 10g/t gold mineralisation. Mineralisation is hosted in a steep easterly dipping shear zone. The Cypress Zone was modelled separately with a top-cut of 50g/t gold.

4

Overall the Buccaneer mineral system, whilst with occasional coarse visible gold, is a more disseminated gold system. Indicated Resources are defined on statistical criteria where at least three proximal drill holes are required to populate the grade of any given block. Inferred Resources are those remaining resource blocks that fall within the overall grade shells. Resources are reported at 1g/t and 2g/t cut-offs which are considered reasonable for a system of this magnitude.

The resource estimations for the Cypress and Buccaneer zones at a variety of cut-offs are shown in the tables below.

Table
3a.
Cypress
Resource
Estimation
without utilising a top-cut, using a 1 g/t block
model cut-off
Tonnes
Gold (g/t)
Ounces
Inferred
193,000
13.31
82,600
Total
193,000
13.31
82,600
Table
3b.
Cypress
Resource
Estimation
using the top-cut, and a 1 g/t block model
cut-off
Tonnes
Gold (g/t)
Ounces
Tonnes
Gold (g/t)
Ounces
Inferred
193,000
13.31
82,600
Inferred
193,000
9.38
58,100
Total
193,000
13.31
82,600
Total
193,000
9.38
58,100

Table 4a. Cypress Resource Estimation without utilising a top-cut, using a 2 g/t block model cut-off

Tonnes Gold(g/t) Ounces
Inferred 154,000 16.28 80,600
Total 154,000 16.28 80,600

Table 4b. Cypress Resource Estimation using the top-cut, and a 2 g/t block model cut-off


cut-off
Tonnes Gold(g/t) Ounces
Inferred 154,000 11.35 56,200
Total 154,000 11.35 56,200

Table 5a. Buccaneer Resource Estimation without utilising a top-cut, using a 1 g/t block model cut-off

Tonnes Gold(g/t) Ounces
Indicated 7,117,000 2.25 515,300
Inferred 7,990,000 2.53 649,600
Total 15,107,000 2.4 1,164,900

Table 5b. Buccaneer Resource Estimation using the top-cut, and a 1 g/t block model cut-off


cut-off
Tonnes Gold (g/t) Ounces
Indicated 7,117,000 2 458,500
Inferred 7,990,000 2.26 581,600
Total 15,107,000 2.14 1,040,100

Table 6a. Buccaneer Resource Estimation without utilising a top-cut, using a 2 g/t block model cut-off

Table 6b. Buccaneer Resource Estimation using the top-cut, and a 2 g/t block model cut-off

Table 6a. Buccaneer Resource Estimation
without utilising a top-cut, using a 2 g/t block
model cut-off
Table 6b. Buccaneer Resource Estimation
using the top-cut, and a 2 g/t block model
cut-off
Tonnes
Gold (g/t)
Ounces
Tonnes
Gold (g/t)
Ounces
Indicated
2,261,000
4.17
303,000
Inferred
3,419,000
4.03
442,800
Indicated
2,261,000
3.39
246,200
Inferred
3,419,000
3.41
374,900
Total
5,680,000
4.08
745,800
Total
5,680,000
3.4
621,100

Note – totals may vary due to rounding

The total combined resource for the Buccaneer Project, including Buccaneer Indicated, Buccaneer Inferred and Cypress Inferred, is listed in Table 7 and 8.

5

Table 7a. Combined Resource Estimation without utilising a top-cut, using a 1 g/t block model cut-off

Tonnes Gold(g/t) Ounces
Indicated 7,117,000 2.25 515,300
Inferred 8,183,000 2.78 732,200
Total 15,300,000 2.54 1,247,500

Table 7b. Combined Resource Estimation using the top-cut, and a 1 g/t block model cut-off


cut-off
Tonnes Gold(g/t) Ounces
Indicated 7,117,000 2.00 458,500
Inferred 8,183,000 2.43 639,700
Total 15,300,000 2.23 1,098,200

Table 8a. Combined Resource Estimation without utilising a top-cut, using a 2 g/t block model cut-off

Tonnes Gold(g/t) Ounces
Indicated 2,261,000 4.17 303,000
Inferred 3,573,000 4.56 523,500
Total 5,834,000 4.41 826,500

Table 8b. Combined Resource Estimation using the top-cut, and a 2 g/t block model cut-off

Tonnes Gold(g/t) Ounces
Indicated 2,261,000 3.39 246,200
Inferred 3,573,000 3.75 431,100
Total 5,834,000 3.61 677,300

Note – totals may vary due to rounding

==> picture [209 x 243] intentionally omitted <==

==> picture [237 x 160] intentionally omitted <==

Figure 5. Drill core oriented to emulate drill angle. Flat-lying quartz veins with visible gold, from Buccaneer

HGZ upper zone.

Wider Twin Bonanza Area and Implications of the New Buccaneer HGZ Resource

The Buccaneer Project is located 3 kilometres from the Company’s Old Pirate Gold Project. Yesterday the Company announced an updated resource statement for Old Pirate. ABM’s initial focus is to develop Old Pirate with a small but up-scalable gravity gold plant. Development at Old Pirate will increase infrastructure on the Twin Bonanza Gold Camp which has the possibility of being shared in the future development of Buccaneer. Synergies may include camp, power generation, comminution and gold extraction. Whilst the two deposits have different styles of mineralisation (high grade coarse gold versus disseminated gold in stockwork veins), together they represent a substantial mid to high-grade resource as noted in the Tables below.

6

Table 9. Twin Bonanza Global Resource with Old Pirate + Buccaneer at 2.0g/t cut-off

Project Cut-off Tonnes
all categories

Grade (g/t Au)
all categories

Ounces gold
Old Pirate Trend 1.0g/t
(top-cut)
1,882,000 10.1 611,000
Buccaneer HGZ 2.0g/t
(top-cut)
5,834,000 3.61 677,300
Total 7,716,000 5.19 1,288,300

Table 10. Twin Bonanza Global Resource with Old Pirate + Buccaneer at 1.0g/t cut-off

Project Cut-off Tonnes
all categories

Grade (g/t Au)
all categories

Ounces gold
Old Pirate Trend 1.0g/t
(top-cut)
1,882,000 10.1 611,000
Buccaneer HGZ 1.0g/t
(top-cut)
15,300,000 2.23 1,098,200
Total 17,182,000 3.10 1,709,200

Note – totals may vary due to rounding

==> picture [338 x 464] intentionally omitted <==

Figure 6. Buccaneer and Old Pirate site map

7

About ABM Resources

ABM is an exploration company developing several gold discoveries in the Central Desert region of the Northern Territory of Australia. The Company has a multi-tiered approach to exploration and development with a combination of high-grade potentially short-term production scenarios such as Old Pirate and Golden Hind, large scale discoveries such as Buccaneer, and regional exploration discoveries such as the Kroda Gold Project. In addition, ABM is committed to regional exploration programs throughout its extensive holdings.

ABM is well capitalised to achieve its milestones in 2013 with $14.1M in cash (as of quarterly report dated 31st December 2012).

==> picture [357 x 250] intentionally omitted <==

Figure 7. ABM Project Location Map Northern Territory

Signed

==> picture [90 x 43] intentionally omitted <==

Darren Holden – Managing Director

Competent Persons Statement

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Darren Holden who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Holden is a full time employee of ABM Resources NL and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves”. Mr Holden consents to the inclusion in the documents of the matters based on this information in the form and context in which it appears.

For Further Information Please Contact

Jutta Zimmermann Darren Holden Berdine Mastaglia CFO / Company Secretary Managing Director Investor Relations Manager +61 8 9423 9777 +61 8 9423 9777 +61 8 9423 9777

8

Appendix 1. Details of 2013 Resource Estimation Work.

Note on JORC Code 2012.

In December 2012 a new JORC Code was released. This code does not come into effect until November 2013, however, companies are asked to voluntarily comply with the new 2012 code as well as the current 2004 JORC Code. As a result, the table below is based as a check list on the JORC Code 2012.

Criteria Explanation
Sampling and sub-
sampling
Techniques
All RC samples were taken using a 12.5:1 Sandvik static cone splitter mounted under a polyurethane cyclone. Samples were
split into 3 aliquots, with one sent to the lab for assay, one stored and retained for QA/QC purposes, and one remaining at
the drill site.
Diamond drill samples were split in half either at the Company’s Wilson’s camp with a masonry saw, or shipped to Tanami
Gold’s Central Tanami operation and split in half with an Almonte core saw.
Drilling Techniques To date the Company has drilled 104 RC holes totalling 33,195m, and 7 diamond drill holes with RC precollars for an
additional 3,448m. RC Holes drilled in 2010 were completed by Gorey and Cole Drillers Pty Ltd of Alice Springs using a
Schramm 685 and Atlas Copco RC rig. Both rigs had a depth capability of approximately 600m, using a 1000psi, 1350cfm
Sullair compressor and auxiliary booster. All holes drilled in 2011 and 2012 were drilled by TopDrill Pty. Ltd. of Kalgoorlie,
using a Schramm 685 RC rig, with an approximate 600m depth capability, using a 1000psi, 1350cfm Sullair compressor and
auxiliary booster. All RC holes were 5 5/8” diameter.
All ABM diamond drilling to date has been completed by Boart-Longyear. All diamond drill holes were completed in 2011
using a dual-purpose KL-1500 diamond/RC drill rig with 6m barrel. Five 90m RC precollars, and one 350m precollar were
completed using the TopDill rig described above. One 90m precollar was completed using the KL-1500. To eliminate
potential problems with recovery, core runs were limited to 3m in length. Recovery near surface was increased by drilling HQ
(hole diameter 96mm, core diameter 63.5mm), with all remaining core drilled with NQ2 (hole diameter 75.7mm, core
diameter 50.6mm).Core was oriented at the drill by the driller using an Ace ori tool, with subsequent alignment and
confirmation by the logging geologist.
Drill sample
recovery
During 2011 and 2012 the Company regularly monitored and reviewed recovery of RC samples. Overall at Buccaneer a
>90% recovery of sample is achieved.
Logging Qualitative code logging for lithology, quartz content, ore minerals content and style, alteration styles, weathering, oxidation,
and mineralogy was conducted on RC drilling in 1m intervals. Diamond drill hole logging captured the same data;
additionally, structural measurements were taken on quartz veins, sedimentary structures, and brittle and ductile deformation
structures. Diamond drill hole logging was conducted over geologic intervals ranging from centimetres to several metres.
Drill logging conducted by previous explorers has been validated by the Company and included.
Quality of assay
data and laboratory
tests
Table A4 provides a summary of the QAQC results for the Buccaneer deposit. The majority of the QAQC measures passed
within 80-99% of two standard deviations and are satisfactory. Blanks, Lab mill flushes and Lab blanks performed well within
minimal contamination and the majority of the analyses falling at or below detection level of the methods, as required by the
QAQC protocols. Lab pulp checks and field duplicates for both the trenching and drilling showed a high level of variation
attributable to the nugget effect of the Old Pirate prospect. The standards performed consistently, with more variation than
the blanks.
While grades at Buccaneer are generally in the 2-10g/t range, given the occasional presence of higher-grade material the
Company recognises the need for a higher grade set of standards for the Buccaneer deposit. In 2013 the Company will be
implementing a new set of standards to better reflect the deposit.
Verification of
sampling and
assaying
Samples were submitted to both ALS Minerals and Intertek Laboratories. No substantial variation was found in the results
received from the two labs. Additionally,1 in 25 samples submitted was a field duplicate. There was no substantial variation
between original and field duplicate assay values.
Location of data
points
All drill collars survey with differential GPS to sub 5cm accuracy.
Down hole surveys completed with a combination of EZ-Trac single shot camera and keeper rate north finding gyro down
hole surveying. Some magnetic camera shots showed variations beyond what was expected due to magnetic interference of
the surrounding rocks.
Data spacing and
distribution
During the 2011 / 2012 season, the Company ensured a 50m spaced RC drill coverage over the entire area of the Indicated
Resource.
Orientation of data
in relation to
geological structure
Holes were structurally logged; resulting data analyses showed a stockwork of veins through the system. An isotropic
Leapfrog model was built for the high-grade envelopes of the deposit in an attempt to find an overall structural control. From
the isotropic model, the deposit was split into an upper and lower domain.
Sample security All samples were stored in secure locations at the Company’s Wilson’s camp, or Tanami Gold’s Central Tanami Operation
prior to being shipped via Toll IPEC to either ALS or Intertek’s Alice Springs preparatory facilities. All sample bags were
sealed with cable ties to ensure no tampering during shipment.

9

Criteria Explanation
Database Integrity ABM uses the Maxwell Data Schema (MDS) version 4.5.1. The interface to the MDS used is DataShed version 4.5 and SQL
2008 R2 (the MDS is compatible with SQL 2008-2012 – most recent industry versions used). This interface integrates with
LogChief and QAQCReporter 2.2, our primary choice of data capture and Assay quality control software.
DataShed is a system that captures data and metadata from various sources, storing the information to preserve the value of
the data and increasing the value through integration with GIS systems. Security is set through both SQL and the DataShed
configuration software. ABM has one sole Database Administrator and an external contractor with expertise in programming
and SQL database administration. Access to the database by the geoscience staff is controlled through security groups
where they can export and import data with the interface providing full audit trails. Assay data is provided in MaxGEO format
from the laboratories and imported by the Database Administrator. The database assay management system records all
metadata within the MDS and this interface provides full audit trails to meet industry best practice.
Exploration field data is primarily captured via LogChief. Multiple data capture configurations are built for specific tasks such
as sample dispatch to gather data across many mining and exploration activities with the referential integrity essential for
synchronisation with the master database. This allows for improved accuracy of data capture and decreased data
management time. QAQCReporter monitors and reports on assay quality control, this management of assay QAQC
increases confidence in the data and provides control of the assay process and reduces overall business risk.
The three ABM databases are backed up on a daily schedule with the current day’s backup being copied across to the
nightly server backup tapes. Standard practice is that there is always a current backup tape held off site and an end of
month tape kept permanently off site. Copies of the original laboratory files are kept on the server’s windows directory and
are available via a web service.
Site Visits The Competent Person has made a total of 12 site visits in the past 3 years and is familiar with the geology and
mineralisation of the region. The Competent Person has directly supervised drilling, and sampling as well as helping to
develop the overall database integrity.
Geological
Interpretation
The resource model is based on geologic knowledge gained through extensive logging of RC chips and core by site
geologists, and Leapfrog Mining 3D software.
Dimensions The Buccaneer gold deposit is hosted in a monzogranite intrusion with an approximate footprint of 2km x 1km. The resource
has been defined over the southern and western portions of the intrusion over an approximate area of 1km x 1km.
Estimation and
Modelling
techniques
An isotropic model was initially constructed using Leapfrog Mining software. Resulting analysis of the isotropic model
suggested two domains in the main Buccaneer deposit. Drilling data was loaded into Leapfrog. Grade shells were generated
for the two domains at 0.5g/t and 1g/t cut-offs using a radial basis function with kriged search parameters. The grade shells
were governed with a search based entirely on the geological model.
The Cypress grade shell was re-modelled manually using MicroMine software, with manual wireframes constructed. Block
model and interpolation parameters are shown in Tables A2 and A3 below.
Metallurgical
factors
Due to clay content the Buccaneer oxide is not thought to be appropriate for heap-leach optimisation. Visible and
microscopic gold is sighted regularly with the main Buccaneer Zone with free gold in veins and it is anticipated that gold will
liberate with gravity and cyanide methods. Further test work required.
Environmental
Factors
Environmental surveys not yet conducted.
Bulk Density Density measurements were done on RC chips using Pyncometer testing, and returned an average value of 2.5g/cm3.
Based on the recommendations of SRK, further density measurements were undertaken on diamond core using a water
immersion method. Samples were weighed dry, weighed suspended in water, with dry weight divided by the difference to
provide density. No diamond drilling has been undertaken in the oxide zone, so the pyncometer average of 2.5g/cm3 was
used. 27 measurements in the transitional zone returned an average of 2.6g/cm3, and 433 measurements of fresh rock
_returned an average of 2.7g/cm3. _
Classification As noted in the body of this document.
Audits or Reviews Reviewed by board of ABM Resources.
Discussion of
relative accuracy /
confidence
Block model was audited and compared against drill results.
Moisture The mineral resource estimate is based upon dry tonnages. Moisture content has not been included.

10

Table A1 – Drill data summary

Buccaneer Project
513,200mE – 516,200mE and 7,771,200mN – 7,775,200mN
Number of
holes
Metres
drilled
Average
Depth(m)
Company DH type Prefix
Pre-ABM Air Core BUAC 7 138 19
Pre-ABM RC/DD BURC 41 5,940 145
Pre-ABM RAB OPRB 16 619 39
Pre-ABM Air Core TBAC 69 5,167 75
Pre-ABM DD TBD 2 405 202
Pre-ABM RAB TBRB 640 29,523 46
Pre-ABM RC TBRC 17 3,452 203
Pre-ABM VAC TBV 6 88 15
Pre-ABM RAB WRB 11 522 47
Pre-ABM VAC WV 21 229 11
TOTAL 46,083
ABM RC BCRC 100 31,995 323
ABM RC/DD BCDD 7 3,448 493
CYRC 4 1,200 300
ABM RC
TOTAL 36,643
GRAND
TOTAL
82,726

Table A2 – Block Model parameters

Origin block centre Origin block centre Origin block centre End block centre End block centre End block centre Parent block size Parent block size Parent block size Sub blocks Sub blocks Sub blocks
X Y Z X Y Z X Y Z X Y Z
514000 7772000 -100 515260 7774000 450 20 20 5 10 10 10
Origin block corn er End block corn er Minimum block size Number of blocks
X Y Z X Y Z X Y Z X Y Z
513990 7771990 -102.5 515270 7774010 452.5 2 2 0.5 64 101 111

11

Table A3 – Interpolation parameters

Table A3 – Interpolation parameters Interpolation parameters Interpolation parameters
ellipseparameters search anisotropy searchparameters
minimum
samples
maximum
samples
per sector
number
of
sectors
azimuth Dip plunge Axis
1
Axis
2
Axis
3
radius
factor
inverse
power
Buccaneer
upper zone
indicated
7 4 4 320 22 5 50 37.5 25 1 2
Buccaneer
upper zone
inferred
4 4 4 320 22 5 50 37.5 25 2 2
Buccaneer
upper zone
inferred ext.
0 4 4 320 22 5 50 37.5 25 4 2
Buccaneer
lower zone
indicated
7 4 4 135 50 5 50 37.5 25 1 2
Buccaneer
lower zone
inferred
4 4 4 135 50 5 50 37.5 25 2 2
Buccaneer
lower zone
inferred
0 4 4 135 50 5 50 37.5 25 4 2
Cypress
inferred
7 4 4 15 39 0 40 40 20 1 2
Cypress
inferred
4 4 4 15 39 0 40 40 20 2 2
Cypress
inferred
0 4 4 15 39 0 40 40 20 4 2

Table A4 – Quality Assurance/Quality Control Summary

Table A4 – Quality Assurance/Quality Control Summary
Type QAQC
Total
% within 2SD
(excluding non-
detection)
Comments
Standards
632
89.28%
Blanks
403
78.66%
Lab mill Flushes
313
85.62%
Drilling Lab Blank
100
89.00%
Lab pulp checks
1311
n/a
Natural variation and nugget effect precludes
calculation of percentage of data within 2 SD.
Field Duplicates
1372
n/a
Natural variation and nugget effect precludes
calculation ofpercentage of data within 2 SD.

12

Table A5 - Risk matrix for Buccaneer modelling.

All resource modelling has a number of risk factors and uncertainties. This table discusses the risk factors and produces considerations for further work.

Risk Factor Discussion Outcome Mitigation
Orientation of
higher grade
zones
The separation of domains is based on
a combination of diamond holes and
lining up high-grade zones via 3D
interpretation. Multiple runs at
different orientations were carried out
to assess the impact and overall there
was low variability between isotropic
and anisotropic domains. The overall
resource will not materially change by
modifying domain search and
definition criteria.
If the higher grade zones are
oriented differently than
modelled the overall mine
design in subsequent
feasibility studies may not
be correct.
Further diamond drilling
and structural modelling
work to further assess the
outcomes.
Metallurgical
test-work
Visible gold and free gold is observed
in petrology work and the main
Buccaneer zone and the Cypress zone
generally have low sulphide in high-
grade portions. In addition,
microscopic gold is observed on the
outside of sulphide grains. However, it
is possible that parts of the resource,
especially the smaller Caribbean zone
may be associated with high sulphide.
A high sulphide content may
not liberate gold as easily
using cyanide. However,
oxide / transition exists to
beyond 100m depth and the
high sulphide zones are
limited to the Caribbean
zone.
Detailed metallurgical test
work across several ore-
types including and
especially for the main
Buccaneer Zone.
Cypress Zone
extents
3 holes in the Cypress zone intersected
grades >100g/t. These appear to part
of an easterly dipping chlorite shear
zone the extents of which are not yet
defined. The resource model was
trimmed to be limited to just the
drilling that intersected the chlorite
shear zone.
The extents of the shear
zone need to be
determined, and the high-
grade Cypress zone may be
expanded into a more
substantial system.
Further drill test to define
extents may add further
high-grade mineralisation.

13

==> picture [453 x 308] intentionally omitted <==

Figure A1, Buccaneer Main Zone drill plan / geology

==> picture [258 x 360] intentionally omitted <==

Figure A2 Buccaneer to Cypress drill plan / geology

14

Appendix 2.

Table 1. Buccaneer Gold Deposit 2012 Indicated and Inferred Resource. Refer release dated 16/04/2012 for further details.


er details.
Cut-off Grade
(g/t)
Million Tonnes
(Mt)
Gold Grade
(g/t)

Contained Gold
(Million Ounces (Moz))
0.2 127.9 0.65 2.672
0.6 44.1 1.10 1.566

Note – Million Tonnes (MT) rounded to 3 significant figures; gold grade rounded to 3 significant figures and Million Ounces (Moz) rounded to 3 significant figures. Refer to release dated 16/04/2012 for further details.

Table 2. Old Pirate Trend Overall High-Grade Mineral Resource Estimation February 2013. Refer release dated 04/02/2013 for further details.

Category Tonnes Gold Grade
(g/t)
(300g/t top-cut)
Gold Grade
(g/t)
(uncut)
Ounces Gold
(300g/t top-cut)
Ounces Gold
(uncut)
Indicated 889,000 8.19 8.93 234,100 255,300
Inferred 993,000 11.80 14.67 376,900 468,500
Total 1,882,000 10.10 11.96 611,000 723,800

Mineral Resources estimated at 1g/t cut-off except for the Central Zone estimated at a 3g/t cut-off. Totals may vary due to rounding. There is an additional 414,900 tonnes averaging 1.74g/t gold for 23,300 ounces of gold in low-grade Indicated Resource in the Central Zone (>1g/t, <3g/t cut-offs).

15