Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

PRODIGY GOLD NL Capital/Financing Update 2004

Jun 27, 2004

65615_rns_2004-06-27_31daa537-e5f6-4aa0-b315-89da6dfd1332.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

AUSTRALIA $N1$

28 June 2004

The Announcements Office Australian Stock Exchange Ltd Level 3, 20 Bridge Street SYDNEY NSW 2000

Dear Sir

DRILLING UPDATE - NORSEMAN GOLD PROJECT

Tantalum Australia NL is pleased to announce further assay results from samples from recent Reverse Circulation (RC) drilling that was completed at its fron Duke and Surprise prospects within the Norseman Project in Western Australia.

In this program deeper inclined holes at Iron Duke were planned to intersect the mineralised structure beneath the previously planned pit depth (30metres) and to test the northerly extensions of the known mineralisation. This work confirmed earlier interpretations; the gold mineralisation occurs in a 50metre wide "envelope" of moderately (west) dipping shears at grades up to 2.5g/t. However, within this zone there occur sub-vertical, discontinuous lenses of high grade (5-80g/t) material. Results of the recent drilling have extended the strike of the mineralised zone to approximately 340 metres. Mineralisation is open to the north and south along strike.

Separate from the Iron Duke lode mineralisation described above, and overlying a parallel shear 80 metres to the east, is a zone of mineralised laterite up to 100 metres x 60 metres in area and extending from the surface to 7 metres depth.

The drilling at Surprise prospect (800 metres north of Iron Duke and on the same structure) was, primarily, to test another surficial deposit. In this case the "laterite" is ferruginous eluvium with calcareous cement and forms a cap up to 4 metres thick overlying the bedrock mineralisation.

Gold assays of 1 metre samples from the program have been returned and are listed below.

The better intercepts from the latest round of results include:

5 metres Ф. 3.32 g/t Au
7 metres Ф. 3.51 g/t Au
6 metres Ф. 4.03 g/t Au
2 metres Ö. 12.39 g/t Au
7 metres @ 4.42 g/t Au

Follow up Drilling

An RC drilling program as follow up to the above drilling commenced during June and was suspended on June 12 due to a rig breakdown with 21 holes being completed for a total of 1400 metres. Composite (5 metre) samples have been dispatched for analysis. The RC program will recommence during the next week with the aim of extending mineralisation north and south and below 30 metres depth where additional information is required to update the resource model. Drilling will continue at least until the end of July as part of the ongoing feasibility study until the strike extent of the Iron Duke deposit is closed off and the drilling density between 30 and 80 metres depth is sufficient for resource estimation.

Yours faithfully

Peter Farrah Company Secretary

Significant Intercepts

Hole ID MGA
North
MGA
East
Total
Depth
Down hole
Interval
Width
(m) (m) (g/t)
Iron Duke $Az - 090^\circ$ $Dip \cdot 60^\circ$
NDC 194 6429840 387530 50 19-25 5 3.32
$32 - 34$ $\mathbf 2$ 1.73
NDC 195 6429855 387515 50 $13 - 20$ 7 3.51
NDC 197 6429710 387470 90 $50 - 51$ Ĩ 1,38
60-66 6 4.03
NDC 199 6429900 387515 50 $0 - 1$ 1 1.92
$11 - 13$ 2 3.58
NDC 200 6429675 387510 90 37-39 $\overline{c}$ 1.52
49-50 Ĩ 5.41
57-58 1 2.28
Iron Duke - Laterite (Vertical holes)
NDC 206 6430000 387670 10 $0 - 4$ $\overline{4}$ 1.06
NDC 207 6430000 387660 10 $0 - 5$ 5 1.40
NDC 208 6430000 387650 10 $0 - 5$ 5 1.57
NDC $210$ 6430020 387670 10 $0 - 2$ $\overline{2}$ 1.12
NDC 211 6430020 387660 10 $0 - 5$ $\mathfrak s$ 1.88
NDC 213 6430020 387640 10 $0 - 5$ 5 1.05
Hole ID MGA MGA Total Down hole Width Au
North East Depth Interval
(m)
(m) (g/t)
Surprise Az - 090° $Dip \cdot 60^\circ$ (*Vertical holes)
NDC 163 * 6430870 387561 15 $7 - 14$ $\overline{7}$ 2.36
NDC 147 6430825 387568 15 $8 - 12$ $\overline{4}$ 3.83
NDC 173 * 6430820 387552 45 $12 - 14$ $\overline{2}$ 12.39
incl. $12 - 13$ Ĩ 22.89
NDC 166 * 6430895 387509 10 $9 - 10$ Ĩ 3.39
Surprise - Laterite
NDC 160 6430910 387565 5 $0 - 1$ Ĩ 3.27
NDC 142 6430890 387563 20 $1 - 4$ 3 1.48
NDC 143 6430835 387589 15 $0 - 4$ $\overline{4}$ 1.69
NDC 144 6430835 387579 15 $0 - 1$ I 1.13
$2 - 6$ $\ensuremath{\mathsf{4}}$ 1.09
NDC 145 6430835 387569 15 $4 - 6$ $\bar{z}$ 1.43
NDC 146 6430825 387578 15 $0 - 7$ 7 4.42
NDC 149 6430790 387588 49 $0 - 4$ $\boldsymbol{4}$ 1.41
NDC 152 6430780 387589 9 $0 - 7$ 7 1.05
NDC 153 6430780 387579 9 $0 - 2$ $\mathbf 2$ 1.20
NDC 168
NDC 165
6430895
6430870
387578
387541
10
15
$0 - 4$
$0 - 2$
$\overline{4}$
2
1.37
1.09