Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

PREDICTIVE DISCOVERY LIMITED Investor Presentation 2017

Feb 6, 2017

65537_rns_2017-02-06_4a11f13a-bcd1-4e46-97a7-e4bec5af6be2.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [720 x 208] intentionally omitted <==

for New Gold Discoveries in West Africa

Disclaimer

This presentation contains only a brief overview of Predictive Discovery Ltd and its associated entities (“PDI or Predictive") and their respective activities. The contents of this presentation, including matters relating to the geology of the projects, may rely on various assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent verification.

This presentation contains a number of forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Predictive’s control, may cause the actual results, performance and achievements of PDI to differ materially from those expressed or implied in this presentation.

To the maximum extent permitted by law, PDI does not warrant the accuracy, currency or completeness of the information in this presentation, nor the future performance of PDI, and will not be responsible for any loss or damage arising from the use of the information. The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential investors and shareholders should seek independent advice before making any investment decision in regard to Predictive or its activities.

Competent Person Statement

The information in this report that relates to Exploration Results and the near-Bongou Exploration Target is based on information compiled by Mr Paul Roberts who is a Fellow of the Australian Institute of Geoscientists. Mr Paul Roberts is a full time employee of the company and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined by the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Roberts consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The Mineral Resource estimation and classification of Mineral Resources for the Bongou deposit is based on, and fairly represents, information and supporting documentation compiled by Mr Richard Gaze. Mr Gaze is a full-time employee of Golder Associates Pty Ltd and a Member and Chartered Professional of the Australasian Institute of Mining and Metallurgy. Mr Gaze has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (2012 Edition). Mr Gaze consents to the inclusion of the estimates, classification and the supporting information in the form and context in which it appears.

PDI – Cape Town 121 Conference Page 2

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Strategy
----- End of picture text -----

  • One-stop shop for investors seeking exposure to gold exploration success in West Africa

  • Advanced projects largely funded by JV partners

  • PDI retains 30-40% equity

  • Identify new projects, exploration work up to/including initial drilling, bring in JV partners and/or obtain project level funding

  • Low overheads

==> picture [115 x 410] intentionally omitted <==

----- Start of picture text -----

Visible gold
panned from
RC chips,
Nyangboue
Prospect,
Boundiali
Permit, Cote
D’Ivoire
----- End of picture text -----

PDI – Cape Town 121 Conference Page 3

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

ASX:PDI -
Corporate Summary
----- End of picture text -----

Board Members

Mr. Phillip Jackson Non-Executive Chairman Extensive board experience, resources petroleum/minerals) corporate lawyer. Chairman of Aurora (largest shareholder) Mr. Paul Roberts Managing Director Discovery track record, global exploration experience Mr. David Kelly Non-Executive Director Extensive geological, business development and investment banking experience

Capital Structure

Shareholders

Shares on Issue (ASX:PDI) 1.63 Billion

Share Price A$0.012 Market Cap. (@0.012 ) A$ 19.6 million Cash Position 31/12/16 A$ 2.7 million Enterprise Value A$ 16.9 million Debt Nil

Top 20 Shareholders (%) 70%

==> picture [203 x 146] intentionally omitted <==

----- Start of picture text -----

43%
40%
6%
11%
----- End of picture text -----

Aurora Lowell Phillip HentySprott Others

PDI – Cape Town 121 Conference Page 4

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

PDI’S CONSISTENT FOCUS: WEST AFRICA
----- End of picture text -----

==> picture [476 x 420] intentionally omitted <==

 Numerous projects - advanced to grass roots

  • Expanding in Cote D‘Ivoire

  • Cote D’Ivoire and Burkina Faso:

  • In Francophone

Africa – fixed exchange rate to the Euro

  • Strong democracies

  • Supportive mining policies and law

  • 50% of the Birimian

  • greenstones

PDI – Cape Town 121 Conference Page 5

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire Permits
>6,000 km [2] permits and permit applications
----- End of picture text -----

==> picture [417 x 424] intentionally omitted <==

  • Toro Gold JV (brown & blue permits) :

  • Toro Gold Limited, successful explorer, developing Mako Gold Mine in Senegal

  • Toro spend USD3.5 million to earn 65% equity on 4 permits. PDI to start contributing in March 2017

  • Active program producing excellent drill results

  • Bobosso (XMI) JV (red permits) :

  • Very large gold mineralised system

  • Starting pre-drill work program next week

  • Very advanced discussions with funding partner for planned diamond drilling

  • New ground – Sika Resources Options plus Ivoirian Resources (100% PDI) - (magenta and green :

  • permits)[1]

  • All permit applications – selected using PDI Predictore target selection system

1announced to ASX 6/2/17

PDI – Cape Town 121 Conference Page 6

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire Permits
Toro Gold JV – Boundiali permit
----- End of picture text -----

==> picture [316 x 341] intentionally omitted <==

==> picture [410 x 273] intentionally omitted <==

  • New discovery 1.2km long gold mineralised .

  • system

RC drill and soil geochemical results reported to the ASX on 20/10/15, 23/3/16, 23/6/16, 25/7/16, 8/8/16, 12/9/16,13/10/16 and 2/2/17

  • Best intercepts (near surface) - 20m @ 10.5g/t Au , 28m @4.0g/t Au, 28m a2 1.6g/t Au

  • Large untested soil anomalies defined in NW and SE – require drilling

PDI – Cape Town 121 Conference Page 7

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire Permits
Toro Gold JV – Boundiali permit
----- End of picture text -----

Drill results reported to ASX 23/6/16 and 8/8/16

 This section 320m from nearest cross-section in both directions Colonial mine water supply  Panned visible gold

PDI – Cape Town 121 Conference Page 8

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire Permits
Toro Gold JV – Kokoumbo permit
----- End of picture text -----

  • First Toro drill hole – 7.5m @ 16g/t Au from Colonial mine water

  • surface

Gold soil geochemistry image

  • Large soil anomalies

  • Long history of artisanal mining

  • With Beriaboukro to south – an 800km[2] ground package Artisanal workings Kokoumbo Hill

  • Close to Bonikro and Agbaou

==> picture [214 x 122] intentionally omitted <==

----- Start of picture text -----

Colonial mine water
supply
----- End of picture text -----

==> picture [208 x 118] intentionally omitted <==

----- Start of picture text -----

Toro diamond drill
set up March 2016
----- End of picture text -----

Soil results reported to ASX 20/10/15 Chip-channel results reported to ASX 10/11/15 Drill results reported to ASX 13/5/16

PDI – Cape Town 121 Conference Page 9

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire Permits
Toro Gold JV – Beriaboukro permit (S of Kokoumbo)
----- End of picture text -----

  • Large soil

anomalies – need Artisanal workings infill and RC drilling Kokoumbo Hill

 Impressive workings with some high gold grades in rock chips

  • Close to Bonikro

Soil geochemical and rock chip results reported to the ASX on 21/9/16 and

2/2/17.

==> picture [485 x 353] intentionally omitted <==

----- Start of picture text -----

Artisanal workings
Kokoumbo Hill
----- End of picture text -----

PDI – Cape Town 121 Conference Page 10

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire Permits
Toro Gold JV – Ferkessedougou permit
----- End of picture text -----

==> picture [355 x 373] intentionally omitted <==

==> picture [326 x 297] intentionally omitted <==

==> picture [133 x 111] intentionally omitted <==

----- Start of picture text -----

Alluvial gold in
panning dish
----- End of picture text -----

Soil geochemical results reported to the ASX on 28/4/16

  • 4km long anomaly with active alluvial gold workings nearby (e.g. image)

  • RC drilling planned

PDI – Cape Town 121 Conference Page 11

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire Permits
Toro Gold JV – Ferkessedougou North
----- End of picture text -----

==> picture [263 x 321] intentionally omitted <==

----- Start of picture text -----

Artisanal workings
Kokoumbo Hill
----- End of picture text -----

==> picture [338 x 395] intentionally omitted <==

  • 17km long gold-in-soil trend

 Early days - more infill soils required Two potential drilling targets, each 2km long

Soil geochemical results reported to the ASX on 14/12/16, 2/2/17

PDI – Cape Town 121 Conference Page 12

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire
XMI Agreement - Bobosso Project [1]
----- End of picture text -----

7 km[2] gold soil anomaly, averaging 0.4g/t Au , peaking at 40g/t Au[1]

  • Complex gold system with numerous shallow gold intercepts[1] e.g.

  • 5m @ 21g/t Au from 48m

  • 32m @ 1.9g/t Au from 12m

  • 7m @ 9.5g/t Au from 26m

  • Many strong gold anomalies not yet drilled

  • PDI now at 37%, bringing in a funding partner for diamond drilling, will maintain 30% equity

==> picture [469 x 362] intentionally omitted <==

----- Start of picture text -----

Drill hole –
low grade
Drill hole – at
least one 2gxm
intercept
Drill
section
Large areas of
soil anomaly
untested 7km [2 ] gold-in-soil
geochemical
anomaly
----- End of picture text -----

PDI – Cape Town 121 Conference Page 13

1 ASX release dated 28/10/15

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire
Bobosso Project – Near surface mineralisation
----- End of picture text -----

==> picture [570 x 394] intentionally omitted <==

----- Start of picture text -----

250m RL
[email protected]/t Au
Weathered volcanics including
[email protected]/t Au
[email protected]
[email protected]/t Au
g/t Au
[email protected]/t Au
including
[email protected]/t Au
200m RL
[email protected] g/t Au
[email protected]
including
Mafic volcanics g/t Au
[email protected]/t Au
150m RL
Low grade [email protected]
gold g/t Au
mineralised
envelope
0 50m
OPEN
ASX release dated 28/10/15
----- End of picture text -----

PDI – Cape Town 121 Conference Page 14

==> picture [720 x 108] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire
New potential gold-bearing structures in magnetics
----- End of picture text -----

  • Historical drilling at oblique angle to structures:

  • Effective distance along structures between drill lines of approximately 500m

  • Strong gold anomalies and east-west structures untested by drilling

  • Additional discovery potential along 90km of strike (same as Hounde Belt in Burkina which hosts Semafo’s Mana Mine and Roxgold’s Yaramoko Mine)

==> picture [479 x 341] intentionally omitted <==

PDI – Cape Town 121 Conference Page 15

1 ASX release dated 28/10/15

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Burkina Faso – Major ground position,
advanced project
----- End of picture text -----

Bongou

PDI – Cape Town 121 Conference Page 16

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

Bongou Gold Discovery
Mineral Resource Estimate (Reported to ASX on 4 [th] Sept 2014)
----- End of picture text -----

Indicated Resources Inferred Resources Total Resources
Cut-off Million Au Million Au Million
Au
grade tonnes (g/t) Ounces tonnes (g/t) Ounces tonnes
(g/t)
Ounces
0.4 1.21 2.54 99,000 1.33 2.13 91,000 2.55
2.32
190,000
0.8 1.14 2.67 98,000 1.09 2.48 86,000 2.22
2.58
184,000
2.0 0.64 3.64 75,000 0.49 3.90 61,000 1.13
3.75
136,000
3.0 0.34 4.68 52,000 0.28 4.95 45,000 0.62
4.80
96,000
Drill assay data
reported to ASX on
2/12/1316/12/13,
20/3/14, 1/4/14
Note: These metallurgical results
were reported to the ASX
on 14 May 2013. This

Note: These metallurgical results were reported to the ASX on 14 May 2013. This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the

PDI – Cape Town 121 Conference Page 17

==> picture [720 x 100] intentionally omitted <==

----- Start of picture text -----

Bongou - Nearby Gold Potential
----- End of picture text -----

  • Over 90 selected targets

  • Exploration Target calculation (excluding Bongou, within 10km of Bongou – ASX release 3/9/15):

  • On: Dave Prospect, Target 92, Laterite Hill Prospect 71, near Bongou targets.

  • 9.4-10.4Mt

  • 1.5-1.7g/t Au

  • 460,000 – 560,000oz Au

The potential quantity (tonnage) and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to

estimate Mineral Resources and it is uncertain if further exploration will result in the estimation of Mineral Resources.

  • Potential for heap leach - sighter metallurgical testwork on Dave RC chips gave 89% Au recovery

  • Additional potential within 80km: Bira, Tambiri, Solna

==> picture [409 x 305] intentionally omitted <==

Land tenure notes: 5 permits covering 665 km[2 ] . PDI owns 100% of 620 km[2] , and is earning 100% on one peripheral 45 km[2] permit without RC or DD drilling. Permits for all key prospects are renewed to mid-2017.

PDI – Cape Town 121 Conference Page 18

==> picture [720 x 100] intentionally omitted <==

----- Start of picture text -----

Bongou - Nearby Gold Potential
----- End of picture text -----

  • Over 90 selected targets

  • Exploration Target calculation (excluding Bongou, within 10km of Bongou):

  • On: Dave Prospect, Target 92, Laterite Hill Prospect 71, near Bongou targets.

  • 9.4-10.4Mt

  • 1.5-1.7g/t Au

  • 460,000 – 560,000oz Au

The potential quantity (tonnage) and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate Mineral Resources and it is uncertain if further exploration will result in the estimation of Mineral Resources.

  • Potential for heap leach - sighter metallurgical testwork on Dave RC chips gave 89% Au recovery

  • Additional potential within 80km: Bira, Tambiri, Solna

EXPLORATION TARGET DATA AND PARAMETERS Data: Gold intercepts from 291 reverse circulation holes, 4 air core holes and 5 diamond drill holes were used in the calculation. The holes were mostly drilled on lines spaced from 50m to 100m apart, with spacing along the lines ranging from 10m to 50m.

Parameters:0.5 g/t gold cut-off grade; minimum downhole intercept width of 2m and a minimum grade times width intercept of 2g*m; minimum internal waste of 3m except for a few holes where it was clear that the holes had drilled almost down-dip and where the inclusion of larger down-hole intervals of internal waste made geological sense; maximum of 100m strike extent from drill holes (where the continuity of the mineralisation is supported by mapping and/or the location of artisanal workings and/or anomalous auger results);maximum of 70m vertical extent below surface; Dry bulk density estimates as follows: laterite - 2.2, saprolite - 1.8, weathered rock between base of saprock and base of complete oxidation (BOCO) - 2.3, fresh mafic volcanics - 2.8, fresh felsic to intermediate rocks including granite and granodiorite - 2.7.

The calculation was carried out using a cross sectional method with volumes projected half way to the next hole (on the section) or half way to the next section to a maximum distance of 100m (along strike).

PDI – Cape Town 121 Conference Page 19

==> picture [720 x 101] intentionally omitted <==

----- Start of picture text -----

News Flow
----- End of picture text -----

Item Mar-Jun Qtrs 2016
Boundiali, Cote D’Ivoire (Toro) Diamond drilling at Nyangboue followed by RC drilling
both at Nyangboue and new NW and SE soil
anomalies.
Kokoumbo and Beriaboukro,
Cote D’Ivoire(Toro)
Aeromagnetic data analysis (in progress), infill soils at
Beriaboukro thenRC drilling
Ferkessedougou and
Ferkessedougou North
Follow-up geochemical anomaly withRC drillingat
Ferkessedougou,infill soil results at Ferkessedougou
Northinpreparation forRC drilling
Bobosso, Cote D’Ivoire (XMI) Diamond drilling programon Bobosso prospect,
regional scalegeochemistry
Bongou area, Burkina Toro Gold and PDI
~~lit iitin~~
JV with company with mine development capabilities
to fast track advance to feasibility/development.New
major workprogram(incl. drilling).
New West African projects ~~geoogss vsg~~
Boundiali, October
2014
3 new optioned and 3 PDI permit applications in Cote
D’Ivoire over prospective target areas.Geochemistry
focused workprogram

PDI – Cape Town 121 Conference Page 20

Predictive Discovery Limited West African Gold Explorer

==> picture [261 x 146] intentionally omitted <==

Contact Details:

Level 2, 33 Ord St, West Perth, Western Australia 6005

Telephone: +61 8 9216 1020 (direct) +61 402 857 249 (mobile) Email: [email protected]

Website: www.predictivediscovery.com

PDI – Cape Town 121 Conference Page 21