Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

PREDICTIVE DISCOVERY LIMITED Investor Presentation 2014

May 29, 2014

65537_rns_2014-05-29_97062eec-9b25-40af-b09f-0e2d731f49e0.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [720 x 208] intentionally omitted <==

Investor Roadshow May 2014

==> picture [163 x 91] intentionally omitted <==

Disclaimer

This presentation contains only a brief overview of Predictive Discovery Ltd and its associated entities (“PDI or Predictive") and their respective activities. The contents of this presentation, including matters relating to the geology of the projects, may rely on various assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent verification.

This presentation contains a number of forward-looking statements. Known and unknown risks and uncertainties, and factors outside of Predictive’s control, may cause the actual results, performance and achievements of PDI to differ materially from those expressed or implied in this presentation.

To the maximum extent permitted by law, PDI does not warrant the accuracy, currency or completeness of the information in this presentation, nor the future performance of PDI, and will not be responsible for any loss or damage arising from the use of the information.

The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential investors and shareholders should seek independent advice before making any investment decision in regard to Predictive or its activities.

Competent Person Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Paul Roberts who is a Fellow of the Australian Institute of Geoscientists. Mr Paul Roberts is a full time employee of the company and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined by the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Roberts consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

PDI May 2014 Page 2

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Summary
----- End of picture text -----

Ob ective: Hi h rade old in West Africa j g g g

Bongou the focus:

  • High grade, thick, consistent, open at depth

  • Good initial metallurgy

  • Excellent alon strike otential g p

Large, strategic ground positions in Burkina and Cote D’Ivoire

Next steps:

  • Along strike exploration at Bongou – geochemical drilling and trenchin followed b RC drillin g y g

Fully funded for current work program

Enterprise value of less than $2m, highly leveraged to new old discoveries in West Africa g

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 3

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

ASX:PDI - Corporate Summary
----- End of picture text -----

Board Members

Mr. Phil Harman Non-Executive Chairman Extensive board experience, discovery track record, senior roles in BHP Mr. Paul Roberts Managing Director Discovery track record, global exploration experience Mr. Phil Henty Non-Executive Director Extensive corporate and stockbroking experience Mr Tim Markwell Non-Executive Director Fund manager, substantial mining industry and resource analyst experience

Capital Structure

Shares on Issue (ASX:PDI) 388 Million Share Price A$0.007 Market Cap. (@0.007 ) A$ 2.7 million Cash Position at 31 03 2014 A$ 1.6 million Enterprise Value A$ 1.1 million Debt Nil Top 20 Shareholders (%) 53%

==> picture [332 x 184] intentionally omitted <==

----- Start of picture text -----

African Lion
Shareholders 18%
Lowell
Resources
7%
Others
67%
Board and
management
8%
----- End of picture text -----

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 4

==> picture [720 x 102] intentionally omitted <==

West Africa Focus

==> picture [451 x 393] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 5

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Strategic Ground Holding, East Burkina Faso
----- End of picture text -----

==> picture [585 x 393] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 6

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Bongou – high grade, thick, consistent
----- End of picture text -----

==> picture [330 x 392] intentionally omitted <==

  • Intensely altered pyritebearing mineralisation

  • High grades on N contact

  • Good continuity and extends to depth

==> picture [317 x 220] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

Note: drill results reported to the ASX on 2[nd] December 2013, 16[th] December 2013, 20[th] March 2014 and 1[st] April 2014.

PDI May 2014 Page 7

Bongou long section

  • high grade

  • thick

  • consistent true widths:

  • 52m at 3.2g/t Au incl. 6m at 10g/t Au

  • 40m at 4.3g/t Au incl. 13m at 9.7g/t Au

  • 36m at 5.0g/t Au incl. 15m at 8.9g/t Au

  • 47m at 3.2g/t Au incl. 21m at 4.9g/t Au

  • 41m at 2.8g/t Au incl. 5m at 7.8g/t Au

  • 58m at 2.0g/t Au incl. 5m at 7.3g/t

==> picture [411 x 471] intentionally omitted <==

Note: drill results reported to the ASX on 2[nd] December 2013, 16[th] December 2013, 20[th] March 2014 and 1[st] April 2014.

PDI May 2014 Page 8

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Bongou – good preliminary metallurgy
----- End of picture text -----

  • Rapid gold dissolution in first few hours

  • Free gold and gold on or within pyrite

  • Acceptable cyanide/lime consumption

  • 50 microns

==> picture [418 x 334] intentionally omitted <==

Note: These metallurgical results were reported to the ASX on 14 May 2013

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 9

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Bongou – nearby potential
----- End of picture text -----

>20 Bongou-scale gold geochemical anomalies

  • Gold in

==> picture [534 x 305] intentionally omitted <==

reconnaissance RC drilling and trenching

 Many small granites under cover open to east and west

 Bedrock drilling and trenching underway, extending to east and west

 RC drilling to come, based on new results

Note: geochemical results on this slide were reported to the ASX on 12 May 2014

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 10

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Bongou-like gold mineralisation nearby
----- End of picture text -----

 Bongou W1 Prospect (left) 250m from Bongou (right)

 Coarse pyrite and siliceous alteration at both locations

  • None at surface in W1 trench, more below?

==> picture [320 x 285] intentionally omitted <==

==> picture [326 x 283] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 11

==> picture [720 x 100] intentionally omitted <==

----- Start of picture text -----

Major untested potential along strike
----- End of picture text -----

 Bongou Structure - 80km+ of strike held 100% by PDI

 Multiple drilling targets

 Close to other prospects in Laterite Hill Gold Field

==> picture [539 x 399] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 12

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Large prospect pipeline in Eastern Burkina
(see appendices for labelled prospects)
----- End of picture text -----

==> picture [635 x 404] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 13

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Cote D’Ivoire Opportunity
----- End of picture text -----

  • Systematic approach to targeting

  • 1,534km[2] granted

  • Kokumbo:

  • Long history of gold mining

  • Close to Bonikro/Agbaou

  • Excellent infrastructure

  • Boundiali:

  • Along strike from Sissingue & Syama

  • Low key exploration – geochemistry and ground magnetics

==> picture [403 x 403] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 14

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Building on Bongou
----- End of picture text -----

 More work near Bongou;

o Ongoing power auger and trenching - results in June o RC drilling after sufficient targets are delineated (wet seasondependent)

  • Elsewhere in West Africa:

o Low key reconnaissance and data compilation in Cote D’Ivoire

==> picture [225 x 365] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 15

Predictive Discovery Limited West African Gold Explorer

==> picture [261 x 146] intentionally omitted <==

Contact Details:

Level 2, 33 Ord St, West Perth, Western Australia 6005

Telephone: +61 8 9216 1020 (direct) +61 402 857 249 (mobile) +226 7427 4930 (Burkina Faso)

Email: [email protected]

Website: www.predictivediscovery.com

PDI May 2014 Page 16

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Appendices – 1 Dave Prospect
----- End of picture text -----

==> picture [693 x 375] intentionally omitted <==

Note: drill results reported to the ASX in Quarterly Reports of September 2011, March 2012, June 2012, September 2012 .

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 17

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Appendices – 2 Bira Prospect
----- End of picture text -----

 Historic drilling results (Anmercosa – an Anglo American subsidiary):

  • 14.5m @ 3.1g/t Au

  • • 13m @ 2.5g/t Au

  • • 21m @ 1.7g/t Au

  • • 20m @ 1.4g/t Au

  • Open to north and south and at depth

  • New target to west

Note: historic drill results reported to the ASX on 25[th] January 2013.

==> picture [396 x 409] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 18

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Appendices – 3 Bira Prospect
----- End of picture text -----

 Historic drilling results (Anmercosa – an Anglo American subsidiary):

  • 14.5m @ 3.1g/t Au

  • • 13m @ 2.5g/t Au

  • • 21m @ 1.7g/t Au

  • • 20m @ 1.4g/t Au

  • Good continuity

  • Open to depth/along strike

Note: historic drill results reported to the ASX on 25[th] January 2013.

==> picture [451 x 390] intentionally omitted <==

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 19

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Appendices – 4 Solna Prospect
----- End of picture text -----

 Multiple high grade intercepts:

  • 6m @ 20g/t Au

  • 5.6m @ 16g/t Au

  • 7m @ 13g/t Au

  • 2m @ 56g/t Au

 Some continuity issues – requires close spaced drilling  Excellent preliminary metallurgy (96% recovery in primary ore)

==> picture [486 x 359] intentionally omitted <==

Note: drill results reported to the ASX in Quarterly Reports of June 2011, December 2011, March 2012, June 2012, March 2013 and the preliminary metallurgical results were reported to the ASX on 14[th] May 2013.

==> picture [532 x 24] intentionally omitted <==

PDI May 2014 Page 20

==> picture [720 x 102] intentionally omitted <==

----- Start of picture text -----

Appendices – 5 Tambiri Prospect
----- End of picture text -----

==> picture [531 x 406] intentionally omitted <==

 Good grades & widths:

  • 5m @ 17g/t Au

  • 9.3m @ 4.9g/t Au

  • 8m @ 7.3g/t Au

  • 28m@ 1.7g/t Au

 Good continuity

  • Open along strike

 Good preliminary metallurgy (92% recovery)

Note: drill results reported to the ASX in Quarterly Reports of June 2011, December 2011, March 2012, June 2012 and the preliminary metallurgical results were reported to the ASX on 14[th] May 2013.