Investors Presentation Q1 FY21
==> picture [70 x 69] intentionally omitted <==
==> picture [369 x 42] intentionally omitted <==
----- Start of picture text -----
POWER MECH PROJECTS LTD
----- End of picture text -----
==> picture [720 x 8] intentionally omitted <==
==> picture [118 x 64] intentionally omitted <==
==> picture [127 x 81] intentionally omitted <==
==> picture [120 x 139] intentionally omitted <==
==> picture [130 x 62] intentionally omitted <==
==> picture [127 x 81] intentionally omitted <==
==> picture [107 x 81] intentionally omitted <==
==> picture [127 x 78] intentionally omitted <==
==> picture [118 x 76] intentionally omitted <==
----- Start of picture text -----
15 [th] September 2020
----- End of picture text -----
==> picture [127 x 60] intentionally omitted <==
==> picture [127 x 59] intentionally omitted <==
==> picture [107 x 57] intentionally omitted <==
==> picture [720 x 47] intentionally omitted <==
Disclaimer
Safe Harbor Statement
-
The information contained herein has been prepared to assist prospective investors in making their own evaluation of Power Mech Projects Limited (hereinafter ‘the company’) and does not purport to be all-inclusive or to contain all of the information a prospective or existing investor may desire.
-
This Information may include certain statements and estimates provided by the company with respect to the projected future performance of the company. Such statements, estimates and projections reflect various assumptions by management concerning possible anticipated results, which assumptions may or may not be correct.
-
Prospective investors will be expected to have conducted their own due diligence investigation regarding these and all other matters pertinent to investment in the company.
-
This presentation may contain statements that are “forward looking statements.” The company’s actual future results may differ materially from those suggested by such statements, depending on various factors for which the company and its management does not take any responsibility.
2
==> picture [720 x 47] intentionally omitted <==
Power Mech – At a Glance
A leading Industrial Services and Construction Company providing versatile and comprehensive service in power and infrastructure sector
==> picture [696 x 91] intentionally omitted <==
Established in 1999 by Mr. S. Kishore Babu, a technocrat and first generation entrepreneur
Presently Operates PanLargest O&M service India, Middle East, South provider in India Asia and Africa
FY 20 Total Income: Rs 21,740 Mn EBITDA : Rs 2,801 Mn PAT : 1,313 Mn Credit Rating “CARE A”
3
==> picture [720 x 46] intentionally omitted <==
Journey of the Company, Major milestones and achievements
-
→Listing in BSE & NSE, overwhelming response
-
→First ETC of 1 X 63 Tph and 2 X 165 →Private Equity into Power Mech subscribed by 38 times Tph AFBC Boilers, 20.85 MW & 55 →First major international work in Libya, 2X157 MW Erection →Major O&M of 4X600 MW at Jharsuguda, Vedanta MW, Raigarh, BHEL of 2 Gas Turbines,BHEL →Started manufacturingfacility at Noida
-
→First AMC of 655 MW Combined →First ETC of 1X500 MW Boiler & Auxiliaries including ESP, →Entry in Steel Sector, Erection & Fabrication work 3.0 Cycle Dual Fuel IPP Power Plant, Mejia, BHEL MTPA & 2.7 MTPA, Nagarnar (NMDC) & Angul (JSPL) Paguthan,GPEC →Erection of Structural, Steam Generator & Auxiliaries of 3 →First FGD Work 500 MW, Vindhyachal,GE Boilers for India’s two UMPP 800 MW unit (Gujarat, Tata Power), Doosan & 6X660 MW unit, Sasan, R Infra
-
1999 2002-04 2007-09 2010-12 2014-16 2017-21 →Major orders in Super Critical Projects 660 MW, Erection, →Completed major international projects at Shuqaiq, KSA (4X660MW, Structural Fabrication works, Sepco, Adani, BGR, CLP SEC) & Bheramara, 360 MW (L&T, Bangladesh)
-
→First major Civil Work 2X520 MW, (Vizag, HNPCL), BHEL →Entry into Oman, Saudi Arabia, Bahrain and Nigeria →Entry in Industrial Sector Mechanical & Piping work in →First O&M project in Public Sector, 2X600 MW, Singareni Collieries Refineries (Dahej, ONGC & Paradeep, IOCL) →Strategic foray into Railway, RVNL, composite package (37 Km, AP) &
-
→First major Erection of Gas Turbine & Civil Work, 4X100 Rural Electrification, 33/11 KV Hoshangabad,MPMKVVCL MW, Yemen, Marib, BHEL →Entry for cross country laying of pipe lines, IOCL
-
→Prestigious project Infrastructure Development, Med Tech Zone, A.P →Quantum jump in its diversification efforts in the area of iron ore material handling & associated works, first order from NMDC
-
→ Incorporation of the Company →Entry in Hydro Power O&M & Mini EPC →Foray in Power Sector Business
4
==> picture [720 x 47] intentionally omitted <==
Established Track Record
==> picture [11 x 27] intentionally omitted <==
Integrated power infrastructure services Track record of ~21 years
-
Established a track record of successfully executing ETC-BTG and BOP contracts for large power projects
-
Engaged on ETC-BTG projects for the first two ultra-mega power projects (UMPPs) (Mundra & Sasan) as well as for 19 supercritical power projects in India
-
These include up to 800 MW unit capacity super-critical projects
-
Carried out the overhauling of a supercritical 660 MW turbine and providing AMC services for an ultra-mega power project (UMPP)
-
In addition to our operations in India, we have also executed various international power projects in the Middle East, North Africa, South Asia and South America .
==> picture [90 x 282] intentionally omitted <==
----- Start of picture text -----
26,00,000
64,000
55,000
520
300
45
19
2
170
4,00,000
1,00,000
----- End of picture text -----
==> picture [90 x 282] intentionally omitted <==
----- Start of picture text -----
26,00,000
64,000
55,000
520
300
45
19
2
170
4,00,000
1,00,000
----- End of picture text -----
==> picture [90 x 282] intentionally omitted <==
----- Start of picture text -----
26,00,000
64,000
55,000
520
300
45
19
2
170
4,00,000
1,00,000
----- End of picture text -----
MT of aggregate tonnage of the erection works executed
MW, engaged on ETC-BTG and BOP Works so far
MW, the aggregate unit capacity of the AMCs we are engaged in
Number of O&M contracts that we have been engaged in, since the commencement of the O&M business
Number of Cranes, ranging from 10 ton to 300 ton in capacity enabling the Company to quickly and effectively mobilize project works
Number of AMC services for power plants across India
Number of super critical power projects where we executed ETC-BTG projects
We executed ETC-BTG for both first 2 UMPPs in India
Km’s of Cross Country Pipeline
Cubic meter of earth work completed under Railway Project
Cubic meter ballast supplied to Railways
5
==> picture [720 x 46] intentionally omitted <==
Our Service presence across key areas
==> picture [168 x 67] intentionally omitted <==
==> picture [168 x 67] intentionally omitted <==
Industrial Construction Industrial Construction
-
Industrial Construction Industrial Services (O&M)
-
Power Projects (Ultra Mega, Super Overhauling and Maintenance of Critical, Sub Critical & Combined Boiler, Turbine & Auxiliaries Cycle Power Projects), Nuclear , R&M of BTG, GTG Refinery & Petro Chemicals, Steel Repair, Modification and Plant , Oil Pipe Line & Cement Rehabilitationof Boiler
-
Erection, Testing & Commissioning of BTG & BOP Revival and Life Extension, etc
-
Steam Generators & Auxiliaries Coal Handling Plant Steam Turbine Generators & TG BOP packages Auxiliaries
-
Critical Piping, LP & HP Piping Trouble Shooting Structural Steel, Coal Handling Upgrade & Retrofits Plant, Ash Handling, Cooling Rebuilds & Plant Relocation Water System, Fuel Oil System
-
ESP, Ducts, FGD & SCR
==> picture [168 x 67] intentionally omitted <==
==> picture [168 x 67] intentionally omitted <==
Infrastructure Construction (Civil)
International Operations
-
Erection, Testing & Commissioni Power Plants, Railway, Industrial ng of Oil Fired Boiler, HRSG, Projects etc. Reserve/AuxiliaryBoiler & BOP Foundation, Decks, Plant
-
Steam Turbine Generators & Buildings, Chimney & Cooling Auxiliaries, Gas Turbine Towers Generators & Auxiliaries Geothermal Soil Exploration
-
Combined Cycle Power Piping, Mass Excavation, Area Grading & LP & HP Piping, High Land Development Pressure Piping, Structural Steel, Bored Cast & Driven Cast Piping Plant, Cooling Water System, Water & Canal Works Fuel Oil System Permanent Way – EWE
-
ESP, Ducts, & SCR, Rotating Permanent Way Linking Works Equipment‘s Track Linking
-
DesalinationPlants Minor & Major Bridges Civil Works Industrial Buildings
6
==> picture [720 x 46] intentionally omitted <==
Our Service presence across key areas (cont..)
==> picture [168 x 67] intentionally omitted <==
==> picture [168 x 67] intentionally omitted <==
==> picture [168 x 67] intentionally omitted <==
Industrial Construction Electricals Hydro Power & Water Manufacturing Extra High Voltage Substation Supply & construction of Hydro Fabrication of Heavy Structures, Works power plants Large & High Pressure Tanks, Construction of 33/11 Kv Renovation & modernization Substations Heavy Trusses, Ducts, Pipes etc AMC & O&M, after sales Strengthening of existing services, spares management, Repair of Steam & Hydro Substations RLA Study, LTSA Turbines Construction of 33 Kv & 11 Kv Trouble shooting of chronic Lines problems by providing value Tie-up with Major OEM Construction of Transmission of added technical solutions in Companies for authorized Electromechanical and Hydroproduction of critical & general Lines mechanical fields spares, etc Optical Fiber Networks EPC of mini hydro projects Reverse Engineering of spares OHE, S&T Sewage treatment plant(STP’s)
7
==> picture [720 x 47] intentionally omitted <==
Company Strengths
Comprehensive service provider in Power Sector Largest service provider in O&M space Well diversified business profile with stable revenue generating higher margins Robust Financials
Huge Asset Base with over 300 Cranes and construction equipments
Large talent with Highly Experienced Management Team with strong industry background
Strong execution capabilities across verticals
Marquee clientele: Long-term relationships with major OEM, EPC players and Utility companies Project handling capabilities across the globe Qualified Independent Board & best Corporate Governance
8
==> picture [720 x 47] intentionally omitted <==
Qualified Board
==> picture [68 x 58] intentionally omitted <==
Sajja Kishore Babu, CMD
Founder of the company holds bachelor’s degree in Mechanical Engineering. He has 35 years of experience in power and infra sector. He is an able administrator and Dynamic Leader, and he also serves the board of subsidiary & JVs
==> picture [67 x 58] intentionally omitted <==
Sajja Lakshmi, Non Executive Director
She is a science graduate and holds place in HR management of the company & also member of CSR committee of the company. She is interested in social service activities offering her time and energy Enthusiastically
==> picture [68 x 59] intentionally omitted <==
Vivek Paranjpe, Independent Director
B. Sc (Honors), post graduated from XLRI, over 40 years of experience, served as Group President of RIL. Currently Strategic HR advisor to RIL and Independent Director, Motilal OswalFin. Services
==> picture [67 x 59] intentionally omitted <==
GDV Prasada Rao, Independent Director
M.E(Chem), retired as a GM in Andhra Bank after ~28 years, currently VP of HEAL, an NGO working with orphans & poor children
==> picture [68 x 59] intentionally omitted <==
M Rajiv Kumar, Non Executive Director
Graduate in electrical engineering, he spent his entire career of 38 years in BHEL, rising to the level of Executive Director, Power Sector, Eastern Region
==> picture [67 x 59] intentionally omitted <==
T. Sankaralingam, Independent Director
B.E(Elec), around 40 years of experience in the power sector, served as CMD of NTPC and MD of BGR Energy in the past. Also worked at BHEL
==> picture [83 x 57] intentionally omitted <==
Lasya. Y, Independent Director
Post Graduate in Management from ISB, MS in Electrical engineering from university of Texas. She has 15 years of experience in IT Project Management and delivery , client engagement
9
==> picture [720 x 47] intentionally omitted <==
Professional and Experienced Management Team
==> picture [53 x 46] intentionally omitted <==
S Kodandaramaiah,Director – Business Development
Post graduate in mechanical engineering. More than 4 decades of experience in power and industry sector related to EPC, Construction, project management, BusinessDevelopment. Worked in BHEL, GE.
==> picture [53 x 48] intentionally omitted <==
M. Rajendran, COO
Degree in Civil Engineering. He has more than 38 years of experience in construction & project management in power & industrial sector. He was associated with BHEL .
==> picture [53 x 46] intentionally omitted <==
Janardhan Kar, Director O&M
Rich experience of more than 40 years in the field of Power Sector. He was associated with NTPC & Chattisgarh State Power Generation Co.
==> picture [53 x 47] intentionally omitted <==
G. Srinivasulu – Executive Director (Non Board)
Has more than three decades of rich experience in the Power Sector dealing in Project & Construction Management, Erection & Commissioning.
==> picture [53 x 46] intentionally omitted <==
S Amarnath: Executive Director (Non Board)
Diploma in Civil Engineering with 35 years of experience in Power and Industrial Construction. Previously he was associated with Indwell Constructions.
==> picture [53 x 48] intentionally omitted <==
Arbind Koul, MD Hydro Magus P.Ltd
38 years of experience in installing, maintaining, and repairing Hydro Generators and Hydro Turbines. He was associated with BHEL and BC Hydro Britsh Columbia, Canada.
==> picture [53 x 45] intentionally omitted <==
J. Satish , CFO
MBA, Chartered Accountant by Profession. He has got more than 18 years of experience in the field of Finance & Accounts. He has worked with PWC, Deloitte, Kerzner International, Indu Projects & Emaar .
==> picture [53 x 48] intentionally omitted <==
K Ajay Kumar, Sr.VP – O&M
BE Mechanical, he has more than 23 years of experience in Operation & Maintenance, Business Development. Previously he was associated with Indwell Constructions.
==> picture [53 x 46] intentionally omitted <==
Anantha Reddy, VP- Electrical T&D
MBA in Project Management, B.E.E. (AMIE) Kolkatta & Diploma in Electrical Engineering. 28 Years of Experience in Business Development, Project Management and Site Execution of T&D .
==> picture [53 x 48] intentionally omitted <==
Biswajit Das - VP – O&M
B Sc Engineering (Electrical). With more than 30 years of experience in erection, commissioning and maintenance of large power plants. He was with Lanco Infratech .
10
==> picture [720 x 47] intentionally omitted <==
Shareholding Pattern
Top Shareholders
| 7.21% 62.57% 14.34% 10.12% 5.92% 2.58% 2.46% 0.67% Promoters Resident Individuals Mutual Funds Alternative Investment Funds Foreign Portfolio-Corp Bodies Corporate Non Resident Indians |
S No | Name | Shares | Category | Percentage |
|---|---|---|---|---|---|
| 1 | Promoters & Family | 92,04,074 | Promoter | 62.57% | |
| 2 | HDFC Small Cap Fund | 10,03,126 | MUT | 6.82% | |
| 3 | Vantage Equity Fund | 6,29,553 | AIF | 4.28% | |
| 4 | IDFC Multi Cap Fund | 4,17,737 | MUT | 2.84% | |
| 5 | Banyantree Growth Capital II L.L.C | 3,56,051 | FPI | 2.42% | |
| 6 | IIFL Re Organise India Equity Fund | 1,23,805 | AIF | 0.84% | |
| 7 | IA All Cap Fund | 67,445 | AIF | 0.46% | |
| 8 | Aditya Birla Sun Life Trustee | 68,533 | MUT | 0.46% | |
| 9 | Adesh Ventures LLP | 36,875 | LTD | 0.25% | |
| 10 | NRI Vantage Equity Fund | 27,281 | AIF | 0.19% | |
| 11 | First Water Fund | 23,966 | FPC | 0.16% |
11
==> picture [720 x 47] intentionally omitted <==
Established Relationships with Clients – Domestic Projects
==> picture [720 x 7] intentionally omitted <==
==> picture [90 x 43] intentionally omitted <==
==> picture [72 x 43] intentionally omitted <==
==> picture [84 x 43] intentionally omitted <==
==> picture [90 x 43] intentionally omitted <==
==> picture [108 x 51] intentionally omitted <==
==> picture [78 x 43] intentionally omitted <==
==> picture [84 x 37] intentionally omitted <==
==> picture [60 x 55] intentionally omitted <==
==> picture [91 x 37] intentionally omitted <==
==> picture [90 x 52] intentionally omitted <==
==> picture [84 x 43] intentionally omitted <==
==> picture [108 x 43] intentionally omitted <==
==> picture [102 x 43] intentionally omitted <==
==> picture [81 x 50] intentionally omitted <==
==> picture [108 x 43] intentionally omitted <==
==> picture [84 x 43] intentionally omitted <==
==> picture [127 x 68] intentionally omitted <==
==> picture [114 x 60] intentionally omitted <==
==> picture [114 x 61] intentionally omitted <==
==> picture [62 x 71] intentionally omitted <==
==> picture [114 x 41] intentionally omitted <==
==> picture [54 x 49] intentionally omitted <==
==> picture [73 x 54] intentionally omitted <==
==> picture [60 x 67] intentionally omitted <==
==> picture [85 x 58] intentionally omitted <==
12
==> picture [720 x 47] intentionally omitted <==
Established Relationships with Clients – International Projects
==> picture [720 x 7] intentionally omitted <==
==> picture [143 x 43] intentionally omitted <==
==> picture [114 x 34] intentionally omitted <==
==> picture [96 x 49] intentionally omitted <==
==> picture [90 x 43] intentionally omitted <==
==> picture [108 x 31] intentionally omitted <==
==> picture [76 x 39] intentionally omitted <==
==> picture [93 x 30] intentionally omitted <==
==> picture [60 x 67] intentionally omitted <==
==> picture [54 x 55] intentionally omitted <==
==> picture [114 x 25] intentionally omitted <==
==> picture [96 x 35] intentionally omitted <==
==> picture [148 x 31] intentionally omitted <==
==> picture [66 x 60] intentionally omitted <==
==> picture [122 x 30] intentionally omitted <==
==> picture [104 x 25] intentionally omitted <==
==> picture [102 x 68] intentionally omitted <==
==> picture [108 x 33] intentionally omitted <==
==> picture [102 x 37] intentionally omitted <==
==> picture [120 x 25] intentionally omitted <==
==> picture [114 x 37] intentionally omitted <==
==> picture [64 x 30] intentionally omitted <==
==> picture [54 x 20] intentionally omitted <==
==> picture [108 x 68] intentionally omitted <==
==> picture [96 x 48] intentionally omitted <==
==> picture [108 x 61] intentionally omitted <==
==> picture [115 x 37] intentionally omitted <==
==> picture [138 x 36] intentionally omitted <==
13
==> picture [720 x 47] intentionally omitted <==
Infra for Project Management
==> picture [419 x 335] intentionally omitted <==
----- Start of picture text -----
Large construction
equipment base
Primavera
SAP
&
Site level, Support
functions MS Project-
Productivity Application
SBU Heads 8,700 HR Base
For Project Engineers, Supervisors,
Responsibility Technicians, HSE, FQA
Other Staff
Capability Centers
Construction, Quality,
Safety, Facility
Engineering
----- End of picture text -----
14
==> picture [720 x 47] intentionally omitted <==
Business Strategy Expanding the services footprint & leveraging technical expertise to target higher margin contracts
Back ward and forward integration has been at the core of the Company’s business consolidation and growth, and this motto continues to drive the future endeavors
Expanding O&M profile and increased penetration in the domestic sector of IPP base, Utility sector of Central and State utilities, Captive Thermal power base, and integrating the spares business
Entering into value added services To integrate the construction by synergizing the existing ETC capabilities with EPC capabilities into non-power sector opportunities available in material for increased business growth in handling jobs using the strong metal, steel, minerals, Civil and ETC base already petrochemicals etc. established for improved growth
Further geographical expansion in export space and consolidation of business in Middle East, Africa, Bangladesh for new investments in petro chemicals, refineries, desalination plants
Identifying feasible and rewarding EPC contracts in infra segment in Railway, Roads, Urban Infra Development, Energy, Transmission and Distribution
Continued efforts to foray into FGD retrofit investments taking place with suitable tie ups with EPC players and technology providers
Enhancing project execution capabilities and project delivery mechanism for better utilization of existing assets, human and capital resources for improved asset turnover, and strengthening IT infra for real time project execution and timely execution of projects.
15
==> picture [720 x 47] intentionally omitted <==
Expanding of O&M service into other sectors & new horizons
==> picture [485 x 286] intentionally omitted <==
----- Start of picture text -----
Solar
Thermal
Hydro
Domestic
O&M
(AMC, R&M,
GAS
Steel Trouble
(Power)
shooting
etc)
Fully developed
Captive Exports
Power (Thermal)
Partially developed
Refinery &
Petro
To be developed
Chemicals
----- End of picture text -----
16
==> picture [112 x 29] intentionally omitted <==
Expanding Horizons…… Expanding Horizons……
…..Broadening Capabilities …..Broadening Capabilities
17
INR in million
==> picture [720 x 47] intentionally omitted <==
Q1 FY21 – YoY Consolidated Financial Performance
Total Income
EBIDTA
PAT
==> picture [388 x 141] intentionally omitted <==
----- Start of picture text -----
800
662
6,000
4,931 600
5,000
4,000 400
13.4%
2,769
3,000
2,000 200
1,000
- - Q1FY20 Q1FY21 -4.34%
Q1FY20 Q1FY21
(200) -120
----- End of picture text -----
Q1 Revenue
==> picture [149 x 123] intentionally omitted <==
----- Start of picture text -----
400
284
300
200
100 5.8%
-
(100) Q1FY20 Q1FY21
(200) -11.8%
(300)
(400) -326
----- End of picture text -----
Erection
O&M
Electrical Works
Civil & Other Works
==> picture [678 x 119] intentionally omitted <==
----- Start of picture text -----
2,000 1,766 1,500
1,413 400 370 1,500 1,349
1,500 1,400
300
1,000
1,000 1,300 1,203 200 201 740
598 1,200
500
500
100
1,100
- 1,000 - -
Q1FY20 Q1FY21 Q1FY20 Q1FY21 Q1FY20 Q1FY21 Q1FY20 Q1FY21
----- End of picture text -----
Note: Lock down due to Covid impacted operations significantly, hence the current results are not comparable with previous quarter performance
18
==> picture [720 x 47] intentionally omitted <==
12M FY20 – YoY Consolidated Financial Performance
INR in million
Total Income EBIDTA
PAT
==> picture [174 x 114] intentionally omitted <==
----- Start of picture text -----
23,000 22,754
22,500
22,000 21,740
21,500
21,000
12MFY19 12MFY20
----- End of picture text -----
==> picture [174 x 116] intentionally omitted <==
----- Start of picture text -----
3,100 3,049
3,000
2,900 13.4%
2,801
2,800
2,700 12.9%
2,600
12MFY19 12MFY20
----- End of picture text -----
==> picture [176 x 114] intentionally omitted <==
----- Start of picture text -----
1,350
1,313
1,300
1,250 6.0%
1,216
1,200
5.3%
1,150
12MFY19 12MFY20
----- End of picture text -----
12M FY 20 Revenue
Civil & Other Works
Electrical Works
==> picture [656 x 129] intentionally omitted <==
----- Start of picture text -----
Erection O&M Electrical Works
7,500 7,492 7,000 10,000
8,425
7,480 6,475 1,600 1,470 8,000
6,500 1,400 6,167
1,200 1,041
7,460 6,000
1,000
7,440 6,000
7,440 5,660 800 4,000
600
7,420 5,500 400 2,000
200
7,400 5,000 - -
12MFY19 12MFY20 12MFY19 12MFY20 12MFY19 12MFY20 12MFY19 12MFY20
----- End of picture text -----
19
==> picture [720 x 47] intentionally omitted <==
FY20 Financial Performance (consolidated)
INR in million
==> picture [313 x 153] intentionally omitted <==
----- Start of picture text -----
Contract Revenue
13,778 13,344 15,439 22,566 21,604
25,000
1,041
20,000 1,470
5,660
6,475
15,000 10,000 3,750 - 4,859 - 5,176 345 8,425 6,167
2,038 2,048 3,434
5,000
7,990 6,437 6,484 7,440 7,492
-
FY16 FY17 FY18 FY19 FY20
Electrical O&M Civil Works Erection Works
----- End of picture text -----
==> picture [11 x 27] intentionally omitted <==
Revenue mix with high-margin O&M services segment
==> picture [312 x 136] intentionally omitted <==
----- Start of picture text -----
120%
2% 5%
100% 7%
27%
80% 36% 34% 25% 30%
15%
60%
16% 22% 37% 29%
40%
58%
20% 48% 42% 33% 34%
0%
FY16 FY17 FY18 FY19 FY20
Electrical O&M Civil works ETC
----- End of picture text -----
==> picture [11 x 27] intentionally omitted <==
EBITDA Margins continue to remain healthy….
==> picture [321 x 123] intentionally omitted <==
----- Start of picture text -----
13.5%
3,500 13.4% 13.6%
13.4%
3,000
13.4%
2,500
2,000 13.2%
1,500 12.9% 12.9% 13.0%
1,000
12.8%
500
1,875 1,737 2,090 3,049 2,801
- 12.6%
FY16 FY17 FY18 FY19 FY20
EBIDTA EBIDTA Margin
----- End of picture text -----
==> picture [11 x 27] intentionally omitted <==
Profit After Tax inching higher
==> picture [289 x 128] intentionally omitted <==
----- Start of picture text -----
1400 6.0% 7.0%
5.3%
1200 5.5% 5.1% 6.0%
4.8%
1000 5.0%
800 4.0%
600 3.0%
400 2.0%
200 1.0%
755 651 795 1216 1313
0 0.0%
FY16 FY17 FY18 FY19 FY20
PAT PAT Margin
----- End of picture text -----
20
==> picture [720 x 47] intentionally omitted <==
FY20 Financial Performance (consolidated)
INR in million
==> picture [11 x 27] intentionally omitted <==
Healthy net debt equity ratio provides significant headroom for growth High Asset Turnover … testament to higher efficiency
==> picture [672 x 135] intentionally omitted <==
----- Start of picture text -----
2,500 14
10,500 9,512 0.60 11.77 11.92
12
9,000 8,194 2,000
0.40
6,985 10
7,500 6,000 5,548 0.33 6,207 0.23 0.30 0.40 1,500 6.29 6.17 7.45 8
4,500 0.21 1,000 2, 1 98 2, 1 81 2,085 1,933 1,813 6
3,000 3,844 0.20 4
500
1,500 2,429 2
1,831 1,308 1,585
- - - 0
FY16 FY17 FY18 FY19 FY20 FY16 FY17 FY18 FY19 FY20
Networth Net Debt Net Debt/Equity Net Fixed Asset Turnover to NFA
----- End of picture text -----
==> picture [298 x 123] intentionally omitted <==
----- Start of picture text -----
25.0% 21.3% Return on Capital Employed 23.7%
20.0% 18.4% 18.2%
16.5%
15.0%
10.0%
5.0%
0.0%
FY16 FY17 FY18 FY19 FY20
----- End of picture text -----
==> picture [316 x 124] intentionally omitted <==
----- Start of picture text -----
18.0% 16.6% Return on Networth 16.0%
16.0% 14.8%
14.0% 12.0%
11.1%
12.0%
10.0%
8.0%
6.0%
4.0%
2.0%
0.0%
FY16 FY17 FY18 FY19 FY20
----- End of picture text -----
21
==> picture [720 x 47] intentionally omitted <==
Robust Order Book: Stronger Revenue visibility for next 3 years
INR in million
==> picture [600 x 237] intentionally omitted <==
----- Start of picture text -----
60,000
50,000 15% 47,830
45,748
49 % 42,677
40,000 85% 37,050
35,238
Contract Revenue
30,000 27,715
Order Inflow
22,566
21,064 21,604
17,950 19,523 Order Back Log
20,000
15,375 15,439
13,778 13,344
34%
10,000
55%
-
FY 16 FY 17 FY 18 FY 19 FY 20
----- End of picture text -----
Note: 1. Projects cancelled / suspended / on hold are excluded from the above
-
Order back log as on 31[st] March 2020 is Rs 45,748 Mn
-
Order back log as on 15[th] September 2020 is Rs 71,368 Mn
22
==> picture [720 x 47] intentionally omitted <==
Robust Order Book: Stronger Revenue visibility for next 3 years (cont..) Order Inflow during 12 M FY 20 (up to 31[st] March 2020) Rs. 19,523 Mn Order backlog as on 31[[st]]
Order backlog as on 31[[st]] March 2020 Rs. 45,748 Mn
INR in million
==> picture [262 x 131] intentionally omitted <==
----- Start of picture text -----
30 %
36 % Erection
5,818
7,114 O&M
Electrical Works
Civil & Other Works
- 34 %
6,591 Power : 83% & Non Power 17%
----- End of picture text -----
Order Inflow up to 15[th] Sep 2020 Rs. 28,362 Mn
==> picture [110 x 106] intentionally omitted <==
----- Start of picture text -----
20%
5,562
9%
2,621
-
20,179
71%
----- End of picture text -----
==> picture [68 x 55] intentionally omitted <==
----- Start of picture text -----
Erection
O&M
Electrical Works
Civil & Other Works
----- End of picture text -----
Power : 44% & Non Power 56%
1. Works executed post 30[th] June 2020 not considered
==> picture [250 x 135] intentionally omitted <==
----- Start of picture text -----
26 %
12,273 45 % Erection
20,541 O&M
Electrical Works
2,975
Civil & Other Works
7 %
9,959
22 % Power : 70% & Non Power 30%
----- End of picture text -----
Order backlog as on 15[th] Sep 2020 Rs. 71,369 Mn #
==> picture [131 x 125] intentionally omitted <==
----- Start of picture text -----
36%
44%
25,505
31,726
16%
4% 11,364
2,774
----- End of picture text -----
==> picture [68 x 49] intentionally omitted <==
----- Start of picture text -----
Erection
O&M
Electrical Works
Civil & Other Works
----- End of picture text -----
Power : 60% & Non Power 40%
- Back log oder book exclude projects cancelled / suspended / on hold
23
==> picture [720 x 47] intentionally omitted <==
Financial Snapshot | Consolidated Income Statement & Balance Sheet
Income Statement (Consolidated)
Balance Sheet (Consolidated)
INR in million
| Particulars | FY16 | FY17 | FY18 | FY19 | FY20 |
|---|---|---|---|---|---|
| Revenue from operations | 13,782 | 13,382 | 15,478 | 22,613 | 21,647 |
| Other Income | 55 | 77 | 67 | 141 | 93 |
| Total Income | 13,837 | 13,459 | 15,546 | 22,754 | 21,740 |
| Cost of materials | 1,145 | 1,245 | 1,964 | 3,264 | 3,238 |
| Change in inventories | 5 | -29 | -85 | 31 | -129 |
| Contract execution exp. | 8,989 | 7,928 | 8,145 | 12,151 | 12,313 |
| Personnel Cost | 1,549 | 2,265 | 3,122 | 3,932 | 3,247 |
| Other expenses | 275 | 313 | 310 | 327 | 270 |
| Sub-total | 11,963 | 11,722 | 13,456 | 19,705 | 18,939 |
| EBIDTA | 1,875 | 1,737 | 2,090 | 3,049 | 2,801 |
| Finance costs | 329 | 329 | 359 | 551 | 741 |
| Depreciation and amort. | 390 | 410 | 428 | 458 | 394 |
| Share of profit from JV’s | 3 | 6 | -2 | 15 | 16 |
| PBT | 1,158 | 1,004 | 1,300 | 2,056 | 1,682 |
| PAT (before MI) | 757 | 651 | 908 | 1,432 | 1,307 |
| Minority Interest | 2 | 0 | 113 | 216 | -6 |
| Restated PAT (after MI) | 755 | 651 | 795 | 1,216 | 1,313 |
| PAT Margin | 5.5% | 4.8% | 5.1% | 5.3% | 6.0% |
| Particulars | FY16 | FY17 | FY18 | FY19 | FY20 |
|---|---|---|---|---|---|
| Assets | |||||
| Fixed Assets | 1,978 | 2,062 | 2,025 | 1,899 | 1,787 |
| CWIP (incl. unallocated capex) | 220 | 119 | 60 | 33 | 26 |
| Non-current investments | - | 9 | 1 | 313 | 329 |
| Other Non Current Assets | 1,872 | 1,936 | 1,966 | 2,663 | 2,579 |
| Total Current Assets | 8,305 | 8,697 | 10,396 | 13,078 | 17,481 |
| Less: Current Liab. & Prov. | 6,343 | 6,273 | 7,623 | 9,418 | 12,748 |
| Net Current Assets | 1,962 | 2,424 | 2,774 | 3,660 | 4,733 |
| Cash & bank | 686 | 805 | 1,397 | 1,284 | 1,193 |
| Total | 6,718 | 7,355 | 8,222 | 9,852 | 10,647 |
| Liabilities | |||||
| Long Term Borrowings | 214 | 155 | 277 | 452 | 298 |
| Deferred Tax Liabilities | 42 | 21 | - | - | - |
| Other Non Current Liabilities | 910 | 950 | 822 | 1,125 | 756 |
| Minority Interest | 4 | 21 | 138 | 81 | 81 |
| Shareholder's Fund | 5,548 | 6,207 | 6,985 | 8,194 | 9,512 |
| Total | 6,718 | 7,355 | 8,222 | 9,852 | 10,647 |
24
==> picture [720 x 47] intentionally omitted <==
Our Projects
25
INDUSTRIAL CONSTRUCTION: DOMESTIC PROJECTS (ERECTION, TESTING & COMMISSIONING)
==> picture [130 x 90] intentionally omitted <==
1X660 MW TPP, BTG, HARDUAGANJ, DOOSAN
==> picture [130 x 90] intentionally omitted <==
3X800 MW, BOILER, ESP, PIPING, STG KUDGI , DOOSAN, L&T & TOSHIBA
==> picture [130 x 90] intentionally omitted <==
2X660 MW STPP, BOILER , ESP, STRUCTURE & STG U#7&8, SURATGARH, BHEL
==> picture [129 x 90] intentionally omitted <==
3X660 MW ,BOILER, ESP,CP, STRUCTURE & STG, NABINAGAR, BHEL
==> picture [129 x 90] intentionally omitted <==
2X600MW TPP, BOILER & STG, MANGALORE, LANCO (COMPLETED)
==> picture [129 x 90] intentionally omitted <==
3X660 MW STPP, BOILER & CRITICAL PIPING, U#1,2&3, BARH, DOOSAN
==> picture [130 x 90] intentionally omitted <==
2X500 MW STPP,BOILER, ESP STG, VINDHYACHAL, BHEL (COMPLETED)
==> picture [130 x 90] intentionally omitted <==
2X660 MW IBTPS, STRUCTURE & STG, BANHARPALLI, BHEL
==> picture [130 x 90] intentionally omitted <==
BLAST FURNACE, STEEL PLANT WORK, JSPL, ANGUL
==> picture [129 x 90] intentionally omitted <==
BOILER, ESP, TG AUXILIARIES, UMPP 800 MW, GUJARAT, TATA POWER (COMPLETED)
==> picture [129 x 90] intentionally omitted <==
2X660 MW JTPP, BOILER,ESP & CP, JHAJJAR, STEPC (COMPLETED)
==> picture [129 x 90] intentionally omitted <==
R-LNG PIPELINE FROM ENNORE LNG TERMINAL TO MFL-ENNORE , IOCL
==> picture [130 x 90] intentionally omitted <==
BOILER, ESP, STRUCTURE, TG AUXILIARIES,UMPP 6X660MW, SASAN, R INFRA (COMPLETED)
==> picture [130 x 90] intentionally omitted <==
2X660 MW STPP, BOILER, ESP U#1&2, SOLAPUR, BGRESL
==> picture [130 x 89] intentionally omitted <==
366 MW REFINARY, GTG, STG, HRSG & PIPING, PARADIP, BHEL
26
INFRASTRUCTURE CONSTRUCTION : CIVIL, ARCHITECTURAL & RAILWAY WORKS
==> picture [130 x 90] intentionally omitted <==
1X800 MW TPSS, CIVIL, STRUCTURAL AND ARCHITECTURAL WORK UNIT-12, KOTHAGUDEM, BHEL
==> picture [130 x 90] intentionally omitted <==
3X366 MW CCPP, CIVIL, STRUCT. & ARCH. WORK, IOCL PARADIP, BHEL
==> picture [130 x 90] intentionally omitted <==
1X800 MW TPSS , CIVIL, STRUCTURAL WORKS, NORTH CHENNAI, BHEL
==> picture [129 x 89] intentionally omitted <==
1X800 MW TPSS, CIVIL, STRUCTURAL AND ARCHITECTURAL WORK STAGE-3, NORTH CHENNAI, BHEL
==> picture [129 x 90] intentionally omitted <==
1X100 MW CCPP, BALANCE CIVIL & STRUCTUAL WORKS, NAMRUP, BHEL (COMPLETED)
==> picture [129 x 90] intentionally omitted <==
1X500 MW, FGUTTP, CIVIL, STRUCTURAL AND BOP & CHP, UNCHAHAR, NBPPL
==> picture [130 x 90] intentionally omitted <==
GDV-MTM 37 ,DOUBLING & ELECTRIFICATION WORKS , RVNL
==> picture [130 x 90] intentionally omitted <==
2X660 MW TP9, CIVIL, STRUCTURAL & ARCHITECTURAL WORK UNIT-7 & 8, SURTGARH, BHEL
==> picture [130 x 90] intentionally omitted <==
INFRASTRUCTURE DEVELOPMENT WORK, AP MEDI TECH ZONE, VIZAG
==> picture [129 x 90] intentionally omitted <==
1X500MW, FGUTTP, CIVIL, STRUCTURAL AND ARCHITECTURAL WORK FOR BTP, BOP & CHP, UNCHAHAR, NBPPL
==> picture [129 x 90] intentionally omitted <==
3X660 MW, STPP, STG,BOP ,NORTH KARNAPURA, BHEL
==> picture [129 x 90] intentionally omitted <==
INFRASTRUCTURE DEVELOPMENT WORK, AP MEDI TECH ZONE, VIZAG
==> picture [130 x 90] intentionally omitted <==
2X800 MW, YTPS, CIVIL, STRUCTURAL AND ARCHITECTURAL WORKS RAICHUR, BHEL (COMPLETED)
==> picture [130 x 90] intentionally omitted <==
1X110 MW, CIVIL AND STRUCTURAL WORKS ,R&M OF MAIN PLANT, BATHINDA, BHEL (COMPLETED)
==> picture [130 x 89] intentionally omitted <==
KALWESHWARAM CANAL PROJECT, 54 KM RAMAYAMPET
27
INTERNATIONAL OPERATIONS
==> picture [130 x 90] intentionally omitted <==
250 MW SABIYA CCPP, KUWAIT INSTALLATION OF HRSG
==> picture [130 x 90] intentionally omitted <==
1516 MW IBRI CCPP, OMAN ETC HRSG,TG
==> picture [130 x 90] intentionally omitted <==
2X640 MW SHUQAIQ THERMAL POWER PLANT, SAUDI ARABIA (COMPLETED)
==> picture [129 x 84] intentionally omitted <==
2X157 MW GT POWER PLANT, LIBYA (COMPLETED)
==> picture [129 x 85] intentionally omitted <==
1516 MW IBRI CCPP, OMAN ETC HRSG,TG
==> picture [129 x 80] intentionally omitted <==
35 MW GT POWER PLANT, KAZAKSTHAN
==> picture [130 x 90] intentionally omitted <==
6X200 MW HEP, BHUTAN INSTALLATION OF HYDRO TURBINE & GENERATOR
==> picture [130 x 90] intentionally omitted <==
1390MW WAAD AL SHAMALISCCPP, SAUDI ARABIA ETC OF HRSG
==> picture [130 x 90] intentionally omitted <==
1519 MW FADHILI CCPP, SAUDI ARABIA GTG,STG & BOP INSTALLATION
==> picture [129 x 90] intentionally omitted <==
1800 MW ALBA CCPP, BAHRAIN ETC OF GTG,STG,HRSG & BOP
==> picture [129 x 90] intentionally omitted <==
228MW, STEAMTURBINE,SABIYA, KUWAIT, MAIN OIL PUMP OVERHAULING
==> picture [129 x 90] intentionally omitted <==
1390MW WAAD AL SHAMALISCCPP, SAUDI ARABIA ETC Of HRSG
==> picture [130 x 90] intentionally omitted <==
360MW BHERAMARA CCPP, BANGLADESH INSTALLATION OF GTG, STG & HRSG
==> picture [130 x 90] intentionally omitted <==
1519 MW FADHILI COMBINED HEAT AND POWER (CHP) PLANT KSA
==> picture [130 x 89] intentionally omitted <==
3X 126 MW, KHOMS, GECOL, LIBYA TOP CASING LIFTING
28
OPERATION AND MAINTANENCE
==> picture [154 x 106] intentionally omitted <==
SIEMENS -138MW GAS TURBINE PAGUTHAN
==> picture [154 x 106] intentionally omitted <==
CAPITAL OVERHAULING OF TURBINE 63MW, SV POWER , KORBA - ROTOR LIFTING-3
==> picture [154 x 106] intentionally omitted <==
MAIN TURBINE OVERHAULING ,660 MW KAWAI
==> picture [155 x 106] intentionally omitted <==
TG OVERHAUING 600MW JHARSUGUDA VEDANTA
==> picture [155 x 106] intentionally omitted <==
HP HEATER REPLACEMENT 800MW ,CGPL MUNDRA2
==> picture [155 x 106] intentionally omitted <==
TURBINE AOH, 600 MW UDIPI
==> picture [155 x 106] intentionally omitted <==
BEARING DIASSEMBLY AT NTPC-SIMHADRI
==> picture [155 x 106] intentionally omitted <==
CUPLOCK SCAFFOLDING ERECTION 800MW,MUNDRA
==> picture [155 x 106] intentionally omitted <==
ID FAN AOH,800 MW CGPL MUNDRA
==> picture [154 x 106] intentionally omitted <==
CONTROL & STOP VALVES OVERHAULING SIPAT 660MW
==> picture [154 x 106] intentionally omitted <==
MSH LINE MODIFICATION, 600 MW SINGARENI
==> picture [154 x 106] intentionally omitted <==
UREA REACTOR TANK INSTALLATION AT RAMAGAUNDAM, TELANGANA
29
MANUFACTURING FACILITY & HYDRO POWER SERVICES
==> picture [154 x 106] intentionally omitted <==
MANUFACTURING UNIT (NOIDA)
==> picture [155 x 106] intentionally omitted <==
CNC SECTION (NOIDA)
==> picture [155 x 106] intentionally omitted <==
SR FURNACE (NOIDA)
==> picture [154 x 106] intentionally omitted <==
CNC OXY FUEL CUTTING (NOIDA)
==> picture [154 x 106] intentionally omitted <==
HEAVY DUTY CENTRE LATHES( NOIDA)
==> picture [155 x 106] intentionally omitted <==
VTL(MANUAL+CNC (NOIDA)
==> picture [155 x 106] intentionally omitted <==
PLANO MILLER, CND (NOIDA)
==> picture [154 x 106] intentionally omitted <==
3 ROLL PLATE BENDING MACHINE (NOIDA)
==> picture [154 x 106] intentionally omitted <==
HYDRO GENERATOR UNDER ASSEMBLY FOR SUNDARIJAL HYDRO PROJECT, NEPAL
==> picture [155 x 106] intentionally omitted <==
FRANCIS RUNNER ASSEMBLY UNDERGOING NDT TESTING FOR UPPER KALLAR HYDRO PROJECT, KERALA
==> picture [155 x 106] intentionally omitted <==
TURBINE EQUIPMENT ASSEMBLY SUNDARIJAL HYDRO PROJECT, NEPAL
==> picture [154 x 106] intentionally omitted <==
NEWLY REWOUND 30MW HYDRO GENERATOR AT UMIAM STG-III HYDRO PROJECT
30
==> picture [720 x 47] intentionally omitted <==
Thank You