Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

POLYMETALS RESOURCES LTD Capital/Financing Update 2023

May 8, 2023

65598_rns_2023-05-08_85444483-5303-4996-9392-3925fbb5dafb.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement

ASX: POL

==> picture [122 x 73] intentionally omitted <==

9th May 2023

MORE OUTSTANDING NEAR SURFACE HIGH-GRADE ASSAYS AT ENDEAVOR

Peak 1.0m high-grade intercepts include 2,799 g/t silver, 13.3% Zinc, 22.7% Lead, 3.2 g/t Gold and 7.4% Copper.

Polymetals Resources Ltd (ASX: POL ) (“ Polymetals ” or the “ Company ”) is pleased announce that it is now in receipt of all assays from its Phase 1 drilling programme at the Endeavor silver (Ag), zinc (Zn) and lead (Pb) Mine in NSW (refer ASX announcements dated 17[th] and 26[th] April 2023).

Further high-grade mineralised intercepts returned from the balance of the RC drilling, include[1] :

NORTH LODE

PNL010 (42m of total mineralisation intersected)

  • 22m @ 4.6% Zn, 816 g/t Ag, 0.69 g/t Au, 1.27% Cu and 2.6% Pb from 101m to 123m (22.1% ZnEq)[2]

  • and 20m @ 5.5% Zn, 435g/t Ag, 0.89g/t Au, 0.08% Cu and 2.6% Pb from 130m to 150m (15.4% ZnEq)

PNL009 (46m of total mineralisation intersected)

  • 46m @ 6.9% Zn, 396 g/t Ag, 1.04 g/t Au, 0.16% Cu and 5.9% Pb from 78m to 124m (17.7% ZnEq)

PNL011 (23m of total mineralisation intersected)

  • 19m @ 7.6% Zn, 398 g/t Ag, 0.64 g/t Au, 0.12% Cu and 5.2% Pb from 106m to 125m (17.4% ZnEq)

  • and 4m @ 8.3% Zn, 640g/t Ag, 0.81g/t Au, 0.13% Cu and 4.5% Pb from 128m to 132m (22.7% ZnEq)

PNL015 (49m of total mineralisation intersected)

  • 30m @ 6.7% Zn, 393 g/t Ag, 0.48 g/t Au, 0.15% Cu and 5.8% Pb from 121m to 151m (16.8% ZnEq)

  • and 19m @ 5.9% Zn, 478g/t Ag, 0.47g/t Au, 0.08% Cu and 3.9% Pb from 155m to 174m (16.8% ZnEq)

PNL012 (53m of total mineralisation intersected)

  • 41m @ 5.0% Zn, 423 g/t Ag, 1.03 g/t Au, 0.17% Cu and 4.9% Pb from 82m to 123m (16.2% ZnEq)

  • and 5m @ 7.9% Zn, 481g/t Ag, 0.74g/t Au, 0.14% Cu and 5.3% Pb from 127m to 132m (19.5% ZnEq) and 7m @ 8.3% Zn, 346g/t Ag, 0.82g/t Au, 0.10% Cu and 3.9% Pb from 137m to 144m (16.5% ZnEq)

1 Refer Appendix 1, Tables 1, 2 (shaded rows being the balance of RC drill holes, the subject of this announcement) and 3. 2 For zinc equivalent calculations refer Appendix 1

Polymetals Resources Ltd | ACN 644 736 247 | Unit 1, 101 Main Street Alstonville NSW 2477 AUSTRALIA

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

PNL013 (12m of total mineralisation intersected)

  • 12m @ 7.6% Zn, 239 g/t Ag, 0.88 g/t Au, 0.09% Cu and 3.2% Pb from 97m to 109m (13.5% ZnEq)

PNL008 (46m of total mineralisation intersected)

  • 26m @ 5.6% Zn, 232 g/t Ag, 0.88 g/t Au, 0.11% Cu and 6.1% Pb from 109m to 135m (13.3% ZnEq)

  • and 16m @ 6.1% Zn, 158g/t Ag, 0.95g/t Au, 0.14% Cu and 5.2% Pb from 139m to 155m (11.8% ZnEq) and 2m @ 3.6% Zn, 295g/t Ag, 1.37g/t Au, 0.08% Cu and 1.8% Pb from 157m to 159m (11.3% ZnEq) and 2m @ 3.8% Zn, 296g/t Ag, 0.92g/t Au, 0.11% Cu and 2.2% Pb from 162m to 164m (11.1% ZnEq)

PNL007 (37m of total mineralisation intersected)

  • 31m @ 6.5% Zn, 226 g/t Ag, 0.66 g/t Au, 0.11% Cu and 3.8% Pb from 109m to 140m (12.4% ZnEq)

  • and 6m @ 6.6% Zn, 183g/t Ag, 0.52g/t Au, 0.11% Cu and 4.2% Pb from 144m to 150m (11.7% ZnEq)

SOUTH LODE

PSL018 (34m of total mineralisation intersected)

  • 34m @ 2.1% Zn, 302 g/t Ag, 0.47 g/t Au, 0.49% Cu and 4.9% Pb from 100m to 134m (10.9% ZnEq)

NEXT STEPS

1. Endeavor North & South Lodes (above 10040 RL - 180m below surface)

  • a. Update mineral resource estimate for the North and South Lodes (including gold),

  • b. Flotation recovery confirmation test work including precious metal leach recovery,

  • c. Ore reserve estimation and economic modelling; and

  • d. Further South Lode drilling if required.

2. Exploration (In-Mine & Near-Mine)

  • a. In-Mine Gold Targets – diamond drilling,

  • b. In-Mine Copper Targets – diamond drilling, and

  • c. Deep Zinc Lode remains open along strike and at depth.

3. Mine Restart Studies – Targeting a +10-year mine plan

  • a. Metallurgical testwork – confirmation of flotation recovery and precious metals leach recovery,

  • b. Preliminary design of hydrometallurgical flow sheet,

  • c. Mine optimisation planning, design and scheduling, and

  • d. Resource extension drilling within existing mine – below 10040 RL or below 180m of surface.

2

www.polymetals.com

ASX: POL

ASX Announcement

==> picture [123 x 73] intentionally omitted <==

DISCUSSION

Polymetals has now received all assays for the Endeavor Mine Phase 1 drilling programme completed on 5th March 2023. The main purpose of the drilling was to enable the estimation of a Measured Mineral Resource (JORC 2012) contained within the unmined near surface North Lode (Figure 1). A secondary purpose of the drilling was to test the tenor and extent of mineralisation that remains in the remaining unmined South Lode (refer ASX announcement dated 17[th] April 2023 - Polymetals intercepts 81 m at 19.5% zinc equivalent). Numerous intercepts of high-grade mineralisation (Table 1) returned from the drilling has confirmed a significant metal endowment within the near surface North and South Lodes.

Polymetals had concluded from its 2022 Endeavor Mine acquisition due diligence studies that the volume and/or grade of the near-surface supergene and massive sulphide mineralisation had the potential to be increased above that indicated by previous resource estimates. The Company also identified the opportunity to test for gold hosted within the near surface mineralisation. All results generated by the Phase 1 drilling will now be used to recalculate the JORC 2012 Mineral Resource Estimate (MRE), which is to be completed within the coming weeks.

The revised MRE and results of metallurgical test work and mine design studies (also to be commenced shortly) will provide the basis, for Polymetals to potentially report an Ore Reserve (JORC 2012) estimate for the near-surface mineralisation. In the South Lode it is possible that further drilling will be required to quantify Measured Resources which the Company believes will be likely to add to potential near surface Ore Reserves.

As announced on 17[th] April 2023, underground development to provide access to the North Lode is already established (Figure 1) which allows ready access to the high-grade mineralisation confirmed by the recent drilling.

3

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Figure 1: High-grade intercepts OUTSIDE of current Resource Outline for the North and South Lodes

==> picture [247 x 459] intentionally omitted <==

==> picture [244 x 454] intentionally omitted <==

North Lode South Lode

4

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Polymetals Resources Executive Chairman, Dave Sproule said,

"Having secured the Endeavor Mine asset and now confirmed the significant metal endowment (now including gold) within the near surface unmined mineralisation, Polymetals is in a most unique position as a junior company.

Receipt of all assays allows a Measured Mineral Resource to be re-calculated for the North and South Lodes and an Ore Reserve estimate to be completed pending the conclusion of other necessary studies. Interrogation and remodelling of all historic mining information is planned during the coming months whilst the Company maintains its core focus of building a significant Ore Reserve.

We are also expanding capability via recruitment of experienced mine geology, engineering, and exploration professionals to ensure the Company is well resourced to support the timely and much anticipated next chapter of operational life at Endeavor.

The Board is also to be reshaped in the near term to provide experience and guidance across all facets of the business.”

This announcement was authorised for release by the Polymetals Resources Ltd Board.

For further information, please contact:

Dave Sproule John Haley Executive Chairman Chief Financial Officer / Company Secretary [email protected] [email protected]

COMPETENT PERSON STATEMENT

The information supplied in this release (excluding the Mineral Resources estimates) is based on information compiled by a team led by Mr Alistair Barton, a Competent Person who is a Fellow of the Australian Institute of Mining and Metallurgy. Mr. Barton is a Director of Polymetals Resources Ltd and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Barton consents to the inclusion of matters based on information in the form and context in which it appears.

For more information, visit www.polymetals.com.

5

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

APPENDIX 1 – Endeavor Project Phase 1 Drillhole details

Table 1: Phase 1 drilling 2023 - Significant mineralised intercepts and Zinc Equivalent Calculation

Hole ID From To End of
Hole
Intercept
(m)
Au g/t Ag g/t Pb% Zn% Cu% Comments ZnEq%
MET_1LS_1 77 158 158 81 1.15 473 5.5 7.4 0.11 Diamond hole drilled during 2015.
Core split Feb 23 for assay.
19.5%
including 77 85 8 2.21 931 12.2 6.2 0.18 32.6%
PNL001 84 136 144 52 0.65 343 4.6 5.7 0.12 14.6%
including 84 86 2 0.64 2020 6.3 1.1 0.13 47.2%
PNL002 95 135 135 40 0.88 226 2.9 5.1 0.10 Could not continue beyond 135m.
Ending in mineralisation.
11.1%
and 142 145 156 3 0.51 576 2.8 5.4 0.08 17.9%
and 147 156 156 9 0.82 757 3.1 7.6 0.07 23.7%
PNL004 120 156 156 36 0.43 341 4.6 7.3 0.18 Ending in mineralisation. 15.5%
PNL005 138 147 9 0.39 228 3.8 5.2 0.09 11.1%
and 151 156 162 5 0.60 281 4.9 6.8 0.08 14.3%
PNL006 119 139 20 0.66 237 5.0 7.2 0.14 13.8%
and 146 148 150 2 0.56 255 5.0 6.8 0.13 13.8%
PNL007 109 140 31 0.66 226 3.8 6.5 0.11 Ending in mineralisation. 12.4%
and 144 150 150 6 0.52 183 4.2 6.6 0.11 11.7%
PNL008 109 135 26 0.88 232 6.1 5.6 0.12 Ending in mineralisation. 13.3%
and 139 155 16 0.95 158 5.2 6.1 0.14 11.8%
and 157 159 2 1.37 295 1.8 3.6 0.08 11.3%
and 162 164 164 2 0.92 296 2.2 3.8 0.11 11.1%
PNL009 78 124 138 46 1.04 396 5.9 6.9 0.16 17.7%
PNL010 101 123 22 0.69 816 2.6 4.6 1.27 includes 5m x 5.08% Cu from 101m 22.1%
and 130 150 150 20 0.89 435 2.6 5.5 0.08 Ending in mineralisation. 15.4%
PNL011 106 125 19 0.64 398 5.2 7.6 0.12 17.5%
and 128 132 132 4 0.81 640 4.5 8.3 0.13 22.7%
PNL012 82 123 41 1.03 423 4.9 5.0 0.17 16.2%
and 127 132 5 0.74 481 5.3 7.9 0.14 19.5%
and 137 144 144 7 0.82 346 3.9 8.3 0.10 16.5%
PNL013 97 109 109 12 0.88 239 3.2 7.6 0.09 Ending in mineralisation. 13.5%
PNL014 - - 143 - - - - - - No significant assays
PNL015 121 151 30 0.48 393 5.8 6.7 0.15 16.8%
and 155 174 180 19 0.47 478 3.9 5.9 0.08 16.8%
PNL016 52 85.5 33.5 2.64 180 3.9 2.9 0.06 Abandoned at 85.5m. Rods bogged. 10.7%
including 64 68 85.5 4 13.9 62 1.8 0.5 0.02 Ending in mineralisation. 18.3%
PSL017 99 111 111 12 0.51 35 3.3 0.1 0.00 Ending in mineralisation. 3.1%
PSL018 100 134 134 34 0.47 302 4.9 2.1 0.49 includes 5m x 2.50% Cu from 117m 10.9%
PSL019 32 48 48 16 0.03 0.5 1.9 0.1 0.02 Abandoned at 48m. Rods bogged. 1.1%
PSL020 107 178 71 0.43 272 4.2 3.6 0.13 11.0%
including 144 178 180 34 0.76 492 4.8 7.3 0.14 19.0%
PSL021 68 96 96 28 0.37 81 3.6 0.04 0.01 Abandoned at 96m. Ending in
mineralisation.
4.2%

6

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Zinc Equivalent (ZnEq%): Zinc is deemed to be the appropriate metal for equivalent calculations as Zinc is the dominant metal within the Endeavor deposit. Zinc equivalent calculations are based on assumed metal prices taken at spot value on 16/04/2023 (below), 38-years of average process recoveries for lead, zinc and silver and hydrometallurgical precious metal recovery testwork. Inputs for the ZnEq% calculation are as follows; metallurgical recoveries of 50.00% gold, 70.05% silver, 78.58% zinc, 70.97% lead and 0.00% copper. Spot metal prices of US$2004.40/oz gold, US$25.40/oz silver, US$2856.50/t zinc and US$2170.00/t lead. ZnEq% = [(Au g/t x (2,004.40/31.1035) x 0.50) + (Ag g/t x (25.40/31.1035) x 0.7005) + (Zn% x 2,856.50 x 0.7858) + (Pb% x 2,170 x 0.7097)] / (2,856.50). Polymetals Resources is of the opinion that all elements included in the metal equivalent calculation have reasonable potential to be recovered and sold.

Table 2: Phase 1 drilling 2023 – Drill hole and collar details (Coordinates are local mine grid)

Hole ID Hole Type Easting Northing RL Dip Depth Azimuth
MET_1LS_1 DD 4439 6883 216 -63 158.4 140
PNL001 RC 4472 6851 215 -90 144 0
PNL002 RC 4483 6847 215 -90 135 0
PNL003 RC 4505 6864 215 -75 157 195
PNL004 RC 4493 6854 215 -75 156 195
PNL005 RC 4495 6854 215 -90 162 0
PNL006 RC 4482 6859 215 -90 150 0
PNL007 RC 4470 6865 214 -90 150 0
PNL008 RC 4456 6860 214 -90 164 0
PNL009 RC 4463 6868 214 -80 138 196
PNL010 RC 4433 6843 214 -80 150 122
PNL011 RC 4434 6855 214 -87 132 114
PLN012 RC 4470 6837 215 -90 144 0
PNL013 RC 4490 6856 215 -80 109 200
PNL014 RC 4471 6837 215 -75 143 190
PNL015 RC 4476 6845 215 -77 180 175
PNL016 RC 4463 6844 215 -90 86 0
PSL017 RC 4563 6745 216 -75 111 260
PSL018 RC 4565 6745 217 -75 134 260
PSL019 RC 4569 6745 217 -75 48 260
PSL020 RC 4559 6805 216 -71 180 247
PSL021 RC 4542 6769 216 -80 96 248

7

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Table 3: Endeavor Phase 1 Mineralised RC Drill intercepts

Hole ID From To Ag g/t Ag g/t Au g/t Au g/t Zn% Pb% Pb% Cu%
PNL007 109 110 188 0.40 10.21 6.02 0.21
PNL007 110 111 138 0.54 9.56 4.12 0.16
PNL007 111 112 139 0.48 10.18 4.69 0.11
PNL007 112 113 572 0.46 6.67 5.49 0.19
PNL007 113 114 296
0.64 7.65 4.36 0.13
PNL007 114 115 245
0.70 8.85 5.17 0.09
PNL007 115 116 260
0.86 8.53 3.62 0.08
PNL007 116 117 247
0.71 8.93 4.64 0.08
PNL007 117 118 218
0.84 4.65
5.16 0.12
PNL007 118 119 282
1.24 5.82 5.39 0.12
PNL007 119 120 290
1.21 6.56 6.72 0.11
PNL007 120 121 234
0.85 5.93 5.67 0.07
PNL007 121 122 180 0.88 4.57
2.17 0.07
PNL007 122 123 242
0.72 5.92 3.10 0.09
PNL007 123 124 192 0.64 4.93 2.92 0.10
PNL007 124 125 272
0.65 5.43 3.72 0.11
PNL007 125 126 288
0.62 6.01 4.49 0.12
PNL007 126 127 255
0.35 5.46 3.63 0.11
PNL007 127 128 224
0.74 6.69 2.95 0.08
PNL007 128 129 183 0.68 7.92 3.41 0.12
PNL007 129 130 157 0.74 6.39 2.81 0.11
PNL007 130 131 137 0.71 4.89 2.37 0.07
PNL007 131 132 179 0.57 4.97 2.94 0.08
PNL007 132 133 185 0.62 5.79 3.47 0.10
PNL007 133 134 249
0.60 6.12 3.63 0.10
PNL007 134 135 220
0.41 5.60 2.62 0.09
PNL007 135 136 193 0.59 6.51 3.66 0.10
PNL007 136 137 142 0.54 4.58
2.25 0.10
PNL007 137 138 178 0.46 4.48
2.01 0.09
PNL007 138 139 217
0.48 6.11 3.57 0.11
PNL007 139 140 192 0.51 5.11 2.71 0.13
PNL007 144 145 153 0.49 4.29
2.43 0.12
PNL007 145 146 143 0.47 4.83 2.20 0.08
PNL007 146 147 199 0.82 6.47 5.01 0.09
PNL007 147 148 242
0.44 7.84 6.58 0.15
PNL007 148 149 173 0.43 7.34 3.72 0.09
PNL007 149 150 188 0.47 8.93 5.12 0.14

8

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Hole ID From To Ag g/t Ag g/t Ag g/t Au g/t Au g/t Au g/t Au g/t Zn% Zn% Zn% Pb% Pb% Pb% Cu%
PNL008 109 110 91
0.41
1.72 1.98 0.05
PNL008 110 111 216 0.84 3.74
5.62 0.10
PNL008 111 112 290 1.00 6 .31 6.90 0.15
PNL008 112 113 207 1.01 4
.51 4.54
0.14
PNL008 113 114 223 0.90 5 .87 4.71
0.16
PNL008 114 115 222 0.99 4
.57 3.23 0.09
PNL008 115 116 297 1.09 6 .30 3.02 0.14
PNL008 116 117 223 1.11 7 .12 3.90 0.09
PNL008 117 118 342 1.3 0 8 .15 5.67 0.12
PNL008 118 119 349 1.07 5 .59 7.55 0.09
PNL008 119 120 259 0.93 6 .31 4.31
0.10
PNL008 120 121 275 0.78 5 .29 5.16
0.09
PNL008 121 122 273 0.96 5 .70 4.32
0.09
PNL008 122 123 235 0.90 5 .89 3.73 0.10
PNL008 123 124 277 0.96 5 .99 4.71
0.08
PNL008 124 125 309 0.89 7 .01 3.71 0.15
PNL008 125 126 - - - - -
PNL008 126 127 208 0.69 4 .94 10.7 8 0.18
PNL008 127 128 234 0.84 6 .03 8.60 0.15
PNL008 128 129 297 0.73 5 .19 12.16 0.19
PNL008 129 130 201 0.78 6 .12 9.7 9 0.10
PNL008 130 131 254 0.69 6 .25 10.5 4 0.15
PNL008 131 132 244 0.84 4 .81 10.2 4 0.16
PNL008 132 133 193 1.05 7 .78 8.74 0.12
PNL008 133 134 123 1.01 6 .64 5.04
0.15
PNL008 134 135 188 1.11 7 .58 8.37 0.17
PNL008 139 140 133 0.82 4 .81 5.04
0.12
PNL008 140 141 161 0.81 5 .26 5.77 0.13
PNL008 141 142 128 0.92 4 .77 4.87
0.12
PNL008 142 143 178 0.89 6 .58 6.78 0.15
PNL008 143 144 179 1.03 5 .97 6.52 0.16
PNL008 144 145 151 0.90 5 .44 5.40
0.13
PNL008 145 146 158 0.73 5 .67 6.16 0.12
PNL008 146 147 189 0.87 7 .39 7.01 0.16
PNL008 147 148 153 0.74 5 .61 5.89 0.12
PNL008 148 149 168 0.96 6 .90 5.55
0.15
PNL008 149 150 165 0.90 7 .10 5.18
0.17
PNL008 150 151 187 1.15 6 .91 5.51
0.12
PNL008 151 152 131 1.62 10.02 4.44
0.18
PNL008 152 153 145 0.84 5 .54 3.69 0.15
PNL008 153 154 157 1.01 6 .89 3.73 0.15
PNL008 154 155 145 0.94 3.43
1.69 0.05
PNL008 157 158 347 1.68 4 .83 2.40 0.07
PNL008 158 159 243 1.06 2.44
1.18 0.08
PNL008 160 161 231 1.01 2.41 1.36 0.09
PNL008 162 163 245 0.95 2.87
1.92 0.13
PNL008 163 164 347 0.88 4 .76 2.49 0.10

9

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Hole ID From To Ag g/t Ag g/t Au g/t Au g/t Au g/t Zn% Zn% Zn% Zn% Pb% Pb% Pb% Cu%
PNL009 77 78 - 1.53 0.05 0.27 0.00
PNL009 78 79 149 2.80 0.35 2.42 0.10
PNL009 79 80 795
3.20 4.
09 6.37 0.26
PNL009 80 81 589
1.78 2.
97 5.36 0.18
PNL009 81 82 2,12 5 0.96
1.19
3.06 0.13
PNL009 82 83 2,799 1.90 5. 25 3.58 0.09
PNL009 83 84 467
1.62 10.84 6.48 0.15
PNL009 84 85 307
1.04
10.57 5.16 0.21
PNL009 85 86 221 1.05
8. 16 3.86 0.10
PNL009 86 87 432
1.14
8. 55 8.12 0.14
PNL009 87 88 311
1.60 7. 52 9.2 4 0.13
PNL009 88 89 223 1.31
4.
49 7.61 0.14
PNL009 89 90 117 1.00
2.12
1.69 0.07
PNL009 90 91 183 1.18
3.
42 4.16 0.07
PNL009 91 92 244
1.51 4.
85 7.12 0.09
PNL009 92 93 251
1.18
6. 30 4.88 0.09
PNL009 93 94 235
1.15
6. 05 5.11 0.12
PNL009 94 95 248
0.64 7. 36 6.29 0.11
PNL009 95 96 143 0.81
7. 39 5.10 0.15
PNL009 96 97 305
0.80
8. 22 7.63 0.12
PNL009 97 98 266
0.80
8. 27 6.84 0.16
PNL009 98 99 301
1.02
8. 05 8.06 0.22
PNL009 99 100 294
0.84
7. 97 8.38 0.20
PNL009 100 101 257
0.52 7. 93 6.24 0.16
PNL009 101 102 404
0.63 7. 18 11.52 0.32
PNL009 102 103 252
0.95
7. 63 6.11 0.16
PNL009 103 104 285
0.79
7. 07 6.49 0.19
PNL009 104 105 287
0.86
6. 84 7.39 0.15
PNL009 105 106 240
0.78
6. 32 7.29 0.15
PNL009 106 107 283
0.70 6. 72 6.17 0.18
PNL009 107 108 225 0.76 6. 55 6.28 0.17
PNL009 108 109 270
0.90
8. 16 5.89 0.17
PNL009 109 110 308
0.80
7. 68 4.83 0.17
PNL009 110 111 301
0.69 6. 75 7.31 0.24
PNL009 111 112 419
1.00
8. 78 6.23 0.18
PNL009 112 113 465
0.58 7. 81 8.22 0.15
PNL009 113 114 288
0.98
7. 80 6.13 0.17
PNL009 114 115 357
1.05
8. 75 7.04 0.17
PNL009 115 116 274
0.98
6. 55 4.04 0.15
PNL009 116 117 273
0.99
5. 88 4.95 0.18
PNL009 117 118 269
0.66 7. 67 4.52 0.16
PNL009 118 119 283
0.67 7. 56 4.12 0.16
PNL009 119 120 295
0.47 9. 11 4.55 0.15
PNL009 120 121 327
0.39 9. 01 5.76 0.16
PNL009 121 122 227
0.56 8. 78 4.04 0.18
PNL009 122 123 277
0.65 8. 81 4.30 0.15
PNL009 123 124 329
0.76 9. 40 5.58 0.18

10

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Hole ID From To Ag g/t Ag g/t Ag g/t Au g/t Au g/t Au g/t Au g/t Zn% Zn% Zn% Pb% Pb% Pb% Cu% Cu% Cu%
PNL010 101 102 601
0.17
0.39 0.87 7.36
PNL010 102 103 348 0.10 0.85
1.22 7.44
PNL010 103 104 245 0.08 0.49 0.97 2.74
PNL010 104 105 1, 330 0.42
1.21
2 .26 4.03
PNL010 105 106 582
0.26
1.42
1.33
3.01
PNL010 106 107 1, 126 0.76 8.76 4.42 0.52
PNL010 107 108 553
0.65 4 .53 2 .21 0.46
PNL010 108 109 586
0.69 5 .06 2 .21 0.18
PNL010 109 110 685
0.80 6 .01 2 .66 0.08
PNL010 110 111 697
0.83 7.6 9 3 .53 0.09
PNL010 111 112 655
0.79 5 .29 3 .42 0.07
PNL010 112 113 1, 096 0.85 4 .84 2 .84 0.13
PNL010 113 114 2,031 0.97 6 .66 4.24 0.19
PNL010 114 115 680
0.67 3
.33 1.54
0.10
PNL010 115 116 784
0.84 6 .27 3 .10 0.10
PNL010 116 117 753
0.88 5 .59 2 .68 0.08
PNL010 117 118 485
0.90 6 .16 2 .94 0.05
PNL010 118 119 702
0.94 7.3 6 2 .78 0.08
PNL010 119 120 1, 246 0.92 5 .31 2 .70 0.12
PNL010 120 121 1, 206 1.08 5 .04 3 .72 0.18
PNL010 121 122 823
0.85 4
.11 2 .61 0.11
PNL010 122 123 746
0.73 3
.96 1.86
0.09
PNL010 130 131 595
0.68 3
.89 1.89
0.08
PNL010 131 132 551
0.66 3
.99 2 .36 0.07
PNL010 132 133 503
0.78 6 .01 3 .72 0.10
PNL010 133 134 442
0.76 5 .36 4.07 0.09
PNL010 134 135 747
0.91 6 .07 2 .89 0.13
PNL010 135 136 544
1.11 6 .34 2 .98 0.08
PNL010 136 137 471
0.99 5 .75 2 .67 0.02
PNL010 137 138 529
1. 25 6 .58 3 .38 0.07
PNL010 138 139 417
1.04 6 .32 2 .26 0.15
PNL010 139 140 407
0.85 5 .11 2 .42 0.12
PNL010 140 141 320 0.73 4 .53 1.88
0.07
PNL010 141 142 375 1.03 7.4 3 3 .36 0.06
PNL010 142 143 468
0.93 6 .22 2 .89 0.07
PNL010 143 144 228 0.90 4 .72 1.24 0.05
PNL010 144 145 316 0.43
3
.19 1.35
0.04
PNL010 145 146 194 0.66 3
.49 1.23 0.04
PNL010 146 147 260 0.70 3
.96 1.58
0.07
PNL010 147 148 414
0.79 5 .16 2 .59 0.07
PNL010 148 149 395
0.92 5 .88 2 .81 0.07
PNL010 149 150 529
1.70 8.98 3 .65 0.13

11

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Hole ID From To Ag g/t Ag g/t Au g/t Au g/t Au g/t Zn% Zn% Zn% Zn% Zn% Pb% Cu% Cu% Cu% Cu%
PNL011 103 104
198
0.12
1.75
0.64 0.01
PNL011 104 105 33 0.04 0.22 0.24 0.01
PNL011 105 106 8 0.03 0.26 0.20 0.01
PNL011 106 107
135
0.36
2.62
1.69
0.08
PNL011 107 108
455
0.67 3.88
5.87 0.15
PNL011 108 109
394
0.67 5.09 5.56 0.15
PNL011 109 110
484
0.41
6.88 7.99 0.15
PNL011 110 111 528 0.70 6.90 9.19 0.16
PNL011 111 112
345
0.76 6.78 5.29 0.13
PNL011 112 113
451
0.50 6.76 7.91 0.15
PNL011 113 114
377
0.52 5.13 6.73 0.11
PNL011 114 115
371
0.62 7.74 4.42 0.15
PNL011 115 116
344
0.50 8.86 4.81 0.14
PNL011 116 117
355
0.51 8.13 4.64 0.13
PNL011 117 118
345
0.26
10.03 5.02 0.11
PNL011 118 119
299
0.37
9.41 4.83 0.09
PNL011 119 120
320
0.55 9.25 4.91 0.07
PNL011 120 121
411
0.83 8.93 4.23 0.08
PNL011 121 122
423
0.90 9.25 3.65
0.09
PNL011 122 123
455
1.04 8.96 4.06
0.09
PNL011 123 124 514 0.93 9.99 3.97
0.10
PNL011 124 125 547 0.97 8.87 4.26 0.09
PNL011 128 129 494 0.80 7.64 3.63
0.09
PNL011 129 130 64 7 0.88 9.13 4.30 0.14
PNL011 130 131 563 0.76 7.74 3.63
0.14
PNL011 131 132 857 0.78 8.47 6.31 0.14
Hole ID From To Ag g/t Au g/t Zn% Pb% Cu%
PNL012 82 83
251
0.55
0.06 3.65
0.02
PNL012 83 84
214
0.33
0.05 1.48
0.02
PNL012 84 85 1,590 0.79
0.06 2.60
0.02
PNL012 85 86
637
2.32 0.13 7.71 0.02
PNL012 86 87
328
1.09 0.61 12.88 0.05
PNL012 87 88
485
0.89
0.36 12.77 0.03
PNL012 88 89
264
1.61 0.51 10.78 0.04
PNL012 89 90 126 1.27 0.40 9.96 0.12
PNL012 90 91 - - - - -
PNL012 91 92
248
1.23 0.25 11.35 0.05
PNL012 92 93
305
1.22 0.39 11.85 0.11
PNL012 93 94
451
2.07 0.37 10.15 0.08
PNL012 94 95
414
1.31 4.15
3.57
0.30
PNL012 95 96
415
1.09 7.49 5.85
0.19
PNL012 96 97
279
0.86
7.71 4.89
0.42
PNL012 97 98
561
1.27 6.65 6.70 0 .59
PNL012 98 99
314
0.85
7.13 5.06
1.01

12

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Hole ID From To Ag g/t Ag g/t Au g/t Au g/t Zn% Zn% Zn% Pb% Pb% Pb% Cu% Cu%
PNL012 99 100 444
0.81 8. 30 5.16
0.7 7
PNL012 100 101 385 0.87
8. 55 4.51
0.7 4
PNL012 101 102 292 0.87
8. 20 3.74
0.16
PNL012 102 103 350 1.02
7. 13 3.55
0.14
PNL012 103 104 441
0.98
8. 36 4.67
0.13
PNL012 104 105 673
1.27 8. 10 3.17
0.10
PNL012 105 106 560
1.19 8. 59 4.19
0.08
PNL012 106 107 533
1.03
7. 93 4.33
0.11
PNL012 107 108 536
1.03
6. 73 2.91 0.07
PNL012 108 109 479
1.08 5. 94 2.91 0.12
PNL012 109 110 421
1.08 4.
50 1.56 0.07
PNL012 110 111 507
1.12 6. 35 2.83 0.10
PNL012 111 112 556
1.17 7. 92 3.67
0.11
PNL012 112 113 432
1.02
8. 45 3.07 0.11
PNL012 113 114 404
1.03
6. 67 2.91 0.14
PNL012 114 115 495
1.03
7. 03 2.59 0.11
PNL012 115 116 355 0.81 5. 29 2.13 0.06
PNL012 116 117 359 0.82
6. 00 3.06 0.06
PNL012 117 118 242 0.89
5. 37 2.41 0.10
PNL012 118 119 484
0.85
6. 32 3.03 0.13
PNL012 119 120 359 0.84
7. 38 3.64
0.11
PNL012 120 121 486
1.04
7. 39 4.99
0.12
PNL012 121 122 371 0.86
5. 05 2.19 0.13
PNL012 122 123 294 0.89
5. 87 2.60 0.09
PNL012 127 128 205 0.72 8. 71 8 .13 0.17
PNL012 128 129 384 0.96
8. 43 4.22
0.10
PNL012 129 130 448
0.84
8. 13 3.68
0.12
PNL012 130 131 664
0.52 7. 91 4.68
0.12
PNL012 131 132 704
0.66 6. 39 5.93 0.17
PNL012 137 138 391
0.86
6. 92 3.73
0.11
PNL012 138 139 509
0.86
9.69 4.46
0.11
PNL012 139 140 345 0.76 5. 33 2.24 0.11
PNL012 140 141 259 0.78 7. 67 3.14
0.11
PNL012 141 142 360 0.77 8. 82 4.18
0.07
PNL012 142 143 290 0.80 8. 82 4.01
0.11
PNL012 143 144 265 0.88
10.68 5.36
0.09

13

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

==> picture [353 x 197] intentionally omitted <==

----- Start of picture text -----

Hole ID From To Ag g/t Au g/t Zn% Pb% Cu%
PNL013 97 98 195 0.88 3.68 4.32 0.13
PNL013 98 99 98 0.37 1.20 2.12 0.12
PNL013 99 100 144 0.99 1.81 1.58 0.10
PNL013 100 101 385 1.21 7.27 3.06 0.10
PNL013 101 102 267 1.02 13.29 3.44 0.12
PNL013 102 103 306 0.92 11.36 3.71 0.10
PNL013 103 104 287 1.10 11.16 4.13 0.09
PNL013 104 105 188 0.52 8.82 3.98 0.08
PNL013 105 106 185 0.95 8.19 3.39 0.07
PNL013 106 107 190 1.03 6.67 2.47 0.07
PNL013 107 108 285 0.70 9.38 2.36 0.06
PNL013 108 109 340 0.83 7.71 3.67 0.07
----- End of picture text -----

Hole ID From To Ag g/t Ag g/t Au g/t Zn% Zn% Zn% Pb% Cu%
PNL015 96 97 112
0.02 0.04 1.33
0.00
PNL015 97 98 89 0.01 0.05 1.73
0.00
PNL015 98 99 313 0.01 0.07 0.42 0.00
PNL015 99 100 259 0.02 0.02 0.20 0.09
PNL015 100 101 4 0.01 0.02 0.23 0.17
PNL015 101 102 5 0.02 0.04 0.56 0.28
PNL015 102 103 603

0.16
0.88
1.16
0.15
PNL015 103 104 1,244
0.29
2.45
1.88
0.04
PNL015 119 120 38
0.10 0.69 0.71 0.01
PNL015 120 121 49 0.05 0.81
0.75 0.02
PNL015 121 122 116

0.28
1.51
1.71
0.04
PNL015 122 123 94
0.21
1.65
1.08
0.07
PNL015 123 124 36 0.05 0.78 0.58 0.02
PNL015 124 125 365 0.41 4. 89 7.95 0.11
PNL015 125 126 258
0.38
4. 97 4.59
0.13
PNL015 126 127 412 0.55 7. 41 6.12 0.15
PNL015 127 128 502
0.54 6. 63 8.76 0.18
PNL015 128 129 517
0.50 7. 17 8.09 0.20
PNL015 129 130 473

0.37
6. 84 8.40 0.18
PNL015 130 131 479
0.50 7. 77 6.70 0.16
PNL015 131 132 424 0.44 7. 62 7.15 0.16
PNL015 132 133 583
0.44 7. 95 10.76 0.19
PNL015 133 134 470
0.45 8. 32 9.12 0.20
PNL015 134 135 478
0.45 7. 30 10.70 0.14
PNL015 135 136 626
0.54 8. 26 7.20 0.26
PNL015 136 137 363 0.57 7. 48 5.61 0.17
PNL015 137 138 445

0.33
7. 51 6.07 0.17
PNL015 138 139 460
0.42 7. 49 6.61 0.20
PNL015 139 140 381 0.53 8. 31 5.71 0.17
PNL015 140 141 327 0.45 7. 43 5.25 0.15

14

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Hole ID From To Ag g/t Ag g/t Au g/t Au g/t Au g/t Zn% Pb% Pb% Cu%
PNL015 141 142
346
0 .69 7.72 6.21 0.18
PNL015 142 143
464
0 .61 8.64 6.12 0.14
PNL015 143 144 8 22 0.87 9.94 5.03 0.17
PNL015 144 145
460
0 .66 7.77 5.67 0.17
PNL015 145 146
354
0 .66 8.07 6.20 0.19
PNL015 146 147
426
0 .58 7.94 4.78
0.19
PNL015 147 148
340
0 .40 6.57 3.88
0.14
PNL015 148 149
334
0 .71 6.56 3.78
0.12
PNL015 149 150
258
0 .43 5.23 2.74 0.06
PNL015 150 151
165
0 .52 5.54 2.52 0.06
PNL015 155 156 70 0.18
2.99
1.04 0.03
PNL015 156 157
481
0
.35 6.73 3.27 0.11
PNL015 157 158
525
0 .52 7.45 3.93
0.11
PNL015 158 159
438
0 .64 9.29 4.48
0.09
PNL015 159 160
340
0.17
4.44
2.20 0.07
PNL015 160 161
538
0.18
3.22
1.64 0.05
PNL015 161 162
314
0 .50 3.41
1.92 0.04
PNL015 162 163
534
0 .60 5.43 3.75 0.07
PNL015 163 164
629
0 .67 6.43 3.16 0.08
PNL015 164 165
565
0 .61 5.82 3.95
0.07
PNL015 165 166
498
0 .50 6.55 4.86
0.09
PNL015 166 167
540
0 .60 5.94 3.84
0.07
PNL015 167 168
574
0 .44 5.94 3.89
0.08
PNL015 168 169
552
0 .57 6.78 5.95 0.12
PNL015 169 170
465
0 .55 6.72 5.32 0.09
PNL015 170 171
478
0 .44 4.93 4.17
0.09
PNL015 171 172
506
0 .50 5.94 5.21 0.10
PNL015 172 173
455
0 .44 6.68 4.87
0.11
PNL015 173 174
575
0
.38 6.88 5.80 0.09
Hole ID From To Ag g/t Au g/t Au g/t Au g/t Zn% Pb% Pb% Pb% Cu%
PSL017 99 100 1 0.06 0.16 4.5 5 0.01
PSL017 100 101
19
0.16
0.05
4.6 8 0.00
PSL017 101 102
51
0.21
0.12 3.57 0.00
PSL017 102 103
48
0.17
0.10
4.1 5 0.00
PSL017 103 104
62
1.72 0.03
3.43 0.00
PSL017 104 105
23
0
.67 0.05
1.27 0.00
PSL017 105 106 - 0.52
0.04
2.28
0.00
PSL017 106 107 4 0.13 0.05
1.76 0.00
PSL017 107 108
15
0.45
0.06
2.86 0.00
PSL017 108 109 141 0
.68 0.20 1.17 0.00
PSL017 109 110
35
0 .80 0.26 4.8 6 0.01
PSL017 110 111
25
0.49
0.15 5.55 0.01

15

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Hole ID From To Ag g/t Ag g/t Ag g/t Ag g/t Ag g/t Au g/t Au g/t Au g/t Au g/t Zn% Zn% Zn% Pb% Pb% Pb% Cu% Cu% Cu% Cu% Cu%
PSL018 100 101 4 0.21
0.09 3.28
0.01
PSL018 101 102 12 0.13
0.05 4.33
0.00
PSL018 102 103 40 0.27
0.03 2.94
0.00
PSL018 103 104 29 1.33 0.02 2.25
0.00
PSL018 104 105 26 0.01 0.03 3.40
0.00
PSL018 105 106 33 0.40
0.07 3.94
0.00
PSL018 106 107 19 0.44
0.08 2.96
0.00
PSL018 107 108 41 0.15
0.08 2.44
0.00
PSL018 108 109 54 0.15
0.13 2.60
0.00
PSL018 109 110 88 0.40
0.14 22.71 0.01
PSL018 110 111 955 0.41
0.08 3.68
0.00
PSL018 111 112 1,627 0. 92 1.62
1.72 0.04
PSL018 112 113 62 0.53
2.44
1.29 0.08
PSL018 113 114 50 0.50
1.99
1.33 0.08
PSL018 114 115 44 0.14
0.50 0.30 0.01
PSL018 115 116 21 0.05 0.17 0.16 0.01
PSL018 116 117 376
1.1 2 0.76
1.82 0.09
PSL018 117 118 1,1 53 1.1 2 1.63
1.17 1.89
PSL018 118 119 282 0.41
0.08 2.04
3.0 1
PSL018 119 120 306 0.43
0.08 1.87
2. 42
PSL018 120 121 465
0.43
0.15 1.12 3.63
PSL018 121 122 96 0.13
0.18 3.06
1.22
PSL018 122 123 293 0.30
0.13 1.33 0.50
PSL018 123 124 360
0.15
1.36
8.19
0.55
PSL018 124 125 338
0.14
1.31
4.68
0.21
PSL018 125 126 140
0.19
2.89
3.14
0.34
PSL018 126 127 371
0.48
5 .86 5.37
0.38
PSL018 127 128 494
0 .80 7.6 0 17. 62 0.18
PSL018 128 129 481
0.46
4 .84 16. 02 0.79
PSL018 129 130 363
0.64 5 .26 1 1.22 0.35
PSL018 130 131 623
0. 95 9.27 9.56
0.26
PSL018 131 132 374
0 .78 7.6 7 7.11
0.17
PSL018 132 133 336
0 .80 9.04 6.07
0.16
PSL018 133 134 297 0.62 6 .24 4.55
0.07

16

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

APPENDIX 2 – JORC Code (2012 Edition), Assessment and Reporting Criteria

Section 1: Sampling Techniques and Data

Criteria Explanation Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
sampling.

Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (eg submarine nodules) may warrant disclosure
of detailed information.
The sampling referred to in this release refers to 12 Reverse Circulation
(RC) drill holes.
Samples were all collected by qualified geologists or under geological
supervision. Representative samples of the material drilled were collected
for every metre drilled. 2 x 2-4kg samples (one for assay and a duplicate)
and a bulk sample of the remainder of each metre was collected directly
from the rig cyclone. The reason for the large discrepancy of individual
sample sizes is that many samples were massive sulphide with an SG twice
that of non mineralised material.
Duplicate samples were taken for assay every 20thsample.
The samples are considered to be representative of the rock being drilled.
The nature and quality of the sampling was carried out in conformity with
industry standard QAQC procedures.
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what
method, etc).
The drilling programme consisted of 21 Reverse Circulation (RC) drill
holes, using a Schramm 1200 with an onboard 350 psi/900 cfm
compressor. An auxiliary air booster was used on all holes. The drill string
utilised standard 6m rods and a 5 ½ inch face sampling hammer. The
contractor was Resolution Drilling Limited.
Drill Hole Met_1LS_1 is a diamond drill hole previously drilled but not
assayed.
Drill sample
recovery

Method of recording and assessing core and chip
sample recoveries and results assessed.

Measures taken to maximise sample recovery and
ensure representative nature of the samples.

Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Representative samples of the material drilled were collected from every
metre drilled.
The drilling method used was selected so as to maximise sample recovery.
Some voids from previous underground mining and vughs were
intersected. No sample was recovered from these intervals.
No sample bias was noted except for the few metres where there was low
sample recovery.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to
support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.

Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.

The total length and percentage of the relevant
intersections logged.
Drill chips were logged for lithology, mineralisation, weathering, colour
and any other relevant characteristics. Geological logging conformed to
the standardised system adopted by the previous operators of the
project.
Logging was either qualitative or quantitative depending on the
characteristic being recorded. Small representative samples of chips are
stored in chip trays for reference.
The whole length of each hole was logged.
Sub-
sampling
techniques

If core, whether cut or sawn and whether quarter, half
or all core taken.
Early in the program it became evident that the top 12 metres of the
holes were drilled through fill previously dumped in the area. Therefore,
the top 12m in each hole was not assayed. Because the target was
reasonablywell known fromprevious drillingit was considered unlikely

17

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Criteria Explanation Commentary
and sample
preparation

If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.

For all sample types, the nature, quality and
appropriateness of the sample preparation technique.

Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.

Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size
of the material being sampled.
that there would be much mineralized material above 72m. Because the
holes are very closely spaced only selected holes were assayed above
72m. The aim was to understand the geochemistry of the top 72m. The
intervals from 12m to 72m were composited into 4m intervals, for
assaying, using a 50cm tube samples. Below 72m samples were collected
on an individual 1 metre basis directly from the on-rig cone splitter as
described in the Sampling techniques section. Duplicate samples were
taken for assay every 20thsample. All samples were dry. Sample size is
considered to be appropriate for the material being sampled.
Quality of
assay data
and
laboratory
tests

The nature, quality and appropriateness of the
assaying and laboratory procedures used and whether
the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.

Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
The gold assay technique selected is a fusion technique which breaks
down the mineral content of the sample completely. The PbO flux is
reduced to Pb metal during the fusion process, and precious metals are
accumulated within the resultant Pb prill. Dissolution of the prill, and
measurement of the Au abundance in the resultant solution provides a
precise and accurate measure of the total Au abundance in the sample.
Standard reference materials and duplicates are included in the analytical
stream by both the company (every 20 samples) and the laboratory.
Separate standards were submitted for gold and base metal assays.
Comparison of the measured value of the standard and the accepted
value provides a clear measure of laboratory performance.
Analysis of duplicates provides a measure of repeatability, but this
approach is less reliable when coarse gold is present in the samples.
Base metals including Pb, Zn, Cu and Ag have been determined by a four-
acid digest procedure. Initial charge weight is 0.5g with metal
concentrations determined by ICP analysis of final diluted solutions. If Cu,
Pb or Zn exceed 10,000ppm then an Ore Grade procedure is used
reducing charge size to 0.3g. If Ag exceeds 100ppm the analysis is
repeated as an Ore Grade digest with excess HCL added to maintain Ag in
solution for ICP analysis. QA/QC procedures for base metals are the same
as for the above-mentioned Au analysis procedure.
Verification
of sampling
and
assaying

The verification of significant intersections by either
independent or alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.

Discuss any adjustment to assay data.
All drilling results were scrutinised by senior management of the
company.
The use of twinned holes is not relevant in this instance as the drill
program has been undertaken to confirm previous drill results.
All drilling data is accumulated initially in spreadsheets, and ultimately
transferred to a master database for archiving.
Location of
data points

Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
Drill collars were initially located on the ground using a theodolite based
on control points used at the Endeavor Mine.
The grid system used is the Endeavor Mine local grid. On completion of
the program collar locations were confirmed by check surveys undertaken
by a registered surveyor. The quality of the topographic control is
considered to be adequate. Down hole surveys were taken at nominal
40m intervals.
Data
spacing

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient
to establish the degree of geological andgrade
Previous drilling had outlined the resource. The current program was
designed to confirm the resource. Drill hole spacing is nominally at 15m

18

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Criteria Explanation Explanation Commentary Commentary
and
distribution
continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.

Whether sample compositing has been applied.
centres which is considered suitable for supporting JORC compliant
resource estimate.
Drill results indicate further drilling is required for confirmation of the
South Lode.
Sample compositing, into 4m composites, was done for samples above
72m down hole where it was considered unlikely that significant
mineralisation would be intersected. Where composite samples contain
potentially significant mineralization they are being re-assayed in the 1m
intervals.
Orientation
of data in
relation to
geological
structure

Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.

If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Orientation of the drill holes is considered to be appropriate for the target
being tested.
Sample
security

The measures taken to ensure sample security.
Samples are stored on the Endeavor Mine site which is a fully fenced site
and has controlled access.
Audits or
reviews

The results of any audits or reviews of sampling
techniques and data.
There has been no external audit or review of the sampling techniques or
data completed at this time.
Section 2: Reportingof Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.

The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Endeavor Project Mineral tenements are listed below
and are 100% owned by Cobar Operations Pty Ltd3
ML’s 158, 159, 160, 161 and 930.
EL’s 8752, 5785 and 8583.
All licenses are in good standing.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other parties.
The drill program was based on establishing the
remaining resources post the 1996 cave event. Previous
resource estimates of the mineralisation by CBH
Resources were checked by this drilling programme.
Further drillingwas considered to be required.
Geology
Deposit type, geological setting and style of mineralisation.
Endeavor (previously Elura) lead-zinc-silver mine
situated in the Cobar Basin in central NSW.
Drill hole
Information

A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.

If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
A representative Long Section (Figure 1) is included in this
announcement. Tables showing collar coordinates, RL’s,
dip, azimuth, down hole surveys and hole depth are
included in this announcement. Table 2, Appendix 1.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
Assays are weighted by sample length to calculate grade
x interval results.

3 Refer to POL ASX release dated 28th March 2023

19

www.polymetals.com

ASX Announcement

ASX: POL

==> picture [123 x 73] intentionally omitted <==

Criteria JORC Code explanation Commentary

Where aggregate intercepts incorporate short lengths of high-grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values
should be clearly stated.
No weighting or high-grade cutting techniques have
been applied to the data reported.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of
Exploration Results.

If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.

If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
The North Lode was known to be a vertical plug like
body. The drilling was designed to test the top part of
this plug. Therefore, vertical and steep dipping drill
holes were considered appropriate to define the
resource. Recent RC drilling of the South Lode provides a
down hole intercept of 71m for PSL020. This
corresponds to an estimated true width of 24m in this
particular area.
Diagrams
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
Refer Figure 1 within this announcement.
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced avoiding misleading reporting of
Exploration Results.
The accompanying document is considered to represent
a balanced report.
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk samples –
size and method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
There is no other exploration data which is considered
material to the results reported in the announcement.
Further work
The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
Further drilling is likely required to confirm the extent of
the South Lode. Metallurgical test-work and mining
studies are also required.

20

www.polymetals.com