REPORT ON THE FIRST HALF YEAR AND ON THE SECOND QUARTER OF 2020

PNE AG

2 | 2020

THE PNE GROUP AT A GLANCE

The PNE Group consists of the companies PNE AG and WKN GmbH and is a leading wind farm developer located in Northern Germany. From this strong position the PNE Group continues to develop into a Clean Energy Solution Provider.

PNE Group key figures

in million EUR 1.1. – 30.6.
2020
1.1. – 30.6.
2019
1.1. – 30.6.
2018
Total aggregate output 77.0 85.6 38.2
Revenues 62.4 65.6 28.4
Earnings before interest, taxes,
depreciation and amortisation (EBITDA)
9.0 18.5 8.7
Operating profit (EBIT) 0.6 12.9 4.1
Earnings before taxes (EBT) -5.8 6.2 -1.9
Result for the period -5.3 3.4 -0.3
Basic earnings per share (euro) -0.07 0.05 0.00
Average number of shares (million) 76.3 74.4 76.6
in million EUR 30.6.2020 31.12.2019 31.12.2018
Equity on the reporting date 210.0 220.0 216.3
Equity ratio on the reporting date (%) 37.3 38.8 47.8
Balance sheet total on the reporting date 562.5 567.6 452.6

FOREWORD OF THE BOARD OF MANAGEMENT

DEAR SHAREHOLDERS

Due to the Corona pandemic, the first half of the 2020 financial year was one of the most challenging and unusual in the Company's history. However, we have successfully managed this situation, made further operational progress and performed well in financial terms.

Dealing with the Corona pandemic

The first half of 2020 was marked by the Corona pandemic and its effects. We have adapted to this situation with concepts aligned with the respective markets. The conclusion is pleasing: Despite a sudden changeover to working from home for a period of around six weeks until May, we made good progress in our operational activities. Projects were further developed, tenders won and the construction of further projects started.

It has paid off for us that we have developed our internal processes and the organisational structure to a high level in recent years as part of our "Scale up" programme. Thus, we were also technically able to implement this changeover spontaneously and remained fully operational at all times. We would like to take this opportunity to pay tribute to the commitment of our employees, who adjusted quickly and well to the unfamiliar situation.

However, it is not yet possible to provide a final assessment of the consequences of the crisis triggered by the pandemic on the economy as a whole. This includes possible effects on delivery routes and suppliers of the wind power turbines and components required for the projects. Among other things, the delivery times for wind turbines have been extended. We also had to prepare ourselves for the fact that there could be delays in project development due to the sometimes slower processing time on the part of approval authorities. In the service area, there were restrictions during the lockdown phase, including with regard to our training portfolio. On the other hand, there were no unexpected negative effects on electricity sales in the projects operated by us. This shows how sound and robust our adapted business model is. We have already taken this into account in our planning. However, we also assume that the global hunger for energy and the will to drive forward CO2 reduction and thus climate protection will make it necessary to expand renewable energies even after the current crisis.

General political conditions

The general conditions for the expansion of renewable energies in Germany have not become easier. In the case of onshore wind energy, increasingly lengthy approval procedures can be observed and, from time to time, legal action is taken against approvals already granted. This delays and hinders projects. With regard to offshore wind energy, the industry is still waiting for reliable framework conditions for future projects and tenders. It is pleasing that the German government has discussed these problems and has held out the prospect of changes.

We are also pleased with the plan for the European Union's "Green Deal", which is likely to strengthen the shift to renewable energy sources and related solutions such as the use of hydrogen. In Germany, the decision to phase out coal and the increase in targets for the expansion of offshore wind energy are positive developments.

Successful operative development

In spite of the difficult conditions resulting from the Corona pandemic, the first half of the year was successful in operational terms. In Poland, we completed the construction of a 42 MW project sold earlier. The construction of wind farms on behalf of customers in Sweden and Poland has been continued. In Germany, we had five wind farm projects with a nominal capacity of 48.7 MW under construction at the end of the first six months, of which 4.2 MW in the form of a citizen wind park.

At the end of the first six months, we thus had a total of approx. 293.7 MW of wind energy projects under construction on our own account and for our customers.

In the first half of the year, we were successful with two projects (13.9 MW) in the tender process in Germany. We were also able to obtain approval for a further project (25.1 MW), which then participated in the tendering round in July and was awarded a contract.

In the reporting period, we have achieved a further milestone for starting the development of marine wind farms off the US coasts. In this connection, a company was founded and an office established in Boston.

Expansion of internally operated wind farms makes progress

In the first half of 2020, we decided to strengthen the portfolio of internally operated wind farms. In this way, as with the expansion of the service business, we intend to make a further contribution to reducing the volatility of earnings and stabilising earnings and sales at a high level. This is a further step towards becoming a Clean Energy Solution Provider with our longterm "Scale up" programme.

At present, the PNE Group has internally operated wind farms with an installed nominal capacity of 130.1 MW; a further 44.5 MW are under construction and are primarily to be integrated into the portfolio. The plans are to expand the portfolio of internally operated projects, especially in Germany, to up to 500 MW by the end of 2023. The basis for this is the well-filled project pipeline.

Project pipeline strengthened

The basis for the future development of the PNE Group is the "pipeline" of projects, which are processed in various phases of project development. We were able to expand the pipeline of onshore wind energy projects to approx. 5,176 MW. It is noteworthy that we have reached a new high in the Company's history with projects of approx. 632 MW currently in the approval phase in Germany and France.

Further progress was also made in the development of photovoltaic projects. In this field, we were able to expand our "pipeline" of projects in progress to 232 MWp. This, too, is an important component of our strategic further development.

First-half results on target

On the basis of these business developments, the Group generated in the reporting period sales revenues of euro 62.4 million (prior year: euro 65.6 million), total aggregate output of euro 77.0 million (prior year: euro 85.6 million), earnings before interest, taxes, depreciation and amortisation (EBITDA) of euro 9.0 million (prior year: euro 18.5 million), operating profit (EBIT) of euro 0.6 million (prior year: euro 12.9 million) and undiluted earnings per share of euro -0.07 (prior year: euro 0.05).

In the first half of the year, the investments in our own projects had a particular impact, as no projects were sold.

The number of employees in the Group has increased significantly to 450 people (prior year: 386) as at June 30, 2020. This increase reflects the higher personnel requirements resulting from the expansion of our business model.

The results of the first half of the year are on target. However, it is the consolidated results achieved in the Group, which do not provide a complete picture of the performance of the entire enterprise. These are strongly influenced by the development of our own portfolio. In view of the internal operation of wind farms, the EBITDA parameter is increasingly becoming a key performance indicator. In the medium term, we will therefore place more emphasis on EBITDA. A look at the individual segments shows the current development.

In the "project development" segment, the preparations for the realisation of economically larger wind farms intended for our own portfolio had an effect.

In the "service products" segment, the expansion of the service strategy, the associated buildup of the workforce and the necessary investments in equipment had an impact on the results.

In the "electricity generation" segment, the course of business was as planned with strong wind months in the first quarter and weak wind results in the second quarter.

Accordingly, we can confirm our goals for the entire year: Despite our investments in building up our portfolio of internally held wind farms, we are expecting EBITDA of euro 15 to 20 million and EBIT of euro 5 to 10 million for the Group for the 2020 fiscal year.

PNE is well on track. In spite of the current developments triggered by the Corona pandemic, we are optimistic about the future.

We would like to express our very sincere gratitude – including on behalf of our employees – for your support to date.

Please maintain your confidence in us in the future!

Yours sincerely

The Board of Management

Markus Lesser Jörg Klowat CEO CFO

CAPITAL MARKET INFORMATION

PNE SHARES VS. RENIXX VS. ÖKODAX indexed to 100%

Share

70

90

110

130

150

160

PNE AG shares began the current fiscal year on January 2, 2020 at an opening price of euro 4.02. After a sustained rise in the price, the share reached its high for the reporting period in February at euro 5.24. Then, the share price declined and was below euro 4.00 in the second half of March, but rose again since the beginning of April to prices just below euro 5.00. At the end of the reporting period on June 30, 2020, the share closed at euro 4.98, which corresponds to a market capitalisation of approx. euro 381.5 million and a change of +23.7 percent compared with the beginning of the year. In the weeks following the end of the first half of the year, the PNE shares rose again and closed at euro 5.29 on July 20, 2020.

BOND INFORMATION

The 2018/23 corporate bond issued by PNE AG has a volume of euro 50 million and it was primarily traded over 100 percent during the reporting period. At the end of the reporting period on June 30, 2020, the bond price was 100.00 percent.

Shareholder structure

At the end of the reporting period on June 30, 2020, the total number of shares issued by PNE AG amounted to 76,603,334.

According to published notifications regarding voting rights and directors' dealings, Morgan Stanley/Photon Management GmbH held 39.80 percent of the shares, Active Ownership Fund SCS 8.99 percent, Goldman Sachs Group, Inc. 5.20 percent, Samson Rock 5.14 percent and Dimensional Holdings Inc. 3.37 percent on June 30, 2020. Accordingly, all other shareholdings were to be classified as other free float. After the end of the reporting period, Goldman Sachs Group reported on July 13, 2020 that it no longer holds any shares. This results in the following overview of the shareholder structure at that time:

General meeting of shareholders

PNE AG's general meeting of shareholders was held in Cuxhaven on May 20, 2020 in the form of a virtual general meeting without the physical presence of shareholders or their proxies.

The shareholders voted by a large majority in favour of the proposal of the Board of Management and the Supervisory Board to pay a dividend of euro 0.04 per eligible share.

The shareholders also clearly consented to the proposed resolution to give formal approval of the actions of the members of the Board of Management Markus Lesser (CEO) and Jörg Klowat (CFO). In addition, the shareholders decided with a clear majority to give formal approval of the actions of the Supervisory Board. Christoph Oppenauer and Alberto Donzelli were newly elected to the Supervisory Board.

Deloitte GmbH Wirtschaftsprüfungsgesellschaft, Hamburg, was elected by a large majority as the auditor of the financial statements and consolidated financial statements.

Finally, the general meeting of shareholders also approved by a large majority the conclusion of a profit transfer agreement between PNE AG as the controlling company and WKN GmbH as the controlled company.

Financial calendar

11.11.2019 Publication of Financial Report Q3
November 2020 Analyst Conference/Frankfurt

Additional information

On the website www.pne-ag.com, you will find extensive information on PNE AG and a comprehensive presentation of the business model as well as current data concerning the shares in the section "Investor Relations". Furthermore, financial and quarterly reports, press announcements and background information on PNE AG can be accessed and downloaded from there.

7

INTERIM GROUP MANAGEMENT REPORT FOR THE FIRST SIX MONTHS OF 2020

1. GENERAL CONDITIONS

General political conditions

The general political conditions have not changed significantly compared with the presentation in the group management report 2019.

PNE AG takes a positive view of the fact that the German government has increased the targets for the expansion of offshore wind energy from 15 to 20 GW by 2030 and 40 GW by 2040 by amending the Offshore Wind Energy Act. PNE AG welcomes these planned expansion targets and sees this as confirmation that the size of 15 MW, which was revised downwards by the German government, was set too low as an expansion scenario at that time.

We also take a positive view of the German government's decisions on the development of a hydrogen strategy and on the coal phase-out.

Overall, the international markets for renewable energies are still undergoing changes that require the PNE Group to adapt its activities accordingly in order to minimise risks and exploit new opportunities. The framework conditions for the economic expansion of photovoltaics are in place in selected markets. The Board of Management is still confident that the extended corporate strategy and further internationalisation, including in Europe as well as in new markets, will advance the positive development of the Group.

Further general conditions/Corona pandemic

It is not yet possible to provide a final assessment of the consequences of the crisis triggered by the global Corona pandemic on the economy as a whole. This includes possible effects on delivery routes and suppliers of the wind power turbines and components required for the projects. Delivery times for wind power turbines have been extended. We therefore had to adjust to the fact that there may be delays in project development. In the service area, there were restrictions during the lockdown phase, including with regard to our training portfolio. On the other hand, there were no unplanned negative effects due to the pandemic on electricity sales in the projects operated by us.

The change of office activities to working from home in the period from around mid-March to the end of May 2020 has had a positive effect. Thanks to the existing technical infrastructure and the flexibility of the employees, this changeover has progressed smoothly. Among other things, this has significantly reduced the potential risk of infection. Internal control processes were not affected.

2. CORPORATE STRUCTURE

The changes in the companies included in the consolidated financial statements as compared to December 31, 2019 are explained in the condensed notes to the consolidated financial statements under item "3. Scope of consolidation".

3. GENERAL ACCOUNTING PRINCIPLES

In the financial report for the first six months of the 2020 fiscal year as at June 30, 2020, the Company applied the same accounting and valuation methods as in the consolidated financial statements as at December 31, 2019. The IFRS standards amended since January 1, 2020 are not relevant to the half-yearly financial statements.

The interim financial statements were drawn up in line with the regulations of IAS 34. The tax expenditure of the PNE Group is determined using an estimate of the taxable income of the relevant companies.

4. ORGANISATION AND EMPLOYEES

On June 30, 2020, the PNE AG Group employed 450 people in total (prior year: 386), including the members of the Board of Management. The employees of the subsidiaries are included in this number.

5. OVERVIEW OF BUSINESS ACTIVITY

Summary

The effects of the Corona pandemic have also been felt by companies that, like PNE AG, are working on expanding renewable energies. The effects on the global economy and consequently also on supply routes or the development of electricity prices are not yet finally foreseeable. At present, PNE assumes that there may be shifts in the operating business as regards the sale of project rights and project implementation from 2020 to 2021 and from 2021 to 2022 due to the current measures to prevent any further spread of the Corona virus. This has already been taken into account in the guidance. However, the Company currently assumes that there should be no significant impact on our business in the medium to long term. The good liquidity position gives the Company sufficient leeway to be able to cope well with longer-term restrictions. Against this background, no support measures or state aid had to be used in the reporting period. The operating activities listed in the remainder of this report and the Group figures still confirm a positive going concern.

PNE decided in March 2020 to significantly expand its own wind farm operations in the future. The aim is to stabilise sales and earnings at a high level. However, individual projects, especially abroad, will still be marketed in the future. PNE currently operates wind farms with an installed nominal capacity of 130.1 MW itself. Additional projects are under construction. The plans are to expand the portfolio of internally operated projects, especially in Germany, to up to 500 MW by the end of 2023. The basis for the expansion is the well-filled project pipeline, since PNE is currently developing national and international onshore wind farms with a volume of 5,176 MW in various phases of project development. The pipeline of photovoltaic projects includes projects with approx. 232 MWp as at June 30, 2020.

The operational business of the PNE Group during the first six months of 2020 was characterised by the development and realisation of onshore wind farms in various countries. The Polish wind farm "Barwice" (42 MW), which was erected on behalf of the purchaser, was completed and put into operation.

As at June 30, 2020, wind farms with a total nominal capacity of 293.7 MW were under construction in Germany, Sweden and Poland.

The development of national and international photovoltaic projects was also intensified in the reporting period.

Segment reporting

The determination and presentation of segment reporting as at June 30, 2020 has not changed versus December 31, 2019.

The "project development" segment reports on the following sub-divisions: onshore wind power – national and international, offshore wind power – national and international, photovoltaic projects – national and international, as well as other projects.

The "service products" segment reports in summary on services. These include technical and commercial operations management, construction management, transformer station services, wind measurements, electricity marketing management, and similar services.

The "electricity generation" segment combines all activities of the Group companies that are engaged directly in the production of electricity from clean energies.

"Project development" segment

Wind energy onshore sub-division

The development and realisation of onshore wind farm projects continued in the first half of 2020, both in Germany and in foreign markets, despite the restrictions caused by the spread of the Corona virus and the associated consequences.

Overview of the status of onshore wind energy project activities of the PNE Group as at June 30, 2020 in MW:

Sold /
Service
Country Phase I – II Phase III Phase IV Total MW Provider
Germany 1,262 371 49 1,682 0
France 271 261 0 532 0
United
Kingdom
43 0 0 43 0
Italy 40 0 0 40 0
Canada 505 0 0 505 0
Panama 345 0 0 345 0
Poland 132 19 0 151 132
Romania 54 102 0 156 0
South
Africa
500 30 0 530 0
Sweden 0 59 0 59 113
Turkey 629 71 0 700 0
USA 266 167 0 433 0
Total 4,047 1,080 49 5,176 245

Phase I – II = Exploration & Development

Phase III = Planning

Phase IV = Implementation

Sold/Service Provider = Projects already sold, for which PNE is currently providing construction management services

9

Wind energy onshore – national

At the end of the second quarter of 2020, the PNE Group was working on wind farm projects with a nominal output of approx. 1,682 MW in various phases of project development.

Five wind farms were under construction at the end of the reporting period. This means that the number of wind farms under construction increased by two to five with a nominal capacity of 48.7 MW.

The necessary permits for the realisation of further wind farms are available.

Wind energy onshore – international

The PNE Group also successfully continued its core business of the development and realisation of projects abroad. Compared to the presentation in the 2019 consolidated management report, there were the following changes in the foreign markets:

Poland

The previously sold "Barwice" wind farm in the North West of Poland was completed. 14 Siemens SWT-3.0-113 wind turbines with a total capacity of 42 MW were erected as part of this project. PNE was responsible for construction management on behalf of the investor.

Construction of the "Jasna" wind farm (132 MW) was continued as scheduled on behalf of the purchaser.

Sweden

The construction of the previously sold "Malarberget" wind farm (113 MW) has progressed as scheduled. PNE has taken over the construction management of the wind farm on behalf of the purchaser and will continue to support it during the operating phase.

Wind energy offshore sub-division Wind energy offshore – national

PNE's high level of competence in offshore project development has resulted in visible successes: In recent years, PNE has sold eight offshore wind farm projects after their development was completed. These include the projects "Atlantis I", "Borkum Riffgrund" and "Gode Wind". PNE continues to act as a service provider for the divested projects.

In the offshore wind energy segment, PNE also examines opportunities of generating electricity from other energy carriers such as hydrogen at sea. Fundamental calculations and examinations are carried out for this purpose, which, if positive, can form the basis of further project activities in this respect.

Wind energy offshore – international

PNE has achieved a further milestone for starting the development of marine wind farms off the US coasts. In this connection, a company was founded and an office established in Boston. The United States Bureau of Ocean Energy Management (BOEM) is currently in the process of leasing additional sites for offshore wind farms in state-controlled coastal waters. In 2018, a tender was launched for three sites off the US east coast (Massachusetts). In this context, contracts for a total volume of USD 405 million were awarded. This demonstrates the value of offshore wind projects off the US coast and shows that this market will continue to develop in the future. PNE is currently preparing for future tenders.

Photovoltaics subdivision

In recent years, photovoltaic installations have become increasingly cost-effective and thus more marketable in the area of electricity generation. In addition, the legal and economic framework conditions for the development of photovoltaic projects are in place in many countries. The development of photovoltaic projects is therefore part of the strategic expansion of the business model of PNE AG. Numerous markets are currently being examined in detail and the first rights are being secured. Particular attention will initially be paid to Germany, France, Italy, Romania and the USA as well as other international markets.

The volume of projects managed at the end of reporting period was increased to 232 MWp.

Overview of the status of photovoltaic project activities of the PNE Group as at June 30, 2020 in MWp:

Country Phase I – II Phase III Phase IV Total MWp
Germany 19 0 0 19
Romania 112 0 0 112
USA 101 0 0 101
Total 232 0 0 232

Phase I–II = Exploration & Development

Phase III = Planning

Phase IV = Implementation

The operative achievements listed above have led to positive results being generated in the "project development" segment in the first six months of 2020. The current Corona pandemic has had little impact on the business activities of the "project development" segment in the form of minor project postponements. These shifts had only minor effects on the results of the "project development" segment in the first half of the year. However, as explained in connection with the published guidance 2020, it cannot be ruled out that this might lead to shifts in earnings in the "project development" segment and in the Group from 2020 to 2021 in the further course of the fiscal year.

In the first half of 2020, the "project development" segment achieved

  • » total aggregate output of euro 67.4 million (prior year: euro 74.6 million),
  • » EBITDA of euro 6.3 million (prior year: euro 13.3 million) and
  • » EBIT of euro 5.3 million (prior year: euro 12.1 million).

"Service products" segment

The "service products" segment reports in summary on services. These include technical and commercial operations management, construction management, transformer station services, wind measurements, electricity marketing management, and similar services.

The international business of operations management was expanded in the first half of 2020 by activities in France and Poland. Investments in personnel and equipment were necessary in the "service products" segment, among other things in order to expand into the two markets, which had a negative impact on the results for the first half of the year compared with the same period of the previous year.

In the Polish wind farm "Barwice", developed and sold by PNE, Group companies provided construction management services in the first quarter of 2020 until the start of operation. With this project, PNE once again successfully implemented its strategy of increasing the volume of services, in particular at the international level.

For the Polish "Jasna" project, which was developed, successfully tendered for and sold by Group companies, and for the Swedish "Malarberget" project, the Company also provides services during the construction phase. In the "Jasna" project, PNE will also take on tasks during the subsequent operating phase.

The current Corona pandemic has had a medium impact on the business activities of the "service products" segment, since although the major part of orders in this segment is based on longterm service orders, in certain service areas, such as training on occupational safety at height, it was temporarily not possible to conduct training courses due to the distance rules and other protective measures.

In the first half of 2020, the "service products" segment achieved

  • » total aggregate output of euro 9.3 million (prior year: euro 7.8 million),
  • » EBITDA of euro 1.6 million (prior year: euro 2.0 million) and
  • » EBIT of euro 0.1 million (prior year: euro 0.7 million).

"Electricity generation" segment

The "electricity generation" segment combines all activities of the Group companies that are engaged directly in the production of electricity from clean energies. This division includes primarily the PNE-operated wind farms with a total nominal capacity of 130.1 MW and the Silbitz biomass power plant with approx. 5.6 MW. Furthermore, the segment includes interests in limited partnerships, in which wind farm projects will be realised in the future.

Until the successful sale and delivery of wind farms to the operators, the "electricity generation" segment will include the revenues of these projects as part of segment reporting.

The first half of 2020 reflected the expected wind trends. While good wind performance was recorded in the first quarter, the second quarter was characterised, as usual, by weaker wind performance. The seasonal wind curve with constant depreciation and costs per quarter results – from quarter to quarter – in the wind farms recording very positive results in quarters with high winds and slightly negative to slightly positive results in low-wind quarters.

To date, the current Corona pandemic has had no impact on the business activities of the "electricity generation" segment.

In the first half of 2020, the "electricity generation" segment achieved

  • » total aggregate output of euro 12.9 million (prior year: euro 8.3 million),
  • » EBITDA of euro 9.9 million (prior year: euro 6.0 million) and
  • » EBIT of euro 4.1 million (prior year: euro 2.9 million).

Changes

The changes in the Group's structure are explained in the condensed notes to the consolidated financial statements under item "3. Scope of consolidation".

Compared to December 31, 2019, there were no other significant changes in the area of operations.

6. NET ASSETS, FINANCIAL POSITION AND RESULTS OF OPERATIONS

The figures shown below were determined and presented in accordance with IFRS for the Group. The consolidated financial information for the first two months of the 2020 fiscal year as at June 30, 2020 was based on the same accounting and valuation methods as the consolidated financial statements as at December 31, 2019. The IFRS standards amended since January 1, 2020 are not relevant to the half-yearly financial statements.

The figures in the text and in the graphic illustrations were rounded, and small rounding differences are possible.

a. Earnings

In the first six months of 2020, the PNE Group achieved a total aggregate output of euro 77.0 million (prior year: euro 85.6 million). Of this, euro 62.4 million was attributable to revenues (prior year: euro 65.6 million), euro 12.5 million to changes in inventories (prior year: euro 18.8 million), and euro 2.2 million to other operating income (prior year: euro 1.2 million).

Total aggregate output/Revenues

million EUR

In the first six months of 2020:

» In the "project development" segment, the Company invoiced internal revenues of euro 16.4 million (prior year: euro 34.3 million), including for general contractor and project development services for the Company's own wind farms "Langstedt", "Lentföhrden" and "Erfurt-Ost" as well as external revenues of euro 44.0 million (prior year: euro 50.6 million), including due to contractual milestone payments from wind farm projects in Germany and abroad, which were sold in 2018/2019, e.g. in France and the USA, as well as from project development and general contractor services for wind farm projects. The "real" performance of the "project development" segment can be seen by looking at the nominal capacity of the projects that were completed or sold or under construction. In 2020, this capacity totalled approx. 336 MW (prior year: approx. 404 MW). With an expected investment volume of around euro 1.4 to 1.8 million per MW of installed nominal capacity for wind energy projects, the Company has initiated investments of around euro 470 to 605 million (prior year: euro 565 to 727 million).

  • » In the "service products" segment, the Company billed external revenues of euro 8.8 million (prior year: euro 7.6 million). The main revenues were generated from commercial and technical operations management totalling euro 5.6 million (prior year: euro 4.7 million) and from transformer station services of euro 2.0 million (prior year: euro 1.8 million).
  • » In the "electricity generation" segment, external revenues of euro 11.7 million (prior year: euro 7.7 million) were generated in the reporting period. These revenues were mainly attributable to the electricity income of internally held wind farms totalling euro 10.0 million (prior year: euro 5.0 million) and the revenues from the "Silbitz" biomass power plant of euro 1.7 million (prior year: euro 1.9 million). The main reason for the higher revenues compared to the prior-year period is that the number of wind power turbines operated by the Group as at January 1, 2020 was higher than in the previous year as at January 1, 2019 and therefore a larger amount of electricity could be produced in 2020.

As in the previous year's reporting period, the services rendered for the wind farm projects planned for the Company's own portfolio and under construction were shown under changes in inventories, which largely explains the changes in finished goods and work in progress.

The Group's personnel expenses rose year-on-year due to the comparatively higher number of employees (450 people, including members of the Board of Management, as at June 30, 2020 versus 386 people, including members of the Board of Management, as at June 30, 2019) and due to the higher salaries for qualified staff. The increase in the number of employees is part of the organisational adjustment to the new strategy that the Group is pursuing with the "Scale up" programme. Personnel expenses are distributed among the segments "project development" with euro 11.2 million (prior year: euro 10.9 million), "service products" with euro 4.1 million (prior year: euro 3.1 million) and "electricity generation" with euro 0.4 million (prior year: euro 0.5 million).

The write-downs of intangible fixed assets as well as property, plant and equipment increased on a year-on-year basis by euro 2.8 million to euro 8.4 million (prior year: euro 5.6 million). The increase resulted primarily from the higher average number of wind power turbines in the Group ("electricity generation" segment) compared to the prior-year period. The write-downs of intangible fixed assets and of property, plant and equipment are attributable to the segments "project development" (euro 1.0 million; prior year: euro 1.2 million), "service products" (euro 1.5 million; prior year: euro 1.4 million) and "electricity generation" (euro 5.8 million; prior year: euro 3.0 million).

Other operating expenses totalling euro 9.1 million (prior year: euro 8.2 million) in the Group are above the previous year's level and can be generally divided into expenses resulting from legal and consulting costs, advertising and travel expenses, insurance premiums and contributions, repair and maintenance expenses (predominantly relating to the "Silbitz" biomass power plant and the wind farms operated by the Company). Other operating expenses, before consolidation effects, are distributed among the segments "project development" with euro 6.7 million (prior year: euro 6.7 million), "service products" with euro 1.3 million (prior year: euro 1.1 million) and "electricity generation" with euro 2.3 million (prior year: euro 1.5 million).

Interest expenses changed only slightly from euro 6.8 million in the prior-year period to euro 6.5 million in the reporting period. Interest and similar expenses were incurred mainly in connection with

  • » the 2018/2023 bond (euro 1.0 million),
  • » the equity and debt financing in connection with wind farm projects (euro 1.9 million) and
  • » the valuation of interest swaps concluded as part of the project financing for wind farm projects (euro 2.4 million).

of both pillars (including EBIT).

In the period under review, the following results were achieved at the Group level:

  • » earnings before interest, taxes, depreciation and amortisation (EBITDA = EBIT plus amortisation and depreciation of intangible assets and property, plant and equipment, rights of use as well as goodwill) of euro 9.0 million (prior year: euro 18.5 million),
  • » operating profit (EBIT = corresponds to the value stated in line "Operating result" of the consolidated statement of comprehensive income) of euro 0.6 million (prior year: euro 12.9 million).

The consolidated net result after non-controlling interests amounted to euro -5.3 million (prior year: euro 3.4 million). The undiluted earnings per share for the Group amounted to euro -0.07 (prior year: euro 0.05) and the diluted earnings per share for the Group amounted to euro -0.07 (prior year: euro 0.04).

Due to the first-half result of euro -5.3 million, the dividend payment of euro 3.1 million made in the reporting period and the changes in the course of the increase in the shareholding in Sevivon Sp. z.o.o., Koszalin, Poland (from 80.0 percent to 100 percent, "project development" segment), the Group's retained earnings at the end of the reporting period totalled euro 62.2 million (December 31, 2019: euro 75.2 million).

b. Net assets and financial position

Assets

in million EUR 30.6.2020 31.12.2019
Total long term assets 321.9 300.6
Intangible assets 64.5 64.7
Property, plant and equipment 172.2 174.1
Rights of use 59.8 39.4
Long germ financial assets 2.0 2.0
Deferred taxes 23.4 20.4
Total short term assets 240.6 267.0
Inventories 115.2 101.4
Receivables, other assets and
tax receivables
26.0 51.7
Tax receivables 1.3 2.0
Cash and cash equivalents 98.1 111.9
Total assets 562.5 567.6

On the reporting date, the consolidated total assets of PNE AG amounted to euro 562.5 million. This is an increase of approx. 0.9 percent in comparison with December 31, 2019.

Assets

million EUR

Total long-term assets increased from euro 300.6 million at the end of 2019 to euro 321.9 million on the reporting date. The main reason for this development is the increase in rights of use (euro +20.4 million) in connection with "IFRS 16 Leases". As at June 30, 2020, euro 59.8 million for rights of use (December 31, 2019: euro 39.4 million) were reported under long-term assets. As at June 30, 2020, the rights of use are attributable to the segments "project development" (euro 10.2 million), "service products" (euro 6.2 million) and "electricity generation" (euro 43.4 million).

Intangible assets as at June 30, 2020 totalled euro 64.5 million (of which euro 63.3 million for goodwill) and thus remained approximately at the same level as at December 31, 2019. As at June 30, 2020, the goodwill is attributable to the segments "project development" (euro 52.8 million), "service products" (euro 10.4 million) and "electricity generation" (euro 0.1 million).

For all assets within the scope of IAS 36 (in particular intangible assets (IAS 38), goodwill (IFRS 3), property, plant and equipment (IAS 16) and investment property measured at cost (IAS 40)), the reporting entity must assess at each balance sheet date whether there is any indication (triggering event) for an impairment loss. Although the effects on the economy caused by the Corona crisis also have certain implications for PNE AG, the Board of Management is of the opinion that there are no indications that the value of the reported goodwill as at June 30, 2020 might be impaired.

In the same period, property, plant and equipment changed by euro -1.9 million to euro 172.2 million (December 31, 2019: euro 174.1 million).

The item "Property, plant and equipment" mainly includes:

  • » land and buildings (euro 10.9 million, excluding the "Silbitz" land and buildings),
  • » transformer stations owned or under construction (euro 14.8 million),
  • » the technical equipment and machinery of the wind farms owned by the Company (euro 139.9 million) and of HKW "Silbitz" (euro 2.9 million, including land and buildings of euro 2.6 million).

Explanation:

As the wind farms owned by the Group were operated and used to generate electricity independently of their current or future shareholder structure, they were reported as fixed assets from the time of their sale within the Group.

The long-term financial assets changed insignificantly during the reporting period and amounted to euro 2.0 million at the end of the first half of 2020 (December 31, 2019: euro 2.0 million).

During the reporting period, short-term assets changed from euro 267.0 million on December 31, 2019 to euro 240.6 million on June 30, 2020. This change is mainly attributable to the increase in inventories (euro +13.8 million), the decrease in cash and cash equivalents (euro -13.8 million) and the decline in receivables and other assets (euro -25.7 million). Of the short-term assets, euro 12.5 million is attributable to trade receivables (December 31, 2019: euro 34.3 million).

The work in progress shown under the inventories increased from euro 77.6 million as at December 31, 2019 to euro 96.2 million. The increase in inventories is due primarily to the Group's investments for onshore projects under construction and for the further development of the onshore and offshore project pipelines in Germany and abroad. The investments made by the Group for the onshore projects under construction and for the further development of onshore and offshore project pipelines in Germany and abroad have resulted in a change in work in progress by approx. euro +18.5 million.

Work in progress is divided as follows:

» offshore projects (euro 17.4 million),

Liabilities

  • » onshore projects/national (euro 52.4 million),
  • » onshore projects/international (euro 26.4 million).

In addition, the advance payments made for onshore projects under construction reported under inventories changed by euro -4.6 million from euro 23.4 million to euro 18.8 million.

As at June 30, 2020, cash and cash equivalents amounted to euro 98.1 million (as at December 31, 2019: euro 111.9 million) and were attributable to the segments "project development" (euro 87.3 million), "electricity generation" (euro 10.1 million) and "service products" (euro 0.7 million) as at June 30, 2020.

Liabilities

in million EUR 30.6.2020 31.12.2019
Shareholders' equity 210.0 220.0
Deferred subsidies from public
authorities
0.7 0.8
Provisions 12.2 9.4
Long term liabilities 252.6 232.2
Short term liabilities 66.2 84.9
Deferred revenues 20.8 20.3
Total liabilities and
shareholders' equity
562.5 567.6

million EUR Net debt (Net liquidity) million EUR

Group equity decreased from euro 220.0 million (December 31, 2019) to euro 210.0 million as at June 30, 2020. The equity ratio of the Group was approx. 37 percent as at June 30, 2020 (December 31, 2019: approx. 39 percent).

On June 30, 2020, the share capital of PNE AG amounted to euro 76,603,334.00 (divided into 76,603,334 shares). The share capital has not changed versus December 31, 2019.

The long-term liabilities changed from euro 232.2 million (December 31, 2019) to euro 252.6 million. This item consists mainly of long-term financial liabilities totalling euro 247.4 million (as at December 31, 2019: euro 226.2 million).

The long-term liabilities mainly consist of

  • » the 2018/2023 bond issued in the 2018 fiscal year with a carrying amount of euro 49.0 million (as at December 31, 2019: euro 48.9 million),
  • » long-term liabilities to banks of euro 134.8 million (as at December 31, 2019: euro 135.6 million) and
  • » liabilities from leases of euro 56.8 million (as at December 31, 2019: euro 37.2 million).

Significant long-term liabilities to banks relate to the "non-recourse" project financing of the wind farm projects operated by the Company.

The liabilities to banks are attributable to the following segments as at June 30, 2020:

  • » "project development" segment, euro 4.1 million (of which long-term, euro 3.8 million),
  • » "electricity generation" segment, euro 158.0 million (of which long-term, euro 131.0 million),
  • » "service products" segment, euro 0.0 million (of which longterm, euro 0.0 million).

Due to "IFRS 16 Leases", approx. euro 56.8 million (as at December 31, 2019: euro 37.2 million) for lease liabilities are recorded under long-term liabilities, and approx. euro 4.2 million (as at December 31, 2019: euro 3.1 million) under short-term liabilities on June 30, 2020.

The liabilities from leases are attributable to the following segments as at June 30, 2020:

  • » "project development" segment, euro 10.8 million (of which long-term, euro 9.7 million),
  • » "service products" segment, euro 6.4 million (of which longterm, euro 5.7 million),
  • » "electricity generation" segment, euro 43.8 million (of which long-term, euro 41.4 million).

In the first six months of the 2020 financial year, the short-term liabilities changed from euro 84.9 million (December 31, 2019) to euro 66.2 million. The short-term liabilities to banks, included in this item, increased from euro 10.3 million (December 31, 2019) to euro 27.3 million due to interim financing raised for onshore wind farms. In the reporting period, the trade liabilities in the context of normal operating business changed from euro 35.3 million (December 31, 2019) to euro 20.7 million.

The Company raised "non-recourse" funds of approx. euro 18.7 million and approx. euro 1.2 million from the available project equity interim financing line in the first half of the year, which contributed to the above-mentioned changes in short-term and long-term liabilities to banks.

Taking the liquid funds into account, the net debt (cash and cash equivalents less the short-term and long-term financial liabilities) as at June 30, 2020 amounted to approx. euro -182.3 million (December 31, 2019: euro -129.0 million).

The statement of cash flow provides information on the liquidity situation and the financial position of the Group. As at June 30, 2020, the group companies had liquidity and credit facilities for interim project financing in the total amount of euro 122.3 million, of which euro 2.1 million is pledged to banks (as at December 31, 2019: euro 139.3 million, of which euro 6.5 million pledged).

Cash and cash equivalents amounted to euro 98.1 million as at June 30, 2020, of which euro 2.1 million was pledged to banks (as at December 31, 2019: euro 111.9 million, of which euro 6.5 million pledged).

In addition, the group companies had available liquidity from unused

  • » working capital lines of euro 8.7 million,
  • » project equity interim financing lines of euro 1.5 million, and
  • » external project interim financing of euro 14.0 million,

as at June 30, 2020.

As at June 30, 2020, PNE AG and WKN GmbH had credit lines for guarantee and contract fulfilment totalling euro 14.3 million (as at December 31, 2019: euro 14.3 million). The Group had used euro 2.9 million of the credit lines for guarantee and contract fulfilment as at June 30, 2020 (as at December 31, 2019: euro 1.9 million).

The cash flow from ordinary activities shown in the statement of cash flows of euro -20.7 million (prior year: euro -13.8 million) was characterised mainly by

  • » the Group result of the reporting period,
  • » the expenses for the implementation of the portfolio projects, the further development of the project pipeline and the realisation of the wind farm projects, which are reflected in the inventories and were primarily financed by project financing (see Cash flow from financing activities).

The cash flow from investing activities in the reporting period includes incoming and outgoing payments for investments in property, plant and equipment of the Group totalling euro -4.5 million (prior year: euro -0.7 million). The investments in property, plant and equipment were characterised mainly by investments in transformer stations for the wind farm projects being constructed.

During the reporting period, the cash flow from financing activities of euro 11.3 million (prior year: euro 25.5 million) was influenced primarily by

  • » the use of bank loans of euro 19.9 million, which were mainly used for the funding of wind farm projects,
  • » the repayment of credit liabilities of euro -3.9 million,
  • » lease payments totalling euro -1.6 million, and
  • » the payment of the dividend of euro -3.1 million.

7. TRANSACTIONS WITH RELATED COMPANIES AND PERSONS

There were no significant changes compared to December 31, 2019.

8. DEVELOPMENT AND INNOVATION

During the period under review, there were no research and development activities in the PNE AG Group.

9. MAJOR EVENTS AFTER THE REPORTING PERIOD

At the end of July, WKN GmbH received the tax assessment notices from the tax audit for the years 2010 – 2013 (see explanations under item "10. Report on opportunities and risks").

After the end of the reporting period, no other significant events affecting the results of operations, financial position and net assets have occurred.

10. REPORT ON OPPORTUNITIES AND RISKS

For information about the opportunities and risks of PNE AG, refer to the chapter "Report on opportunities and risks" in the group management report of the 2019 annual report, which is available on the Company's website at www.pne-ag.com.

The Internal Control System (ICS) is an essential component of PNE's risk provisioning. It was therefore important for us to ensure that the mechanisms and processes anchored in it were also guaranteed during the period of working at home due to the Corona pandemic. This has worked as a result of the existing technical prerequisites. This also applies, in particular, to the principle of dual control when concluding contracts. The requirements for assessing and mitigating risks were thus also met during this period.

In addition, all recognisable risks arising from the Corona pandemic currently present worldwide are continually assessed with regard to possible effects on the net assets, financial position and results of operations as well as the well-being of its employees and have been incorporated in this half-yearly financial report and the outlook.

At the end of July, WKN GmbH received the tax assessment notices relating to the 2010 – 2013 tax audit. The tax office has not changed its previous view on tax issues that the management of WKN GmbH and its tax advisors see differently. In the coming weeks, the company, i.e. the management of WKN GmbH, will conduct a final analysis of the assessment notices with its tax consultants and then take action against the notices.

During the first six months of the 2020 fiscal year, the Board of Management did not identify any other significant additions or changes in the risks presented in the management report of the annual report for the 2019 fiscal year.

11. MANAGEMENT DECLARATION (SECTION 289f AND SECTION 315d OF THE GERMAN COMMERCIAL CODE (HGB))

The management declaration, summarised with the declaration pursuant to Section 289f HGB, in accordance with Section 315d HGB is published on our internet site www.pne-ag.com under "Investor Relations" in the "Corporate Governance" section and can be downloaded there.

12. FORECAST REPORT

The PNE Group is an internationally operating enterprise and one of the most experienced project developers of clean energy projects on land and at sea. We combine economic success with ecological responsibility. We offer services covering the entire value-added chain, ranging from the development, planning, realisation, sale and operation of wind and photovoltaic farms as well as transformer stations to repowering – i.e. the replacement of older wind power turbines by new modern equipment. We also offer our skills acquired in this context as a service provider to third parties. This extended approach towards customers is part of the strategic orientation to develop into a "Clean Energy Solution Provider".

We want to develop high quality projects that meet international standards and allow for secure project financing at the international level. Such a project quality can be achieved by ensuring compliance with the project schedule and the cost framework from the development to the start of operation.

Following the successful development of wind farms in recent years, we have achieved our goal of realising a new wind farm portfolio with a total capacity of 130.1 MW. These completed wind farms are operated by the Company to generate current income from the sale of electricity.

In addition, the combination of power plants with clean energies and storage technologies is an issue of the future. We have therefore expanded the strategic orientation of the Group via the "Scale up" programme. The operative business will be realigned, and the activities will be placed on a significantly broader basis, both nationally and internationally. Our objective is to develop PNE from a wind farm specialist into a broad-based provider of clean energy solutions. The fundamentals of this expanded strategy of a "Clean Energy Solution Provider" are the expansion of our range of services and the development of new markets and technologies.

With this new strategic orientation, we are responding to changes in the clean energy markets. While clean energies will grow dynamically worldwide in the coming years, countervailing trends can be observed in individual established markets. Subsidies for wind energy are being reduced, remuneration systems are being converted to tenders (more electricity purchase agreements are being put out to tender by individual companies) or other market mechanisms, and the expansion of wind energy in some countries is being limited as a result. This increases competitive pressure. The optimisation of the costs associated with a project is therefore becoming increasingly important. We will also focus on photovoltaic projects and hybrid solutions as well as storage technologies.

Based on this broader position, we are minimising market risks, opening up new potentials and markets for PNE and, in the medium term, we will stabilise primarily the, to date, volatile results.

After a transitional phase, in which investments will pave the way for the implementation of the "Scale up" programme, this is expected to lead to an increase in average operating results (EBIT) by 2023. This strategic goal will also be achieved through the increased own operation of wind farms.

The following forecasts are based on the results derived

  • » from the implementation of operationally planned projects in Germany and abroad (onshore, offshore, photovoltaics),
  • » from the service business, and
  • » from the electricity generation business.

In fiscal 2020, we will have further upfront expenditure in the lower single-digit million range for the strategic expansion of the business model and the preparations for the entry into new markets. Due to the continuing global spread of the Corona virus, we must still assume that there may be shifts in the operating business as regards the sale of projects rights and project implementation from 2020 to 2021 and from 2021 to 2022. Nevertheless, we confirm our guidance for the 2020 fiscal year with positive Group EBITDA of euro 15 to 20 million and Group EBIT of euro 5 to 10 million.

Cuxhaven, August 12, 2020

PNE AG, Board of Management

CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME (IFRS)

in TEUR (differences due to rounding possible) 2nd Quarter
1.4.2020 –
30.6.2020
2nd Quarter
1.4.2019 –
30.6.2019
Period
1.1.2020 –
30.6.2020
Period
1.1.2019 –
30.6.2019
1. Revenues 46,609 37,669 62,354 65,636
2. Changes in inventories of finished goods and work in progress 5,858 3,768 12,468 18,827
3. Other operating income -571 -204 2,188 1,166
4. Total aggregate output
5. Cost of materials and purchased services
51,896
-36,647
41,233
-17,625
77,009
-43,174
85,629
-44,534
6. Personnel expenses -8,467 -7,943 -15,671 -14,407
7. Amortisation of intangible fixed assets and depreciation of property,
plant and equipment -4,323 -2,998 -8,423 -5,597
8. Other operating expenses -4,135 -4,049 -9,117 -8,211
9. Operating result -1,676 8,618 624 12,880
10. Income from participations and associated companies 21 5 27 18
11. Other interest and similar income 94 58 125 130
12. Expenses from assumption of losses of associated companies -1 45 -28 -13
13. Interest and similar expenses -2,817 -4,807 -6,542 -6,776
14. Result before taxes -4,379 3,919 -5,794 6,239
15. Taxes on income -1,114 -1,194 -191 -1,764
16. Other taxes -47 -85 -102 -177
17. Result before non-controlling interests -5,540 2,640 -6,086 4,299
18. Share of non-controlling interests in the result 9 897 -755 947
19. Consolidated net income -5,549 1,743 -5,331 3,353
Undiluted earnings per share in EUR -0.07 0.02 -0.07 0.05
Diluted earnings per share in EUR -0.07 0.02 -0.07 0.04
Weighted average of shares in circulation (undiluted), in million 76.3 74.4 76.3 74.4
Weighted average of shares in circulation (diluted), in million 76.3 76.6 76.3 76.6
19. Consolidated net income -5,549 1,743 -5,331 3,353
Other comprehensive income/items that may be reclassified
in the future in the profit and loss account
20. Currency translation differences -1,217 -560 -800 -251
21. Others 0 0 0 0
22. Other comprehensive income for the period (after tax) -1,217 -560 -800 -251
23. Total comprehensive income for the period -6,757 2,080 -6,886 4,048
Consolidated profit/loss for the period attributable to
Owners of the parent company -5,549 1,743 -5,331 3,352
Non-controlling interests 9 897 -755 947
-5,540 2,640 -6,086 4,299
Total comprehensive income for the period attributable to
Owners of the parent company -6,766 1,183 -6,131 3,101
Non-controlling interests 9 897 -755 947
-6,757 2,080 -6,886 4,048

CONSOLIDATED STATEMENT OF FINANCIAL POSITION (IFRS)

Assets

in TEUR (differences due to rounding possible) as per 30.6.2020 as per 31.12.2019
Intangible assets 64,544 64,720
Property, plant and equipment 172,197 174,081
Rights of use 59,804 39,376
Long-term financial assets 1,996 2,026
Deferred taxes 23,352 20,401
Total long-term assets 321,893 300,604
Inventories 115,178 101,357
Receivables, other assets and tax receivables 27,260 53,702
Cash and cash equivalents 98,127 111,935
Total short-term assets 240,565 266,994
Total assets 562,458 567,598

Liabilities

in TEUR (differences due to rounding possible) as per 30.6.2020 as per 31.12.2019
Subscribed capital 76,603 76,603
Capital reserve 82,953 82,953
Treasury shares -707 -707
Retained earnings 51 51
Foreign currency reserve -1,619 -819
Consolidated profit 62,178 75,216
Non-controlling interests -9,480 -13,283
Total equity 209,979 220,014
Other provisions 1,060 1,060
Deferred subsidies from public authorities 738 761
Long-term financial liabilities 247,377 226,160
Deferred tax liabilities 5,209 5,966
Total long-term liabilities 254,384 233,947
Provisions for taxes 7,107 4,604
Other provisions 3,985 3,777
Short-term financial liabilities 33,013 14,762
Trade liabilities 20,651 35,276
Other liabilities and tax liabilities 33,339 55,217
Total short-term liabilities 98,095 113,636
Total liabilities 562,458 567,598

CONSOLIDATED STATEMENT OF CASH FLOWS (IFRS)

FOR THE PERIOD FROM JANUARY 1 TO JUNE 30

in TEUR 2020 2019
Consolidated net result -6,086 4,299
-/+ Income tax benefit/expense 191 1,764
-/+ Income tax paid/received -651 -4,922
-/+ Interest income and expense 6,418 6,647
-
Interest paid
-4,163 -3,606
+
Interest received
125 130
+/- Write-downs/write-ups of intangible fixed assets, property,
plant and equipment, rights of use and long-term financial assets
8,423 5,597
+/- Increase/decrease in provisions 2,711 -2,006
+/- Non-cash effective expenses and income -770 -248
-/+
Profit/loss from the disposal of fixed assets and from final consolidation
0 350
+/- Decrease/increase in inventories and other assets -12,080 -8,415
+/-
Decrease/increase in trade receivables and stage of completion accounting
22,216 -8,709
+/- Increase/decrease in trade liabilities and other liabilities -37,028 -4,719
Cash flow from operating activities -20,694 -13,839
+
Inflow of funds from disposal of items of property, plant and equipment
64 203
-
Outflow of funds for investments in property, plant and
equipment and intangible assets
-4,425 -948
+
Inflow of funds from disposal of financial assets
1 0
-
Outflow of funds for investments in financial assets
-95 0
Cash flow from investing activities -4,456 -745
+
Inflow of funds from financial loans
19,897 31,850
-
Outflow of funds for the redemption of financial loans
-3,947 -1,706
-
Outflow of funds for the redemption of lease liabilities
-1,554 -1,629
-
Outflow of funds for dividend
-3,053 -2,975
Cash flow from financing activities 11,343 25,540
Cash-effective change in liquid funds -13,807 10,956
+
Change in liquid funds due to changes in scope of consolidation
0 2
+
Liquid funds at the beginning of the period
111,934 129,071
Liquid funds at the end of the period* 98,127 140,029
* of which are pledged to a bank as security 2,073 4,283

Supplementary information: The value of liquid funds on June 30 corresponds to the "Cash and cash equivalents" item in the balance sheet.

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY (IFRS)

in TEUR
(differences due to
rounding possible)
Capital
subscribed
Capital
reserve
Treasury
shares
Profit
reserves
Foreign
exchange
reserve
Retained
results
Share
holders'
equity before
non
controlling
interests
Non
controlling
interests
Total
share
holder's
equity
Balance on
1.1.2019
76,558 82,292 -5,803 51 -385 77,499 230,212 -13,938 216,274
Result for
the period 0 0 0 0 0 3,353 3,353 947 4,300
Other result 0 0 0 0 -251 0 -251 0 -251
Total result
for the period
01-06/2019
0 0 0 0 -251 3,353 3,102 947 4,049
Dividend 0 0 0 0 0 -2,975 -2,975 0 -2,975
Conversion of
convertible bond
2014/2019
2 4 0 0 0 0 6 0 6
Other changes 0 0 0 0 0 0 0 0 0
Balance on
30.6.2019
76,560 82,295 -5,803 51 -636 77,877 230,345 -12,991 217,353
Balance on
1.1.2020
76,603 82,953 -707 51 -819 75,216 233,297 -13,283 220,014
Result for
the period
0 0 0 0 0 -5,331 -5,331 -755 -6,086
Other result 0 0 0 0 -800 0 -800 0 -800
Total result
for the period
01-06/2020 0 0 0 0 -800 -5,331 -6,131 -755 -6,886
Dividend 0 0 0 0 0 -3,053 -3,053 0 -3,053
Other changes 0 0 0 0 0 -4,654 -4,654 4,559 -95
Balance on
30.6.2020
76,603 82,953 -707 51 -1,619 62,178 219,460 -9,480 209,979

CONDENSED NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS OF PNE AG, CUXHAVEN, FOR THE FIRST SIX MONTHS OF 2020

1. ACCOUNTING AND VALUATION PRINCIPLES

The financial report on the first six months of the 2020 fiscal year of PNE AG and its subsidiaries is drawn up according to the International Financial Reporting Standards (IFRS) of the International Accounting Standards Board (IASB), as they are applied in the European Union (EU). New standards adopted by the IASB are in principle applied as from the time of their becoming effective, as they are to be taken into consideration in the EU.

The interim financial statements were drawn up in line with the regulations of IAS 34. The tax expenditure of the PNE Group is determined using an estimate of the taxable income of the relevant companies. The diluted earnings per share take account of the potential shares from convertible bonds in accordance with IAS 33.

For all assets within the scope of IAS 36 (in particular intangible assets (IAS 38), goodwill (IFRS 3), property, plant and equipment (IAS 16) and investment property measured at cost (IAS 40)), the reporting entity must assess at each balance sheet date whether there is any indication (triggering event) for an impairment loss. Although the effects on the economy caused by the Corona crisis also have certain implications for PNE AG, the Board of Management is of the opinion that there are no indications that the value of the reported goodwill as at June 30, 2020 might be impaired.

In the financial report for the first six months of the 2020 fiscal year as at June 30, 2020, the Company applied the same accounting and valuation methods as in the consolidated financial statements as at December 31, 2019. The IFRS standards amended since January 1, 2020 are not relevant to the half-yearly financial statements.

2. FINANCIAL INSTRUMENTS

During the first six months of the 2020 fiscal year, no material additions or changes occurred in the interim group management report for the first half of 2020 compared with the figures presented in the group management report for the 2019 financial year.

The following tables show the carrying amounts and the fair values of financial assets and financial liabilities by the relevant categories.

in TEUR Category
acc. to IFRS 9
Total Fair value
As per 30.6.2020
Short-term financial assets
Cash and cash equivalents AC 98,127 98,127
Trade receivables AC 12,495 12,495
Other short-term loan receivables AC 0 0
Trade receivables from affiliated companies AC 2,848 2,848
Receivables from associated companies and those
in which an investment is held
AC 159 159
Long-term financial assets
Shares in affiliated companies FVOCI 119 119
Shares in companies in which an investment is held FVOCI 1,207 1,207
Other borrowings AC 178 178
Other long-term loan receivables AC 28 28
115,161 115,161
Total AC 113,835 113,835
Total FVOCI 1,326 1,326
As per 31.12.2019
Short-term financial assets
Cash and cash equivalents AC 111,935 111,935
Trade receivables AC 34,251 34,251
Other short-term loan receivables AC 5,457 5,457
Trade receivables from affiliated companies AC 1,621 1,621
Receivables from associated companies and those
in which an investment is held
AC 163 163
Long-term financial assets
Shares in affiliated companies FVOCI 121 121
Shares in companies in which an investment is held FVOCI 1,208 1,208
Other borrowings AC 178 178
Other long-term loan receivables AC 32 32
154,966 154,966
Total AC 153,637 153,637
Total FVOCI 1,329 1,329

AC = measured at amortised cost FVOCI = measured at fair value (changes in value in OCI)

Shares in affiliated companies classified as "FVOCI" and shares in companies in which an investment is held were measured at cost of acquisition of euro 1,326 thousand (December 31, 2019: euro 1,329 thousand), which represents a suitable estimate of the fair value. Currently, there are no net results and dividends attributable to the "FVOCI" category. On the reporting date, there was no intention of selling these.

The carrying amounts of financial assets in the category "measured at amortised cost" (AC) approximate their fair values on the reporting date.

The financial liabilities shown are attributable to corporate bonds, liabilities to banks, other financial liabilities, liabilities from leasing contracts as well as derivatives.

The fair values of financial instruments listed in the tables were derived from market information available on the reporting date. The fair value is determined in line with generally accepted pricing models based on discounted cash flow analyses and using observable current market prices for similar instruments. In the current reporting period, as in the comparable period of the previous year, no reclassifications were made between the hierarchy levels.

The fair values of liabilities to banks and other financial liabilities are determined using current interest rates at which similar loans with identical maturities could have been taken out on the reporting date.

The determination of the fair values of bonds is based on the observable price quotations as at the reporting date.

The fair values of interest rate swaps were calculated using forward interest rates (observable yield curves on the reporting date) and the estimated contractual interest rates, which were discounted on the reporting date using the yield curve.

The valuation of trade liabilities and other financial liabilities is based on the assumption that the fair values correspond to the carrying amounts of these financial instruments in view of their short remaining terms.

The book values of financial liabilities have the following remaining terms or the following fair values:

in TEUR Category
acc. to IFRS 9
Total up to 1 year 1 to 5 years more than
5 years
Fair value
As per 30.6.2020
Trade liabilities AC 20,651 20,651 0 0 20,651
Fixed interest
Bonds AC 49,020 0 49,020 0 50,000
Liabilities to banks AC 144,991 10,191 50,085 84,714 146,287
Other financial liabilities AC 1,057 1,057 0 0 1,057
Liabilities under leases AC 61,013 4,206 11,383 45,424 61,013
Variable interest
Liabilities to banks AC 17,110 17,110 0 0 17,110
Derivatives
Interest rate swaps FVPL 7,200 449 1,795 4,956 7,200
301,041 53,664 112,284 135,094 303,317
As per 31.12.2019
Trade liabilities AC 35,276 35,276 0 0 35,276
Fixed interest
Bonds AC 48,858 0 48,858 0 51,188
Liabilities to banks AC 145,933 10,350 47,434 88,149 147,585
Other financial liabilities AC 1,057 1,057 0 0 1,057
Liabilities under leases AC 40,264 3,057 10,115 27,093 40,264
Variable interest
Liabilities to banks AC 0 0 0 0 0
Derivatives
Interest rate swaps FVPL 4,810 298 1,191 3,322 4,810
276,198 50,037 107,598 118,563 280,180

AC = measured at amortised cost

FVPL = measured at fair value through profit or loss

The following table analyses the financial liabilities of the Group by the relevant maturity bands:

Total
in TEUR contractual
cash flows
up to 1 year 1 to 5 years more than
5 years
Carrying
amount
As per 30.6.2020
Trade liabilities 20,651 20,651 0 0 20,651
Bonds 55,689 2,005 53,683 0 49,020
Liabilities to banks 192,645 30,659 60,535 101,451 162,100
Other financial liabilities 1,089 1,089 0 0 1,057
Liabilities under leases 74,015 5,328 15,849 52,837 61,013
Interest rate swaps 7,200 449 1,795 4,956 7,200
351,288 60,182 131,863 159,244 301,041
As per 31.12.2019
Trade liabilities 35,276 35,276 0 0 35,276
Bonds 57,527 2,000 55,527 0 48,858
Liabilities to banks 176,139 13,674 57,453 105,012 145,933
Other financial liabilities 1,089 1,089 0 0 1,057
Liabilities under leases 51,981 3,956 14,630 33,396 40,264
Interest rate swaps 4,810 298 1,191 3,322 4,810
326,821 56,292 128,800 141,729 276,198

The table analyses the financial liabilities of the Group by the relevant maturity bands, based on their contractual terms for:

(a) all non-derivative financial liabilities, and

(b) derivative financial instruments that are settled on a net basis and whose contractual maturities are material to an understanding of the timing of cash flows.

The amounts shown in the table are the contractual non-discounted cash flows. Balances due within 12 months correspond to their carrying amounts, as the effect of discounting is not significant. In the case of interest rate swaps, the cash flows were estimated using the forward interest rates applicable at the end of the reporting period.

3. SCOPE OF CONSOLIDATION

The corporate structure has changed in the first six months of 2020 versus December 31, 2019.

During the reporting period, the following companies were included in the scope of consolidation for the first time:

  • » WKN WERTEWIND Windpark Langstedt GmbH & Co. KG, Husum (100 percent), "electricity generation" segment, (reclassified from "non-consolidated companies due to minor significance"),
  • » WKN WERTEWIND Windpark Lentföhrden GmbH & Co. KG, Husum (100 percent), "electricity generation" segment, (reclassified from "non-consolidated companies due to minor significance"),
  • » WKN Windkraft Nord GmbH & Co Windpark Kleinbüllesheim, Husum (100 percent), "electricity generation" segment, (reclassified from "non-consolidated companies due to minor significance"),
  • » PNE WIND Park XVIII GmbH & Co. KG, Cuxhaven (100 percent), "electricity generation" segment, (reclassified from "non-consolidated companies due to minor significance"),
  • » PNE WIND Park XXVI GmbH & Co. KG, Cuxhaven (100 percent), "electricity generation" segment, (reclassified from "non-consolidated companies due to minor significance"),
  • » WKN WERTEWIND Betriebsgesellschaft mbH, Husum (100 percent), "project development" segment, (reclassified from "non-consolidated companies due to minor significance"),
  • » WKN Wertewind Verwaltungs GmbH, Husum (100 percent), "project development" segment, (reclassified from "non-consolidated companies due to minor significance"),
  • » WKN Wertewind Bürgerbeteiligungsgesellschaft mbH, Husum (100 percent), "project development" segment, (established),
  • » WKN Wertewind Bürgerprojekt GmbH, Husum (100 percent), "project development" segment, (established).

The reclassification of subsidiaries from "non-consolidated companies due to minor significance" to full consolidation is generally made as soon as at it is clear that the business activity or the project planning/implementation phase will begin in the near future.

The reclassifications had no significant impact on the consolidated financial statements.

During the reporting period, the shareholdings in the following Group companies, which are or were included in the scope of consolidation in the previous year, have changed:

» Sevivon Sp. z.o.o., Koszalin, Poland (from 80.0 percent to 100 percent, "project development" segment)

The change in the shareholding has not resulted in a change in the consolidation method, but only in a change in non-controlling interests of approx. euro 4.6 million. The amount paid for the acquisition of the shares amounted to approx. euro 0.1 million. The difference was recorded directly in equity.

In the reporting period, the following companies included in the Group were merged into consolidated companies:

  • » PNE WIND Middle East GmbH, (100 percent), previously "project development" segment,
  • » PNE WIND Middle East Verwaltungs GmbH, (100 percent), previously "project development" segment,
  • » Wind Kapital Invest Verwaltungs GmbH, (100 percent), previously "project development" segment,
  • » Wind Kapital Invest GmbH & Co. KG, (100 percent), previously "project development" segment.

The mergers had no significant impact on the consolidated financial statements.

4. MAJOR EVENTS AFTER THE REPORTING PERIOD

Regarding any major events which have occurred after the end of the reporting period, we refer to the interim group management report.

CONSOLIDATED SEGMENT REPORTING (IFRS)

Project development Electricity
Services
generation
Consolidation PNE AG Group
in TEUR
(differences due to
rounding possible)
2020 2019 2020 2019 2020 2019 2020 2019 2020 2019
External sales 44,020 50,579 6,631 7,393 11,702 7,665 0 0 62,354 65,636
Inter-segment sales 16,399 34,268 2,143 225 120 515 -18,662 -35,008 0 0
Changes in inventories 6,405 -11,091 0 0 0 0 6,063 29,918 12,468 18,827
Other operating
income
595 872 491 182 1,102 112 0 0 2,188 1,166
Total aggregate output 67,420 74,628 9,265 7,800 12,925 8,291 -12,599 -5,091 77,009 85,629
Depreciation and
amortisation
1,042 1,160 1,542 1,393 5,839 3,044 0 0 8,423 5,597
Operating result 5,288 12,149 108 656 4,098 2,944 -8,869 -2,869 624 12,880
Interest and similar
income
2,500 2,536 230 232 39 27 -2,644 -2,665 125 130
Interest and similar
expenses
-4,190 -6,398 -237 -226 -4,760 -2,818 2,644 2,665 -6,543 -6,776
Tax expense and
income
2,732 2,825 31 43 -300 -244 -2,271 -861 191 1,764
Investments 833 610 2,498 172 1,189 166 0 0 4,520 948
Segment assets 468,025 556,966 48,733 50,703 268,348 222,531 -222,647 -262,603 562,458 567,597
Segment liabilities 314,476 339,375 34,679 38,242 232,886 193,415 -229,563 -223,449 352,478 347,583
Segment equity 153,548 217,591 14,054 12,461 35,461 29,116 6,915 -39,154 209,979 220,014

The figures as at June 30, 2020 are compared with the figures as at June 30, 2019 or, in the case of segment assets/segment liabilities, with the figures as at December 31, 2019.

Cuxhaven, August 12, 2020

PNE AG, Board of Management

REVIEW REPORT

To PNE AG, Cuxhaven/Germany

We have reviewed the condensed interim consolidated financial statements, which comprise the condensed balance sheet as at 30 June 2020, the condensed statement of comprehensive income, the condensed statement of cash flows, the condensed statement of changes in equity, the condensed segment information and selected explanatory notes to the financial statements, as well as the interim group management report of PNE AG, Cuxhaven/ Germany, for the period from 1 January to 30 June 2020, that are part of the half-year financial report under Section 115 German Securities Trading Act (WpHG). The preparation of the condensed interim consolidated financial statements in accordance with the IFRS applicable to interim financial reporting as adopted by the EU and of the interim group management report in accordance with the requirements of the WpHG applicable to interim group management reports is the responsibility of the executive directors. Our responsibility is to express a conclusion on the condensed interim consolidated financial statements and on the interim group management report based on our review.

We conducted our review of the condensed interim consolidated financial statements and of the interim group management report in compliance with German Generally Accepted Standards for Reviews of Financial Statements promulgated by the Institut der Wirtschaftsprüfer (Institute of Public Auditors in Germany). Those standards require that we plan and perform the review to obtain a certain level of assurance to preclude through critical evaluation that the condensed interim consolidated financial statements are not prepared, in all material respects, in accordance with the IFRS applicable to interim financial reporting as adopted by the EU or that the interim group management report is not prepared, in all material respects, in accordance with the requirements of the WpHG applicable to interim group management reports. A review is limited primarily to inquiries of company personnel and to analytical procedures applied to financial data and thus provides less assurance than an audit. Since, in accordance with our engagement, we have not performed an audit, we do not express an audit opinion.

Based on our review, nothing has come to our attention that causes us to believe that the condensed interim consolidated financial statements of PNE AG, Cuxhaven/Germany, are not prepared, in all material respects, in accordance with the IFRS applicable to interim financial reporting as adopted by the EU or that the interim group management report is not prepared, in all material respects, in accordance with the requirements of the WpHG applicable to interim group management reports.

Without modifying our opinion, we draw attention to the fact that we have not reviewed the content of the corporate governance statement under Section 289f German Commercial Code (HGB) combined with the consolidated corporate governance statement under Section 315d HGB, which is referred to in the interim group management report.

Hamburg/Germany, 12 August 2020

Deloitte GmbH Wirtschaftsprüfungsgesellschaft

Signed: Christian Dinter Signed: Dr. Arno Probst Wirtschaftsprüfer Wirtschaftsprüfer (German Public Auditor) (German Public Auditor)

STATEMENT MADE BY THE LEGAL REPRESENTATIVES

To the best of our knowledge, and in accordance with the applicable reporting principles for financial reporting, the consolidated financial statements give a true and fair view of the assets, liabilities, financial position and profit or loss of the Group, and the management report of the Group includes a fair review of the development and performance of the business and the position of the Group, together with a description of the principal opportunities and risks associated with the expected development of the Group.

PNE AG, The Board of Management

Markus Lesser Jörg Klowat

IMPRINT

PNE AG

Peter-Henlein-Straße 2–4 27472 Cuxhaven Germany

Telephone: + 49 (0) 47 21–718–06 Telefax: + 49 (0) 47 21–718–444 E-mail: [email protected] www.pne-ag.com

Board of Management

Markus Lesser (CEO), Jörg Klowat Registergericht: Tostedt Registernummer: HRB 110360 As per: June 2020

Design

Kirchhoff Consult AG Borselstraße 20 22765 Hamburg, Germany

The report on the first half year and on the second quarter of 2020 is also available in german. In case of discrepancies the german version is decisive. The digital version of the annual report and the quarterly statements of PNE AG are available online at www.pne-ag.com in the section "Investor Relations/Financial reports".

This report includes statements concerning the future, which are subject to risks and uncertainties. They are estimations of the Board of Management of PNE AG and reflect their current views with regard to future events. Such expressions concerning forecasts can be recognised with terms such as "expec", "estimate", "intend", "can", "will" and similar terms relating to the Company. Factors, which can have an effect or influence are, for example (without all being included): the development of the wind power market, competitive influences including price changes, regulatory measures and risks with the integration of newly acquired companies and participations. Should these or other risks and uncertainty factors take effect or should the assumptions underlying the forecasts prove to be incorrect, the results of PNE AG could vary from those, which are expressed or implied in these forecasts. The Company assumes no obligation to update such expressions or forecasts.

PNE AG

Peter-Henlein-Straße 2–4 27472 Cuxhaven Germany

pne-ag.com