AI assistant
PILBARA GOLD LIMITED — Call Transcript 2026
Apr 12, 2026
65554_rns_2026-04-12_cd683d36-febe-42db-b720-420f5aa78981.pdf
Call Transcript
Open in viewerOpens in your device viewer
==> picture [595 x 57] intentionally omitted <==
ASX ANNOUNCEMENT
13 April 2026
Investor Webinar/Conference Call
Kairos Minerals Ltd ( ASX: KAI ) (“ KAI ” or the “ Company ”) is hosting an investor webinar/conference call on Tuesday 14 April at 12:00 noon (AEST) / 10:00am (AWST).
Managing Director Dr Peter Turner will discuss Kairos’ delivery of a 2.1Moz Mineral Resource Estimate (MRE) for its Mt York Gold Project in WA and ongoing activities across its portfolio, including the 50,000m of drilling underway at Mt York and progress on the Mt York Pre-Feasibility Study (PFS).
CALL DETAILS
Date: Tuesday 14 April 2026
Time: 12:00 noon AEST / 10:00am AWST
Register for the webinar/conference call at the link below:
https://us02web.zoom.us/webinar/register/WN_Yhp4XLrWSfyNOfboySjcDw
After registering, you will receive a confirmation email containing information about joining the webinar/call, including details for dialling in via telephone.
The webinar will incorporate a Q&A session. If you would like to submit a question for this, please email it to [email protected] prior to commencement of the webinar.
A replay of the webinar will be made available on the Company’s website after its conclusion.
About Kairos Minerals
Kairos Minerals (ASX:KAI) owns 100% of the flagship 2.1 Moz Mt York Gold Project in the Pilbara of Western Australia that was partially mined by Lynas Gold NL between 1994 and 1998. Kairos has recognised that the resource, hosted in an Archaean Banded Iron Formation or BIF, has significant potential to grow further from its current 2.1 Moz base with significant exploration potential existing within the Mt York ‘ Main Trend’ and its extension towards the northwest where Kairos owns the mineral rights for gold.
Current resources are estimated within a pit shell using a A$5,500/oz gold price and a 0.4 g/t Au lower cutoff grade (table below).
| Deposit | Cut-off (g/t Au) |
Indicated | Indicated | Indicated | Inferred | Inferred | Total | Total | ||
|---|---|---|---|---|---|---|---|---|---|---|
| Tonnes (Mt) |
Au (g/t) |
Ounces (koz) |
Tonnes (Mt) |
Au (g/t) |
Ounces (koz) |
Tonnes (Mt) |
Au (g/t) |
Ounces (koz) |
||
| Mt York | 0.4 | 42.1 | 1.02 | 1,380 | 19.7 | 1.11 | 703 | 61.7 | 1.05 | 2,082 |
Scoping study results released in November 2024 point to a robust, open-cut mining operation through a conventional CIL process route. In 2026, Kairos will complete a 50,000m of extensional and infill drilling programme where resources are expected to grow further for incorporation into the Prefeasibility Study or
==> picture [360 x 29] intentionally omitted <==
==> picture [595 x 57] intentionally omitted <==
PFS. During the resource expansion work, Kairos will collect important additional information to fine-tune metallurgical processing, geotechnical engineering and mine scheduling.
Kairos is pursuing a maiden gold resource in 2026 at its 100% owned Roe Hills Project , located 120km east of Kalgoorlie in WA’s Eastern Goldfields. The Terra and Caliburn Prospects that have many geological similarities to some of the deposits at the giant St Ives gold camp, have 1,500m of solid gold intercepts in historic drilling that the Company recognises as a valuable asset in an area surrounded by gold mills and mines.
This announcement has been authorised for release by the Board.
Peter Turner Simon Lill Managing Director Non-Executive Chairman
For investor information, please contact
Nathan Ryan – NWR Communications 0420 582 887
The Mineral Resources were first reported in this announcement dated 13 April 2026 (Announcement). The Company confirms that it is not aware of any new information or data that materially affects the information included in the Announcement and, in the case of estimates of mineral resources, that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
==> picture [360 x 29] intentionally omitted <==