Management Board's report on activities of the PGE Capital Group for the 6-month period

ended June 30, 2021

KEY FINANCIAL RESULTS OF THE PGE CAPITAL GROUP
1.
1.1.
2.
2.1.
2.2.
3.
3.1
3.2.
3.3. 9 Prices of certificates
3.4. 9 Prices of CO2 emission rights
3.5.
4.
4.1 . Main business segments
4.2.
4.3.
CONVENTIONAL GENERATION
DISTRICT HEATING
RENEWABLES
DISTRIBUTION
SUPPLY
CRCULAR ECONOMY
4.4.
5.
5.1.
5.2
5.3.
6. Statement on the reliable preparation of the financial statements
7.
Glossary

KEY FINANCIAL RESULTS OF THE PGE CAPITAL GROUP

Period ended Period ended % change
Key financial data Unit June 30, 2021 June 30, 2020
Sales revenues PLN
million
21 908 22 776 -4%
EBIT PLN
million
3 158 271 1 065%
EBITDA PLN
million
5 254 2 805 87%
EBITDA margin % 24% 12%
Recurring EBITDA PLN
million
4 290 3 117 38%
Recurring EBITDA margin % 20% 14%
Net profit/loss PLN
million
2 719 -637 -
Capital expenditures PLN
million
2 247 2 504 -10%
Net cash from operating activities PLN
million
3 290 5 309 -38%
Net cash from investing activities PLN
million
-2 076 -3 449 -40%
Net cash from financial activities PLN
million
12 -1 153 -
Key financial data As at
June 30, 2021
As at
December 31, 2020
% change
Working capital PLN
million
1 360 71 1 815%
Net debt /LTM EBITDA* x 0.71 1.22

* In order to standardise the reporting of net debt (adjustment to the method of calculating covenants in loan agreements), starting from the results for H1 2021, there's been a change in the presentation, which also results in a change in the comparable periods (as at December 31, 2020), i.e. restricted cash items include only the funds in PGE Dom Maklerski S.A. clients' accounts as collateral for settlements with IRGiT (the Warsaw Commodity Clearing House.

**LTM EBITDA - Last Twelve Months EBITDA.

One-offs affecting EBITDA Unit As at
June 30, 2021
As at
June 30, 2020
% change
Change in reclamation provision PLN
million
932 -434 -
Change in actuarial provision PLN
million
17 -40 -
Provision reversal - Voluntary Leave Program PLN
million
11 - -
LTC compensations PLN
million
4 41 -90%
Release of the provision for the risk of returning
the equivalent of the CO2 emission allowances
received at Dolna Odra power plant
PLN
million
- 121 -
Total PLN
million
964 -312 -

1. PGE Capital Group

Characteristics of activities

Capital Group of PGE Polska Grupa Energetyczna S.A. ("PGE Capital Group", the "Capital Group", "PGE Group", the "Group") is the largest vertically integrated producer of electricity and heat in Poland. With a mix of own fuel sources, generation assets and distribution network, PGE Group provides a safe and reliable supply of electricity to more than five million households, businesses and institutions. Moreover, PGE Group is the largest heat producer in the country.

The parent company of PGE Capital Group is PGE Polska Grupa Energetyczna S.A. (also "PGE S.A.", "PGE", the "Company). PGE Group organizes its activities in seven operating segments:

CONVENTIONAL GENERATION

Core business of the segment includes extraction of lignite, production of electricity and heat from conventional sources.

DISTRICT HEATING

The core business of the segment includes production of electricity and heat from conventional sources as well as transmission and distribution of heat.

RENEWABLES

The core business of the segment includes electricity generation from renewable sources and in pumped-storage power plants and provision of ancillary services.

The core business of the segment includes wholesale trading of electricity on domestic and international market, sale of electricity to final off-takers, trading of CO2 allowances and energy certificates and fuels and provision of services of the Corporate Centre to companies from the PGE Group.

DISTRIBUTION

The core business of the segment includes supply of electricity to final off-takers through the grid and HV, MV and LV infrastructure.

CIRCULAR ECONOMY

The core business of the segment is the management of combustion by-products.

Other operations include provision of services, through the subsidiaries, to PGE Group, which include organisation of capital raising in form of Eurobonds (PGE Sweden), provision of IT, payroll and HR services, transportation, management of investment funds and investing in start-ups.

The composition of the Capital Group is presented in note 1.3 to the consolidated financial statements.

2. Risks in the PGE Group's operations

PGE S.A., as the Corporate Centre managing the Group, creates and implements integrated risk management architecture at PGE Group. In particular, it shapes PGE Group's risk management policies, standards and practices, designs and develops internal IT tools to support these processes, specifies global risk appetite and adequate limits as well as monitors their levels.

PGE Capital Group companies, as well as other entities from the electrical and power sector, are exposed to a number of risks and threats resulting from the specific operating activities and operating in specific market and regulatory environment.

In PGE Group risk management process is pursued based on the GRC (Governance - Risk - Compliance) model. It allows adaptation and integration of each of the operational areas at all levels of management. Having established a top-level Risk Committee, which reports directly to the Management Board, supervision over the effectiveness of risk management in the Group is ensured. Function definition within corporate risk management allows an independent assessment of particular risks, their impact on PGE Group and limiting and controlling major risks using dedicated instruments. Formation of a separate compliance function within the Group guarantees that PGE Group's activities are in line with legal conditions and ensures observance of the adopted internal standards.

The PGE Capital Group has consequently developed a comprehensive risk management system. The Group measures and assesses risks in the key companies of the Group. Mechanism allowing identification of areas exposed to risk and risk level measurement methods are constantly verified and developed. Thanks to that, the significant risks concerning various areas of operations are identified and kept within the assumed limits by reducing negative effects of such risks and by taking preventive or corrective measures, in accordance with the presented cycle.

All identified and assessed risks relating to the Group's current activities are recorded in the risk register (risk books) maintained by the Risk and Insurance Department in PGE S.A. Risk books reflect changes in the value of particular risk parameters along with information on implemented mitigating activities (reducing the probability of occurrence and minimising negative consequences of a risk).

The table below presents the most significant risks identified in the PGE Capital Group together with their assessment in 2022 perspective (12 months i.e. until the end of 2022). A risk level indicates a risk's potential financial impact on the Group's results, and a risk prospect (trend) indicates the probable direction of risk development. Potential events determining risk assessments in the previous report are now partially described in other sections of this report as period events. The assessment of the described risks takes into account the impact of the COVID-19 pandemic on them. This fact is not analysed as a separate risk.

The current scenario does not include the carve-out of PGE Group's coal assets (Conventional Generation segment).

Current outlook

The main risks and threats of PGE S.A. and the PGE Group are presented below along with their assessment and outlook for year 2022.

Risk level
Risk outlook
in the next
period
Low level
low

decrease
medium

growth
Risk does not pose a threat and may be tolerated
high

stable
Mitigating actions
and main tools used for the management
of the risk
Medium level Risk which needs preparation of the proper reaction based on analysis of costs and benefits
High level Intolerable risk, which needs immediate and active reaction, leading simultaneously to limitation of possible consequences and of probability of occurrence thereof
Most important actions:
Market and
product
risks
Related to prices and
volumes of offered
products and services
Gross margin on electricity
in related products
-
uncertainty as to the future levels and volatility
of key energy products -
particular hard coal, gas and the prices of
certificates)
from the production
assets of the PGE Capital Group and on trading
its amount results from the
of market prices (electricity prices and the prices
CO2, fuels, including in

Optimization of generation assets -
definition of production scenarios for updated market parameters of
electricity, CO2
and fuels.

Using consistent guidance in respect of process organisation in the context of commercial strategy and mid
term planning (strategy for hedging key exposures in the area of electricity and related product trading that
correspond to the adopted risk appetite in the mid-term).

Establishing position hedging levels with consideration given to the results of analysing pricing risk in respect
Electricity sales volumes –
uncertainty related to the development of
context of the impact of the coronavirus
pandemic and the remedial actions taken
this risk derives from
macroeconomic indicators affecting the demand
for electricity and energy goods, including in the
↗1 of electricity and related products, VaR-based. Target hedging levels are specified taking into consideration the
Group's financial standing, including in particular its strategic objectives.

Monitoring exposures for individual areas in relation to the set limits and hedging strategies defined by the
Risk Committee or the Management Board of PGE S.A. through operational reports prepared by the
Department of Risk and Insurance

Research, monitoring and analysing the electricity
markets
and sector trends
in order to optimally use
Tariffs (regulated prices) –
requirement to approve rates for distribution
services and electricity and heat prices for
particular groups of entities.
resulting from the ↗2 generation and selling capacities.

Using the administrative appeal path provided for in the Energy Law and the Code of Civil Procedure.

Acquiring new customers -
diversification of channels to
reach final off-takers
and diversification of target
groups by maintaining an extensive product portfolio and adapting offering to market.

1 The change in the risk outlook (trend) results from the growing demand for electricity in the National Energy System ("PPS"). In February 2021, the demand for power in the Polish power system reached a record level. On February 12, 2021, 27 617 MW was recorded, which was the highest level in the history of the Polish power industry.

2 The change in the risk outlook is due to the qualification of carry-over in the tariff of all justified costs for investments.

Management Board's report on activities of the PGE Capital Group for the 6-month period ended June 30, 2021

The Capacity Market –
resulting from
uncertainties related to withholding of
payments from the Capacity Market and threats
related to compliance with the capacity
obligations of Capacity Market Units
↘3
Current clients retention -
a diversified portfolio of customer loyalty schemes and client-acquisition activities
and special offers dedicated to former clients who moved over to the competitors.

Care for a high level of customer service by developing employees' competences and building relations with
business and retail clients.

Use of tools to supporting customer relations processes allows the Group better sales planning and
organisation of sales.

Conducting lobbying activities within the framework of the proceedings conducted before the CJEU.

Ensuring the expected
level of operational readiness of the individual capacity market units.
Property risks
Related to development
and maintenance of the
assets
Failures and
damage to property – connected
with the operation and degradation over time of
energy equipment and facilities
and
protection
of energy equipment and facilities against
destructive factors
(
including fire, effects of
weather phenomena,
intentional damage).
↔4 Most important actions:

Diversification of the current structure of the production sources, Introducing a technology reducing the
negative impact of atmospheric factors.

Active pursuing of a strategy for building up and modernization of the production capacities.

Performing maintenance repairs in line with the highest sector standards.

Insurance of the most important production assets in the event of breakdown and property damage. Assets
Investment and development –
connected with
strategic plans for expanding the generation,
distribution and sales potential as well as on
going investments.
↗5 are insured based on an analysis of insurance costs, capabilities of insurance markets for specified risks or for
particular types of assets, costs related to asset replacement and potential lost revenue.

The reliability of the power supply to the end users has been systematically improved through modernization
of the distribution grid.

Continuous monitoring of environmental laws and regulations regarding environmental protection,
and the
energy policy.
Operational risks
Related to pursuing of
ongoing economic
processes
Electricity and heat production

connected
with production planning and negative impact of
the factors that determine production
capacities.
Most important actions:

Optimisation of equipment lifecycles and the availability of key assets.

Timely inspections, repairs and modernisation of the existing assets.
Fuel management

connected with
uncertainty regarding the costs, quality,
timeliness and volumes of fuel supply (mainly
coal) and production raw material as well as the
effectiveness of inventory management
processes.

Optimisation of costs inter alia through monitoring of fuel prices and reserves and securing supply through
long-term contracts with suppliers and through price fixing formulas.

Monitoring of legal changes and changes in technical standards in the field of by-products.

Investments in improving the efficiency of the combustion process.

Constant monitoring of service availability.

Creating Business Continuity Plans for critical systems, developing and testing emergency procedures.

3 The change in the risk outlook results from the improvement of the situation regarding the complaint against the Polish Capacity Market (see the case of the British Capacity Market). On June 24, 2021, the Sejm adopted a draft act amending the Act on the Capacity Market and certain other acts. The new regulations will ensure, inter alia, efficient operation of the Capacity Market and compliance with EU emission limits.

4 The change in the risk outlook results from adjusting the insurance cover as well as deepening cooperation with insurers and taking active actions, positively affecting the adequacy of the valuation of losses and compensations due under the insurance contracts concluded by the PGE Capital Group. The failure rate of devices does not change abruptly and is expected to be at a stable level.

5 The change in the risk outlook results from the parallel investment activities and preparations for the separation of coal assets. An important risk in this context is the human resources factor.

Management Board's report on activities of the PGE Capital Group for the 6-month period ended June 30, 2021

By-products and services -
related to the
management of production waste

Ongoing monitoring of changes in legal regulations.

Training in regulations preventing money laundering and terrorist financing.

Requirement to read Best Procurement Practices and the Code of Conduct for Business Partners of PGE Group
companies.

The approval path and internal regulations concerning the purchasing process.
Cybersecurity

the risk of deliberate disruption
of the proper functioning of the information
processing and exchange space created by IT
systems operating at the PGE Capital Group

Control of the work environment.

Training of employees in the field of occupational health and safety.

Informing about threats, restrictions and rules related to the COVID-19 (dedicated tab on the Intranet).

Conducting an intensive and effective dialogue in order to avoid escalation of potential disputes with the social
partners and to work out the most favourable solutions with regard to employment and employment costs
Procurement -
related to the ineffectiveness and
uncorrectness of the purchasing process
within PGE Capital Group connected therewith.

PGE
Group's active participation in internship programmes and cooperation with educational institutions in
order to secure a pipeline of qualified personnel.
Employee safety -
related to lack of ensuring
safe working conditions

Assessment and training of personnel in order to make optimal use of it within the Group's structures
Human Resources

pertaining to difficulties in
provision of personnel with the relevant
experience, competences and ability to perform
specific tasks
Social dialogue

related to the failure to reach
an agreement between the Group's
management and the social partners, which
could lead to strikes / collective disputes
Regulatory and legal
risks
Related to compliance
with external and
internal legal provisions
Legal changes in support systems –
connected
with uncertainty as to the future shape of the
support system for production of certified
energy
Most important actions:

Monitoring of the changes being introduced or proposed provides that our operations in key business
segments are carried in compliance with the law and that PGE Capital Group has solutions which take into
Environmental protection –
resulting from
industry regulations specifying which
"environmental" requirements energy
installations should meet and what are
the
principles for using the natural environment
account potential changes in the legal environment.

Social dialogue and advertising campaigns.

Exercising operational supervision of planned and ongoing investment and modernisation measures with
respect to their compliance with environmental requirements.

Management Board's report on activities of the PGE Capital Group for the 6-month period ended June 30, 2021

Climate

commitments on the EU and national
level and under strategic objectives arising from
the EU's climate and energy policy
Concessions –
resulting from the statutory
↗6
Implementation of the investment plan intended to adapt installations to requirements arising from the BAT
conclusions, as planned. Failure to meet the requirements arising from BREF/BAT conclusions may lead to
refusal to issue a decision on the award or amendment of integrated permits.

Improvement of activities aimed at protecting and improving the state of the environment by implementing
technological and organisational solutions ensuring efficient and effective management in this area.

Reduction in the emission
intensity of PGE Group's generating assets, development of low-
and zero-carbon
energy generation sources.
requirement to hold concessions with regard to
conducted operations

Adaptation of internal regulations and practices to make sure that the activities are in compliance with the
Taxes –
related to uncertainty surrounding the
future shape of tax regulations and their
interpretation
power sector regulations and binding law.

Active participation of PGE S.A. as the member of the Polish Electricity Committee that opened its office in
Brussels. Through the Committee's operations, the Company actively influences proceeding and shaping of EU
law and engages a dialogue with the EU institutions.

Effective raising of external financing and state aid for the development of planned low-
and zero-carbon
investments by PGE Group.
Financial risks
Related to finance
management
Credit risk

connected with the counterparty
default, partial and/or late payment of
receivables or a different type of breach of
contractual conditions (for example failure to
deliver/collect goods or failure to pay for any
associated damages or contractual penalties)
↔7 Most important actions:

Prior to executing a transaction, a counterparty assessment is carried out and forms a base for applying credit
limits, that are regularly updated and monitored. Exposures that exceed established limits are hedged in
accordance with the Group's credit risk management policy. The level of utilisation of limits is monitored on a
regular basis, payment of receivables is monitored on an ongoing basis and early recovery procedures are in
Liquidity risk

connected with the possibility of
losing the ability to meet current liabilities and
obtaining financing sources for business
operations
place.

Applying
a central financing model, which assumes –
as a rule –
that external capital
is raised by PGE S.A. PGE
Group subsidiaries use a variety of intra-group financing sources and liquidity risk is monitored using periodic
planning for operating, investing and financing activities.
Interest rate risk

resulting from the negative
impact of changes in market interest
rates on
PGE Group's cash flows

As regards currency risk and interest
rate risk, PGE Group has implemented internal management procedures.
PGE Group companies execute derivative transactions involving interest rate-
and/or currency-based
instruments (IRS, CCIRS, FX Forward) only in order to hedge identified risk exposures. Regulations in force at
Foreign exchange risk

resulting from
negative
impact of exchange rate movements on PGE
Group's cash flows denominated in currencies
other than domestic
currency
the PGE Group do not allow, with regard to derivative transactions based on interest rates and currencies, to
enter into speculative transactions, i.e. transactions which would be aimed at generating additional gains
resulting from changes in the level of interest rates and changes in exchange rates, while exposing the Group
to the risk of incurring a potential loss on this account.

6 The change in the risk outlook results from the growing global climate pressure (FiT 55), growing requirements from financial investors, emerging new guidelines and obligations resulting from them, e.g. non-financial reporting, carbon footprint disclosure, having a diversity policy.

7 The change in the risk outlook results from an improvement in the situation of ongoing analyzes of the timeliness of payments made by contractors. The negative impact of COVID-19 related to the repayment of receivables is currently not monitored.

Long-term outlook

The purpose of the assessment is determined by the challenges and threats that will arise for the PGE Group in the next decade. Each of the long-term risks is assessed in terms of its impact on the achievement of business goals, the company's image and business continuity. The presented result is the dominant (value most often appearing in the results) of these three aspects.

The results of this assessment are broken down into the following categories:

Assets Law and regulations Operating activities Market and products Finance
 Cybersecurity
 Forces of nature
 Law
 Environmental
restrictions
 Vision for the
developement of the
power sector
 Human resources
 Safety of employees
and customers
 Competition
 Technological
revolution
 Macroeconomics

Cybersecurity - risk of deliberate disruption of the proper functioning of the information processing and exchange space created by IT systems operating in the PGE Capital Group (interference with any element of the PGE Group infrastructure resulting in disruption of the IT and OT (Operational Technology - industrial networks) infrastructure, and thus disruption of the process supported thereby).

Forces of nature - risk of intensification of extreme weather conditions affecting the price and volume of electricity and heat, costs of their distribution and production (increase in the frequency of extreme weather conditions, as a result of which the assets of the PGE Capital Group may be damaged and climate changes affecting the demand for electricity and heat).

Law - risk of instability of the national law defining the rules for the conduct of the PGE Group's operations and an increase in the number and scope of EU regulations affecting the Group (a situation in which the regulations governing the activities of the PGE Group will change more and more often, there will be more and more stringent regulations, and the quality of the law will not grow).

Environmental restrictions - risk related to tightening restrictions in the area of electricity and heat generation and mining activities in the PGE Group (new provisions on climate protection, environmental protection, which constitute additional barriers (increasing costs) to operate on the electricity and heat market).

Vision for the developement of the power sector - risk of changing the concept of shaping the energy sector in Poland and the role played by the PGE Capital Group in it (administrative activities that have or may have an impact on changing the direction of development of the PGE Capital Group).

Human resources-risk related to difficulties in providing staff with appropriate experience, competences and abilities to perform specific tasks.

Safety of employees and customers - risk associated with unexpected events that generate irreversible material losses and heavy injuries or deaths.

Competition - risk of dynamic development of competitors' product offers and their structural strengthening, which reduces the share of the PGE Capital Group in the energy market.

Technological revolution - risk of technological change causing a decrease in electricity and heat production in baseload assets and their distribution using grid assets owned by PGE Group.

Macroeconomics - risk associated with changes in economic situation, causing swings in macroeconomic indicators and commodity prices that have impact on PGE Group's activities (economic changes that may affect the deterioration of the financial ratios of PGE Group companies).

Diagram: Map of long-term risks

Source: Own work

The assessment of long-term risks was performed in two scenarios: (I) taking into account and (II) not taking into account the spinoff of coal assets from the PGE Capital Group. The location on the map and the differences in valuation between these scenarios show the significance level of a given risk / issue for the PGE Capital Group.

The map of long-term risks was prepared based on the elements dominating in the responses, according to the subjective perception of the development of these risks in the assessments of the top management of the PGE Capital Group (Management Board Members and Division Directors). The scenario where the carbon assets are not allocated outside the Group is associated with greater uncertainty and therefore more risk categories are exposed to very high risk.

3. Electricity market and regulatory and business environment

Macroeconomic environment

PGE Group's main operating area is Poland, and the domestic macroeconomic backdrop has a substantial impact on Group's results. At the same time, the condition of Poland's economy remains largely tied to the situation across the European Union and in global markets. The Group's financial results are affected by both the situation in specific segments of the economy and the financial markets, which affect the terms of PGE Group's debt financing.

As a rule of thumb, there is a historical correlation between change in electricity demand and change in the rate of economic growth in Poland. Considering PGE Group's position on the Polish power generation market, as well as its substantial share in the electricity sales and distribution market, changes in power and heat demand may have a significant impact on the Group's results.

The socioeconomic situation in the country in the first half of 2021 remained under the influence of the COVID-19 pandemic. The pandemic restrictions introduced in the winter period were gradually lifted starting in April 2021, which steadily improved results in comparison with the previous year.

An improvement in the socioeconomic situation and lower air temperatures in the winter period led to an increase in gross electricity consumption in the first half of 2021 by more than 7% y/y.

Economic trends in the first half of 2021 were still driven by pandemic restrictions, which mainly affected the services sector. However, a gradual lifting of restrictions means that there is consensus among analysts that 2021 should be a time of economic recovery globally and in Poland. Central Statistical Office of Poland announced that after the GDP decline was slowed down in the first quarter of 2021 to -1.2% y/y, in the second quarter of 2021 GDP grew by 10.7% y/y. The European Commission has raised its estimate for Poland's GDP growth in 2021 from 4.0% to 4.8% y/y. Any further impact of the pandemic on GDP will depend on its duration and the time it takes to full efficiency, especially in services and manufacturing.

Chart: Seasonally adjusted GDP change vs. change in domestic gross electricity consumption.

Source: EC, Central Statistical Office of Poland, PSE S.A.

The Purchasing Managers' Index ("PMI") reflects the positive impact of the efforts being undertaken to rebuild the economy following the COVID-19 pandemic. The manufacturing PMI figures for Poland in the first half of 2021 showed optimism in the industry. The PMI posted record figures in May and June 2021, reaching 57.2 points and 59.4 points, respectively. The June PMI figure was the highest recorded since 1998, when the survey had been launched. The average manufacturing PMI in Poland in the first half of 2021 was 55.0 points, denoting a 28% y/y increase. A score above 50.0 points means that the surveyed managers expect the situation in the sector to improve. Polish industry is influenced by the condition of industry in the Eurozone, where PMI in the first half of 2021 reached 60.8 points, compared to 43.6 points last year (up by 39.4% y/y). In June 2021, manufacturing PMI for the Eurozone reached 63.4 points, the highest level in history. The growth rate of this indicator reflects a fast improvement in the sector. At the same time, the expanding economic activity is being blocked by extended delivery times for raw materials and components, resulting from market shortages due to both strong demand for industrial goods and disruptions in logistics stemming from COVID-19 restrictions.

Chart: Manufacturing PMI in Poland and Eurozone (in points).

Source: Markit Economics

Development in the Polish economy is reflected by inter alia dynamics in overall industrial production. In the first half of 2021, industrial production sold was higher than in the same period of last year (when it recorded a decline), which was due to its stronger dynamic in the second quarter of 2021. In the first half of 2021, industrial production sold grew in comparison with the same period of last year by 18.2% (vs. a 6.3% decline in the preceding year). In the first quarter of 2021, production went up by 7.8%, and in the second quarter of 2021 by 30.3% (following a deep decline in the previous year). Sales grew in most sections of industry (aside from mining and extraction). Production sold increased the most in the industrial processing segment, which had experienced an aboveaverage decline last year. Sales in all key industrial groupings increased in comparison with the first half of 2020; the highest growth was recorded in the production of durable consumer goods.

Market environment

SITUATION IN THE NATIONAL POWER SYSTEM (NPS)

Table: Domestic electricity consumption (GWh).

H1 2021 H1 2020 % change
Domestic electricity consumption 86 365 80 640 7%
Wind farms 6 762 7 859 -14%
Industrial thermal hard-coal fired power plants 44 696 33 835 32%
Industrial thermal lignite fired power plants 21 210 18 669 14%
Industrial gas-fired power plants 6 437 6 633 -3%
International trading balance 3 272 6 547 -50%
8
Other (industrial plants, hydro power plants, other RES)
3 988 7 097 -44%

Source: PSE S.A. data

8 From January 1, 2021, power stations located at industrial complexes are classified as utility thermal power stations. It is not possible to historically classify them this way, which is why 2021 should be treated as a transitional period. The new classification results from changes introduced to PSE S.A.'s IT systems in connection with the necessity to introduce changes resulting from the following documents approved by the President of the Energy Regulatory Office ("URE"): Amendments no. 1/2020 of Balancing Terms, Update Sheet no. CK/13/2020 for the Transmission Network Code ("IRiESP") – Terms for use, operation and planning of network development, and Update Sheet no. CB/28/2020 IRiESP – System balancing and managing system constraints.

H1 2021

Domestic consumption electricity increased in the first half of 2021 (mainly due to low temperatures and an increase in the Polish economy's energy demand due to the lesser impact of the coronavirus pandemic) by 5.7 TWh compared to the base period. Due to weak windiness, wind generation decreased by 1.1 TWh y/y. In addition, due to the situation in neighboring countries, net imports decreased by 3.3 TWh y/y. As a result, more energy produced in utility hard coal-fired power plants (approx. +10.9 TWh) and lignitefired power plants (approx. +2.5 TWh) was needed to balance the power system.

Chart: Energy balance in the NPS in the first half of 2021 y/y (TWh).

Source: own work based on data from PSE S.A.

ELECTRICITY PRICES – DOMESTIC MARKET

Day-ahead market (RDN)

Market/measure Unit H1 2021 H1 2020 % change
RDN – average price PLN/MWh 284 179 59%
RDN – trading volume TWh 15.1 14.4 5%

Analysis – selected price factors affecting RDN quotations

Factor Unit H1 2021 H1 2020 % change
CO2 emission rights EUR/t 44.57 21.71 105%
Polish Steam Coal Market Index PSCMI-1 PLN/GJ 11.44 12.00 -5%
Wind generation NPS TWh 6.8 7.9 -14%
Ratio: wind generation/ NPS consumption % 8% 10%
Ratio: international trading/ NPS consumption % 4% 8%

In the first half of 2021, the average electricity price on the day-ahead market was PLN 284/MWh and was higher by 59% than average price (PLN 179/MWh) in same period in the preceding year. The increase in energy prices was attributable to the increased energy demand for electricity (by 5.7 TWh), net imports lower by 50% compared to the first half of 2020 and decrease by 14% in generation from NPS wind sources.

Chart: Average monthly prices at the day-ahead market in 2020-2021 (TGE).*

* Average monthly RDN prices calculated on the base of hourly quotations (fixing).

Forward market

Market/measure Unit H1 2021 H1 2020 % change
BASE Y+1 – average price PLN/MWh 306 233 31%
BASE Y+1 – trading volume TWh 45.14 69.77 -35%
PEAK5 Y+1 – average price PLN/MWh 339 277 22%
PEAK5 Y+1 – trading volume TWh 5.30 6.45 -18%

Electricity prices on forward market are shaped by the similar fundamental factors, as the prices on the Day-Ahead Market described above. The observed forward market price increase y/y for the whole year for BASE_Y+1 is related to increased demand for electricity and very high prices of CO2.

Chart: Average monthly prices on the forward market in 2020-2021 (TGE).*

* Monthly average index level for forward contracts for the next year (Y+1), baseload and peak, weighted by the trading volume.

International market

Wholesale market (comparison of day-ahead markets)

Chart: Comparison of average electricity prices on Polish market and on European markets in the first half of 2021 (prices in PLN/MWh, average exchange rate EUR/PLN 4.54).

Source: TGE, EEX, Nordpool

Chart: Evolution of spot market prices.

Source: TGE, EEX, Nordpool

In the first half of 2021, the y/y increase in prices on neighbouring markets ranged between PLN 146 and PLN 153/MWh (i.e. approx. 243- 284%), whereas in Poland the average prices were higher by PLN 105/MWh y/y (approx. 59%). The price spread between Poland and neighbouring countries is largely due to differences in realized coal prices in the country and abroad. The price of hard coal in ARA (Amsterdam-Rotterdam-Antwerp) ports rose by 54% y/y, while the domestic PSCMI-1 decreased by 5% over the same period. Transmission capacities on cross-border connections, which increased in the second half of 2019, enabled the import of higher volumes of cheap energy which contributed to higher correlation of wholesale prices observed in Poland and abroad and in domestic prices approaching the level recorded on neighbouring markets.

Chart: Hard coal indices ARA vs PSCMI 19 .

Source: ARP, Bloomberg (API21MON OECM Index), own work.

9 The comparison is illustrative only. Methodologies of counting the ARA and PSCMI1 indexes are different.Among other things, the ARA index includes insurance and delivery costs. The PSCMI 1 is an ex-mine index without insurance and delivery costs. Standards for calculating the caloric values are also different (ARA – 25.12 GJ/t vs. PSCMI1 caloric value - range 20-24 GJ/t). The aim is to compare the trend and not the absolute level. For illustration purposes ARA index is recalculated from USD/t to PLN/GJ.

-750,00

-500,00

-250,00

0,00

250,00

500,00

750,00

1 000,00

1 250,00

1 500,00

1 750,00

International trading

Chart: Monthly imports, exports and cross-border exchange balance in 2020-2021.

Source: own work based on PSE S.A. data.

Chart: Quarterly trading volumes – import, export and international trading balance in years 2009-2021.

Source: own work based on PSE S.A. data.

In the second quarter of 2021, Poland remained a net importer of electricity, and the trade balance was 1.1 TWh (import 2.5 TWh, export 1.4 TWh) and was lower by 2.6 TWh y/y (i.e. by approx. 71% y/y). The international trading balance was impacted mostly by import from Sweden (0.9 TWh), Germany (0.6 TWh) and Lithuania (0.4 TWh).

In the first half of 2021, the trade balance was 3.2 TWh (import 5.5 TWh, export 2.3 TWh) and was lower by approx. 3.2 TWh y/y (i.e. by approx. 49% y/y). The international trading balance was impacted mostly by import from Sweden (1.8 TWh), Czechia (1.2 TWh) and Germany (1.0 TWh).

Chart: Geographical structure of commercial exchange in the first half of 2021 (in GWh).

Source: own work based on PSE S.A. data.

Chart: Parallel exchange balance10: average vs. maximum hourly flow in particular months.

Source: own work based on PSE S.A. data.

Global increase in fuel prices (which translate into an increase in the costs of electricity production from natural gas and hard coal) and, additionally, lower windiness translated into an increase in energy prices in neighboring countries, which in turn limited electricity imports to Poland.

Retail market

The diversity of electricity prices for retail customers in the European Union depends both on the level of the wholesale prices of electricity and fiscal system, regulatory mechanism and support schemes in particular countries. In Poland in the second half of 202011 an additional burden (over sale price and cost of electricity distribution) for individual customers accounted for 37% of the electricity price and in comparison to EU average of 40%. In Denmark and Germany the proportion of additional charges in the price of electricity exceeded 50%.

Chart: Comparison of average prices for individual customers in selected EU countries in the second half of 2020 (prices in PLN/MWh, average exchange rate EUR/PLN 4.47).

Source: own work based on Eurostat data.

10 Parallel exchange – exchange between synchronised system on borders with Germany, Czechia and Slovakia.

11 Eurostat data on retail market are published in semi-annual intervals, at publication date no data availbale for H1 2021.

Chart: The share of additional charges in electricity prices for the individual customers in selected EU countries in the second half of 2020 (prices in PLN/MWh, average exchange rate EUR/PLN 4.47).

Source: own work based on Eurostat data.

Prices of certificates

In the first half of 2021 the average price of green certificates (index TGEozea) reached PLN 150.21 PLN/MWh and was higher by 9% compared to the analogical period of the previous year. An obligation to redeem green certificates has remained at the same level (19.5%) as in 2020. The decreased demand for certificates is related mainly to lower pace of electricity contractation for final off-takers and uncertainty with regard to the redemption requirement in 2022. Moreover, a 15-year support period for first installations that had entered the system in 2005, ended in 2020.

Chart: Average quarterly prices of green certificates (TGEozea).

Source: Own work based on TGE quotations.

Prices of CO2 emission rights

EUA (European Union Allowances) prices are one of the key factors determining wholesale energy prices and PGE Group's financial results. Installations emitting CO2 in the process of electricity or heat production bear the expenses for purchasing EUA allowances to cover the deficit (i.e. the difference between CO2 emissions at PGE Group's generating units and the free-of-charge allowances received under derogation in accordance with the National Investment Plan). Wherein, last allocations granted free of charge were planned for realisation of investment tasks for 2019. It means that the free allocations for electricity generation, in accordance with the currently used method, ended when 2019 allowances were received.

Following a sharp slump caused by the outbreak of the COVID-19 pandemic in mid-March 2020, the prices of CO2 emission allowances began recovering until reaching dynamic growth from November 2020. In the first half of 2021, the weighted average price of EUA DEC 21 was EUR 44.57/t and was considerably higher (by 105%) than the average price of EUR 21.71/t for the EUR DEC 20 instrument in the similar period of the previous year.

Chart: Prices of CO2 emission rights.

Source: own work based on ICE exchange quotations.

CO2 EMISSION RIGHTS GRANTED FREE OF CHARGE

The Group received emission allowance allocations for heat generation for 2020 on April 23, 2021, after verification of asset and financial reports for investments included in the National Investment Plan. Allocations for electricity producers are no longer awarded from 2020.

On July 7, 2021, the climate minister published a list of installations along with the final volume of CO2 emission allowances allocated for the production of heat for 2021-2025 in accordance with the Act of June 12, 2015 on the ETS scheme.

The publication of this list is the final step in the process of determining the allocation of emission allowances on the basis of reports concerning key data submitted by installation operators by June 30, 2019. The input data for the allocation concerned the period 2014-2018.

The publication of the list completes the process of determining the final volume of emission allowances allocated to installations in accordance with Commission Delegated Regulation (EU) 2019/331 of December 19, 2018 determining transitional Union-wide rules for harmonised free allocation of emission allowances pursuant to Article 10a of Directive 2003/87/EC of the European Parliament and of the Council.

The final volume of emission allowances published is subject to adjustment based on the average level of production in the two years preceding the year for which emission allowances are granted. Data on production levels is provided by March 31 of each year starting from 2021 in ALC reports. Based on this data, emission allowance allocations are either decreased or increased if the average production level in the past two years exceeds the ±15% threshold (if the threshold is exceeded, the threshold in the following years will be ±5 percentage points above 15%). The final volume of emission allowances granted to an installation is determined on this basis. The adjustment will be performed on an annual basis in accordance with rules specified in Commission

Delegated Regulation (EU) 2019/1842 of October 31, 2019. The ALC reports submitted by installation operators will be approved by the European Commission, which will issue a decision approving the final volume of emission allowances. The allowances will be transferred to the installation's account in the EU register in 2021. The European Commission plans to issue the decision approving the grant of emission allowances for 2021 in the fourth quarter of 2021.

The climate minister will publish in the Public Information Bulletin (BIP) the approved final annual volume of emission allowances resulting from ALC reports pursuant to the Act of June 12, 2015 on the ETS scheme.

Table: Emission of CO2 in the first half of 2021 broken down into electricity and heat production compared to the allocation of CO2 emission allowances for 2021 (in tonnes).

Product CO2 emissions in H1 2021* Allocation of CO2 emission rights
for 2021
Electricity 30 848 494 -
Heat 3 065 144 667 856
TOTAL 33 913 638 667 856

* Estimates, emissions not verified - the emissions will be settled and certified by the authorised verifier of CO2 emission on the ground of yearly reports of volume of CO2 emissions.

Regulatory environment

DOMESTIC REGULATORY ENVIRONMENT

PGE Group operates in an environment with a significant impact of domestic and foreign regulations. Presented below is a summary of the most significant decisions, which took place in 2021 and which could have an impact on PGE Group's operations in the coming years.

Segments Regulation Regulation objectives Latest conclusions Next stage Impact on PGE Group
The bill on the amendment to
the Energy Law.
CM list:
UC 17
Parliamentary document: 808
Act of May 20, 2021 on
amendment of the act –
Energy Law, and certain other
acts.
The amendment to the Energy Law contains a number of changes of
systemic importance, including:

comprehensive arrangements concerning the energy storage
issue,

the introduction of the obligation to install remote reading
meters,

the appointment of an energy market information operator
whose role will be to establish and develop a central market
information system.
The act entered into force on
July 3, 2021 with certain
exceptions when the vacatio
legis period was extended to
12, 24, 30,
36 months
_ The proposed solutions will
affect all operating segments of
the PGE Group, in particular the
Supply
and
Distribution
segments. The draft prepares
the market for the further
implementation of directive
2019/944 on common rules for
the
internal
market
for
electricity.
The bill on the amendment to
the Energy Law and the
Renewable Energy Sources
Act.
GLC list: UC 74
The
draft
act
includes,
in
particular,
proposals
for
provisions
implementing
into
the
Polish
legal
system
Directive
(EU)
2019/944
of
the
European
Parliament
and
of
the
Council
of
June
5,
2019
on
common
rules
for
the
internal
market
in
electricity
and
amending
Directive
2012/27/EU.
The draft expands on the directions of changes in regulations initiated
in the act of May 20, 2021 on amendment of the act –
Energy Law, and
certain other acts. These include:

the technical ability to change electricity supplier within 24 hours,
starting from 2026,

implementation of civic institutions of energy communities,

the customer's right to voluntarily and temporarily reduce
electricity consumption ("DSR"), aggregation, contracts with
dynamic electricity prices,

definition of the aggregator's function on the electricity market,
along with its tasks and authorisations,

definition of demand response and active customer on the energy
market,

allow DSOs and TSOs to own certain energy storage installations,

expand the Energy Regulatory Office's authority,

regulations concerning system services, flexibility services and
changes in balancing,

introduction
of
provisions
introducing
the
separation
of
transmission
and
distribution
activities
from
energy
storage
-
(an
The deadline for submitting
comments was
June 23,
2021.
Publication of draft
following
consultations, sent
to
Council
of
Ministers for further
work.
The proposed solutions will
have an impact on all of PGE
Group's operating segments,
especially the Supply
and
Distribution segments. The
draft introduces or applies
numerous EU laws addressing
the electricity market, including
directive 2019/944
on common
rules for the internal market for
electricity, and grid codes.

energy
system
operator,
with
the
exceptions
provided
for
in
the
draft,
cannot
be
the
owner
of
and
cannot
build,
operate
or
manage
an
energy
storage
system).
The bill on the amendment to
the Energy Law and the
Renewable Energy Sources
Act
GLC list: UD 162
The bill includes proposals for legislation to abolish the exchange
obligation and to tighten liability for electricity market manipulations.
The ERO President will have at their disposal appropriate tools to
prevent abuses and attempted abuses in the electricity market.
According to the explanatory memorandum to the bill,
the abolition of
the obligation is included in the Polish Electricity Market Reform
Implementation Plan.
Comments submitted during
public consultations were
published
on April 8, 2021.
Submitted
for
further work in the
Council of Ministers.
The proposed change to abolish
the exchange obligation will
have no adverse impact on the
PGE Group's operations
Act amending the Act on the
Capacity Market and certain
other acts .
The bill promoter's intention is to align the Act on the capacity market
to the provisions of Regulation (EU) 2019/943 of the European
Parliament and of the Council of June 5, 2019 on the internal market for
electricity and to improve the capacity mechanism taking into account
lessons learned from organisation of capacity auctions to date and the
associated processes (promulgation of regulations and rules, definition
of auction parameters, certification processes).
On July 22, 2021
the
parliamentary
commission
for Energy, climate and state
assets recommended that
the amendments proposed
by the Senate be adopted.
On August 7, 2021, the law
was signed by the President.
It entered into force on
September 1, 2021, with the
exception of Art. 6, which
comes into force on July 1,
2024.
- The amendment is of key
importance for PGE Group, the
holder of a significant stake in
the capacity
market.
Act of December 17, 2020 on
promoting
electricity
generation in offshore wind
farms.
The Act provides for enabling the development of offshore wind
power generation. Offshore wind farms are important for the
fulfilment of international commitments in the field of renewable
energy in the long term. The key to these is to create legal regulations
that will stimulate the growth of this sector.
The Act
provides for:

A support system for the offshore technology, adjusted to its
technical and economic conditions, consisting in granting the so
called right to cover the negative balance to be calculated on the
basis of the offshore installation's LCOE.

modifications of administrative procedures related to the
investment process, taking into account the specificity of the
project to construct offshore wind farms.
On January 22, 2021
the act
was signed by the President
of Poland. It entered into
force on February 18, 2021.
- The act is of key importance for
the development of offshore
wind farms and thus for PGE
Baltica
sp. z o.o., a company
responsible
for
the
implementation of the Offshore
Programme at the PGE Group
and coordinating preparations
for the construction of offshore
wind farms.
The bill amending the Act on
renewable energy sources
and certain other acts.
GLC list: UD 107
Parliamentary document: 1
129
The bill envisages in particular
:

abolishing the concession obligation for facilities below 1MW,

extending the life of the discount/FIT
(guaranteed tariff
scheme)/FIP (surcharge to the market price) support system by 5
years (possibility to enter the system while retaining a 15 years'
period of support),

introducing the obligation for the Minister of Climate to publish,
in advance, RES energy volumes to be subject to support over the
next 4 years,
The third reading
and
adoption of the act by the
Parliament took place on
August 11, 2021.
The act was sent to the
Senate on August 13, 2021.
On
September
9,
2021
the
Senate
presented
its
position
on
the
draft.
Sending
to
the
President of the
Republic of Poland
for signature.
The bill regards mainly the RES
segment, extending the period
within which new RES projects
may apply for support. It also
facilitates
planning
the
development of this segment by
introducing the obligation for
the Minister of Climate to
publish the schedule and


increasing the PV capacity threshold for PV above which it is
required to include facilities and protection zones around them in
local zoning plans

possibility
of
executing
lease
contracts
for
the
State
Treasury's
agricultural
property
without
a
tender
between
the
National
Center
for
Agricultural
Support
("KOWR")
and
capital
companies,
as
referred
to
in
art.
1
sec.
1
of
the
Act
of
March
18,
2010
on
the
special
powers
of
the
Minister
responsible
for
state
assets
and
their
implementation
in
certain
capital
companies
or
groups
operating
in
the
electricity,
crude
oil
and
gaseous
fuels
sectors
in
order
to
build,
modernise
or
expand
equipment
or
installations
related
to
generation
of
electricity,
ensuring
safety
and
maintaining
the
functionality
of
property
disclosed
in
the
uniform
list
of
facilities,
installations,
devices
and
services
being
part
of
critical
infrastructure.
On
September
17,
2021
the
Parliament
adopted
the
Senate's
editorial
corrections
and
rejected
the
amendment
on
deletion
of
a
provision
allowing
the
non-tender
lease
of
the
State
Treasury's
agricultural
property
to
State
Treasury
companies
for
the
purpose
of
generating
electricity.
capacity volumes for RES which
may apply for support in the
next 4 years.
Amendment of the act on
investment in wind farms.
GLC
ref. no.
UD207
Modification of rule 10H -
mitigation by allowing municipalities to
define in local spatial development plans (after consultation with local
communities) a distance less than the statutory distance for
wind
farms from residential buildings, but not less than 500 m.
The deadline for
submitting
comments to the draft act
was
June 4, 2021.
Publication of draft
after consultations,
further
public
consultations
or
submission of draft
to
Council
of
Ministers for further
work.
The draft is of significance to the
development of the Renewable
Energy segment.
The Act of April 15, amending
the Act on the greenhouse gas
emissions trading scheme and
certain other acts.
The Act
is meant to transpose Directive (EU) 2018/410 of the European
Parliament and of the Council of March
14,
2018 amending Directive
2003/87/EC to enhance cost-effective emission reductions and low
carbon investments, and Decision (EU) 2015/1814 ("Directive
2018/410"), which establishes the so-called Modernisation Fund to
operate in 2021-2030 and finance the modernisation of large power
facilities as well as smaller-scale projects (insulation of single-family
dwellings, modernisation of district heating sources and systems,
development of low-carbon dispersed generation).
Although the Act
does not prejudge what projects will receive financing,
it provides that the function of the national operator of the
Modernisation Fund will be held by the National Fund for
Environmental Protection and Water Management (Narodowy Fundusz
Ochrony Środowiska i Gospodarki Wodnej, NFOŚiGW). In consequence,
the Fund will provide project financing within the framework of the
NFOŚiGW's priority programmes.
On April 15, 2021 the bill was
passed by the Sejm,
aside
from exceptions, the Act
went into effect
on June 25,
2021.
- The Act can open the way to
apply for financing for PGE
Capital
Group
investment
projects.
The bill on amendments to
the
Electromobility
and
Alternative Fuels Act and
certain other acts.
Within the scope of its regulations, the bill transposes into Polish law a
number of EU directives, including in particular Directive (EU) 2019/944
of the European Parliament and of the Council of 5 June 2019 on
common rules for the internal market in electricity and amending
Directive 2012/27/EU, as regards the construction of charging stations
The draft was sent to the
Legal Committee on July 2,
2021.
A
Legal
Committee
meeting
was
held
on
July
19-22,
2021,
Draft
sent
to
Parliament.
The proposed regulations will
have no adverse impact on the
operations of the PGE Group.
The removal of the so-called
intervention
mechanism
is

by DSOs. The proposed act in its latest wording provides for the removal
of the so-called intervention mechanism for building the charging
infrastructure. According
to the proposed act, DSOs will not be
responsible for the construction of missing charging points in
municipalities that were required by the Act on electromobility to reach
a certain number of charging points.
where
changes
were
introduced
to
the
draft
act.
The
applicant
wasrequired
to
develop
a
draft
law
taking
into
account
the
arrangements
made
at
the
meeting
of
the
Legal
Committee.
associated with the abolition of
obligations imposed on PGE
Dystrybucja and
PGE Obrót.
The regulation of the Council
of Ministers on the maximum
quantity
and
value
of
electricity from renewable
energy sources that may be
sold by auction in 2021.
The aim of this regulation is to enable auctions to take place in 2021,
thus continuing the upward trend in the use of renewable energy
sources, which will contribute to the fulfilment of new EU obligations.
The draft regulation was
published on December 22,
2020
and, bypassing public
consultations, was
promulgated on December
28, 2020.
The regulation entered into
force on January 12, 2021.
The regulations will make it
possible to place the Group's
photovoltaic
projects
in
auctions scheduled for 2021.
Regulation of the Minister of
Climate and Environment on
reference price for electricity
from renewable sources in
2021 and periods applicable
to
producers
that
win
auctions in 2021.
Important parameters for renewables auctions that are to be held in
2021. Small changes in relation to the 2020 prices.
Regulation adopted on April
-
16, 2021.
Important from the point of
view
of
planning
and
development
of
RES
investments in the PGE Capital
Group.
Regulation of the Minister of
Climate and Environment
amending
regulation
on
detailed rules for setting and
calculating
tariffs
and
settlements concerning heat
supplies.
The Regulation introduces the possibility of a one-time, quick change of
tariff for heating, calculated
using the cost method due to the
considerable change in CO2
emission allowance prices. The proposed
solution provides a simplified procedure, without the necessity to
examine and analyse the entire tariff for heating.
Regulation signed on April 24,
2021. Published on April 28,
2021, entered into force on
the
next
day
after
publication.
The regulation has a positive
impact on the District Heating
segment, and particularly on
heat generation at heating
plants. Indirectly, the regulation
has a positive impact on
revenue from heat from
cogeneration units.
Act amending the Act on
disclosure of information
about the environment and
its
protection,
public
involvement in environmental
protection and environmental
impact studies and certain
other acts.
The Act aims to transpose the EIA Directive (specifying the principles of
environmental impact assessment) as regards Article 11(1) and (3), i.e.
regulations concerning public access to justice in the area of the
environment by granting environmental organisations new powers
affecting the possibility to use decisions on environmental conditions of
projects significantly affecting the environment and to obtain further
investment decisions in the investment and construction process.
Regulation signed on April 20,
-
2021 by the President of
Poland.
Published on April 28, 2021,
entered
into force after 14
days
after publication.
The Act affects all business
segments of the PGE Group that
implement
infrastructural
investments.

Act
amending the Energy
Efficiency Act and certain
other acts
The draft introduces
a number of amendments dictated by the need to
implement Directive 2018/2002/EU (EED). From the point of view of
The bill was signed by the
-
President of Poland
The amendment will have a
neutral impact on companies
PGE Group, the most important amendments: Published on May 7, 2021, from the PGE Capital Group.

introduction of additional (in addition to energy efficiency
certificates) measures to achieve the energy saving target. These
include programmes and financial instruments for projects aimed
at improving energy efficiency on the part of final off-takers,
entered
into force after 14
days after publication
The proposed changes may
have a
positive impact on the
achievement of the goal
specified in the EED Directive.

creating opportunities for obligated entities to implement co
financing programmes, in order to finance or co-finance projects
aimed at improving energy efficiency. The beneficiaries of such
programmes may include final off-takers. Obligated entities
holding a license to trade in gaseous fuels, electricity and heat
may implement subsidy programmes to finance or co-finance:
replacement of furnaces or boilers fired with solid fuels, thermal
upgrading of buildings, upgrade of lighting, connection to the
heating
network.
Regulation
of
the
Minister
of
Climate
and
Environment
on
the
change
in
the
volume
share
of
electricity
resulting
from
redeemed
certificates
of
origin
confirming
the
production
of
electricity
from
renewable
energy
sources
in
2022.
Climate
and
Environment
Ministry
list:
638
The
regulation
specifies
the
level
of
the
obligation
to
redeem
certificates
of
origin
for
energy
from
renewable
sources
("PM
OZE")
for
the
so-called
obligated
entitiesin
2022.
The
regulation
reducesthe
level
of
the
obligation
for
PM
OZE
(the
so-called
green
certificates)
by
1pp
-
from
19.5%
to
18.5%
-
compared
to
the
level
in
effect
in
2021.
At
the
same
time,
the
justification
to
the
regulation
providesfor
the
possibility
of
further
lowering
the
level
of
the
obligation
in
the
coming
years.
The
regulation
was
published
in
the
Journal
of
Laws
and
went
into
effect
on
August
28,
2021.
The
reduced
level
of
the
obligation
may
slow
down
the
growth
in
Renewables-segment
revenue
from
the
sale
of
PM
OZE.
At
the
same
time,
it
reduces
the
burden
on
the
Supply
segment
with
the
need
to
purchase
a
certain
amount
of
PM
OZE
in
relation
to
the
volume
of
electricity
traded.

Draft regulation of the Minister of Climate and Environment on technical requirements, connection conditions and cooperation of micro-installations with the power system Government Legislation

Centre list: UD 19

The draft regulation implements the authorisation contained in art. 9 sec. 4a of the act - Energy Law, which imposes an obligation on the Minister responsible for climate to determine:

technical requirements for connecting micro-installations to the grid and the conditionsfor its cooperation with the powersystem,

  • conditions for connecting micro-installations to the grid and the
    • mode of: issuing connection conditionsfor thisinstallation,

notifying the connection of the micro-installation.

In accordance with the guidelines contained in the statutory authorisation, when specifying the above-mentioned elements, the need to increase the share of electricity generated by renewable energy prosumersin micro-installations in the country's energy balance, safety and reliable operation of the powersystem, as well asrequirements for On June 28, 2021 following negotiations the draft was sent to be examined by the Legal Committee at the Government Legislation Centre. by the Minister.

Examination of the draft by the Legal Committee and submission of the draft for signature The draft regulation has a significant impact on the Distribution segment as regards the connection of microinstallations to the distribution grid and the Supply segment as regards prosumers' settlements, including for sellers obligated to purchase electricity introduced to the distribution grid from microinstallations.

The Distribution segment will be required to register and

the
construction
and
operation
of
devices,
installations
and
grids
were
taken
into
account.
The
main
purpose
of
the
regulation
is
to
reduce
and
simplify
formalities
related
to
connecting
micro-installations,
and
thus
to
make
the
investment
process
in
this
type
of
installation
more
attractive.
The
draft
introduces,
among
otherthings:
a
standardised
form
of
micro
installation
notification,
as
well
as
a
template
of
an
application
for
a
micro-installation
connection
conditions.
Detailed
technical
requirements
for
connecting
micro-installations
to
the
grid
and
conditions
for
its
cooperation
with
the
power
system
and
detailed
conditionsfor
connecting
micro-installationsto
the
grid
are
set
out
in
an
appendix
to
the
regulation.
share
metering
data
on
the
surplus
energy
generated
in
the
micro-installation
and
fed
into
the
distribution
grid.
Companies
in
the
Supply
segment
will
be
required
to
settle
surplus
energy
generated
in
micro-installations
and
fed
into
the
distribution
grid
under
the
agreement.
Draft
regulation
of
Climate
and
Environment
Minister
regarding
energy
market
processes
Government
Legislation
Centre
list:
UD
603
Draft
regulation
of
Climate
and
Environment
Minister
regarding
energy
market
processesimplementsthe
statutory
delegation
contained
in
art.
11zh
sec.
1
of
the
act
-
Energy
Law.
The
draft
regulation
is
to
enable
the
preparation
of
IT
systems
(remote
reading
systems
for
electricity
distribution
system
operators
and
the
central
energy
market
information
system)
in
connection
with
new
challenges
on
the
electricity
market.
The
definition
of
a
full
catalogue
of
energy
market
processes
is
necessary
to
ensure
the
transparency
of
obligations
of
all
energy
market
participants,
both
electricity
system
users
obligated
to
implement
energy
market
processesthrough
the
central
energy
market
information
system
("CSIRE"),
and
for
the
energy
market
information
operator
("OIRE")
so
that
it
is
possible
to
assess
the
fulfilment
by
the
above-mentioned
entities
of
the
obligations
imposed
on
them.
The
regulation
will
define
a
catalogue
of
energy
market
processes,
the
implementation
of
which
through
CSIRE
will
be
obligatory
for
system
users.
The
catalogue
of
energy
market
processes
includes
the
basic
processes
currently
implemented
on
the
electricity
market,
taking
into
account
the
greatest
usefulness
of
CSIRE
for
system
users.
The
draft
regulation
was
published
on
June
24,
2021
along
with
a
justification
and
Regulatory
Impact
Assessment.
Comments
to
the
draft
were
published
in
July
and
August
2021.
Accept
/
disregard
comments
to
the
draft.
Publication
of
amended
draft
and
submission
of
modified
draft
for
further
work
of
Council
of
Ministers
/
for
meeting
of
Legal
Committee
at
Government
Legislation
Centre.
The
regulation
will
have
a
significant
impact
primarily
on
the
Distribution
segment,
but
also
on
the
following
segments:
Conventional
Generation
and
Supply.
Draft
regulation
of
Climate
and
Environment
Minister
regarding
metering
system
Government
Legislation
Centre
list:
UD
507
The
draft
regulation
implements
the
statutory
delegation
contained
in
art.
11x
sec.
2
of
the
act
-
Energy
Law,
which
which
imposes
on
the
minister
responsible
for
energy
the
obligation
to
regulate
therein,
in
consultation
with
the
minister
responsible
for
computerisation,
the
detailed
requirements
and
standardsto
be
met
by
the
metering
system.
In
addition,
the
draft
regulation
satisfies
the
obligation
specified
in
art.
19
sec.
3
of
Directive
(EU)
2019/944
of
the
European
Parliament
and
of
the
Council
of
5
June
2019
on
common
rules
for
the
internal
market
in
electricity
and
amending
Directive
2012/27
/
EU,
according
to
which
Member
States
joining
the
introduction
of
smart
metering
systems
adopt
and
publish
minimum
requirements
functional
and
technical
related
to
smart
metering
systems
to
be
introduced
in
their
territories.
The
draft
regulation
was
published
on
June
24,
2021
along
with
a
justification
and
Regulatory
Impact
Assessment.
Comments
to
the
draft
regulation
from
negotiations,
public
consultations
and
commenting
were
published
on
July
14,
2021.
Accept
/
disregard
comments
to
the
draft.
Publication
of
amended
draft
and
submission
of
modified
draft
for
further
work
of
Council
of
Ministers
/
for
meeting
of
Legal
Committee
at
Government
Legislation
Centre.
The
regulation
will
have
a
significant
impact
primarily
on
the
Distribution
segment,
but
also
on
the
following
segments:
Conventional
Generation
and
Supply.
As
regards
the
DSO's
activities,
it
will
be
necessary
to
clarify
requirements
for
metering
systems,
including
electricity
meters
and
metering
system.
Draft
regulation
of
the
Minister
of
Climate
and
Environment
amending
the
The
draftregulation
implementsthe
delegation
contained
in
art.
46
sec.
5
and
6
of
the
act
of
April
10,
1997
-
Energy
Law
(Polish
Journal
of
Laws
of
2021,
item
716,
as
amended).
Pursuant
to
the
provisions
of
the
The
draft
regulation
was
published
on
August
5,
2021
along
with
a
justification
and
Accept
/
disregard
comments
to
the
draft.
Publication
of
The
regulation
has
a
positive
impact
on
the
District
Heating
segment,
both
on
heat

regulation
on
detailed
rules
Energy
Law,
the
minister
responsible
for
energy,
after
consulting
the
Regulatory
Impact
amended
draft
and
generation
in
heating
plants
for
the
formation
and
President
of
the
Energy
Regulatory
Office,
defines,
by
way
of
a
Assessment. submission
of
and
cogeneration
units.
Positive
calculation
of
tariffs
and
regulation,
detailed
rules
for
shaping
and
calculating
tariffs
and
modified
draft
for
changes
in
the
tariff
process
settlements
for
heat
supply
settlements
for
heat
supply.
The
need
to
issue
the
proposed
further
work
of
may
become
an
additional
amendment
to
the
regulation,
preceded
by
the
Regulation
of
the
Council
of
Ministers
investment
impulse.
Minister
of
Climate
of
April
23,
2020
on
the
detailed
principles
of
/
for
meeting
of
Government
Legislation
shaping
and
calculating
tariffs
and
settlements
for
heat
supply
(Polish
Legal
Committee
at
Centre
list:
641
Journal
of
Laws,
item
718
and
of
2021,
item
158
and
item
788),
is
the
Government
result
of
challenges
faced
by
district
heating,
including
climate
policy
Legislation
Centre.
and
decreasing
heat
demand.
The
necessity
to
amend
the
regulation
also
results
from
implementation
of
Poland's
Energy
Policy
2040
("PEP
2040"),
which
providesfor
an
increased
use
of
district
heating.
This
makesit
necessary
to
develop
a
new
heat
market
model,
with
the
need
to
take
into
account
the
acceptability
of
heat
prices
by
consumers,
and
at
the
same
time
to
enable
energy
companies
to
cover
justified
costs
along
with
a
return
on
invested
capital.

INTERNATIONAL REGULATORY ENVIRONMENT

Segments Regulation Regulation
objectives
Latest conclusions Next stage Impact on PGE
European Green Deal/ Fit for 55
package
Regulation of the
European
Parliament and of
the
Council
establishing
the
framework
for
achieving
climate
neutrality (European
Climate Law).
Enshrining
the
2050
climate
neutrality
objective in EU
law and
definition
of the new 2030
emission
reduction target.
On 10-11 December 2020, the European Council adopted an emission
reduction target of at least 55%
by 2030 compared to the 1990 level.
A
provisional agreement on the European Climate Law
was reached
at a
trilogue
on
April 21, 2021.
COREPER (Committee of the Permanent Representatives of the
Governments of the Member States to the European Union) approved the
adoption of the agreement
on
May 5, 2021.
The European Parliament's Committee on Environment approved the
agreement
on
May 10, 2021. In this situation, the final adoption of the text
of the agreement during a PE plenary session on June 24, 2021, and in the
Council on June 28,
2021,
was a formality.
The European Climate Law was published in the EU Official Journal on July
9, 2021 and entered into force on July 29, 2021.
The key conclusions include:

A climate neutrality target by 2050 specified for the entire EU. After
2050, the EU should strive for negative emissions,

The 2030 target was confirmed as "at least 55% compared to 1990 levels
by 2030," with contribution of net removals by carbon sinks to this target
limited to 225 MtCO2Eq,

Establishment of an indicative greenhouse gas budget for the entire EU
for 2030-2050, specifying the volume of greenhouse gases that the EU
can emit without putting at risk its commitments under the Paris
Agreement, which will be published by the European Commission
together with a proposed target for 2040 (most likely in 2024).
Expected
publication
of
relevant legislative proposals
implementing the European
Climate Law (the Fit for 55
package)
took place on
July
14,
2021.
Improved
competitiveness of
renewable sources and,
in the short term, of gas
units, at the expense of
high-carbon fuel-based
generation units.
Increase in operating
costs of conventional
electricity generation.
Directive 2003/87/EC
establishing a
scheme for
greenhouse gas
emission allowance
trading within the EU
(ETS Directive) as
well as implementing
and delegated acts,
Decision
(EU)
2015/1814 of the
European
Parliament and of
the
Council
concerning
the
Combating
climate
change
and
performance
of
obligations
resulting
from
the
Paris
Agreement.
Development
of
investment
incentives
through
a
CO2
price
signal
to
develop
low
emission
sources.
On July 14, 2021
the European Commission presented a draft reform of ETS
and MSR decision (relevant legislative proposals), including the following
proposals:

increase the linear reduction factor (LRF) from 2.2% to 4.2% a year after
the directive enters into force (i.e. from 2024, according to EC
assumptions),

a one-off reduction in the quantity of allowances available in the entire
EU ETS system by a quantity that the increased LRF would decrease it by
if it would have been applied from 2021, alongside an increase by a
quantity of
allowances corresponding to the maritime transport
emissions to be included in the EU ETS,

maintain the 24% level of allowances transferred to reserve in a situation
when the total number of allowances in circulation (TNAC) exceeds
1
096 million allowances. When TNAC will be between 833 million and
1
096 million, allowances in excess of 833 million will be put into reserve.
The legislative proposal is being
proceeded in accordance with
the regular procedure
by the
European
Parliament
and
Council.
The
EC
expects
that
negotiations at EU institutions
may last until 2023, so that the
higher EU targets can be
implemented from 2024.
The deadline to transpose the
changes in the ETS directive as
stated in the draft is December
31, 2023.
competitiveness
of
renewable
sources
and

in
short-term-
gas
units
to
the
detriment
of
generation
assets
using
high-emission
fuels.
Increase
in
operating
costs
for
conventional
generation
of
electricity.
Option
to
obtain
direct
investment
support
from
2021
from
the
Modernisation
Fund
and
Innovation
Fund.

Segments Regulation Regulation
objectives
Latest conclusions Next stage Impact on PGE
establishment and
operation
of
a
market
stability
reserve
for
the
Union greenhouse
gas emission trading
scheme
(MSR
Decision).
Cancelling allowances in MSR above the 400 million threshold (lower
MSR threshold), further reduction in the overall market surplus. Include
a wider pool of allowances used for calculating TNAC,

increase the Modernisation Fund (MF) by 2.5% of allowances from the
entire auction pool in 2024-2030 with a new allowance allocation key,

include transport and buildings in a new subsystem with a separate CO2
price and MSR dedicated to these sectors,

increase the benchmarks for district heating to 2.5% annually, without
LRF being applied to these allowances,

all budget proceeds from the sale of allowances in auctions are to be
used for implementing ETS directive objectives,

increase the Innovation Fund by 200 million allowances,
make it more difficult to reduce the capacity of installations in order to get
them out of ETS.
Another revision of the ETS
Directive and MSR decision
is likely to cause a further
increase in prices of
emission allowances.
Directive 2018/2001
on the promotion of
the use of energy
from
renewable
sources (Renewable
Energy Directive).
To adapt legislation
related
to
increased share of
renewables
in
reference to EU's
new higher GHG
reduction target by
2030.
On July 14, 2021 as part of Fit for 55 the European Commission presented
a legislative proposal that includes a draft amendment to the renewables
directive, containing the following proposed new targets for existing and
new sectors:

overall target –
40% binding on the EU level,

buildings –
49% indicative target on the EU level,

industry –
indicative target of 1.1% annually until 2030 and a 50% target
share of renewable non-biological fuel by 2030,

heat and cool –
binding target on national level of 1.1 percentage point
annually in the years
2021-2025 and 2026-2030 (currently indicative).
Aside from the minimum annual growth, indicative national targets are
proposed,

district heating and cooling –
indicative target of 2.1 percentage points
annually in the periods 2021-2025 and 2026-2030 (currently indicative
target of 1.0pp annually),

transport –
binding national target of 13% reduction in GHG by 2030,
target for non-biological renewable fuel of 2.6% by 2030.
The criteria of sustainability and GHG reduction will be strengthened by
lowering the threshold (from 20 to 5 MWt) for installations that need to
comply with the criteria for combustion of biomass-based fuel and by
introducing stricter criteria for forest biomass. The possibility of providing
support for installations that combust biomass fuel and produce
electricity only will also be reduced from 2026.
In accordance with the EC's proposal, by December 31, 2025 every
member state will implement at least one joint renewables project with
at least one other member state.
The legislative proposal has
been sent for further work at
the Council and European
Parliament.
The proposed deadline for
transposing the proposal into
national law is December 31,
2024.
Improvement
in
the
competitiveness of low
emission sources of energy
in comparison with high
emission sources.
Larger share of renewable
sources in the Polish
energy mix by 2030.

Segments Regulation Regulation
objectives
Latest conclusions Next stage Impact on PGE
Member states connected with a sea basin are also required to specify
the targets for developing offshore renewable energy by 2050, with
intermediate stages in 2030 and 2040.
Directive
2012/27/EU
on
energy
efficiency
(EED Directive).
To adapt legislation
related to energy
efficiency
improvements in
reference to EU's
new higher GHG
emission reduction
target by 2030.
On July 14, 2021 as part of Fit for 55 the EC presented a legislative
proposal concerning a draft amendment of the EED directive, which
covers a full review of the directive and proposed new targets for energy
efficiency improvements:

a binding EU target for energy consumption reduction of at least 9% by
2030, in comparison with 2020. In 2030, the EU's final energy
consumption is to reach 787 Mtoe, and primary 1
023 Mtoe.
Referencing this data to the existing target of 32.5%, this would mean
that the target would be increased to 36% for final energy and to 39%
for primary energy,

member states would need to specify their contributions and
trajectories for reaching them in their integrated national plans for
energy and climate in accordance with a new methodology,

the current target for annual final energy savings of 0.8% of the average
three-year consumption in 2016-2018 would be binding until 2023.
From 2024, a higher target is proposed –
1.5% of the new annual final
energy savings in reference to the average from years 2017-2019. This
will be binding until 2040.
Significant changes are introduced to the definition of "efficient heating
and cooling system." From 2035, heating systems will not be considered as
efficiently solely on the basis of the share of
high-efficiency cogeneration,
rather solely on the basis of the share of renewables and waste heat.
As regards meeting the eligibility of cogeneration as high-efficiency
cogeneration, the existing criteria include a new criterion for the limit of
direct CO2
emissions (for units using fossil fuels), amounting to less than
270 g CO2
per 1 kWh of cogenerated
energy. Particular attention is
paid to
the implementation of the "energy efficiency first" principle into the
directive, including taking this aspect into account when determining
network tariffs by the regulator.
The legislative proposal has
been sent for further work at
the Council and European
Parliament.
The published draft does not
include
a
deadline
for
transposing the directive into
national law.
Improvement
in
the
competitiveness of low
emission sources of energy
in comparison with high
emission
sources,
particularly in heating
systems.
A faster phase-out of coal
based cogeneration from
heating
systems
in
connection
with
the
introduction of a new
emission criterion.
A higher factor for annual
final energy savings will
result in an increase in
burdens on the energy
efficiency
certificate
system.
Directive 2003/96/EC
restructuring
the
Community
framework for the
taxation of energy
products
and
electricity
(ETD
Directive).
To adapt legislation
related to tax on
energy
products
and electricity to
the
EU's
new
higher
GHG
emission target by
2030.
On July 14, 2021 as part of Fit for 55 the EC presented a legislative
proposal that includes a draft revision of the ETD directive. In accordance
with the draft:

minimum tax rates will apply not to the volume of a given energy
product but to its energy value; new rates are also specified,

the difference between rates in the case of commercial and non
commercial use of an energy product/electric energy is to be removed,

a transitional period (2023-2033) will apply to the minimum tax rates,
The legislative proposal has
been sent for further work
at
the Council.
The proposal
deadline for
transposing the directive is
January 1, 2023.
Negative impact on PGE
Group resulting from an
increase in the minimum
tax rates for energy
products.

Segments Regulation Regulation
objectives
Latest conclusions Next stage Impact on PGE

the minimum tax rates specified in the directive will be indexed by
inflation starting from January 1, 2024,

member states can apply exemptions and tax rate reductions, including
for: electricity from renewable sources, generated from sustainable
biomass and generated in high-efficiency cogeneration in accordance
with the definition specified in the EED directive,

member states can apply reduced rates, which will not be lower than
the minimum rates, for: energy products and electricity used in
cogeneration and energy-intensive industry,

energy products and electricity used by households considered as
sensitive may be subject to exemption from taxation for a maximum
period of 10 years from the ETD directive's entry into force. Sensitive
households are defined as being below the threshold constituting 60%
of the median domestic disposable income.
Alternative
Fuels
Infrastructure
Regulation
(AFIR
Regulation).
The aim of the new
regulation, which
repeals
directive
AFID, is to ensure
faster
development
of
charging
infrastructure and
implement targets
for charging station
locations, including
targets concerning
distances between
charging
points
throughout
the
TEN-T network.
On July 14, 2021 as part of Fit for 55 the EC presented a legislative
proposal covering the AFIR Regulation. In accordance with this draft:

obligations concerning sufficient charging network density, charging
point and charger capacity and the separation of light and heavy
vehicles may be imposed on member states,

the largest charging stations are to reach 3.5 MW in output capacity by
2035,

charging station operators should have the ability to purchase
electricity from every vendor located in the EU,

progress will be monitored based on domestic policy frameworks for
the development of the alternative fuels market in the transport sector
and the dislocation of appropriate infrastructure,

rules for gathering and transferring data and common technical
specifications for charging points will be specified,

the first targets are to be reached by 2025.
The legislative proposal has
been sent to the Council and
European
Parliament
for
further work.
The necessity to prepare
the power grid to perform
obligations resulting from
the AFIR Regulation in the
distribution area.

Segments Regulation Regulation
objectives
Latest conclusions Next stage Impact on PGE
Regulation on
guidelines for trans
European energy
infrastructure
(revision of the TEN-E
Regulation).
Establishing
guidelines for the
development of
trans-European
energy
infrastructure
areas
contributing
to
the achievement
of
the
EU's
climate targets by
2030 and climate
neutrality
by
2050.
Establishing new
criteria
for
projects
of
common
interests
("PCI").
On December 15,
2020, the EC presented a legislative proposal to revise
the TEN-E Regulation. The regulation provides a framework for identifying
so-called PCIs that can receive financial support under the "Connecting
Europe" facility. The draft includes new solutions for the development of
offshore infrastructure and changes in the area of smart power grids.
The deadline for submitting amendments to the draft ITRE report on TEN-E
passed on April 21, 2021. Opinions on the legislative proposals were
submitted by ENVI, TRAN and REGI. Then, work continued on compromise
proposals.
On
June 11, 2021, the Transport, Telecommunications and Energy Council
adopted a general approach that is the basis for the Council's positions in
trilogues. The main area of changes proposed by the Council are issues
related to further support for natural gas infrastructure under TEN-E. The
Council decided to end support for new natural gas and oil projects (with the
exception of Cyprus and Malta). EU funding for projects that adapt pipelines
for hydrogen transmission would be in effect until the end of 2027. No major
changes were introduced for energy projects.
The report is expected to be
adopted by the European
Parliament's ITRE in 2021.
Trilogues could begin in the
fourth quarter
of 2021.
The new rules would come into
force as of January 1,
2022.
Defining rules for the
implementation
of
projects
of
common
interest –
a potential
opportunity
to
obtain
support for PGE CG
investments.

The regulations concerning the financial perspective 2021-2027 and financing for sustainable economic growth

Regulation of the Providing
a
On 12 February 2021, the EC published technical guidelines to this Waiting on the EC to issue an A chance for co-financing
European Parliament financial Regulation with respect to the "do no harm" principle. According to these opinion on Poland's national of projects submitted to
and of the Council framework
for
guidelines, support from the Recovery and Resilience Facility may be recovery plan. NRP.
2021/241 recovery of the EU granted to investments in gas-based generation sources and gas-fired
establishing
a
economy after the cogeneration in Member States facing significant challenges in moving
Recovery
and
COVID-19 away from coal, provided that:
Resilience Facility. pandemic
and and
implementing

this support will
contribute to the achievement of the EU
decarbonisation objectives for the years 2030 and 2050;
reforms aimed at
such sources will emit less than 250 g CO2e/kWh or will be adapted to
increasing
its
use renewable or decarbonised gases.
resilience
to
The Regulation was published
on February 18,
2021 and entered into force
economic shocks. on February 19, 2021.
On April 30, 2021, Poland's National Recovery
Plan
(NRP)
was approved at a
Council of Ministers meeting and subsequently submitted to the European
Commission.

Segments Regulation Regulation
objectives
Latest conclusions Next stage Impact on PGE
The Regulation of the
European Parliament
and of the Council
(EU)
2020/852
on the
establishment of a
framework
to
facilitate sustainable
investment, changing
the regulation (EU)
2019/2088
(the
Taxonomy
Regulation)
and
delegated act to this
regulation
determining technical
screening criteria.
Facilitation
of
funding
for
sustainable
economic
growth
in
EU.
The Taxonomy Regulation was published in the Official Journal of the
European Union on
June 22, 2020
and entered into force on
July 12, 2020.
On April 21, 2021 the European Commission initially adopted delegated act
establishing detailed technical screening criteria on the basis of which
economic activities will be assessed to determine whether an activity is
environmentally sustainable in relation to climate change prevention and
adaptation. This act does not contain technical screening criteria for gas
and nuclear power.
On June 4, 2021 the EC published the above-mentioned delegated act in
the national languages, thus launching the four-month period (with an
option to extend it by another two months) to lodge an objection to the
delegated act by the EP and Council.
On July 2, 2021
the EC published an opinion by an expert group formed
pursuant to art. 31 EUROATOM and an opinion of SCHEER experts
regarding the JRC report concerning nuclear energy assessment in terms of
sustainability.
On July 6, 2021
the EC published a delegated act under art. 8 of the
taxonomy regulation, specifying rules for reporting participation in trade,
CAPEX and OPEX of environmentally sustainable activities.
Expected completion of the
legislative
process
for
a
delegated act setting out the
detailed technical screening
criteria and a delegated act
under Art. 8 of the Taxonomy
Regulation –
Q4 2021.
Expected preparation by the EC
of an additional delegated act
specifying detailed technical
screening criteria for gas and
nuclear energy

Q4 2021.
Further out, legislation is
expected on financial support
for certain activities, mainly in
the power sector (especially
gas), that will contribute to
greenhouse
gas
emission
reductions by supporting the
transition to a climate-neutral
economy.
Publication by the Platform on
Sustainable Finance
of a report
on the taxonomy of harmful
activities and activities having no
significant
environmental
impact,
report
on
social
taxonomy
and
report
on
technical screening criteria for
further environmental objectives

Q4 2021.
Impact
on
availability
and
cost
of
funding
obtained
by
PGE
Group
companies
for
investments. The matter of
recognising nuclear power
and gas as environmentally
sustainable
will
be
resolved
under
the
additional delegated act.
The obligation to include
information on the share in
the trade, CAPEX and OPEX
of
environmentally
sustainable activities in the
statement on non-financial
information
or
consolidated statement on
non-financial information.

Segments Regulation Regulation
objectives
Latest conclusions Next stage Impact on PGE
European
Commission Revised
Climate, Energy and
Environmental Aid
Guidelines
2022
(CEEAG)
Definition of new
rules for award of
state aid, adapted
to
EU's
new
reduction targets
resulting from the
Climate Law.
On June 7, 2021
the EC published a draft of new CEEAG guidelines, which
are to replace the existing guidelines. Public consultations will end on
August 2, 2021.
The draft proposes the following:

a wide range of changes in the new guidelines, intended to achieve
climate targets,

inclusion of mechanisms for financing earlier closure of coal-based
plants in the new guidelines,

changes in conditions for awarding support for nearly all types of energy
generation, especially gas-based investments and linking availability of
public aid with rules specified in legislation concerning EU taxonomy.
Public
consultations
and
formal completion, as declared
by EC, of legislative process in
the first half of 2021.
The entry into force of new aid
rules is planned for the
beginning of 2022.
A change in conditions for
obtaining state aid in PGE
Group's segments. Some of
the provisions introduce
stricter
criteria
for
obtaining state aid, others
clarify rules for obtaining it.

ADDITIONAL INFORMATION WITH REGARD TO INTERNATIONAL REGULATORY ENVIRONMENT

Segments Proceeding Objective of the action
brought
Key events Next stage Impact on PGE Group
Action brought against the European Commission's decision not to raise
objections to the Polish Capacity Market
(SA 46100), case file no
T-167/19
Proceedings
brought by Tempus
Energy
Germany
and
T
Energy
Sweden against the
European
Commission (case
file no. T-167/19).
The objective of the
action is to annul the
European
Commission's Decision
not to raise objections
to the Polish Capacity
Market (SA.
46100)
issued as part of the
aid procedure.
On March 14, 2019
Tempus Energy Germany and T Energy Sweden
brought an action against the EC decision concerning the Polish Capacity
Market (case T-167/19). The summary of main reproaches and arguments
brought up in the complaint was published in the EU Official Journal on
May 6, 2019. From the published abstract it results, that in their action
brought they argue that the EC failed, in particular, to initiate
formal
investigation proceedings (the second stage of the capacity evaluation
mechanism) and that the demand side response (DSR) suffered alleged
discriminatory treatment within the Polish Capacity Market.
The
outcome
of
the
proceedings
before
the
Court
of
Justice
in
the
case
of
Tempus
Energy
and
Tempus
Energy
Technology
against
the
EC
in
the
case
concerning
the
British
capacity
market
(case
C-57/19
P)
may
have
an
impact
on
the
examination
of
the
complaint.
In
this
case,
on September 2,
2021,
the
Court
ruled
in
favour
of
the
European
Commission,
which
overruled
the
judgement
of
the
EU
Court
in
the
first
instance
and
dismissed
the
appeal
of
Tempus
Energy
and
Tempus
Energy
Technology.
A
judgement
on
the
complaint
of
Tempus
Energy
Germany
and
T
Energy
Sweden
can
be
expected
in
2021.
Depending on the outcome of
the dispute, the case may have
an impact on the conditions
for the performance of and
entering into the capacity
contracts
within
Polish
Capacity Market.

Segments Proceeding Objective of the action
brought
Key events Next stage Impact on PGE Group
Complaint against Poland lodged by Czechia (Case
C-121/21)
including an application for interim measures
Proceeding in the
case Czechia vs.
Poland (Case C
121/21).
On February 26, 2021
Czechia ledged an interstate complaint against Poland
with the Court of Justice concerning the prolongation of the mining concession
for KWB Turów. The complaint was accompanied by an application for interim
measures in the form of an immediate half of KWB Turów's operation.
A summary of the complaint and key arguments was published in the Official
EU Journal on April 19, 2021.
On May 21, 2021 the Vice-President of the Court of Justice of the European
Union issued an order on an interim measure as follows: "Poland must
immediately cease lignite extraction activities in the Turów mine until a
judgment of the Court brings case C-121/21 to an end. An interim measure
does not rule on the merits of the case.
The
request
to
repeal
the
decision
of
the
Vice-President
of
the
Court
of
Justice
of
May
21,
2021
was
dismissed.
Pursuant
to
a
decision
issued
on
September
20,
2021,
by
the
Vice-President
of
the
Court
of
Justice,
the
Republic
of
Poland
was
obligated
to
pay
to
the
European
Commission
a
periodic
penalty
payment
in
the
amount
of
EUR
500
000
per
day,starting
from
the
date
ofservice
of
this
order
to
the
Republic
of
Poland
until
the
time
when
the
Member
State
complies
with
the
order(C
-
121/21
R).
If the complaint is not
withdrawn, the following will
be examined in the next stage:
procedural motions submitted
by
the
parties
to
the
proceeding, and then the
complaints and arguments of
the parties to the proceeding
before the Court of Justice.
Depending on the outcome of
the application for interim
measures and the demands
specified in the complaint, the
case may have an impact on
the further operation of the
energy complex in
Turów.

4. Activities of PGE Capital Group

Main business segments

Conventional Renewables
Generation District Heating Distribution Supply
Key assets of the segment 5 conventional power plants
2 CHP plants
2 lignite mines
14 CHP plants 17 wind farms
5 photovoltaic power plants
29 run-of-river hydro power plants
4 pumped-storage power plants,
including 2 with natural flow
296 278 kms
of distribution lines
-
Installed capacity
electricity/heat
13
522 MWe/1 329 MWt
2
344 MWe/6 496 MWt
2
326 MWe
- -
Electricity volumes Net electricity generation
26.82 TWh
Net electricity generation
4.77
TWh
Net electricity generation
1.35 TWh
Electricity distribution volume
18.64 TWh
Sales to final off-takers
18.65 TWh*
Heat volumes Heat production
3.60 PJ
Heat production
29.39 PJ
- - -
Market position PGE Group is the leader of lignite
mining in Poland
(92%)
- PGE Group is the largest electricity
producer from RES with market share
of approx. 9% (excluding production
Second domestic electricity distributor
with regard to number of customers
Leader in wholesale and retail
trading in Poland
PGE Group is also a national leader
in electricity and district heat generation
from biomass and bio-gas)
*
Data for
PGE Obrót S.A.

PGE Group's key financial results

The best way to measure the profitability of energy companies is EBITDA. This is a result before depreciation, amortization, income tax and financial activities, including interest from drawn debt. It approximately reflects cash flows from operating activities and makes it possible to compare the results of companies regardless of the value of their assets, level of debt and existing income tax rates.

PGE Group's consolidated results are composed of the financial results of each of its operating segments. The the Conventional Generation segment and Distribution segment made the largest contribution to the Group's result for the half quarter of 2021, participating respectively in 39% and 26% of the Group's EBITDA. The District Heating segment contributed 14%, Supply segment 13% and Renewables segment contributed 7% the Group's EBITDA.

EBITDA of the Capital Group by segments (PLN million)

*The chart does not show data for the first half of 2020, because in that period companies from the Circular Economy segment were presented in Conventional Generation, District Heating and Other Operations.

Chart: Key factors affecting EBITDA in PGE Capital Group (in PLN million).

EBITDA
H12020
Result on the
sale of electricity
at producers 1
Revenues
from heat
sales
CO2
emission rights2
Fuel
costs
Capacity
Market 3
Revenues
from
ancillary
services 4
Revenues
from
certificates
Result on the
sale of
electricity to
final
customers 5
Margin on
distribution
services 6
Personnel
costs 7
Other 8 EBITDA
H12021
Change 81 340 -929 -216 1 338 -170 -28 580 190 134 -147
Reported EBITDA
H1 2020
2 805
One-offs H1 2020 -312
Recurring EBITDA H1
2020
3 117 8 163 1 156 2 836 2 090 0 349 154 -54 2 057 2 795 985
Recurring EBITDA H1
2020
8 244 1 496 3 765 2 306 1 338 179 126 526 2 247 2 661 1 132 4 290
One-offs H1 2021 964
Reported EBITDA
H1 2021
5 254

Reversal of impact of total one-offs reducing the reported result.

Reversal of impact of total one-offs increasing the reported result.

1Revenue from the sale of electricity reduced by the purchase cost of electricity.

2Adjusted for result on resale of CO2 emission rights and reversal of impact of provision for CO2 reversal at Dolna Odra power plant (one-off in 2020). 3Managerial perspective.

4RUS –Ancillary services, agreements with the TSO.

5 Including margin adjustment on certificates at PGE Group.

6 Including revenues from distribution services, transmission services (TSO), balance of transferred fees and costs of electricity purchased to cover balancing difference. 7Personnel costs without including the impact of change in actuarial provision and VLP provision reversal (one-offs).

8Other without including the impact of change in reclamation provision and LTC compensations (one-offs).

CONSOLIDATED STATEMENT OF FINANCIAL POSITION

Chart: Structure of assets and equity and liabilities (in PLN million).

Non-current assets Current assets

Purchase/sale of

Current liabilities

CONSOLIDATED STATEMENT OF CASH FLOWS

Sale of other financial assets

Balance of

Interest paid loans,

Cash and cash

Chart: Net change in cash (in PLN million).

Cash and cash

Proceeds from the

1Half of funds, which Elektrownia Wiatrowa Baltica–2 sp. z o.o. ("EWB 2") and Elektrownia Wiatrowa Baltica–3 sp. z o.o. ("EWB 3") rceived from Ørsted for the capital increase.

2Mainly sale of shares in PGE EJ 1 (value reduced by cash and cash equivalents of the sold company), bonds of PGE EJ 1 and conseqence of loss of control and deconsolidation.

Chart: Net debt (in PLN million).

1 In order to standardise the reporting of net debt (adjustment to the method of calculating covenants in loan agreements), starting from the results for the first half of 2021, there has been a change in the presentation, which also results in a change in the comparable periods (as at December 31, 2020), i.e. restricted cash items include only the funds in PGE Dom Maklerski S.A. clients' accounts as collateral for settlements with IRGiT (the Warsaw Commodity Clearing House).

2 Funds from sale of PGE EJ1 (PLN 372 million) reduced by cash and cash equivalents of the sold company (PLN 53 million).

*The charts do not show data for the first half of 2020, because in that period companies from the Circular Economy segment were presented in Conventional Generation, District Heating and Other Operations.

BALANCE OF ENERGY OF PGE CAPITAL GROUP

Balance of electricity

Table: Sales, purchase, production and consumption of electricity in the PGE Capital Group (TWh).

Volume H1 2021 H1 2020 % change
A. Sales of electricity outside the PGE Capital Group: 52.38 57.51 -9%
Sales to end-users* 18.75 20.12 -7%
Sales on the wholesale and balancing market 33.63 37.39 -10%
B. Purchases of electricity from outside of PGE Group (wholesale and
balancing market)
21.35 31.19 -32%
C. Net production of electricity in units of PGE Capital Group 32.94 28.58 15%
D. Own consumption DSO, lignite mines, pumped-storage power
plants (D=C+B-A)
1.91 2.26 -15%

* Sale mainly by PGE Obrót S.A. and PGE Energia Ciepła S.A.

The total volume of purchased and generated electricity is higher than the volume of electricity sold. The difference presented in point D results from the necessity to cover grid losses in the distribution business (Distribution System Operator), consumption of energy at lignite mines and consumption of energy at pumped-storage power plants.

The lower purchases and sales in wholesale market results from a lower level of contracted purchases and sales in derivative transactions. The Capital Group to a lesser degree pursued market purchase for the needs of decreased sale on the bilateral market.

Decrease in volume of sales to end-users in the first half of 2021 is a consequence of lower demand for electricity in the corporate customers segment.

Production of electricity

Table: Electricity production (TWh).

Electricity production volume H1 2021 H1 2020 % change
ELECTRICITY PRODUCTION IN TWh, including: 32.94 28.58 15%
Lignite-fired power plants 17.58 14.68 20%
Coal-fired power plants 8.81 7.42 19%
including co-combustion of biomass 0.01 0.01 0%
Coal-fired CHP plants 2.57 2.46 4%
Gas-fired CHP plants 2.46 2.39 3%
Biomass-fired CHP plants 0.15 0.21 -29%
Communal waste-fired CHP plants 0.02 0.02 0%
Pumped-storage power plants 0.36 0.37 -3%
Hydroelectric plants 0.28 0.25 12%
Wind power plants 0.71 0.78 -9%
including RES generation 1.17 1.27 -8%

Higher generation volume in the first half of 2021 mainly results from increased NPS demand due to low outside temperatures, lower net imports and decreased wind generation.

Higher generation at lignite-fired power plants (increase by 2.9 TWh) results from higher average load factors at the Turów power plant by 75 MW, i.e. by 59% and at the Bełchatów power plant by 9 MW, i.e. by 3%. In addition, the unit no. 3 at Turów power plant (+0.6 TWh) was in modernisation in the first half of 2020. And in 2021 the production from a new unit no. 7 at Turów power plant (+0.5 TWh) has commenced.

Higher production in hard coal-fired power plants (up by 1.4 TWh) results from increased generation at Rybnik power plant and Opole power plant, what is a consequence of shorter reserve downtime of the units: by 7 949 h of units 3-8 at Rybnik power plant and by 2 001 h at Opole power plant.

Production at coal-fired CHP plants, gas-fired CHP plants, pumped-storage power plants and waste-to-energy plants remained at similar level as in the base period.

Lower generation from biomass CHP plants is a consequence of technical conditions in Szczecin CHP Plant, where higher heat generation (due to lower outside temperatures) led to lower electricity generation.

Higher generation at hydro power plants was caused by better hydrological conditions.

Lower generation at wind farms results from worse wind conditions in the first half of 2021. Load factor at wind farms in the first half of 2021 was lower by 5 p.p. on average.

Table: Production of heat (PJ).

Heat production volume H1 2021 H1 2020 % change
Heat production in PJ, including: 32.99 28.53 16%
Lignite-fired power plants 1.59 1.50 6%
Coal-fired power plants 0.38 0.29 31%
Coal-fired CHP plants 23.59 20.76 14%
Gas-fired CHP plants 6.19 5.47 13%
Biomass-fired CHP plants 1.09 0.37 195%
CHP plants fuelled by municipal waste 0.06 0.07 -14%
Other CHP plants 0.09 0.07 29%

External temperatures contributed more than any other factor to higher generation of heat in the first half of 2021 (y/y). As compared to 2020, the average temperatures for the first half of 2021 were by 2.6°C lower, which translated into increased production of heat.

Sales of heat

In the first half of 2021 the heat sales volume in PGE Capital Group totalled 32.12 PJ and was higher by 4.36 PJ y/y. The above results were caused mainly by higher demand for heat due to the lower average outside temperatures in the first half of 2021.

Operational segments

CONVENTIONAL GENERATION

Segment description and its business model

Przedmiotem działalności segmentu jest wydobycie węgla brunatnego i wytwarzanie energii elektrycznej w źródłach konwencjonalnych.

* managerial perspective

The main source of revenue in the Conventional Generation segment is revenue from the sale of electricity on the wholesale market, based on electricity prices that are shaped by supply and demand mechanisms, taking into account the variable costs of generation. At the same time, the segment's key cost items, given their size and volatility, and thus their impact on operating results, are the cost of production fuels, mainly hard coal and natural gas, as well as fees for CO2 emissions. Lignite-based production, which is of key significance for the Group, is based on own mines, therefore its cost is relatively stable and reflected mainly in fixed-cost items, i.e. personnel costs, third-party services and depreciation.

Revenue from the Capacity Market, a mechanism introduced to prevent electricity shortages in the NPS, constitutes a significant item in the segment's revenue in 2021. PGE GiEK S.A.'s power plants receive fees for performing the capacity obligation (a Capacity Market entity being on standby to supply electricity to the system and the obligation to supply specified capacity to the system when the system is under threat). Capacity Market revenue compensated for revenue from ancillary services. The cold intervention reserve and operational capacity reserve services were discontinued, while revenue from capacity reallocation remained.

In addition, this segment generates revenues from sales of heat produced both at industrial plants and at the Szczecin CHP plant and Pomorzany CHP plant 12 , which form part of ZEDO.

12 From July 1, 2021, Szczecin CHP, Pomorzany CHP and the district heating network in Gryfino were included in the structures of the District Heating segment.

ASSETS

Conventional Generation segment consists of: 2 lignite mines, 5 conventional power plants and 2 CHP plants.

Conventional Generation is the leader of lignite mining (its share in the extraction market of this raw material accounting for 92%13 of domestic extraction), it is also the largest generator of electricity as it generates approx. 32%14 of domestic gross electricity production. The generation is based on lignite extracted from mines owned by the company as well as hard coal and biomass.

Diagram: Main assets of the Conventional Generation segment with their installed capacity.

13 Own calculations based on data from Central Statistical Office of Poland.

14 Own calculations based on data from PSE S.A.

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

Chart: Key changes of EBITDA in Conventional Generation (in PLN million) – managerial perspective.

EBITDA
H1 2020
Electricity
production
difference in
volume
Electricity
production
difference in
price
Result on the
optimization of
the electricity
trade
Capacity
Market1
Result on
sale of CO2
Revenues from
agreement with
TSO
Costs
of fuel
Costs
of
2
CO2
Personnel
expenses3
Other4 EBITDA
H1 2021
Change 1 146 -442 -760 1 039 -252 -60 -111 -548 76 -73
Reported EBITDA
H1 2020
774
One-offs H1 2020 -323
Recurring EBITDA H1
2020
1 097 5 953 905 0 255 221 1 166 2 686 1 474 911
Recurring EBITDA H1
2020
6 657 145 1 039 3 161 1 277 3 234 1 398 984 1 112
One-offs H1 2021 937
Reported EBITDA
H1 2021
2 049

Reversal of impact of total one-offs reducing the reported result

Reversal of impact of total one-offs increasing the reported result

1Managerial perspective.

2Adjusted for result on resale of CO2 emission rights, assigned to a given period and reversal of impact of provision for CO2 reversal at Dolna Odra power plant (one-off in 2020).

3Personnel costs without including the impact of change in actuarial provision (one-off). 4Other without including the impact of change in reclamation provision (one-off).

Key factors affecting the EBITDA result of Conventional Generation segment on y/y basis included:

  • Higher electricity production volume in PGE GiEK by 4.2 TWh due to increased degree of use of units by PSE S.A. resulting from low outside temperatures, lower net import and lower wind generation (see p. 3.2 of this report).
  • Decrease in electricity sales prices due to lower prices of forward contracts with delivery in 2021 as compared to contracts with 2020 delivery.
  • Lower result on optimisation of electricity portfolio due to decreased volume of electricity trading by 10.8 TWh, with lower margin realized on electricity trading.
  • Capacity Market, a mechanism, which was not present in the base period.
  • Result on sale of CO2,which occured in 2020 (free allowances granted for Opole power plant and Rybnik power plant and resale of surplus of allowances, purchased for delivery year 2019).

  • Lower revenues from ancillary control services, mainly as a result of lack of revenues cold reserve and from the Operational Capacity Reserve.
  • Higher fuel consumption costs mainly hard coal, due to increased generation based on this fuel (see p. 3.2 of this report). Main changes on different types of fuel are presented in the chart below.
  • Higher CO2 costs as a result of higher CO2 emissions volume by 4.2 million tons due to generation higher by 4.2 TWh. Main changes are shown in the chart below.
  • Lower personnel expenses due to ongoing optimisation process.

Chart: Costs of production fuels consumption in Conventional Generation (in PLN million).

Cost of
fuels H1
2020
Hard coal
volume
Hard coal price Biomass
volume
Biomass price Light and
heavy oil
volume
Light and
heavy oil
price
Cost of
fuels H1
2021
Change 190 -72 -13 -6 6 6
Cost of fuels H1 2020 1 166 1 073 61 32
Cost of fuels H1 2021 1 191 42 44 1 277

Table: Data on use of production fuels consumption in Conventional Generation.

H1 2021 H1 2020
Fuel type Volume Cost Ilość Volume
(tons ths) (PLN million) (tys. ton) (tons ths)
Hard coal 3 942 1 191 3 345 1 073
Biomass 216 42 247 61
Fuel oil – light and heavy 26 44 22 32
TOTAL 1 277 1 166

Chart: CO2 costs in Conventional Generation segment (in PLN million).

Table: Data on CO2 costs in Conventional Generation.

Data regarding CO2 H1 2021 H1 2020 % change
Allocation of free allowances for CO2 emissions (tons) 51 645 79 343 -35%
CO2 emission* (tons) 29 098 524 24 912 275 17%
Average CO2 costs(PLN/t CO2) 111.34 108.16 3%

* Estimates, emissions not verified - the emissions will be settled and certified by the authorised verifier of CO2 emission on the ground of yearly reports of volume of CO2 emissions.

CAPITAL EXPENDITURES

Table: Capital expenditures incurred in Conventional Generation segment in the first half of 2021 and 2020.

PLN million H1 2021 H1 2020 % change
Investments in generating capacities, including: 1 359 691 97%

Development
921 183 403%

Modernisation and replacement
438 508 -14%
Other 28 35 -20%
TOTAL 1 387 726 91%
Capitalised costs of overburden removal in mines 0 87 -
TOTAL with capitalized costs of overburden removal 1 387 813 71%

KEY EVENTS IN THE CONVENTIONAL GENERATION SEGMENT

Key development investments:

  • Annex no. 1 to the contract to build a capacity offtake system for units 9 and 10 as part of the investment "Construction of two gasand-steam units at PGE GiEK S.A.'s Dolna Odra branch" was signed on January 5, 2021.
  • An agreement was signed with Energoprojekt Katowice S.A. on February 2, 2021 to draft an environmental impact report and obtain a decision on environmental conditions for the project "Construction of new low-emission unit at Rybnik power plant," and work began on an application to PSE S.A. for issue of conditions for connecting to the National Power System.

  • On February 25, 2021 syndicate of Mitsubishi Hitachi Power Europe GmbH, Tecnicas Reunidas S.A., Budimex S.A. signed an Annex no. 10 with PGE GiEK S.A. to the contract for construction of unit no. 7 in the Turów power plant. The annex included prolongation of the contract realization by 6 months until April 30, 2021 and change in the Contractor's remuneration. On March 31, 2021 PGE GiEK S.A. and the consortium signed a regulatory run completion protocol for unit 7 at Turów power plant. A 720-hour test run for unit 7 began. On April 30, 2021 information was taken on another delay in commissionings of the unit. The unit was officially, by protocol, put into operation on May 14, 2021.
  • Installing piles for machinery building at unit 10 and for a boiler room chimney for units 9 and 10 was completed on March 29, 2021 as part of the investment "Construction of two gas-and-steam units at PGE GiEK S.A.'s Dolna Odra branch".
  • Final handover and commissioning on a carburising system at the new unit of the Turów power plant was carried out on May 31, 2021.
  • On June 17, 2021 PSE S.A. obtained a final decision on a building permit for PSE S.A. investments enabling the connection of units 9 and 10 at the Dolna Odra power plant that are currently under construction, along with a backup transformer to the transmission network.
  • On June 23, 2021, the Management Board of PGE GiEK adopted a resolution to transfer to Rybnik 2050 sp. z o.o. rights to the construction project for a new low-emission unit at the Rybnik power plant and accepted the content of the proposed agreement for the sale of rights to the project and the obligation to sell the right of perpetual usufruct of land properties intended for the Project.

Key modernisation investments aimed at reducing emissions to the environment:

  • Final handover and commissioning of modernised electrostatic precipitator no. 5 at Turów power plant took place on January 26, 2021.
  • Final handover of modernised electrostatic precipitator at unit 2 of Opole power plant took place on February 5, 2021.
  • A modernised flue-gas desulphurisation system for units 9 and 10 at Bełchatów power plant was put into operation on February 10, 2021.
  • Construction of the 3rd catalytic layer in the SCR reactor (selective catalytic reduction system for converting nitrogen oxide particles into water and nitrogen) for unit 8 at Rybnik power plant began on February 19, 2021.
  • An agreement was signed with Eltur-Serwis Sp. z o.o. on March 3, 2021 for the modernisation of the electrostatic precipitator at Turów's unit 6.
  • A test run for an SCR system at Dolna Odra's unit 5 was launched on March 9, 2021.
  • The electrostatic precipitator of units 7 and 6 at Rybnik plant was put into operation on March 25, 2021.
  • The final handover of the SNCR system (reducing NOx via selective non-catalytic reduction) for unit 2 at Opole plant took place on March 30, 2021.
  • On April 15, 2021, as part of a contractforthe modernisation ofthe spraying levels of FGD absorbersfor units 2-4 attheOpole power plant, an acceptance protocol for the stage involving the completion of works on the absorber of unit 3 was signed.
  • The SCR installation of unit 5 at the Dolna Odra power plant was commissioned on April 28, 2021.
  • The FGD systems at units 5 and 6 of the Bełchatów power plant were put into operation on May 31, 2021.
  • The SCR installation of unit 8 at the Dolna Odra power plant was commissioned on June 11, 2021.
  • The handover and commissioning of an OPII ash settling tank at the Turów power plant was carried out on June 24, 2021.
  • An electrostatic precipitator at unit 8 of the Rybnik power plant was handed over for regulatory operation on June 21, 2021.
  • Works on the assembly of a facility installation to reduce Hg emissionsfor units 7–12 at the Bełchatów power plant were completed on June 30, 2021.
  • An SCR system for unit 8 at the Rybnik power plant was commissioned for initial operation after the installation of the third catalyst layer on June 30, 2021.
  • On July 29, 2021, modernisation works were completed and a dust emission reduction installation on unit 6 at the Turów power plant wassynchronised.

KEY PROJECTS IN H1 2021

Aim of the project Budget (net,
without costs
of financing)
Capital
expenditures
incurred so far
(net, without
costs of
financing)
Capital
expenditures
in H1 2021
(net, without
costs of
financing)
Fuel/ Net
efficiency
Contractor Expected date of
completion
Aim of the project
Construction of new unit in Turów power plant
Construction of
power unit no. 7
with a capacity of
490 MW in Turów
power plant
PLN 4.4 billion PLN 4.3 billion PLN 546
million
Lignite/
43%
Syndicate of companies:
MHPSE,
Budimex
and Tecnicas Reunidas
Q2 2021 The unit no. 7 was officially, by protocol, commissioned on May
14, 2021. On June 19, 2021, the planned standstill of the unit
began. The contractor performed a technical inspection of the
equipment after the first month of operation of the unit. The
commissioning of the block after the shutdown was completed
on July 24, 2021.
Construction of new units in Dolna Odra power plant
Construction of
two CCGT units no.
9 and 10 in Dolna
Odra power plant
PLN 4.3 billion PLN 380.3
million
PLN 319
million*
Natural gas/
63%
Syndicate of companies:
General Electric (consortium
leader) and Polimex
Mostostal
December 2023 At the end of June 2021, the progress of work under the project
was estimated at approx. 37%. Construction works related to the
laying of foundations for the main buildings of new units are
underway at the construction site.

* Expenditures incurred do not include expenses in the form of advances paid to the General Contractor for the Project and to the other contractor in amount of PLN 564 million.

DISTRICT HEATING

Segment description and its business model

Core business of the District Heating segment includes production of heat and electricity from conventional sources as well as distribution of heat.

* managerial perspective

As in the case of Conventional Generation, this segment's significant revenues are revenues from electricity sales, however, they are usually directly related to generation of heat which in turn depends on demand that is highly seasonal and depends on external temperatures. This is why, in contrast to industrial power plants in Conventional Generation, as a rule, CHP plants do not have any considerable impact on the development of prices for electricity on the wholesale market.

Revenues from the sale and distribution of heat are regulated revenues. Energy companies independently set tariffs and present them to the President of the Energy Regulatory Office (the "ERO President") for approval. Heat production at PGE Group takes place in cogeneration units, which tariffs for heat are calculated using a simplified approach (compared to tariffs based on a full cost structure), based on reference prices, conditioned on average sales prices for heat generated in units with specific fuel other than cogeneration units. They are published each year by the ERO President. Tariffs for heat production for cogeneration units in a given tariff year thus reflect changes in the costs of heat-generation units (not co-generation units) in the previous calendar year. The cost approach is applied in the case of tariffs for heat distribution, which allows to cover justified costs (mainly the costs of heat losses and property tax) and a return on invested capital, in line with guidelines from the ERO President. Distribution tariffs for heat are in place at branches in Gorzów and Zgierz, as well as by Kogeneracja S.A., PGE Toruń and Zielona Góra CHP.

Generation of heat and electricity is directly related to key variable costs of the segment, i.e. the cost of production fuel used (in particular, hard coal and gas) and the cost of fees for CO2 emissions.

Electricity production in high-efficiency cogeneration is additionally remunerated. Until 2018, CHPs generated revenue from the sale of energy origin certificates, i.e. cogeneration certificates (yellow and red). From 2019, due to a change in support model, they receive support at a level covering increased operating costs related to production. For large units, this are set on an individual basis. The support mechanism in the form of certificates is in place also for biomass-fired generating assets. This type of production is additionally remunerated by awarding origin certificates, i.e. green certificates, the sale of which generates additional revenue. Tithin the segment such revenues is obtained at biomass unit in Kielce CHP.

Revenue from the Capacity Market, a mechanism introduced to prevent electricity shortages in the National Power System, constitutes a significant item in the segment's revenue, starting from 2021. CHP plants receive fees for performing the capacity obligation (a Capacity Market entity being on standby to supply electricity to the system and the obligation to supply specified capacity to the system when the system is under threat).

ASSETS

District Heating within PGE Capital Group combines CHP plants separated from the EDF Polska assets acquired on November 14, 2017 and CHP plants separated from PGE GiEK. Since January 2, 2019 the following companies has been included in the segment. 15

District Heating is the largest heat producer in Poland. Generation is based mainly on hard coal and gas.

Diagram: Main assets of the District Heating segment and their installed capacity.

15 In addition, from July 1, 2021, Szczecin CHP, Pomorzany CHP and the district heating network in Gryfino, recognised until June 30, 2021 as part of the Conventional Generation segment, were included in the structures of the District Heating segment.

TARIFFS IN DISTRICT HEATING

Description of tariffs in the segment

Due to the fact that the income on heat sales for CHP plant are tariffed as part of the so-called simplified method, they are characterised by a relative delay in the transfer of costs (annual or two-year). They are based on the year-to-year dynamics of average costs (including fuels used) incurred by entities that are not co-generation entities for the year preceding the time of tariff setting.

Charts: Changes in the reference price of heat for hard coal and natural gas (PLN/GJ).

Source: ERO.

Charts: Changes in costs of fuels – hard coal (PLN/GJ) – PSCMI 216 and gas (PLN/MWh) -TGE.

Source: ARP, TGE.

Chart: Changes in price of CO2 emission rights17 (PLN/t).

Source: ICE.

16PSCMI-2 Polish Steam CoalMarket Index 2 - The average prices for pulverised coals sold to industrial and municipal heat plants, other industrial customers and other domestic customers in Poland.

17Arithmetic average of the daily and monthly records in a given period (spot price).

Reflecting previous cost increases, the reference price of heat produced from hard coal increased by 8% in 2020. It is a base to the increase in heat prices for co-generation entities establishing the tariff during 2021. In the first haf of 2021 the average market price of coal decreased by 5%, while the average price of CO2 emission rights increased by 80%.

Tariffs for the production of heat from gas in 2021 are set based on an increase in the reference price (+1%), whereas in the first half of 2021 gas prices are already higher than in previous periods. Prices stand at PLN 93/MWh and are largely due to forward contracts.

Weather conditions also substantially affect the segment's results. Temperatures directly shape the level of heat demand. Simultaneously, the level of heat production determines the level of electricity production in co-generation, which is an additional source of revenues that decisively affects the CHP plant's profitability.

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

Chart: Key changes of EBITDA in District Heating (in PLN million) – managerial perspective.

EBITDA
H1
2020
Heat
production -
volume
Heat
production
- price1
Electricity
production
- volume
Electricity
production
– price1
Capacity
Market
revenues
Costs
of fuel
Costs of
CO2
2
Personnel
expenses3
Other4 EBITDA
H1 2021
Change 160 146 52 -1 138 -99 -113 39 -76
Reported EBITDA
H1 2020
493
One-offs H1 2020 31
Recurring EBITDA H1 2020 462 1 065 1 127 0 933 422 261 115
Recurring EBITDA H1 2020 1 371 1 178 138 1 032 535 222 191 708
One-offs H1 2021 7
Reported EBITDA
H1 2021
715

Reversal of impact of total one-offs increasing the reported result.

1 Includes costs of certificates redemption.

2Adjusted for result on resale of CO2 emission rights, assigned to a given period.

3Personnel costs without including the impact of change in actuarial provision (one-off).

4Other without including the impact of change in reclamation provision and LTC compensations (one-off).

Key factors affecting the EBITDA result of District Heating segment on y/y basis included:

  • Higher volume of heat production in the first half of 2021 y/y is a result of lower outside temperatures as compared to analogical period of 2020 the average temperatures were by 2.6 oC lower, what translated into increased heat production (by 3.8 PJ).
  • Increase of heat sale price is a result of increased tariffs for heat for the CHP plants following the publication by the ERO of new reference prices for heat production in units not being co-generation units.
  • Higher electricity production volume in the segment by 0.5 TWh as a result of increased electricity production in co-generation, due to higher demand for heat.
  • Decrease of electricity sale prices due to lower forward contracts with 2021 delivery as compared to the contracts with 2020 delivery.
  • Capacity Market, a mechanism, which was not present in the base period.
  • Higher fuel consumption costs are caused by increased volume of hard coal consumption and higher gas prices. The details are shown in the chart below.
  • Higher CO2 costs are mainly a result of higher price of allowances and lower allocation of allowances granted free of charge. The details are shown in the chart below.

933 - 1.28 PLN/GJ + 0.97 GJ m + 2.99 PLN/GJ - 3.38 PLN/GJ 1 032 +0.04 GJ m + 4.30 GJ m + 0.36 GJ m 800 850 900 950 1 000 1 050 1 100

Lower personnel expenses result mainly from decreased employment y/y.

Costs of
fuel H1
2020
Hard coal
volume
Hard coal
price
Gas
volume
Gas
price
Biomass
volume
Biomass
price
Light and
heavy oil
volume
Light and
heavy oil
price
Other raw
materials
Costs of
fuel H1
2021
Change 64 -50 19 61 8 -4 3 0 -2
Costs of fuel H1
2020
Costs of fuel H1
2021
933 514
528
388
468
16
20
7
10
8
6
1 032

Chart: Consumption costs of production fuels in District Heating (in PLN million).

Table: Data on use of production fuels consumption in District Heating.

H1 2021 H1 2020
Fuel type Volume Cost Volume Cost
(tons ths) (PLN million) (tons ths) (PLN million)
Hard coal 1 719 528 1 547 514
Gas (cubic metres ths) 668 182 468 632 977 388
Biomass 74
117
20 74 16
Fuel oil and other raw materials - 16 - 15
TOTAL 1 032 933

Chart: CO2 costs in District Heating (PLN million).

CO2 costs H1 2020 Allocation of free
allowances for CO2
emissions
CO2 emission Average
CO2 costs
CO2 costs H1 2021
Change 20 46 47
CO2 costs H1 2020 422
CO2 costs H1 2021 535

Table: Data on CO2 costs in District Heating.

Data regarding CO2 H1 2021 H1 2020 % change
Allocation of free allowances for CO2 emissions (tons) 317 309 504 011 -37%
CO2 emission* (tons) 4 815 114 4 392 867 10%
Average CO2 costs(PLN/t CO2) 119.04 108.60 10%

* Estimates, emissions not verified - the emissions will be settled and certified by the authorised verifier of CO2 emission on the ground of yearly reports of volume of CO2 emissions

CAPITAL EXPENDITURES

Table: Capital expenditures incurred in District Heating segment in the first half of 2021 and 2020.

PLN million H1 2021 H1 2020 % change
Investments in generating capacities, including: 190 160 19%

Development
119 55 116%

Modernisation and replacement
71 105 -32%
Other 14 18 -22%
TOTAL 204 178 15%

KEY EVENTS IN THE DISTRICT HEATING

On June 23, 2021 an agreement (the "Agreement") was concluded with syndicate of companies Polimex Mostostal S.A. (Consortium leader) and Polimex Energetyka sp. z o.o. (Consortium partner) for construction of gas and steam CHP plant in Siechnice for KOGENERACJA S.A. (New Czechnica CHP plant). Subject matter of the agreement is realisation by the Contractor of turn-key construction of CCGT unit with a total gross capacity of 179.4 MWe and 162.9 MWt, heat accumulator and four water boilers with total capacity of 152 MWt. New units will replace currently existing hard coal-fired CHP plant. The value of the agreement for construction of CHP (EPC agreement) amounts to PLN 1 425.8 thousand gross. In connection with the EPC agreement, a LTSA (Long-Term Service Agreement) was also signed with regard to service for 103 months starting from the commissioning date of the units. The value of the LTSA amounts to PLN 1 572.4 thousand gross (according to the average EUR/PLN exchange rate on June 21, 2021).

The project schedule provides for the commissioning of the CCGT unit in the second quarter of 2024.

RENEWABLES

Segment description and its business model

This segment is involved in the generation of electricity from renewable sources and in pumped storage power plants.

The Renewables segment is based mainly on revenues from the sale of electricity, however contrary to production at industrial plants within the Conventional Generation segment, this revenue is subject to a larger degree to changes in weather conditions and prices on the spot market due to the renewables sales model in place. Electricity output volume translates into property rights (green certificates) and revenue from the sale of energy origin certificates obtained by the segment's assets, excluding hydropower plants over 5 MWe.

Revenue from the Capacity Market, a mechanism introduced to prevent electricity shortages in the National Power System, constitutes a significant item in the segment's revenue, starting from 2021. Selected power plants in the Renewables segment receive fees for performing the capacity obligation (a Capacity Market Entity being on standby to supply electricity to the system and the obligation to supply specified capacity to the system when the system is under threat). Capacity Market revenue compensated for revenue from ancillary services. The readiness intervention reserve service was discontinued.

On the cost side, the most important items include: depreciation of segment assets, use of energy to pump water at pumpedstorage plants and third-party services, mainly the repair services. Property tax and employee wages also constitute a significant cost item in this segment.

Assets

The PGE Capital Group's operations in renewable energy are managed by the PGE Energia Odnawialna S.A. Due to the profile of operations, the segment includes PGE Baltica sp. z o.o. This company is responsible for all activities related to off-shore wind farms.

Assets in the segment include:

  • 17 wind farms,
  • 5 photovoltaic power plants,
  • 29 run-of-river hydro power plants,
  • 4 pumped-storage power plants, including 2 with natural flow.

Diagram: Main assets of the Renewables segment and their installed capacity.

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

Chart: Key changes of EBITDA in Renewables (in PLN million) – managerial perspective.

Reversal of impact of total one-offs reducing the reported result.

1 The sum of electricity revenues includes revenues from main generation technologies (wind, water, PV, pumped storage).

2 Personnel costs without including the impact of change in actuarial provision (one-off).

Key factors affecting the y/y results of Renewables included:

  • Increase in revenues from electricity sales results from: higher electricity sale price by PLN 107/MWh y/y, what translated into increase of revenues by approx. PLN 147 million; offset by lower sales volume by 137 GWh, what caused revenues decrease of approx. PLN 24 million.
  • Lower revenues from sales of certificates result from: decreased generation volume by 192 GWh, what translated into decrease of revenues by approx. PLN 28 million; lower average sale price of certificates by PLN 16/MWh y/y, what translated into decrease of revenues by approx. PLN 10 million.
  • Lower sales revenues from ancillary services result mainly from change in agreement for provision of services and withdrawal of Readiness Interventional Reserve among others.
  • Capacity Market, a mechanism, which was not present in the base period.
  • Decrease in other results mainly from higher operating costs in connection with new assets commissioned from the second quarter to the end of 2020: 3 wind farms and 4 PV plants. Additionally, from the beginning of 2021 pumped-storage units are obligated to pay grid fees in full in order to pump water that is used to generate electricity. The change in model was caused by the discontinuation of certain ancillary services.

CAPITAL EXPENDITURES

Table: Capital expenditures(excluding acquisitions) incurred in Renewables segment in the first half of 2021 and 2020.

PLN million H1 2021 H1 2020 % change
Investments in generating capacities, including: 70 643 -89%

Development
19 630 -97%

Modernisation and replacement
51 13 292%
Other 7 6 17%
TOTAL 77 649 -88%

KEY EVENTS IN THE RENEWABLES

As part of the ordinary auctionsforthe sale of energy from renewable sources announced by the President of the Energy Regulatory Office, held from May 26 to June 11, 2021, PGE Group's 19 photovoltaic projects won auctionsforthe sale of electricity in renewable energy installations up to 1 MW.

As part of the project, accompanying infrastructure related to power off-take will be built next to solar power plants. All installations will be built using modern PV modules, the technical parameters of which allow for high productivity in weather conditions typical for climatic zones in Poland. Photovoltaic installations will be built not only under the auction system, but also on the basis of longterm contracts for the sale of electricity ("PPA").

In accordance with the PV Program, PGE Group intendsto launch within the next decade up to 3 GW capacities of solar installations and solidify its leading position on the renewable energy market in Poland. The Company has so far secured more than 2500 ha of land for PV farms with a total capacity of approx. 2 GW.

DISTRIBUTION

Segment description and its business model

Core business of the segment includes supply of electricity to final off-takers through the grid and HV, MV and LV infrastructure.

* managerial perspective.

Segment revenue is based on a tariff for electricity distribution services, which is approved by the ERO President every year at company request and is regulated. The tariff allow costs related to the distribution system operator's on-going activities to be transferred. These are both justified operating costs, depreciation, as well as costs related to the necessity to cover grid losses on electricity distribution or the purchase of transmission services from the TSO. At the same time, the tariff reflects the costs transferred in fees such as the RES fee, the transition fee, the co-generation fee and – from 2021 – the capacity fee.

The key element shaping the Distribution segment's result is return on company's invested capital. This is based on the Regulatory Asset Base ("RAB"), which is established on the basis of completed investments and taking into account asset depreciation. The Regulatory Asset Base serves as the basis for calculating return on capital, using weighted average cost of capital, which is published by the ERO President in accordance with a set formula and using as the risk free rate the average yield on 10-year State Treasury bonds with the longest maturity during the 36-month period preceding the tariff application submission, quoted on the Treasury BondSpot market. In addition, return on capital depends on the achievement of individual quality targets set by the ERO President for performance indicators including: interruption time, interruption frequency, connection time and (not yet included) time to provide metering and settlement data.

VOLUME, CUSTOMERS AND OPERATING DATA

PGE Dystrybucja S.A. operates in the area of 129 829 sq. km and delivers electricity to approximately 5.56 million customers.

Diagram: Area of PGE distribution grid.

Table: Volume of distributed energy and number of customers in the first half of 2021 and 2020.

Tariff Volume (TWh)* Number of customers
according to power take-off points
H1 2021 H1 2020 H1 2021 H1 2020
A tariff group 2.64 2.54 115 109
B tariff group 7.25 6.65 12 703 12 287
C+R tariff groups 3.37 3.16 488 971 486 087
G tariff group 5.38 4.94 5 056 964 4 999 745
TOTAL 18.64 17.29 5 558 753 5 498 228

* with additional estimation of sales.

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

Chart: Key changes of EBITDA in Distribution (in PLN million) – managerial perspective.

EBITDA
H1 2020
Electricity
distribution
volume
Change of
distribution
tariff1
Network
losses2
Property tax Personnel
expenses3
Other EBITDA
H1 2021
Change 176 -54 38 -5 17 58
Reported EBITDA
H1 2020 1 127
One-offs H1 2020 -17
Recurring EBITDA H1
2020
1 144 2 241 292 218 649 62
Recurring EBITDA H1
2020
2 363 254 223 632 120 1 374
One-offs H1 2021 8
Reported EBITDA
H1 2021
1 382

Reversal of impact of total one-offs increasing the reported result

Reversal of impact of total one-offs reducing the reported result

1 Excluding cost of transmission services from PSE S.A.

2 Adjusted for revenues from the Balancing market.

3 Personnel costs without including the impact of change in actuarial provision (one-off).

Key factors affecting results of Distribution segment y/y included:

  • Increased volume of distributed energy by 1.4 TWh resulting mainly from higher demand by households.
  • Decrease in rates in tariff for 2021 by PLN 2.9/MWh compared to the tariff for the corresponding period of the previous year, that translated into an decrease in revenues from the sale of distribution services.
  • Lower costs of energy purchases to cover network losses mainly as a result of a decrease in the electricity purchase price to cover the losses.
  • Increase of costs of tax on real estate in connection with an increase of: grid assets value as a result of investments; tax rates on land and buildings.
  • Decrease in personnel expenses due to ongoing process to optimise costs.
  • Change in other resulting mainly from higher revenues from sale of other distribution services, mainly in the field of collecting subsidies and release of provisions related to claims concerning non-contractual use of properties as a result of a significant increase in the number of court cases being ruled in favour of the company.

CAPITAL EXPENDITURES

Table: Capital expenditures incurred in Distribution segment in the first half of 2021 and 2020.

PLN million H1 2021 H1 2020 % change
Development investments 302 385 -22%
Modernisation and replacement 304 439 -31%
Other 0 1 -
TOTAL 606 825 -27%

KEY CAPITAL EXPENDITURES IN THE DISTRIBUTION SEGMENT

In the first half of 2021 the largest expenditures in amount of PLN 279 million were incurred for connection of new off-takers.

SUPPLY

Segment description and its business model

Supply segment activities include Group's wholesale and retail trading of electricity. Wholesale trading includes mainly electricity trading on behalf of and for Conventional Generation segment, District Heating segment and Renewables segment.

* Data for PGE Obrót S.A.

As part of retail-market activities, the key source of segment's revenue is sale of electricity to final customers. This is sale to business and institutional clients, which constitutes more than 70% of the sales volume, and to retail clients. The segment's revenue also includes the sale of fuels, mainly: pulverised coal and coarse coal, which is sold by PGE Paliwa sp. z o.o., and sale of gas.

Electricity sales are matched by the costs to purchase electricity on the wholesale market and costs to redeem certificates as part of the support system for renewable sources and energy efficiency.

The Supply segment also incurs costs related to the Group's corporate centre.

VOLUME, CUSTOMERS AND OPERATING DATA

Table: Volume of electricity sales to final off-takers and number of customers in the first half of 2021 and 2020.

Tariff Volume (TWh)* Number of customers according to power take-off
points*
H1 2021
H1 2020
H1 2021 H1 2020
A tariff group 3.63 4.60 136 145
B tariff group 6.69 7.08 11 830 12 533
C+R tariff groups 3.13 3.31 423 869 447 684
G tariff group 5.20 4.88 4 989 505 4 913 860
TOTAL 18.65 19.87 5 425 340 5 374 222

* Data for PGE Obrót S.A.

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

Chart: Key changes of EBITDA in Supply (in PLN million) – managerial perspective.

EBITDA
H1 2020
Result on
electricity -
volume
Result on
electricity -
margin
Revenues from
services
provided to
other segments
of the PGE
Group
Result on sale of
fuels
Personnel
expenses1
Balance of
provisions
for onerous
contracts
Other EBITDA
H1 2021
Change 6 663 -20 6 -1 -174 25
Reported EBITDA
H1 2020
187 111
One-offs H1 2020 -2
Recurring EBITDA H1 2020 189 -123 446 6 188 174 126
Recurring EBITDA H1 2020 546 426 12 189 0 101 694
One-offs H1 2021 12
Reported EBITDA
H1 2021
706

Reversal of impact of total one-offs increasing the reported result.

Reversal of impact of total one-offs reducing the reported result.

1Personnel costs without including the impact of change in actuarial provision (one-off).

Key factors affecting EBITDA of Supply segment y/y included:

  • Higher result on electricity, due to lowered base in the sale of tariffed products in previous year the ERO President set the prices for households at a level which did not cover actual costs of electricity purchase. The last year's low base was also an effect of lower demand due to COVID-19, what resulted in re-selling certain volumes on the spot market below purchase prices in forward transactions.
  • Decrease of revenues from services performed within the Group resulting mainly from lower revenues from the Agreement for Commercial Management of Generation Capacities as a consequence of lower trading value of electricity under management.
  • Higher result on fuel sales, mainly due to a higher result on the sale of coarse coal.
  • Negative impact of balance of provisions for onerous contracts in PGE Obrót resulting fromhigh base level in the analogical period of the previous year. At the end of the first half of 2020, the result was due to reversal of provision for onerous contracts, that mainly related to lack of coverage of part of justified operating costs in the tariff for households approved by the ERO President.

CIRCULAR ECONOMY

Segment description and its business model

The core business of Circular Economy segment is the management of combustion by-products in the PGE Group.

From the beginning of 2021, PGE Group reports a new operating segment – Circular Economy, which includes the following companies: PGE Ekoserwis S.A., EPORE S.A., ZOWER sp. z o.o. The management of combustion by-products at PGE Group turns waste into high-value substances that are used in other branches of economy (cement industry, construction, road-building, mining) and thus reduces the volume of ultimate waste generated.

The main revenue source in the Circular Economy segment is revenue from the economic use of combustion by-products, which includes revenue from the sale of products manufactured on the basis of combustion by-products in internal production processes and the sale of services related to the management of combustion by-products. The level of revenue depends on multiple factors, including commercial potential for selling combustion by-products, in processed and unprocessed form, seasonality of industries purchasing combustion by-products, seasonality of suppliers of combustion by-products (power plants, combined heat-and-power plants), volumes collected, efficiency of production infrastructure, capabilities for storing combustion by-products as materials inventories intended for production, as well as market conditions.

Revenue from other services includes revenue from the sale of continuous and ad hoc services provided to electricity and heat producers, including the operation of ash handling systems and equipment, operation of technological lines, operation of mill facilities and operation of fuel and combustion by-product storage sites.

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

Chart: Key factors affecting EBITDA in Circular Economy segment (in PLN million) – managerial perspective.

*The chart does not show data for the first half of 2020, because in that period companies from the Circular Economy segment were presented in Conventional Generation, District Heating and Other Operations.

Key factors affecting EBITDA of Circular Economy segment included:

EBITDA*

  • Revenue from sale of combustion by-products: ash, slag, gypsum obtained in the process of hard coal and lignite combustion.
  • Revenue from sale of services, concerning services in the field of coal storage site operations and heavy equipment rentals, mainly to PGE Group companies.
  • Personnel costs necessary for the proper functioning of the segment.
  • Third-party service costs, mainly concerning services in the field of transporting waste from production units.

Significant events of the reporting period and subsequent events

IMPACT OF THE COVID-19 PANDEMIC ON PGE GROUP'S OPERATIONS

PGE Group identifies, on an ongoing basis, the risk factors that affect the Group's performance in connection with the COVID-19 pandemic. In the first half of 2021, the impact of the pandemic on financial performance remained limited. The nature and scale of possible further effects are difficult to estimate. What will be important is the duration of the epidemic, its potential severity and extent and its impact on economic growth in Poland. At the same time, the accuracy of estimates remains difficult in view of a number of other factors affecting the power market, including the level of demand for electricity.

The outbreak of the pandemic led to the economic slowdown in the global economy and in Poland. After the "freezing" of the economy in Poland, the economic situation is improving. These are reflected, among others, in the rapid growth of GDP and industrial production in the second quarter of 2021 on a year-on-year basis.

Nevertheless, another implementation of restrictions may result in the reduced level of economic activity, which may create risk that the lower level of domestic electricity consumption will continue periodically, what may have impact on the decrease in revenues and margins from energy generation, distribution and sales in the Conventional Generation, Distribution, Supply, as well as in District Heating segment. Most of the production for 2021 was contracted in previous years, which is why the potential negative impact of lower volumes on the Conventional Generation segment was largely limited.

If the pandemic situation were to deteriorate, the Supply segment would face the risk of a decline in demand for electricity, which could result in lower sales to end users and a higher cost to balance electricity. Also in the Distribution segment, a lower volume of deliveries made to final off-takes would directly translate into lower revenues earned on this account.

As at June 30, 2021, the impact of the expected increase in payment congestion, especially regarding receivables from small and medium-sized enterprises, was not significant. As it is described in note 2.4 to the consolidated financial statements, the Group created additional write-offs on receivables in the amount of PLN 13 million. On the other hand, depending on the further epidemiological and economic situation, the risk of deteriorated liquidity of PGE Group and increased impairment losses on overdue receivables still exists and is monitored on an ongoing basis. Currently, the Group does not expect the occurrence to be more material and does not identify any liquidity risk.

PGE Group's plants are of strategic importance for maintaining undisturbed production and supply of electricity and heat in Poland. The COVID-19 pandemic has affected the change of work organisation, especially with respect to PGE Group's generation units. In many cases, this involves additional costs resulting from, for example, the purchase of protective materials for employees. Since the beginning of the pandemic, the Group has introduced work rules that aim to reduce, as much as possible, the health risk for employees. As one of the largest employers in Poland, with approx. 40 thousand employees, PGE Group takes a number of measures related to the organisation of the companies and work to ensure business continuity, protect the health and life of its employees, including the implementation of teleworking and rotational work, raising awareness of, in particular, the basic principles of protection against coronavirus, prevention and quarantine.

PGE Group constantly conducts communication activities aimed at employees, to build awareness of the positive effects of vaccinations - both individual and social. In addition, internal communication is carried out related to the course of the pandemic and encouraging to minimise the risk of infection - that is, keeping a distance, washing hands frequently or using office spaces in a safe way. PGE has established a Crisis Team to collect information from all Group companies, monitor the situation in individual companies on an ongoing basis and take appropriate steps. The production branches also have plans for operation with increased absenteeism that are developed and verified on an ongoing basis, and as plants of strategic importance from the point of view of maintaining undisturbed production and supply of electricity and heat, they are in constant contact with local authorities responsible for monitoring the situation in the country in all locations of PGE Group entities.

In the area of retail customer service, PGE Group focused primarily on expanding remote service channels.

Due to the introduction of appropriate countermeasures at the early stage of the pandemic, PGE Group has been continuously producing electricity and heat and ensuring their uninterrupted supply.

PGE Group has been monitoring the further impact of the COVID-19 pandemic on the financial condition of the PGE Group and is preparing for various scenarios. The pandemic has accelerated the introduction of measures to prepare the entire organisation to changes in order to tackle the decarbonisation challenges faced by energy companies. This will require considerable financial expenditure. All potential savings scenarios for both capital expenditures and operating costs were analysed in order to focus on the most important development projects related to the core business of PGE Group.

CHANGES IN THE MANAGEMENT BOARD AND SUPERVISORY BOARD

Management Board members

From January 1, 2021 till March 31, 2021 the Management Board had worked in following composition:

Name and surname of the
Management Board
Position
Wojciech Dąbrowski President of the Management Board from February 20, 2020
Wanda Buk Vice-President for Regulatory Affairs from September 1, 2020
Paweł Cioch Vice-President for Corporate Affairs from February 24, 2020
Paweł Strączyński Vice-President for Finance from February 24, 2020
Paweł Śliwa Vice-President for Innovations from February 20, 2020
Ryszard Wasiłek Vice-President for Operations from February 20, 2020

On March 31, 2021 Mr Paweł Strączyński - Vice-President for Finance – submitted his decision to resign from the position. The resignation took effect on April 1, 2021.

After a competitive procedure, on June 8, 2021 the Supervisory Board adopted resolution no. 396/XI/2021 on appointing Mr Lechosław Rojewski to the Management Board of PGE Polska Grupa Energetyczna S.A. entrusting him the position of the Vice-President for Finance as from June 9, 2021.

As at June 30, 2021 and at the publication date of this report, the Management Board has worked in following composition:

Name and surname of the
Management Board
Position
Wojciech Dąbrowski President of the Management Board from February 20, 2020
Wanda Buk Vice-President for Regulatory Affairs from September 1, 2020
Paweł Cioch Vice-President for Corporate Affairs from February 24, 2020
Lechosław Rojewski Vice-President for Finance From June 9, 2021
Paweł Śliwa Vice-President for Innovations from February 20, 2020
Ryszard Wasiłek Vice-President for Operations from February 20, 2020

Supervisory Board members

As at June 30, 2021 and at the publication date of this report, the Supervisory Board has worked in following composition:

Name and surname Position
Anna Kowalik Chairman of the Supervisory Board
Artur Składanek Vice-Chairman of the Supervisory Board – independent
Grzegorz Kuczyński Secretary of the Supervisory Board - independent
Janina Goss Supervisory Board Member - independent
Tomasz Hapunowicz Supervisory Board Member - independent
Marcin Kowalczyk Supervisory Board Member
Mieczysław Sawaryn Supervisory Board Member - independent
Jerzy Sawicki Supervisory Board Member - independent
Radosław Winiarski Supervisory Board Member

As at June 30, 2021 and at the publication date of this report, the committees have worked in following compositions:

Name and surname of
the member of the
Supervisory Board
Audit Committee Corporate Governance
Committee
Strategy and
Development
Committee
Appointment and
Remuneration
Committee
Janina Goss Member Member
Tomasz Hapunowicz Chairman Member
Marcin Kowalczyk Member
Anna Kowalik Member Member Member
Grzegorz Kuczyński Chairman Member
Mieczysław Sawaryn Member Chairman
Jerzy Sawicki Member Member Member
Artur Składanek Member Chairman
Radosław Winiarski Member Member

IMPAIRMENT TESTS ON PROPERTY, PLANT AND EQUIPMENT, INTANGIBLE ASSETS AND GOODWILL

Property, plant and equipment is PGE Group's most significant group of assets. Due to variable macroeconomic conditions, PGE Group regularly verifies indications of impairment for its assets. When assessing the market situation PGE Group uses both its own analytical tools and independent think tanks' support. In previous reporting periods, PGE Group recognised substantial impairment allowances of property, plant and equipment of Conventional Generation segment, District Heating segment and the Renewables segment. An impairment loss recognised in the Renewables segment was also partially reversed in previous reporting periods.

In the current reporting period, the Group analysed impairment indications and identified factors that could result in changes to the asset values in the Conventional Generation and Renewables segments. The tests showed no need to recognise an impairment loss for the Conventional Generation segment and the necessity to reverse the impairment loss for the Renewables segment. An analysis of the indications for conducting impairment tests in the District Heating segment did not show the need to conduct these tests.

The results of the test are described in Note 3 (with regard to property, plant and equipment) and 7.5 (with regard to partial reversal of loss of value of shares in the associate - Polska Grupa Górnicza S.A., recognised in the consolidation under the equity method) to the consolidated financial statement.

The impairment test results were disclosed in the current report of PGE S.A.:

Information on the result of impairment tests

ACTIVITIES RELATED TO NUCLEAR ENERGY

Business partnership and sale of 100% shares in PGE EJ 1 to the State Treasury

Until the end of the first quarter of 2021, company PGE EJ 1 (set up in 2010) was part of the PGE Capital Group. In 2014, a shareholder agreement was signed, pursuant to which Enea S.A., KGHM Polska Miedź S.A. and TAURON Polska Energia S.A. each purchased from PGE a 10% stake in PGE EJ1 (30% in total).

In the first quarter of 2021, talks regarding the acquisition by the State Treasury of 100% shares in PGE EJ1 from PGE and other partners continued. The intention to conclude such transaction was expressed in the Letter of Intent signed on October 1, 2020 between PGE, KGHM Polska Miedź S.A., TAURON Polska Energia S.A., Enea S.A. and the State Treasury.

The business model for Polish nuclear power plants envisaged in the Nuclear Power Programme updated in October 2020, provides for the State Treasury's acquisition of 100% of shares in the special purpose company responsible for investments in nuclear power in Poland, i.e. PGE EJ1 Sp. z o.o.

On March 26, 2021 PGE, KGHM Polska Miedź S.A., TAURON Polska Energia S.A., Enea S.A. and the State Treasury concluded an agreement to sell 100% shares in PGE EJ 1 to the State Treasury. In accordance with the provisions of the agreement, PGE sold to

the State Treasury 3 727 661 shares of PGE EJ1, constituting 70% of the share capital of PGE EJ1 and representing 70% of votes at the Assembly of Partners. The sale price for all shares amounted to PLN 531 362.0 thousand, out of which PGE received PLN 371 953.4 thousand.

In accordance with the provisions of the agreement, the transfer of ownership of shares took place on the payment date by the State Treasury what was made on March 31, 2021. On that day, PGE ceased to be the parent company of PGE EJ 1 sp z o.o. within the meaning of the Commercial Companies Code.

Following the transaction, PGE EJ1 is no longer a company of the PGE Capital Group.

Sale of shares in PGE EJ1 constitutes the implementation of one of the activities provided in the PGE Group's Strategy until 2030 announced on October 19, 2020.

The sale of shares in PGE EJ 1 was described in the current report of PGE S.A.:

Signing of the agreement for the sale of PGE EJ 1 shares

Compensations from WorleyParsons

On March 26, 2021 roku PGE, KGHM Polska Miedź S.A., TAURON Polska Energia S.A. and Enea S.A. signed with PGE EJ1 an annex to the agreement dated April 15, 2015 regarding WorleyParsons, according to which PGE, KGHM Polska Miedź S.A., TAURON Polska Energia S.A. and Enea S.A. are proportionally responsible for liabilities or are proportionally entitled to claims that may potentially arise as a result of resolution of a dispute with WorleyParsons, up to the level of claims together with accrued interest as at March 26, 2021.

Detailed information are described in note 24.1 to the consolidated financial statements.

LEGAL ASPECTS

The issue of compensation regarding the conversion of shares

Information on the issue of compensation regarding the conversion of shares are described in note 24.4 to the consolidated financial statements.

INFORMATION CONCERNING PROCEEDINGS IN FRONT OF COURT, BODY APPROPRIATE FOR ARBITRATION PROCEEDINGS OR IN FRONT OF PUBLIC ADMINISTRATION AUTHORITIES

Significant proceedings pending in front of courts, competent arbitration authority or public administration authority are described in note 24.4 to the consolidated financial statements.

Termination by Enea S.A. of agreements for sale of certificates

Information on termination by Enea S.A. of agreements for sale of certificates are described in note 24.4 to the consolidated financial statements.

INFORMATION CONCERNING THE GUARANTEES FOR LOANS GRANTED BY THE COMPANY OR A SUBSIDIARY

Within the Group, as at June 30, 2021 PGE S.A. and subsidiaries did not grant guarantees to other entities or to a subsidiary, where a value of guarantees constitutes at least 10% of the Company's equity.

INFORMATION ON ISSUE, REDEMPTION AND REPAYMENT OF DEBT SECURITIES AND OTHER SECURITIES

Information on issue, redemption and repayment of debt securities and other securities is described in p. 5.1 of the foregoing report and in note 1.3 to the consolidated financial statements.

TRANSACTIONS WITH RELATED ENTITIES

Information about transactions with related entities is presented in note 26 to the consolidated financial statements.

SUBMITTING OF AN INITIAL NON-BINDING OFFER FOR ACQUISITION OF SHARES IN FORTUM GROUP'S ASSETS BY A CONSORTIUM WITH PARTICIPATION OF PGE

On October 27, 2020, an investment consortium, a part of which was PGE, has submitted an initial, non—binding offer to purchase district heating and cooling businesses in Estonia, Lithuania, Latvia and Poland from Fortum Holding B.V. The participants of the consortium are: PGE, Polskie Górnictwo Naftowe i Gazownictwo S.A., PFR Inwestycje FIZ (Closed-end investment fund) which is managed by Polski Fundusz Rozwoju S.A. (Polish Development Fund) and IFM Investors Pty Ltd.

On November 16, 2020 PGE and Polskie Górnictwo Naftowe i Gazownictwo S.A. (the "Partners"), submitted a revised, initial nonbinding offer to acquire assets owned by Fortum Holding B. V.

Under the revised Offer, the Partners are bidding for the district heating business operated by Fortum Holding B.V. exclusively in Poland. PGE further announces that the Partners abandoned their original intention to purchase the Fortum Group's assets operating in Estonia, Lithuania and Latvia, and decided they would not participate in the investment consortium with PFR Inwestycje FIZ and IFM Investors Pty Ltd.

Currently, joint works towards the submission of a binding offer are being continued. The core business of Fortum Holding B.V.'s Polish subsidiary is generation, distribution and sale of heat and the generation of electricity.

The acquisition of the shares in the Fortum Group's assets is in line with PGE Group's Strategy until 2030 announced on October 19, 2020.

Current reports of PGE S.A.:

Submitting of an initial non-binding offer for acquisition of shares in Fortum Group's assets

Submitting of an initial non-binding offer for acquisition of shares in Fortum Group's assets - 2

APPROVAL OF THE ENERGY POLICY OF POLAND UNTIL 2040 ("PEP2040")

On February 2, 2021, the Council of Ministers approved the Energy Policy of Poland until 2040. PEP2040 is a vision for Poland's energy transition strategy, presenting inter alia, a proposed structure of electricity generating units. According to PEP2040, the share of zero-emission units will grow and the share of coal units will decrease. The full text of PEP2040 was published on March 10, 2021.

The pace of energy transition and trends assumed in PEP2040 have recently accelerated and strengthened significantly. In July 2021, the European Commission published the Fit for 55 legislative package, aimed at, inter alia, achieving the reduction of greenhouse gas emissions in the EU by 55% (previously 40%) by 2030 compared to 1990. As expected by market participants, the reform of the EU ETS included in the package should result in a significant increase in the price of CO2 emission allowances, which in practice took place in the first half of the year. As a result, the current level of prices of CO2 emission allowances significantly differs from the assumptions of PEP2040. Another important element that differs significantly from the assumptions of the Policy is the dynamic increase in photovoltaic capacity as a result of the operation of numerous co-financing programs, a discount system for prosumers and RES auctions. As a result, the level of installed capacity assumed for 2030 has already been achieved.

In view of the above, to assess the recoverable amount of its generation assets, PGE Group adopted assumptions that take into account the current market and regulatory situation. Possible future differences compared to the adopted assumptions may lead to changes in the financial situation and financial results of the PGE Group and will be included in future financial statements.

SIGNING OF AN INVESTMENT AGREEMENT WITH ØRSTED REGARDING OFFSHORE WIND PROJECTS

On February 10, 2021, entities from PGE and Ørsted group concluded an agreement, according to which the parties determined their share at 50% in two offshore projects developed until now by PGE: Baltica-2 (through SPV named EWB 2 with potential capacity of approximately 1.5 GW) and Baltica 3 (through SPV named EWB 2 with potential capacity of approximately 1 GW).

The Investment Agreement constitutes a legal framework for the establishment of a joint venture dedicated to the development, construction and operation of the Baltica-2 and Baltica-3 offshore wind power farms.

On May 6, 2021, following the fulfilment of the conditions precedent the transaction was finalised. As part of the transaction the Ørsted group subscribed for the shares representing 50% of the share capital of Elektrownia Wiatrowa Baltica – 2 sp. z o.o. and Elektrownia Wiatrowa Baltica – 3 sp. z o.o. – the companies developing two offshore windfarms: Baltica-2 and Baltica-3. Upon the registration of the share capital increase, Ørsted and PGE will become 50/50 partners in the joint ventures.

The total subscription price for 50% of the shares in Baltica-2 and Baltica-3 amounted to the equivalent of approx. PLN 686 million. Upon the fulfilment of certain assumptions, the relevant investors from Ørsted group will be required to provide EWB 2 and EWB 3 with additional cash contributions which may amount in total up to PLN 1 024 million.

At the closing of the transaction the entities from both Ørsted and PGE groups entered into a number of documents separately for each EWB 2 and EWB 3, including notably:

  • the shareholders' agreements regulating, inter alia, the corporate governance of the joint ventures, functioning of integrated project teams, obligations of the parties related to the funding of and providing for other support to the joint ventures, restrictions regarding the transfer of interest on the joint ventures as well as the consequences of any events of default and change of control;
  • the development services agreements regulating the provision of development services to the joint ventures by the respective affiliates of both parties;
  • the resource provisions agreements based on which both parties will delegate personnel to the joint venture;
  • the shareholder loan agreements under which the shareholders will provide debt financing (in addition to equity financing) to the joint ventures;
  • the corporate guarantees issued by both PGE and Ørsted Wind Power A/S under which both parties guarantee the commitments of their respective subsidiaries in the development stage of the projects.

Current reports of PGE S.A.:

Signing of an investment agreement with Ørsted regarding offshore wind projects

Closing of the transaction regarding offshore wind projects

COMMISSIONING OF UNIT NO. 7 IN TURÓW POWER PLANT

On February 25, 2021 PGE GiEK, after detailed analysis of the Consortium's proposal for change in the schedule and price of the contract with regard to methodic accuracy of assumptions taken, reasons for delay and planned methods of further management of the project execution, concluded a settlement agreement in front of the mediator that concerns designing and turn-key construction of power unit in Turów power plant, being realized by consortium including companies: Mitsubishi Hitachi Power System GmbH (Consortium leader), Tecnicas Reunidas S.A. and Budimex S.A. The value of the Agreement was increased by approx. PLN 108 million net, i.e. to PLN 3 755 million net. The commissioning date of the unit was postponed by 6 months i.e. until April 30, 2021.

On April 30, 2021 the Management Board of PGE had taken about the another postponement of the completion of the investment, resulting in changing the commissioning date of the unit no. 7 to May 14, 2021.

A scheduled standstill of unit 7 at the Turów plant, resulting from contractual provisions, began on June 19, 2021. During that time, the Consortium made a technical inspection of the equipment after the first month of the unit's operation. Optimisation and maintenance work was carried out. All activities carried out by the Consortium on the new generating unit are standard and are aimed at ensuring itsstable operation in the future. On July 24, 2021, unit 7 wasre-integrated into the national power system.

Current reports and press releases of PGE S.A.:

Signing of the settlement agreement regarding the unit in Turów

Delay of the commissioning of the unit no. 7 in Turów power plant

Unit No. 7 at Turów Power Plant at full disposal for PSE

CZECHIA'S COMPLAINT AGAINST POLAND REGARDING PROLONGATION OF MINING CONCESSION FOR KWB TURÓW MINE

On September 30, 2020 the Czech Republic lodged a letter with the European Commission pursuant to art. 259 of the Treaty on the Functioning of the European Union initiating a proceeding against Poland for alleged violations of EU law in connection with the extension of the term of the concession for lignite mining for 6 years for KWB Turów (Turów lignite mine).

On December 17, 2020 the European Commission issued a reasoned opinion in which it agreed with some of the infringements alleged by Czechia, at the same time indicating that the prolongation of KWB Turów's functioning did not infringe on the provisions of the water framework directive. The European Commission also emphasised that some of the other infringements alleged by Czechia were unfounded.

On February 26, 2021 the Czech government lodged a complaint against Poland with the Court of Justice of the European Union. A summary of the complaint and key arguments were published in the EU Official Journal on April 19, 2021. The Member States are parties to the proceedings, which excludes the possibility of participation of natural and legal persons, even if the case is directly connected with their activities.

On May 21, 2021 the Vice-President of the Court of Justice of the European Union issued an order on an interim measure as follows: "Poland must immediately cease lignite extraction activities in the Turów mine until a judgment of the Court brings case C-121/21 to an end." An interim measure does not rule on the merits of the case.

On June 9, 2021, the European Commission joined the main proceedings as an intervenersupporting some of the claims of the Czech side. In the interim measure procedure, the Czech Republic additionally demanded a fine for each day of non-compliance with the decision to immediately cease lignite mining. At the same time, the Republic of Poland applied for annulment of the decision on interim measures due to a change in circumstances within the meaning of art. 163 of the Rules of the Court of Justice. In accordance with the decision of September 20, 2021, the Vice-President of the Court of Justice dismissed the request to revoke the interim measure and ordered Poland to pay the European Commission a fine in the amount of EUR 500 000 per day, starting from the date of delivery to Poland of the decision until that Member State complies with the decision of May 21, 2021. In the opinion of the Company, it is not possible to transfer the above-mentioned penalties onto PGE Group companies.

PGE Group does not plan to stop coal mining activities at KWB Turów and electricity generation activities at the Turów plant. The operation of the Turów lignite mine is conducted in compliance with the provisions of national law and European environmental standards, on the ground of legally obtained licence. The government of the Republic of Poland takes the same position in this respect, additionally pointing out that the suspension of works in the mine would endanger the stability of the Polish power system and would have negative consequences for energy security. Government representatives also point to the lack of legal grounds to order the suspension of work at KWB Turów.

At the same time, the main proceedings concerning allegations of breach of EU law are pending.

In the opinion of the PGE Capital Group, the dispute does not affect the financial statements as at the date of their preparation. At the same time, the PGE Capital Group will monitor the course of the case on an ongoing basis and any possible events that will occur will be appropriately reflected in future financial statements.

CONSTRUCTION OF GAS AND STEAM CHP PLANT IN SIECHNICE (NEW CZECHNICA CHP PLANT)

On March 1, 2021 the Management Board of KOGENERACJA S.A. decided on:

  • conditional approval of selection of the offer by consortium consisting of Polimex Mostostal S.A. (Consortium Leader) and Polimex Energetyka sp. z o.o. (Consortium Partner) submitted in the procurement procedure titled "Turn-key construction of CCGT combined heat and power plant for Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A. in Siechnice",
  • giving consent for conditional signing of the agreement with the above mentioned consortium.

On March 5, 2021 the Supervisory Board of the company adopted resolution on giving consent to pursue the above investment, in connection with which new fixed assets will be created with a value exceeding PLN 10 million, provided that the Energy Regulatory Office (ERO) President grants a co-generation individual premium to the Company for unit New Czechnica CHP plant, on the ground of the Act of December 14, 2018 on promotion of electricity from highly-efficient co-generation.

On March 12, 2021 the company received a co-generation individual premium for unit New Czechnica CHP plant, by the decision by the ERO President.

On April 1, 2021, the Extraordinary General Meeting of the company adopted resolution on giving consent to acquisition of noncurrent assets, within the meaning of the Accounting Act of September 29, 1994, exceeding PLN 10 million through giving consent to pursue agreement for construction of CCGT combined heat and power plant in Siechnice, on the ground of agreements with a syndicate of: Polimex Mostostal S.A. and Polimex Energetyka sp. z o.o. with a value of approx. PLN 1.2 billion net and the corresponding LTSA with a value of approx. PLN 118 million net.

Thus, on April 1, 2021 the last condition was fulfilled with regard to the acceptance of the selection of the consortium.

On June 23, 2021 an agreement (the "Agreement") was concluded with syndicate of companies Polimex Mostostal S.A. and Polimex Energetyka sp. z o.o. for construction of gas and steam CHP plant in Siechnice for KOGENERACJA S.A.

Subject matter of the Agreement is realisation by the Contractor of turn-key construction of CCGT unit with a total gross capacity of 179.4 MWe and 162.9 MWt, heat accumulator and four water boilers with total capacity of 152 MWt. New units will replace currently existing hard coal-fired CHP plant. The value of the Agreement for construction of CHP (EPC agreement) amounts to PLN 1 159 180.0 thousand net.

In connection with the EPC agreement, a LTSA (Long-Term Service Agreement) was also signed with regard to service for 103 months starting from the commissioning date of the units. The value of the LTSA amounts to PLN 25 027.8 thousand net and EUR 20 717.8 thousand net. The total value of all concluded contracts amounts to approx. PLN 1 278 353.8 thousand netto (according to the average EUR/PLN exchange rate on June 21, 2021).

The project schedule provides for the commissioning of the CCGT unit in the second quarter of 2024.

Current reports of PGE S.A.:

Conditional approval of offer for construction of New Czechnica CHP plant

Fulfilment of conditions necessary to sign a contract for construction of gas New Czechnica CHP plant

Signing of a contract for construction of gas and steam CHP plant Czechnica.

GRANTING OF CONTRACTS FOR DIFFERENCE FOR PGE'S OFFSHORE WIND FARMS

On April 7, 2021, the ERO President awarded right to cover negative balance of electricity (the "Contract for Difference", "CfD") to the Baltica-2 and Baltica-3 offshore wind farms with a total capacity of up to 2.5 GW. The right to the CfD guarantees a price at a maximum of PLN 319.60/MWh in accordance with the Decree of the Minister of Climate and Environment of Poland and the Act of December 17, 2020 on promoting electricity generation in offshore wind farms. The CfD award, including the final price, is subject to final approval from the European Commission.

Current report of PGE S.A.:

Granting of contracts for difference for PGE's offshore wind farms.

RECOMMENDATION NOT TO PAY DIVIDEND FOR 2020

On April 27, 2021, the Management Board of PGE decided on the recommendation not to pay dividend for 2020 to the PGE's shareholders. Decision was taken in accordance with the dividend policy, particularly following the analysis of the Company's indebtedness in the context of the implementation of the investment program, in line with the assumptions of the PGE Group's Strategy until 2030.

During a General Meeting on June 29, 2021, the shareholders of PGE S.A. decided to allocate all of the 2020 profit to supplementary capital.

Current report of PGE S.A.:

Recommendation not to pay dividend for 2020.

PROLONGATION OF COAL MINING CONCESSION FOR KWB TURÓW TO 2044

On April 28, 2021 the Minister of Climate and Environment prolonged the existing concession for the mining of lignite and associated minerals at the "Turów" deposit to 2044.

According to the Minister of Climate and Environment, the continued mining of lignite and accompanying minerals at the "Turów" deposit is compliant with the rational deposit management concept therefore the issue of the decision making it possible for the mining facility to continue operating was justified.

SHUT-DOWN OF 10 UNITS AT BEŁCHATÓW POWER PLANT

On May 17, 2021, 10 units of Bełchatów power plant with a total capacity of approx. 3 900 MW were shut down as a result of reasons at the side of PSE S.A. All units were put back to operation on May 18, 2021. The shutdown did not result in interruptions in electricity supplies and was not felt by consumers. The reason for the shutdown was a disturbance at the Rogowiec power station, to which 11 units of the Bełchatów Power Plant are connected.

PLANNED TRANSFER OF COAL ASSETS TO THE NATIONAL ENERGY SECURITY AGENCY

On May 21, 2021, the following project was published in the list of legislative and program works of the Council of Ministers: "Transformation of the electricity sector in Poland. Separation of generation coal assets from companies with State Treasury shareholding ". According to the draft project, the asset spin-off process will be pursued through acquisition by the State Treasury from PGE S.A., ENEA S.A., TAURON Polska Energia S.A. and ENERGA S.A. (which was not included in the published draft, but joined the transformation process in June 2021) all assets related to the generation of electricity in hard coal-fired and lignite-fired power plants, including service companies providing services to them. Due to the inseparability of lignite-fired energy complexes, lignite mines will also be among the acquired assets. Assets related to hard coal mining will not be transferred to the entity dealing with generation of electricity in coal units. CHP plants will not be subject to his transaction, as they are planned to be modernized towards low and zero-emission sources. Then, the State Treasury will integrate the acquired assets within one entity. The integrator is to be PGE GiEK S.A. The integration will take place through the merger of the companies acquired by the State Treasury or their contribution for a capital increase to PGE GiEK S.A. PGE GiEK will be operating under the name of the National Energy Security Agency (Polish "NABE"). NABE will be a self-sufficient entity that, as part of its operations, will carry out maintenance and modernisation investments necessary to maintain the efficiency of the coal-fired units in operation. Transaction is to take place following appropriate business and economic analyses, including due diligence and valuations of selected assets. The method of settlement of the transaction, based on the valuation made, due to the indebtedness of the generation companies towards parent entities in their capital groups, will be subject to detailed arrangements between the State Treasury and the current owners.

According to the assumptions of the project, after the separation of coal generation assets, energy companies will focus on the implementation of low and zero-emission investments, and NABE, operating in the form of a company with 100% State Treasury shareholding, will be the owner of coal-based generation assets. The role of NABE will be to ensure the necessary power balance in the energy system, limiting itself to the necessary replacement investments and gradual decommissioning of coal-fired units along with the progressive capacity increase from low and zero-emission sources, ensuring the country's energy security.

Public consultations on the published draft were conducted. An updated version of the document "Transition of Poland's energy sector. Carve out of coal-based generation assets from companies with a State Treasury shareholding." has not yet been published. On July 23, 2021, PGE S.A., ENEA S.A., TAURON Polska Energia S.A. and ENERGA S.A. executed an agreement with the State Treasury regarding cooperation on the carve out of coal-based energy generation assets and their integration into NABE.

A precise date for the disposal of the coal assets, their valuation and means of settling debt and other liabilities related to these assets has not yet been set. In connection with this, it is currently not possible to determine the impact of this division on the future financial statements of PGE and PGE Group.

The Company expects the process to sell these assets to NABE to take place in 2022.

Current report of PGE S.A.:

Agreement regarding co-operation in spin-off of coal assets to National Energy Security Agency.

AFFIRMATION OF PGE'S RATING AT BAA1 WITH STABLE OUTLOOK

On June 30, 2021 Moody's Investors Service affirmed rating for PGE S.A. at Baa1 and its stable outlook.

According to the opinion issued by this institution, the rating affirmation reflects PGE's currently strong financial risk profile, which provides the Company with some flexibility to absorb a large investment program and withstand potential changes in Poland's electricity market.

According to Moody's, the Polish government's plan to transform the domestic utility sector will be supportive of PGE's credit risk profile. A spin-off of the coal assets would strengthen the company's business risk profile since PGE would be able to implement its corporate strategy, focused on increasing already high share of regulated earnings from distribution grid operations and district heating and growth of generation from renewable energy sources.

AGREEMENT BETWEEN PGE S.A. AND POLSKA GRUPA GÓRNICZA ("PGG") REGARDING COAL SUPPLIES

On August 27, 2021 PGE S.A. and PGG S.A. signed an agreement concerning hard coal supply contracts. This agreement regulates rules for further cooperation until 2023 under existing multiannual contracts. Most importantly, issues related to coal supplies that could not have been collected by PGE S.A. as a result of decreased demand for electricity in connection with the COVID-19 pandemic were addressed.

The agreement guarantees the continuity of cooperation and allows PGG to function without interruptions, while for PGE S.A. it provides market-based conditions for receiving the contracted hard coal.

PGE's press release:

Coal supply agreement.

5. Other elements of the report

Significant changes in organisation of the Capital Group

Changes which occurred in the PGE Capital Group's structure in the period from January 1, 2021 until the publication date of this report, are presented in note 1.3 to consolidated financial statements and described below.

ESTABLISHMENT OF COMPANIES

Segment Entity Date of
establishment/
registration in the
National Court
Register
(NCR)
Comment
Renewables Elektrownia Wiatrowa
Baltica-6 sp. z o.o.
February 25, 2021 On December 17, 2020 PGE S.A. set up an one-person limited liability company with headquarters in Warsaw. Current name
of the company is: Elektrownia Wiatrowa Baltica-6 sp. z o.o. The share capital the company is PLN 1 250
000.
Other Operations Rybnik 2050 sp. z o.o. in
organisation
May 31,2021 On February 1, 2021 PGE S.A. set up an one-person limited liability company with headquarters in Rybnik. Current name of
the company is: Rybnik 2050 sp. z o.o. The share capital the company is PLN 50
000.

ACQUSITION OR DISPOSAL OF SHARES BY THE COMPANIES

Segment Shares of the company Date of
transaction/
registration in the
NCR
Comment
Other Operations PGE EJ 1 sp. z o.o. ("PGE EJ 1") –sale
by PGE S.A. of all shares of PGE EJ 1
(the share saleagreement)
March 31, 2021 On March 26, 2021 PGE S.A., Enea S.A., TAURON Polska Energia S.A. and KGHM Polska Miedź S.A. (as the sellers) and the State
Treasury (as the buyer) signed an agreement for sale of all possessed shares in PGE
EJ
1, i.e. 5
325
230 shares of this company,
with a total nominal value of PLN 750
857
430, representing 100% of the share capital. Transfer of ownership of shares to the
State Treasury took place on
March 31, 2021. PGE S.A. held 3
727
661 shares representing 70% of the share capital of PGE
EJ
1.
As a result of the share purchase agreement, PGE ceased to be the parent company of PGE EJ 1 sp z o.o. within the meaning of
the Commercial Companies Code, thus PGE
EJ
1 is no longer part of PGE Group.
District Heating Przedsiębiorstwo Energetyki Cieplnej
S.A. with seat in Bogatynia ("PEC
Bogatynia") –sale by PGE GiEK S.A.
of all shares of PEC Bogatynia (the
share sale agreement)
April 15, 2021/
May 5, 2021
(entry in the register of
shareholders)
On April 15, 2021 PGE GiEK
as a seller and PGE Energia Ciepła S.A. as a buyer concluded an agreement for the sale of all held
by PGE GiEK S.A. inscribed shares in PEC Bogatynia, i.e. 101
036 shares, with a total nominal value of PLN 10
103
600,
representing 34.93% of the share capital. Transfer of ownership of shares to
PGE Energia Ciepła S.A. took place on May
5, 2021
(upon entry in the register of PEC Bogatynia shareholders indicating PGE Energia Ciepła S.A. as the buyer of these shares, under
the above-mentioned share sale agreement).
District Heating "Przedsiębiorstwo Energetyki
Cieplnej" sp. z o.o. with seat in
Bełchatów ("PEC Bełchatów") –sale
by PGE GiEK S.A. of all shares of PEC
Bełchatów (the share sale
agreement)
April 15, 2021 On April 15, 2021 PGE GiEK
as a seller and PGE Energia Ciepła S.A. as a buyer concluded an agreement for the sale of all held
by PGE GiEK S.A. inscribed shares in PEC Bełchatów, i.e. 14
411 shares, with a total nominal value of PLN 7
205
500, representing
17.05% of the share capital. Transfer of ownership of shares to
PGE Energia Ciepła S.A. took place on April 15, 2021.

Segment Shares of the company Date of
transaction/
registration in the
NCR
Comment
Other Operations PGE Ekoserwis S.A. with seat in
Wrocław("PGE Ekoserwis") –
acquisition by PGE S.A. all shares
held by minority shareholders
(compulsory buyout)
April 30, 2021
August 19,2021 –entry
in the register of
shareholders of
PGEEkoserwis.
On April 30, 2021 the Extraordinary General Meeting of PGE Ekoserwis adopted resolution on compulsory buyout
of shares held by
minority shareholders, referred to in Art. 418 of the Polish Commercial Companies Code. The compulsory buy-out covered
11
525 shares representing 4.92% of the share capital of the company, i.e.
all shares owned by other shareholders
of
PGE
Ekoserwis. On July 12, 2021 PGE S.A. paid the full buyout price of the minority shareholders' shares referred to above, and on
July 13, 2021, the company's Management Board decided to buy back the shares of minority shareholders of the company
and transfer the acquired
shares to the shareholder
PGE S.A. and make appropriate changes to the register of the company's
shareholders. As a result of the compulsory buyout of shares, PGE S.A. became the sole shareholder of PGE Ekoserwis.
Other Operations ZOWER sp. z o.o. with seat inRybnik
("ZOWER")
July 7, 2021 On July 7, 2021PGE Energia Ciepła S.A. as a seller and
PGE Ekoserwis as a buyer concluded an agreement for the sale of all held
by
PGE Energia Ciepła S.A. shares in
ZOWER, i.e. 8
000 shares, with a total nominal value of PLN
4
000
000, representing
100%
of the share capital. Transfer of ownership of shares to
PGE Ekoserwis took place on
July
7,
2021.
Other Operations ElectroMobility Poland S.A. with seat
inWarsaw ("ElectroMobility
Poland") –increasing the share
capital of ElectroMobility Poland and
taking up all new shares by a new
shareholder, i.e. by the State
Treasury
Not yet registered On August 19,
2021 the Extraordinary General Meeting of
ElectroMobility Poland adopted resolution on
decrease of the share
capital of the company from PLN 70
000
000 to PLN
52
300
500, i.e. by PLN 17
699
500, by reducing the nominal value of all
the company's shares from the PLN 7
000 to a new nominal value of PLN
5
230.05 each. The purpose of reducing the share
capital is to transfer funds from the share capital to the supplementary capital, therefore the amounts obtained from the
reduction of the share capital will increase the company's supplementary capital.
In addition, On August 19, 2021 the Extraordinary General Meeting of
ElectroMobility Poland adopted resolution on
increase
of the share capital of the company from PLN 52
300
500 to PLN 302
296
890, i.e. by PLN
249
996
390, by issuing through
private subscription 47
800 series B shares numbered from B-00001 to B-47800, with a nominal value of PLN 5
230.05 each.
The Extraordinary General Meeting of the company decided to deprive the existing shareholders of the right to acquire new
shares in full and offer all new shares to be taken up by the State Treasury in exchange for a cash contribution.
Current
shareholders of ElectroMobility Poland, holding 25% share in the share capital are PGE S.A., ENEA S.A., ENERGA S.A. and
TAURON Polska Energia S.A. As a result of the State Treasury joining ElectroMobility Poland by acquiring all new shares in the
increased share capital of ElectroMobility Poland, the share of PGE S.A. in the share capital of this company will decrease from
25% to 4.33%.

INCREASE OF SHARE CAPITAL OF SUBSIDIARIES

Segment Entity Date of registration
in the NCR
Comment
Renewables Elektrownia Wiatrowa
Baltica-1 sp. z o.o.
January 25, 2021 On October 28, 2020 the Extraordinary Assembly of Partners of the company adopted resolution on a share capital increase
from PLN
20
700
000 to PLN 22
545
000,
i.e. by PLN 1
845
000. The share capital increase was taken up and paid by PGE S.A. in
cash. PGE S.A. holds 100% in the share capital.
Renewables PGE Baltica 5 sp. z o.o. March 22, 2021 On February 11, 2021 the Extraordinary Assembly of Partners of the company adopted resolution on a share capital increase
from PLN
2
778
000
to PLN 46
768
000, i.e. by PLN 43
990
000. The share capital increase was taken up and paid by PGE S.A. in
cash. PGE S.A. holds 100% in the share capital.
Renewables Elektrownia Wiatrowa
Baltica-3 sp. z o.o.
March 15, 2021 On February 11, 2021 the Extraordinary Assembly of Partners of the company adopted resolution on a share capital increase
from PLN
83
900
000
to PLN 127
422
000,
i.e. by PLN 43
522
000. The share capital increase was taken up and paid by PGE
Baltica 5 sp. z o.o. in cash. PGE Baltica 5 sp. z o.o. holds 100% in the share capital.

Segment Entity Date of registration
in the NCR
Comment
Renewables Elektrownia Wiatrowa
Baltica-1 sp. z o.o.
March 11, 2021 On February 18, 2021 the Extraordinary Assembly of Partners of the company adopted resolution on a share capital increase
from PLN
22
545
000
to PLN 32
545
000,
i.e. by PLN 10
000
000. The share capital increase was taken up and paid by PGE S.A.
in cash. PGE S.A. holds 100% in the share capital.
Renewables PGE Baltica 6 sp. z o.o. March 15, 2021 On February 18, 2021 the Extraordinary Assembly of Partners of the company adopted resolution on a share capital increase
from PLN
1
344
000
to PLN 36
516
000,
i.e. by PLN 35
172
000. The share capital increase was taken up and paid by PGE S.A. in
cash. PGE S.A. holds 100% in the share capital.
Renewables Elektrownia Wiatrowa
Baltica-2 sp. z o.o.
April 28, 2021 On February 18, 2021
the Extraordinary Assembly of Partners of the company adopted resolution on a share capital increase
from PLN
65
200
000
to PLN 99
947
500,
i.e. by PLN 34
747
500. The share capital increase was taken up and paid by PGE Baltica
6 sp. z o.o. in cash. After this transaction, PGE Baltica 6 sp. z o.o. holds 100% in the share capital.
Renewables Elektrownia Wiatrowa
Baltica-3 sp. z o.o.
July 19,2021 On May 6,
2021
the Extraordinary Assembly of Partners of Elektrownia Wiatrowa
Baltica-3 sp. z o.o. adopted resolution on a
share capital increase from PLN 127
422
000 to PLN 254
844
000, i.e. by PLN 127
422
000, through issue of new 254
844 shares
of the company with a nominal value of PLN 500 each. In addition, the Extraordinary Assembly of Partners of the company
decided to exclude the pre-emptive right of the former sole partner of the company, i.e. PGE Baltica 5 sp. z o.o., to acquire all
newly created shares in the increased share capital and decided that all newly created shares of the company would be acquired
by the new partner, i.e. Ørsted Baltica 3 Holding sp. z o.o. with seat in Warsaw. In connection with the above resolution, the
increase in the company's share capital was covered by a cash contribution by the new partner
of the company: EUR
19
727
173
, DKK 158
934
766
and PLN 200
721
000, with part of the contribution in amount of PLN 127
422
allocated to cover
the nominal value of the new shares, and the remaining part of the cash contribution constituting the surplus over the nominal
value of the new shares in the amount of PLN 73
299
000, EUR 19
727
173 and DKK 158
934
766 was allocated to the company's
reserve capital. As a result of increasing the company's share capital and taking up its new shares, PGE Baltica 5 sp. z o.o. and
Ørsted Baltica 3 Holding sp. z o.o. have the same number of shares in the company, each representing 50% of its share capital,
and the company became
a jointly controlled entity.
Renewables Elektrownia Wiatrowa
Baltica-2 sp. z o.o.
April 18,2021 On May 6,
2021
the Extraordinary Assembly of Partners of Elektrownia Wiatrowa Baltica-2 sp. z o.o. adopted resolution on a
share capital increase from PLN 99
947
500 to PLN 199
895
000, i.e. by PLN 99
947
500, through issue of new 199
895 shares
of the company with a nominal value of PLN 500 each. In addition, the Extraordinary Assembly of Partners of the company
decided to exclude the pre-emptive right of the former sole partner of the company, i.e. PGE Baltica 6 sp. z o.o., to acquire all
newly created shares in the increased share capital and decided that all newly created shares of the company would be acquired
by the new partner, i.e. Ørsted Baltica 2 Holding sp. z o.o. with seat in Warsaw. In connection with the above resolution, the
increase in the company's share capital was covered by a cash contribution by the new partner of the company: EUR
15
499
922
, DKK 124
877
316
and PLN 156
913
750, with part of the contribution in amount of PLN 99
947
500 allocated to
cover the nominal value of the new shares, and the remaining part of the cash contribution constituting the surplus over the
nominal value of the new shares in the amount of PLN 56
966
250, EUR 15
499
922 and DKK 124
877
316 was allocated to the
company's reserve capital. As a result of increasing the company's share capital and taking up its new shares, PGE Baltica 6 sp.
z o.o. and Ørsted Baltica 2 Holding sp. z o.o. have the same number of shares in the company, each representing 50% of its
share capital, and the company will become a jointly controlled entity.
Renewables PGE Baltica 2 sp. z o.o. September 9, 2021 On July 1,
2021 the Extraordinary Assembly of Partners of PGE Baltica 2 sp. z o.o. adopted resolution on a share capital increase
from PLN
20
000 to PLN 606
216
000, i.e. by PLN
606
196
000, through issue of new
606
196 shares of the company with a
nominal value of PLN
1
000 each. The share capital increase was taken up by the sole partner, i.e. by
PGE S.A., in return for an
in-kind contribution (in-kind contribution)
in for of 36
516 shares in the share capital of PGE Baltica 6 sp. z o.o. (former name:
PGE Inwest 19 sp. z o.o.) constituting 100%
in it share capital, what means that PGE Baltica 2 sp. z o.o. became the sole partner

Segment Entity Date of registration
in the NCR
Comment
of PGE Baltica 6 sp. z o.o. On July 13,
2021 transfer of ownership of shares to
PGE Baltica 2 sp. z o.o.
took place, on the ground
of the in-kind agreement concluded on that day between PGE S.A. and
PGE Baltica 2 sp. z o.o.
Renewables PGE Baltica 3 sp. z o.o. August 26, 2021 On July 1, 2021 the Extraordinary Assembly of Partners of PGE Baltica 2 sp. z o.o. adopted resolution on a share capital increase
from PLN
20
000 to PLN 774
491
000, i.e. by PLN
774
471
000, through issue of new
774
471 shares of the company with a
nominal value of PLN
1
000 each. The share capital increase was taken up by the sole partner, i.e. by PGE S.A., in return for an
in-kind contribution (in-kind contribution) in for of 46
768 shares in the share capital of PGE Baltica 5 sp. z o.o. (former name:
PGE Inwest 16 sp. z o.o.), constituting 100%
in it share capital, what means that
PGE Baltica 3 sp. z o.o. became the sole partner
of
PGE Baltica 5 sp. z o.o. On July 13,
2021 transfer of ownership of shares to
PGE Baltica 3 sp. z o.o.
took place, on the ground
of the in-kind agreement concluded on that day between PGE S.A. and
PGE Baltica 3 sp. z o.o.
Conventional Generation Rybnik 2050 sp. z o.o. September 15, 2021 On August 17,
2021 the Extraordinary Assembly of Partners of
Rybnik 2050 sp. z o.o. adopted resolution on a share capital
increase from PLN 50
000 to PLN 22
564
000, i.e. by PLN
22
514
000, through issue of new
22
514 471 shares of the company
with a nominal value of PLN 1
000 each.
The share capital increase was taken up and paid by PGE S.A. in cash. PGE S.A. holds
100% in the share capital.
Renewables PGE Baltica 4 sp. z o.o. Not yet registered On August 25,
2021 the Extraordinary Assembly of Partners of
PGE Baltica 4 sp. z o.o. adopted resolution on a share capital
increase from PLN
20
000 to PLN 1
170
000, i.e. by PLN
1
150
000, through issue of new
1
150 shares of the company with a
nominal value of PLN 1
000 each. The share capital increase was taken up and paid by PGE S.A. in cash. PGE S.A. holds 100% in
the share capital.

ADDITIONAL PAYMENTS FOR COMPANIES SHARES

Segment Entity Transaction date Comment
Other Operations PGE Inwest 8 sp. z o.o. January 13 –15, 2021 On January 13, 2021, the Extraordinary Assembly of Partners of the company adopted a resolution to obligate the sole
shareholder of the company, i.e. PGE S.A., to make an additional payment to its shares, within the meaning of Article 177 of
the Commercial Companies Code, in the total amount of PLN 50
000, i.e. in the amount of PLN 1 000 to each share held by
PGE
S.A., by Janaury
18,
2021. In accordance with the above resolution of the Extraordinary Assembly of Partners, the additional
payment was made by
PGE S.A. on January 15,
2021.
Renewables PGE SOLEO 1 sp. z o.o.
PGE SOLEO 2 sp. z o.o.
PGE SOLEO 3 sp. z o.o.
PGE SOLEO 4 sp. z o.o.
PGE SOLEO 5 sp. z o.o.
PGE SOLEO 6 sp. z o.o.
PGE SOLEO 7 sp. z o.o.
("Companies
PGE Soleo")
February 4, 2021 On February 4, 2021 the Extraordinary Assemblies of Partners of the
Companies
PGE Soleo adopted resolutions to obligate the
sole shareholder of the Companies
PGE Soleo, i.e.
PGE Energia Odnawialna S.A., to make additional paymenta
to its shares,
within the meaning of Article 177 of the Commercial Companies Code. Amount of the additional payment in case of PGE SOLEO
1 sp. z o.o. and
PGE SOLEO 5 sp. z o.o. is the amount of PLN 200 000 for each
one, and in case of PGE SOLEO 2 sp. z o.o., PGE
SOLEO 3 sp.
z o.o., PGE SOLEO 6 sp. z o.o.
and
PGE SOLEO 7 sp. z
o.o is the amount of PLN
50
000 for each
one.
Other Operations PGE Inwest 8 sp. z o.o. March 2 –5, 2021 On March 2
2021 the Extraordinary Assembly of Partners of the company adopted a resolution to obligate the sole shareholder
of the company, i.e. PGE S.A., to make an additional payment to its shares, within the meaning of Article 177 of the Commercial
Companies Code, in the total amount of PLN
820
000, i.e. in the amount of PLN
16
400 to each share held by
PGE S.A., by March
5,
2021. In accordance with the above resolution of the Extraordinary Assembly of Partners, the additional payment was made
by
PGE S.A. on March
5,
2021.

Companies Code, in the total amount of PLN 2
381
058,
i.e. in the amount of PLN
537 to each share held by
28,
by
PGE S.A. on April
27,
2021.
Other Operations PGE Inwest 14 sp. z o.o. April 22-27, 2021 On April 22,
2021 the Extraordinary Assembly of Partners of the company adopted a resolution to obligate the sole shareholder
of the company, i.e. PGE S.A., to make an additional payment to its shares, within the meaning of Article 177 of the Commercial
PGE S.A., by April
2021. In accordance with the above resolution of the Extraordinary Assembly of Partners, the additional payment was made
------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ------------------ -------------------------- ------------------- -----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

MERGERS

Segment Acquiring company/acquired
company
Date of
transaction/
registration in the
National Court
Register
Comment
Renewables PGE Energia Odnawialna S.A./
ECO

POWER sp. z o.o.
March 31, 2021/
April 30, 2021
On March 31, 2021 the Extraordinary General Meeting of PGE Energia Odnawialna S.A. (Acquiring company) and the
Extraordinary Assembly of Partners ECO -
POWER sp. z o.o. (acquired company) adopted resolutions on the merger of the
companies in mode of art.
492 § 1 p. 1 of the Polish Commercial Companies Code (merger through acquisition), through
transferring of all assets of the acquired company to the acquiring company without issue of new shares in exchange for the
shares in the share capital of the acquired company pursuant to art. 516 of the Polish Commercial Companies Code and
dissolution of the acquired company without its liquidation. PGE Energia Odnawialna S.A. was the sole shareholder of ECO –
POWER sp. z o.o.
Supply PGE Obrót S.A./
PGE Centrum sp. z o.o.
September 20, 2021/
Not yet registered
On September 20, 2021 the Extraordinary General Meeting of
PGE Obrót S.A. (Acquiring company) and the Extraordinary Assembly
of Partners
of
PGE Centrum sp. z o.o. (acquired company) adopted resolutions on the merger of the companies in mode of
art.
492 § 1 p. 1 of the Polish Commercial Companies Code (merger through acquisition), through transferring of all assets of
the acquired company to the acquiring company, in exchange for the shares of the acquiring company, which the acquiring
company will grant to PGE S.A. as the sole partner of the acquired company. As a result of the merger, the Extraordinary
General Meeting of
PGE Obrót S.A. adopted resolution on increase of the share capital of the acquiring company by PLN
37
283
500
to PLN 529
923
900
in way of issue of
372
835 inscribed shares of I series
with a nominal value of PLN 100 each. In
addition, the Extraordinary General Meeting of PGE Obrót S.A. decided to assign the company PGE S.A. all new shares of PGE
Obrót S.A. referred to above.

DE-MERGERS

Segment Spun off company /acquiring
company
Date of
transaction/
registration in the
NCR
Comment
District Heating PGE GiEK S.A./
PGE Energia Ciepła S.A.
April 15, 2021
May 24,2021 decrease
of the share capital of
PGE GiEK S.A. was
registeredin NCR.
July 1,2021 increase of
the share capital of PGE
Energia Ciepła S.A. was
registered in NCR.
On April 15, 2021 the Extraordinary General Meetings of PGE GiEK S.A. and PGE Energia Ciepła S.A. adopted resolutions to
divide PGE GiEK S.A. (divided company) through partial division pursuant to art. 529 § 1
point 4 of the Polish Commercial
Companies Code by transferring to PGE Energia Ciepła S.A. (acquiring company) certain assets of the divided company in the
form of a part of a branch of this company, i.e. branch ZEDO, in the scope covering the Szczecin CHP plant, Pomorzany CHP
plant and the district heating system in Gryfino, constituting an organised part of enterprise, functionally related to the
generation of electricity as well as electricity and heat in cogeneration and the distribution of heat. The transfer of the organised
part of enterprise to the acquiring company was
performed through a reduction in the divided company's supplementary
capital and an increase in the acquiring company's share capital by PLN 120 347 940 to PLN 2 501 281 240 as a result of the
issue of 12 034 794 registered shares of the acquiring company, with a nominal value of PLN 10 each. As the sole shareholder
of the divided company, PGE acquired all of the newly-issued shares in the increased share capital of the acquiring company.
Conventional Generation PGE GiEK S.A./PGE Inwest 8 sp.
z o.o.
July 15,2021
The decrease of the
share capital of PGE
GiEK S.A.waregistered
on September 9, 2021.
The increase of the
share capital of PGE
Inwest 8 sp. z o.o.has
not been registered
On July 15,
2021 the Extraordinary General Meeting of PGE GiEK S.A. and
the Extraordinary Assembly of Partners of
PGE Inwest
8 sp. z o.o. adopted resolutions to divide PGE GiEK S.A. (divided company) through partial division pursuant to art. 529 § 1 point
4 of the Polish Commercial Companies Code by transferring to
PGE Inwest 8 sp. z o.o. (acquiring company) certain assets of the
divided company in the form of a part of a branch of this company, i.e.
PGE GiEK S.A. –
Branch Zespół Elektrowni Dolna Odra,
in the scope covering the construction of gas-fired
units
constituting an organized part of the enterprise
("OPE"), functionally
related to the construction of new units
and the generation of electricity in the future. Transfer of OPE to the acquiring company
will take place by reducing the share capital of the divided company by the amount of PLN 27
543
770
to
PLN 6
450
307
050
and an increase in the share capital of the acquiring company by the amount of
PLN
32
314
000
to
PLN 32
364
000 as a result
of the issue of 32
314 shares of the acquiring company, with a nominal value of PLN
1
000 PLN each. As the sole shareholder
of the divided company, PGE acquired all of the newly-issued shares in the increased share capital of the acquiring company.

TRANSFORMATION OF COMPANIES

Segment Company in Date of transaction/ Comment
transformation/transformed
company
registration in the
NCR
Other Operations PGE Ekoserwis sp. z o.o.
after transformation:
PGE Ekoserwis S.A.
December 2, 2020/
February, 5 2021
On December 2, 2020 the Extraordinary Assembly of Partners of PGE Ekoserwis sp. z o.o. adopted resolution on transformation
of the company into a joint stock company under name PGE Ekoserwis S.A. PGE Ekoserwis S.A. was established on February 5,
2021 as a result of an entry into the register of entrepreneurs of the National Court Register. At the reporting date PGE S.A.
held
222 850 shares, constituting 95.08% in the share capital of PGE Ekoserwis S.A.
Other Operations EPORE sp. z o.o.
after transformation:
EPORE S.A.
December 21, 2020/
January 13, 2021
On December 21, 2020 the Extraordinary Assembly of Partners of EPORE sp. z o.o. adopted resolution on transformation of
the company into a joint stock company under name EPORE S.A. EPORE S.A. was established on January 13, 2021 as a result
of an entry into the register of entrepreneurs of the National Court Register. PGE GiEK S.A. is the sole shareholder of the
company, holding 100% in the share capital of EPORE S.A.

LIQUIDATION OF COMPANIES

Segment Company in liquidation Date of
transaction/
registration in the
National Court
Register
Comment
Supply PGE Trading GmbH with seat in
Berlin ("PGE Trading")
March 1, 2021/
PGE Trading has not
been removed from
the commercial register
kept by the District
Court in Berlin
Charlottenburg
On March 1, 2021 the Extraordinary Assembly of Partners of PGE Trading, in which PGE holds 100% of the share capital, adopted
resolution on dissolution of PGE Trading and appointment of a liquidator to carry out liquidation activities
of PGE Trading.

Publication of financial forecasts

PGE S.A. did not publish financial forecasts.

Information about shares and other securities

SHAREHOLDERS WITH A SIGNIFICANT STAKE

According to the best knowledge, on the ground of the letter from the Ministry of the State Treasury of April 27, 2016, the State Treasury holds 1 072 984 098 ordinary shares of the Company, representing 57.39% of the Company's share capital and entitling to 1 072 984 098 votes on the General Meeting of the Company, constituting 57.39% of total votes.

Table: Shareholders holding directly or indirectly by subsidiaries at least 5% of the total votes at the General Meeting of PGE S.A.

Shareholder Number of shares Number of votes % in total votes on General
Meeting
State Treasury 1 072 984 098 1 072 984 098 57.39%
Others 796 776 731 796 776 731 42.61%
Total 1 869 760 829 1 869 760 829 100.00%

Shares of the parent company owned by the members of management and supervisory authorities

As at June 30, 2021, none of the persons managing the Company owns or manages directly the shares of PGE S.A.

6. Statement on the reliable preparation of the financial statements

STATEMENT ON THE RELIABLE PREPARATION OF THE FINANCIAL STATEMENTS

To the best knowledge of the Management Board of PGE S.A., the half-yearly financial report, containing interim condensed consolidated financial statements of PGE Capital Group, interim condensed standalone financial statements for PGE S.A. and comparative data were prepared in accordance with the governing accounting principles, present a fair, true and reliable view of the material and financial situation of PGE Capital Group and its financial result.

The report of the Management Board on the activities of PGE Capital Group presents a true view of the development, achievements and situation of the Capital Group.

STATEMENT ON THE ENTITY AUTHORISED TO AUDIT THE FINANCIAL STATEMENTS

The Management Board of PGE S.A. declares that the entity authorised to audit the financial statements, which reviews the interim consolidated financial statements and interim condensed standalone financial statements for PGE S.A., has been appointed in accordance with provisions of the law. The entity and the statutory auditors, who performed the review, fulfilled all the requirements for issuing an unbiased and independent report on the review, in accordance with the governing provisions and professional standards.

7. Approval of the Management Board's Report

The foregoing Management Board's Report on activities of PGE Capital Group was approved for publication by the Management Board of the parent company on September 28, 2021.

Warsaw, September 28, 2021

Signatures of members of the Management Board of PGE Polska Grupa Energetyczna S.A.

President
of the
Management
Board
Wojciech Dąbrowski
Vice
President
of the
Management
Board
Wanda Buk
Vice
President
of the
Management
Board
Paweł Cioch
Vice
President
of the
Management
Board
Lechosław Rojewski
Vice
President
of the
Management
Board
Paweł Śliwa
Vice
President
of the Ryszard Wasiłek
Management
Board

Glossary AKPiA Control, measurement and automation apparatus area Ancillary control services (ACS) services provided to the transmission system operator, which are indispensable for the proper functioning of the National Power System and ensure the keeping of required reliability and quality standards. Achievable capacity the maximum sustained capacity of a generating unit or generator, maintained continuously by a thermal generator for at least 15 hours or by a hydroelectric generator for at least five hours, at standardized operating conditions, as confirmed by tests. ARA USD hard coal price index in EU. Loco in harbours Amsterdam-Rotterdam-Antwerp Balancing market a technical platform for balancing electricity supply and demand on the market. The differences between the planned (announced supply schedules) and the actually delivered/off-taken volumes of electricity are settled here. The purpose of the balancing market is to balance transactions concluded between individual market participants and actual electricity demand. The participants of the balancing market can be the generators, customers for electricity understood as entities connected to a network located in the balancing market area (including off-takers and network customers), trading companies, electricity exchanges and the TSO as the balancing company. Base, baseload standard product on the electricity market: a constant hourly power supply per day in a given period, for example week, month, quarter or year. BAT Best Available Technology Best Practices Document "Best Practice for GPW Listed Companies 2016" adopted by the resolution of the GPW Supervisory Board of October 13, 2015 and effective from January 1, 2016. Biomass solid or liquid substances of plant or animal origin, subject to biodegradation, obtained from agricultural or forestry products, waste and remains or industries processing their products as well as certain other biodegradable waste in particular agricultural raw materials. Black energy popular name for energy generated as a result of combustion of black coal or lignite. CCGT Combined Cycle Gas Turbine Circular economy system that minimises the consumption of resources and the level of waste as well as emissions and energy losses by creating a closed loop of processes in which waste from one process is used as resources in other processes so as to maximally reduce the quantity of production waste Cocombustion the generation of electricity or heat based on a process of combined, simultaneous combustion in one device of biomass or biogas together with other fuels; part of the energy thus generated can be deemed to be energy generated with the use of renewable sources. Co-generation the simultaneous generation of heat and electricity or mechanical energy in the course of one and the same technological process. Constrained generation the generation of electricity to ensure the quality and reliability of the national power system; this applies to generating units in which generation must continue due to the technical limitations of the operation of the power system and the necessity of ensuring its adequate reliability. CVC fund Corporate Venture Capital; in the CVC model, portfolio companies, aside from financial support, receive the opportunity to verify their ideas in a corporate setting Distribution transport of energy through distribution grid of high (110 kV), medium (15kV) and low (400V) voltage in order to supply the customers. Distribution System Operator (DSO) a power company engaging in the distribution of gaseous fuels or electricity, responsible for traffic in the gas or electricity distribution systems, current and long-term security of operation of the system, the operation, maintenance, repairs and indispensable expansion of the distribution network, including connections to other gas or power systems. Energy cluster civil-law arrangement that may include natural persons, legal entities, scientific units, research institutes or local government units, concerning the generation, distribution or trade in energy and energy demand balancing, with this energy being from renewable sources or other sources or fuels, within a distribution grid with nominal voltage below 110 kV, within the operational area of the given cluster, not exceeding the area of one district (powiat) in the meaning of the act on district authorities) or 5 municipalities (gmina) in the meaning of the act on municipal authorities; an energy cluster is represented by a coordinator, which is a cooperative, association, foundation appointed for this purpose or any member of the energy cluster indicated in the civil-law arrangement ERO Energy Regulatory Office (pol. URE). EUA European Union Allowances: transferable CO2 emission allowances; one EUA allows an operator to release one tonne of CO2.

EU ETS European Union Greenhouse Gas Emission Trading Scheme) EU emission trading scheme. Its operating
rules are set out in the ETS Directive, amended by the Directive 2009/29/EC of the European Parliament
and of the Council of April 23, 2009 (OJ EU L. of 2009, No. 140, p. 63—87).
EV Electric vehicle
FIT/FIP Feed-in-Tariff (FIT) and Feed-in-Premium (FIP): system of subsidies to the market price of electricity
performed by Zarządca Rozliczeń S.A.
Generating
unit
a technically and commercially defined set of equipment belonging to a power company and used to
generate electricity or heat and to transmit power.
GJ Gigajoule, a unit of work/heat in the SI system, 1 GJ = 1000/3.6 kWh = approximately 278 kWh.
GPZ main power supply point, a type of transformer station used for the processing or distribution of
electricity or solely for the distribution of electricity.
Green
certificate
popular name for energy generated from renewable energy sources.
GW gigawatt, a unit of capacity in the SI system, 1 GW = 109 W.
GWe one gigawatt of electric capacity.
GWt one gigawatt of heat capacity.
HCl hydrogen chloride.
Hg mercury.
HICP Harmonised Index of Consumer Prices
High Voltage a network with a nominal voltage of 110 kV.
Network (HV)
IED
Industrial Emissions Directive
IGCC Integrated Gasification Combined Cycle.
Installed the formal value of active power recorded in the design documentation of a generating system as being
capacity the maximum achievable capacity of that system, confirmed by the acceptance protocols of that system
(a historical value, it does not change over time.
IRiESP the Transmission Network Operation and Maintenance Manual required to be prepared by a
transmission system operator pursuant to the Energy Law; instructions prepared for power networks
that specify in detail the terms and conditions of using these networks by system users as well as terms
and conditions for traffic handling, operation and planning the development of these networks; sections
on transmission system balancing and system limitation management, including information on
comments received from system users and their consideration, are submitted to the ERO President for
approval by way of a decision.
IRZ Cold Intervention Reserve Service – service consisting of maintaining power units ready for energy
KRI production. Energy is produced on request of PSE S.A.
Key Risk Indicator
KSE the National Power System, a set of equipment for the distribution, transmission and generation of
electricity, forming a system to allow the supply of electricity in the territory of Poland.
KSP the National Transmission System, a set of equipment for the transmission of electricity in the territory
of Poland.
kV kilo volt, an SI unit of electric potential difference, current and electromotive force; 1kV= 103 V.
kWh kilowatt-hour, a unit of electric energy in the SI system defined as the volume of electricity used by the 1
kW equipment over one hour. 1 kWh = 3,600,000 J = 3.6 MJ.
kWp a power unit dedicated to determining the power of photovoltaic panels, means the amount of
electricity in the peak of production.
Low Voltage
Network (LV)
a network with a nominal voltage not exceeding 1 kV.
LTC long-term contracts on the purchase of capacity and electricity entered into between Polskie Sieci
Elektroenergetyczne S.A. and electricity generators in the years 1994-2001.
Medium
voltage
network (MV)
an energy network with a nominal voltage higher than 1 kV but lower than 110 kV.
MEV Minimum Energy Volumes.
MSR Market Stability Reserve (relating to CO2)
MW a unit of capacity in the SI system, 1 MW = 106 W.
MWe one megawatt of electric power.

MWt one megawatt of heat power.
NAP National emissions Allocation Plan, prepared separately for the national emission trading system and for
the EU emission trading system by the National Administrator of the Emission Trading System.
NAP II National CO2 emissions Allocation Plan for the years 2008-2012 prepared for the EU emission trading
system adopted by the Ordinance of the Council of Ministers of July 1, 2008 (Dz. U. of 2008, No. 202,
NH3 item 1248).
ammonia
Nm3 normal cubic meter; a unit of volume from outside the SI system signifying the quantity of dry gas in 1
m3 of space at a pressure of 101.325 Pa and a temperature of 0°C.
NOx nitrogen oxides.
N:W ratio Ration of volume of overburden removed in m3
to the mass of extracted coal in tons
OTF Organised Trading Facilities
Operational ORM constitutes of generation capacities of active Production Schedular Units (JGWa) in operation or
Capacity layover, representing excess capacity over electricity demand available to the TSO under the Energy
Reserve Sale Agreements and on the Balancing Market in unforced generation
(ORM)
Peak, peakload a standard product on the electricity market; a constant power supply from Monday to Friday, each hour
between 7:00 a.m. and 10:00 p.m. (15-hour standard for the Polish market) or between 8:00 a.m. and
8:00 p.m. (12-hour standard for the German market) in a given period, for example week, month,
quarter or year.
Peak power special type of hydro-power plant allowing for electricity storage. It uses the upper reservoir, to which
pumped water is pumped from the lower reservoir using electricity (usually excessive in system). The pumped
storage plants storage facilities provide ancillary control services for the national power system. In periods of increased
demand for electricity, water from the upper reservoir is released through the turbine. This way,
electricity is produced.
PJ Petajoule, a unit of work/heat in the SI system, 1 PJ = approx. 278 GWh
Property rights negotiable exchange-traded rights under green and co-generation certificates
Prosumer end customer who purchases electricity under a comprehensive agreement and generates electricity
PSCMI1 only from renewable sources at a micro-installations for own purposes, unrelated to economic activities
Polish Steam Coal Market Index 1 - average level of prices of coal dust sold to industrial-scale power
plants in Poland
RAB Regulatory Asset Base.
Red certificate a certificate confirming generation of electricity in co-generation with heat.
Red energy popular name for electricity co-generated with heat.
Regulator the President of ERO, fulfilling the tasks assigned to him in the energy law. The regulator is responsible
for, among others, giving out licenses for energy companies, approval of tariffs for energy companies,
appointing Transmission System Operators and Distribution System Operators.
Renewable a source of generation using wind power, solar radiation, geothermal energy, waves, sea currents and
Energy Source tides, flow of rivers and energy obtained from biomass, landfill biogas as well as biogas generated in
(RES) sewage collection or treatment processes or the disintegration of stored plant or animal remains.
RIG Readiness Interventional Reserve - the power plant's readiness to provide the active power generation
service or its consumption at the request of PSE.
SAIDI System Average Interruption Duration Index - index of average system interruption time (long, very long
and disastrous), expressed in minutes per customer per year, which is the sum of the interruption
duration multiplied by the number of consumers exposed to the effects of this interruption during the
year, divided by the total number of off-takers. SAIDI does not include interruptions lasting less than
three minutes and is determined separately for planned and unplanned interruptions. It applies to
breakdowns in the low (LV), medium (MV) and high voltage (HV), wherein SAIDI in quality tariff does not
include interruptions on low voltage.
SAIFI System Average Interruption Frequency Index - index of average system amount of interruptions ( long,
very long and disastrous ), determined as number of off-takers exposed to the effects of all such
interruptions during the year divided by the total number of off-takers. SAIFI does not include
interruptions lasting less than three minutes and is determined separately for planned and unplanned
interruptions. It applies to breakdowns in the low (LV), medium (MV) and high voltage (HV), wherein
SAIFI in quality tariff does not include interruptions on low voltage .
SCR Selective catalytic reduction
SNCR Selective non-catalytic reduction

Start-up early-stage company established in order to build new products or services and characterised by a high
level of uncertainty. The most common features of start-ups are: short operational history (up to 10
years), innovativeness, scalability, higher risk than in the case of traditional businesses but also potential
higher returns on investment
Tariff the list of prices and rates and terms of application of the same, devised by an energy enterprise and
introduced as binding on the customers specified therein in the manner defined by an act of parliament.
Tariff group a group of customers off-taking electricity or heat or using services related to electricity or heat supply to
whom a single set of prices or charges and terms are applied.
TGE Towarowa Giełda Energii S.A. (Polish Power Exchange), a commodity exchange on which trading can take
place in electricity, liquid or gas fuels, extraction gas, emission allowances and property rights whose
price depends directly or indirectly on electric energy, liquid or gas fuels and emission allowances,
admitted to commodity exchange trading.
TPA, TPA rule Third Party Access, the owner or operator of the network infrastructure to third parties in order to
supply goods/services to third party customers.
Transmission of
electricity
transport of electricity through high voltage (220 and 400 kV) transmission network from generators to
distributors.
Transmission
System
Operator (TSO)
a power company engaging in the transmission of gaseous fuels or electric energy, responsible for traffic
in a gas or power transmission system, current and long-term security of operation of that system, the
operation, maintenance, repair and indispensable expansion of the transmission system, including
connections with other gas or power systems. In Poland, for the period from July 2, 2014 till December
31, 2030 Polskie Sieci Elektroenergetyczne S.A. was chosen as a TSO in the field of electricity
transmission.
TWh terawatt hour, a multiple unit for measuring of electricity unit in the system SI. 1 TWh is 109 kWh.
Ultra-high
voltage network
(UHV)
an energy network with a voltage equal to 220 kV or higher.
V (volt) electrical potential unit, electric voltage and electromotive force in the International System of Units (SI),
1 V= 1J/1C = (1 kg x m2
3
) / (A x s
).
W (watt) a unit of power in the International Systems of Units (SI), 1 W = 1J/1s = 1 kg x m2 x s
-3
Yellow
certificate
a certificate confirming generation of energy in gas-fired power plants and CCGT power plants.
Yellow energy popular name for energy generated in gas-fired power plants and CCGT power plants.