Management Reports • May 15, 2018
Management Reports
Open in ViewerOpens in native device viewer
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period
ended March 31, 2018
| 1. | Description of activity of the Capital Group | 5 |
|---|---|---|
| 1.1. Description of organisation | 6 | |
| 2. | PGE Group's strategy and its implementation | 8 |
| 2.1. Strategy of the Capital Group | 8 | |
| 2.2. Implementation of key projects within the strategic objectives | 9 | |
| 3. | Electricity market and regulatory and business environment | 16 |
| 3.1. Macroeconomic environment | 16 | |
| 3.2. Regulatory environment | 18 | |
| 3.3. Supply markets | 28 | |
| 4. | Results of PGE Capital Group | 30 |
| 4.1. Key financial results of the PGE Capital Group | 30 | |
| 4.2. Key operational figures of PGE Capital Group | 34 | |
| 4.3. Key financial results in the business segments | 37 | |
| 4.4. Significant events of the reporting period and subsequent events | 48 | |
| 4.5. Transactions with related entities | 53 | |
| 4.6. Publication of financial forecasts | 53 | |
| 4.7. Information about shares and other securities | 53 | |
| 5. | Statements of the Management Board | 54 |
| 6. | Approval of the Management Board's Report | 54 |
| Glossary | 55 |
| March 31, 2018 | Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended | ||
|---|---|---|---|
4 of 57
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2018
Capital Group of PGE Polska Grupa Energetyczna S.A. ("PGE Capital Group", the "Capital Group", "PGE Group", the "Group") is the largest vertically integrated producer of electricity and heat in Poland. With a mix of own fuel sources, generation assets and distribution network, PGE Group provides a safe and reliable supply of electricity to more than five million households, businesses and institutions.
The parent company of PGE Capital Group is PGE Polska Grupa Energetyczna S.A. (also "PGE S.A.", "PGE", the "Company", the "Issuer").
PGE Group currently organizes its activities in five business segments:
Conventional Generation
Core business of the segment includes extraction of lignite, production of electricity and heat from conventional sources as well as transmission and distribution of heat . The Conventional Generation segment includes PGE Energia Ciepła S.A., which also tradesin electricity.
Renewables
Core business of the segment includes electricity generation from renewable sources and in pumped-storage power plants.
Supply
Core business ofthe segment includes trading of electricity across the country, wholesale trading of electricity on domestic and international market, provision of services to companies from the PGE Group related to commercial management of generation capacities of the Group and electricity produced, as well as trading of CO2 allowances and energy certificates and fuels.
Distribution
Core business of the segment includes supply of electricity to final off-takers though the grid and HV, MV and LV infrastructure.
Other Operations
Other operations include services, through the subsidiaries, to PGE Group, which includes organisation of capital raising projects and provision of IT, payroll & HR and transportation services. Its activities also include subsidiaries formed to prepare and implement a projectto build a nuclear power plant and invest in start-ups.
Changes which occurred in the PGE Capital Group's structure in the period from January 1, 2018 until the publication date of this report, are presented in note 1.3 to consolidated financial statements and described below.
| Entity | Date of registration | (1) Share capital | Comment | |
|---|---|---|---|---|
| National Court Register | (2) Increase | |||
| (3) Share capital | ||||
| after increase | ||||
| Towarzystwo Funduszy |
April 3,2018 | (1) | PLN6250000 | On November 28, 2017 the Extraordinary General Meeting of the company adopted a resolution on an increase of the company's share |
| InwestycyjnychEnergia S.A. | (2) PLN18000000 | capital. The increased capital was acquired by PGE S.A., in exchange for a cash contribution. PGE S.A. holds 100% of share capital. | ||
| (previous name: PGE Towarzystwo Funduszy | (3) PLN24250000 | |||
| Inwestycyjnych S.A.) | ||||
| PGE Inwest5 sp. z o.o., PGE Inwest 8 sp. z o.o., Not yet registered in |
(1) | PLN20000 | On April 5, 2018 the Extraordinary Assemblies of Partners of the companies adopted resolutions on an increase of the company's share |
|
| PGE Inwest 9 sp. z o.o., PGE Inwest 10 sp. | National Court Register | (2) | PLN 30000 | capital by PLN 30 000 in each case. The increased capital were acquired by PGE S.A. in exchange for cash contributions. PGE S.A. holds |
| zo.o., PGE Inwest 11 sp. z o.o., PGE Inwest | (3) | PLN 50000 | 100% of share capital ofthe companies. |
|
| 12sp. z o.o. andPGE Inwest 14 sp. z o.o. | ||||
| PGE Inwest 17 sp. z o.o., PGE Inwest 18 Not yet registered in |
(1) | PLN10000 | On April 5, 2018 the Extraordinary Assemblies of Partners of the companies adopted resolutions on an increase of the company's share | |
| sp.zo.o. andPGE Inwest 19 sp. z o.o. National Court Register |
(2) | PLN30000 | capital by PLN 30 000 in each case. The increased capital were acquired by PGE S.A. in exchange for cash contributions. PGE S.A. holds |
|
| (3) | PLN 40000 | 100% of share capital ofthe companies. |
| Shares of the entity | Date of transaction/ registration in the National Court Register |
Number of acquired shares |
Comment |
|---|---|---|---|
| ElectroMobility Poland S.A. ("ElectroMobility") – acquisition by PGE S.A. of the share capital increase shares of ElectroMobility |
January 3, 2018/ April 23, 2018 ElectroMobility's share capital increase registered |
2 500 shares |
On January 3, 2018 the Extraordinary General Meeting of adopted resolution on a share capital increase by PLN 20 000 000 to PLN 30 000 000 by increasing the nominal value of existing shares. In exchange for a cash contribution, PGE S.A. took up increased nominal value of 2 500 shares, the total nominal value of which increased from PLN 2 500 000 to PLN 7 500 000. As a result of the share capital increase, PGE S.A.'s stake in ElectroMobility did not change (25% shareholding). |
| Polska Grupa Górnicza S.A. ("PGG") – acquisition by PGE Górnictwo i Energetyka Konwencjonalna S.A. ("PGE GiEK S.A.", "PGE GiEK") of shares in the increased share capital of PGG |
January 31, 2018 April 6, 2018PGG'sshare capital increase registered |
300 000 shares | On January 31, 2018 the Extraordinary Assembly of Partners of PGG adopted resolution in the increase of the share capital by PLN 300 000 000 to PLN 3 916 718 200, through issue of new inscribed shares. PGE GiEK S.A. took up 300 000 shares with a nominal value of PLN 30 000 000, representing 0.8% in the increased share capital of PGG. Currently PGE GiEK S.A. holds a total of 6 000 000 shares with a nominal value of PLN 600 000 000 representing 15.32% in the share capital of PGG. |
| PGE Energia Ciepła S.A. - acquisition of shares by PGE Polska Grupa Energetyczna S.A. (reverse squeeze-out procedure) |
March 7,2018 | 3 285 shares |
PGE Polska Grupa Energetyczna S.A. acquired 3 285 shares of PGE Energia Ciepła S.A., through reverse squeeze-out procedure, pursuant to art. 418 of the Polish Commercial Companies Code. Currently PGE S.A. holds total of 70 436 319 shares with a nominal value of PLN 704 363 190, representing 99.52% in the share capital of the company. |
| Shares of the entity | Date of transaction/ registration in the National Court Register |
Number of acquired shares |
Comment |
|---|---|---|---|
| Zespół Elektrociepłowni Wrocławskich Kogeneracja S.A. ("Kogeneracja S.A.") - acquisition of shares by PGE Energia Ciepła S.A. (as a result of tender offer) |
March 14,2018 | 1 202 172 shares |
PGE Energia Ciepła S.A. acquired 1 202172 shares of Kogeneracja S.A. (acqusition was a conseqience of the tender offer due to exceeding 33% of total votes, pursuant to art. 73 Act of July 29, 2005 on public offering, conditions governing the introduction of financial instruments to organised trading, and public companies). Currently PGE Energia Ciepła S.A. holds directly 3 845 041 shares of the company with a nominal value of PLN 19 225205, representing 25.81% in the share capital of Kogeneracja S.A. In addition, PGE Energia Ciepła S.A., through one-man subsidiary Investment III B.V., holds indirectly 4 807 132 shares with a nominal value of PLN 24035 660, representing 32.26% in the share capital of Kogeneracja S.A. |
| Acquiring company /acquired company | Date of transaction/ registration in the National Court Register |
Comment |
|---|---|---|
| ELTUR -SERWIS sp.z o.o. -acquiring company TOP SERWIS sp. z o.o. -acquired company |
February 26,2018 April 12,2018 merger registered in the National Court Register |
On February 26, 2018 the Extraordinary Assembly of Partners of ELTUR - SERWIS sp. z o.o. (acquiring company) and TOP SERWIS sp.z o.o. (acquired company) adopted resolutions on merger of the companies in mode of art. 492 § 1 p. 1 of the Polish Commercial Companies Code (merger through acquisition), ), through transferring of all assets of the acquired company to the acquiring companyin exchange for the shares, which the acquiring company allotted to PGE S.A. as a sole shareholder of the acquired company. The share capital of the acquiring company was increased by PLN 50 000, i.e. from PLN 34 824 500 to PLN34 874 500. |
| PGE Energia Odnawialna S.A. - acquiring company PGE Energia Natury PEW sp. z o.o. - acquired company |
March 27 and29,2018 May 2, 2018merger registered in the National Court Register |
The Extraordinary General Meeting of PGE Energia Odnawialna S.A. (acquiring company) and the Extraordinary Assembly of Partners of PGE Energia Natury PEW sp.z o.o. (acquired company) on – respectively – March 29, 2018 and March 27, 2018 adopted resolutions on merger of the companies in mode of art. 492 § 1 p. 1 of the Polish Commercial Companies Code (merger through acquisition), through transferring of all assets of the acquired company to the acquiring company without issue of new shares in exchange for the shares in the share capital of the acquired company, pursuant to art. 516 of the Polish Commercial Companies Code and dissolution of the acquired company without its liquidation. PGE Energia Odnawialna S.A. was the sole shareholder of PGE Energia Natury PEW sp. z o.o. |
| Entity | Date of transaction | Comment |
|---|---|---|
| PGE KLASTER sp. z o.o. March 29and30,2018 |
On March 29, 2018 the Extraordinary Assembly of Partners of PGE KLASTER sp. z o.o. adopted resolution on obligation of the sole |
|
| shareholder i.e. PGE Energia Odnawialna S.A., to supplementary payment to the shares, in the meaning of art. 177 of the Polish | ||
| Commercial Companies Code, in total amount of PLN 2 000 000, i.e. PLN 2000 for each share of PGE KLASTER sp. z o.o. entitled to PGE |
||
| Energia Odnawialna S.A., by March 30, 2018. In accordance with the above resolution, additional equity contributions were paid on |
||
| March 30, 2018. |
PGE Group's strategy update by 2020 was approved by the Supervisory Board on September 6, 2016. The strategy seeks to adapting the Group's activities to the changing environment, addresses threats and opportunities connected with, among others, volatility of fuel prices, climate policy directions, market model evolution and new technology development.
PGE's mission is to ensure security and growth based on reliability of supply, technical excellence, modern services and partnership relationships. Increase its value for shareholders and the key role in ensuring Poland's energy security are the overall objectives which PGE Group is constantly realising.
Diagram: Redefining PGE Group's mission.
PGE Group's vision determines our target position in four areas:
| 2016 – 2018 |
2018 + |
|---|---|
| Continuation of flagship Investments in Opole and Turów Launch of preparatory phase for construction of new gas-fired unit at Dolna Odra power plant Closing of transaction to acquire EDF Polska's assets: strengthening the top position on the power market and securing the position of largest supplier of district heating Adoption of PGE Group's District Heating Strategy |
Establishment of specialised business line integrating activities in the district heating area Construction of 1 000 MWe of new cogeneration capacities Increase of low-emission fuels' share in the district heating segment to 50% Launch of 1 045 MW offshore wind farm, with potential to expand the project by additional 1 500 MW Increase of exposure to the diffuse source segment Optimal adaptation of power plants and CHP plants to new industrial emission standards BAT Optimisation of generation portfolio in terms of participation in the capacity market |
| Connection process simplified and shortened to 7 months Launch of Telephone Reporting Centre, which is active throughout PGE Dystrybucja's entire area, handling the emergency line 991 Launched innovative system for detecting and isolating short-circuit incidents on overhead MV lines Implemented innovative metering system at Białystok branch and Łódź branch Adaptation of distribution network to new sources – 8 251 micro installations connected in 2017 alone Customer satisfaction indicators and credibility assessments at very high level Retention of low client migration rate in mass segment Expanded retail product offering Launched new sales and customer service channels (mobile electronic customer service office, chatbot) |
Increase of share of managed district heating networks at PGE Energia Ciepła S.A. locations to 2/3 Increase of the Group's potential through mergers and acquisitions in the district heating area Further improvement in supply reliability and reduction in SAIDI and SAIFI by 56% between 2015 and 2020. Development of integrated and automated system for managing LV distribution network infrastructure cooperating with diffuse energy sources and accumulators installed at prosumer installations. Construction of system for automatic reconfiguration of LV grid to improve the quality of distribution services in normal and emergency work mode Development of autonomous mechanisms for reducing the effects of LV line failures |
| 2016 – 2018 |
2018 + |
|---|---|
| Reduction in PGE Group's controllable costs Standardisation and optimisation of support functions across entire PGE Group Start of implementation of integrated management system for production assets Update of human capital management strategy |
Reduction of controllable costs by PLN 500 million compared to 2016 In the district heating segment, reduction of repair expenses by 10% (by 2023, compared to 2017) Additional annual EBITDA resulting from implementing the District Heating Strategy estimated at approx. PLN 1 billion by 2030 Retention of competitiveness of lignite mining Increase in efficiency of combustion by product management |
| Launch of specialised fund CVC PGE Ventures for equity Investments in promising startups Formation of PGE Nowa Energia sp. z o.o. ("PGE Nowa Energia") for incubation and acceleration of earliest-stage projects Agreement on establishment of two energy clusters |
PLN 400 million until 2020 intended for research, development and innovations, half of which from external sources Development of energy efficiency activities Development and commercialisation of new technologies to introduce to the market modern and comprehensive client offering, covering photovoltaics, electromobility, intelligent home solutions (the Smart Energy project), natural gas and demand management |
| Key projects in Q1 2018 | |
|---|---|
| Development investments |
Construction of new units in Opole power plant ● aim of the project: construction of two power units of 900 MW each ● budget: approx. PLN 11 billion (net, without costs of financing) ● capital expenditures incurred so far: approx. PLN 8.4 billion ● fuel: hard coal ● net efficiency: 45.5% ● contractor: syndicate of companies: Rafako, Polimex-Mostostal and Mostostal Warszawa with co-operation of GE as Project manager on behalf of the syndicate ● commissioning according to the binding agreement with the General Contractor: unit 5 – July 31, 2018; unit 6 – March 31, 2019 wherein commissioning dates declared by the General Contractor are: May 31, 2019 for unit 5 and September 30, 2019 for unit 6. The Project team have analysed the working schedule presented by the General Contractor with regard to methodic accuracy of assumptions taken, reasons for delay and planned methods of further management of the contract execution. In the opinion of the Project team, the execution of the investment in above mentioned dates is possible provided that the General Contractor will act with the highest commitment, introducing necessary conditions which will guarantee timely execution of works (see https://www.gkpge.pl/Investor-Relations/Current-reports/5-2018). |
| ● status: as regards unit 5 cold start-up is progressing, preparations for a chemical cleaning of the boiler are under way; as regards the key equipment at unit 6, installation work is on-going with regard to the boiler and assembly of low- and medium-pressure pipelines at the machine facility; work is also continued on the assembly of ancillary infrastructure including flue gas desulphurisation systems and a slag removal system; overall project progress at the end of March 2018 was approx. 91% |
|
| Construction of new unit in Turów power plant ● aim of the project: construction of power unit with a capacity of 490 MW ● budget: approx. PLN 4 billion (net, without costs of financing) ● capital expenditures incurred so far: approx. PLN 1.6 billion ● fuel: lignite ● net efficiency: 43.1% ● contractor: syndicate of companies: MHPSE, Budimex and Tecnicas Reunidas ● commissioning: H1 2020 ● December 1, 2014 - issue of Notice to Proceed ● status: status: as regards the unit's main equipment, assembly of the boiler's pressure part and elements of a turboset is on-going, as is assembly of auxiliary systems, including a flue gas desulphurisation system and carburisation system and construction work on two electricity buildings: main (including control room) and electrostatic precipitator. Construction of cooling tower shell recommenced after winter break. |
|
| Construction of a Thermal Processing Installation with Energy Recovery at Rzeszów CHP ● aim of the project: construction of a thermal processing installation with energy recovery at Rzeszów CHP with capacity of approx. 8 MWe in condensation (approx. 4.6 MWe + 16.5 MWt in co-generation ) ● budget: approx. PLN 293 million (net, without costs of financing ) ● capital expendituresincurred so far: approx. PLN 148 million ● fuel: municipal waste ● boiler's efficiency: 86% ● contractor: syndicate of TM.E. S.p.A. Termomeccanica Ecologia and Astaldi S.p.A ● commissioning: June 2018 ● status: as regards the main equipment, installation works are on-going and the assembly of ancillary systems continues, including flue gas aftertreatment and bottom ash revalorisation; assembly of equipment and installations in the electricity area and the control, measurement and automation |
apparatus area.
| Modernisation and | Comprehensive reconstruction and modernisation of units no. 1-3 at Turów power plant |
|---|---|
| replacement projects |
● aim of the project: Adaptation to future BAT conclusions requirements regarding permissible emissions of SO2, NOx and particulate, increase of availability and efficiency, as well as expansion of each turboset's nominal capacity by approx. 15 MWe |
| ● status: modernisation work on unit 2 was completed. Irregularities in the operation of the turboset | |
| were observed during the unit's startup. Work is under way to remove the causes of the problem. | |
| The first synchronisation of unit 2 with the power network and start of regulated operations are | |
| planned for the second quarter of 2018. | |
| ● budget: PLN 0.8 billion (net, without costs of financing) | |
| ● fuel: lignite | |
| ● completion: 2020 | |
| Change in technology of furnace waste storage for units 1-12 – Bełchatów power plant and | |
| construction of installation to transport ash; production and transport of sludge from unit 14 | |
| in Bełchatów power plant | |
| ● aim of the project: to provide the capability for storage of furnace waste produced during the | |
| operation of units 1-12 of Bełchatów power plant until exhaustion of lignite resources. In the | |
| course of the project, the requirement to fit out unit 14 with new technology for the transport and storage of combustion waste was identified. |
|
| ● status: works related to filling in and securing the "Zwałowisko" and "Lubień" storage sites continue, | |
| as do works related to construction of installations for unit 14. Process of start-up of installation for suspension production from tanks 1 and 2 and of installation of ash feeding to tank V and the |
|
| dispatch station have been commenced. Comissioning of installations is planned at the end of August 2018. |
|
| ● budget for units 1-12: ca. PLN 450 million (net, without costs of financing) | |
| ● budget for unit 14: ca. PLN 90 million (net, without costs of financing) | |
| ● completion: 2018 | |
| Modernisation of the Pomorzany power plant | |
| ● aim of the project: Reduction of NOx and SO2 emissions from Benson OP-206 boilers to a level |
|
| allowing to meet the requirements of future BAT conclusions as well as to ensure that the plant remains in operation until about 2040. |
|
| ● status: work is in progress on assembly of SCR reactor structure at unit B. Trial run of SCR | |
| installation at unit A was completed – installation was approved for use and warranty | |
| measurements began. | |
| As regards the flue gas desulphurization (FGD) system: assembly of wharf construction commenced, | |
| ongoing assembly works of supporting structure for absorber and bag filter of Unit A, assembly | |
| of reactor B in system's building commenced. | |
| ● budget: ca. PLN 213 million (net, without costs of financing) | |
| ● fuel: hard coal | |
| ● completion: SCR – 2018 (unit A/B), FGD – 2019 | |
| Construction of flue gas denitrification installation and flue-gas desulphurisation for OP-230 boilers | |
| no. 3 and 4 in Bydgoszcz CHPs | |
| ● aim of the project: Reduction of NOx and SO2 emissions from boilers no. 3 and 4 to a level allowing for further use after 2017 |
|
| ● status: on March 2, 2018, a foundation act was signed and a cornerstone set for an expansion of the | |
| flue gas desulphurisation system and system for reducing nitrogen oxide emissions. Construction | |
| and assembly works and deliveries of system elements are on-going. | |
| As regards deNOx : on January 30, 2018, a final and binding decision from the Marshal's Office of |
|
| Bydgoszcz was received, approving the building design and granting a construction permit. On January 31, 2018, the construction site was handed over to the Contractor by protocol. Construction |
|
| and assembly works and deliveries of system elements are on-going. | |
| ● budget: for deNOx project: PLN 48 million (net, without costs of financing; for FGD project: PLN 45 |
|
| million (net, without costs of financing) | |
| ● fuel: hard coal | |
| ● completion: 2018 |
| Construction of flue gas denitrogenation system forsix OP-650 boilers at Rybnik power plant ● project objective: construction of flue gas denitrogenation unit to ensure compliance with IED Directive requirements ● budget: PLN 259 million (net, without financing costs) ● expendituresso far: PLN 215 million (net, without financing costs) ● contractors: SCR – Consortium Strabag sp. z o.o. and Strabag Energy Technologies GmbH, SNCR – Energotechnika – Energorozruch S.A., PM – Energotechnika – Energorozruch S.A. ● deadline: December 2018 ● status: progress at approx. 83%. Still left to do is SNCR at boiler 5 as well as optimisation and some warranty-related measurements. |
|
|---|---|
| Construction of flue gas denitrogenation units at CHP plantsin: Kraków, Wrocław, Gdańsk, Gdynia ● project objective: construct flue gas denitrogenation unit to ensure compliance with IED Directive requirements ● budget: PLN 545 million (net, without financing costs) ● expendituresso far: PLN 485 million (net, without financing costs) ● contractors: General Electric; Fortum-ZRE; Fortum Mehldau; SBB Energy; Fortum-Instal ● deadline: December 2018 ● status: progress at approx. 90%. Still left to complete and optimise are SNCR installations in Gdańsk, Kraków and Gdynia. |
|
| Project of network losses reduction |
● aim of the project: reduction of electricity procurement costs for balancing differences ● activities undertaken (multi-year project): replacement of HV/MV, MV/LV transformers with low-loss units, adaptation of transformers' output to power consumption; grid conversion and modernisation: construction of HV/MV and MV/LV stations, increase of cable cross-sections for HV, MV and LV lines, reduction of MV and LV lines; maintenance of optimal grid workload, elimination of adverse energy transit in HV lines, optimisation of MV line partitions; reduction of load asymmetries in LV lines. ● the results of the project: lowering of the balancing difference in 2017 to 5.37% (in 2016 it amounted to 5.77%); volume of balancing difference in 2017 was by 5% lower than in 2016 with the simultaneous increase of volumes of energy delivered to off-takers by 3% in that period. ● activities initiated in Q1 2018: project assumptions for 2018-2022 were updated in March 2018; activities aimed at reducing balancing differences at PGE Dystrybucja S.A. are to be continued, the |
Strategic Research and Development and New Business Areas ("SOBiR+NB"), within which the Group intends to carry out R&D and innovation projects concerning, among others, the supply of new products or services. The SOBiR+NB areas are aligned with the Group's most important challenges and are identified for each element of the value chain (see the graph below).
In connection with an Update of the Group's Strategy until 2020 being introduced in the third quarter of 2016, works have progressed on updating the Development and Innovation Strategy. The updated Development and Innovation Strategy will place emphasis on challenges that most affect the Group, where R&D and innovation are essential to the achievement of business objectives. In connection with this, particular attention will be paid to both dynamically developing segments such as electromobility or energy warehousing as well as ways of acquiring and developing initiatives such as new models of management and implementation of innovations like acceleration and investing in an equity fund model in small businesses that develop technologies and products. A strategic option for PGE will be the design and development of specific technologies – which constitutes a large quality change in contrast to the previous model – an operator of technologies from other businesses, providers. An SPV named PGE Nowa Energia was formed to work with small businesses (start-ups) in the acceleration and project commercialisation (implementation of innovation solutions) formula. By working with start-up market stakeholders (small businesses, accelerators, other investors, government agencies, etc.), the company is a competence centre, allowing PGE to effectively identify and develop technologies and products being part of and related to the power value chain. Moreover, PGE Nowa Energia is a company designated to build charging infrastructure for electric vehicles and develop the Group's operations in the electromobility area.
In order to facilitate the continued development of companies and obtainment of new solutions from the market (at the maturity stage later than acceleration), the PGE Ventures company was established, which serves the role of the corporate investment fund of PGE Capital Group. The purpose of the company is to invest PGE's own funds and funds obtained via support tools – the public budget available through the Polish Development Fund (PFR) and the National Research and Development Centre ("NCBiR").
PGE focuses on initiating and executing R&D projects that fall within the SOBiR+NB areas. In the first quarter of 2018, several dozen projects were continued within these areas.
| Key projects in Q1 2018 | |||
|---|---|---|---|
| Involvement in equity structures that support the development of new technologies and solutions as well as small businesses |
● aim of the project: Introduction of a new model for developing and implementing new solutions, allowing to manage higher-risk undertakings whilst reducing time-to-market for new solutions (for own purposes or to sell to other entities) ● main activities: PGE Ventures company was established to conduct an investment activity on the basis of its own funds and funds obtained from the public budget (PFR Ventures, NCBiR). The process of recruitment was completed the first edition of PGE Ventures' scouting programme was completed, with the first two investment agreements signed in January 2018 Advanced negotiations are on-going with other highly innovative startups in which PGE Ventures plans to invest in the nearest future the acceleration activities conducted by the PGE Nowa Energia company have been commenced and rules of co-operation between the companies (PGE Nowa Energia and PGE Ventures) have been determined, providing for optimization and maintenance of continuity at the next stages of development of small. Project acceleration applications are being accepted. |
||
| Electromobility | ● aim of the project: promoting and developing electric transport in Poland and gaining by PGE Capital Group of experience and the competence necessary to serve the role of the operator of electrical cars charging infrastructure and of the supplier of electrical cars charging services ● main activities: concern individual transport – cars used for private and business purposes PGE has been continuing a project launched in December 2016 in which a pilot run is being implemented that consists of the construction of infrastructure for an electromobility system in Łódź. In the fourth quarter of 2017, the first rapid charging station in Łódź was launched, with the next stations expected to follow in the coming months. Talks regarding cooperation in other locations are on-going (Rzeszów, Kraków, Siedlce, Warsaw). |
||
| Recykling | aim of the project: PGE Group is preparing to execute a project allowing to develop and implement a new technology for the recycling of lithium batteries, particularly those used in energy warehouse systems and to charge electric cars. This technology is intended to obtain strategic materials from used lithium batteries – cobalt, nickel and copper. The project directly supports the assumptions of the Ministry of Development concerning the transformation of the economy in the direction of closed-circuit economy, as well as the requirements of the Polish legislation specifying the needs of collection and utilization of used batteries. The project has a business potential due to the anticipated growth in the world's market of lithium batteries and the increase in the quantity of battery wastes connected with that, as well as increased demand of markets for products recycled from used batteries. ● main activities: PGE S.A. has set up a consortium with RDLS sp. z o.o. ("RDLS"), a spin-off company of the Warsaw University operating in the area of environmental research and biotechnology. The goal of the consortium is to produce a pilot recycling installation for lithium batteries and implement this technology in Poland. The project was recommended by NCBiR for co-financing from public funds of the Research Programme of the Power Sector ("PBSE"). The consortum led by RDLS, received a consent for financing of the project from NCBiR funds. In December 2017 the Management Board of PGE S.A. issued approval for commencement of the project implementation phase and signing of an agreement on project funding between NCBiR and RDLS. The project implementation has commenced on December 29, 2017 – on that day the consortium leader aigned the agreement for financing of the project. |
PGE Group's main operating area is Poland, and the domestic macroeconomic backdrop has a substantial impact on Group's results. At the same time, the condition of Poland's economy remains largely tied to the situation across the European Union and in global markets. The Group's financial results are affected by both the situation in specific segments of the economy and the financial markets, which affect the terms of PGE Group's debt financing.
As a rule of thumb, there is a historical correlation between rising electricity demand and economic growth in Poland. Considering PGE Group's position on the Polish power generation market, as well as its substantial share in the electricity sales and distribution market, changes in power and heat demand may have a significant impact on the Group's results.
In the first quarter of 2018, gross electricity consumption went up 2.8% compared to analogical period of 2017. The increase was higher than in the previous year, when consumption went up 2.7% compared to analogical period of 2016.
Economic trends in the first quarter of 2018 remained positive in general. According to estimates by Institute of Economic Prognosis and Analyses, in the first quarter of 2018 growth of real gross domestic product (not adjusted seasonally) was 4.2% compared to 2016.
Diagram: Seasonally adjusted GDP change vs. change in domestic gross electricity consumption.
Economic growth and rising electricity consumption were accompanied by optimistic condition of Polish industry, which is responsible for approx. 45% of domestic electricity consumption. The Purchasing Managers' Index (PMI) for industry reached 54.2 points on average in the first quarter of 2017, and 54.0 points on average in the first quarter of 2018. It means level above 50 points, above which the respondents expect the sector's situation to improve. The positive result stems mainly from growing production, employment and consumption. The results of the Polish industrial sector should be further strengthened by the Eurozone, whose PMI for Q1 2017 reached an average level of 55.6 points, and 57.0 points in the analogical period of 2018.
Diagram: Manufacturing PMI in Poland and Eurozone (in points).
Source: Markit Economics
Positive development in the Polish economy is confirmed by dynamics in overall industrial production. In the first quarter of 2018, it went up by 5.6% y/y, compared to 7.3% in the first quarter of 2017. The change resulted from increase in industrial production dynamics (5.5% y/y in the first quarter of 2018 versus 8.1% in the first quarter of 2017). Simultaneously, production in the whole energy sector increased by 9.2% y/y in the first quarter of 2018 vs 3.6% in the first quarter of 2017. The value of industrial manufacturing depends on volumes of goods produced and prices. PPI in the first quarter of 2018 amounted to 0.1% y/y. CPI reading amounted to 1.5% y/y.
Table: Key economic indicators for Poland.
| Key economic indicators (% change y/y) |
Q1 2018 | Q1 2017 |
|---|---|---|
| GDP1 | 4.2 | 4.4 |
| CPI2 | 1.5 | 2.0 |
| PPI3 | 0.1 | 4.4 |
| Sold industrial production3 | 5.6 | 7.3 |
| Sold production – manufacturing3 | 5.5 | 8.1 |
| 3 Sold production – energy |
9.2 | 3.6 |
| Dynamics of domestic electricity consumption4 | 2.8 | 2.7 |
| Gross domestic electricity consumption (TWh)4 | 45.1 | 43.9 |
| EUR/PLN5 | 4.18 | 4.32 |
Source: 1for Q1 2018 – forecast by Institute of Economic Prognosis and Analyses, for Q1 2017 - Central Statistical Office of Poland, 2National Bank of Poland, 3 Central Statistical Office of Poland, 4PSE S.A., 5National Bank of Poland.
support of coal investments is not possible; way of redistributing free allowances that does not interfere with obtaining support for pro-environment modernisations.
Having agreed on a common position of the European Commission, European Parliament and the EU Council in November 2017, on March 19, 2018, the text of Directive (EU) 2018/410 of the European Parliament and of the Council of March 14, 2018. In the first half of 2018, the European Commission began work on implementing provisions that will address detailed operational rules for the Modernisation Fund. A potential decision by the European Commission on whether to issue guidelines for the application of art. 10c (derogations) will depend on the number of member states interested in using free-of-charge allocation of allowances for producers of electricity.
The Council has adopted a general approach for the EED draft on June 26, 2017 and to the RED II, EMR, EMD and EU Governance proposals on December 18, 2017. In the first quarter of 2018, talks regarding EED, RED II and EU Governance were held as part of trialogues between the European Parliament, Council of the European Union and European Commission. The trialogues are expected to continue in the second quarter of 2018. Trialogues related to EMR and EMD are expected to start in the second half of 2018.
In the first quarter of 2018, the average price of electricity on the Day-Ahead Market reached PLN 184/MWh and was 19% higher than the average price recorded in the same period of last year (PLN 155/MWh). This growth in price was driven by cost factors. Prices of CO2 emission allowances nearly doubled in the first quarter of 2018, comparing to the same period in the previous year. Coal prices also increased – the average level of the Polish Steam Coal Market Index ("PSCMI1") in the first quarter of 2018 grew by 18% to PLN 10.5/GJ, compared to PLN 8.9/GJ in the same period of last year.
The volume of wind electricity production in the first quarter of 2018 reached 3.41 TWh, compared to 3.58 TWh in the same period of 2017 – denoting a change of -5% y/y. In the context of high volatility on commodity markets (coal and CO2), windbased generation had minor impact on average energy prices in the first quarter of 2018. It should however be noted that wind-based production was unevenly distributed between the months of 2018 (1.72 TWh in January vs 0.59 TWh in February vs 1.10 TWh in March) – which translated into swings in the average monthly price. National energy consumption increased by 2.8% y/y in the first quarter of 2018 to 45.09 TWh. The additional energy consumption was accommodated mainly by supply from foreign sources: net import grew to 1.59 TWh in the first quarter of 2018 from 0.22 TWh in the first quarter of 2017. This had a curbing effect on energy price growth but was insufficient to counteract the aforementioned cost factors.
Chart: Monthly prices and price volatility at the day ahead market in 2017–2018 (TGE)*.
* average monthly price of IRDN index calculated on the base of hourly quotations (fixing), weighted by the trading volume.
The average price for BASE_Y-19 contracts in the first quarter of 2018 reached PLN 186/MWh, while in the same period of last year price of BASE_Y-18 was PLN 160/MWh on average (+16% y/y). Trading volume for BASE_Y-19 in the first quarter of 2018 was 18.1 TWh – this is 159% higher than the BASE_Y-18 trading volume in the first quarter of 2017. The average price for PEAK5_Y-19 contracts in the first quarter of 2018 was PLN 231/MWh and was 10% higher than the analogical contract PEAK5_Y-18 quoted in the first quarter of 2017. PEAK5_Y-19 trading volume in the first quarter of 2018 amounted to 0.6 TWh – this is by 10% lower than the PEAK5_Y-18 in the first quarter of 2017.
Chart: Monthly prices and price volatility on the forward market in 2017–2018 (TGE)*.
* monthly average index level for forward contracts for the next year (Y+1), baseload and peak, calculation based on hourly quotations, weighted by the trading volume.
Chart: Regional reversal of price relations(PLN/MWh).
Source: TGE, EEX, EPEX, Nordpool,OTE a.s., PXE
Wholesale energy prices in Germany declined from PLN 179/MWh in the first quarter of 2017 to PLN 148/MWh in the first quarter of 2018 (decrease of prices was particularly affected by wind production in January 2018 whoch was nearly twice as high as in January 2017). The situation In the Czech Republic the energy price declined from PLN 183/MWh in the first quarter of 2017 to PLN 155/MWh in the first quarter of 2018. The situation in Sweden was different, with energy prices increasing from PLN 142/MWh in the first quarter of 2017 to PLN 165/MWh in the first quarter of 2018, as was the situation in Lithuania – increase from PLN 151/MWh to PLN 177/MWh. These changes resulted in the reversal of price relations – in the base period, energy prices in the north (Sweden, Lithuania) were approx. PLN 30/MWh lower in comparison to prices in the Czech Republic and Germany – while in the first quarter of 2018 the opposite was true. In Poland, wholesale energy prices went up from PLN 155/MWh to PLN 184/MWh. This evolution of wholesale energy prices was reflected in the foreign trade balance.
Chart: Comparison of average electricity prices on Polish market and on selected European markets in the first quarter of 2018 (prices in PLN/MWh, average exchange rate EUR/PLN 4.18).
Source: TGE, EEX, EPEX, Nordpool,OTE a.s., PXE
Source: own work based on PSE data
In the first quarter of 2018, Poland was a net importer of electricity: the foreign trade balance was 1.59 TWh (import of 2.10 TWh, export of 0.51 TWh) – in the same period last year, import and export were close to equal (import of 1.60 TWh, export of 1.39 TWh, balance of 0.22 TWh). As a result, the balance (net import) increased seven-fold y/y. The main change in relation to the base period was a reversal of the trade balance with Germany and the Czech Republic – the total trade volume with these two countries amounted to 0.86 TWh of net export in the first quarter of 2017 vs 0.17 TWh of net import in the first quarter of 2018, which explains the y/y change in the balance by 1 TWh. The main net import direction was Sweden, with the balance of 0.73 TWh being similar to that in the same period last year. Net import from Lithuania of 0.30 TWh also remained close to last year's level. Net import from Ukraine grew to 0.42 TWh from 0.33 TWh in the same period of last year.
Diagram: Geographical structure of commercial exchange in the first quarter of 2018 (GWh).
Source: own work based on PSE data
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2018
The diversity of electricity prices for retail customers in the European Union depends not only on the level of the wholesale prices of electricity. The fiscalsystem, regulation mechanisms and supportschemesin particular countries all have significant impact on the final price of electricity. In Poland in the first half of 2017 (at the preparation date of this report, Eurostat has not ye published newer data), an additional burden for individual customers accounted for approx. 25% of the electricity price and was lower than EU average. In Denmark and Germany the proportion of additional charges in the price of electricity exceeded 50%.
In the first quarter of 2018, the average price of green certificates (PMOZE) reached PLN 63/MWh and was 80% higher than in the same period of last year (index OZEX_A). Updated Act on renewable energy sources of July 2017 introduced new way of the substitute fee calculatation – as 125% of the average market price from the previous year. Market price changes were also affected by a regulation of the Minister of Energy that increased an obligation to redeem green certificates from 15.4% in 2017 to 17.5% in 2018 and to 18.5% in 2019. The average price of yellow certificates in the first quarter of 2018 reached PLN 117/MWh and was 5% lower than in the same period last year. The decline resulted from a higher supply of energy produced in gas-fired cogeneration sources and a reduction of the substitute fee from PLN 120/MWh in 2017 to PLN 115/MWh in 2018. The obligation to redeem yellow certificates increased to 8% in 2018, compared to 7% in 2017.
Chart: Average quarterly prices of certificates.
Source: Own work based on TGE quotations. The yellow certificates prices presented on the chart are weighted average blended price – for products PMGM-16, PMGM-17, PMGM-18.
EUA (European Union Allowances) prices are one of the key factors determining wholesale energy prices and PGE Group's financial results. When it comes to costs of CO2 emissionsit means the expenses for purchasing EUA allowances to cover the deficit (i.e. the difference between CO2 emissions at PGE Group's generating units and the free-of-charge allowances received under derogation in accordance with the National Investment Plan).
In the first quarter of 2018, the average weighted price of the EUA DEC 18 instrument was EUR 10.33/t and was nearly twice as high as the average price of EUR 5.19/t of EUA DEC 17 in the analogical period of previous year. The growth in prices of CO2 emission allowances observed in the second half of 2017 and the first quarter of 2018 is a reflection of progress in the legislative process aimed at reforming the ETS system. In November 2017, during so called trilogue, an agreement was reached between the European Parliament, the European Commission and the Estonian Presidency as to the final wording of the reformed directive. In January 2018, the draft was formally adopted by the European Parliament and at the end of February accepted by the Council of the European Union. The agreement includes a doubling of the volumes of allowances for the market stability reserve ("MSR") in 2019-2023 from 12% to 24%, together with the introduction of cyclical cancellations of allowancesfrom 2023.
Chart: Prices of CO2 emission rights.
Source: Bloomberg, own work
The Regulation of the Council of Ministers, that sets the allocation of allowances for particular units of electricity producers in period 2013-2020, was adopted on April 8, 2014. Analogically, allocations of allowances for heat producers were set by the Regulation of the Council of Ministers of March 31, 2014.
PGE's installations accounts were credited with free allowances for heat for 2018 and energy for 2017, while free allowances for electricity for 2018 will be received by the Group by the end of April 2019, after verification of reports from investments submitted to the National Investment Plan.
At the same time, redemption of emission rights resulting from CO2 emissions in 2017 was completed in April 2018.
Table: Emission of CO2 from major Group installations in the first quarter of 2018 in comparison to allocation of CO2 emission rights for 2018 (in Mg).
| Operator | CO2 emissions in Q1 2018* |
Allocation of CO2 emission rights for 2018** |
|---|---|---|
| Bełchatów Power Plant | 9 653 200 | 6 211 022 |
| Turów Power Plant | 1 727 902 | 2 500 954 |
| Opole Power Plant | 1 818 269 | 1 437 267 |
| ZEDO *** | 1 126 684 | 1 187 286 |
| Bydgoszcz CHPs | 300 862 | 290 951 |
| Lublin Wrotków CHP | 221 951 | 166 164 |
| Gorzów CHP | 171 969 | 129 987 |
| Rzeszów CHP | 126 328 | 78 433 |
| Kielce CHP | 88 054 | 52 905 |
| Zgierz CHP | 53 818 | 22 210 |
| TOTAL PGE GiEK S.A. | 15 289 037 | 12 077 179 |
| Rybnik power plant | 1 204 968 | 703 890 |
| Wybrzeże CHPs**** | 790 627 | 583 062 |
| Kraków CHP | 713 364 | 497 470 |
| ZEW Kogeneracja* | 634 534 | 477 859 |
| Zielona Góra CHP | 157 864 | 47 491 |
| Toruń CHP | 107 443 | 52 056 |
| TOTAL Acquired assets | 3 608 800 | 2 361 828 |
| TOTAL Conventional Generation segment | 18 897 837 | 14 439 007 |
|---|---|---|
* estimates, emissions not verified - the data will be settled and certified by the authorised verifier of CO2 emission on the ground of yearly reports of volume of CO2 emissions
** amount of granted CO2 emission rights will be confirmed in the Regulation of the Council of Ministers in the first quarter of 2019
*** Pomorzany power plant, Dolna Odra power plant, Szczecin power plant
**** Gdańsk CHP and Gdynia CHP
***** Wrocław CHP, Czechnica CHP, Zawidawie CHP
Table: Volume and cost of purchase of fuels from third party suppliers in the first quarter of 2017 and 2018.
| Q1 2018 | Q1 2017 | |||
|---|---|---|---|---|
| Type of fuel | Volume (tons ths) |
Cost (PLN m) |
Volume (tons ths) |
Cost (PLN m) |
| Hard coal | 2 623 | 619 | 1 308 | 290 |
| Gas (cubic metres ths) | 397 104 | 291 | 242 934 | 179 |
| Biomass | 175 | 30 | 133 | 24 |
| Fuel oil* | 12 | 30 | 7 | 10 |
| TOTAL | 970 | 503 |
* heavy and light
In the first quarter of 2018 the costs of purchasing primary fuels from providers outside the Group amounted to PLN 970 million and were higher by PLN 467 million than in the first quarter of 2017. The biggest impact on the change of fuel purchase costs in PGE Group came from the Acquired assets which are mainly hard coal-fired and gas-fired.
Hard coal
Gas
Fuel oil
Biomass
In the first quarter of 2018 approximately 56% of the electricity was produced from internally sourced lignite, whose extraction price is fully controlled by PGE Capital Group. In comparable period of 2017 the production from lignite accounted for 71% of total production.
PGE Group companies earn part of their income based on tariffs approved by the President of the Energy Regulatory Office:
Methodology of and assumptions for tariffs determination were published in the document "Tariffs for the DSO for the year 2018", which was prepared and published by the President of the Energy Regulatory Office.
On December 14, 2017, the President of ERO approved a tariff for PGE Dystrybucja S.A. for electricity distribution services over the period from January 1, 2018, to December 31, 2018.
Tariff came into force on January 1, 2018.
On January 3, 2018, the President of ERO approved a change in PGE Dystrybucja S.A.'s tariff consisting of the introduction of so called an anti-smog tariff (G12as). This tariff was adjusted by the decision of the ERO President of January 16, 2018.
On February 27, 2018, in connection with the publication of the Act on Electromobility and Alternative Fuels, a change in the tariff was made in the part related to the connection to the grid of charging infrastructure for public road transport and publicly available charging stations.
Distribution tariffs for 2018 approved by the President of the Energy Regulatory Office, contributed to changes in average tariff in particular tariff groups (calculated for revenues and volume in a given tariff year) in comparison to year 2017:
The change in rates for distribution services takes into account a decline in the RES fee to PLN 0/MWh in 2018 and maintaining the transaition fee at the same level as in 2017. These fees are fully transferred to entities in charge of support instruments, thus they do not impact profit of the distribution companies.
Changes in average tariff in particular tariff groups (not including RES fees and transition fee) are as follows:
The quality regulation elements introduced in 2016 are being continued in 2018. It has been settled that the ratios directly impacting the regulated revenue will be following key performance indicators:
Not meeting the levels of ratios indicated by the ERO President will result in penalty of decreasing the regulated revenue through reduction of amount of return on capital in year t+2. In the initial period no rewards are anticipated for achieving better indicators than the required ones.
Impact of quality parameters realized in 2016 is included in tariff for 2018 and the realization of 2018 parameters will be included in tariff for 2020. In accordance with the assumptions adopted by the ERO, a penalty cannot exceed 2% of regulated revenue and value of 15% of return on capital in a given year. The 2018 tariff does not include a reduction in regulated revenue from quality regulation.
Pursuant to the Energy Law, energy companies holding concessions set tariffs for heat and propose their duration. Conduction of proceedings concerning heat tariffs approval lies within the competence of regional branches of the Energy Regulatory Office. PGE's average sales price for district heating increased by approx. 2% from the prices in effect in the first quarter of 2017.
| Key financial data | Unit | Q1 2018 |
Q1 2017 |
% change |
|---|---|---|---|---|
| Sales revenues | PLN million | 7 137 | 5 741 | 24% |
| EBIT | PLN million | 1 315 | 1 201 | 9% |
| EBITDA | PLN million | 2 214 | 1 948 | 14% |
| LTC compensations | PLN million | 14 | 75 | -81% |
| LTC revenues | PLN million | 14 | 0 | - |
| LTC settlements adjustment (other operations) | PLN million | 0 | 75 | - |
| Capital expenditures | PLN million | 855 | 1 088 | -21% |
| Net cash from operating activities | PLN million | 1 681 | 1 637 | 3% |
| Net cash from investing activities | PLN million | -1 818 | 425 | - |
| Net cash from financial activities | PLN million | -60 | -80 | -25% |
| EBITDA margin | % | 31% | 34% |
| Key financial data | As at December 31, 2018 |
As at December 31, 2017* |
% change |
|
|---|---|---|---|---|
| Working capital | PLN million | 1 471 | 513 | 187% |
| Net debt/LTM EBITDA ** | x | 0.98 | 0.99 |
* Data restated
** LTM EBITDA - Last Twelve Months EBITDA
Table: Impact of one-offs on EBITDA (in PLN million).
| Q1 | Q1 | % | |
|---|---|---|---|
| One-offs | 2018 | 2017 | change |
| LTC compensations | 14 | 75 | -81% |
| Voluntary Leave Program | -2 | -7 | -71% |
| Total | 12 | 68 | -82% |
Chart: Key changes of recurring EBITDA in PGE Capital Group (in PLN million).
Acquired assets**
* Adjusted for one-offs
* EBITDA of companies: PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A., PGE Paliwa sp. z o.o., PGE Ekoserwis sp. z o.o., Torec sp. z o.o., Zower sp. z o.o., Energopomiar sp. z o.o.
Chart: Key changes of recurring EBITDA by segments (in PLN million).
| EBITDA Q1 2017 |
Conventional Generation* |
Renewables | Supply** | Distribution | Other Operations*** + consolidation adjustments |
EBITDA Q1 2018 |
|
|---|---|---|---|---|---|---|---|
| Change | 352 | 23 | -54 | 20 | -19 | ||
| EBITDA reported Q1 2017 | 1 948 | 992 | 91 | 243 | 618 | 4 | |
| One-offs Q1 2017 | 68 | 68 | 0 | 0 | 0 | 0 | |
| Recurring EBITDA Q1 2017 | 1 880 | 924 | 91 | 243 | 618 | 4 | |
| Recurring EBITDA Q1 2018 | 1 276 | 114 | 189 | 638 | -15 | 2 202 | |
| One-offs Q1 2018 | 12 | 0 | 0 | 0 | 0 | 12 | |
| EBITDA reported Q1 2018 | 1 288 | 114 | 189 | 638 | -15 | 2 214 |
One-offs
* Result of the segment in Q1 2018 includes EBITDA of companies: PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A.
** Result of the segmentin Q1 2018 includes EBITDA of PGE Paliwa sp. z o.o.
*** Result of the segmentin Q1 2018 includes EBITDA of companies: PGE Ekoserwis sp. z o.o., Torec sp. z o.o., Zower sp. z o.o., Energopomiar sp. z o.o.
Chart: Key changes in Assets (in PLN million).
Chart: Net change in cash (in PLN million).
Chart: Net debt (in PLN million).
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2018
Table: Key operational figures.
| Key figures | Unit | Q1 2018 |
Q1 2017 |
% change |
2017 |
|---|---|---|---|---|---|
| Lignite extraction | Tons m | 12.86 | 13.34 | -4% | 49.51 |
| Net electricity production | TWh | 17.66 | 15.00 | 18% | 56.79 |
| Heat sales | PJ | 23.49 | 7.88 | 198% | 24.85 |
| Sales to final customers* | TWh | 10.54 | 10.06 | 5% | 40.43 |
| Distribution of electricity** | TWh | 9.19 | 8.96 | 3% | 35.34 |
* after elimination ofsales within PGE Group
** with additional estimation
Table: Sales of electricity outside the PGE Capital Group (in TWh).
| Sales volume | Q1 2018 |
Q1 2017 |
% change |
2017 |
|---|---|---|---|---|
| SALES IN TWh, including: | 19.63 | 17.07 | 15% | 65.78 |
| Sales to end-users* | 10.54 | 10.06 | 5% | 40.43 |
| Sales on the wholesale market, including: | 8.39 | 6.29 | 33% | 22.67 |
| Sales on the domestic wholesale market - power exchange |
7.32 | 4.16 | 76% | 14.66 |
| Other sales on the domestic wholesale market | 0.94 | 2.03 | -54% | 7.55 |
| Sales to foreign customers | 0.13 | 0.10 | 30% | 0.46 |
| Sales on the Balancing Market | 0.70 | 0.72 | -3% | 2.68 |
* after elimination of internal sales within PGE Group
The higher volume of sales to end customers compared to the same period of 2017 resulted from recognition of sales generated by PGE Energia Ciepła S.A. Retail sales by Supply segment remained at a similar level (10 TWh). The higher sales volume on the wholesale market – exchange results largely from expanded generation capacity due to the Acquired assets. Additionally, the volume growth was driven by favourable market conditions. Sales volume on the other wholesale markets declined due to lower sales in bilateral contracts, caused by larger requirements resulting from the so-called "exchange obligation", which led to the transfer of sales into the regulated segment and a change in regulations regarding allocating energy from renewable sources (limit on sales to obligated sellers).
Table: Purchases of electricity from outside of the PGE Capital Group (in TWh).
| Purchases volume | Q1 2018 |
Q1 2017 |
% change |
2017 |
|---|---|---|---|---|
| PURCHASES IN TWh, including: | 3.47 | 3.36 | 3% | 13.76 |
| Purchases on the domestic wholesale market – power exchange |
1.21 | 0.75 | 61% | 2.55 |
| Purchases on the domestic wholesale market, other |
0.09 | 1.02 | -91% | 4.43 |
| Purchases from abroad | 0.12 | 0.01 | 1100% | 0.21 |
| Purchases from Balancing Market | 2.05 | 1.58 | 30% | 6.57 |
Higher purchases on the wholesale market – exchange resulted from portfolio optimisation and exercise of options to buy back previously sold electricity at prices below the cost of manufacture. The decline in purchases on the domestic wholesale market – other is mainly the result of the removal of the obligation to purchase electricity from renewable energy sources of over 500 kWe. The increase in purchases on the balancing market resulted from a higher volume of reductions forced by PSE S.A. in January 2018, largely due to higher wind-based generation in that month.
Table: Production of electricity (in TWh).
| Generation volume | Q1 2018 |
Q1 2017 |
% change |
2017 |
|---|---|---|---|---|
| ELECTRICITY HENERATION IN TWh, including: | 17.66 | 15.00 | 18% | 56.79 |
| Lignite-fired power plants | 9.82 | 10.57 | -7% | 38.95 |
| including co-combustion of biomass | 0.00 | 0.00 | - | 0.00 |
| Coal-fired power plants | 3.95 | 2.51 | 57% | 11.11 |
| including co-combustion of biomass | 0.01 | 0.04 | -75% | 0.13 |
| Coal-fired CHP plants | 1.80 | 0.38 | 374% | 1.47 |
| including co-combustion of biomass | 0.01 | 0.00 | - | 0.00 |
| Gas-fired CHP plants | 1.49 | 0.95 | 57% | 2.87 |
| Biomass-fired CHP plants | 0.05 | 0.05 | 0% | 0.20 |
| Pumped-storage power plants | 0.11 | 0.10 | 10% | 0.44 |
| Hydroelectric plants | 0.15 | 0.12 | 25% | 0.47 |
| Wind power plants | 0.29 | 0.32 | -9% | 1.28 |
| Including Acquired assets *: | 3.16 | - | - | 1.58 |
* Rybnik power plant, EC Gdańsk, EC Gdynia, EC Kraków, EC Wrocław, EC Czechnica, EC Zawidawie, EC Zielona Góra, EC Toruń
The main impact on the level of electricity generation in the first quarter of 2018, compared to the first quarter of 2017, was lower generation at hard coal-fired power plants. This growth results from inclusion of Rybnik power plant in generation (1.22 TWh). Higher generation at Opole power plant resulted from repair-related downtime being lower by 737 hours (unit no. 3 remained in medium overhaul in March 2017) and larger use of the power plant's units by PSE S.A. Higher production at Opole power plant compensated for lower output at Dolna Odra power plant, due to lower demand from PSE S.A. in the first quarter of 2018.
The higher production at hard coal-based CHP plants results from recognition of production of Gdańsk CHP, Gdynia CHP, Wrocław CHP, Czechnica CHP and Kraków CHP (1.41 TWh).
The growth in production at gas-fired combined heat-and-power plants results from the recognition of production of Toruń CHP, Zielona Góra CHP and Zawidawie CHP (0.53 TWh).
Production in biomass CHP plants remained at the similar level as in the first quarter of 2017.
Decreased production in lignite-based power plants in the first quarter of 2018 results from longer downtime of units in Bełchatów power plant (by 1 518 h) and Turów power plant (by 1 720 h) in repairs and modernisations. Unit no. 6 in Bełchatów power plant was in medium overhaul from March 3 till April 6, unit no. 2 was in medium overhaul from February 11 till March 9 and unit no. 1 was in medium overhaul from January 1 till January 15 (in case of uni no. 1 longer downtime in repair was compensated by shorter time in reserve). In Turów power plant, during the whole first quarter of 2018, unit no. 2 was in modernization while unit no. 6 was in repairs for 332 h longer compared to the first quarter of 2017.
Production at wind power plants was lower than in the first quarter of 2017 resulting mainly from worse windiness.
Production at hydro power plants at higher level compared to the first quarter of 2017, results mainly from better hydrological conditions.
Slightly higher production in pumped storage power plants results from the nature of these generation units, which in the first quarter of 2018, were used to a higher extent by PSE S.A.
In the first quarter of 2018 the heat sales in PGE Capital Group totaled 23.49 PJ and were higher by 15.61 PJ than in the first quarter of 2017. The above growth includes the sales of heat by the Acquired assets from Conventional Generation segment, which were not recognised in the first quarter of 2017 (15.17 PJ) and higher sales by branches of PGE GiEK S.A. (0.44 PJ), what resulted largely from increased demand for heat caused by the lower average outside temperatures.
Table: Breakdown of the Group's revenues by business segments in the first quarter of 2018 and 2017.
| PLN million | Q1 2018 | Q1 2017 | % change |
|---|---|---|---|
| Conventional Generation | 4 644 | 3 164 | 47% |
| Renewables | 212 | 192 | 10% |
| Supply | 3 650 | 3 953 | -8% |
| Distribution | 1 516 | 1 643 | -8% |
| Other Operations | 144 | 172 | -16% |
| TOTAL | 10 166 | 9 124 | 11% |
| Consolidation adjustments | -3 029 | -3 383 | -10% |
| TOTAL AFTER ADJUSTMENTS | 7 137 | 5 741 | 24% |
Table: Key financial figures for each business segment in the first quarter of 2018 (after intrasegmental eliminations).
| PLN million | EBITDA | EBIT | Capital expenditures |
Assets of the segment* |
|---|---|---|---|---|
| Q1 2018 | ||||
| Conventional Generation | 1 288 | 765 | 596 | 44 591 |
| Renewables | 114 | 50 | 15 | 3 287 |
| Supply | 189 | 182 | 2 | 4 240 |
| Distribution | 638 | 346 | 226 | 17 897 |
| Other Operations | 17 | -5 | 41 | 694 |
| TOTAL | 2 246 | 1 338 | 880 | 70 709 |
| Consolidation adjustments | -32 | -23 | -25 | -3 320 |
| TOTAL AFTER ADJUSTMENTS | 2 214 | 1 315 | 855 | 67 389 |
* see note 5.1 to the consolidated financial statements
Table: Key financial figures for each business segment in the first quarter of 2017 (after intrasegmental eliminations).
| PLN million | EBITDA | EBIT | Capital expenditures |
Assets of the segment* |
|---|---|---|---|---|
| Q1 2017 | ||||
| Conventional Generation | 992 | 630 | 788 | 37 101 |
| Renewables | 91 | 25 | 12 | 3 631 |
| Supply | 243 | 237 | 3 | 3 569 |
| Distribution | 618 | 326 | 263 | 17 332 |
| Other Operations | 12 | -21 | 33 | 591 |
| TOTAL | 1 956 | 1 197 | 1 099 | 62 224 |
| Consolidation adjustments | -8 | 4 | -11 | -2 613 |
| TOTAL AFTER ADJUSTMENTS | 1 948 | 1 201 | 1 088 | 59 611 |
* see note 5.1 to the consolidated financial statements
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2018
Diagram: Main assets of the Conventional Generation segment.
Table: Key figures for Conventional Generation.
| w PLN million | Q1 2018 |
Q1 2017 |
% change |
|---|---|---|---|
| Sales revenues | 4 644 | 3 164 | 47% |
| EBIT | 765 | 630 | 21% |
| EBITDA | 1 288 | 992 | 30% |
| Capital expenditures | 596 | 788 | -24% |
Chart: Key changes of EBITDA in Conventional Generation (in PLN million).
1 400
*EBITDA of companies: PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A.
Key factors affecting the results of Conventional Generation segment in the first quarter of 2018 compared to the results of the first quarter of 2017 included:
One-offs
*Acquired assets: Rybnik power plant, EC Gdańsk, EC Gdynia, EC Kraków, EC Wrocław, EC Czechnica, EC Zawidawie, EC Zielona Góra, EC Toruń
Table: Capital expenditures incurred in Conventional Generation segment in the first quarter of 2018 and 2017.
| PLN million | Q1 2018 |
Q1 2017 |
% change |
|---|---|---|---|
| Investments in generating capacities, including: | 440 | 684 | -36% |
| Development |
269 | 538 | -50% |
| Modernisation and replacement |
171 | 146 | 17% |
| Purchase of finished capital goods | 10 | 2 | 400% |
| Vehicles | 1 | 0 | - |
| Other | 3 | 3 | 0% |
| Acquired assets* | 68 | 0 | - |
| TOTAL | 522 | 689 | -24% |
| Capitalized costs of overburden removal in mines | 74 | 99 | -25% |
| TOTAL with capitalized costs of overburden removal | 596 | 788 | -24% |
*PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A.
Highest capital expenditures in the first quarter of 2018 were incurred for the following projects:
| construction of units 5 and 6 in Opole power plant |
PLN 166 million; |
|---|---|
| construction of unit no. 11 in Turów power plant |
PLN 72 million; |
| construction of a Thermal Processing Installation with Energy Recovery at Rzeszów CHP |
PLN 31 million; |
| modernisation of units 1-3 in Turów power plant | PLN 18 million; |
| construction of installation to transport ash and suspension from unit 14 in Bełchatów power plant |
PLN 15 million; |
| change in technology of furnace waste storage in Bełchatów power plant |
PLN 10 million. |
Key developments in the first quarter of 2018 in the Conventional Generation segment:
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2018
The PGE Capital Group's operations in renewable energy are managed by the PGE Energia Odnawialna S.A. Assets in the segment include:
Diagram: Main assets of the Renewables segment.
Table: Key figures for Renewables.
| w PLN million | Q1 2018 |
Q1 2017 |
% change |
|---|---|---|---|
| Sales revenues | 212 | 192 | 10% |
| EBIT | 50 | 25 | 100% |
| EBITDA | 114 | 91 | 25% |
| Capital expenditures | 15 | 12 | 25% |
Chart: Key changes of EBITDA in Renewables (in PLN million).
* excluding revenues and costs relating to balancing market not affecting EBITDA result
Key factors affecting the results of Renewables in the first quarter of 2018 compared to the first quarter of 2017:
Table: Capital expenditures incurred in Renewables segment in the first quarter of 2018 and 2017.
| PLN million | Q1 2018 |
Q1 2017 |
% change |
|---|---|---|---|
| Investments in generating capacities, including: | 14 | 11 | 27% |
| Development |
9 | 5 | 80% |
| Modernisation and replacement |
5 | 6 | -17% |
| Other | 1 | 1 | 0% |
| TOTAL | 15 | 12 | 25% |
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2018
PGE Dystrybucja S.A. operates in the area of 122,433 sq. km and delivers electricity to approximately 5.4 million.
Diagram: Area of PGE distribution grid.
Table: Key figures for Distribution.
| w PLN million | Q1 2018 |
Q1 2017 |
% change |
|---|---|---|---|
| Sales revenues | 1 516 | 1 643 | -8% |
| EBIT | 346 | 326 | 6% |
| EBITDA | 638 | 618 | 3% |
| Capital expenditures | 226 | 263 | -14% |
* Except costs of transmission by PSE S.A.
** Other revenues (reactive power, excess capacity, additional services), resumption of deliveries, balance of transit services
Key factors affecting the results of Distribution in yhe first quarter of 2018 compared to the results of the first quarter of 2017 included:
Table: Capital expenditures incurred in Distribution segment in the first quarter of 2018 and 2017.
| PLN million | Q1 2018 |
Q1 2017 |
% change |
|---|---|---|---|
| MV and LV power networks | 88 | 80 | 10% |
| 110/ MV and MV/MV | 19 | 33 | -42% |
| 110 kV power lines | 3 | 7 | -57% |
| Connection of new off-takers | 83 | 91 | -9% |
| Purchase of transformers and energy counters | 10 | 31 | -68% |
| IT, telemechanics and communication | 14 | 15 | -7% |
| Other | 9 | 6 | 50% |
| TOTAL | 226 | 263 | -14% |
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2018
Table: Key figures for Supply.
| w PLN million | Q1 2018 |
Q1 2017 |
% change |
|---|---|---|---|
| Sales revenues | 3 650 | 3 953 | -8% |
| EBIT | 182 | 237 | -23% |
| EBITDA | 189 | 243 | -22% |
| Capital expenditures | 2 | 3 | -33% |
Chart: Key changes of EBITDA in Supply (in PLN million).
*PGE Paliwa sp. z o.o.
Key factors affecting EBITDA of Supply segment in the first quarter of 2018 compared to the first quarter of 2017 included:
Table: Key figures for Other operations.
| w PLN million | Q1 2018 |
Q1 2017 |
% change |
|---|---|---|---|
| Sales revenues | 144 | 172 | -16% |
| EBIT | -5 | -21 | 76% |
| EBITDA | 17 | 12 | 42% |
| Capital expenditures | 41 | 33 | 24% |
Increase in the EBITDA result of the Other operations segment by approx. PLN 5 million was mainly connected with the EBITDA of PGE Systemy S.A. higher by approx. PLN 8 million as a consequence of increasing the range of services provided for companies from the Group belonging to other segments.
Capital expenditures in Other Operations in the first quarter of 2018 amounted to PLN 41 million compared to PLN 33 million in the first quarter of 2017.
Within the above amount, the highest capital expenditures in the first quarter of 2018 were incurred by the following companies:
| | PGE EJ 1 sp. z o.o. – for nuclear project development | PLN 26 million; |
|---|---|---|
| | PGE Systemy S.A. – forIT infrastructure and software development | PLN 14 million. |
No significant event took place in the first quarter of 2018 and until the publicaton date of this report.
No material agreements took place in the first quarter of 2018.
As at March 31, 2018 the Management Board worked in unchanged composition:
| Name and surname of the Management Board member |
Position |
|---|---|
| Henryk Baranowski | President of the Management Board |
| Wojciech Kowalczyk | Vice-President for Capital Investments |
| Marek Pastuszko | Vice-President for Corporate Affairs |
| Paweł Śliwa | Vice-President for Innovations |
| Ryszard Wasiłek | Vice-President for Operations |
| Emil Wojtowicz | Vice-President for Finance |
As at January 8, 2018 the Supervisory Board consisted of:
| Name and surname | ||
|---|---|---|
| of the Supervisory Board member | Position | |
| Anna Kowalik | Chairman of the Supervisory Board | |
| Artur Składanek | Vice-Chairman of the Supervisory Board – independent | |
| Grzegorz Kuczyński | Secretary of the Supervisory Board - independent | |
| Janina Goss | Supervisory Board Member - independent | |
| Witold Kozłowski | Supervisory Board Member - independent | |
| Mieczysław Sawaryn | Supervisory Board Member - independent |
On January 9, 2018 the State Treasury, represented by the Minister of Energy, by way of a written statement, appointed Mr. Tomasz Hapunowicz as a member of Supervisory Board of the Company as of January 9, 2018.
As at the publication date of this report, the Supervisory Board of the Company consists of:
| Name and surname | Position |
|---|---|
| of the Supervisory Board member | |
| Anna Kowalik | Chairman of the Supervisory Board |
| Artur Składanek | Vice-Chairman of the Supervisory Board – independent |
| Grzegorz Kuczyński | Secretary of the Supervisory Board - independent |
| Janina Goss | Supervisory Board Member - independent |
| Tomasz Hapunowicz | Supervisory Board Member - independent |
| Witold Kozłowski | Supervisory Board Member - independent |
| Mieczysław Sawaryn | Supervisory Board Member - independent |
| Name and surname of the member of the Supervisory Board |
Audit Committee | Corporate Governance Committee |
Strategy and Development Committee |
Appointment and Remuneration Committee |
|---|---|---|---|---|
| Janina Goss | Member from March 2, 2016 |
Member from March 2, 2016 |
||
| Tomasz Hapunowicz | Member From January 23, 2018 |
Member From January 23, 2018 |
||
| Anna Kowalik | Member | Member From January 23, 2018 |
Member | |
| Witold Kozłowski | Member from Sep. 13, 2016 Chairman from October 25, 2016 |
Member from December 13, 2017 |
Member from September 13, 2016 |
|
| Grzegorz Kuczyński | Member from March 2, 2016 Chairman from March 18, 2016 |
Member from March 2, 2016 |
Member From January 23, 2018 |
|
| Mieczysław Sawaryn | Member from March 2, 2016 |
Member from March 2, 2016 Chairman from August 8, 2016 |
||
| Artur Składanek | Member From September 19, 2017 |
Member from March 2, 2016 |
Member from March 2, 2016 Chairman from January 23, 2018 |
In the first quarter of 2018 the standing committees of the Supervisory Board consisted of:
Information on claims for annulment of the resolutions of the General Meetings of PGE S.A are described in note 20.4 to the consolidated financial statements.
Information on the issue of compensation regarding the conversion of shares are described in note 20.4 to the consolidated financial statements.
Significant proceedings pending in front of courts, competent arbitration authority or public administration authority are described in note 20.4 to the consolidated financial statements.
Table: Main guarantees granted by the PGE Group companies as at March 31, 2018.
| Issuer of guarantee |
Entity entitled to guaran tee (Beneficiary) |
Entity whose liabilities are subject to guaran tee (Debtor) |
Date of commitment due to the granted guarantee (yyyy-mm-dd) |
Validity of guar antee until (yyyy-mm-dd) |
Value of guaran tee (million) |
Currency | Value of loan subject to guar antee (million) |
Currency |
|---|---|---|---|---|---|---|---|---|
| PGE S.A. | Bondholders | PGE Sweden AB | 2014-05-22 | 2041-12-31 | 2 500.0 |
EUR | 638.0 | EUR |
| PGE S.A. | Nordic Investment Bank | PGE GiEK S.A. | 2017-05-12 | 2024-12-31 | 134.3 | EUR | 111.9 | EUR |
Information on issue, redemption and repayment of debt securities and other securities is described in p. 1.1 of the foregoing report and in note 1.3 to the consolidated financial statements.
The programme to build Poland's first nuclear power plant (the "Programme") is focusing on conducting site characterisation and environmental surveys until an environmental impact assessment report and site report are prepared. Decisions with regard to the continuation of the Programme, in the above scope or otherwise, will be made based on decisions by the Minister of Energy concerning an updated Programme for Poland's Nuclear Power, a model for the procurement of nuclear power plant technology and investment financing model.
As a result of the sale of shares on April 15, 2015 to the Business Partners (TAURON Polska Energia S.A., ENEA S.A. and KGHM Polska Miedź S.A.) by PGE S.A., PGE S.A. holds 70% in the share capital of PGE EJ 1 sp. z o.o. ("PGE EJ 1", "EJ 1"), and each of the Business Partners holds 10% in the share capital of PGE EJ 1.
According to the Partners' Agreement, concluded on September 3, 2014, the Parties jointly undertook to finance operations under the initial phase of the Program (the "Development Stage"), proportionally to their shareholdings. It is assumed that PGE's financial commitment in the Development Stage will not exceed amount of approx. PLN 700 million. The funds for the Program are paid to PGE EJ1 in form of the increase of the share capital. In the first quarter of 2018, PGE EJ 1 received a loan from its shareholders instead of a share capital increase.
Further action with regard to delivery of technology is dependent on the final arrangements with the Ministry of Energy related to formula of technology selection, working out economic, organisational and legal solutions, including the risk distribution and estimated costs of implementation of those solutions.
Site characterisation and environmental surveys, necessary to prepare an environmental impact assessment and a site characterisation report, were continued in the first quarter of 2018. The surveys are being carried out with the participation of ELBIS Sp. z o.o., a company from PGE Group. The aim of the surveys is gathering of data necessary to assess the area from the point of view of usefulness for foundation of nuclear power plant.
Works are being conducted at two sites: Lubiatowo-Kopalino and Żarnowiec, within Choczewo, Krokowa and Gniewino municipalities in the Pomeranian Voivodeship.
The works on schedule update have been carried out.
The main aim of activities in this area is to maintain a high level of community support at the planned nuclear plant sites and to deliver knowledge about nuclear power and about the Programme to the widest possible range of stakeholders.
In the first quarter of 2018, works were continued within the Site Municipality Development Support Programme intended to reinforce partner relations with the local communities and authorities of the municipalities by providing support to initiatives that are of significance to the residents and development of the region.
In 2013, PGE EJ1 sp. z o.o. signed an agreement for environmental studies, site characterisation and services related to obtaining permits and permissions necessary in the investment process associated with the construction of a nuclear power plant with a consortium of WorleyParsons Nuclear Services JSC, WorleyParsons International Inc. and WorleyParsons Group Inc. ("WorleyParsons"), in the amount of approximately PLN 253 million net (including basic scope of approximately PLN 167 million). Due to delays in the implementation of the agreement, in 2013 PGE EJ 1 accrued to WorleyParsons a contractual penalty in the amount of approximately PLN 7 million. In addition, in connection with a further improper execution of services in 2014, PGE EJ 1 accrued contractual penalties in the total amount of approximately PLN 43 million. On December 23, 2014, PGE EJ 1 terminated the contract for reasons attributable to WorleyParsons.
Contractual penalties of 2013 were deducted from the remuneration payable to WorleyParsons in 2014. Penalties for 2014 were partly deducted from the remuneration payable to WorleyParsons and partly obtained from the bank guarantee. After all deductions and amounts received by the company from the bank guarantee, PGE EJ 1 is entitled to claim towards WorleyParsons for payment of approximately PLN 14 million as a penalty by way of delay.
On August 7, 2015 PGE EJ 1 filed with the District Court in Warsaw a claim against WorleyParsons for the payment of approximately PLN 15 million plus statutory interest for late payment of the amount due.
On November 13, 2015, PGE EJ 1 received a payment demand from WorleyParsons for about PLN 59 million due for WorleyParsons remuneration, which - according to the claimant - was deducted unduly, for the works that in opinion of WorleyParsons were unjustifiably not accepted and for the project management, as well as funds collected from the bank guarantee. The court obligated PGE EJ 1 sp. z o.o. to submit a statement of defence within three months from receipt. Moreover, value of claims by WorleyParsons amounting to approximately PLN 54 million was included in the WorleyParsons' payment demand for PLN 92 million of March 13, 2015 with regard to termination of the agreement. On March 24, 2017, PGE EJ1 received a procedural document expanding the action being brought by WorleyParsons from approximately PLN 59 million to approximately PLN 104 million (i.e. by around PLN 45 million). It is possible that WorleyParsons will file another claim amounting to approximately PLN 32 million representing the difference in amount of claims from the demand for payment of March 13, 2015 and the expanded claim received on March 24, 2017.
PGE EJ 1 does not accept the claim and regards its possible admission by the court as less likely than its dismissal.
On March 29, 2017, mediation between the Parties took place – the meeting did not result in a settlement. The first hearing was held on December 8, 2017, during which the Court decided to examine the matter behind closed doors (without an audience).
Further hearings in the case took place on February 15 and 16, 2018.
The company filed a response to WorleyParsons' expanded lawsuit on March 31, 2018.
Furthermore, on May 20, 2016, PGE EJ 1 filed a motion with the District Court for the Capital City of Warsaw in Warsaw to commit WorleyParsons to attempt reaching a settlement concerning PGE EJ 1's claims of PLN 41 million together with statutory interest for compensation for undue contractual performance. A conciliation meeting at the court is scheduled for June 8, 2017. During the hearing on June 8, 2017, the Court stated that a certified copy of the application was not delivered to the American WorleyParsons companies, and therefore it adjourned the hearing without setting a date. On July 3, 2017, a representative of PGE EJ 1 received information that a certified copy of the application was delivered to the American companies. At a hearing on September 19, 2017, the court ruled that a settlement had not been agreed and concluded the case.
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2018
Information about transactions with related entities is presented in note 22 to the consolidated financial statements.
PGE S.A. did not publish financial forecasts.
According to the best knowledge, on the ground of the letter from the Ministry of the State Treasury of April 27, 2016, the State Treasury holds 1 072 984 098 ordinary shares of the Company, representing 57.39% of the Company's share capital and entitling to 1 072 984 098 votes on the General Meeting of the Company, constituting 57.39% of total votes.
Table: Shareholders holding directly or indirectly by subsidiaries at least 5% of the total votes at the General Meeting of PGE S.A.
| Shareholder | Number of shares | Number of votes | % in total votes on General Meeting |
|---|---|---|---|
| State Treasury | 1 072 984 098 | 1 072 984 098 | 57.39% |
| Others | 796 776 731 | 796 776 731 | 42.61% |
| Total | 1 869 760 829 | 1 869 760 829 | 100,00% |
According to the best knowledge of the Management Board of the Company, members of management and supervisory authorities of the Company as of the date of submission of this report and as of the date of publishing of the consolidated report for 2017 did not hold shares of PGE S.A.
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2018
To the best knowledge of the Management Board of PGE S.A., the quarterly consolidated financial statements and comparative data were prepared in accordance with the governing accounting principles, present a fair, true and reliable view of the material and financial situation of PGE Capital Group and its financial result.
The report of the Management Board on the activities of PGE Capital Group presents a true view of the development, achievements and situation of the Capital Group.
The foregoing Management Board's Report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. was approved for publication by the Management Board of the parent company on May 15, 2018.
Warsaw, May 15, 2018
Signatures of Members of the Management Board of PGE Polska Grupa Energetyczna S.A.
President of the Management Board Henryk Baranowski
Vice-President of the Management Board Wojciech Kowalczyk
Vice-President of the Management Board Marek Pastuszko
Vice-President of the Management Board Paweł Śliwa
Vice-President of the Management Board Ryszard Wasiłek
Vice-President of the Management Board Emil Wojtowicz
| AKPiA | Control, measurement and automation apparatus area |
|---|---|
| Ancillary control | services provided to the transmission system operator, which are indispensable for the proper |
| services (ACS) | functioning of the National Power System and ensure the keeping of required reliability and quality standards. |
| Achievable capacity | the maximum sustained capacity of a generating unit or generator, maintained continuously by a thermal generator for at least 15 hours or by a hydroelectric generator for at least five hours, at standardized operating conditions, as confirmed by tests. |
| Balancing market | a technical platform for balancing electricity supply and demand on the market. The differences between the planned (announced supply schedules) and the actually delivered/off-taken volumes of electricity are settled here. The purpose of the balancing market is to balance transactions concluded between individual market participants and actual electricity demand. The participants of the balancing market can be the generators, customers for electricity understood as entities connected to a network located in the balancing market area (including off-takers and network customers), trading companies, electricity exchanges and the TSO as the balancing company. |
| Base, baseload | standard product on the electricity market: a constant hourly power supply per day in a given period, for example week, month, quarter or year. |
| Best Practices | Document "Best Practice for GPW Listed Companies 2016" adopted by the resolution of the GPW Supervisory Board of October 13, 2015 and effective from January 1, 2016. |
| Biomass | solid or liquid substances of plant or animal origin, subject to biodegradation, obtained from agricultural or forestry products, waste and remains or industries processing their products as well as certain other biodegradable waste in particular agricultural raw materials. |
| Black energy | popular name for energy generated as a result of combustion of black coal or lignite. |
| CCS | Carbon Capture and Storage Technology used to capture CO2 from the emissions of fossil fuel power plants followed by its underground storage. |
| CDM | Clean Development Mechanisms, one of the flexible mechanisms introduced under Article 12 of the Kyoto Protocol. |
| CER | Certified Emission Reduction. |
| Co-combustion | the generation of electricity or heat based on a process of combined, simultaneous combustion in one device of biomass or biogas together with other fuels; part of the energy thus generated can be deemed to be energy generated with the use of renewable sources. |
| Co-generation | the simultaneous generation of heat and electricity or mechanical energy in the course of one and the same technological process. |
| Constrained generation |
the generation of electricity to ensure the quality and reliability of the national power system; this applies to generating units in which generation must continue due to the technical limitations of the operation of the power system and the necessity of ensuring its adequate reliability. |
| Distribution | transport of energy through distribution grid of high (110 kV), medium (15kV) and low (400V) voltage in order to supply the customers. |
| Distribution System Operator (DSO) |
a power company engaging in the distribution of gaseous fuels or electricity, responsible for traffic in the gas or electricity distribution systems, current and long-term security of operation of the system, the operation, maintenance, repairs and indispensable expansion of the distribution network, including |
| connections to other gas or power systems. | |
| ERO | Energy Regulatory Office (pol. URE). |
| ERU | Emission Reduction Units. |
| EUA | European Union Allowances: transferable CO2 emission allowances; one EUA allows an operator to release one tonne of CO2 |
| EU ETS | European Union Greenhouse Gas Emission Trading Scheme) EU emission trading scheme. Its operating rules are set out in the ETS Directive, amended by the Directive 2009/29/EC of the European Parliament and of the Council of April 23, 2009 (OJ EU L. of 2009, No. 140, p. 63—87). |
| Generating unit | a technically and commercially defined set of equipment belonging to a power company and used to generate electricity or heat and to transmit power. |
| GJ | Gigajoule, a unit of work/heat in the SI system, 1 GJ = 1000/3.6 kWh = approximately 278 kWh. |
| GPZ | main power supply point, a type of transformer station used for the processing or distribution of electricity or solely for the distribution of electricity. |
| Green certificate | popular name for energy generated from renewable energy sources. |
| GW | gigawatt, a unit of capacity in the SI system, 1 GW = 109 W. |
| GWe | one gigawatt of electric capacity. |
| GWt | one gigawatt of heat capacity. |
| HICP | Harmonised Index of Consumer Prices |
| High Voltage Network (HV) |
a network with a nominal voltage of 110 kV. |
|---|---|
| IGCC | Integrated Gasification Combined Cycle. |
| Installed capacity | the formal value of active power recorded in the design documentation of a generating system as being the maximum achievable capacity of that system, confirmed by the acceptance protocols of that system (a historical value, it does not change over time. |
| IRiESP | the Transmission Network Operation and Maintenance Manual required to be prepared by a transmission system operator pursuant to the Energy Law; instructions prepared for power networks that specify in detail the terms and conditions of using these networks by system users as well as terms and conditions for traffic handling, operation and planning the development of these networks; sections on transmission system balancing and system limitation management, including information on comments received from system users and their consideration, are submitted to the ERO President for approval by way of a decision. |
| IRZ | Cold Intervention Reserve Service – service consisting of maintaining power units ready for energy production. Energy is produced on request of PSE S.A. |
| JI | Joint Implementation: one of the flexibility mechanisms introduced under Article 6 of the Kyoto Protocol. |
| Kyoto Protocol | the Kyoto Protocol to the United Nations Framework Convention on Climate Change of December 11, 1997 (Dz.U. of 2005, No. 203, Item 1684), in force since February 16, 2005. |
| KSE | the National Power System, a set of equipment for the distribution, transmission and generation of electricity, forming a system to allow the supply of electricity in the territory of Poland. |
| KSP | the National Transmission System, a set of equipment for the transmission of electricity in the territory of Poland. |
| kV | kilo volt, an SI unit of electric potential difference, current and electromotive force; 1kV= 103 V. |
| kWh | kilowatt-hour, a unit of electric energy in the SI system defined as the volume of electricity used by the 1 kW equipment over one hour. 1 kWh = 3,600,000 J = 3.6 MJ. |
| Low Voltage Network (LV) |
a network with a nominal voltage not exceeding 1 kV. |
| LTC | long-term contracts on the purchase of capacity and electricity entered into between Polskie Sieci Elektroenergetyczne S.A. and electricity generators in the years 1994-2001. |
| Medium-voltage network (MV) |
an energy network with a nominal voltage higher than 1 kV but lower than 110 kV. |
| MEV | Minimum Energy Volumes. |
| MSR | Market Stability Reserve (relating to CO2 ) |
| MW | a unit of capacity in the SI system, 1 MW = 106 W. |
| Mwe | one megawatt of electric power. |
| MWt | one megawatt of heat power. |
| NAP | National emissions Allocation Plan, prepared separately for the national emission trading system and for the EU emission trading system by the National Administrator of the Emission Trading System. |
| NAP II | National CO2 emissions Allocation Plan for the years 2008-2012 prepared for the EU emission trading system adopted by the Ordinance of the Council of Ministers of July 1, 2008 (Dz. U. of 2008, No. 202, item 1248). |
| Nm3 | normal cubic meter; a unit of volume from outside the SI system signifying the quantity of dry gas in 1 m3 of space at a pressure of 101.325 Pa and a temperature of 0°C. |
| NOx | nitrogen oxides. |
| Operational Capacity Reserve (ORM) |
ORM constitutes of generation capacities of active Production Schedular Units (JGWa) in operation or layover, representing excess capacity over electricity demand available to the TSO under the Energy Sale Agreements and on the Balancing Market in unforced generation |
| Peak, peakload | a standard product on the electricity market; a constant power supply from Monday to Friday, each hour between 7:00 a.m. and 10:00 p.m. (15-hour standard for the Polish market) or between 8:00 a.m. and 8:00 p.m. (12-hour standard for the German market) in a given period, for example week, month, quarter or year. |
| Peak power pumped storage plants |
a special kind of hydroelectric power plants. In addition to river flow and the difference in the water table levels they need two bodies of water connected with a channel or a pipeline. The power station is situated next to the lower lake or at the dam of the upper lake. The pumped storage facilities provide ancillary control services for the National Power System. Their functions are to secure stability, provide passive energy, store excessive power in the system and supply power to the system in peak time. The pumped storage plants that have a natural inflow of water to the upper lake also generate electricity from renewable sources. The main off-taker of electricity produced by the peak power pumped storage power stations and their services is TSO |
| PJ | petadżul, jednostka pracy/ciepła w układzie SI, 1 PJ = ok. 278 GWh |
| Property rights | negotiable exchange-traded rights under green and co-generation certificates |
| PSCMI1 | Polish Steam Coal Market Index |
|---|---|
| RAB | Regulatory Asset Base. |
| Red certificate | a certificate confirming generation of electricity in co-generation with heat. |
| Red energy | popular name for electricity co-generated with heat. |
| Regulator | the President of ERO, fulfilling the tasks assigned to him in the energy law. The regulator is responsible for, among others, giving out licenses for energy companies, approval of energy tariffs, appointing Transmission System Operators and Distribution System Operators. |
| Renewable Energy Source (RES) |
a source of generation using wind power, solar radiation, geothermal energy, waves, sea currents and tides, flow of rivers and energy obtained from biomass, landfill biogas as well as biogas generated in sewage collection or treatment processes or the disintegration of stored plant or animal remains. |
| SAIDI | System Average Interruption Duration Index - index of average system interruption time (long, very long and disastrous), expressed in minutes per customer per year, which is the sum of the interruption duration multiplied by the number of consumers exposed to the effects of this interruption during the year, divided by the total number of off-takers. SAIDI does not include interruptions lasting less than three minutes and is determined separately for planned and unplanned interruptions. It applies to breakdowns in the low (LV), medium (MV) and high voltage (HV), wherein SAIDI in quality tariff does not include interruptions on low voltage. |
| SAIFI | System Average Interruption Frequency Index - index of average system amount of interruptions ( long, very long and disastrous ), determined as number of off-takers exposed to the effects of all such interruptions during the year divided by the total number of off-takers. SAIFI does not include interruptions lasting less than three minutes and is determined separately for planned and unplanned interruptions. It applies to breakdowns in the low (LV), medium (MV) and high voltage (HV), wherein SAIFI in quality tariff does not include interruptions on low voltage . |
| SCR | Selective catalytic reduction |
| SNCR | Selective non-catalytic reduction |
| Tariff | the list of prices and rates and terms of application of the same, devised by an energy enterprise and introduced as binding on the customers specified therein in the manner defined by an act of parliament. |
| Tariff group | a group of customers off-taking electricity or heat or using services related to electricity or heat supply to whom a single set of prices or charges and terms are applied. |
| TFS | Tradition Financial Services, an electricity trading platform used for concluding various transactions, purchase and sale of conventional energy, property rights, renewable energy and CO2 emission allowances. |
| TGE | Towarowa Giełda Energii S.A. (Polish Power Exchange), a commodity exchange on which trading can take place in electricity, liquid or gas fuels, extraction gas, emission allowances and property rights whose price depends directly or indirectly on electric energy, liquid or gas fuels and emission allowances, admitted to commodity exchange trading. |
| TPA, TPA rule | Third Party Access, the owner or operator of the network infrastructure to third parties in order to supply goods/services to third party customers. |
| Transmission | transport of electricity through high voltage (220 and 400 kV) transmission network from generators to distributors. |
| Transmission System Operator (TSO) |
a power company engaging in the transmission of gaseous fuels or electric energy, responsible for traffic in a gas or power transmission system, current and long-term security of operation of that system, the operation, maintenance, repair and indispensable expansion of the transmission system, including connections with other gas or power systems. In Poland, for the period from July 2, 2014 till December 31, 2030 Polskie Sieci Elektroenergetyczne S.A. was chosen as a TSO in the field of energy transmission. |
| TWh | terawatt hour, a multiple unit for measuring of electricity unit in the system SI. 1 TWh is 109 kWh. |
| Ultra-high-voltage network (UHV) |
an energy network with a voltage equal to 220 kV or higher. |
| V (volt) | electrical potential unit, electric voltage and electromotive force in the International System of Units (SI), 1 V= 1J/1C = (1 kg x m2 3 ) / (A x s ). |
| W (watt) | a unit of power in the International Systems of Units (SI), 1 W = 1J/1s = 1 kg x m2 -3 x s |
| Yellow certificate | a certificate confirming generation of energy in gas-fired power plants and CCGT power plants. |
| Yellow energy | popular name for energy generated in gas-fired power plants and CCGT power plants. |