Management Reports • Aug 7, 2018
Management Reports
Open in ViewerOpens in native device viewer
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period
ended June 30, 2018
| 1. | Description of activity of the Capital Group | 5 |
|---|---|---|
| 1.1. Description of organisation | 6 | |
| 2. | PGE Group's strategy and its implementation | 8 |
| 2.1. Strategy of the Capital Group | 8 | |
| 2.2. Implementation of key projects within the strategic objectives | 9 | |
| 3. | Electricity market and regulatory and business environment | 16 |
| 3.1. Macroeconomic environment | 16 | |
| 3.2. Regulatory environment | 18 | |
| 3.3. Supply markets | 28 | |
| 4. | Results of PGE Capital Group | 30 |
| 4.1. Key financial results of the PGE Capital Group | 30 | |
| 4.2. Key operational figures of PGE Capital Group | 34 | |
| 4.3. Key financial results in the business segments | 37 | |
| 5. | Risks and opportunities | 49 |
| 5.1. Risk management | 49 | |
| 5.2. Risk factors and mitigating actions | 50 | |
| 5.3. Strategic risk | 53 | |
| 6. | Significant events of the reporting period and subsequent events | 54 |
| 6.1. Changes in the Management Board and Supervisory Board | 54 | |
| 6.2. Legal aspects | 55 | |
| 6.3. Information concerning proceedings in front of court, body appropriate for arbitration proceedings or in | ||
| front of public administration authorities | 55 | |
| 6.4. Information about granting guarantees by the Company or its subsidiary | 56 | |
| 6.5. Information on issue, redemption and repayment of debt securities and other securities | 57 | |
| 6.6. Activities related to nuclear energy | 57 | |
| 6.7. Tender offer to subscribe for the sale of 100% shares of Polenergia S.A. | 58 | |
| 6.8. Transactions with related entities | 59 | |
| 6.9. Publication of financial forecasts | 59 | |
| 6.10. Information about shares and other securities |
60 | |
| 7. | Statements of the Management Board | 61 |
| 8. | Approval of the Management Board's Report | 61 |
| Glossary | 62 |
| June 30, 2018 |
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period ended | ||
|---|---|---|---|
| 4 of 64 |
Capital Group of PGE Polska Grupa Energetyczna S.A. ("PGE Capital Group", the "Capital Group", "PGE Group", the "Group") is the largest vertically integrated producer of electricity and heat in Poland. With a mix of own fuel sources, generation assets and distribution network, PGE Group provides a safe and reliable supply of electricity to more than five million households, businesses and institutions.
The parent company of PGE Capital Group is PGE Polska Grupa Energetyczna S.A. (also "PGE S.A.", "PGE", the "Company", the "Issuer").
PGE Group currently organizes its activities in five business segments:
Conventional Generation
Core business of the segment includes extraction of lignite, production of electricity and heat from conventional sources as well as transmission and distribution of heat. The Conventional Generation segment includes PGE Energia Ciepła S.A., which also tradesin electricity.
Renewables
Core business of the segment includes electricity generation from renewable sources and in pumped-storage power plants.
Supply
Core business of the segment includes trading of electricity across the country, wholesale trading of electricity on domestic and international market, provision of services to companies from the PGE Group related to commercial management of generation capacities of the Group and electricity produced, as well as trading of CO2 allowances and energy certificates and fuels.
Distribution
Core business of the segment includes supply of electricity to final off-takers though the grid and HV, MV and LV infrastructure.
Other Operations
Other operations include services, through the subsidiaries, to PGE Group, which includes organisation of capital raising projects and provision of IT, payroll & HR and transportation services. Its activities also include subsidiaries formed to prepare and implement a projectto build a nuclear power plant, to manage investment funds and to invest in start-ups.
Changes which occurred in the PGE Capital Group's structure in the period from January 1, 2018 until the publication date of this report, are presented in note 1.3 to condensed interim consolidated financial statements and described below.
| Entity | Date of registration | (1) Share capital | Comment | |
|---|---|---|---|---|
| National Court Register | (2) Increase | |||
| (3) Share capital | ||||
| Towarzystwo Funduszy |
April 3, 2018 | (1) | after increase PLN 6250000 |
On November 28, 2017 the Extraordinary General Meeting of the company adopted a resolution on an increase of the company's share |
| InwestycyjnychEnergia S.A. | (2) PLN 18000000 | capital. The increased capital was acquired by PGE S.A., in exchange for a cash contribution. PGE S.A. holds 100% of share capital. | ||
| (previous name: PGE Towarzystwo Funduszy | (3) PLN 24250000 | |||
| Inwestycyjnych S.A.) | ||||
| PGE Inwest 5 sp. z o.o., PGE Inwest 8 sp. z o.o., | PGE Inwest 5 sp. z o.o. – | (1) | PLN 20000 | On April 5, 2018 the Extraordinary Assemblies of Partners of the companies adopted resolutions on an increase of the company's share |
| PGE Inwest 9 sp. z o.o., PGE Inwest 10 sp. | June 5, 2018, | (2) | PLN 30000 | capital by PLN 30 000 in each case. The increased capital were acquired by PGE S.A. in exchange for cash contributions. PGE S.A. holds |
| zo.o., PGE Inwest 11 sp. z o.o., PGE Inwest | PGEInwest8 sp. z o.o. – | (3) | PLN 50000 | 100% of share capital of the companies. |
| 12sp. z o.o. andPGE Inwest 14 sp. z o.o. | May 22, 2018, | |||
| PGEInwest 9 sp. z o.o. – | ||||
| June 9, 2018, | ||||
| PGEInwest 10 sp. z o.o. – | ||||
| May 28, 2018, | ||||
| PGEInwest 11 sp. z o.o. – | ||||
| June 21, 2018, | ||||
| PGE Inwest 12 sp. z o.o. – | ||||
| May 21, 2018, | ||||
| PGE Inwest 14 sp. z o.o. – | ||||
| June13, 2018 | ||||
| PGE Inwest 17 sp. z o.o., PGE Inwest 18 | PGE Inwest17 sp. z o.o. – | (1) | PLN 10000 | On April 5, 2018 the Extraordinary Assemblies of Partners of the companies adopted resolutions on an increase of the company's share |
| sp.zo.o. and PGE Inwest 19 sp. z o.o. | May 30, 2018, | (2) | PLN 30000 | capital by PLN 30 000 in each case. The increased capital were acquired by PGE S.A. in exchange for cash contributions. PGE S.A. holds |
| PGEInwest 18 sp. z o.o. - | (3) | PLN 40000 | 100% of share capital of the companies. | |
| May 30, 2018, | ||||
| PGE Inwest 19 sp. z o.o. – | ||||
| June 29 2018 |
| Shares of the entity | Date of transaction/ | Number of acquired | Comment | ||
|---|---|---|---|---|---|
| registration in the | shares | ||||
| National Court Register | |||||
| ElectroMobility | Poland | S.A. | January 3, 2018/ | 2 500 shares |
On January 3, 2018 the Extraordinary General Meeting of adopted resolution on a share capital increase by PLN 20 000 000 to PLN 30 000 |
| ("ElectroMobility") – acquisition by PGE S.A. |
000 by increasing the nominal value of existing shares. In exchange for a cash contribution, PGE S.A. took up increased nominal value of | ||||
| of the share capital increase shares of | April 23, 2018 | 2 500 shares, the total nominal value of which increased from PLN 2 500 000 to PLN 7 500 000. As a result of the share capital increase, |
|||
| ElectroMobility | ElectroMobility's share | PGE S.A.'s stake in ElectroMobility did not change (25% shareholding). | |||
| capital increase registered |
| Shares of the entity | Date of transaction/ registration in the National Court Register |
Number of acquired shares |
Comment |
|---|---|---|---|
| Polska Grupa Górnicza S.A. ("PGG") – acquisition by PGE Górnictwo i Energetyka Konwencjonalna S.A. ("PGE GiEK") of shares in the increased share capital of PGG |
January 31, 2018 April 6, 2018 PGG's share capital increase registered |
300 000 shares | On January 31, 2018 the Extraordinary Assembly of Partners of PGG adopted resolution in the increase of the share capital by PLN 300 000 000 to PLN 3 916 718 200, through issue of new inscribed shares. PGE GiEK S.A. took up 300 000 shares with a nominal value of PLN 30 000 000, representing 0.8% in the increased share capital of PGG. Currently PGE GiEK holds a total of 6 000 000 shares with a nominal value of PLN 600 000 000 representing 15.32% in the share capital of PGG. |
| PGE Energia Ciepła S.A. - acquisition of shares by PGE S.A. (reverse squeeze-out procedure and squeeze out procedure) |
March 7, 2018 and May 7, 2018(reverse squeeze out) May 18, 2018 (squeeze out) |
342 728 shares |
On March 7, 2018 and May 7, 2018 PGE S.A. acquired respectively 3 285 and 2 970 shares of PGE Energia Ciepła S.A., through reverse art. 4181 squeeze-out procedure, pursuant to of the Polish Commercial Companies Code. On May 18, 2018 PGE S.A. acquired 336 473 shares of PGE Energia Ciepła S.A., through squeeze-out procedure, pursuant to art. 418 of the Polish Commercial Companies Code. As a result of the above transactions, currently PGE S.A. holds shares representing 100% in the share capital of PGE EC. |
| Zespół Elektrociepłowni Wrocławskich Kogeneracja S.A. ("Kogeneracja S.A.") - acquisition of shares by PGE EC (as a result of tender offer) |
March 14, 2018 | 1 202 172 shares |
PGE EC acquired 1202172 shares of Kogeneracja S.A. (acquisition was a consequence of the tender offer due to exceeding 33% of total votes, pursuant to art. 73 Act of July 29, 2005 on public offering, conditions governing the introduction of financial instruments to organised trading, and public companies). Currently PGE EC holds directly 3 845 041 shares of the company with a nominal value of PLN 19 225 205, representing 25.81% in the share capital of Kogeneracja S.A. In addition, PGE EC, through one-man subsidiary Investment III B.V., holds indirectly 4 807 132 shares with a nominal value of PLN 24035660, representing 32.26% in the share capital of Kogeneracja S.A. |
| Acquiring company /acquired company | Date of transaction/ | Comment |
|---|---|---|
| registration in the | ||
| National Court Register | ||
| ELTUR -SERWIS sp. z o.o. -acquiring company TOP SERWIS sp. z o.o. -acquired company |
February 26, 2018 | On February 26, 2018 the Extraordinary Assembly of Partners of ELTUR - SERWIS sp. z o.o. (acquiring company) and TOP SERWIS sp.z o.o. (acquired company) adopted resolutions on merger of the companies in mode of art. 492 § 1 p. 1 of the Polish Commercial Companies Code (merger through acquisition), ), through transferring of all assets of the acquired company to the acquiring companyin exchange for |
| April 12, 2018 merger | the shares, which the acquiring company allotted to PGE S.A. as a sole shareholder of the acquired company. The share capital of the | |
| registered in the National Court Register |
acquiring company was increased by PLN 50 000, i.e. from PLN 34 824 500 to PLN34 874 500. |
|
| PGE Energia Odnawialna S.A. - acquiring |
March 27 and 29, 2018 | The Extraordinary General Meeting of PGE Energia Odnawialna S.A. (acquiring company) and the Extraordinary Assembly of Partners of |
| company | PGE Energia Natury PEW sp.z o.o. (acquired company) on – respectively – March 29, 2018 and March 27, 2018 adopted resolutions on |
|
| PGE Energia Natury PEW sp. z o.o. - acquired |
merger of the companies in mode of art. 492 § 1 p. 1 of the Polish Commercial Companies Code (merger through acquisition), through |
|
| company | May 2, 2018 merger | transferring of all assets of the acquired company to the acquiring company without issue of new shares in exchange for the shares in |
| registered in the National | the share capital of the acquired company, pursuant to art. 516 of the Polish Commercial Companies Code and dissolution of the | |
| Court Register | acquired company without its liquidation. PGE Energia Odnawialna S.A. was the sole shareholder of PGE Energia Natury PEW sp. z o.o. |
| Entity | Date of transaction | Comment |
|---|---|---|
| PGE KLASTER sp. z o.o. | March 29 and 30, 2018 | On March 29, 2018 the Extraordinary Assembly of Partners of PGE KLASTER sp. z o.o. adopted resolution on obligation of the sole |
| shareholder i.e. PGE Energia Odnawialna S.A., to supplementary payment to the shares, in the meaning of art. 177 of the Polish | ||
| Commercial Companies Code, in total amount of PLN 2 000 000, i.e. PLN 2000 for each share of PGE KLASTER sp. z o.o. entitled to PGE |
||
| Energia Odnawialna S.A., by March 30, 2018. In accordance with the above resolution, additional equity contributions were paid on |
||
| March 30, 2018. |
PGE Group's strategy update by 2020 was approved by the Supervisory Board on September 6, 2016. The strategy seeks to adapting the Group's activities to the changing environment, addresses threats and opportunities connected with, among others, volatility of fuel prices, climate policy directions, market model evolution and new technology development.
PGE's mission is to ensure security and growth based on reliability of supply, technical excellence, modern services and partnership relationships. Increase its value for shareholders and the key role in ensuring Poland's energy security are the overall objectives which PGE Group is constantly realising.
Diagram: Redefining PGE Group's mission.
PGE Group's vision determines our target position in four areas:
| 2016 – 2018 |
2018 + |
|---|---|
| Continuation of flagship Investments in Opole and Turów Launch of preparatory phase for construction of 2 new gas-fired units at Dolna Odra power plant Closing of transaction to acquire EDF Polska's assets: strengthening the top position on the power market and securing the position of largest supplier of district heating Adoption of PGE Group's District Heating Strategy. Approval of "De-merger plan for PGE Górnictwo i Energetyka Konwencjonalna S.A." in order to transfer six of PGE GiEK's branches to PGE EC. Optimisation of generation portfolio in terms of participation in the capacity market. |
Construction of 1 000 MWe of new cogeneration capacities. Establishment of specialised business line integrating activities in the district heating area – PGE Energia Ciepła S.A. Increase of low-emission fuels' share in the district heating segment to 50%. Launch of 1 045 MW offshore wind farm, with potential to expand the project by additional 1 500 MW. Increase of exposure to the diffuse source segment. Optimal adaptation of power plants and CHP plants to new industrial emission standards BAT. Modernisation of local district heating systems and construction of new cogeneration sources as part of a programme combating household originated emissions. |
Sale of electricity in the Warsaw area under the LUMI brand.
Increase of share of managed district heating networks at PGE Energia Ciepła S.A. locations to 2/3
| 2016 – 2018 |
2018 + |
|---|---|
| Reduction in PGE Group's controllable costs. Standardisation and optimisation of support functions across entire PGE Group. Start of implementation of integrated management system for production assets. Implementation of projects resulting from human capital management strategy. |
Reduction of controllable costs by PLN 500 million compared to 2016. In the district heating segment, reduction of repair expenses by 10% (by 2023, compared to 2017). Additional annual EBITDA resulting from implementing the District Heating Strategy estimated at approx. PLN 1 billion by 2030. Retention of competitiveness of lignite mining. Increase in efficiency of combustion by product management. |
| Launch of specialised CVC fund by PGE Ventures sp. z o.o. ("PGE Ventures") for equity investments in promising startups. Formation of PGE Nowa Energia sp. z o.o. ("PGE Nowa Energia") for incubation and acceleration of earliest-stage projects. Agreement on establishment of two energy clusters. Launch of public fast charging stations for electric cars in several Polish cities as part of a pilot programme for the development and management of infrastructure for an electromobility system. Construction of photovoltaics laboratory and start of experimental station. |
PLN 400 million until 2020 intended for research, development and innovations, half of which from external sources. Development of energy efficiency activities. Development and commercialisation of new technologies to introduce to the market modern and comprehensive client offering, covering photovoltaics, electromobility, intelligent home solutions (the Smart Energy project), natural gas and demand side response. Sale of charging services and short-term rentals of electric cars for clients (e carsharing). |
| Key projects in H1 2018 | |
|---|---|
| Development | Construction of new units in Opole power plant |
| investments | ● aim of the project: construction of two power units of 900 MW each |
| ● budget: approx. PLN 11 billion (net, without costs of financing) | |
| ● capital expenditures incurred so far: approx. PLN 8.6 billion | |
| ● fuel: hard coal | |
| ● net efficiency: 45.5% | |
| ● contractor: syndicate of companies: Rafako, Polimex-Mostostal and Mostostal Warszawa with | |
| co-operation of GE as Project manager on behalf of the syndicate | |
| ● commissioning according to the binding agreement with the General Contractor: unit 5 – July | |
| 31, 2018; unit 6 – March 31, 2019 wherein commissioning dates declared by the General Con | |
| tractor are: May 31, 2019 for unit 5 and September 30, 2019 for unit 6. | |
| ● status: as regards unit 5 cold start-up is progressing, preparations for a chemical cleaning of the | |
| boiler are under way; assembly work on unit 6 and shared systems is on-going; coal deliveries for the | |
| start-up of both units are in progress,; coal deliveries for the start-up of both units are in progress; | |
| overall project progress at the end of June 2018 was approx.92%. | |
| Construction of new unit in Turów power plant | |
| ● aim of the project: construction of power unit with a capacity of 490 MW | |
| ● budget: approx. PLN 4 billion (net, without costs of financing) | |
| ● capital expenditures incurred so far: approx. PLN 1.8 billion | |
| ● fuel: lignite | |
| ● net efficiency: 43.1% | |
| ● contractor: syndicate of companies: MHPSE, Budimex and Tecnicas Reunidas | |
| ● commissioning: H1 2020 | |
| ● as regards the unit's main equipment, assembly of the boiler's pressure part and elements of a | |
| turboset is continued, as is assembly of auxiliary systems, including a flue gas desulphurisation | |
| system and carburisation system and construction work on two electricity buildings: main (including | |
| control room) and electrostatic precipitator. Construction of a cooling tower shell was completed in | |
| the second quarter of 2018. Construction of a coal-feed system and technological feed system is in | |
| progress as part of ancillary works. | |
| Construction of a Thermal Processing Installation with Energy Recovery at Rzeszów CHP | |
| ● aim of the project: construction of a thermal processing installation with energy recovery at | |
| Rzeszów CHP with capacity of approx. 8 MWe in condensation (approx. 4.6 MWe + 16.5 MWt in | |
| co-generation ) | |
| ● budget: approx. PLN 293 million (net, without costs of financing ) | |
| ● capital expendituresincurred so far: approx. PLN 218 million | |
| ● fuel: municipal waste | |
| ● boiler's efficiency: 86% | |
| ● contractor: syndicate of TM.E. S.p.A. Termomeccanica Ecologia and Astaldi S.p.A. | |
| ● according to the binding agreement, investment should be commissioned in June 2018. the The | |
| General Contractor asked for a deadline extension for this investment. The parties began talks | |
| intended to define a new deadline for the investment, as short as possible. A delay of several weeks | |
| is expected. | |
| ● status: the installation's hot start-up began and first waste was incinerated in the boiler; finishing | |
| works are on-going in buildings as well as works related to land management. |
| Modernisation and | Comprehensive reconstruction and modernisation of units no. 1-3 at Turów power plant |
|---|---|
| replacement projects |
● aim of the project: Adaptation to future BAT conclusions requirements regarding permissible emissions of SO2, NOx and particulate, increase of availability and efficiency, as well as expansion of |
| each turboset's nominal capacity by approx. 15 MWe | |
| ● status: unit 2 was synchronised with the National Power System on June 16, 2018. The unit is | |
| currently in regulatory operation. Unit 2 is planned to be commissioned in October 2018. Work on | |
| disassembly of combustion chamber lining at boiler 1, modernisation of turbo-set and assembly of | |
| electrical system as well as control and metering equipment and automatics for unit 1. | |
| ● budget: PLN 0.8 billion (net, without costs of financing) | |
| ● fuel: lignite ● completion: 2020 |
|
| Change in technology of furnace waste storage for units 1-12 – Bełchatów power plant and | |
| construction of installation to transport ash; production and transport of sludge from unit 14 | |
| in Bełchatów power plant | |
| ● aim of the project: to provide the capability for storage of furnace waste produced during the | |
| operation of units 1-12 of Bełchatów power plant until exhaustion of lignite resources. In the | |
| course of the project, the requirement to fit out unit 14 with new technology for the transport and storage of combustion waste was identified. |
|
| ● status: works related to filling in and securing the "Zwałowisko" and "Lubień" storage sites continue, | |
| as do works related to construction of installations for unit 14. Start-up of specific systems related to | |
| the generation and pumping of suspension from reservoirs 1 and 2 and start-up work on ash | |
| transport system and shipping station. Commissioning of installations is planned at the end of August 2018. |
|
| ● budget for units 1-12: ca. PLN 450 million (net, without costs of financing) | |
| ● budget for unit 14: ca. PLN 90 million (net, without costs of financing) | |
| ● completion: 2018 | |
| Modernisation of the Pomorzany power plant | |
| ● aim of the project: Reduction of NOx and SO2 emissions from Benson OP-206 boilers to a level |
|
| allowing to meet the requirements of future BAT conclusions as well as to ensure that the plant | |
| remains in operation until about 2040 | |
| ● status: SCR installation for unit A was handed over for use; assembly of SCR reactor at unit B is also | |
| nearly finished. | |
| As regards flue gas desulphurisation system: assembly of building steel structure and reactors for | |
| boilers A and B is in progress. Foundations for pipelines are almost finished. At the same time, work | |
| is continuing on an ash distribution station. | |
| ● budget: ca. PLN 213 million (net, without costs of financing) | |
| ● fuel: hard coal | |
| ● completion: SCR – 2018 (unit A/B), FGD – 2019 | |
| Construction of flue gas denitrification installation and flue-gas desulphurisation for OP-230 boilers | |
| no. 3 and 4 in Bydgoszcz CHPs | |
| ● aim of the project: Reduction of NOx and SO2 emissions from boilers no. 3 and 4 to a level allowing |
|
| for further use | |
| ● status: As regards flue gas desulphurisation system: assembly work is on-going, together with | |
| deliveries of the installation's elements. The reactor and bag filter structure were assembled. | |
| Construction of supporting structures and deliveries of sorbent management system elements are in progress. |
|
| As regards deNOx : construction work on foundations for flue gas ventilators were completed; |
|
| technical building was built – shell construction; construction of supporting structure for SCR reactors | |
| at boilers 3 and 4. Assembly of flue gas ventilators and reagent management system is in progress. | |
| ● budget: for deNOx project: PLN 48 million (net, without costs of financing); for FGD project: PLN 45 |
|
| million (net, without costs of financing) | |
| ● fuel: hard coal | |
| ● completion: 2018 |
| Construction of flue gas denitrogenation system forsix OP-650 boilers at Rybnik power plant | |
|---|---|
| ● project objective: construction of flue gas denitrogenation unit to ensure compliance with IED Directive requirements |
|
| ● budget: PLN 259 million (net, without financing costs) | |
| ● expendituresso far: PLN 216 million (net, without financing costs) | |
| ● contractors: SCR – Consortium Strabag sp. z o.o. and Strabag Energy Technologies GmbH, SNCR – Energotechnika – Energorozruch S.A., PM – Energotechnika – Energorozruch S.A. ● completion: December 2018 |
|
| ● status: progress at approx. 90%. Still left to do is SNCR at boiler 5 as well as optimisation and warranty-related measurements on boilers 3 and 5. |
|
| Construction of flue gas denitrogenation units at CHP plantsin: Kraków, Wrocław, Gdańsk, Gdynia | |
| ● project objective: construct flue gas denitrogenation unit to ensure compliance with IED Directive requirements |
|
| ● budget: PLN 545 million (net, without financing costs) | |
| ● expendituresso far: PLN 488 million (net, without financing costs) | |
| ● contractors: General Electric; Fortum-ZRE; Fortum Mehldau; SBB Energy; Fortum-Instal | |
| ● completion: December 2018 | |
| ● status: progress at approx. 92%. Still left to complete and optimise are SNCR installationsin Gdańsk, | |
| Kraków and Gdynia. | |
| Project of network | ● aim of the project:reduction of electricity procurement costs for balancing differences |
| losses reduction | ● activities undertaken (multi-year project): |
| replacement of HV/MV, MV/LV transformers with low-loss units, adaptation of transformers' output to power consumption; |
|
| grid conversion and modernisation: construction of HV/MV and MV/LV stations, increase of cable cross-sections for HV, MV and LV lines, reduction of MV and LV lines; |
|
| maintenance of optimal grid workload, elimination of adverse energy transit in HV lines, optimisation of MV line partitions; reduction of load asymmetries in LV lines. |
|
| ● the results of the project: lowering of the balancing difference in 2017 to 5.37% (in 2016 it amounted to 5.77%); volume of balancing difference in 2017 was by 5% lower than in 2016 with the simultaneous increase of volumes of energy delivered to off-takers by 3% in that period. The balancing difference in period July 2017 – June 2018 amounted to 5.21%. |
|
| ● activities initiated in H1 2018: project assumptions for 2018-2022 were updated in March 2018; activities aimed at reducing balancing differences at PGE Dystrybucja S.A. are to be continued, the |
Strategic Research and Development and New Business Areas ("SOBiR+NB"), within which the Group intends to carry out R&D and innovation projects concerning, among others, the supply of new products or services. The SOBiR+NB areas are aligned with the Group's most important challenges and are identified for each element of the value chain (see the graph below).
tasks assumed in the project are being carried out on an ongoing basis.
| Mining | Generation |
Renewable Energy |
Distribution | WHI Sale |
|---|---|---|---|---|
| Optimisation of the mining process |
Utilisation of carbon dioxide (CCU) |
Prosumer photovoltaics | Smart Grid | Management of information about customers (Big Data) |
| Raw material treatment | Reduction of emissions (NOx, SOx, Hg, etc.), |
Wind energy | Smart Meters | Smart Facility |
| Improvement of generation effectiveness |
Energy storage | E-mobility | ||
| Fuel gasification | Demand management | |||
| Micro-cogeneration | ||||
| Nuclear energy |
In connection with an Update of the Group's Strategy until 2020 being introduced in the third quarter of 2016, works have progressed on updating the Development and Innovation Strategy that will place emphasis on challenges that most affect the Group, where R&D and innovation are essential to the achievement of set business objectives. Particular attention will be paid to both dynamically developing segments such as electromobility or energy storage as well as ways of acquiring and developing initiatives such as new models of management and implementation of innovations like acceleration and investing in an equity fund model in small businesses that develop technologies and products. A strategic option for PGE will be the design and development of specific technologies – which constitutes a large quality change in contrast to the previous model – an operator of technologies from other businesses, providers. An SPV named PGE Nowa Energia was formed to work with small businesses (start-ups) in the acceleration and project commercialisation (implementation of innovation solutions) formula. By working with start-up market stakeholders (small businesses, accelerators, other investors, government agencies, etc.), the company is a competence centre, allowing PGE to effectively identify and develop technologies and products being part of and related to the power value chain. Moreover, PGE Nowa Energia is a company designated to build charging infrastructure for electric vehicles and develop the Group's operations in the electromobility area.
In order to facilitate the continued development of companies and obtainment of new solutions from the market (at the maturity stage later than acceleration), the PGE Ventures company was established, which serves the role of the corporate investment fund of PGE Capital Group. The purpose of the company is to invest PGE's own funds and funds obtained via support tools – the public budget available through the Polish Development Fund (PFR) and the National Research and Development Centre ("NCBiR").
PGE focuses on initiating and executing R&D projects that fall within the SOBiR+NB areas. In the first quarter of 2018, several dozen projects were continued within these areas.
| Key projects in H1 2018 | |
|---|---|
| Involvement in equity structures that support the development of new technologies and solutions as well as small businesses |
● aim of the project: Introduction of a new model for developing and implementing new solutions, allowing to manage higher-risk undertakings whilst reducing time-to-market for new solutions (for own purposes or to sell to other entities) ● main activities: the first edition of PGE Ventures' scouting programme was completed, with the first two investment agreements signed by PGE Ventures in January 2018 3 further investments were finalised, as a result of PGE Ventures' scouting program, durng which more than 120 companies from energy sector were analysed the acceleration activities conducted by the PGE Nowa Energia company have been commenced and rules of co-operation between the companies (PGE Nowa Energia and PGE Ventures) have been determined, providing for optimization and maintenance of continuity at the next stages of development of small. Project acceleration applications are being accepted. activities related to the formation of an external investment fund named Energy Research Capital ("ERC") were finalised under the Polish Research and Development Centre's BRIdge Alfa 2017 programme. PGE Ventures will serve as investor and will have influence over the fund's investment strategy. ERC will invest in innovative solutions for the energy industry, technologies from the IoT area and ICT technologies. ERC plans to invest in approx. 20 carefully selected companies that are characterised by high innovativeness. |
| Electromobility | ● aim of the project: promoting and developing electric transport in Poland and gaining by PGE Capital Group of experience and the competence necessary to serve the role of the operator of electrical cars charging infrastructure and of the supplier of electrical cars charging services ● main activities: concern individual transport – cars used for private and business purposes PGE has been continuing a project launched in December 2016 in which a pilot run is being implemented that consists of the construction of infrastructure for an electromobility system in Łódź, where the first rapid charging station in Łódź was launched and the next stations are expected to follow in the second half of 2018. Talks regarding cooperation in other locations are on-going. |
| Recycling | ● aim of the project: PGE Group is preparing to execute a project allowing to develop and implement |
|---|---|
| a new technology for the recycling of lithium batteries, particularly those used in energy storage | |
| systems and to charge electric cars. This technology is intended to obtain strategic materials from | |
| used lithium batteries – cobalt, nickel and copper. The project directly supports the assumptions of | |
| the Ministry of Development concerning the transformation of the economy in the direction of | |
| closed-circuit economy, as well as the requirements of the Polish legislation specifying the needs of | |
| collection and utilization of used batteries. The project has a business potential due to the | |
| anticipated growth in the world's market of lithium batteries and the increase in the quantity of | |
| battery wastes connected with that, as well as increased demand of markets for products recycled | |
| from used batteries. | |
● main activities: PGE S.A. has set up a consortium with RDLS sp. z o.o. ("RDLS"), a spin-off company of the Warsaw University operating in the area of environmental research and biotechnology. The goal of the consortium is to produce a pilot recycling installation for lithium batteries and implement this technology in Poland. The project was recommended by NCBiR for co-financing from public funds of the Research Programme of the Power Sector ("PBSE"). The consortium led by RDLS, received a consent for financing of the project from NCBiR funds. In December 2017 the Management Board of PGE S.A. issued approval for commencement of the project implementation phase and signing of an agreement on project funding between NCBiR and RDLS. The project implementation has commenced on December 29, 2017 – on that day the consortium leader signed the agreement for financing of the project.
PGE Group's main operating area is Poland, and the domestic macroeconomic backdrop has a substantial impact on Group's results. At the same time, the condition of Poland's economy remains largely tied to the situation across the European Union and in global markets. The Group's financial results are affected by both the situation in specific segments of the economy and the financial markets, which affect the terms of PGE Group's debt financing.
As a rule of thumb, there is a historical correlation between rising electricity demand and economic growth in Poland. Considering PGE Group's position on the Polish power generation market, as well as its substantial share in the electricity sales and distribution market, changes in power and heat demand may have a significant impact on the Group's results.
In the first half of 2018, gross electricity consumption went up 1.9% compared to analogical period of 2017. The increase was lower than in the first half of 2017, when consumption went up 2.3% compared to analogical period of 2016.
Economic trends in the first half of 2018 remained positive in general. Data from Credit Agricole shows that just in the second quarter of 2018 GDP grew by 4.9%, comparing to the same period last year. Growth was higher than in the second quarter of 2017, when it reached 4.2% y/y.
Diagram: Seasonally adjusted GDP change vs. change in domestic gross electricity consumption.
Economic growth and rising electricity consumption were accompanied by optimistic condition of Polish industry, which is responsible for approx. 45% of domestic electricity consumption. The Purchasing Managers' Index (PMI) for industry reached 53.7 points on average in the first half of 2017, and 53.9 points on average in the first half of 2018. It means level above 50 points, above which the respondents expect the sector's situation to improve. The positive result stems mainly from growing production, employment and consumption. The results of the Polish industrial sector should be further strengthened by the Eurozone, whose PMI for H1 2017 reached an average level of 56.3 points, and 56.9 points in the analogical period of 2018.
Diagram: Manufacturing PMI in Poland and Eurozone (in points).
Source: Markit Economics
Source: Central Statistical Office of Poland, PSE S.A., GDP for Q2 2018 – estimate by Credit Agricole
Positive development in the Polish economy is confirmed by dynamics in overall industrial production. In the first half of 2018, it went up by 6.2% y/y, compared to 5.7% in the first half of 2017. The change resulted from increase in industrial production dynamics (6.4% y/y in the first half of 2018 versus 6.2% in the first half of 2017). Simultaneously, production in the whole energy sector increased by 8.4% y/y in the first half of 2018 vs 5.3% in the first half of 2017. The value of industrial manufacturing depends on volumes of goods produced and prices. PPI in the first half of 2018 amounted to 1.4% y/y. CPI reading in the second quarter of 2018 amounted to 1.7% y/y.
Table: Key economic indicators for Poland.
| Key economic indicators | H1 | H1 |
|---|---|---|
| (% change y/y) | 2018 | 2017 |
| GDP1 | 4.9 | 4.2 |
| CPI2 | 1.7 | 1.8 |
| PPI3 | 1.4 | 3.6 |
| Sold industrial production3 | 6.2 | 5.7 |
| Sold production – manufacturing3 | 6.4 | 6.2 |
| 3 Sold production – energy |
8.4 | 5.3 |
| Dynamics of domestic electricity consumption4 | 1.9 | 2.3 |
| Gross domestic electricity consumption (TWh)4 | 85.1 | 83.5 |
| EUR/PLN5 | 4.22 | 4.27 |
Source: 1for Q2 2018 – forecast by Credit Agricole bank, for Q2 2017 - Central Statistical Office of Poland, 2National Bank of Poland, quarterly data 3Central Statistical Office of Poland, 4PSE S.A., 5National Bank of Poland.
International ● key climate-energy package regulations, setting out greenhouse gas emission reduction targets by 2030 and the package "Clean energy for all Europeans," which aims to implement on the legal side the concept of energy union. The following regulations will have a significant impact onthe Polish energy sector, including PGE Group, after 2020:
Directive of the European Parliament and of the Council no. 2018/410 amending Directive 2003/87/EC (to enhance cost-effective emission reductions and low- carbon investments) and decision (EU) 2015/1814, setting up in particular: the level of the linear reduction factor ("LRF") set at 2.2% annually from 2021; double increase in volume of allowances to be directed to the market stability reserve ("MSR") in 2019- 2023 from 12% to 24% of allowances being traded and the introduction of cyclical removal of allowances from 2023 in a volume that will exceed the volume of allowances being the subject of auctions in the preceding year; Modernisation Fund, the size of which has been set at 2% of the total number of allowances after 2021, with a conditional possibility to increase its size to 2.5%; way of redistributing the Modernisation Fund's investment funds, with a simple decision path for select project categories (including renewables and grids) and receipt of a recommendation from the investment committee if
support of coal investments is not possible; way of redistributing free allowances that does not interfere with obtaining support for pro-environment modernisations.
After formal adoption of the act in the first quarter of 2018, on March 19, 2018 the text of Directive was published in the UE Official Journal. In the first half of 2018, the European Commission began work on an implementing act that will set detailed rules for the Modernisation Fund and the Innovation Fund as well as on a delegated act concerning free allocation of allowances for industry and district heat producers. A potential decision by the European Commission on whether to issue guidelines for the application of art. 10c (derogations) will depend on the number of member states interested in using free-of-charge allocation of allowances for producers of electricity.
fuels and the option to finance the construction of liquidation costs for nuclear power plants. The Commission did not propose to support transformation for countries and regions that are dependent on coal. However, it proposed a new source of the EU's own resources: member states are to contribute to the EU's new budget up to 30% of revenue from the sale of emission allowances allocated pursuant to art. 10 sec. 2 letter A of EU ETS and up to 30% of the market equivalent of allowances that may not be allocated for free to electricity producers under art. 10c of EU ETS. Entitlements under the Modernisation Fund and the Innovation Fund as well as entitles from the solidarity pool for less wealthy countries will be excluded from having to contribute to this new source.
In the first half of 2018, the average price of electricity on the Day Ahead Market was PLN 197/MWh and was 30% higher than the average price (PLN 151/MWh) in the same period last year. The growth in energy prices on the spot market is related to growth in the price of CO2 emission allowances, among other things. The EUA December 2018 instrument was priced at an average of EUR 12.6/t in the first half of 2018, meaning 152% growth y/y. The growth in energy prices was also driven by higher fuel costs. The average level of the Polish Industry Coal Market Index (PSCMI1) in the period January-May 2018 was PLN 10.6/GJ, i.e. 18% higher than in the same period last year (PLN 9.0/GJ). An additional factor having impact on electricity price growth was a decline in the volume of wind-based production, which in the first half of 2018 reached 6.2 TWh and was 9% lower y/y.
Chart: Monthly prices and price volatility at the day ahead market in 2017–2018 (TGE)*
* average monthly price of IRDN index calculated on the base of hourly quotations (fixing), weighted by the trading volume
The average price for BASE_Y-19 contracts in the first half of 2018 reached PLN 198/MWh, while in the same period of last year price of BASE_Y-18 was PLN 162/MWh on average (+23% y/y). Trading volume for BASE_Y-19 in the first half of 2018 was 47.3 TWh – this is 173% higher than the BASE_Y-18 trading volume in the first half of 2017 which reached 17.0 TWh. The increased trading volume is a result of the power exchange obligation. In 2017 minimum of 15% of electricity sales was required to be traded on TGE market. As from January 18, 2018 the power exchange obligation for all energy groups in Poland was raised to 30%. The average price for PEAK5_Y-19 contracts in the first half of 2018 was PLN 259/MWh and was 24% higher than the analogical contract PEAK5_Y-18 quoted in the first half of 2017. PEAK5_Y-19 trading volume in the first half of 2018 amounted to 2.0 TWh – thisis by 22% higher than the trading volume of PEAK5_Y-18 in the first half of 2017.
Chart: Monthly prices and price volatility on the forward market in 2017–2018 (TGE)*.
* monthly average index level for forward contracts for the next year (Y+1), baseload and peak, calculation based on hourly quotations, weighted by the trading volume.
In the first half of 2018, average energy prices in neighbouring countries were lower than in Poland: in Germany by PLN 46/MWh, in the Czech Republic by PLN 41/MWh, in Sweden by PLN 29/MWh. The electricity generation structure in Poland, compared to Germany, Sweden and the Czech Republic, is more dependent on coal-based conventional energy therefore dynamic growth in the price of CO2 emission allowances and a rising cost of coal fuel had a larger impact on energy price growth in Poland than in countries with a generation mix, more based on renewable sources and nuclear power. The differences in prices were reflected in cross-border trade exchange volumes.
Chart: Comparison of average electricity prices on Polish market and on selected European markets in the first half of 2018 (prices in PLN/MWh, average exchange rate EUR/PLN 4.22).
Source: TGE, EEX, EPEX, Nordpool, OTE a.s., PXE
Chart: Monthly imports, exports and cross-border exchange balance in 2017-2018 (in GWh).
Source: own work based on PSE S.A. data.
In the first half of 2018, Poland was a net importer of electricity: the foreign trade balance was 3.7 TWh (import of 4.5 TWh, export of 0.8 TWh). In the same period last year, import and export were close to equal (import of 3.2 TWh, export of 2.0 TWh). The excess of import over export continues since March 2017. The largest y/y change was the reversal of trade exchange with Germany and the Czech Republic. In the first half of 2017, net export to these two countries reached 1.0 TWh, while in the first half of 2018 net import was 0.9 TWh – this was mainly caused by a general increase in the import balance in y/y terms. Sweden, Lithuania and Ukraine remained the sources of net import in the first half of 2018, with the volume of exchange with these countries being similar to that recorded in the base period.
Diagram: Geographical structure of commercial exchange in the first half of 2018 (GWh).
Source: own work based on PSE S.A. data.
The diversity of electricity prices for retail customers in the European Union depends not only on the level of the wholesale prices of electricity. The fiscalsystem, regulation mechanisms and supportschemesin particular countries all have significant impact on the final price of electricity. In Poland in the second half of 2017, an additional burden for individual customers accounted for approx. 35% of the electricity price and in comparison to EU average of 31%. In Denmark and Germany the proportion of additional chargesin the price of electricity exceeded 50%.
Chart: Comparison of average prices for individual customers in selected EU countries in the second half of 2017 (prices in PLN/MWh).
Source: own work based on Energy prices in the EU. Eurostat, the statistical office of the European Union. EUR/PLN 4.24.
Diagram: The share of additional charges in electricity prices for the individual customers in selected EU countries in the second half of 2017 (prices in PLN/MWh, calculated with average exchange rate EUR/PLN 4.24).
Source: Eurostat
In the second quarter of 2018, the average price of green certificates (index OZEX_A) reached PLN 74/MWh and was 164% higher than in the same period of last year. The price growth was driven by both supply (14% y/y decline in wind generation in the second quarter of 2018) and demand factors (regulation of the Minister of Energy that increased an obligation to redeem green certificates from 15.4% in 2017 to 17.5% in 2018 and to 18.5% in 2019). The average price of yellow certificates in the second quarter of 2018 reached PLN 113/MWh and was 5% lower than in the same period last year. The decline resulted from a higher supply of energy produced in gas-fired cogeneration sources and a reduction of the substitute fee from PLN 120/MWh in 2017 to PLN 115/MWh in 2018. The obligation to redeem yellow certificates increased to 8% in 2018, compared to 7% in 2017.
Chart: Average quarterly prices of certificates.
Source: Own work based on TGE quotations. The yellow certificates prices presented on the chart are weighted average blended price – for products PMGM-16, PMGM-17, PMGM-18
EUA (European Union Allowances) prices are one of the key factors determining wholesale energy prices and PGE Group's financial results. Installations emitting CO2 in the process of electricity or heat production bear the expenses for purchasing EUA allowancesto cover the deficit (i.e. the difference between CO2 emissions at PGE Group's generating units and the freeof-charge allowances received under derogation in accordance with the National Investment Plan). In the first half of 2018, the weighted average price of EUA DEC 18 was EUR 12.58/t and was 152% higher than the average price for EUA DEC 17 (EUR 5.00/t) in the same period last year. In the second quarter of 2018 alone, the weighted average price of EUA DEC 18 was EUR 14.47/t, denoting a threefold increase in comparison to the EUR 4.78/t price for the EUA DEC 17 instrument recorded in the second quarter of 2017. The increase in CO2 emission prices observed in the second half of 2018 is a result of market perception of the end of the EU ETS reform. In November 2017, in the course of a trilogue, an arrangement was made between the European Parliament, European Commission and European Council as to the final wording of Directive 2003/87/EC and changes in the MSR decision. The amended content of the directive was published in the EU's Official Journal at the beginning of March 2018. The key changes include: increase in linear indicator of emission reduction from 1.74% in 2013-2020 to 2.2% annually from 2021, doubling the volume of allowances directed to MSR for 2019-2023 from 12% to 24% (allowances in trade), together with the introduction of their cyclical erasure from 2023 and the introduction of dedicated "solidarity mechanisms" for the poorest member states (including Poland) – i.e. free allocation of allowances for producers of electricity and the Modernisation Fund, although with limited capabilities for their use in conventional energy generation.
Moreover, the Court of Justice, in a ruling of June 21, 2018 in case C-5/16, repealed Poland's appeal of the MSR decision, making it possible to introduce further changes intended to strengthen reduction ambitions within the EU ETS system even before the end of the next settlement period. Further discussion about enhancing the reduction ambitions within the European Union should be expected to take place at the COP24 in Katowice, during which the European Commission is expected to present in greater detail a preliminary version of the Road Map 2.0, together with specific proposals for the EU's new reduction ambitions until 2050. At the same time, work is on-going on delegated and implementing acts for the directive recently adopted. New legislative motions related to the revision of the EU ETS directive and the MSR decision should be expected once the new European Commission is appointed, which will take place in the second half of 2019.
5.00 12.58 5.94 0 10 20 30 40 50 60 70 80 90 100 0 2 4 6 8 10 12 14 16 18 2017-01 2017-02 2017-03 2017-04 2017-05 2017-06 2017-07 2017-08 2017-09 2017-10 2017-11 2017-12 2018-01 2018-02 2018-03 2018-04 2018-05 2018-06 volume (thousand tonnes) EUR Wolumen EUA_DEC (right axis) EUA_DEC (left axis) EUA_DEC H1 average EUA_DEC annual average
Chart: Prices of CO2 emission rights.
Source: Bloomberg, own work
The Regulation of the Council of Ministers, that sets the allocation of allowances for particular units of electricity producers in period 2013-2020, was adopted on April 8, 2014. Analogically, allocations of allowances for heat producers were set by the Regulation of the Council of Ministers of March 31, 2014.
PGE's installations accounts were credited with free allowances for heat for 2018 and energy for 2017, while free allowances for electricity for 2018 will be received by the Group by the end of April 2019, after verification of reports from investments submitted to the National Investment Plan.
At the same time, redemption of emission rights resulting from CO2 emissions in 2017 was completed in April 2018.
Table: Emission of CO2 from major Group installations in the first half of 2018 in comparison to allocation of CO2 emission rights for 2018 (in Mg).
| Operator | CO2 emissions in H1 2018* |
Allocation of CO2 emission rights for 2018** |
|---|---|---|
| Bełchatów Power Plant | 19 185 597 | 6 211 022 |
| Turów Power Plant | 3 290 757 | 2 500 954 |
| Opole Power Plant | 3 646 230 | 1 437 267 |
| ZEDO *** | 2 004 217 | 1 187 286 |
| Bydgoszcz CHPs | 404 532 | 290 951 |
| Lublin Wrotków CHP | 268 909 | 166 164 |
| Gorzów CHP | 262 270 | 129 987 |
| Rzeszów CHP | 166 456 | 78 433 |
| Kielce CHP | 106 589 | 52 905 |
| Zgierz CHP | 90 420 | 22 210 |
| TOTAL PGE GiEK S.A. | 29 425 977 | 12 077 179 |
| Rybnik power plant | 2 423 763 | 458 373 |
| Wybrzeże CHPs**** | 1 109 549 | 583 062 |
| Kraków CHP | 938 576 | 497 146 |
| ZEW Kogeneracja* | 877 321 | 387 589 |
| Zielona Góra CHP | 273 227 | 47 491 |
| Toruń CHP | 139 927 | 52 056 |
| TOTAL Acquired assets | 5 762 363 | 2 025 717 |
| RAZEM segment Energetyka Konwencjonalna | 35 188 340 | 14 102 896 |
|---|---|---|
* estimates, emissions not verified - the data will be settled and certified by the authorised verifier of CO2 emission on the ground of yearly reports of volume of CO2 emissions
** amount of granted CO2 emission rights will be confirmed in the Regulation of the Council of Ministers in the first quarter of 2019
*** Pomorzany CHP, Dolna Odra power plant, Szczecin CHP
**** Gdańsk CHP and Gdynia CHP
***** Wrocław CHP, Czechnica CHP, Zawidawie CHP
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period ended June 30, 2018
Table: Volume and cost of purchase of fuels from third party suppliers in the first half of 2017 and 2018
| H1 2018 | H2 2017 | |||
|---|---|---|---|---|
| Type of fuel | Volume (tons ths) |
Cost (PLN m) |
Volume (tons ths) |
Cost (PLN m) |
| Hard coal | 5 534 | 1 343 | 2 446 | 546 |
| Gas (cubic metres ths) | 597 333 | 427 | 368 686 | 266 |
| Biomass | 258 | 50 | 253 | 46 |
| Fuel oil* | 20 | 45 | 13 | 18 |
| TOTAL | 1 865 | 876 |
* heavy and light
In the first half of 2018 the costs of purchasing primary fuels from providers outside the Group amounted to PLN 1 865 million and were higher by PLN 989 million than in the first half of 2017. The biggest impact on the change of fuel purchase costs in PGE Group came from the Acquired assets which are mainly hard coal-fired and gas-fired.
Hard coal
higher purchase volume by 126% (PLN +689 million)
The higher volume of hard coal purchased in the first half of 2018 is mainly related to the acquisition of EDF's assets.
higher average price by 9% (PLN +108 million)
Higher hard coal price in the first half of 2018 results from the higher prices on the mining market, both domestic and international, what translated directly into higher contractual prices.
Gas
higher purchase volume by 62% (PLN +165 million)
Increased volume of gas used results from acquisition of gas-fired EDF assets (see p. 4.2.1 of this report).
lower average price by -1% (PLN -4 million)
Fuel oil
higher average price by 63% (PLN +17 million)
Higher global prices of crude oil and refinery products attributed to the significant increase of average purchase price of fuel oil.
higher purchase volume by 54% (PLN +10 million)
Higher purchase volume in the first half of 2018 compared to the analogical period of the previous year results from impact of acquisition of assets from EDF. Higher number of generating units translated into higher number of trial run of units related to failures, planned overhauls and TSO's request to produce.
Biomass
Higher volume of biomass purchase is a result of heat production in the Acquired assets.
In the first half of 2018 approximately 59% of the electricity was produced from internally sourced lignite, whose extraction price is fully controlled by PGE Capital Group. In comparable period of 2017 the production from lignite accounted for 72% of total production.
PGE Group companies earn part of their income based on tariffs approved by the President of the Energy Regulatory Office:
Methodology of and assumptions for tariffs determination were published in the document "Tariffs for the DSO for the year 2018", which was prepared and published by the President of the Energy Regulatory Office.
On December 14, 2017, the President of ERO approved a tariff for PGE Dystrybucja S.A. for electricity distribution services over the period from January 1, 2018, to December 31, 2018.
Tariff came into force on January 1, 2018.
On January 3, 2018, the President of ERO approved a change in PGE Dystrybucja S.A.'s tariff consisting of the introduction of so called an anti-smog tariff (G12as). This tariff was adjusted by the decision of the ERO President of January 16, 2018.
On February 27, 2018, in connection with the publication of the Act on Electromobility and Alternative Fuels, a change in the tariff was made in the part related to the connection to the grid of charging infrastructure for public road transport and publicly available charging stations – change is effective from March 14, 2018.
Distribution tariffs for 2018 approved by the President of the Energy Regulatory Office, contributed to changes in average tariff in particular tariff groups (calculated for revenues and volume in a given tariff year) in comparison to year 2017:
The change in rates for distribution services takes into account a decline in the RES fee to PLN 0/MWh in 2018 and maintaining the transition fee at the same level as in 2017. These fees are fully transferred to entities in charge of support instruments, thus they do not impact profit of the distribution companies.
Changes in average tariff in particular tariff groups (not including RES fees and transition fee) are as follows:
The quality regulation elements introduced in 2016 are being continued in 2018. It has been settled that the ratios directly impacting the regulated revenue will be following key performance indicators:
Not meeting the levels of ratios indicated by the ERO President will result in penalty of decreasing the regulated revenue through reduction of amount of return on capital in year t+2. In the initial period no rewards are anticipated for achieving better indicators than the required ones.
Impact of quality parameters realized in 2016 is included in tariff for 2018 and the realization of 2018 parameters will be included in tariff for 2020. In accordance with the assumptions adopted by the ERO, a penalty cannot exceed 2% of regulated revenue and value of 15% of return on capital in a given year. The 2018 tariff does not include a reduction in regulated revenue from quality regulation.
Pursuant to the Energy Law, energy companies holding concessions set tariffs for heat and propose their duration. Conduction of proceedings concerning heat tariffs approval lies within the competence of regional branches of the Energy Regulatory Office. PGE's average sales price for district heating increased by approx. 2% from the prices in effect in the first half of 2017.
| Key financial data | Unit | H1 2018 |
H1 2017 |
% change |
|---|---|---|---|---|
| Sales revenues* | PLN million | 12 871 | 10 620 | 21% |
| EBIT | PLN million | 1 831 | 1 932 | -5% |
| EBITDA | PLN million | 3 675 | 3 445 | 7% |
| Net profit for the reporting period | PLN million | 1 296 | 1 495 | -13% |
| LTC compensations | PLN million | -83 | 83 | - |
| LTC revenues | PLN million | -83 | 0 | - |
| LTC settlements adjustment (other operations) | PLN million | 0 | 83 | - |
| Capital expenditures | PLN million | 2 244 | 2 595 | -14% |
| Net cash from operating activities | PLN million | 2 683 | 3 282 | -18% |
| Net cash from investing activities | PLN million | -2 905 | -591 | 392% |
| Net cash from financial activities | PLN million | -1 122 | -242 | 364% |
| EBITDA margin | % | 29% | 32% | |
| Key financial data | As at June 30, 2018 |
As at December 31, 2017* |
% change |
|
| Working capital | PLN million | -254 | 524 | - |
| Net debt/LTM EBITDA ** | x | 1.04 | 0.99 |
* The Group has applied IFRS 15 since the standard's effective date i.e. since January 1, 2018, without restating the comparable data (changes introduced by IFRS 15 are described in note 4 to the interim condensed consolidated financial statements)
** Data restated *** LTM EBITDA - Last Twelve Months EBITDA
Table: Impact of one-offs on EBITDA (in PLN million).
| One-offs | H1 | H1 | % |
|---|---|---|---|
| 2018 | 2017 | change | |
| LTC compensations | -83 | 83 | - |
| Change in reclamation provision | -17 | 0 | - |
| Total | -100 | 83 | - |
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period ended June 30, 2018
Chart: Key changes of recurring EBITDA in PGE Capital Group (in PLN million).
Acquired assets*
| EBITDA HY 2017 |
Conventional Generation |
Renewable Energy |
Supply | Distribution | + consolidation adjustments |
EBITDA HY 2018 |
|
|---|---|---|---|---|---|---|---|
| Change | 410 | 53 | -120 | 48 | 22 | ||
| EBITDA reported HY 2017 | 3 445 | 1 612 | 169 | 422 | 1 222 | 20 | |
| One-offs HY 2017 | 83 | 83 | 0 | 0 | 0 | 0 | |
| Recurring EBITDA HY 2017 | 3 362 | 1 529 | 169 | 422 | 1 222 | 20 | |
| Recurring EBITDA HY 2018 | 1 939 | 222 | 302 | 1 270 | 42 | 3 775 | |
| One-offs HY 2018 | -100 | 0 | 0 | 0 | 0 | -100 | |
| EBITDA reported HY 2018 | 1 839 | 222 | 302 | 1 270 | 42 | 3 675 |
One-offs reducing the reported result
One-offs increasing the reported result
Acquired assets*
* EBITDA of companies: PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A., PGE Paliwa sp. z o.o., PGE Ekoserwis sp. z o.o.,Torec sp. z o.o., Zower sp. z o.o., Energopomiar sp. z o.o.
Chart: Key changes in Assets (in PLN million).
Chart: Key changes in Equity and Liabilities (in PLN million).
Chart: Net change in cash (in PLN million).
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period ended June 30, 2018
Table: Key operational figures.
| Key figures | Unit | H1 2018 |
H1 2017 |
% change |
2017 |
|---|---|---|---|---|---|
| Lignite extraction | Tons m | 25.18 | 25.02 | 1% | 49.51 |
| Net electricity production | TWh | 32.92 | 27.88 | 18% | 56.79 |
| Heat sales | PJ | 29.04 | 10.61 | 174% | 24.85 |
| Sales to final customers* | TWh | 20.73 | 19.80 | 5% | 40.43 |
| Distribution of electricity** | TWh | 17.99 | 17.50 | 3% | 35.34 |
* after elimination ofsales within PGE Group
** with additional estimation
Table: Sales of electricity outside the PGE Capital Group (in TWh)).
| Sales volume | H1 2018 |
H1 2017 |
% change |
2017 |
|---|---|---|---|---|
| SALES IN TWh, including: | 37.80 | 32.03 | 18% | 65.78 |
| Sales to end-users* | 20.73 | 19.80 | 5% | 40.43 |
| Sales on the wholesale market, including: | 15.48 | 10.80 | 43% | 22.67 |
| Sales on the domestic wholesale market - power exchange |
13.43 | 6.84 | 96% | 14.66 |
| Other sales on the domestic wholesale market | 1.83 | 3.78 | -52% | 7.55 |
| Sales to foreign customers | 0.22 | 0.18 | 22% | 0.46 |
| Sales on the Balancing Market | 1.59 | 1.43 | 11% | 2.68 |
* after elimination of internal sales within PGE Group
The higher volume of sales to end customers compared to the same period of 2017 resulted from recognition of sales generated by PGE Energia Ciepła S.A. Retail sales by Supply segment remained at a similar level (19.7 TWh). The higher sales volume on the wholesale market – exchange results mainly from placing generation capacity of the newly acquired assets. Additionally, the volume growth was driven by favourable market conditions. Sales volume on the other wholesale markets declined due to lower sales in bilateral contracts, caused by larger requirements resulting from the so-called "exchange obligation", which led to the transfer of sales into the regulated segment and a change in regulations regarding allocating energy from renewable sources (limit on sales to obligated sellers).
Table: Purchases of electricity from outside of the PGE Capital Group (in TWh).
| Purchases volume | H1 2018 |
H1 2017 |
% change |
2017 |
|---|---|---|---|---|
| PURCHASES IN TWh, including: | 7.12 | 6.37 | 12% | 13,76 |
| Purchases on the domestic wholesale market – power exchange |
2.76 | 1.05 | 163% | 2,55 |
| Purchases on the domestic wholesale market, other |
0.18 | 2.26 | -92% | 4,43 |
| Purchases from abroad | 0.27 | 0.04 | 575% | 0,21 |
| Purchases from Balancing Market | 3.91 | 3.02 | 29% | 6,57 |
The growth in volume of purchases from the power exchange results from the recognition of newly acquired assets in sales portfolio optimisation and the exercise of early buy-back options for energy previously sold at prices below the cost of manufacture as well as due to higher trading activities being tied to greater liquidity at the TGE exchange. The decline in purchases on the domestic wholesale market – other is mainly the result of the removal of the obligation to purchase electricity from renewable energy sources of over 500 kWe. The growth in sales in the Conventional Generation segment contributed to higher purchases from the Balancing Market as a result of a higher volume of reductions forced by PSE S.A., largely due to imported electricity covering a larger share of domestic demand.
Table: Production of electricity (in TWh).
| Generation volume | H1 2018 |
H1 2017 |
% change |
2017 |
|---|---|---|---|---|
| ELECTRICITY HENERATION IN TWh, including: | 32.92 | 27.88 | 18% | 56.79 |
| Lignite-fired power plants | 19.25 | 19.93 | -3% | 38.95 |
| including co-combustion of biomass | 0.00 | 0.00 | - | 0.00 |
| Coal-fired power plants | 7.93 | 4.81 | 65% | 11.11 |
| including co-combustion of biomass | 0.05 | 0.06 | -17% | 0.13 |
| Coal-fired CHP plants | 2.44 | 0.52 | 369% | 1.47 |
| including co-combustion of biomass | 0.01 | 0.00 | - | - |
| Gas-fired CHP plants | 2.24 | 1.46 | 53% | 2.87 |
| Biomass-fired CHP plants | 0.08 | 0.10 | -20% | 0.20 |
| Pumped-storage power plants | 0.20 | 0.18 | 11% | 0.44 |
| Hydroelectric plants | 0.25 | 0.26 | -4% | 0.47 |
| Wind power plants | 0.53 | 0.62 | -15% | 1.28 |
| Including Acquired assets*: | 5.24 | - | 1.58 |
* Rybnik power plant, EC Gdańsk, EC Gdynia, EC Kraków, EC Wrocław, EC Czechnica, EC Zawidawie, EC Zielona Góra, EC Toruń
The main impact on the level of electricity generation in the first half of 2018, compared to the first half of 2017, was lower generation at hard coal-fired power plants. This growth results from inclusion of Rybnik power plant in generation (2.42 TWh). Higher generation at Opole power plant resulted from repair-related downtime being lower by 1 857 hours (unit no. 3 remained in medium overhaul from March 3, 2017 till May 4, 2017) and larger use of the power plant's units by PSE S.A. Higher production at Opole power plant compensated for lower output at Dolna Odra power plant, due to lower demand from PSE S.A. in the first half of 2018.
The higher production at hard coal-based CHP plants results from recognition of production of Gdańsk CHP, Gdynia CHP, Wrocław CHP, Czechnica CHP and Kraków CHP (1.95 TWh).
The growth in production at gas-fired combined heat-and-power plants results from the recognition of production of Toruń CHP, Zielona Góra CHP and Zawidawie CHP (0.87 TWh).
Production in biomass CHP plants remained at the similar level as in the first half of 2017.
Decreased production in lignite-based power plants in the first half of 2018 results from lower load of Bełchatów power plant units by 11 MW and longer downtime of units in Turów power plant (by 3 239 h) in repairs and modernisations. During the first half of 2018 unit no. 2 was in modernisation, while unit no. 2 has been in modernisation since May 1, 2018.
Production at wind power plants was lower than in the first half of 2017 resulting mainly from worse windiness.
Production at hydro power plants was at slightly lower level compared to the first half of 2017.
Slightly higher production in pumped storage power plants results from the nature of these generation units, which in the first half of 2018, were used to a higher extent by PSE S.A.
In the first half of 2018 the heat sales in PGE Capital Group totalled 29.04 PJ and were higher by 18.43 PJ than in the first half of 2017. The above growth includes the sales of heat by the Acquired assets from Conventional Generation segment, which were not recognised in the first half of 2017 (18.81 PJ) and lower sales by branches of PGE GiEK S.A. (-0.38 PJ), what resulted largely from increased demand for heat caused by the higher average outside temperatures.
Table: Breakdown of the Group's revenues by business segments in the first half of 2018 and 2017.
| PLN million | H1 2018 | H1 2017 | % change |
|---|---|---|---|
| Conventional Generation | 8 281 | 5 650 | 47% |
| Renewables | 402 | 369 | 9% |
| Supply | 6 918 | 7 630 | -9% |
| Distribution | 2 920 | 3 175 | -8% |
| Other Operations | 299 | 251 | 19% |
| TOTAL | 18 820 | 17 075 | 10% |
| Consolidation adjustments | -5 949 | -6 455 | -8% |
| TOTAL AFTER ADJUSTMENTS | 12 871 | 10 620 | 21% |
Table: Key financial figures for each business segment in the first half of 2018 (after intrasegmental eliminations).
| PLN million | EBITDA | EBIT | Capital expenditures |
Assets of the segment* |
|---|---|---|---|---|
| H1 2018 | ||||
| Conventional Generation | 1 839 | 743 | 1 580 | 44 084 |
| Renewables | 222 | 95 | 48 | 3 235 |
| Supply | 302 | 290 | 5 | 4 551 |
| Distribution | 1 270 | 688 | 596 | 17 986 |
| Other Operations | 37 | -8 | 71 | 738 |
| TOTAL | 3 670 | 1 808 | 2 300 | 70 594 |
| Consolidation adjustments | 5 | 23 | -56 | -3 256 |
| TOTAL AFTER ADJUSTMENTS | 3 675 | 1 831 | 2 244 | 67 338 |
* see note 6.1 to the the interim condensed consolidated financial statements
Table: Key financial figures for each business segment in the first half of 2017 (after intrasegmental eliminations).
| PLN million | EBITDA | EBIT | Capital expenditures |
Assets of the segment* |
|---|---|---|---|---|
| H1 2017 | ||||
| Conventional Generation | 1 612 | 855 | 1 906 | 36 653 |
| Renewables | 169 | 37 | 28 | 3 547 |
| Supply | 422 | 409 | 5 | 6 430 |
| Distribution | 1 222 | 642 | 629 | 17 349 |
| Other Operations | 20 | -31 | 53 | 609 |
| TOTAL | 3 445 | 1 912 | 2 621 | 64 588 |
| Consolidation adjustments | 0 | 20 | -26 | -5 325 |
| TOTAL AFTER ADJUSTMENTS | 3 445 | 1 932 | 2 595 | 59 263 |
* see note 6.1 to the the interim condensed consolidated financial statements
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period ended June 30, 2018
Diagram: Main assets of the Conventional Generation segment.
Key financial figures.
| w PLN million | H1 | H1 | % change |
|---|---|---|---|
| 2018 | 2017 | ||
| Sales revenues | 8 281 | 5 650 | 47% |
| EBIT | 743 | 855 | -13% |
| EBITDA | 1 839 | 1 612 | 14% |
| Capital expenditures | 1 580 | 1 906 | -17% |
Chart: Key changes of EBITDA in Conventional Generation (in PLN million).
Key factors affecting the results of Conventional Generation segment in the first half of 2018 compared to the results of the first half of 2017 included:
*Acquired assets: Rybnik power plant, Gdańsk CHP, Gdynia CHP, Kraków CHP, Wrocław CHP, Czechnica CHP, Zawidawie CHP, Zielona Góra CHP, Toruń CHP
Table: Capital expenditures incurred in Conventional Generation segment in the first half of 2018 and 2017.
| PLN million | H1 2018 |
H1 2017 |
% change |
|---|---|---|---|
| Investments in generating capacities, including: | 1 198 | 1 660 | -28% |
| Development |
701 | 1 221 | -43% |
| Modernisation and replacement |
497 | 439 | 13% |
| Purchase of finished capital goods | 12 | 30 | -60% |
| Vehicles | 1 | 1 | 0% |
| Other | 13 | 11 | 18% |
| Acquired assets* | 189 | - | - |
| TOTAL | 1 413 | 1 702 | -17% |
| Capitalized costs of overburden removal in mines | 167 | 204 | -18% |
| TOTAL with capitalized costs of overburden removal | 1 580 | 1 906 | -17% |
*PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A.
Highest capital expenditures in the first half of 2018 were incurred for the following projects:
| | construction of units 5 and 6 in Opole power plant | PLN 380 million; |
|---|---|---|
| | construction of new unit in Turów power plant | PLN 215 million; |
| | construction of a Thermal Processing Installation with Energy Recovery at Rzeszów CHP | PLN 103 million; |
| | modernisation of units 1-3 in Turów power plant | PLN 86 million; |
| | construction of suspension production and transport installation from u. 14 in Bełchatów power plant | PLN 25 million; |
| | expansion of flue gas desulphurisation system for OP 230 boilers no. 3 and 4 at ZEC Bydgoszcz | PLN 24 million; |
| | change in technology of furnace waste storage in Bełchatów power plant | PLN 20 million; |
| | construction of flue gas denitrogenation system for OP 230 boilers no. 3 and 4 at ZEC Bydgoszcz | PLN 17 million; |
| | shaping of reservoir no. 4 at KWB Bełchatów mine's internal heap | PLN 16 million. |
Key developments in the first half of 2018 in the Conventional Generation segment:
The PGE Capital Group's operations in renewable energy are managed by the PGE Energia Odnawialna S.A. Assets in the segment include:
Diagram: Main assets of the Renewables segment.
| w PLN million | H1 2018 |
H1 2017 |
% change |
|---|---|---|---|
| Sales revenues | 402 | 369 | 9% |
| EBIT | 95 | 37 | 157% |
| EBITDA | 222 | 169 | 31% |
| Capital expenditures | 48 | 28 | 71% |
Chart: Key changes of EBITDA in Renewables (in PLN million).
Key factors affecting the results of Renewables in the first quarter of 2018 compared to the first half of 2017 were:
Table: Capital expenditures incurred in Renewables segment in the first half of 2018 and 2017.
| PLN million | H1 2018 |
H1 2017 |
% change |
|---|---|---|---|
| Investments in generating capacities, including: | 47 | 25 | 88% |
| Development |
13 | 10 | 30% |
| Modernisation and replacement |
34 | 15 | 127% |
| Other | 1 | 3 | -67% |
| TOTAL | 48 | 28 | 71% |
Management Board's report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period ended June 30, 2018
PGE Dystrybucja S.A. operates in the area of 122,433 sq. km and delivers electricity to approximately 5.4 million.
Diagram: Area of PGE distribution grid.
Table: Key figures for Distribution.
| w PLN million | H1 2018 |
H1 2018* |
H1 2017** |
% change | % change * |
|---|---|---|---|---|---|
| Sales revenues* | 2 920 | 3 229 | 3 175 | -8% | 2% |
| EBIT | 688 | 693 | 642 | 7% | 8% |
| EBITDA | 1 270 | 1 275 | 1 222 | 4% | 4% |
| Capital expenditures | 596 | 596 | 629 | -5% | -5% |
* Data restated – IFRS 15 not applied in 2018
** The Group has applied IFRS 15 since the standard's effective date i.e. since January 1, 2018, without restating the comparable data (changes introduced by IFRS 15 are described in note 4 to the interim condensed consolidated financial statements)
Key factors affecting the results of Distribution in the first quarter of 2018 compared to the results of the first half of 2017 included:
Table: Capital expenditures incurred in Distribution segment in the first half of 2018 and 2017.
| PLN million | H1 2018 |
H1 2017 |
% change |
|---|---|---|---|
| MV and LV power networks | 240 | 193 | 24% |
| 110/ MV and MV/MV | 41 | 68 | -40% |
| 110 kV power lines | 15 | 13 | 15% |
| Connection of new off-takers | 218 | 226 | -4% |
| Purchase of transformers and energy counters | 38 | 71 | -46% |
| IT, telemechanics and communication | 24 | 38 | -37% |
| Other | 20 | 20 | 0% |
| TOTAL | 596 | 629 | -5% |
Table: Key figures for Supply.
| PLN million | H1 2018 |
H1 2018* |
H1 2017** |
% change | % change * |
|---|---|---|---|---|---|
| Sales revenues* | 6 918 | 8 936 | 7 630 | -9% | 17% |
| EBIT | 290 | 290 | 409 | -29% | -29% |
| EBITDA | 302 | 302 | 422 | -28% | -28% |
| Capital expenditures | 5 | 5 | 5 | 0% | 0% |
* Data restated – IFRS 15 not applied in 2018
** The Group has applied IFRS 15 since the standard's effective date i.e. since January 1, 2018, without restating the comparable data (changes introduced by IFRS 15 are described in note 4 to the interim condensed consolidated financial statements)
Chart: Key changes of EBITDA in Supply (in PLN million).
*PGE Paliwa sp. z o.o.
Key factors affecting EBITDA of Supply segment in the first quarter of 2018 compared to the first half of 2017 included:
Table: Key figures for Other operations.
| w PLN million | H1 2018 |
H1 2017 |
% change |
|---|---|---|---|
| Sales revenues | 299 | 251 | 19% |
| EBIT | -8 | -31 | - |
| EBITDA | 37 | 20 | 85% |
| Capital expenditures | 71 | 53 | 34% |
Increase in the EBITDA result of the Other operations segment by approx. PLN 17 million was mainly connected with the EBITDA of PGE Systemy S.A. higher by approx. PLN 10 million as a consequence of increasing the range of services provided for companies from the Group belonging to other segments.
Capital expenditures in Other Operations in the first half of 2018 amounted to PLN 71 million compared to PLN 53 million in the first half of 2017.
Within the above amount, the highest capital expenditures in the first half of 2018 were incurred by the following companies:
PGE EJ 1 sp. z o.o. – for nuclear project development PLN 40 million; PGE Systemy S.A. – for IT infrastructure and software development PLN 28 million.
PGE S.A., as the Corporate Centre managing the Group, creates and implements integrated risk management architecture at PGE Group. In particular, it shapes PGE Group's risk management policies, standards and practices, designs and develops internal IT tools to support these processes, specifies global risk appetite and adequate limits as well as monitors these.
PGE Capital Group companies, as well as other entities from the electrical and power sector, are exposed to a number of risks and threats resulting from the specific operating activities and operating in specific market and regulatory environment.
In PGE Group risk management process is pursued based on the GRC (Governance - Risk - Compliance) model. It allows
adaptation and integration of each of the operational areas at all levels of management. Having established a top-level Risk Committee, which reports directly to the Management Board, supervision over the effectiveness of risk management in the Group is ensured. Function definition within corporate risk management allows an independent assessment of particular risks, their impact on PGE Group and limiting and controlling major risks using the capital exposed to risk concept via dedicated instruments. Formation of a separate compliance function within the Group guarantees that PGE Group's activities are in line with legal conditions and ensures observance of the adopted internal standards.
The PGE Capital Group has consequently developed a comprehensive risk management system. Mechanism allowing identification of areas exposed to risk and risk level measurement methods are constantly verified and developed. Thanks to that, the significant risks concerning various areas of operations are identified
and kept within the assumed limits by reducing negative effects of such risks and by taking preventive or corrective measures, in accordance with the below cycle.
The main risks and threats of PGE S.A. and the PGE Group are presented below along with their assessment and outlook in the horizon of the next year.
| Risk level | |
Risk outlook | | | |
|---|---|---|---|---|---|
| low medium high |
decrease | growth | stable | ||
| low level medium level high level |
Risk does not pose a threat and may be tolerated, Risk which needs preparation of the proper reaction based on analysis of costs and benefits, Intolerable risk, which needs immediate and active reaction, leading simultaneously to limitation of possible consequences and of probability of occurrence thereof. |
||||
| Market and | Prices of electricity and related products – resulting from a lack of certainty with | ||||
| product risks | regard to the future levels and volatility of commodity prices relative to open contract positions - this particularly concerns electricity and associated products |
| | ||
| Related to prices and volumes of offered products and services |
(property rights, CO2 emission allowances). Electricity sales volumes – this risk derives from a lack of certainty with regard to the conditions determining the demand and supply of electricity, directly affecting the volume of market sales by PGE Group. Tariffs (regulated prices) – resulting from the requirement to approve rates for distribution services and electricity and heat prices for particular groups of entities. |
|
|
||
| Property risks | Failures – connected with the operation and degradation over time of energy equipment and facilities (maintenance and repair work, diagnostics) |
| | ||
| Related to development and maintenance of |
Damage to property – connected with the physical protection of energy equipment and facilities against destructive external factors (including fire, weather phenomena and intentional damage). |
| | ||
| the assets | Investment and development – expanding the generation, distribution and sales potential as well as on going investments. |
connected with strategic plans for | | | |
| Operational risks |
Electricity and heat production – connected with production planning and impact of the factors that determine production capacities. Fuel management – |
connected with uncertainty regarding the costs, | | | |
| Related to pursuing of ongoing economic |
quality, timeliness and volumes of fuel supply (mainly coal) and production raw material as well as processes. |
the effectiveness of inventory management | | | |
| processes | Human Resources – pertaining to provision of employees with the relevant experience and competences, who are capable of performing specific tasks. Social dialogue – connected with a failure in achieving agreement between |
| | ||
| the Group's management and strikes/collective labour disputes. |
employees, what |
could lead |
to |
| |
| Regulatory and legal risks |
Legal changes in support systems – connected with uncertainty as to the future shape of the support system for production of certified energy. |
| | ||
| Related to compliance with external and internal legal |
Purchase of certificates and CO2 allowances - resulting from the possible changes to the statutory requirement for electricity sellers to purchase a specified quantity of property rights and to uncertainty with regard to volume of CO2 emission rights granted free of charge in future. Environmental protection – resulting from industry regulations specifying which |
| | ||
| provisions | "environmental" requirements energy installations should meet and what the principles for using the natural environment are. The future environmental regulations and uncertainty concerning their final shape (in particular with regard to the revision of BAT / BREF) may translate into a change in the level of capital expenditures of the PGE Group. |
| | ||
| Unresolved legal status – connected with difficulties in respect of land acquisition or access to land in the course of new investments (particularly in the Distribution segment). |
| |
| Concessions – resulting from the statutory requirement to hold concessions with regard to conducted operations. Discriminatory activities – connected with application by the Group of practices that limit or eliminate competition and infringe on legal regulations or consumer interests. |
|
|
|
|---|---|---|---|
| Financial risks Related to finance management |
Credit risk – connected with the counterparty default, partial and/or late payment of receivables or a different type of breach of contractual conditions (for example failure to deliver/collect goods or failure to pay for any associated damages or contractual penalties). |
| |
| Liquidity risk – connected with the possibility of losing the ability to meet current liabilities and obtaining financing sources for business operations. |
| | |
| Interest rate risk – resulting in particular from the negative impact of changes in market interest rates on PGE Group's cash flows generated by floating-rate financial assets and liabilities. |
| | |
| Foreign exchange risk – understood in particular as risk that PGE Group's cash flows denominated in currencies other than the functional currency are exposed to due to negative exchange rate movements. |
| |
The main risk mitigation actions for the PGE Group are presented below along with the description of the main tools used for the management of the given risk.
| Market and product risks | |
|---|---|
| Impact: revenues and product and service offerings |
Measures: PGE Group has rules for managing market risk (price- and volume-related), which include a global risk appetite measure, VaR-based position limits and management of consolidated exposure to commodity pricing risk through mechanisms for protection against risk exceeding acceptable levels. Those rules provide consistent guidance in respect of process organisation in the context of commercial strategy and mid-term planning. PGE Group follows rules pertaining to a strategy for hedging key exposures in the area of electricity and related product trading that correspond to the adopted risk appetite in the mid-term. Position hedging levels are established with consideration given to the results of analysing pricing risk in respect of electricity and related products. Target hedging levels are specified taking into consideration the Group's financial standing, including in particular its strategic objectives. |
| PGE Group researches, monitors and analyses the electricity and related products markets in order to optimally use its generation, distribution and selling capacities. |
|
| New products are introduced on the retail market and actively promoted through nationwide marketing campaigns. Maintaining a diverse product portfolio and focusing efforts on tailoring its offering to the market, the Group diversifies channels used to reach the end-customers and diversifies target groups with account take to client's volume potential. Efforts aimed at current clients retention are based on a model consisting of a diversified portfolio of customer loyalty schemes and client acquisition activities. Portfolio includes also special offers dedicated to former clients who moved over to the competitors, as well as industry offerings dedicated to specific types of economic activity. PGE Group also introduces bundled offers. Particular attention is paid to ensuring a high level of customer service by developing employees' competences and building relations with business and retail clients. Having implemented tools to support these processes, the Group effectively manages information flows, which directly translates into comfortable client relations as well as better sales planning and |
organisation.
| Operational risks | |
|---|---|
| Impact: costs | Measures: PGE Group's results are to a large extent dependent on the costs incurred in the course of operations. The Group optimises costs inter alia through monitoring of fuel prices and reserves and securing supply through long-term contracts with suppliers and through price fixing formulas. Inspections, repairs and modernisation of the existing assets optimise equipment lifecycles and required availability of key components of those assets. Level of costs is affected by securing CO2 emission allowances partly free of charge and purchase of lacking allowance with the assumption of securing the margin on sales. An intensive and effective dialogue is also carried out in order to avoid escalation of potential disputes with the social partners and to work out the most favourable solutions with regard to employment and employment costs within PGE Capital Group connected therewith. |
| Property risks | |
| Impact: assets | Measures: PGE Group effectively pursues a strategy for building up and modernization of its production capacities. The Group diversifies current structure of the production sources due to energy generation technology. Currently PGE Group is running two key investments (Opole, Turów) alongside a number of grid investments, as well as modernisation and replacement projects. We are continuously carrying out maintenance and repair work. Our main generation assets were insured against failure and damage to property. The reliability of the power supply to the end users has been systematically improved. |
| Regulatory and legal risks | |
| Impact: compliance area |
Measures: PGE Group's operations are subject to a host of national and international laws and regulations. Monitoring of the changes being introduced or proposed provides that our operations in key business segments are carried in compliance with the law and that PGE Capital Group has solutions which take into account potential changes in the legal environment. PGE S.A. is one of the members of the Polish Electricity Committee that opened its office in Brussels. Through the Committee's operations, PGE S.A. actively influences proceeding and shaping of EU law and engages a dialogue with the EU institutions. |
| The Group adapts its internal regulations and practices to make sure that the activities are in compliance with the power sector regulations and binding law. |
|
| The extraction of fossil fuels as well as the production and distribution of electricity and heat have impact on the environment therefore the Group continuously improves its activities aimed at protecting and improving the state of the environment by implementing technological and organisational solutions ensuring efficient and effective management in this area. |
|
| Financial risks | |
| Impact: Finance management |
Measures: PGE Group manages credit risk stemming from commercial transactions. Prior to executing a transaction, a counterparty assessment is carried out and forms a base for applying credit limits, that are regularly updated and monitored. Exposures that exceed established limits are hedged in accordance with the Group's credit risk management policy. |
| PGE Group applies a central financing model, which is generally used by PGE S.A. when raising external capital. PGE Group subsidiaries use a variety of intra-group financing sources and liquidity risk is monitored using periodic planning for operating, investing and financing activities. As regards currency risk and interest rate risk, PGE Group has implemented internal management procedures. PGE Group companies execute derivative transactions involving interest rate- and/or currency-based instruments (IRS, CCIRS) only in order to hedge identified risk exposures. |
PGE Group does not focus exclusively on risks concerning on-going activities. Risks that may have an impact on the Group's functioning in a longer timeframe are also subject to identification, assessment and analysis. Assessment of impact on the Group's objectives, image and business continuity is performed at the top management level. This allows us to prepare for arising challenges and ensure the Group's development in the long term. Unlike threats to PGE's day-to-day business and results,strategic risks might have an impact on strategy implementation and the future of the entire organisation.
Presented below are the key identified strategic risks along with their assessment.
As at June 30, 2018 the Management Board worked in unchanged composition:
| Name and surname of the Management Board |
Position |
|---|---|
| member Henryk Baranowski |
President of the Management Board |
| Wojciech Kowalczyk | Vice-President for Capital Investments |
| Marek Pastuszko | Vice-President for Corporate Affairs |
| Paweł Śliwa | Vice-President for Innovations |
| Ryszard Wasiłek | Vice-President for Operations |
| Emil Wojtowicz | Vice-President for Finance |
As at June 30, 2018 the Supervisory Board consisted of:
| Name and surname of the Supervisory Board member |
Position |
|---|---|
| Anna Kowalik | Chairman of the Supervisory Board |
| Artur Składanek | Vice-Chairman of the Supervisory Board – independent |
| Grzegorz Kuczyński | Secretary of the Supervisory Board - independent |
| Janina Goss | Supervisory Board Member - independent |
| Tomasz Hapunowicz | Supervisory Board Member - independent |
| Witold Kozłowski | Supervisory Board Member - independent |
| Mieczysław Sawaryn | Supervisory Board Member - independent |
On July 9, 2018 Witold Kozłowski resigned from the position of the Supervisory Board member.
On July 19, 2018 the Ordinary General Meeting of the Company appointed eight members to the Supervisory Board of 11th term as from July 20, 2018.
As at the publication date of this report, the Supervisory Board of the Company consists of:
| Name and surname | Position | ||
|---|---|---|---|
| of the Supervisory Board member | |||
| Anna Kowalik | Chairman of the Supervisory Board | ||
| Artur Składanek | Vice-Chairman of the Supervisory Board – independent | ||
| Grzegorz Kuczyński | Secretary of the Supervisory Board - independent | ||
| Artur Bartoszewicz | Supervisory Board Member - independent | ||
| Janina Goss | Supervisory Board Member - independent | ||
| Tomasz Hapunowicz | Supervisory Board Member - independent | ||
| Mieczysław Sawaryn | Supervisory Board Member - independent | ||
| Jerzy Sawicki | Supervisory Board Member - independent |
| Name and surname of the member of the Supervisory Board |
Audit Committee | Corporate Governance Committee |
Strategy and Development Committee |
Appointment and Remuneration Committee |
|---|---|---|---|---|
| Janina Goss | Member from March 2, 2016 |
Member from March 2, 2016 |
||
| Tomasz Hapunowicz | Member From January 23, 2018 |
Member From January 23, 2018 |
||
| Anna Kowalik | Member | Member From January 23, 2018 |
Member | |
| Witold Kozłowski | Member from Sep. 13, 2016 Chairman from October 25, 2016 |
Member from December 13, 2017 |
Member from September 13, 2016 |
|
| Grzegorz Kuczyński | Member from March 2, 2016 Chairman from March 18, 2016 |
Member from March 2, 2016 |
Member From January 23, 2018 |
|
| Mieczysław Sawaryn | Member from March 2, 2016 |
Member from March 2, 2016 Chairman from August 8, 2016 |
||
| Artur Składanek | Member From September 19, 2017 |
Member from March 2, 2016 |
Member from March 2, 2016 Chairman from January 23, 2018 |
As at June 30, 2018 the standing committees of the Supervisory Board consisted of:
Information on claims for annulment of the resolutions of the General Meetings of PGE S.A are described in note 21.4 to the interim condensed consolidated financial statements.
Information on the issue of compensation regarding the conversion of shares are described in note 21.4 to the interim condensed consolidated financial statements.
Significant proceedings pending in front of courts, competent arbitration authority or public administration authority are described in note 21.4 to the interim condensed consolidated financial statements.
Table: Main guarantees granted by the PGE Group companies as at June 30, 2018.
| Issuer of guarantee |
Entity entitled to guaran tee (Beneficiary) |
Entity whose liabilities are subject to guaran tee (Debtor) |
Date of commitment due to the granted guarantee (yyyy-mm-dd) |
Validity of guar antee until (yyyy-mm-dd) |
Value of guaran tee (million) |
Currency | Value of loan subject to guar antee (million) |
Currency |
|---|---|---|---|---|---|---|---|---|
| PGE S.A. | Bondholders | PGE Sweden AB | 2014-05-22 | 2041-12-31 | 2 500.0 |
EUR | 638.0 | EUR |
| PGE S.A. | Nordic Investment Bank | PGE GiEK S.A. | 2017-05-12 | 2024-12-31 | 121.4 | EUR | 101.2 | EUR |
Information on issue, redemption and repayment of debt securities and other securities is described in p. 1.1 of the foregoing report and in note 1.3 to the interim condensed consolidated financial statements.
The programme to build Poland's first nuclear power plant (the "Programme") is focusing on conducting site characterisation and environmental surveys until an environmental impact assessment report and site report are prepared. Decisions with regard to the continuation of the Programme, in the above scope or otherwise, will be made based on decisions by the Minister of Energy concerning an updated Programme for Poland's Nuclear Power, a model for the procurement of nuclear power plant technology and investment financing model.
As a result of the sale of shares on April 15, 2015 to the Business Partners (TAURON Polska Energia S.A., ENEA S.A. and KGHM Polska Miedź S.A.) by PGE S.A., PGE S.A. holds 70% in the share capital of PGE EJ 1 sp. z o.o. ("PGE EJ 1", "EJ 1"), and each of the Business Partners holds 10% in the share capital of PGE EJ 1.
According to the Partners' Agreement, concluded on September 3, 2014, the Parties jointly undertook to finance operations under the initial phase of the Program (the "Development Stage"), proportionally to their shareholdings. It is assumed that PGE's financial commitment in the Development Stage will not exceed amount of approx. PLN 700 million. The funds for the Program are paid to PGE EJ1 in form of the increase of the share capital and loans. In the first quarter of 2018, PGE EJ 1 received a loan from its shareholders instead of a share capital increase.
Further action with regard to delivery of technology is dependent on the final arrangements with the Ministry of Energy related to formula of technology selection, working out economic, organisational and legal solutions, including the risk distribution and estimated costs of implementation of those solutions.
Site characterisation and environmental surveys, necessary to prepare an environmental impact assessment and a site characterisation report, were continued in the first half of 2018. The surveys are being carried out with the participation of ELBIS Sp. z o.o., a company from PGE Group. The aim of the surveys is gathering of data necessary to assess the area from the point of view of usefulness for foundation of nuclear power plant.
Works are being conducted at two sites: Lubiatowo-Kopalino and Żarnowiec, within Choczewo, Krokowa and Gniewino municipalities in the Pomeranian Voivodeship.
The works on schedule update have been carried out.
The main aim of activities in this area is to maintain a high level of community support at the planned nuclear plant sites and to deliver knowledge about nuclear power and about the Programme to the widest possible range of stakeholders.
In the first half of 2018, works were continued within the Site Municipality Development Support Programme intended to reinforce partner relations with the local communities and authorities of the municipalities by providing support to initiatives that are of significance to the residents and development of the region.
In 2013, PGE EJ1 sp. z o.o. signed an agreement for environmental studies, site characterisation and services related to obtaining permits and permissions necessary in the investment process associated with the construction of a nuclear power plant with a consortium of WorleyParsons Nuclear Services JSC, WorleyParsons International Inc. and WorleyParsons Group Inc. ("WorleyParsons"), in the amount of approximately PLN 253 million net (including basic scope of approximately PLN 167 million). Due to delays in the implementation of the agreement, in 2013 PGE EJ 1 accrued to WorleyParsons a contractual penalty in the amount of approximately PLN 7 million. In addition, in connection with a further improper execution of services in 2014, PGE EJ 1 accrued contractual penalties in the total amount of approximately PLN 43 million. On December 23, 2014, PGE EJ 1 terminated the contract for reasons attributable to WorleyParsons.
Contractual penalties of 2013 were deducted from the remuneration payable to WorleyParsons in 2014. Penalties for 2014 were partly deducted from the remuneration payable to WorleyParsons and partly obtained from the bank guarantee. After all deductions and amounts received by the company from the bank guarantee, PGE EJ 1 is entitled to claim towards WorleyParsons for payment of approximately PLN 14 million as a penalty by way of delay.
On August 7, 2015 PGE EJ 1 filed with the District Court in Warsaw a claim against WorleyParsons for the payment of approximately PLN 15 million plus statutory interest for late payment of the amount due.
On November 13, 2015, PGE EJ 1 received a payment demand from WorleyParsons for about PLN 59 million due for WorleyParsons remuneration, which - according to the claimant - was deducted unduly, for the works that in opinion of WorleyParsons were unjustifiably not accepted and for the project management, as well as funds collected from the bank guarantee. The court obligated PGE EJ 1 sp. z o.o. to submit a statement of defence within three months from receipt. Moreover, value of claims by WorleyParsons amounting to approximately PLN 54 million was included in the WorleyParsons' payment demand for PLN 92 million of March 13, 2015 with regard to termination of the agreement. On March 24, 2017, PGE EJ1 received a procedural document expanding the action being brought by WorleyParsons from approximately PLN 59 million to approximately PLN 104 million (i.e. by around PLN 45 million). It is possible that WorleyParsons will file another claim amounting to approximately PLN 32 million representing the difference in amount of claims from the demand for payment of March 13, 2015 and the expanded claim received on March 24, 2017.
PGE EJ 1 does not accept the claim and regards its possible admission by the court as less likely than its dismissal.
On March 29, 2017, mediation between the Parties took place – the meeting did not result in a settlement. The first hearing was held on December 8, 2017, during which the Court decided to examine the matter behind closed doors (without an audience).
Further hearings in the case took place on February 15 and 16, 2018.
The company filed a response to WorleyParsons' expanded lawsuit on March 31, 2018.
Furthermore, on May 20, 2016, PGE EJ 1 filed a motion with the District Court for the Capital City of Warsaw in Warsaw to commit WorleyParsons to attempt reaching a settlement concerning PGE EJ 1's claims of PLN 41 million together with statutory interest for compensation for undue contractual performance. A conciliation meeting at the court is scheduled for June 8, 2017. During the hearing on June 8, 2017, the Court stated that a certified copy of the application was not delivered to the American WorleyParsons companies, and therefore it adjourned the hearing without setting a date. On July 3, 2017, a representative of PGE EJ 1 received information that a certified copy of the application was delivered to the American companies. At a hearing on September 19, 2017, the court ruled that a settlement had not been agreed and concluded the case. The company is considering expanding the lawsuit. The company's claim expires in September 2019.
Additional hearings in the case were held on April 24 and 25, 2018.
The court scheduled 10 hearings for the second half of 2018. The next upcoming hearing dates are August 21 and 22, 2018.
On May 22, 2018 PGE S.A., using the intermediary services of Pekao Investment Banking S.A. (acting as financial advisor to PGE), announced a tender offer (the "Tender Offer") to subscribe for the sale of 45,443,547 ordinary bearer shares of Polenergia S.A. ("Polenergia"), that is for all shares issued by Polenergia, entitling to exercise 100% of total votes at the general meeting of Polenergia, for a price of PLN 16.29 per each share. PGE is also the entity acquiring the shares in the Tender Offer. Within the transaction in way of tender offer, a security in form of a bank guarantee was issued for the liabilities of PGE. Bank guarantee was issued by Bank Polska Kasa Opieki S.A. and its beneficiary is PEKAO Investment Banking S.A. The bank guarantee was issued on May 22, 2018 for the amount of PLN 740 million and is valid until November 21, 2018.
The Tender Offer was announced subject to the following conditions:
concluding of an agreement by PGE and Polenergia on strategic cooperation and integration of Polenergia within the PGE Group.
Unless the subscription period under the Tender Offer is extended or shortened, the subscriptions can be placed from July 13, 2018 to September 20, 2018.
Full text of the Tender Offer was published by PGE in the current report no. 10/2018.
Information about transactions with related entities is presented in note 23 to the interim condensed consolidated financial statements.
PGE S.A. did not publish financial forecasts.
According to the best knowledge, on the ground of the letter from the Ministry of the State Treasury of April 27, 2016, the State Treasury holds 1 072 984 098 ordinary shares of the Company, representing 57.39% of the Company's share capital and entitling to 1 072 984 098 votes on the General Meeting of the Company, constituting 57.39% of total votes.
Table: Shareholders holding directly or indirectly by subsidiaries at least 5% of the total votes at the General Meeting of PGE S.A.
| Number of shares Shareholder |
Number of votes | % in total votes on General Meeting |
|
|---|---|---|---|
| State Treasury | 1 072 984 098 | 1 072 984 098 | 57.39% |
| Others | 796 776 731 | 796 776 731 | 42.61% |
| Total | 1 869 760 829 | 1 869 760 829 | 100.00% |
According to the best knowledge of the Management Board of the Company, members of management and supervisory authorities of the Company as of the date of submission of this report and as of the date of publishing of the consolidated report for the first quarter of 2018 did not hold shares of PGE S.A.
To the best knowledge of the Management Board of PGE S.A., the half-yearly financial report, containing interim condensed consolidated financial statements of PGE Capital Group, interim condensed standalone financial statements for PGE S.A. and comparative data were prepared in accordance with the governing accounting principles, present a fair, true and reliable view of the material and financial situation of PGE Capital Group and its financial result.
The report of the Management Board on the activities of PGE Capital Group presents a true view of the development, achievements and situation of the Capital Group.
The Management Board of PGE S.A. declares that the entity authorised to audit the financial statements, which reviews the interim consolidated financial statements and interim condensed standalone financial statements for PGE S.A., has been appointed in accordance with provisions of the law. The entity and the statutory auditors, who performed the review, fulfilled all the requirements for issuing an unbiased and independent report on the review, in accordance with the governing provisions and professional standards.
The foregoing Management Board's Report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. was approved for publication by the Management Board of the parent company on August 7, 2018.
Warsaw, August 7, 2018
Signatures of Members of the Management Board of PGE Polska Grupa Energetyczna S.A.
President of the Management Board Henryk Baranowski
Vice-President of the Management Board Wojciech Kowalczyk
Vice-President of the Management Board Marek Pastuszko
Vice-President of the Management Board Paweł Śliwa
Vice-President of the Management Board Ryszard Wasiłek
Vice-President of the Management Board Emil Wojtowicz
| AKPiA | Control, measurement and automation apparatus area |
|---|---|
| Ancillary control services (ACS) |
services provided to the transmission system operator, which are indispensable for the proper functioning of the National Power System and ensure the keeping of required reliability and quality standards. |
| Achievable capacity | the maximum sustained capacity of a generating unit or generator, maintained continuously by a thermal generator for at least 15 hours or by a hydroelectric generator for at least five hours, at standardized operating conditions, as confirmed by tests. |
| Balancing market | a technical platform for balancing electricity supply and demand on the market. The differences between the planned (announced supply schedules) and the actually delivered/off-taken volumes of electricity are settled here. The purpose of the balancing market is to balance transactions concluded between individual market participants and actual electricity demand. The participants of the balancing market can be the generators, customers for electricity understood as entities connected to a network located in the balancing market area (including off-takers and network customers), trading companies, electricity exchanges and the TSO as the balancing company. |
| Base, baseload | standard product on the electricity market: a constant hourly power supply per day in a given period, for example week, month, quarter or year. |
| BAT | Best Available Technology |
| Best Practices | Document "Best Practice for GPW Listed Companies 2016" adopted by the resolution of the GPW Supervisory Board of October 13, 2015 and effective from January 1, 2016. |
| Biomass | solid or liquid substances of plant or animal origin, subject to biodegradation, obtained from agricultural or forestry products, waste and remains or industries processing their products as well as certain other biodegradable waste in particular agricultural raw materials. |
| Black energy | popular name for energy generated as a result of combustion of black coal or lignite. |
| Circular economy | system that minimises the consumption of resources and the level of waste as well as emissions and energy losses by creating a closed loop of processes in which waste from one process is used as resources in other processes so as to maximally reduce the quantity of production waste |
| Co-combustion | the generation of electricity or heat based on a process of combined, simultaneous combustion in one device of biomass or biogas together with other fuels; part of the energy thus generated can be deemed to be energy generated with the use of renewable sources. |
| Co-generation | the simultaneous generation of heat and electricity or mechanical energy in the course of one and the same technological process. |
| Constrained generation |
the generation of electricity to ensure the quality and reliability of the national power system; this applies to generating units in which generation must continue due to the technical limitations of the operation of the power system and the necessity of ensuring its adequate reliability. |
| CVC fund | Corporate Venture Capital; in the CVC model, portfolio companies, aside from financial support, receive the opportunity to verify their ideas in a corporate setting |
| Distribution | transport of energy through distribution grid of high (110 kV), medium (15kV) and low (400V) voltage in order to supply the customers. |
| Distribution System Operator (DSO) |
a power company engaging in the distribution of gaseous fuels or electricity, responsible for traffic in the gas or electricity distribution systems, current and long-term security of operation of the system, the operation, maintenance, repairs and indispensable expansion of the distribution network, including connections to other gas or power systems. |
| Energy cluster | civil-law arrangement that may include natural persons, legal entities, scientific units, research institutes or local government units, concerning the generation, distribution or trade in energy and energy demand balancing, with this energy being from renewable sources or other sources or fuels, within a distribution grid with nominal voltage below 110 kV, within the operational area of the given cluster, not exceeding the area of one district (powiat) in the meaning of the act on district authorities) or 5 municipalities (gmina) in the meaning of the act on municipal authorities; an energy cluster is represented by a coordinator, which is a cooperative, association, foundation appointed for this purpose or any member of the energy cluster indicated in the civil-law arrangement |
| ERO | Energy Regulatory Office (pol. URE). |
| EUA | European Union Allowances: transferable CO2 emission allowances; one EUA allows an operator to release one tonne of CO2 |
| EU ETS | European Union Greenhouse Gas Emission Trading Scheme) EU emission trading scheme. Its operating rules are set out in the ETS Directive, amended by the Directive 2009/29/EC of the European Parliament and of the Council of April 23, 2009 (OJ EU L. of 2009, No. 140, p. 63—87). |
| Generating unit | a technically and commercially defined set of equipment belonging to a power company and used to generate electricity or heat and to transmit power. |
| GJ | Gigajoule, a unit of work/heat in the SI system, 1 GJ = 1000/3.6 kWh = approximately 278 kWh. |
|---|---|
| GPZ | main power supply point, a type of transformer station used for the processing or distribution of electricity or solely for the distribution of electricity. |
| Green certificate | popular name for energy generated from renewable energy sources. |
| GW | gigawatt, a unit of capacity in the SI system, 1 GW = 109 W. |
| GWe | one gigawatt of electric capacity. |
| GWt | one gigawatt of heat capacity. |
| HICP | Harmonised Index of Consumer Prices |
| High Voltage Network (HV) |
a network with a nominal voltage of 110 kV. |
| IGCC | Integrated Gasification Combined Cycle. |
| Installed capacity | the formal value of active power recorded in the design documentation of a generating system as being the maximum achievable capacity of that system, confirmed by the acceptance protocols of that system (a historical value, it does not change over time. |
| IRiESP | the Transmission Network Operation and Maintenance Manual required to be prepared by a transmission system operator pursuant to the Energy Law; instructions prepared for power networks that specify in detail the terms and conditions of using these networks by system users as well as terms and conditions for traffic handling, operation and planning the development of these networks; sections on transmission system balancing and system limitation management, including information on comments received from system users and their consideration, are submitted to the ERO President for approval by way of a decision. |
| IRZ | Cold Intervention Reserve Service – service consisting of maintaining power units ready for energy production. Energy is produced on request of PSE S.A. |
| KSE | the National Power System, a set of equipment for the distribution, transmission and generation of electricity, forming a system to allow the supply of electricity in the territory of Poland. |
| KSP | the National Transmission System, a set of equipment for the transmission of electricity in the territory of Poland. |
| kV | kilo volt, an SI unit of electric potential difference, current and electromotive force; 1kV= 103 V. |
| kWh | kilowatt-hour, a unit of electric energy in the SI system defined as the volume of electricity used by the 1 kW equipment over one hour. 1 kWh = 3,600,000 J = 3.6 MJ. |
| Low Voltage Network (LV) |
a network with a nominal voltage not exceeding 1 kV. |
| LTC | long-term contracts on the purchase of capacity and electricity entered into between Polskie Sieci Elektroenergetyczne S.A. and electricity generators in the years 1994-2001. |
| Medium-voltage network (MV) |
an energy network with a nominal voltage higher than 1 kV but lower than 110 kV. |
| MEV | Minimum Energy Volumes. |
| MSR | Market Stability Reserve (relating to CO2 ) |
| MW | a unit of capacity in the SI system, 1 MW = 106 W. |
| Mwe | one megawatt of electric power. |
| MWt | one megawatt of heat power. |
| NAP | National emissions Allocation Plan, prepared separately for the national emission trading system and for the EU emission trading system by the National Administrator of the Emission Trading System. |
| NAP II | National CO2 emissions Allocation Plan for the years 2008-2012 prepared for the EU emission trading system adopted by the Ordinance of the Council of Ministers of July 1, 2008 (Dz. U. of 2008, No. 202, item 1248). |
| Nm3 | normal cubic meter; a unit of volume from outside the SI system signifying the quantity of dry gas in 1 m3 of |
| space at a pressure of 101.325 Pa and a temperature of 0°C. | |
| NOx | nitrogen oxides. |
| Operational Capacity Reserve (ORM) |
ORM constitutes of generation capacities of active Production Schedular Units (JGWa) in operation or layover, representing excess capacity over electricity demand available to the TSO under the Energy Sale Agreements and on the Balancing Market in unforced generation |
| Peak, peakload | a standard product on the electricity market; a constant power supply from Monday to Friday, each hour between 7:00 a.m. and 10:00 p.m. (15-hour standard for the Polish market) or between 8:00 a.m. and 8:00 p.m. (12-hour standard for the German market) in a given period, for example week, month, quarter or year. |
| Peak power pumped storage plants |
special type of hydro-power plant allowing for electricity storage. It uses the upper reservoir, to which water is pumped from the lower reservoir using electricity (usually excessive in system). The pumped storage facilities provide ancillary control services for the national power system. In periods of increased demand for electricity, water from the upper reservoir is released through the turbine. This way, electricity is produced. |
| PJ | Petajoule, a unit of work/heat in the SI system, 1 PJ = approx. 278 GWh |
|---|---|
| Property rights | negotiable exchange-traded rights under green and co-generation certificates |
| Prosumer | end customer who purchases electricity under a comprehensive agreement and generates electricity only from renewable sources at a micro-installations for own purposes, unrelated to economic activities |
| PSCMI1 | Polish Energy Coal Market Index 1 - average level of prices of coal dust sold to industrial-scale power plants in Poland |
| RAB | Regulatory Asset Base. |
| Red certificate | a certificate confirming generation of electricity in co-generation with heat. |
| Red energy | popular name for electricity co-generated with heat. |
| Regulator | the President of ERO, fulfilling the tasks assigned to him in the energy law. The regulator is responsible for, among others, giving out licenses for energy companies, approval of energy tariffs, appointing Transmission System Operators and Distribution System Operators. |
| Renewable Energy Source (RES) |
a source of generation using wind power, solar radiation, geothermal energy, waves, sea currents and tides, flow of rivers and energy obtained from biomass, landfill biogas as well as biogas generated in sewage collection or treatment processes or the disintegration of stored plant or animal remains. |
| SAIDI | System Average Interruption Duration Index - index of average system interruption time (long, very long and disastrous), expressed in minutes per customer per year, which is the sum of the interruption duration multiplied by the number of consumers exposed to the effects of this interruption during the year, divided by the total number of off-takers. SAIDI does not include interruptions lasting less than three minutes and is determined separately for planned and unplanned interruptions. It applies to breakdowns in the low (LV), medium (MV) and high voltage (HV), wherein SAIDI in quality tariff does not include interruptions on low voltage. |
| SAIFI | System Average Interruption Frequency Index - index of average system amount of interruptions ( long, very long and disastrous ), determined as number of off-takers exposed to the effects of all such interruptions during the year divided by the total number of off-takers. SAIFI does not include interruptions lasting less than three minutes and is determined separately for planned and unplanned interruptions. It applies to breakdowns in the low (LV), medium (MV) and high voltage (HV), wherein SAIFI in quality tariff does not include interruptions on low voltage . |
| SCR | Selective catalytic reduction |
| SNCR | Selective non-catalytic reduction |
| Start-up | early-stage company established in order to build new products or services and characterised by a high level of uncertainty. The most common features of start-ups are: short operational history (up to 10 years), innovativeness, scalability, higher risk than in the case of traditional businesses but also potential higher returns on investment |
| Tariff | the list of prices and rates and terms of application of the same, devised by an energy enterprise and introduced as binding on the customers specified therein in the manner defined by an act of parliament. |
| Tariff group | a group of customers off-taking electricity or heat or using services related to electricity or heat supply to whom a single set of prices or charges and terms are applied. |
| TGE | Towarowa Giełda Energii S.A. (Polish Power Exchange), a commodity exchange on which trading can take place in electricity, liquid or gas fuels, extraction gas, emission allowances and property rights whose price depends directly or indirectly on electric energy, liquid or gas fuels and emission allowances, admitted to commodity exchange trading. |
| TPA, TPA rule | Third Party Access, the owner or operator of the network infrastructure to third parties in order to supply goods/services to third party customers. |
| Transmission | transport of electricity through high voltage (220 and 400 kV) transmission network from generators to distributors. |
| Transmission System Operator (TSO) |
a power company engaging in the transmission of gaseous fuels or electric energy, responsible for traffic in a gas or power transmission system, current and long-term security of operation of that system, the operation, maintenance, repair and indispensable expansion of the transmission system, including connections with other gas or power systems. In Poland, for the period from July 2, 2014 till December 31, 2030 Polskie Sieci Elektroenergetyczne S.A. was chosen as a TSO in the field of electricity transmission. |
| TWh | terawatt hour, a multiple unit for measuring of electricity unit in the system SI. 1 TWh is 109 kWh. |
| Ultra-high-voltage network (UHV) |
an energy network with a voltage equal to 220 kV or higher. |
| V (volt) | electrical potential unit, electric voltage and electromotive force in the International System of Units (SI), 1 V= 1J/1C = (1 kg x m2 3 ) / (A x s ). |
| W (watt) | a unit of power in the International Systems of Units (SI), 1 W = 1J/1s = 1 kg x m2 -3 x s |
| Yellow certificate | a certificate confirming generation of energy in gas-fired power plants and CCGT power plants. |
| Yellow energy | popular name for energy generated in gas-fired power plants and CCGT power plants. |
Building tools?
Free accounts include 100 API calls/year for testing.
Have a question? We'll get back to you promptly.