Management Board's report on activities of the PGE Capital Group for
ended September 30, 2024

1 of 91

| 1.4.1 | ||||||
|---|---|---|---|---|---|---|
| 1.4.2 | Management Board 9 Supervisory Board 10 |
|||||
| 1.4.3 | Committees of the Supervisory Board11 | |||||
| 1.5.1 | Share capital of PGE S.A. and ownership structure12 | |||||
| 1.5.2 | Shares of the parent company and shares in the entities related to PGE S.A. owned by the members | |||||
| of management and supervisory authorities 13 | ||||||
| 2.2.1 | Situation in the National Power System (NPS) 15 | |||||
| 2.2.2 | Electricity prices – domestic market 17 | |||||
| 2.2.3 | Electricity prices - international market18 | |||||
| 2.2.4 | Prices of certificates 22 | |||||
| 2.2.5 | Prices of CO2 emission rights 22 | |||||
| 2.4.1 2.4.2 |
Domestic regulatory environment 24 International regulatory environment 28 |
|||||
| 3.3.1 | Key results in business segments1 38 |
|||||
| 3.3.2 | Renewables39 | |||||
| 3.3.3 | Gas-fired Generation44 | |||||
| 3.3.4 | Conventional Generation48 | |||||
| 3.3.5 | District Heating 53 | |||||
| 3.3.6 | Distribution60 | |||||
| 3.3.7 | Railway Energy Services 65 | |||||
| 3.3.8 3.3.9 |
Supply69 Circular Economy72 |
|||||
| 3.3.10 | Other Operations 74 | |||||
| 4.1.1 | Changes in the Management Board and Supervisory Board 76 | |||||
| 4.1.2 | Project of carve-out of coal generation assets76 | |||||
| 4.1.3 4.1.4 |
Regulatory changes77 Environmental decision on the Turów Lignite Mine 79 |
|||||
| 4.1.5 | Impact of war between Russia and Ukraine on PGE Group's activities 80 | |||||
| 4.1.6 | Restructuring proceedings at ENESTA sp. z o.o80 | |||||
| 4.1.7 | Implementation by PGE Paliwa sp. z o.o. of the decision of the Prime Minister concerning the purchase | |||||
| of coal80 | ||||||
| 4.1.8 | Recommendation not to pay dividend for 2023 81 | |||||
| 4.1.9 | Impairment tests 81 | |||||
| 4.1.10 4.1.11 |
Nuclear power plant construction project 81 Signing of an annex to the syndicated loan 81 |
|||||
| 4.1.12 | The impact of the approval of the G tariff on the financial results of the PGE Capital Group 82 | |||||
| 4.1.13 | Estimation of electricity imbalance 82 | |||||
| 4.1.14 | Conclusion of the agreement by Elektrociepłownia Zielona Góra S.A. for the supply of gas fuel82 | |||||
| 4.1.15 | The General Meetings83 | |||||
| 4.1.16 | Setting new commissioning dates of CCGT units in PGE Gryfino 2050 sp. z o.o83 | |||||
| 4.1.17 | Contractual penalties for the contractor for unit 7 at Turów Power Plant 83 | |||||
| 4.1.18 | Signing of a loan agreement with the European Investment Bank 84 | |||||
| 4.1.19 | Signing of an annex to the term loan agreement with Bank Gospodarstwa Krajowego 84 | |||||

| 4.6. Publication of financial forecasts |
|---|
| 4.7. Significant off-balance sheet items |
| 4.8. Factors which, in the issuer's opinion, will have an impact on its results over at least the next quarter 85 |
| 4.9. Agreements and other information important for the assessment of the personnel and financial situation, financial result of the PGE Capital Group and their changes, as well as information important for the assessment of the Group's ability to fulfil its obligations |
| 5. Statement of the Management Board on the reliable preparation of the financial statements 86 |
| 6. Approval of the Management Board's Report |

| Key financial data | Unit | Q3 2024 | Q3 2023 | % change | Q1-Q3 2024 |
Q1-Q3 2023 |
% change |
|---|---|---|---|---|---|---|---|
| Sales revenues | PLN m | 15 562 | 21 515 | -28% | 46 856 | 71 075 | -34% |
| EBIT | PLN m | 1 297 | 1 206 | 8% | 4 156 | 4 755 | -13% |
| EBITDA | PLN m | 2 458 | 2 458 | 0% | 7 598 | 8 330 | -9% |
| EBITDA margin | % | 16% | 11% | 16% | 12% | ||
| Recurring EBITDA | PLN m | 2 454 | 2 450 | 0% | 7 291 | 8 655 | -16% |
| Recurring EBITDA margin | % | 16% | 11% | 16% | 12% | ||
| Net profit | PLN m | 722 | 950 | -24% | 2 811 | 3 121 | -10% |
| Capital expenditures | PLN m | 2 580 | 2 682 | -4% | 7 225 | 6 635 | 9% |
| Net cash from operating activities |
PLN m | 8 514 | 9 192 | -7% | 14 619 | 9 531 | 53% |
| Net cash from investing activities |
PLN m | -2 692 | -2 704 | 0% | -7 394 | -8 195 | -10% |
| Net cash from financial activities |
PLN m | -598 | -3 893 | -85% | -4 384 | -260 | 1 586% |
| Key financial data | September 30, 2024 | December 31, 2023 | % change | |
|---|---|---|---|---|
| Working capital | PLN m | -8 392 | -7 107 | 18% |
| Net debt | PLN m | 4 4321 | 11 121 | -60% |
| Net debt /LTM reported EBITDA 2 |
x | 0.48 | 1.11 | |
| Net debt /LTM recurring EBITDA 2 |
x | 0.47 | 1.04 |
| One offs affecting EBITDA | Q3 2024 | Q3 2023 | % change | Q1-Q3 2024 |
Q1-Q3 2023 |
% change | |
|---|---|---|---|---|---|---|---|
| Change of reclamation provision |
PLN m | -4123 | 0 | - | -20 | -331 | -94% |
| Change of actuarial provision |
PLN m | -32 | 0 | - | 0 | -52 | - |
| Voluntary Leave Program (VLP) |
PLN m | -2 | 0 | - | -2 | 0 | - |
| LTC compensations | PLN m | 4 | 3 | 33% | -3 | -28 | -89% |
| Correction of estimated contribution to Price Difference Payment Fund for year 2022 |
PLN m | 0 | 5 | - | 0 | 86 | - |
| Write-down of receivables from PKP Cargo S.A. |
PLN m | -6 | 0 | - | -120 | 0 | - |
| Adjustment of compensations for electricity for previous years |
PLN m | 452 | 0 | - | 452 | 0 | - |
| Total | PLN m | 4 | 8 | -50% | 307 | -325 | - |
1 Estimated level of economic financial net debt (taking into account future payments for CO2 emission rights) amounts to PLN 19 021 million.
2 LTM EBITDA - Last Twelve Months EBITDA.
3Effect of discount rate change.

Capital Group of PGE Polska Grupa Energetyczna S.A. ("PGE Capital Group", the "Capital Group", "PGE Group", the "Group") is the largest vertically integrated producer of electricity and heat in Poland. With a mix of own fuel sources, generation assets and distribution network, PGE Group provides a safe and reliable supply of electricity to households, businesses and institutions. Moreover, PGE Group is the largest heat producer in the country.
The parent company of PGE Capital Group is PGE Polska Grupa Energetyczna S.A. (also "PGE S.A.", "PGE", the "Company"). PGE Group organizes its activities in nine operating segments:

The core business of the segment includes electricity generation from renewable sources and in pumped-storage power plants.

The core business of the segment includes electricity generation from gas-fired sources.

Core business of the segment includes extraction of lignite, production of electricity and heat from conventional sources.

The core business of the segment includes production of electricity and heat in cogeneration sources as well as transmission and distribution of heat.

The core business of the segment includes supply of electricity to final off-takers through the grid and HV, MV and LV infrastructure.

The segment's main activities are the distribution and sale of electricity to railway operators and customers functioning within the railway system, the sale of fuels, as well as the maintenance and modernisation of overhead contact line network, together with other auxiliary services.


The core business of the segment includes wholesale trading of electricity on domestic and international market, sale of electricity to final off-takers, trading of CO2 allowances, energy certificates and fuels and provision of services of the Corporate Centre to companies from the PGE Group.

The activities of the segment include the provision of comprehensive services in the field of management of combustion by-products ("UPS"), provision of services in auxiliary areas for electricity and heat producers and the supply of materials based on UPS.

Other operations include provision of services, through the subsidiaries, to PGE Capital Group, which include organisation of capital raising in form of Eurobonds (PGE Sweden), provision of IT services and investing in startups. Additionally, within the segment there are project companies of the Group.
PGE Capital Group as at September 30, 2024 consisted of:
All of PGE Group's companies are organised in 9 operating segments indicated in the chart below.
The following diagram illustrates the Group's structure. A full composition of PGE Group, divided into segments as well as directly and indirectly consolidated subsidiaries, is presented in note 1.3 to the consolidated financial statements.
Chart: Structure of PGE Capital Group1

1Simplified structure – includes key entities.
2 Previous company name: PGE Gryfino 2050 sp. z o.o.

Significant changes which occurred in the PGE Capital Group's structure in the period from January 1, 2024 until the publication date of this report, are presented in note 1.3 to consolidated financial statements and described below.
| Segment | Shares of the company | Date of transaction/ registration in the National Court Register (NCR) |
Comment |
|---|---|---|---|
| Other operations |
PGE Inwest 12 sp. z o.o.– taking up shares by PGE S.A. and joining the PGE Inwest 12 sp. z o.o. and taking up new shares by National Fund for Environmental Protection and Water Management (NFOŚiGW) |
October 24, 2023 / March 4, 2024 |
On October 16, 2023 PGE S.A. and NFOŚiGW signed an investment agreement regarding financing of PGE Inwest 12 sp. z o.o. in order to implement construction of the pumped-storage power plant in Młoty (commune Bystrzyca Kłodzka, Lower Silesia voivodship). As a result of performance of the above mentioned contract on October 17, 2023 Extraordinary Assembly of Partners of PGE Inwest 12 sp. z o.o. adopted a resolution on increase of the share capital and decided that the new shares in the increased share capital will be taken up respectively by PGE S.A. and NFOŚiGW in exchange for cash contributions. On October 24, 2023 PGE S.A. and NFOŚiGW took up new shares in PGE Inwest 12 sp. z o.o. PGE S.A. currently holds 51%, and NFOŚiGW 49% in the share capital of this company. |
| Supply | ENESTA sp. z o.o. in restructuring with seat in Stalowa Wola - increase of the share capital and subscription of all new shares by PGE Obrót S.A. |
December 18, 2023 / June 17, 2024 |
On December 18, 2023 the Extraordinary Meeting of Partners of ENESTA sp. z o.o. in restructuring adopted a resolution on increasing the share capital of the company from PLN 82 402 000 to PLN 116 402 000 PLN, i.e. by PLN 34 000 000, by issue of new 34 000 shares of the company with a nominal value of PLN 1 000 per share. PGE Obrót S.A. as one of the company's shareholders, took up all the company's new shares in the increased share capital. As a result of the share capital increase and the subscription of all new shares of the company by PGE Obrót S.A., the share of PGE Obrót S.A. in the share capital of the company increased from 92.25% to 94.51% as of the date of registration of the company's share capital increase in the National Court Register, i.e. as of June 17, 2024. |
| District Heating |
PGE Toruń S.A. with seat in Toruń – compulsory buy-out by PGE Energia Ciepła S.A. of shares from minority shareholders of PGE Toruń S.A. |
June 11, 2024 / August 12, 2024 entry was made in the register of shareholders of PGE Toruń S.A. |
Ordinary General Meeting o PGE Toruń S.A. on the ground of art. 4181 of the On June 11, 2024 the Commercial Companies Code decided on compulsory buy-out by PGE Energia Ciepła S.A. of 48 220 shares, representing 0.12% of the share capital of PGE Toruń S.A., from minority shareholders of PGE Toruń S.A. As a result of the buy-out and entry of the appropriate change in the register of shareholders of PGE Toruń S.A., the share of PGE Energia Ciepła S.A. in the share capital of PGE Toruń S.A. increased from 95.22% to 95.34%. |

| Segment | Company in liquidation |
Date of transaction/ registration in the National Court Register |
Comment |
|---|---|---|---|
| - | PGE Trading GmbH in liquidation with seat in Berlin |
March 1, 2021 As of September 30, 2024, the company has not been removed from the commercial register |
On March 1, 2021 the Extraordinary Assembly of Partners of PGE Trading in liquidation, in which PGE holds 100% of the share capital, adopted resolution on dissolution of the company and appointment of a liquidator to carry out liquidation activities. The liquidation process of the company is currently underway. |
| - | PGE Nowa Energia sp. z o.o. in liquidation with seat in Warsaw |
March 31, 2022 /On 16 February 2024, the register court decided to delete the company from the Register of Entrepreneurs of the NCR. On April 22, 2024, the deletion of the company from the NCR became effective. |
On March 31, 2022 the Extraordinary Assembly of Partners of PGE Nowa Energia sp. z o.o. in liquidation, in which PGE holds 100% of the share capital, adopted resolution on dissolution of the company and appointment of a liquidator to carry out liquidation activities. On February 16, 2024, the liquidation of PGE Nowa Energia sp. z o.o. in liquidation was completed and the company was deleted from the National Court Register. On April 22, 2024, the deletion of the company from the National Court Register became effective. |
| - | Railen GmbH in liquidation with seat in Berlin |
January 31, 2023 / As of September 30, 2024, the company has not been removed from the commercial register |
On January 26, 2023 the Extraordinary Assembly of Partners of Railen GmbH in liquidation, in which PGE Energetyka Kolejowa Holding sp. z o.o. holds 100% of the share capital, adopted resolution, effective January 31, 2023, resolution on dissolution of the company and appointment of a liquidator to carry out liquidation activities. The liquidation process of the company is currently underway. |
| - | Railen Baltics, UAB with seat in Vilnius |
October 3, 2023/ On January 31, 2024, the Administrator of the Lithuanian Register of Legal Entities reversed the liquidation of Railen Baltics, UAB, i.e. the company is not currently under liquidation |
On October 3, 2023, the Administrator of the Lithuanian Register of Legal Entities initiated the liquidation of the company Railen Baltics, UAB in liquidation, in which PGE Energetyka Kolejowa Holding sp. z o.o. holds 100% of the share capital. The decision to initiate liquidation was appealed, as a result of which, on January 31, 2024, the Administrator of the Lithuanian Register of Legal Entities revoked the decision to place Railen Baltics, UAB into liquidation, i.e. currently the company is not in liquidation. |
| Segment | Company in liquidation |
Date of transaction/ registration in the National Court Register |
Comment |
|---|---|---|---|
| Supply | ENESTA sp. z o.o. in | June 21, 2022 / No | On June 21, 2022, the District Court in Rzeszów, 5th Commercial Division, opened restructuring (recovery) |
| restructuring with seat in | completion of restructuring | proceedings of the company ENESTA sp. z o.o. in restructuring and appointed an Administrator as part of these | |
| Stalowa Wola | proceedings as at |
restructuring proceedings. The restructuring process of the company is currently underway. PGE Obrót S.A. | |
| September 30, 2024 |
currently holds 94.51% share in the share capital of the company. |

| Name and surname of the Management Board |
Position | Period of office |
|---|---|---|
| Wojciech Dąbrowski | President of the Management Board | from February 20, 2020 to February 7, 2024 |
| Wanda Buk | Vice-President for Regulatory Affairs | from September 1, 2020 to February 7, 2024 |
| Przemysław Kołodziejak | Vice-President for Operations | from May 1, 2023 |
| Lechosław Rojewski | Vice-President for Finance | from June 9, 2021 to February 28, 2024 |
| Rafał Włodarski | Vice-President for Support and Development | from January 9, 2023 to February 7, 2024 |
On February 7, 2024, the Supervisory Board adopted the following resolutions:
Moreover, the Supervisory Board of the Company on February 7, 2024 adopted resolutions to delegate Supervisory Board Members:
On February 28, 2024 the Supervisory Board of the Company has adopted a resolution No. 304/XII/2024 on dismissal of Lechosław Rojewski, Vice-President of the Management Board for Finance.
On March 6, 2024, following the qualification procedure, the Supervisory Board adopted the resolutions:
Also on March 6, 2024 the Company's Supervisory Board adopted resolutions to:
On March 21, 2024, following the qualification procedure, the Supervisory Board adopted the resolution:
No. 326/XII/2024 on appointing Robert Kowalski to the Management Board of PGE S.A., entrusting him the position of Vice-President of the Management Board for Support and Development as from May 15, 2024.
On April 4, 2024, following the qualification procedure, the Supervisory Board adopted the resolution:
No. 336/XII/2024 on appointing Renata Czech to the Management Board of PGE S.A., entrusting her the position of Vice-President of the Management Board for Finance as from April 15, 2024.

Also on April 4, 2024 the Supervisory Board adopted the resolution:
No. 343/XII/2024 on dismissal of Przemysław Kołodziejak, Vice-President of the Management Board for Operations.
On April 5, 2024 the Supervisory Board received a statement of Renata Czech, appointed as the Vice-President of the Management Board for Finance, on resignation from this position due to personal reasons.
On May 20, 2024, following the qualification procedure, the Supervisory Board adopted the resolution:
No. 368/XII/2024 on appointing Maciej Górski to the Management Board of PGE S.A., entrusting him the position of Vice-President of the Management Board for Operations as from June 24, 2024.
On June 24, 2024 , following the qualification procedure, the Supervisory Board adopted the resolution:
No. 378/XII/2024 on appointing Przemysław Jastrzębski to the Management Board of PGE S.A., entrusting him the position of Vice-President of the Management Board for Finance as from July 15, 2024.
Table: Composition of the Company's Management Board at the date of signing of this report
| Name and surname of the Management Board |
Position |
|---|---|
| Dariusz Marzec | President of the Management Board |
| Maciej Górski | Vice-President for Operations |
| Przemysław Jastrzębski | Vice-President for Finance |
| Robert Kowalski | Vice-President for Support and Development |
| Marcin Laskowski | Vice-President for Regulations |
Supervisory Board of PGE S.A. operates on the basis of the Act of September 15, 2000 - Code of Commercial Companies and the Company's Statute and Regulations of the Supervisory Board, the content of which is available on the Company's website: Regulations of the Supervisory Board.
| Name and surname of the Management Board |
Position |
|---|---|
| Anna Kowalik | Chairman of the Supervisory Board |
| Artur Składanek | Vice-Chairman of the Supervisory Board – independent |
| Radosław Winiarski | Secretary of the Supervisory Board |
| Janina Goss | Supervisory Board Member - independent |
| Tomasz Hapunowicz | Supervisory Board Member - independent |
| Mieczysław Sawaryn | Supervisory Board Member - independent |
CHANGES TO THE COMPOSITION OF THE COMPANY'S SUPERVISORY BOARD IN 2024
On January 25, 2024, the Minister of State Assets by a statement appointed Michał Domagała to the Supervisory Board.
On January 31, 2024 the Extraordinary General Meeting:

On February 7, 2024, a new Presidium of the Supervisory Board was elected. Also on February 7, 2024 the Supervisory Board adopted resolutions to delegate Supervisory Board Members:
On March 6, 2024, the Supervisory Board adopted resolutions concerning the termination of the delegation of Supervisory Board Members to temporarily perform the duties of Members of the Management Board of PGE S.A.
On September 11, 2024 the Company received a resignation of Mr. Eryk Kosiński from the position of a member of the Company's Supervisory Board.
| Table: Composition of the Company's Supervisory Board at the date of signing of the report | |||
|---|---|---|---|
| Name and surname of the Management Board |
Position |
|---|---|
| Michał Domagała | Chairman of the Supervisory Board – independent |
| Andrzej Sadkowski | Vice-Chairman of the Supervisory Board – independent |
| Anna Kowalik | Secretary of the Supervisory Board |
| Małgorzata Banasik | Member of the Supervisory Board – independent |
| Andrzej Kozyra | Member of the Supervisory Board – independent |
| Elżbieta Niebisz | Member of the Supervisory Board – independent |
| Sławomir Patyra | Member of the Supervisory Board – independent |
| Andrzej Rzońca | Member of the Supervisory Board – independent |
Table: Composition of the committees of the Supervisory Board as at January 1, 2024
| Name and surname of the member of the Supervisory Board |
Audit Committee | Corporate Governance Committee |
Strategy and Development Committee |
Appointment and Remuneration Committee |
|---|---|---|---|---|
| Janina Goss | Member | Member | ||
| Tomasz Hapunowicz | Chairman | Member | ||
| Anna Kowalik | Member | Member | Member | Member |
| Mieczysław Sawaryn | Member | Member | Member | Chairman |
| Artur Składanek | Chairman | Member | ||
| Radosław Winiarski | Member | Chairman |
On January 25, 2024, the Minister of State Assets by a statement appointed Michał Domagała to the Supervisory Board.
On January 31, 2024, the Extraordinary General Meeting dismissed the following persons from the Supervisory Board: Janina Goss, Tomasz Hapunowicz, Mieczysław Sawaryn, Artur Składanek, Radosław Winiarski, and appointed to the Supervisory Board: Małgorzata Banasik, Eryk Kosiński, Andrzej Kozyra, Elżbieta Niebisz, Sławomir Patyra, Andrzej Rzońca and Andrzej Sadkowski.
On September 11, 2024 the Company received a resignation of Mr. Eryk Kosiński from the position of a member of the Company's Supervisory Board.

Table: Composition of the committees of the Supervisory Board as at the signing date of the report
| Name and surname of the member of the Supervisory Board |
Audit Committee | Corporate Governance Committee |
Strategy and Development Committee |
Appointment and Remuneration Committee |
|---|---|---|---|---|
| Małgorzata Banasik | Chairwoman | Member | ||
| Michał Domagała | Member | Member | ||
| Anna Kowalik | Member | Member | Chairwoman | |
| Andrzej Kozyra | Member | Member | ||
| Elżbieta Niebisz | Member | Member | ||
| Sławomir Patyra | Chairman | Member | ||
| Andrzej Rzońca | Chairman | Member | ||
| Andrzej Sadkowski | Member |
As at January 1, 2024, June 30, 2024 and the date of signing of this report, the share capital of PGE S.A. was PLN 19 183746098.70 and split into 2 243 712 994 shares with a nominal value of PLN 8.55 each. There were no changes in share capital of PGE S.A. during the three quarters of 2024.
Table: Share capital of the Company.
| Series/ issue |
Type of shares |
Type of privilege | Number of shares |
Value of series/issue at nominal value |
Capital payment method |
|---|---|---|---|---|---|
| "A" | ordinary | n/a | 1 470 576 500 | 12 573 429 075.00 | contribution in kind/cash |
| "B" | ordinary | n/a | 259 513 500 | 2 218 840 425.00 | cash |
| "C" | ordinary | n/a | 73 228 888 | 626 106 992.40 | merger with PGE GiE S.A.1 |
| "D" | ordinary | n/a | 66 441 941 | 568 078 595.55 | merger with PGE Energia S.A. |
| "E" | ordinary | n/a | 373 952 165 | 3 197 291 010.75 | cash |
| Total | 2 243 712 994 | 19 183 746 098.70 |
1 PGE Górnictwo i Energetyka S.A.
According to the letter from the Ministry of the State Assets of May 20, 2022, the State Treasury held 1 365 601 493 ordinary shares of the Company, representing 60.86% of the Company's share capital and entitling to 1 365 601 493 votes on the General Meeting of the Company, constituting 60.86% of total votes.
In addition, The State Treasury informed about the subsidiary holding PGE shares and the total number of votes by both entities and its percentage share in the total number of votes. According to the notification, taking into account the number of shares (18 697 608) held by a subsidiary of the State Treasury, i.e. Towarzystwo Finansowe Silesia sp. z o.o.(TF Silesia), the State Treasury holds a total of 1 384 299 101 shares constituting 61.70% of the share capital of the Company and entitling to exercise 1 384 299 101 votes, which constitutes 61.70% of the total number of votes.
Table: Shareholding structure at January 1, 2024, September 30, 2024 and at the signing date of this report1 .
| State Treasury and its subsidiary | Other shareholders | Total | |||
|---|---|---|---|---|---|
| Nominal value of shares (PLN) |
% in share capital and votes |
Nominal value of shares (PLN) |
% in share capital and votes |
Nominal value of shares (PLN) |
% in share capital and votes |
| 11 835 757 313.55 | 61.70 | 7 347 988 785.15 | 38.30 | 19 183 746 098.70 | 100.00 |
1 The ownership structure is presented on the basis of information available to the Company.
All of the Company shares have been paid.

Although the Company's shares are not privileged, the Statutes of the Company provide for special rights of the State Treasury until it remains a Shareholder of the Company.
Table: Shareholders holding directly or indirectly by subsidiaries at least 5% of the total votes at the General Meeting of PGE S.A. January 1, 2024, September 30, 2024 and at the signing date of this report.
| Shareholder | Number of shares | Number of votes | % in total votes on General Meeting |
|---|---|---|---|
| State Treasury | 1 365 601 493 | 1 365 601 493 | 60.86% |
| State Treasury's subsidiary – TF Silesia | 18 697 608 | 18 697 608 | 0.84% |
| State Treasury and its subsidiary - total |
1 384 299 101 | 1 384 299 101 | 61.70% |
| Others | 859 413 893 | 859 413 893 | 38.30% |
| Total | 2 243 712 994 | 2 243 712 994 | 100.00% |
During the three quarters of 2024, there were no changes in the shareholding structure of PGE S.A.
Chart: Shareholding structure of PGE S.A.

According to the best knowledge of the Management Board of the Company, none of the members of management and supervisory authorities of the Company held shares of the parent company or shares in entities related to PGE S.A. as at September 30, 2024 and as at the date of signing of this report

PGE Group's main operating area is Poland, and the domestic macroeconomic backdrop has a substantial impact on Group's results. At the same time, the condition of Poland's economy remains largely tied to the situation across the European Union and in global markets. The Group's financial results are affected by both the situation in specific segments of the economy and the financial markets, which determine the terms of PGE Group's debt financing.
In Poland there is a dependence between change in electricity demand and change in the rate of economic growth. Considering PGE Group's position on the Polish power generation market, as well as its substantial share in the electricity sales and distribution market, changes in electricity and heat demand may have a significant impact on the Group's results.
Third quarter of 2024 saw a significant weakening of economic growth compared to the first half of 2024. Seasonally adjusted GDP increased by 1.70% in the third quarter compared to the same period of the previous year. The described situation is in line with the observed trends in electricity demand.
Chart: Seasonally adjusted GDP change vs. change in domestic gross electricity consumption.

Source: Central Statistical Office of Poland, Polskie Sieci Elektroenergetyczne S.A. (PSE S.A.)
The PMI index of the Polish industrial sector stood at 48.6 points in September 2024, up from 47.8 points in August, the highest reading since November 2023. The index, which exceeded analysts' expectations in August 2024 (47.3 points), signals a slower deterioration in economic conditions in the sector, with the decline in production and new orders slowing down and employment stabilising. Although new orders fell for the thirty-first consecutive month, the rate of decline was the slowest since November last year. The average PMI in the third quarter of 2024 was 47.9 points, compared to 43.5 points in the third quarter of 2023. Price pressures remain weak and exports are showing a slower rate of decline, despite further signs of weakness in the German market, which has a very strong influence on performance in the Polish market. The performance of the Polish index is better than the Eurozone PMI, which stood at 44.8 points in September 2024 against 45.6 points in August 2024. This is a much lower result than expected by experts. The PMI declines concern the largest economies: Germany, France and the UK. German industry is still in a deep recession, with a PMI of 40.3 points (compared to 42.4 points in August). The index for France was 44.0 points, up slightly from 43.9 points a month earlier.

Chart: Manufacturing PMI in Poland and Eurozone (in points).

Source: Market Economics
Despite an improvement in the condition of the Polish industrial sector, industrial output sold in September 2024 was 0.3% lower than in September 2023, which was lower than analysts had expected. However, it is a 9.0% increase compared to August. In the period from January to September 2024, the dynamics of sold production increased by 0.2% compared to the same period of the previous year. According to preliminary data, in September 2024, an increase in sold production was recorded, among others, in the production of other transport equipment - by 18.7%, in waste management and recovery of raw materials - by 7.6%. Among the selected industrial divisions, compared to September last year, the largest decrease was recorded in the mining of coal and lignite by 21.0%, in the repair, maintenance and installation of machinery and equipment - by 17.6%, in the production of electrical equipment - by 15.7%. Since the beginning of the year, mining and quarrying recorded the largest year-on-year decrease of 7.3% in 2023.
Table: Domestic electricity consumption (TWh).
| Q3 2024 | Q3 2023 | % change |
Q1-Q3 2024 |
Q1-Q3 2023 |
% change | |
|---|---|---|---|---|---|---|
| Domestic electricity consumption, including: |
39.94 | 39.89 | 0% | 125.26 | 123.01 | 2% |
| Wind farms | 4.74 | 3.67 | 29% | 17.55 | 14.07 | 25% |
| Industrial thermal hard-coal fired power plants |
14.56 | 17.62 | -17% | 49.47 | 55.20 | -10% |
| Industrial thermal lignite fired power plants | 9.22 | 8.30 | 11% | 26.56 | 25.66 | 4% |
| Industrial gas-fired power plants | 4.16 | 2.55 | 63% | 11.52 | 9.48 | 22% |
| International exchange balance | 0.16 | 1.75 | -91% | 2.28 | 4.10 | -44% |
| Other (hydro power plants, other RES) | 7.10 | 6.00 | 18% | 17.88 | 14.50 | 23% |
Source: PSE S.A. data
In the third quarter of 2024, domestic electricity consumption increased by 0.05 TWh, mainly due to a lower base. As a result of an increase in installed capacity and more favourable wind conditions, wind generation increased by 1.07 TWh compared to the same period last year. In the third quarter of 2024, similar to a year ago, Poland was per balance an importer of energy, while there was a significant decrease in the balance of foreign exchange (by -1.59 TWh y/y). There was a decrease in production at coal-fired stations (-3.06 TWh). At the same time, there was an increase in generation from lignite (0.92 TWh), which could be attributed to the low base of the previous year, and from gas (1.61 TWh), which was the result of a decrease in gas prices on wholesale markets and an increase in installed capacity. There was also an increase in generation from other electricity sources (1.10 TWh), primarily PV plants due to an increase in installed capacity.


1 2 3 4 5 6
Source: own work based on data from PSE S.A.
On a cumulative basis, domestic electricity consumption increased by 2.25 TWh y/y. The increase was due to the low base of the previous year - as a result of the slowing economy due to higher commodity prices caused by Russia's war with Ukraine. As a result of the increase in installed capacity and more favourable wind conditions, wind generation increased by 3.48 TWh compared to the same period last year. For the first three quarters of 2024, similar to a year ago, Poland was an energy importer, with imports lower than last year by 1.82 TWh. There was a decrease in production at coal-fired power plants (-5.73 TWh). At the same time, we recorded an increase on lignite (0.90 TWh), which may have been the result of the low base of last year and the increase in demand this year, and on gas (2.04 TWh), which was the result of the fall in gas prices on wholesale markets and the increase in installed capacity. There was also an increase in generation from other electricity sources (3.38 TWh), primarily PV plants due to an increase in installed capacity.
Chart: Energy balance in the NPS (TWh).

Source: own work based on data from PSE S.A.

| Market/measure | Unit | Q3 2024 | Q3 2023 | % change | Q1-Q3 2024 |
Q1-Q3 2023 |
% change |
|---|---|---|---|---|---|---|---|
| RDN – average price | PLN/MWh | 450 | 532 | -15% | 410 | 572 | -28% |
| RDN – trading volume | TWh | 12.24 | 14.57 | -16% | 35.47 | 41.77 | -15% |
1Data from TGE, include weighted average monthly BASE prices.
| Factor | Unit | Q3 2024 | Q3 2023 | % change | Q1-Q3 2024 |
Q1-Q3 2023 | % change |
|---|---|---|---|---|---|---|---|
| CO2 emission rights1 | EUR/t | 68.09 | 85.67 | -21% | 66.19 | 88.21 | -25% |
| Polish Steam Coal Market Index PSCMI-1 |
PLN/GJ | 22.02 | 33.56 | -34% | 22.53 | 33.20 | -32% |
| Wind generation NPS | TWh | 4.74 | 3.67 | 29% | 17.55 | 14.07 | 25% |
| Ratio: wind generation/ NPS consumption |
% | 12% | 9% | 14% | 11% | ||
| Ratio: international trading/ NPS consumption |
% | 0% | 4% | 2% | 3% |
1Source: own work based on ICE quotations.
In the first three quarters of 2024, the average electricity price on the day-ahead market was PLN 410/MWh and was lower by 28% than average price (PLN 572/MWh) in the analogical period of the previous year. Increased generation from RES sources and higher average daily temperatures y/y contributed to the price drop.
Average level of PSCMI-1 in the first three quarters of 2024 was PLN 22.53/GJ, i.e. lower by 32% than in the base period.
Chart: Average monthly prices on the day-ahead market in 2023–2024 (TGE).1

1Data from TGE, include weighted average monthly BASE prices.
| Market/measure | Unit | Q3 2024 | Q3 2023 | % change |
Q1-Q3 2024 |
Q1-Q3 2023 |
% change |
|---|---|---|---|---|---|---|---|
| BASE Y+1 – average price | PLN/MWh | 453 | 639 | -29% | 458 | 690 | -34% |
| BASE Y+1 – trading volume | TWh | 10.35 | 10.52 | -2% | 26.98 | 21.94 | 23% |
| PEAK5 Y+1 – average price | PLN/MWh | 484 | 706 | -31% | 494 | 834 | -41% |
| PEAK5 Y+1 – trading volume | TWh | 1.74 | 0.96 | 81% | 3.95 | 2.64 | 50% |
Energy prices on the forward market in the first three quarters of 2024 fell significantly for both BASE and PEAK5 contracts in comparison to the analogical period of the previous year. The decrease was due to the high base of the previous year, when increases were influenced by the market situation related to the limited supply of hard coal and natural gas due to the ongoing conflict in Ukraine.

Chart: Average monthly prices on the forward market in 2023–2024 (TGE).1

1 Monthly average index level for forward contracts for the next year (Y+1), baseload and peak, weighted by the trading volume.
Chart: Comparison of average electricity prices on Polish market and on European markets in the first three quarters of 2024 (prices in PLN/MWh, average exchange rate EUR/PLN 4.30).

Source: TGE - RDN price level calculated on the basis of hourly quotations (fixing), EEX, Nordpool

Chart: Evolution of spot market prices.

Source: TGE, EEX, Nordpool
There was a year-on-year fall in prices in neighbouring markets in the first three quarters of 2024. The largest y/y declines were recorded in Germany (PLN -84/MWh), while there was an increase in Hungary (PLN +68/MWh). The differentiation of energy prices results from a higher share of renewable energy sources in the technological mix and from the situation on the markets for related products. The price spread between Poland and its neighbouring countries is also due to differences in realised coal prices and also to prices of natural gas at home and abroad. The reason for the price drop was a change in the market situation – in the analogical period of the previous year the supply of hard coal and natural gas were limited due to the ongoing conflict in Ukraine.
Chart: Hard coal indices ARA vs PSCMI-1 1 .

Source: ARP, Bloomberg (API21MON OECM Index), own work.
1The comparison is illustrative only. Methodologies of counting the ARA and PSCMI1 indexes are different. Among other things, the ARA index includes insurance and delivery costs. The PSCMI 1 is an ex-mine index without insurance and delivery costs. Standards for calculating the caloric values are also different (ARA – 25.12 GJ/t vs. PSCMI1 caloric value - range 20-24 GJ/t). The aim is to compare the trend and not the absolute level. For illustration purposes ARA index is recalculated from USD/t to PLN/GJ.

-1 500,0 0 -1 250,0 0 -1 000,0 0 -750,00 -500,00 -250,00 0,0 0 250 ,00 500 ,00 750 ,00 1 00 0,00 1 25 0,00 1 50 0,00 1 75 0,00
-4000 -3000 -2000 -1000 0 1000 2000 3000 4000 5000
Chart: Monthly imports, exports and cross-border exchange balance in 2023-2024.

Source: own work based on data from PSE S.A.
The fall in global fuel prices (which translate into lower energy production costs) has driven down electricity prices in neighbouring countries, resulting in higher energy imports into Poland in the first seven months of 2024. In contrast, we have been an exporter of energy since August, driven primarily by PV generation and lower prices relative to our neighbours.
Chart: Quarterly trading volumes – import, export and international trading balance in years 2013 - 2024.

Source: own work based on data from PSE S.A.
In the third quarter of 2024, Poland was a net importer of electricity, with a trade balance of 0.2 TWh (import 2.8 TWh, export 2.6 TWh). Imports from Germany (1.4 TWh), Sweden (0.6 TWh) and Czechia (0.5 TWh) had the greatest impact on the trade balance. At the same time, we exported the most electricity to Slovakia (1.2 TWh), Lithuania (0.5 TWh) and Germany (0.3 TWh).
In the three quarters of 2024, Poland was a net importer of electricity, with a trade balance of 2.5 TWh (import 9.5 TWh, export 7.0 TWh). Imports from Germany (4.2 TWh), Sweden (2.4 TWh) and Czechia (1.6 TWh) had the greatest impact on the trade balance. At the same time, we exported the most electricity to Slovakia (2.8 TWh), Lithuania (1.4 TWh) and Germany (1.1 TWh).
The diversity of electricity prices for retail customers in the European Union depends mainly on the level of the wholesale prices of electricity, fiscal system (taxes and fees), regulatory mechanism and support schemes in particular countries. In Poland in the first half of 20242 an additional burden (over sale price and cost of electricity distribution) for individual customers accounted for 50% of the electricity price. The Germans paid the most for electricity, for whom additional charges also accounted for 29% of the final price.
2 Eurostat data on retail market are published in semi-annual intervals.

Chart: The share of additional charges in electricity prices for the individual customers in selected EU countries in the first half of 2024 (prices in PLN/MWh, average exchange rate EUR/PLN 4.32).

Source: own work based on Eurostat data.
Chart: The share of additional charges in electricity prices for the individual customers in selected EU countries in the first half of 2024 (prices in PLN/MWh, average exchange rate EUR/PLN 4.32).

Source: own work based on Eurostat data.

In the three quarters of 2024 the average price of green certificates (index TGEozea) reached PLN 51/MWh and was lower by 72% compared to the analogical period of the previous year.
An obligation to redeem green certificates changed as compared to 2023 (12%) and stands at 5% for 2024. In turn, at the end of August 2024, the Ministry of Climate and Environment published the level of the green certificates redemption obligation for 2025, which will amount to 8.5%.
Chart: Average quarterly prices of green certificates (TGEozea).

Source: Own work based on TGE quotations.
EUA (European Union Allowances) prices are one of the key factors determining wholesale energy prices and PGE Group's financial results. Installations emitting CO2 in the process of electricity or heat production bear the expenses for purchasing EUA allowances to cover the deficit (i.e. the difference between CO2 emissions at PGE Group's generating units and the free-of-charge allowances received under derogation in accordance with the National Investment Plan). Wherein, last allocations granted free of charge were planned for realisation of investment tasks for 2019. It means that the free allocations for electricity generation, in accordance with the currently used method, ended when 2019 allowances were received.
In the first three quarters of 2024 the weighted average price of EUA DEC was EUR 66.19/t and was lower (by approx. 25%) than the average price of EUR 88.21/t in the similar period of the previous year.
Chart: Prices of CO2 emission rights.

Source: own work based on ICE exchange quotations.

In accordance with Commission Implementing Regulation (EU) 2019/1842 of October 31, 2019 laying down rules for the application of Directive 2003/87/EC of the European Parliament and of the Council as regards further arrangements for adjustment of the allocation of free CO2 emission allowances due to changes in activity levels, the competent authority may suspend the issuance of free emission allowances to an installation until it is determined that there is no need to adjust the allocation to that installation or the Commission has adopted a decision concerning adjustments to the allocation to that installation.
In national legislation, the Act on the Greenhouse Gas Emission Trading Scheme introduced an additional condition for the issuance of emission allowances to installations. Due to the amendment of Directive (EU) 2023/959 of the European Parliament and of the Council of May 10, 2023, amending Directive 2003/87/EC establishing a scheme for greenhouse gas emission allowance trading within the Union, the deadline for issuing emission allowances has changed from February 28 to June 30 each year, following the publication of information in the Public Information Bulletin on the website of the Ministry of Climate and Environment.
In accordance with legal requirements, activity level reports for individual installations for 2023 have been submitted, with a deadline of March 31, 2024. A further adjustment will be made during 2024 to reflect increases and decreases in production volumes resulting from revised activity level reports submitted for individual installations.
Table: Emission of CO2 vs allocations of allowances for 2024 (in tons).
| Product | CO2 emissions in Q3 2024 | Allocation of CO2 emission rights for 20241 |
|---|---|---|
| Electricity | 12 287 160 | - |
| Heat | 335 960 | 595 229 |
| Total | 12 623 120 | 595 229 |
1Allowances for heat production.

PGE Group operates in an environment with a significant impact of domestic and foreign regulations. Presented below is a summary of the most significant decisions, which could have an impact on PGE Group's operations in the coming years.
Legal regulations regarding the current rules for determining the prices of electricity and heat and the compensations due in this respect are described in chapter 4.1.3 of this report in the section Regulatory changes.
| Segments | Regulation | Regulation objectives | Latest conclusions and next stages |
Impact on PGE Group |
|---|---|---|---|---|
| The Act on energy vouchers and on changes of other acts in order to temporary cap the price for electricity, natural gas and system heat. |
Among other things, the Act regulates electricity prices from July 1, 2024 to December 31, 2024. The Act imposed an obligation on electricity traders in the form of submitting an application for a change in the existing tariff for 2024 within seven days of the date of entry into force of the Act, or at the request of the ERO President. The revised tariff is effective from July 1, 2024 to December 31, 2025. The bill also provides for an extension of the maximum price mechanism for electricity. This price is in effect in the second half of 2024, and is set at PLN 500/MWh for household consumers and at PLN 693/MWh for local government units and public utilities, as well as micro, small and medium-sized entrepreneurs. In addition, according to the law, an energy voucher has been introduced, which is a one-time cash benefit intended for lower-income households, to be paid in the second half of 2024. In addition, the Law provides for a temporary exemption from the power fee for households. The legislation also refers to limiting the increase in the cost of heat, but with a gradual increase in maximum prices and rates. |
The Act came into force on June 13, 2024. |
The Act affects the financial results of power utilities with respect to their settlement with electricity consumers and the resulting level of compensation. It also provides for the application of heat prices and tariffs at a level not higher than that indicated in the Act in return for compensation. |
|
| Draft Act amending the Renewable Energy Sources Act and certain other acts. |
The draft law envisages accelerating the issuance of permits in the area of RES by shortening the existing time limits for proceedings. In addition, it assumes the recognition of activities concerning the construction or modernisation of RES installations and the equipment and installations necessary for the connection of a given RES installation to the grid, as well as heat pump installations with a capacity of up to 50 MW, as being of overriding public interest. The bill also introduces changes to the net-billing system for prosumers by maintaining after July 1, 2024 the possibility to settle based on the monthly market price of electricity and increasing the value of funds for energy injected into the grid and recognised in the prosumer deposit in the event of a settlement method change. The draft regulation also brings aid schemes into line with the European Commission's state aid guidelines by removing the possibility of supporting cogeneration based on carbon fuels. |
On November 8, 2024, the law was passed in the session of the Sejm. On November 12, 2024, the law was forwarded to the President and the Speaker of the Senate. |
The bill is of significant importance for the Supply segment due to the need to adapt to changes in settlements with prosumers, as well as for the Distribution segment due to changes in the deadlines for issuing connection conditions. The project is also important for the District Heating segment and the Renewables segment due to the introduction of procedural facilitations for investments in RES and heat pump installations. |

| Segments | Regulation | Regulation objectives | Latest conclusions and next stages |
Impact on PGE Group |
|---|---|---|---|---|
| Draft Act amending the act - Environmental Protection Law and certain other acts. |
The draft provides for climate change adaptation to be taken into account in documents related to spatial planning and development, the sustainable design of urban spaces, as well as clarifying the provisions on climate risk analyses in environmental impact assessment proceedings, by indicating that these analyses include an analysis of the vulnerability of projects to climate change. |
On November 15, 2024, the draft was referred to the first reading in the Committee on Environmental Protection, Natural Resources and Forestry and the Committee on Local Self-Government and Regional Policy. |
The bill is important because of the need to take into account its vulnerability to climate change during the environmental impact assessment and to include adaptation plans as part of local spatial plans. |
|
| Draft Act amending the Energy Law and certain other acts. |
The project is an implementation of provisions for the implementation of the Polish Hydrogen Strategy until 2030 with an outlook until 2040. The regulation introduces in the Energy Law a grid of concepts necessary for the development and operation of the hydrogen market in Poland, as well as provisions on the rights and obligations of hydrogen market participants and the President of the Energy Regulatory Office by introducing the principle of certification and designation of hydrogen system operators, defining the scope of their obligations and the principles of ownership unbundling, introducing the obligation to provide hydrogen transmission and storage services by energy companies. |
On November 7, 2024, the first reading was held at the meeting of the Committee for Energy, Climate and State Assets. |
The draft law introduces a strategic framework for the implementation of the hydrogen economy in Poland with a particular focus on the use of low carbon and renewable hydrogen in energy, heating, transport and industry. |
|
| Draft law amending the Agricultural Tax Act, the Local Taxes and Fees Act, the Forest Tax Act and the Stamp Duty Act. |
The bill provides for a change in the legal definition of a building and a structure by creating autonomous definitions for the purposes of the Tax Act, independent of the definitions functioning on the basis of the Act - Construction Law, as well as the inclusion in the legal definition of construction equipment of other technical facilities. |
On November 6, 2024, the first reading of the bill took place at a session of the Sejm and the bill was considered at a meeting of the Public Finance Committee. On November 19, 2024, the report of the Public Finance Committee on the draft was presented. |
The entry into force of the legislation as proposed could lead to a significant increase in the property tax burden for all PGE Group assets. |

| Segments | Regulation | Regulation objectives | Latest conclusions and next stages |
Impact on PGE Group |
|---|---|---|---|---|
| Draft Act amending the Act on stocks of crude oil, petroleum products and natural gas and the principles of proceeding in situations of threat to the state's fuel security and disturbances on the oil market and some other acts. |
The main objective of the project is to change the current model for the creation and maintenance of strategic stocks of natural gas. The regulation imposes on the Government Strategic Reserve Agency the exclusive obligation to create and maintain strategic stocks of natural gas, and obliged entities will bear the cost of their maintenance through a gas fee. |
The bill was referred to the Committee for European Affairs for consideration. |
The entry into force of the legislation will result in the PGE Group paying a gas levy as an obligated entity from the gas year 2024/2025. |
|
| Draft Decree of the Minister of Climate and Environment on specific qualitative and dimensional characteristics of energy wood. |
The purpose of the proposed regulation is to define the specific qualitative and dimensional characteristics of energy wood, to indicate the characteristics of wood raw material that is not suitable for industrial use or has limited potential for use in the non-energy sector. |
PGE S.A. submitted comments during the public consultation on the draft. |
The entry into force of the legislation as proposed will tighten the criteria for wood used in the energy sector. |
|
| Draft Regulation of the Minister of Climate and Environment on the maximum price for electricity generated at offshore wind farms and injected into the grid that may be indicated in bids submitted by generators in an auction. |
The draft regulation determines the maximum price for electricity generated in offshore wind farms and introduced to the grid in PLN per 1 MWh under the second phase of the support scheme. The public consultation report shows that the project proponent has updated and set it at PLN 512/MWh. |
On October 30, 2024, the project was considered by the Economic Committee of the Council of Ministers. |
The draft regulation is of key importance for the Renewables segment as it will enable applying for the right to cover the negative balance in phase II of the support scheme for OWFs to be claimed. |
|
| Draft Act amending the Act on investments in wind power plants and certain other acts. |
Above all, the draft abolishes the general 10H rule3, by introducing a minimum distance of 500 m from residential buildings, national parks and Natura 2000 areas. The proposed changes also concern the modification of the functioning of the mechanism for making at least 10% of the capacity of a wind power plant available to residents who use the generated energy under the virtual prosumer formula. In addition, the draft law introduces a support system for biomethane in installations above 1 MW in the form of an auction and allows the entire stream from the biodegradable part of RDF4 and biomass co-firing in a multi-fuel firing combustion plant to be treated as emission-free. |
The public consultation closed on October 16, 2024. PGE S.A. submitted comments during the public consultation on the draft. |
The bill introduces facilities for the location of onshore wind farms, which will contribute to the development of the RES sector and thus have a positive impact on the investments made by the Renewables segment. In other respects, the bill is of significant importance for the Supply segment, due to the need to adapt to changes in settlements with prosumers. |
|
| Ordinance of the Ministry of Climate and Environment on the change of the quantitative share of the sum of electricity resulting from redeemed certificates of origin confirming the generation of electricity from renewable energy sources in 2025. |
Regulation sets level of redemption of certificates of origin for 2025 confirming: - the generation of electricity from RES – 8.5%, - the generation of electricity from the combustion of agricultural biogas – 0.5%. |
The regulation entered into force on August 31, 2024. |
The regulation is important for the Supply segment due to the obligation to obtain an appropriate share of sold energy from RES and for generators in the Renewables segment that participate in the system of certificates of origin. |
3 Rule 10H - ten times the height of the wind turbine as the minimum distance of a new development from existing residential buildings and forms of nature conservation.
4 RDF - waste that has been treated to meet industrial guidelines, regulations or specifications, primarily to achieve a high calorific value.

| Segments | Regulation | Regulation objectives | Latest conclusions and next stages |
Impact on PGE Group |
|---|---|---|---|---|
| Bill to amend the Capacity Market Act |
The purpose of the proposed law is to introduce a supplementary auction mechanism in the Capacity Market in the period from the second half of 2025 to the end of 2028. Supplementary auctions will purchase additional power for energy security purposes under the Capacity Market mechanism and, by way of derogation, high-carbon units will be able to participate in them. |
The bill was referred to the Committee for European Affairs for consideration. |
The entry into force of the legislation as proposed may allow units not meeting the 550 kg/MWh emission limit to participate in the Capacity Market mechanism until the end of 2028. |
|
| Decree of the Ministry of Climate and Environment on the parameters of the main auction for the year of delivery 2029 and the parameters of the additional auctions for the year of delivery 2026, as well as the parameters of the preliminary auctions for these auctions. |
Among other things, the regulation defines the power demand in the main auction for the delivery period falling in 2029, the corrective dispatch coefficients for individual technology groups for this auction and the parameters of the supplementary auction for 2026. Entities planning to participate in the auctions may decide to participate in the auction or to opt out and to adopt an appropriate auction participation strategy. |
The regulation entered into force on August 2, 2024. |
The regulation affects the generation and storage segments, including pumped storage power plants, which will participate in the main Capacity Market auction in 2029 and the supplementary auctions in 2026. |
|
| Draft Law amending the Law on Value Added Tax, the Law on Excise Tax and certain other laws |
The draft proposes to extend the operation of the reverse charge mechanism for VAT on gas in the gas system, electricity in the electricity system and services for the transfer of greenhouse gas emission allowances until December 31, 2026. |
On October 28, 2024 the bill was referred to the Committee on Legal Affairs for consideration. |
The project is part of the sector's call for an extension of the reverse charge mechanism for VAT on electricity, gas and greenhouse gas emissions until December 31, 2026. |
|
| Draft Regulation of the Ministry of Climate and Environment on reference values for new and substantially modernised cogeneration units in 2025. |
The Regulation specifies the reference values for new cogeneration units and for substantially retrofitted cogeneration units, applicable in the following calendar year. |
The regulation was published on October 30, 2024. It will come into force on January 1, 2025. |
Regulation affects the level of revenue from the support scheme for the District Heating segment in 2025. |
|
| Draft Regulation of the Ministry of Climate and Environment on the maximum quantity and value of energy from high efficiency cogeneration covered by support and unit amounts of the guaranteed premium in the year 2025. |
The regulation indicates the maximum quantities and values of electricity from high-efficiency cogeneration supported and the unit amounts of the guaranteed premium in 2025. |
The regulation was published on October 31, 2024. It will come into force on January 1, 2025. |
Regulation affects the level of revenue from the support scheme for the District Heating segment in 2025. |

| Segments | Regulation | Regulation objectives | Latest conclusions and next stages |
Impact on PGE Group |
|---|---|---|---|---|
| Directive 2023/959 amending Directive 2003/87/EC establishing a scheme for greenhouse gas emission allowance trading within the Union and Decision (EU) 2015/1814 on the establishment and operation of the market stability reserve. |
Combating climate change. Development of investment incentives through a CO2 price signal to develop low-emission sources. |
The EC is currently implementing the reform of the ETS system. On April 4, 2024 an amendment to the Delegated Regulation on the rules for free allocation of allowances was published. The EC is currently working on an amendment to Implementing Regulation 2019/1842, which lays down rules for the application of Directive 2003/87/EC with regard to further arrangements for adjustments to the free allocation of emission allowances due to changes in activity levels (determination of the allowance allocation method). Consultation on a draft of this regulation is announced for the fourth quarter of 2024 and its adoption for the first quarter of 2025. The EC is finalising the revision of the implementing regulation 2018/2066 on monitoring and reporting of greenhouse gas emissions, with amendments scheduled for the fourth quarter of 2024. |
Increased competitiveness of renewable sources compared to generation assets using high emission fuels. Increase in operating costs for conventional generation of electricity and heat. Option to obtain investment support from the Modernisation Fund and Innovation Fund and additional free allocation of allowances to district heating. |
|
| Directive 2010/75/EU on industrial emissions (integrated pollution prevention and control – IED). |
Introduction of new requirements determining emission levels in the integrated permit, the rules for obtaining derogations from BAT requirements and giving new competences to the EC. Public participation in appeal proceedings will be increased. |
On July 15, 2024, Directive (EU) 2024/1785 of the European Parliament and of the Council amending Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (integrated pollution prevention and control) and Council Directive 1999/31/EC on the landfill of waste was published in the Official Journal of the EU and entered into force on the 20th day after publication. Member States have 22 months to implement the provisions into national law. |
The entry into force of the agreed solutions involves additional administrative costs due to the need to adapt the environmental management system (including in relation to the need to prepare a transformation plan). The role of the public in permitting and in monitoring the implementation of IED obligations by operators of installations will be enhanced. |
|
| Directive of the European Parliament and of the Council on corporate sustainability due diligence (CSDDD). |
To establish a framework that encourages companies to contribute to the pursuit of respect for human rights and environmental legislation in their operations and through their value chains. |
Directive (EU) 2024/1760 was published in the Official Journal of the EU on July 5, 2024 and entered into force on the 20th day after publication. The deadline for transposition of the directive was July 26, 2026. |
Increasing reporting obligations for PGE Group's value chain in terms of environmental impact and respect for human rights. Incorporating the due diligence policy on sustainability in the activities of the PGE Group. |

| Basic operational data of PGE Capital Group |
Gas-fired | Conventional | Railway Energy | ||||
|---|---|---|---|---|---|---|---|
| Renewables | Generation | Generation | District Heating | Distribution | Services | Supply | |
| Key assets of the segment |
21 wind farms 43 photovoltaic power plants 29 run-of-river hydro power plants 4 pumped-storage power plants, including 2 with natural flow |
1 gas-fired power plant1 |
5 conventional power plants 2 lignite mines |
16 CHP plants | 302.5 th km of distribution lines |
18.4 th km of distribution lines |
- |
| Installed capacity electricity/heat |
2 627 MWe/- | 1 366 MWe1 /- |
12392 MWe/958 MWt | 2477 MWe/5 976 MWt | - | - | - |
| Electricity volumes | Net electricity generation 0.63 TWh |
Net electricity generation 1.06 TWh |
Net electricity generation 10.48 TWh |
Net electricity generation 0.99 TWh |
Electricity distribution volume 8.78 TWh2 |
Electricity distribution volume 1.01 TWh; Sales to final off-takers 0.73 TWh |
Sales to final off-takers 7.57 TWh3 |
| Heat volumes | - | - | Net heat production 0.37 PJ |
Net heat production 3.26 PJ |
- | - | - |
| Market position | PGE Group is the largest electricity producer from RES with market share of approx. 6% (excluding co-combustion of biomass and bio-gas) |
Gryfino power plant - the largest gas-fired power plant in Poland |
PGE Group is a national leader in electricity and district heat generation |
Second domestic electricity distributor with regard to number of customers |
Leader of energy services for railway infrastructure and the largest distributor and seller of electricity to the traction grid |
Leader in wholesale and retail trading in Poland |
|
| 1 Unit no. 9 commissioned on August 14, 2Data for PGE Dystrybucja S.A. |
2024, unit no. 10 on October 18, 2024. |
3Data for PGE Obrót S.A.
| Key operating data | Unit | Q3 2024 |
Q3 2023 |
% change |
Q1-Q3 2024 |
Q1-Q3 2023 |
% change |
|---|---|---|---|---|---|---|---|
| Electricity generation, net | TWh | 13.16 | 13.10 | 0% | 40.67 | 41.12 | -1% |
| including RES generation | TWh | 0.59 | 0.46 | 28% | 2.05 | 1.90 | 8% |
| Sales of electricity outside the PGE Capital Group |
TWh | 17.59 | 20.24 | -13% | 51.38 | 59.58 | -14% |
| Sales of electricity to final off-takers1 | TWh | 8.30 | 8.49 | -2% | 25.34 | 25.96 | -2% |
| Heat production | PJ | 3.63 | 3.51 | 3% | 30.57 | 32.65 | -6% |
| Heat sales | PJ | 3.46 | 3.44 | 1% | 29.81 | 31.82 | -6% |
| Electricity distribution | TWh | 9.79 | 9.64 | 2% | 29.90 | 28.46 | 5% |
1After eliminating sales within the PGE Group, sales carried out mainly by PGE Obrót S.A. and additionally by PKP Energetyka Kolejowa S.A.
| Sales volume | Q3 2024 |
Q3 2023 |
% change |
Q1-Q3 2024 |
Q1-Q3 2023 |
% change |
|---|---|---|---|---|---|---|
| A. Sales of electricity outside the PGE Capital Group: |
17.59 | 20.24 | -13% | 51.38 | 59.58 | -14% |
| Sales to end-users1 |
8.30 | 8.49 | -2% | 25.34 | 25.96 | -2% |
| Sales on the wholesale and balancing market |
9.29 | 11.75 | -21% | 26.04 | 33.62 | -23% |
| B. Purchases of electricity from outside of PGE Group (wholesale and balancing market) |
5.32 | 7.67 | -31% | 13.93 | 21.06 | -34% |
| C. Net production of electricity in units of PGE Capital Group |
13.16 | 13.10 | 0% | 40.67 | 41.12 | -1% |
| D. Own consumption DSO, lignite mines, pumped storage power plants (D=C+B-A) |
0.89 | 0.53 | 68% | 3.22 | 2.60 | 24% |
1Sales carried out mainly by PGE Obrót S.A. and additionally by PGE Energetyka Kolejowa S.A.
The total volume of purchased and generated electricity is higher than the volume of electricity sold. The difference presented in point D results from the necessity to cover grid losses in the distribution business (DSO), consumption of energy at lignite mines and consumption of energy at pumped-storage power plants.
Lower energy sales on the wholesale market, including the balancing market, result from higher share of RES production. The lower purchase on the wholesale market is mainly the result of PGE Obrót's lower sales to end customers in the corporate client and large business segments, who tend to diversify energy sources, mainly with greater use of RES. At the same time, an increase was recorded in sales to the end customers as an effect of the recognition of electricity sales realised by PKP Energetyka Kolejowa S.A. in the first three quarters of 2024 that in the similar period of the previous year took place only in the second and third quarter (Railway Energy Services segment consolidated since April 3, 2023).
| Production volume | Q3 2024 |
Q3 2023 |
% change |
Q1-Q3 2024 |
Q1-Q3 2023 |
% change |
|---|---|---|---|---|---|---|
| NET ELECTRICITY PRODUCTION IN TWh, including: |
13.16 | 13.10 | 0% | 40.67 | 41.12 | -1% |
| Lignite-fired power plants | 7.94 | 7.13 | 11% | 22.93 | 21.95 | 4% |
| Coal-fired power plants | 2.54 | 4.21 | -40% | 8.85 | 10.82 | -18% |
| Including co-combustion of biomass | 0.01 | 0.01 | 0% | 0.03 | 0.01 | 200% |
| Gas-fired power plants | 1.06 | 0.00 | - | 1.50 | 0.00 | - |
| Coal-fired CHP plants | 0.34 | 0.40 | -15% | 2.11 | 2.67 | -21% |
| Gas-fired CHP plants | 0.55 | 0.59 | -7% | 2.53 | 2.90 | -13% |
| Biomass-fired CHP plants | 0.09 | 0.07 | 29% | 0.27 | 0.33 | -18% |
| Communal waste-fired CHP plants | 0.01 | 0.02 | -50% | 0.02 | 0.03 | -33% |
| Pumped-storage power plants | 0.15 | 0.32 | -53% | 0.73 | 0.89 | -18% |
| Hydroelectric plants | 0.06 | 0.07 | -14% | 0.33 | 0.34 | -3% |
| Wind power plants | 0.34 | 0.28 | 21% | 1.27 | 1.17 | 9% |
| PV plants | 0.08 | 0.01 | 700% | 0.13 | 0.02 | 550% |
| including RES generation | 0.59 | 0.46 | 28% | 2.05 | 1.90 | 8% |
The level of electricity generation in the three quarters of 2024 was 1% lower than in the first three quarters of 2023.
The slightly lower level of electricity generation in the PGE CG is mainly due to the high coverage of domestic demand by renewable sources and gas.
Lower production from coal-fired CHPs, gas-fired CHPs and biomass-fired CHPs (total decrease of 1.0 TWh) is the result of lower CHP production due to weather conditions (higher average temperatures).
Lower production in hard coal-fired power plants (total decrease of 2.0 TWh) took place at the Opole Power Plant (by 1.6 TWh) and the Dolna Odra Power Plant (by 0.3 TWh) and at the Rybnik Power Plant (by 0.1 TWh). The change was caused by lower average load factor of units at the Opole Power Plant (by 15 MW) and Dolna Odra Power Plant (by 5 MW). Opole and Dolna Odra power plants were in reserve downtime longer by 4 049 hours.
In addition, in total, all power plants remained under repair for 2 355 hours longer.
Lower production at pumped storage plants is due to lower use of the plant by PSE S.A.
Units at Gryfino Power Plant generated 1.5 TWh of electricity.
Higher generation at lignite-fired power plants (increase by 1.0 TWh) is due to higher production at Bełchatów Power Plant (increase by 1.6 TWh) caused by higher average load factor of units by 26 MW. At the same time, there was lower production at the Turów Power Plant (decline by 0.6 TWh), which operated with average load factor of units lower by 19 MW.
Higher production at wind farms due to better windiness in farm areas.
Higher photovoltaic generation is due to new capacity being commissioned.
Production at municipal waste-fired thermal power plants and hydroelectric power plants remained at the level of the comparable period.
Table: Net production of heat (PJ).
| Heat production volume | Q3 2024 |
Q3 2023 |
% change | Q1-Q3 2024 |
Q1-Q3 2023 |
% change |
|---|---|---|---|---|---|---|
| Net production of heat in PJ | 3.63 | 3.51 | 3% | 30.57 | 32.65 | -6% |
| Lignite-fired power plants | 0.29 | 0.28 | 4% | 1.58 | 1.68 | -6% |
| Coal-fired power plants | 0.08 | 0.08 | 0% | 0.43 | 0.44 | -2% |
| Coal-fired CHP plants | 1.12 | 2.35 | -52% | 20.69 | 23.19 | -11% |
| Gas-fired CHP plants | 1.56 | 0.62 | 152% | 5.83 | 6.03 | -3% |
| Biomass-fired CHP plants | 0.37 | 0.14 | 164% | 1.46 | 1.00 | 46% |
| CHP plants fuelled by municipal waste | 0.04 | 0.02 | 100% | 0.09 | 0.09 | 0% |
| Other CHP plants | 0.17 | 0.02 | 750% | 0.49 | 0.22 | 123% |

External temperatures contributed more than any other factor to lower net generation of heat in 2024 (y/y). The average temperatures in the three quarters of 2024 were by 1.1° C higher y/y, which translated into decreased production of heat.
In the third quarter of 2024 the heat sales volume in PGE Capital Group totalled 3.5 PJ and was higher by 0.1 PJ y/y.
In the three quarters of 2024 the heat sales volume in PGE Capital Group totalled 29.8 PJ and were lower by 2.0 PJ y/y. The above result was caused mainly by lower demand for heat due to the higher average outside temperatures than in 2023.
The best way to measure the profitability of energy companies is recurring EBITDA. This is a result before depreciation, amortization, income tax and financial activities, including interest from drawn debt. EBITDA makes it possible to compare the results of companies regardless of the value of their assets, level of debt and existing income tax rates. Additionally, recurring EBITDA is adjusted for one-offs.
PGE Group's consolidated EBITDA is composed of the financial results of each of its operating segments. The following segments have the largest share in the Group's recurring EBITDA for the third quarter of 2024: Distribution (47%), Conventional Generation (20%), Renewables (16%) and Railway Energy Services (12%). Supply segment negatively affects the Group's recurring EBITDA result, while other segments have an insignificant share in the result.
Chart: Recurring EBITDA of PGE Capital Group (PLN million)




Chart: Key factors affecting EBITDA in PGE Capital Group (in PLN million).

| EBITDA Q3 2023 |
Contribution to PDP fund1 |
Result on the sale of electricity at producers2 |
CO2 emission rights |
Fuel costs, other production materials, other |
Revenues from support of highly-efficient co-generation |
Revenues from ancillary services and Capacity Market3 |
Result on the sale of electricity to final customers4 |
Revenues from heat sales5 |
Margin on distribution services6 |
Personnel expenses7 |
Capitalised costs |
Provision for onerous contracts |
distribution services and on electricity to final customers Railway Energy Services |
Other8 | EBITDA Q3 2024 |
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Change | 1 124 | -2 475 | 992 | 641 | -31 | 228 | -581 | 54 | 178 | -182 | -38 | 198 | 37 | -141 | ||
| Reported EBITDA Q3 2023 |
2 458 | |||||||||||||||
| One-offs Q3 2023 | 8 | |||||||||||||||
| Recurring EBITDA Q3 2023 |
2 450 | 1 124 | 10 101 | 5 591 | 2 225 | 41 | 1 035 | 247 | 526 | 1 491 | 1 856 | 338 | 11 | 322 | 866 | |
| Recurring EBITDA Q3 2024 |
0 | 7 626 | 4 599 | 1 584 | 10 | 1 263 |
-334 | 580 | 1 669 | 2 038 | 300 | 209 | 359 | 1 007 | 2 454 | |
| One-offs Q3 2024 | 4 | |||||||||||||||
| Reported EBITDA Q3 2024 |
2 458 |
1Without impact of correction of estimated contribution to the fund for 2022 (one-off).
2Revenue from the sale of electricity reduced by the purchase cost of electricity.
3Including balancing service revenues.
4 Including compensations (without adjustment for previous years), margin adjustment on certificates at PGE Group; without additional estimation of the cost of the balancing difference.
5 Including compensations.
6 Including revenues from distribution services, compensations, transmission services (PSE), balance of transferred fees and costs of electricity purchased to cover balancing difference; without additional estimation of the cost of the balancing difference.
7Without impact of the change in the actuarial provision and Voluntary Leave Program (one-offs).
8Without LTC compensations, change in the reclamation provision ad write-down of receivables from PKP Cargo S.A. (one-offs).


Chart: Net change in cash (in PLN million).

| Cash and cash equivalents at January 1, 2024 |
Net cash from operating activities |
Proceeds from the issuance of shares of non controlling shareholders |
Purchase/sale of property, plant and equipment and intangible assets |
Balance of repayments/ inflows of loans, borrowings, bonds and finance lease |
Interest paid - loans, borrowings, bonds and financial instruments |
Other | Cash and cash equivalents at September 30, 2024 |
|
|---|---|---|---|---|---|---|---|---|
| Impact on level of cash |
14 619 | 37 | -7 375 | -3 937 | -573 | 70 | ||
| Cash and cash equivalents |
6 033 | 8 874 | ||||||


1 Estimated level of net economic debt (taking into account forward payment for CO2 emission rights) amounts to PLN 19 021 million.


From 2024 a Gas-fired Generation segment was established and the data of the Other Operations segment for the third quarter of 2023, which in previous reporting periods included companies transferred to the newly created segment, were adjusted for comparability.

This segment is involved in the generation of electricity from renewable sources and in pumped storage power plants.
The data presented below concerns the third quarter of 2024.

The Renewables segment is based mainly on revenues from the sale of electricity, however contrary to production at industrial plants within the Conventional Generation segment, this revenue is subject to a larger degree to changes in weather conditions and prices on the spot market due to the renewables sales model in place. Electricity output volume translates into production of property rights (green certificates) and revenue from the sale of energy origin certificates obtained by the segment's assets, excluding hydropower plants over 5 MWe.
Revenue from the Capacity Market, a mechanism introduced to prevent electricity shortages in the National Power System, constitutes a significant item in the segment's revenue, starting from 2021. Selected power plants in the Renewables segment receive fees for performing the capacity obligation (a Capacity Market Entity being on standby to supply electricity to the system and the obligation to supply specified capacity to the system when the system is under threat). Capacity Market revenue compensated for revenue from ancillary services. The readiness intervention reserve service was discontinued. Since mid-June 2024, the next phase of the Balancing Market reform has been implemented. As a result of the above reform, power plants have the possibility to offer balancing energy and balancing capacity. The new catalogue of balancing services includes: frequency maintenance reserve, frequency restoration reserve and replacement reserve. New balancing services are recognised as ancillary services revenue.
The significant cost items of the segment's operations are: use of energy to pump water at pumpedstorage plants, depreciation of segment assets and third-party services, mainly the repair and maintenance services. Property tax and labour costs also constitute a significant cost item in this segment.
Under the provisions of the Emergency Measures in 2023 Act, electricity generating entities were required to make a contribution to the Price Difference Payment Fund.

The PGE Capital Group's operations in renewable energy are managed by the PGE Energia Odnawialna S.A. Due to the profile of operations, the segment also includes companies from the Offshore area, which are responsible for all activities related to offshore wind energy.
Assets in the segment include:
Diagram: Main assets of the Renewables segment and their installed capacity.


| Type of power plant | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Pumped-storage power plants | 0.15 | 0.32 | -53% |
| Run-of-river hydro power plants | 0.06 | 0.07 | -14% |
| Wind farms | 0.34 | 0.28 | 21% |
| PV | 0.08 | 0.01 | 700% |
| Total | 0.63 | 0.68 | -7% |
Chart: Key changes of EBITDA in Renewables (in PLN million) – managerial perspective.

| EBITDA Q3 2023 |
Electricity revenues1 |
Certificates revenues |
electricity for pumped storage plants |
Ancillary services and Capacity Market2 |
Personnel costs3 |
PDP Fund | Other | EBITDA Q3 2024 |
|
|---|---|---|---|---|---|---|---|---|---|
| Change | -147 | 44 | 146 | 150 | -10 | 42 | -10 | ||
| Reported EBITDA Q3 2023 |
167 | ||||||||
| One-offs Q3 2023 | 0 | ||||||||
| Recurring EBITDA Q3 2023 |
167 | 480 | 4 | 208 | 68 | 47 | 42 | 88 | |
| Recurring EBITDA Q3 2024 |
333 | 48 | 62 | 218 | 57 | 0 | 98 | 382 | |
| One-offs Q3 2024 | -1 | ||||||||
| Reported EBITDA Q3 2024 |
381 |
1Electricity revenues include revenues from main generation technologies (wind, water, PV, pumped storage).
2 Including income from balancing services.
3Includes actuarial provision (one-off).

| One-offs | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Change in actuarial provision | -1 | 0 | - |
| Total | -1 | 0 | - |
Key factors affecting the y/y results of Renewables:
Table: Capital expenditures incurred in Renewables segment.
| PLN million | Q3 2024 | Q3 2023 | % change | |
|---|---|---|---|---|
| Investments in generating capacities, including: | 467 | 375 | 25% | |
| | Development | 346 | 337 | 3% |
| | Modernisation and replacement | 121 | 38 | 218% |
| Total | 467 | 375 | 25% |
The strategic goal of the PGE Group in the offshore energy area is to build at least 6.5 GW of capacity by 2040.
The group has 8 location permits for an offshore wind farms in the Baltic Sea. 5 proceedings (with a total capacity potential of 3.9 GW) were resolved in favour of the PGE Group in 2023 and 3 location permits were obtained by the Group in 2012, based on which it is preparing investments in the Baltic Sea with a total capacity of approx. 3.5 GW (including 2.5 GW in JO with Ørsted). Commissioning of the first project carried out jointly with Ørsted - Baltica 2 with a capacity of 1.5 GW is planned by 2030.
The Baltica 1 project (approximately 0.9 GW) is in the early stages of preparation for implementation. In the third quarter of 2024, the environmental report for the OWF area was submitted to the Regional Directorate for Environmental Protection and work was being carried out to prepare a transboundary impact report under the so-called Espoo procedure. Geotechnical studies and a post-validation campaign for wind measurements were also conducted. In July 2024, an agreement was also concluded with the contractor of the basic design for the power derivation from the installation (Energoprojekt-Katowice S.A.) and conceptual work began.
The Baltica 2 project (approximately 1.5 GW) is at an advanced stage of preparation for implementation. Key contracts for construction and installation works and the supply of components have already been concluded. During the third quarter of 2024, work was carried out under the contract for the construction of the power derivation system in the onshore section, for which a work order was issued on June 28, 2024. Work is currently underway on the construction of the foundations of the switchgear buildings of the Onshore Transformer Station.

The Baltica 3 project (approx. 1 GW) is under preparation for implementation. In the third quarter of 2024, the geotechnical documentation of the subsoil was completed and environmental surveys for migratory birds and bats were carried out in the area of the so-called buffer zone.
So far, projects with a total capacity of approx. 197 MW have been commissioned under the programme, including farms with capacity of 102 MW in the third quarter of 2024, with PV Jeziórko of 100 MW among others.
PV farm projects with a total capacity of approximately 228 MW continued in the third quarter of 2024, including PV Pokrzywnica (7 MW), where commissioning is planned for the fourth quarter of 2024, and PV Żółtańce (15 MW), PV Tyszki - Wądołowo (10 MW) and PV Jedlanka Stara (5 MW), where commissioning is planned for the first quarter of 2025.
On September 30, 2024, the commissioning of the last (fourth) hydroset was carried out. Thus, the implementation of the project was completed.
The scope of works includes the modernization of the technological part of the upper reservoir and the construction facilities of the waterway. The main works related to the modernisation of the upper reservoir and the fairway have been completed. Work on the technological part, i.e. the modernisation of the four hydrosets, will be carried out sequentially so that partial operation of the power station is possible. At present, dismantling work is starting for hydroset no. 3, after which the main modernisation work will be carried out. Design work is also continuing.

The segment's business is the generation of electricity in gas-fired sources.
The data presented below concerns the third quarter of 2024.

1 Managerial perspective.
The primary source of revenue for the Gas-Fired Generation segment is revenue from the sale of electricity on the wholesale market based on the price of electricity determined by supply and demand balancing mechanisms, taking into account the variable costs of generation. At the same time, the most significant cost items of the segment, by virtue of their size and volatility, and therefore impact on the operating result, are the costs of natural gas consumption and the costs of CO2 emission charges.
A significant item in the segment's revenue is revenue fromtheCapacity Market, a mechanism introduced to prevent a shortage of electricity in the NPS. The power plants are remunerated for the fulfilment of the capacity obligation (the Capacity Market unit's remaining ready to supply electricity to the system and its commitment to supply a certain capacity to the system during an emergency period). An additional item in the segment's revenue is revenue from for the provision of ancillary services.
The Gas-fired Generation segment will ultimately comprise 2 gas-fired power plants: the Gryfino Power Plant (2 units, each with an installed capacity of 683 MW) and the Rybnik Power Plant (1 unit with a capacity of 882 MW).
On March 4, 2024 unit no. 9 at the Gryfino Power Plant was synchronised with the NPS. On August 14, 2024 the unit was commissioned.
On May 22, 2024 unit no. 10 at the Gryfino Power Plant was synchronised with the NPS. On October 18, 2024 the unit was commissioned.

Diagram: Main assets of the Gas-fired Generation segment and their installed capacity.

Chart: Key changes of recurring EBITDA in Gas-fired Generation (in PLN million) – managerial perspective1 .

| Q3 2023 |
production2 | services and Capacity Market |
natural gas | CO2 | ZHZW3 | costs | Q3 2024 | ||
|---|---|---|---|---|---|---|---|---|---|
| Change | 490 | 43 | -402 | -20 | -6 | -16 | -6 | ||
| EBITDA Q3 2023 | -4 | 0 | 0 | 0 | 0 | 0 | 5 | -1 | |
| EBITDA Q3 2024 | 490 | 43 | 402 | 20 | 6 | 21 | 5 | 79 |
1Due to separation of the Gas-fired Generation segment from Other Operations segment data for Q3 2023 were restated for comparability.
2Managerial perspective.
3ZHZW – agreement for Commercial Management of Generation Capacities.

Key factors affecting EBITDA of Gas-fired Generation segment y/y:
Table: Data on production fuels consumption in Gas-fired Generation.
| Q3 2024 | Q3 2023 | |||||
|---|---|---|---|---|---|---|
| Rodzaj paliwa | Volume (m3 ths) |
Cost (PLN m) |
Volume (m3 ths) |
Cost (PLN m) |
||
| Gas | 174 279 | 402 | - | - | ||
| Total | 174 279 | 402 | - | - | ||
| Table: Data on CO2 costs in Gas-fired. |
||||||
| Dane dot. CO2 | Q3 2024 | Q3 2023 | % change | |||
| CO2 emission (tons) | 65 112 | - | - | |||
| Average CO2 costs (PLN/t CO2) | 302.26 | - | - |
Table: Capital expenditures incurred in Gas-fired Generation segment1
| PLN million | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Investments in generating capacities, including: | 819 | 199 | 312% |
| Development |
819 | 199 | 312% |
| Total | 819 | 199 | 312% |
1Segment separated from the Other Operations segments as from 2024.

| Aim of the project |
Budget | Expenditures incurred1 |
Capital expenditures in 9M 20241 |
Fuel/ Net efficiency |
Contractor | Investment completion date |
|---|---|---|---|---|---|---|
| Construction of two CCGT units at PGE Gryfino Dolna Odra sp. z o.o. |
PLN 4.3 bn | PLN 3.8 bn | PLN 592 m Natural gas / | Syndicate of companies: |
Unit no. 9 – August 14, 20242 |
|
| 63.2 % | General Electric (consortium leader) and Polimex Mostostal |
Unit no. 10 – October 18, 20242 |
||||
| Construction of gas-steam unit |
PLN 4.0 bn | PLN 1.2 bn | PLN 1 050 m Natural gas / | Syndicate of companies: |
December 2026 | |
| at Rybnik 2050 sp. z o.o. |
63.9 % | Polimex Mostostal S.A. (consortium leader), Siemens Energy sp. z o.o., Siemens Energy Global GmbH & Co. KG |
1 Expenditures incurred do not include financing costs and expenses in the form of advances paid to the General Contractor for the Investment and to the other contractors.
2 Completed

This segment includes lignite mining and generation of electricity in conventional sources.
The data presented below concerns the third quarter of 2024.

| Main revenue items |
PLN m | Main cost items | PLN m | |||||
|---|---|---|---|---|---|---|---|---|
| Sale of electricity1 | 6 249 | Electricity generation |
10.48 Twh | Fees for CO2 emissions | 4 316 | |||
| Capacity market | 603 | Personnel costs2 | 894 | |||||
| Revenues from ancillary services |
339 | Heat | Cost of production fuels used |
654 | ||||
| Sale of heat | generation | 0.37 PJ | External services | 518 | ||||
| Including contracted capacity and heat distribution |
30 | Depreciation and | 354 | |||||
| amortisation, liquidation, write-offs |
||||||||
| Main result items | PLN m | |||||||
| EBIT recurring | 144 | |||||||
| EBIT reported | -296 | |||||||
| EBITDA recurring | 484 | |||||||
| EBITDA reported | 58 | |||||||
1 Managerial perspective.
2Adjusted for one-offs.
The main source of revenue in the Conventional Generation segment is revenue from the sale of electricity on the wholesale market, based on electricity prices that are shaped by supply and demand mechanisms, taking into account the variable costs of generation. At the same time, the segment's key cost items, given their size and volatility, and thus their impact on operating results, are the fees for CO2 emissions and cost of production fuels, mainly hard coal. Lignite-based production, which is of key significance for the Group, is based on own mines, therefore its cost is relatively stable and reflected mainly in fixed-cost items, i.e. personnel costs, third-party services and depreciation.
Revenue from the Capacity Market, a mechanism introduced to prevent electricity shortages in the NPS, constitutes a significant item in the segment's revenue in 2021. PGE GiEK S.A.'s power plants receive fees for performing the capacity obligation (a Capacity Market entity being on standby to supply electricity to the system and the obligation to supply specified capacity to the system when the system is under threat). Capacity Market revenue compensated for revenue from ancillary services. The cold intervention reserve and operational capacity reserve services were discontinued, while revenue from capacity reallocation remained. Since mid-June 2024, the next phase of the Balancing Market reform has been implemented. As a result of the above reform, power plants have the possibility to offer balancing energy and balancing capacity. The new catalogue of balancing services includes: frequency maintenance reserve, frequency restoration reserve and replacement reserve.
In addition, this segment generates revenues from sales of heat produced at industrial plants.
Under the provisions of the Emergency Measures Act in 2023, electricity generating entities were required to make a contribution to the Price Difference Payment Fund.

Conventional Generation segment consists of: 2 lignite mines and 5 conventional power plants.
Conventional Generation segment is the leader of lignite mining (its share in the extraction market of this raw material accounting for 96%5 of domestic extraction), it is also the largest generator of electricity as it generates approx. 29%6 of domestic gross electricity production. The generation is based on lignite extracted from mines owned by the company as well as hard coal.
Diagram: Main assets of the Conventional Generation segment with their installed capacity.

| Main fuel types | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Hard coal | 2.53 | 4.21 | -40% |
| Lignite | 7.94 | 7.13 | 11% |
| Biomass | 0.01 | 0.01 | 0% |
| Total | 10.48 | 11.35 | -8% |
| Main fuel types | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Hard coal | 0.08 | 0.08 | 0% |
| Lignite | 0.29 | 0.28 | 4% |
| Total | 0.37 | 0.36 | 3% |
5 Own calculations based on data from Central Statistical Office of Poland.
6 Own calculations based on data from PSE S.A.

Chart: Key changes of recurring EBITDA in Conventional Generation (in PLN million) – managerial perspective.

| EBITDA Q3 2023 |
Electricity production -volume1 |
Electricity production - price1 |
Ancillary services and Capacity Market2 |
PDP Fund | Costs of fuel |
Costs of CO2 |
Costs of ZHZW3 |
Personnel costs4 |
Other5 | EBITDA Q3 2024 |
|
|---|---|---|---|---|---|---|---|---|---|---|---|
| Change | -708 | -2 178 | 30 | 958 | 1 049 | 1 008 | 75 | -9 | -51 | ||
| Reported EBITDA Q3 2023 |
310 | ||||||||||
| One-offs Q3 2023 | 0 | ||||||||||
| Recurring EBITDA Q3 2023 |
310 | 9 135 | 912 | 958 | 1 703 | 5 324 | 338 | 885 | 529 | ||
| Recurring EBITDA Q3 2024 |
6 249 | 942 | 0 | 654 | 4 316 | 263 | 894 | 580 | 484 | ||
| One-offs Q3 2024 | -426 | ||||||||||
| Reported EBITDA Q3 2024 |
58 |
1Managerial perspective.
2 Including revenue from balancing services.
3ZHZW – agreement for Commercial Management of Generation Capacities.
4 Personnel costs without impact of the change in actuarial provision and costs of Voluntary Leave Program (one-offs).
5 Item Other without impact of the change in reclamation provision (one-off).
Table: Data on one-offs in the Conventional Generation segment (PLN million).
| One-offs | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Change in reclamation provision | -410 | - | - |
| Change in actuarial provision | -14 | - | - |
| Costs of Voluntary Leave Program | -2 | - | - |
| Total | -426 | - | - |
Key factors affecting the EBITDA result of Conventional Generation segment on y/y basis:

production between PGE GiEK branches within the Balancing Market, which was mostly offset by revenue from new balancing services in the third quarter of 2024.

| Cost of fuels Q3 2023 |
Hard coal Hard coal price volume |
Biomass Biomass price volume |
Light and heavy oil volume |
Light and heavy oil price |
Cost of fuels Q3 2024 |
|||
|---|---|---|---|---|---|---|---|---|
| Change | -598 | -461 | 1 | -1 | 9 | 1 | ||
| Cost of fuels Q3 2023 |
1 703 | 1 664 | 4 | 35 | ||||
| Cost of fuels Q3 2024 |
605 | 4 | 45 | 654 |
Table: Data on use of production fuels consumption in Conventional Generation.
| Q3 2024 | Q3 2023 | |||||
|---|---|---|---|---|---|---|
| Fuel type | Volume (tons ths) |
Cost (PLN million) |
Volume (tons ths) |
Cost (PLN million) |
||
| Hard coal | 1 134 | 605 | 1 780 | 1 664 | ||
| Biomass | 5 | 4 | 4 | 4 | ||
| Fuel oil – light and heavy | 18 | 45 | 14 | 35 | ||
| Total | 654 | 1 703 |



| CO2 costs | |
|---|---|
| Q3 2024 | 4 316 |
Table: Data on CO2 costs in Conventional Generation.
| Data on CO2 | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Allocation of free allowances for CO2 emissions (tons) | 14 886 | 15 696 | -5% |
| CO2 emission (tons) | 11 740 668 | 12 270 343 | -4% |
| Average CO2 costs (PLN/t CO2) | 368.08 | 434.45 | -15% |
Table: Capital expenditures incurred in Conventional Generation segment
| PLN million | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Investments in generating capacities, including: | 182 | 349 | -48% |
| Development |
1 | 11 | -91% |
| Modernisation and replacement |
181 | 338 | -46% |
| Other | 21 | 32 | -34% |
| Total | 203 | 381 | -47% |

Core business of the District Heating segment includes production of electricity and heat from cogeneration sources as well as distribution of heat.
The data presented below concerns the third quarter of 2024.

As in the case of Conventional Generation, this segment's significant revenues are revenues from electricity sales, however, they are usually directly related to generation of heat which in turn depends on demand that is highly seasonal and depends on external temperatures. This is why, in contrast to industrial power plants in Conventional Generation, as a rule, CHP plants do not have any considerable impact on the development of prices for electricity on the wholesale market.
Revenues from the sale and distribution of heat are regulated revenues. Energy companies independently set tariffs and present them to the President of the Energy Regulatory Office (the "ERO President") for approval. Heat production at PGE Group takes place in cogeneration units, which tariffs for heat are calculated using a simplified approach (compared to tariffs based on a full cost structure), based on reference prices, conditioned on average sales prices for heat generated in units with specific fuel other than cogeneration units. They are published each year by the ERO President. Tariffs for heat production for cogeneration units in a given tariff year thus reflect changes in the costs of heat-generation units (not cogeneration units) in the previous calendar year. The cost approach is applied in the case of tariffs for heat distribution, which allows to cover justified costs (mainly the costs of heat losses and property tax) and a return on invested capital, in line with guidelines from the ERO President. Distribution tariffs for heat are in place at branches in Gorzów and Zgierz, as well as by KOGENERACJA S.A., PGE Toruń and Zielona Góra CHP.
Generation of heat and electricity is directly related to key variable costs of the segment, i.e. the cost of production fuel used (in particular, hard coal and gas) and the cost of fees for CO2 emissions.
Electricity production in high-efficiency cogeneration is additionally remunerated. CHP plants receive support at a level covering increased operating costs related to production. The support mechanism in the form of certificates is in place also for biomass-fired generating assets. This type of production is additionally remunerated by awarding origin certificates, i.e. green certificates, the sale of which generates additional revenue. Within the segment such revenues is obtained at Szczecin CHP plant and biomass unit in Kielce CHP.
Revenue from the Capacity Market, a mechanism introduced to prevent electricity shortages in the National Power System, constitutes a significant item in the segment's revenue. CHP plants receive fees for

performing the capacity obligation (a Capacity Market entity being on standby to supply electricity to the system and the obligation to supply specified capacity to the system when the system is under threat).
Weather conditions substantially affect the segment's results. Temperatures directly shape the level of heat demand. Simultaneously, the level of heat production determines the level of electricity production in cogeneration, which is an additional source of revenues that decisively affects the CHP plant's profitability.
Under the provisions of the Emergency Measures in 2023 Act, electricity generating entities were required to make a contribution to the Price Difference Payment Fund.
The following companies are included in the segment: PGE Energia Ciepła S.A., KOGENERACJA S.A., EC Zielona Góra S.A., PGE Toruń S.A., MEGAZEC sp. z o.o. and the district heating network in Gryfino.
Currently, the segment includes 16 combined heat and power plants.
District Heating is the largest heat producer in Poland. Generation is based mainly on hard coal and natural gas.
Diagram: Main assets of the District Heating segment and their installed capacity.

Due to the fact that the income on heat sales for CHP plant are tariffed as part of the so-called simplified method, they are characterised by a relative delay in the transfer of costs (annual or two-year). They are based on the year-to-year dynamics of average costs (including fuels used) incurred by entities that are not co-generation entities for the year preceding the time of tariff setting.


Source: ERO.
Charts: Changes in costs of fuels – hard coal (PLN/GJ) – PSCMI-2 7 and gas (PLN/MWh) - TGE.


Source: ARP, TGE.
Chart: Changes in price of CO2 emission rights8 (PLN/t).

Reflecting previous cost increases, the reference price of heat produced from hard coal increased by 60% in 2023. It is a base to the increase in heat prices for co-generation entities establishing the tariff during 2024. In 2024 the average market price of coal decreased by 35%, while the average price of CO2 emission rights decreased by 24% in comparison to 2023.
Tariffs for the production of heat from gas in 2024 are set based on an change in the reference price, whereas in 2024 gas prices are lower than in previous periods. Prices of gas in TGE forward contracts stood at approx. PLN 162/MWh (i.e. decrease by 59%).
7 PSCMI-2 Polish Steam Coal Market Index 2 - the average prices for pulverised coals sold on the domestic heating market.
8 Arithmetic average of the daily and monthly records in a given period (spot price).


| EBITDA Q3 2023 |
Heat production - volume |
Heat production - price1 |
Electricity production - volume |
Electricity production – price1 |
Capacity Market |
Revenues from support of highly efficient cogeneration |
PDP Fund Cost of fuel | Costs of CO2 |
Personnel costs2 |
Other3 | EBITDA Q3 2024 |
||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Change | 22 | 11 | -51 | 6 | 4 | -31 | 84 | 21 | 16 | 2 | -17 | ||
| Reported EBITDA Q3 2023 |
89 | ||||||||||||
| One-offs Q3 2023 |
3 | ||||||||||||
| Recurring EBITDA Q3 2023 |
86 | 534 | 676 | 45 | 41 | 84 | 463 | 342 | 159 | 162 | |||
| Recurring EBITDA Q3 2024 |
567 | 631 | 49 | 10 | 0 | 442 | 326 | 157 | 179 | 153 | |||
| One-offs Q3 2024 |
1 | ||||||||||||
| Reported EBITDA Q3 2024 |
154 |
1Value adjusted for costs of certificates redemption; data for Q3 2023 adjusted to current presentation - including heat price compensation.
2Personnel costs without taking into account of change in the actuarial provision (one-off).
3Item Other without taking into account the impact of changes in the LTC compensations and change in the reclamation provision (one-offs).
| One-offs | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Change in the reclamation provision | -2 | - | - |
| Change in the actuarial provision | -1 | - | - |
| LTC compensations | 4 | 3 | 33% |
| Total | 1 | 3 | -67% |
Key factors affecting the EBITDA result of District Heating segment on y/y basis:

Chart: Consumption costs of production fuels in District Heating (in PLN million).

| Costs Q3 2023 |
Hard coal volume |
Hard coal price |
Gas volume |
Gas price |
Biomass volume |
Biomass price |
Fuel oil and other raw materials volume |
Fuel oil and other raw materials price |
Costs Q3 2024 |
||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Change | -20 | -64 | -5 | 88 | 6 | -28 | 3 | -1 | |||
| Costs of fuel Q3 2023 |
463 | 222 | 184 | 50 | 7 | ||||||
| Costs of fuel Q3 2024 |
138 | 267 | 28 | 9 | 442 |
Table: Data on production fuels consumption in District Heating.
| Q3 2024 | Q3 2023 | ||||
|---|---|---|---|---|---|
| Fuel type | Volume | Cost | Volume | Cost | |
| (tons ths) | (PLN million) | (tons ths) | (PLN million) | ||
| Hard coal | 276 | 138 | 296 | 222 | |
| Gas (cubic metres ths) | 154 408 | 267 | 162 999 | 184 | |
| Biomass | 127 | 28 | 111 | 50 | |
| Fuel oil and other raw materials | - | 9 | - | 7 | |
| Total | 442 | 463 |


| Data on CO2 | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Allocation of free allowances for CO2 emissions (tons) | 37 911 | 47 274 | -20% |
| CO2 emission (tons) | 817 340 | 889 459 | -8% |
| 1 Average CO2 costs (PLN/t CO2) |
418,35 | 406,26 | 3% |
1 Managerial perspective.
Table: Capital expenditures incurred in District Heating segment.
| PLN million | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Investments in generating capacities, including: | 234 | 367 | -36% |
| Development |
109 | 259 | -58% |
| Modernisation and replacement |
125 | 108 | 16% |
| Other | 24 | 29 | -17% |
| Total | 258 | 396 | -35% |
The turnkey construction of the New Czechnica CHP plant, i.e. CCGT unit with a total gross capacity of 179 MWe and 163 MWt, heat accumulator and four water boilers with total capacity of 152 MWt, is in progress. The water boiler plant, which was commissioned on November 16, 2023, operates as a part of the district heating system of Siechnice and Wrocław. In the third quarter of 2024, commissioning work continued on the gas and steam unit, including the so-called hot start-up and the first firing of both gas turbines. The contractual deadline for completing the investment is the second quarter of 2024, but mediation is currently underway in this regard at the Arbitration Court at the General Prosecutor's Office of the Republic of Poland.

| Aim of the project |
Budget1 | Expenditures incurred1 |
Capital expenditures in 9M 20241 |
Fuel/ Net efficiency |
Contractor | Investment completion date |
|---|---|---|---|---|---|---|
| Construction of New Czechnica CHP Plant |
PLN 1.2 bn | approx. PLN 1 bn |
PLN 81 m | Gaz ziemny/ Kogeneracja 85% |
Syndicate of: Polimex Mostostal S.A. (Leader) / Polimex Energetyka sp. z o.o. |
Contractual date: Q2 2024 (mediation in progress) |
1 Expenditures incurred do not include financing costs and expenses in the form of advances paid to the General Contractor for the Investment and to the other contractors.

Core business of the segment includes supply of electricity to final off-takers through the grid and HV, MV and LV infrastructure.
The data presented below concerns the third quarter of 2024.

1 Managerial perspective
2 Adjusted for one-offs
ERO President every year at company request what means that it is regulated. The tariff takes into account reasonable operating costs related to the distribution system operator's activities, depreciation costs, costs of taxes on distribution assets, costs related to the necessity to cover network losses on electricity distribution or the purchase of transmission services from the TSO. At the same time, the tariff reflects the costs transferred in fees such as the RES fee, the transition fee, the co-generation fee and the capacity fee.
The key element shaping the Distribution segment's result is return on company's invested capital. For this purpose, the so-called Regulatory Asset Base (RAB) is determined and calculated on the basis of incurred investment costs including depreciation of assets. The RAB is the basis for calculating the return on capital employed, using the weighted average cost of capital (WACC), which is determined by the ERO President in the tariff process. It is within the competence of the ERO President to differentiate the remuneration from capital employed, taking into account the prioritisation of the DSO's development objectives, so that priority investment projects can be remunerated using an additional reinvestment bonus mechanism. In addition, return on capital depends on the achievement of individual quality targets set by the ERO President for performance indicators including: interruption time, interruption frequency and connection time for years 2018-2025.
As part of the government's Solidarity Shield, a package of laws was adopted in 2022 to protect consumers, including with respect to the pricing of electricity distribution services. Under its terms, for some eligible customers, within certain limits, the prices of electricity distribution services in 2023 were frozen at the 2022 price level, which was in force until the end of June 2024. As a result of the entry into force of the Energy Voucher Act from July 1, 2024, prices for electricity distribution services have been unfrozen, with the result that rates from the current tariff apply. DSOs are entitled to compensation to cover the application of reduced prices for distribution services. The compensation is the difference in the electricity distribution service charges between the 2024 tariff and the 2022 tariff up to the maximum limit. The entity responsible for the payment of compensation is the company Zarządca Rozliczeń S.A. As a result of the entry into force of the Energy Voucher Act from July 1, 2024 the settlement deadline for compensation for 2023 was also postponed from June 30, 2024 to October 31, 2024.

PGE Dystrybucja S.A. operates in the area9 of 129 938 sq. km and delivers electricity to approximately 5.8 million customers.
Diagram: Area of PGE distribution grid.

| Tariff | Q3 2024 |
Q3 2023 |
% change |
|---|---|---|---|
| A tariff group | 1.32 | 1.28 | 3% |
| B tariff group | 3.65 | 3.57 | 2% |
| C+R tariff groups | 1.49 | 1.47 | 1% |
| G tariff group | 2.32 | 2.32 | 0% |
| Total | 8.78 | 8.64 | 2% |
Table: Number of customers according to power take-off points.
| Tariff | September 30, 2024 | September 30, 2023 | % change |
|---|---|---|---|
| A tariff group | 158 | 145 | 9% |
| B tariff group | 14 509 | 13 921 | 4% |
| C+R tariff groups | 476 484 | 475 151 | 0% |
| G tariff group | 5 286 309 | 5 218 941 | 1% |
| Total | 5 777 460 | 5 708 158 | 1% |
9 The area of municipalities in which PGE Dystrybucja S.A. operates.


| EBITDA Q3 2023 |
Electricity distribution volume |
Network losses1 |
Revenues from connection fees |
Other revenue from distribution services |
Real estate tax | Personnel costs2 |
Other | EBITDA Q3. 2024 |
|
|---|---|---|---|---|---|---|---|---|---|
| Change | 28 | 86 | -25 | 69 | -11 | -41 | 35 | ||
| Reported EBITDA Q3 2023 |
1 001 | ||||||||
| One-offs Q3 2023 | 0 | ||||||||
| Recurring EBITDA Q3 2023 |
1 001 | 1 754 | 366 | 69 | 89 | 127 | 404 | -5 | |
| Recurring EBITDA Q3 2024 |
1 782 | 280 | 44 | 158 | 138 | 445 | 30 | 1 142 | |
| One-offs Q3 2024 | -12 | ||||||||
| Reported EBITDA Q3 2024 |
1 130 |
1Adjusted for revenues from the Balancing market.
2Personnel costs without impact of the change in the actuarial provision (one-off).
Table: Data on one-offs in Distribution (PLN million).
| One-off | Q3 2024 |
Q3 2023 |
% change |
|---|---|---|---|
| Change in actuarial provision | -12 | 0 | - |
| Total | -12 | 0 | - |
Key factors affecting results of Distribution segment y/y:

Table: Capital expenditures incurred in Distribution segment.
| PLN million | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Investments in generating capacities, including: | 767 | 1 086 | -29% |
| Development |
371 | 432 | -14% |
| Modernisation and replacement |
396 | 654 | -39% |
| Total | 767 | 1 086 | -29% |
The Customer Connection Program to the distribution network was implemented, under which in the third quarter of 2024 expenditures were incurred in the amount of PLN 328 million.
The objective of the Programme is the construction of a modern Special Communications Network in the LTE450 technology for the provision of services such as critical communication, control of energy infrastructure and remote reading for PGE Dystrybucja S.A. The entity responsible for the execution of this task within the PGE Capital Group is PGE Systemy S.A.
In the third quarter of 2024, in accordance with the framework schedules resulting from the concluded contracts, implementation work continued in the main project streams covering the deployment of further components of the CORE core network, the RAN radio network and the backbone telepresence network. In the CORE project, work related to the testing and acceptance of the Test Environment and the installation of equipment dedicated to the Production Environment was carried out. In the RAN project, works related to the commissioning of the OSS surveillance system were carried out. In the Teletransmission project, the implementation of synchronisation sources was completed and further implementation work was carried out. In parallel, the modernisation of towers belonging to PGE Dystrybucja S.A. dedicated to the installation of base stations of the system continued.
The final selection of the Contracting Authority in two public tenders for the purchase of Power Systems and for the lease of space on commercial operators' towers to complement the backbone of the LTE450 network under construction has been published.
The input documents to the National Recovery Plan proposal for co-financing the implementation of LTE450 were updated and documents were submitted to the Ministry of State Assets.
The launch of the LTE450 service is planned for the second quarter of 2025 and the full coverage of the PGE Dystrybucja S.A. operating area by the end of second quarter of 2026.
In the third quarter of 2024 PGE continued to implement its cabling program for medium-voltage (MV) grids up to the level of 30% of MV networks owned by PGE Dystrybucja S.A., incurring expenditures in amount of PLN 84 million.
4 555 kms of MV cable lines were completed from the start of the Program in 2019.
This project implementation is mandatory and results from the requirements imposed on Distribution System Operators (DSO) by the legislator in the amended Energy Law. In the third quarter of 2024, the tasks with a value of PLN 125 million were realized in order to:
According to the provisions of the law, the DSO until December 31, 2028 is to install remote reading meters connected to a remote reading system at power take-off points, representing at least 80% of the total number of end-customer energy consumption points.

The aim of the NCB Program is the implementation of a comprehensive, central IT solution to support key business processes at PGE Group being performed by PGE Obrót S.A. and PGE Dystrybucja, consisting of two billing systems – separate for each of the companies – and a CRM system for PGE Obrót S.A. The entity responsible for the execution of this task within the PGE Capital Group is PGE Systemy S.A.
In the third quarter of 2024 implementation works of the pilot stage were continued, covering selected local billing systems. At the same time, as part of dedicated accompanying projects included in the Programme, works were carried out to ensure the necessary integration of the new solution with other components of the IT environment in the PGE Capital Group. In the stream dedicated to the adaptation of PGE CG's IT environment to the requirements of the Central Energy Market Information System (CSIRE), work was started in the communication module in preparation for the pilot at PSE S.A. The initial feeding of CSIRE was carried out in October 2024.
the start of the system within the pilot phase is planned for the fourth quarter of 2024, and completion of key tasks under the NCB Program in 2025.

The segment include activities by the PGE Capital Group mainly in field of distribution and sale of electricity to railway operators and customers functioning within the railway system, the sale of fuels, as well as the maintenance and modernisation of overhead contact line network, together with other ancillary services.
The data presented below concerns the third quarter of 2024.

One of the primary sources of revenue in the Railway Energy Services segment is the sale of electricity. This revenue is derived from the supply of energy to railway operators and entities connected to the segment's distribution network. Rail operators are additionally the recipients of fuel sales services.
Another important source of revenue is the revenue form the distribution of electricity. Similarly to the Distribution segment, this revenue is subject to applicable regulations and based on a tariff approved by the ERO President. In principle, this tariff ensures a transfer of reasonable costs and a return on the capital invested in the distribution network. The activities of the Railway Energy Services segment as a distribution network operator are limited to the areas along railway lines throughout the country.
The most significant cost items of the segment include the purchase of the distribution services, as well as the purchase of electricity and fuels for resale.
The scope of the Railway Energy Services segment's activities comprises works related to the maintenance of the overhead contact line network and the performance of local modernisation works on this network. The segment also provides power engineering services outside the ranges of the overhead contact line network, such as equipment maintenance, as well as the construction and maintenance of railway traffic control systems. In this type of activity, the most significant costs are personnel costs.
Additionally, on the basis of the provisions of the Act of December 7, 2023 amending the acts to support consumers of electricity, gas fuels and heat, the system of compensation for trading companies for the application of capped prices and discounts was extended until June 30, 2024. In addition, as a result of the Act of May 23, 2024 on the energy voucher and amendments to other acts, from July 1, 2024, maximum prices for households, SMEs and local authorities were introduced.

The main part of the segment's assets consists of electricity distribution assets held by PGE Energetyka Kolejowa SA. Among other elements, these assets include 544 overhead contact line network substations supplying power to railway lines throughout the country. The total length of the company's network lines is 18.4 thousand kilometres. The network serves approximately 57 thousand customers.
| Tariff | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| B tariff group | 0.69 | 0.68 | 1% |
| C+R tariff groups | 0.02 | 0.03 | -33% |
| G tariff group | 0.02 | 0.01 | 100% |
| Total | 0.73 | 0.72 | 1% |
Table: Number of retail sale customers by power take-off points.
| Taryfy | September 30, 2024 |
September 30, 2023 |
% change |
|---|---|---|---|
| B tariff group | 294 | 314 | -6% |
| C+R tariff groups | 7 302 | 8 147 | -10% |
| G tariff group | 29 863 | 27 683 | 8% |
| Total | 37 459 | 36 144 | 4% |
| Tariff | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| B tariff group | 0.89 | 0.87 | 2% |
| C+R tariff groups | 0.11 | 0.11 | 0% |
| G tariff group | 0.01 | 0.02 | -50% |
| Total | 1.01 | 1.00 | 1% |
Table: Number of distribution customers by power take-off points.
| Tariff | September 30, 2024 |
September 30, 2023 |
% change |
|---|---|---|---|
| B tariff group | 670 | 637 | 5% |
| C+R tariff groups | 25 887 | 25 907 | 0% |
| G tariff group | 30 181 | 27 946 | 8% |
| Total | 56 738 | 54 490 | 4% |

Chart: Key changes of recurring EBITDA in Railway Energy Services (in PLN million) – managerial perspective.

| Q3 2023 | distribution1 | operations2 | Q3 2024 | ||||
|---|---|---|---|---|---|---|---|
| Change | -128 | 40 | 67 | -12 | -37 | ||
| Reported EBITDA Q3 2023 | 356 | ||||||
| One-offs Q3 2023 | 0 | ||||||
| Recurring EBITDA Q3 2023 | 356 | 379 | 40 | 71 | 129 | 75 | |
| Recurring EBITDA Q3 2024 | 251 | 0 | 138 | 141 | 38 | 286 | |
| One-offs Q3 2024 | -8 | ||||||
| Reported EBITDA Q3 2024 | 278 |
1 Excluding the costs of transmission services from PSE S.A., including compensation revenues, connection revenues, resumption of supplies and adjusted for the cost of the balancing difference.
2Other activities mainly concern the sale of fuel and traction services.
3Adjusted for one-offs.
Table: Data on one-offs in Railway Energy Services segment (PLN million).
| One-offs | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Recognition of write-down of receivables from PKP Cargo S.A. |
-6 | 0 | - |
| Change in actuarial provision | -2 | 0 | - |
| Total | -8 | 0 | - |
Key factors affecting results of Railway Energy Services segment y/y:

Table: Capital expenditures in Railway Energy Services segment
| PLN million | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Investment in generation capacities, including: | 100 | 274 | -64% |
| Development |
76 | 254 | -70% |
| Modernisation and replacement |
24 | 20 | 20% |
| Total | 100 | 274 | -64% |
The MUZa programme was continued, that is being implemented on the basis of the "Agreement on the principles of establishing a connection to the distribution network" entered into with PKP Polskie Linie Kolejowe S.A. (PKP PLK) and its objectives are the following:
On the part of the Railway Energy Services segment, the programme consists in the modernisation and construction of overhead contact line network substations in accordance with the agreements for network connections entered into with PKP PLK. In the third quarter of 2024 expenditures incurred amounted to PLN 46 million. Since the start of the programme in 2012, 296 connection agreements were signed, of which 264 were completed.
On July 29, 2024 a term loan agreement in amount of PLN 1 billion was signed with the European Investment Bank for financing of MUZa Program.
The program for connecting new customers to the distribution network was realised, under which expenditures of PLN 14 million were incurred in the third quarter of 2024.
Project aimed at installing remote reading balancing meters (Balancing Systems Installation – BSI ) was continued. The implementation of the project is mandatory under the requirements imposed on DSOs by the Legislator in the Energy Law of May 20, 2021. The deadline for the completion of the task is determined for December 31, 2025. In the third quarter of 2024, tasks were carried out aimed at:
Expenditures of PLN 13 million were incurred in the third quarter of 2024 for third project.

Supply segment activities include Group's wholesale and retail trading of electricity. Wholesale trading includes mainly electricity trading on behalf of and for Conventional Generation segment, District Heating segment and Renewables segment.
The data presented below concerns the third quarter of 2024.

As part of retail-market activities, the key source of segment's revenue is sale of electricity to final customers. This is sale to business and institutional clients, which constitutes almost 70% of the sales volume, and to retail clients. The segment's revenue also includes the sale of natural gas and fuels, mainly: pulverised coal and coarse coal, which is sold by PGE Paliwa sp. z o.o.
Additionally, on the basis of the provisions of the Act of December 7, 2023 amending the acts to support consumers of electricity, gas fuels and heat, the system of compensation for trading companies for the application of capped prices and discounts was extended until June 30, 2024. In addition, as a result of the Act of May 23, 2024 on the energy voucher and amendments to other acts, from July 1, 2024, maximum prices for households, SMEs and local authorities were introduced.
Electricity sales are matched by the costs to purchase electricity on the wholesale market and costs to redeem certificates as part of the support system for renewable sources and energy efficiency.
As part of the activities on the wholesale market, CO2 purchases are made for the needs of the Conventional Generation and District Heating segments, which is reflected both in terms of costs and revenues. At the same time, a significant revenue item is the provision of services to the Group's companies related to the management of purchases and sales of electricity and related products.
The Supply segment also incurs costs related to the operations of the Group's corporate centre.

Table: Volume of electricity sales to final off-takers (TWh)1 .
| Tariffs | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| A tariff group | 1.07 | 1.35 | -21% |
| B tariff group | 2.86 | 2.83 | 1% |
| C+R tariff groups | 1.44 | 1.43 | 1% |
| G tariff group | 2.20 | 2.16 | 2% |
| Total | 7.57 | 7.77 | -3% |
1Data for PGE Obrót S.A.
Table: Number of customers according to power take-off points1 .
| Tariffs | September 30, 2024 | September 30, 2023 | % change |
|---|---|---|---|
| A tariff group | 144 | 163 | -12% |
| B tariff group | 11 082 | 11 200 | -1% |
| C+R tariff groups | 396 509 | 420 436 | -6% |
| G tariff group | 5 287 778 | 5 215 422 | 1% |
| Total | 5 695 513 | 5 647 221 | 1% |
1Data for PGE Obrót S.A.
Chart: Key changes of EBITDA in Supply (in PLN million) – managerial perspective.

| -400 | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| EBITDA Q3 2023 |
Result on electricity - volume1 |
Result on electricity - price1 |
Revenues from services provided to other segments of the PGE Group2 |
Result on sale of gas and other fuels |
Result on sale of CO2 |
Personnel costs3 |
Other4 | EBITDA Q3 2024 |
|
| Change | -14 | -567 | -60 | 33 | 23 | -53 | 127 | ||
| Reported EBITDA Q3 2023 | 387 | ||||||||
| One-offs Q3 2023 | 5 | ||||||||
| Recurring EBITDA Q3 2023 | 382 | 247 | 418 | 9 | -17 | 159 | -116 | ||
| Recurring EBITDA Q3 2024 | -334 | 358 | 42 | 6 | 212 | 11 | -129 | ||
| One-offs Q3 2024 | 450 | ||||||||
| Reported EBITDA Q3 2024 | 321 |
1Item without taking into account the adjustment of electricity compensation revenues for previous years (one-off).
2This item does not include the margin on CO2 transactions with PGE Group companies E.
3Item without taking into account impact of the change in actuarial provision (one-off).
4Item without taking into account correction of the contribution to the PDP Fund for 2022 in PGE Obrót S.A. (one-off).

Table: Data on one-offs in Supply segment (PLN million).
| One-offs | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Correction of estimated contribution to Price Difference Payment Fund for 2022 at PGE Obrót |
- | 5 | - |
| Adjustment of electricity compensation revenues for previous years |
452 | - | - |
| Actuarial provision | -2 | - | - |
| Total | 450 | 5 | 8 900% |
Key factors affecting EBITDA of Supply segment y/y:

The activities of the segment include the provision of comprehensive services in the field of management of combustion by-products ("UPS"), provision of services in auxiliary areas for electricity and heat producers and the supply of materials based on UPS.
The data presented below concerns the third quarter of 2024.

Segment includes companies: PGE Ekoserwis S.A. and ZOWER sp. z o.o. On October 2, 2023, PGE Ekoserwis S.A. acquired the company EPORE S.A., which had previously belonged to the segment.
The management of combustion by-products at PGE Group turns waste into high-value substances that are used in other branches of economy (cement industry, construction, road-building, mining) and thus reduces the volume of ultimate waste generated.
The main revenue source in the Circular Economy segment is revenue from the economic use of combustion by-products, which includes revenue from the sale of products manufactured on the basis of combustion by-products in internal production processes and the sale of services related to the management of combustion by-products. The level of revenue depends on multiple factors, including commercial potential for selling combustion by-products, in processed and unprocessed form, seasonality of industries purchasing combustion by-products, seasonality of suppliers of combustion by-products (power plants, combined heat-and-power plants), volumes collected, efficiency of production infrastructure, capabilities for storing combustion by-products as materials inventories intended for production, as well as market conditions.
Revenue from other services includes revenue from the sale of continuous and ad hoc services provided to electricity and heat producers, including the operation of ash handling systems and equipment, operation of technological lines, operation of mill facilities and operation of fuel and combustion by-product storage sites.

Chart: Key changes in recurring EBITDA in Circular Economy segment (in PLN million) – managerial perspective.

| EBITDA Q3 2023 |
Revenues from sale of combustion by-products |
Revenue from sale of services |
Personnel costs |
External services |
Value of goods and materials sold |
Other | EBITDA Q3 2024 |
|
|---|---|---|---|---|---|---|---|---|
| Change | 22 | 7 | -4 | -3 | -5 | -1 | ||
| EBITDA Q3 2023 | 21 | 53 | 34 | 31 | 19 | 11 | 5 | |
| EBITDA Q3 2024 | 75 | 41 | 35 | 22 | 16 | 6 | 37 |
Key factors affecting EBITDA of Circular Economy segment y/y:

Core activities of the segment include provision of services to PGE Capital Group, inter alia organisation of capital raising in form of Eurobonds (PGE Sweden), provision of IT services.
The segment also includes the company PGE Ventures sp. z o.o., which is responsible for investments in startups at every stage of the investment cycle: from projects in the earliest phase of development, through projects in the early growth phase, to mature start-ups in the late growth and expansion phase.
The data presented below concerns the third quarter of 2024.

Chart: Key change in recurring EBITDA in Other Operations segment (in PLN million) – managerial perspective1 .

EBITDA Q3 2024 134 76 14 21 23 1Due to the separation of the Gas-fired Generation segment from the Other Operations segment, data for the third quarter of 2023 have been adjusted for comparability.
EBITDA Q3 2023 35 84 38 6 5

Key factors affecting EBITDA of Other Operations segment y/y:
Table: Capital expenditures incurred in Other Operations segment1
| PLN million | Q3 2024 | Q3 2023 | % change |
|---|---|---|---|
| Investments in generation capacities, including: | 50 | 28 | 79% |
| Modernisation and replacement |
50 | 28 | 79% |
| Total | 50 | 28 | 79% |
1Due to the separation of the Gas-fired Generation segment from the Other Operations segment, data for the third quarter of 2023 have been adjusted for comparability.

A detailed description of the changes in the composition of the Management Board and the Supervisory Board can be found in p. 1.4 of this report.
The discontinuation of Conventional Generation's operations based on coal combustion results from the strategy of the PGE Capital Group, which assumes climate neutrality by 2050. The spin-off coal assets will bring measurable benefits for the Group, among others, in the following areas:
All the above actions, in the opinion of the Management Board, will increase the attractiveness of the Company for shareholders.
On May 9, 2024, a team was set up by order of the Minister of State Assets with a view to spinning off coal assets from energy sector enterprises in which the State Treasury holds shares.
The team's tasks include:
In the second quarter of 2024, the aforementioned team started works.
At the same time, PGE S.A. together with its advisor PwC Advisory sp. z o.o. started work on a new concept for the separation of coal assets, taking into account current economic and market conditions.

In the opinion of the PGE Capital Group, as at the reporting date, the conditions of IFRS 5 concerning operations held for sale regarding assets and liabilities as well as revenue and expenses for the described coal-fired units are not met.
Consequently, as at September 30, 2024, assets related to PGE GiEK S.A. are not reclassified to discontinued operations. PGE S.A. also did not make adjustments bringing the value of assets related to PGE GiEK S.A. to the values required by IFRS 5. The values of assets, liabilities, revenue, costs and results of the Conventional Generation segment, showing the data for PGE GiEK S.A. and its subsidiaries, are presented in note 6.1 to the financial statements.
The book value of the consolidated net assets of PGE GiEK S.A. and its subsidiaries was PLN 303 million on September 30, 2024. The book value of the shares of PGE GiEK S.A. in the stand-alone financial statements was PLN 0 on September 30, 2024.
Due to the electricity market crisis, the legislator decided to introduce regulations that temporarily introduced exceptional solutions for electricity prices and tariffication in 2023. On October 18, 2022, the Act of October 7, 2022, on special measures to protect electricity consumers in 2023 in connection with the situation on the electricity market (Act for Households) entered into force and, the Act of October 27, 2022 on Emergency Measures in 2023 aimed at capping electricity prices and supporting certain consumers (Act on Emergency Measures in 2022) in entered into force on November 4, 2022.
Pursuant to the Act for households, in 2023 an electricity trading company was required to apply to the aforementioned households customers prices equal to those contained in the tariff in force on January 1, 2022 for individual tariff groups up to certain consumption limits. On the other hand, once the Act of August 16, 2023 amending the Act for Households entered into force, the consumption limits for each category of customer were increased by an additional 1MWh. Once the consumption limits for household consumerswere exceeded, a maximum price of PLN 693/MWh (price excluding VAT and excise duty) was used for billing offtakers in households in accordance with the Emergency Measures Act in 2023. This means that electricity prices have been fixed by law and therefore in 2023 the tariffs approved by the President of the Energy Regulatory Office did not have a direct impact on electricity prices for households.
Additionally, in accordance with the Emergency Measures Act in 2023, the maximum electricity price for other eligible customers was set at PLN 785/MWh (price excluding VAT and excise duty). After the Act of August 16, 2023 amending the Act for households and certain other acts entered into force, the maximum price was, similarly to that for households, PLN 693/MWh. This price, in principle, applied from December 1, 2022, however, the changed amount applied from October 1, 2023 to December 31, 2023. The maximum price limit for eligible customers also applied to electricity sales agreements concluded or amended after February 23, 2022, in which case the maximum price also applied to settlements for the period from the date of conclusion or amendment of these agreements until November 30, 2022. Electricity companies were required to make systematic refunds resulting from the application of the maximum prices until the end of 2023.
Electricity trading companies, in accordance with the implemented regulations, was entitled to compensation for applying electricity prices in their settlements with household customers at the same level as on January 1, 2022. The compensation was the product of the electricity consumed at the point of consumption, up to the maximum consumption limits entitling customers to apply to them the prices from 2022 and the difference between the price of electricity resulting from the electricity tariff approved by the President of the Energy Regulatory Office for 2023 and the electricity prices approved in the tariff for 2022. In turn, for applying the maximum price of PLN 693/MWh in settlements with household customers, trading companies were entitled to compensation in the amount of the product of the volume of electricity consumed in a given month and the difference between the reference price and the maximum price, for each energy point. The reference price was the price of electricity resulting from the electricity tariff approved by the President of URE for 2023. Compensation is also due for the use of maximum prices in settlements with other eligible entities. In this case, in principle, the reference price for compensation payments was calculated on the basis of electricity prices in exchange contracts and the prices of electricity purchased for sale to eligible customer, plus the cost of redemption of energy certificates of origin and a margin.
The mechanisms introduced in the Act for Households and the Emergency Measures in 2023 Act should as a rule compensate trading companies for the price reduction.
In accordance with the provisions of the Act of December 7, 2023 on amending laws to support consumers of electricity, gaseous fuels and heat, which came into force on December 31, 2023 (the Act for 2024), the mechanisms for freezing tariff prices and the maximum price were extended until June 30, 2024.

On June 13, 2024 the Act on energy vouchers entered into force. It regulates electricity prices from July 1, 2024 to December 31, 2024. The Act imposed an obligation on electricity traders to submit an application to change the existing tariff for 2024 within seven days of the entry into force of the corresponding Act or at the request of the President of the ERO. The revised tariff applies from July 1, 2024 to December 31, 2025. In a decision dated June 28, 2024, the President of the Energy Regulatory Office approved a change in the electricity tariff of PGE Obrót S.A. for the period from July 1, 2024 to December 31, 2025. The approved price of electricity for the G11 tariff group is PLN 628/MWh. The Act also provides for an extension of the period for the functioning of the capped electricity price mechanism. This price applies in the second half of 2024 and was set at PLN 500/MWh for household consumers, and at PLN 693/MWh for local government units and public institutions (including schools, hospitals, social welfare units), as well as micro, small and mediumsized entrepreneurs.
If the tariff approved by the ERO President is higher than the capped price for households, household customers will be billed according to the capped price of PLN 500/MWh. By virtue of the application of a capped price in settlements with customers, trading companies will be entitled to compensation amounting to the difference between the tariff price in force from July 1, 2024 and the capped price. Electricity customers who have concluded contracts for the sale of electricity with a dynamic price have been excluded from the possibility of taking advantage of the capped price.
In the three quarters of 2024, compensation revenue amounted to PLN 2 939 million. The amounts of compensation received by the sales companies were intended to compensate for the losses these entities suffered due to the price freeze.
The above values concerning due compensation are estimates determined in accordance with the best knowledge available to the PGE Capital Group as at the date of the preparation of this report.
On November 19, 2024, the Council of Ministers adopted a draft law amending the Act on Emergency Measures in 2023 and 2024 and certain other laws, which was sent to the Sejm on the same day. The draft envisages maintaining the maximum price at the level of PLN 500/MWh for household consumers until September 30, 2025. At the same time, the maximum prices for other energy consumers, i.e. local government units and public utility entities (including schools, hospitals, social welfare units), as well as micro, small and medium-sized entrepreneurs, are not expected to be maintained from January 1, 2025. In addition, the proposed law requires electricity traders to apply for a change to the tariff in force until December 31, 2025 by April 30, 2025, which may result in a reduction of the price of electricity in the tariff in several months of 2025. If the application of the maximum price for household customers is not extended beyond September 30, 2025, the price of electricity set in the tariff approved by the President of the ERO will be used for settlements with these customers as of October 1, 2025
From December 1, 2022 PGE Group's financial position was also affected by the provisions of the Emergency Measures in 2023 Act, which provide for the requirement to make monthly contributions to the account of the Price Difference Payment Fund (PDP Fund) by electricity producers and power companies that are engaged in the business of electricity trading. The contribution to the PDP Fund was the product of the volume of electricity sales and the positive volume-weighted average difference of the market price of electricity sold and the volume-weighted average of the price cap of electricity sold, as regulated in the Regulation of the Council of Ministers of November 8, 2022 on the method of calculating the price cap.
A different way of calculating the price cap has been defined for individual generation sources:
For electricity trading companies, on the other hand:

From January 1, 2023 onwards, trading companies calculated the amount of the contribution to the Fund for the calendar month to which the settlement related, taking into account the volume of electricity sales, the market price and the price cap for periods of 3 decades of that month, i.e. from the 1st to the 10th, from the 11th to the 20th and from the 21st to the last day of the month. Until December 31, 2022, the Fund contributions were calculated separately for each day of the month.
On March 1, 2023 and September 1, 2023, an amendments to the Act on Extraordinary Measures in 2023 came into force, determining the rules for paying contributions to the PDP Fund.
The amendment concerned, among other things, the extension of the catalogue of revenue items that constitute the basis for calculating the contribution to the PDP Fund. As a result, the amount of contributions transferred by the PGE Capital Group increased.
In connection with doubts concerning the interpretation of the provisions and the qualification of revenue from additional cash settlements, which should be taken into account in the calculation of contributions to the Fund, PGE S.A. applied to the President of the Energy Regulatory Office for an individual interpretation confirming the applied interpretation of the Act, as a result of which revenue from selected agreements should not be taken into account in the calculation of contributions to the Fund. The President of the ERO did not share the Company's position. PGE S.A., disagreeing with the adverse decision of the President of the ERO, appealed against it to the Regional Court in Warsaw.
In 2023, the contribution due to the Fund amounted to PLN 6 569 million (including the adjustment for 2022) reducing the financial result. In turn, compensation income for 2023 amounted to PLN 7 658 million. Compensation revenues are independent of the amount of contributions to the PDP Fund. As described above, the funds received by the sales companies were intended to compensate for the losses these entities suffered due to the price freeze. In turn, the contributions to the PDP Fund limited the margins realised by individual energy companies to the detailed levels indicated in the regulations.
The system of contributions to the PDP Fund was not closed by December 31, 2023. Contributions to the Fund have to be transferred also in 2024 in the case of sales made in the last weeks of 2023. In the Act for 2024, the legislator did not decide to extend the obligation to make contributions to the Fund to 2024, which means that the last month for which a contribution to the Fund should have been paid was December 2023. In the three quarters of 2024, an adjustment to the contribution to the Fund for the previous period in the amount of PLN 23 million was recognised as a reduction of costs.
On September 11, 2023, the regulation of the Ministry of Climate and Environment of September 9, 2023 was published, amending the regulation on the method of shaping and calculating tariffs and the method of settlement in electricity trading and entered into force on September 19, 2023. This regulation reduced electricity bills for household consumers by PLN 125 on average in 2023, provided that one of the conditions mentioned was met. Power utilities conducting business activities related to electricity trading are obliged to make the reduction at the latest in the last electricity invoice in 2023. No compensation has so far been granted to trading companies for this reduction due to the lack of legislation that would provide a basis for it.
On December 31, 2023, taking into account the number of recipients who met at least one of the conditions set out in the regulation, revenue was reduced by PLN 535 million (of which PLN 230 million was an estimate).
As at September 30, 2024, the amount representing the estimate as at the end of 2024, i.e. PLN 230 million, has been settled. On the side of receivables from customers, an estimate of PLN 2 million remains, representing items to be clarified or adjusted taking into account the fulfilment of the required prerequisites by customers.
On June 10, 2024, PGE CG received a tax interpretation granting the right to reduce the tax base and the amount of output tax in connection with the above-described reduction of bills by PLN 125. In the three quarters of 2024, the estimate of sales revenue was increased by approximately PLN 97 million on this account.
On May 31, 2023, the Provincial Administrative Court in Warsaw suspended – pending an analysis of the relevant complaint – the enforceability of the environmental decision on lignite mining for the Turów Mine. The environmental decision sets out the conditions for the implementation of the project: "Continuation of the exploitation of the Turów lignite deposit, carried out in the commune of Bogatynia". The complaint against the environmental decision was filed by, among others, the Frank Bold Foundation, Greenpeace and the EKO-UNIA Ecological Association.
On June 12, 2023, PGE GiEK S.A. filed a complaint with the Supreme Administrative Court in Warsaw against the decision concerning the Turów Mine and issued by the Provincial Administrative Court on May 31, 2023. This was the company's response to the Provincial Administrative Court's suspension of the enforceability of the environmental decision issued by the General Directorate of Environmental Protection in September 2022.

On July 18, 2023, the Supreme Administrative Court overturned the decision of the Provincial Administrative Court of May 31, 2023 to suspend the enforceability of the environmental decision concerning the Turów Mine. The complaints filed by the General Directorate of Environmental Protection, PGE GiEK S.A. and the National Public Prosecutor's Office were taken into consideration.
On August 31, 2023, the Provincial Administrative Court suspended the proceedings on the environmental decision issued by the General Directorate of Environmental Protection and concerning the Turów Mine until the formal conclusion of the proceedings relating to the application of PGE GIEK S.A. for amending the environmental decision. Proceedings at the request of PGE GIEK S.A. to change the environmental decision ended with a final and legally binding decision to discontinue the proceedings.
On March 13, 2024, the Regional Administrative Court overturned the decision of the General Directorate of Environmental Protection, specifying the environmental conditions for the further exploitation of the Turów lignite deposit. As the Regional Administrative Court stressed, this does not mean either closure or suspension of work at the Turów Mine. The ruling is not legally binding.
On April 30, 2024, PGE GiEK S.A. was served with a copy of the judgment with a statement of reasons. The ruling is not legally binding. On May 29, 2024 PGE GiEK S.A. filed a cassation complaint against the above judgment to the Supreme Administrative Court.
The same judgment was also appealed in its entirety on May 17, 2024 by General Directorate of Environmental Protection. PGE GiEK S.A., after serving the cassation appeal of General Directorate of Environmental Protection, filed a response to the cassation appeal on July 2, 2024 and requested that it be upheld and that the appealed verdict of the Provincial Administrative Court be revoked.
The verdict of the Voivodship Administrative Court was appealed by environmental organisations. PGE GiEK S.A. filed replies to the cassation appeals.
The war between Russia and Ukraine may affect the PGE Capital Group's operations and future financial performance. There were no significant changes in the issues reported compared to the latest published financial statements. In particular, the following items may be assessed/changed: the recoverable amount of selected asset items, the level of expected credit losses and the valuation of financial instruments. The PGE Group monitors the course of the war, the macroeconomic consequences and the market implications on an ongoing basis. Any events that occur will be reflected accordingly in the Group's future financial statements.
In 2021 ENESTA sp. z o.o. (currently ENESTA sp. z o.o. in restructuring) terminated unfavourable contracts for the supply of electricity and natural gas. In 2022, some contractors brought their claims to court. After unsuccessful attempts to reach an agreement with its counterparties, ENESTA sp. z o.o. applied for restructuring proceedings. On June 21, 2022, restructuring proceedings were opened. In September 2023 ENESTA's capital was increased by PLN 32 million. All shares in the increased capital were acquired and paid by PGE Obrót S.A. In December 2023 another resolution was passed regarding a capital increase of PLN 34 million.
As at September 30, 2024, the value of assets and equity and liabilities of ENESTA sp. z o.o. amounts to PLN 97 million and the value of equity to PLN -129 million.
In years 2022-2024, PGE Paliwa sp. z o.o. was implementing the decisions of the Prime Minister issued in mid-2022 instructing the purchase of at least 3 million tonnes of thermal coal with parameters similar to the quality parameters used by households and its import into the country (the Decision).In connection with a significant decrease in market prices of coal and continued low coal prices in the first quarter of 2024 the company realised a negative result on sales of coal purchased in order to implement the Decision and which was not sold by April 30, 2023.
The total result on the sale of this coal, together with other costs incurred to implement the decision, recognised in the financial results in the three quarters of 2024 amounted to PLN -219 million. Coal that was sold by April 30, 2024 was subject to an impairment write-down of PLN 239 million as of December 31, 2023. The write-down was partially utilised in amount of PLN 195 million, including PLN 178 million in period until April 30, 2024.
An agreement signed in 2023 with the Ministry of Climate and Environment for the financing of the implementation of the Prime Minister's decision provides for the reimbursement of costs incurred in connection with the implementation of the decision. A report on the implementation of the decision as at April 30, 2023, as required by the provisions of the agreement, was submitted on time by PGE Paliwa sp. z o.o. to the Ministry

of Climate and Environment. The company submitted an update to the Report as at April 30, 2024 in accordance with the deadlines set out in the Agreement. On July 30, 2024, the update to the Report was accepted by the Ministry of Climate and Environment and on August 7, 2024, the company received requested funds in the net amount of PLN 483 million.
In 2023, revenue of PLN 849 million was recognised under the Agreement. This revenue consisted of PLN 406 million received in 2023 and an estimate of the remaining compensation of PLN 443 million. The final compensation amounted to PLN 890 million net, of which PLN 41 million was recognised in the results of the current period.
On April 3, 2024 the Management Board of PGE S.A. decided on the recommendation not to pay dividend for 2023 to the PGE's shareholders. Decision was taken in accordance with the dividend policy and is a result of analysis of total Company's indebtedness and expected capital expenditures, in the context of lack of implementation of coal assets carve-out project and deteriorating operational conditions of the coal-fired power plants that are reflected in results of the impairment tests of property, plant and equipment in the Conventional Generation segment. The Ordinary General Meeting of the Company of June 28, 2024 agreed with the recommendation.
Property, plant and equipment is the most significant asset item of the PGE Capital Group. Due to the changing macroeconomic and regulatory environment, the PGE Group periodically reviews indications that the recoverable value of its assets may be impaired. In assessing the market situation, the PGE Capital Group uses both its own analytical tools and the support of independent analytical centres. In previous reporting periods, the PGE Capital Group recognised significant impairment losses on non-current assets.
In the first half of 2024 period the Group analysed indications and identified factors that could significantly contribute to change of value of the non-current assets.
Results of the impairment tests on property, plant and equipment are described in note 3 to the consolidated financial statements.
On October 31, 2022 PGE S.A. signed with Korea Hydro & Nuclear Power Co. Ltd. and ZE PAK S.A. a letter of intent, the aim of which is to start cooperation as part of the strategic Polish-Korean project to build a nuclear power plant in Pątnów-Konin area. The planned capacity of the plant is 2 800 MWe, based on the use of two PWR (Pressurised Water Reactor) nuclear reactors with the Korean APR 1400 technology. The cooperation also includes field and environmental studies, the implementation of a feasibility study and the obtainment of all necessary administrative decisions.
In the Polish Nuclear Power Programme (PNPP), the Pątnów-Konin area is recommended as one of the possible locations for the construction of a nuclear power plant in Poland. The investment project is also in line with the principles of the development of nuclear technologies contained in Poland's Energy Policy until 2040.
On May 22, 2023, PGE PAK Energia Jądrowa S.A. was registered in the National Court Register. PGE S.A. and ZE PAK S.A. each hold 50% of the shares in PGE PAK Energia Jądrowa S.A.
On August 11, 2023, PGE S.A., ZE PAK S.A. and PGE PAK Energia Jądrowa S.A. entered into a shareholders' agreement setting out the rules of this company's corporate governance and business activity.
On August 16, 2023, PGE PAK Energia Jądrowa S.A. filed an application with the Ministry of Climate and Environment for the issuance of a fundamental decision for the construction of a nuclear power plant in the Konin region.
On November 24, 2023, the Ministry of Climate and Environment issued the fundamental decision for the construction of a nuclear power plant in the Konin region.
On February 6, 2024 an annex was signed to the revolving loan agreement which was signed on March 1, 2023 by PGE S.A. with a syndicate consisting of the following banks: Powszechna Kasa Oszczędności Bank Polski S.A., Bank Polska Kasa Opieki S.A., Bank of China (Europe) S.A., Industrial and Commercial Bank of China (Europe) S.A., Alior Bank S.A. and Santander Bank Polska S.A. As a result of the annex China Construction Bank (Europe) S.A. with its seat in Luxembourg joined the agreement and the amount of the Loan was increased from PLN 2 330 million to PLN 3 150 million.
The subject matter of the agreement includes granting by the banks of the revolving loan which may be utilised for:

The final repayment date falls on March 1, 2027. Interest rate of the loan is calculated on the floating rate based on the relevant WIBOR rate (reference rate) plus margin. The margin may be periodically adjusted depending on the ESG rating assigned to PGE by a specialised agency. According to the provisions of the agreement, PGE undertakes to keep the consolidated net debt to consolidated EBITDA at a level not higher than 4:1 in the case PGE holds investment grade credit rating or at a level not higher than 3.5:1 in the case PGE does not held investment grade credit rating. The loan is not secured on any of the assets of PGE or of the PGE Group.
Signing of an annex to the syndicated loan
On June 28, 2024 the ERO President approved the electricity sale price for off-takers in G11 tariff for the period July 1, 2024 – December 31, 2025 for PGE Obrót S.A. at an level of PLN 628 per MWh10. The sales price for electricity approved by the ERO President is significantly lower compared to the tariff approved in December 2023 which was to be applicable throughout the entire year 2024 and which resulted in creation by PGE Obrót S.A. of a provision for onerous contracts for December 31, 2023. The analysis conducted by the Group did not indicate the need to update the provision as at September 30, 2024.
The impact of the approval of the G tariff on the financial results of the PGE Capital Group
At the end of the current reporting period, the Group has estimated an imbalance of electricity fed into the grid by prosumers. The energy generated and fed into the grid by prosumers enters the grid during periods of overproduction, thereby reducing the Group's need to purchase energy in the market. However, during the autumn and winter period, when prosumers consume energy in the absence of production covering their own demand, the Group has to purchase the missing electricity from the market. For this reason, the Group created an estimated liability of PLN 622 million. The estimate of the liability most closely reflects the Group's interim results, which stabilise at the end of the year during the winter period and reduce to negligible values.
In the previous period, the Group was not able to reliably make such an estimate, as it did not have sufficient information and tools. Using current knowledge, the estimate of the liability would be approximately PLN 497 million as at September 30, 2023. The figures for the comparative period were not restated.
On July 1, 2024 Elektrociepłownia Zielona Góra S.A. (company from PGE Group) concluded a framework agreement with ORLEN S.A. for the comprehensive sale of gas fuel in the distribution system together with an individual contract to the Agreement.
The framework agreement was concluded for an indefinite period, while the individual contract provides for gas fuel deliveries from July 2, 2024 to January 1, 2037.
The estimated value of the individual contract during its validity period, determined on the basis of gas market prices and distribution rates, amounts to a total of PLN 6.3 billion net. The basis for calculating the price formula in the individual contract will be variable components based on quotation of gas price indexes, taking into account the conditions of gas supplies from local deposits.
The agreement is secured by a bank guarantee for the amount of PLN 33 million and a surety provided by PGE in the amount of PLN 40 million.
Conclusion of the agreement for the supply of gas fuel
10 The average price for G tariff group is PLN 623 per MWh.

The Ordinary General Meeting was held on June 28, 2024 and on July 25, 2024 (after the break in the proceedings).
On January 31, 2024, the Extraordinary General Meeting passed resolutions on changes to the composition of the Supervisory Board. The General Meeting dismissed the following persons from the Supervisory Board: Janina Goss, Tomasz Hapunowicz, Mieczysław Sawaryn, Artur Składanek, Radosław Winiarski, and appointed to the Supervisory Board: Małgorzata Banasik, Eryk Kosiński, Andrzej Kozyra, Elżbieta Niebisz, Sławomir Patyra, Andrzej Rzońca and Andrzej Sadkowski.
On June 28, 2024, the Annual General Meeting adopted the reports for 2023.
On July 25, 2024, during the continuation of the meeting of June 28, 2024, the Annual General Meeting passed resolutions:
The Ordinary General Meeting did not pass resolutions concerning the acknowledgement of the fulfillment of duties for the year 2023 to: Artur Składanek, Janina Goss, Mieczysław Sawaryn, Tomasz Hapunowicz, Zbigniew Gryglas and Marcin Kowalczyk.
The content of adopted resolutions is presented in the locations on the PGE S.A. website indicated below:
Content of OGM resolutions from June 28, 2024 Content of OGM resolution from July 25, 2024
On July 23, 2024 PGE Gryfino Dolna Odra sp. z o.o. and the syndicate of General Electric Global Services GmbH (leader of syndicate), Polimex Mostostal S.A. and GE Vernova LLC concluded before the mediator of the arbitration court at the Solicitor's Office of the Republic of Poland a settlement regarding the realisation of the contract for construction of two CCGT units with a capacity of 683 MWe each.
As a consequence of the Settlement, the commissioning date of unit no. 9 was set at August 15, 2024 and of unit no. 10 at September 30, 2024. There was a 35-days joint grace period for both units for non-compliance with the mentioned commissioning dates that could be prolonged in the event of early commissioning of unit no. 9.
Unit no. 9 was commissioned on August 14, 2024, unit no. 10 – on October 18, 2024.
New commissioning dates for units at PGE Gryfino 2050
In 2022, PGE GiEK S.A. charged the contractor for unit no. 7 at Turów Power Plant - a consortium of Mitsubishi Power Europe GmbH, TECNICAS REUNIDAS S.A. and BUDIMEX S.A. - with a contractual penalty of PLN 562 million for failing to meet the unit's availability rate in the first year of the guarantee period. In July 2022, the Company submitted a demand for payment to the consortium, to which it received a negative response. In 2022, the contractual penalty was subject to an impairment charge in the same amount. On June 15, 2023, PGE GiEK S.A. applied to the General Prosecutor's Office of the Republic of Poland for mediation with the participation of a mediator of the Court of Arbitration at the General Prosecutor's Office of the Republic of Poland in order to attempt an amicable settlement of disputes arising from the contract. The mediation, which lasted in 2023 and 2024, had not been completed by the date of this report. In addition, PGE GiEK S.A. held bank performance guarantees in the total amount of PLN 135 million and bank advance payment refund guarantees in the total amount of PLN 7 million. On June 21, 2024, PGE GiEK S.A. delivered to the bank requests for payment of amounts resulting from the guarantees held and in July 2024 received the amount of PLN 142 million. The amount of PLN 135 million under the performance bond was not recognised in the financial result due to uncompleted mediation proceedings.
On October 30, 2024, PGE GiEK S.A. issued a debit note in the amount of PLN 357 million for failure to meet the availability rate of the unit in the second year of the warranty period and a contractual penalty for delay

in removal of defects. Due to the significant risk of this note being disputed by the Contractor and the significant probability of not receiving payment, it was subject to a write-down in the full amount.
On July 29, 2024 PGE signed a term loan agreement with the European Investment Bank ("EIB"). The value of the loan agreement amounts to PLN 1 billion and the loan will be intended for financing of capital expenditures of PGE Energetyka Kolejowa S.A. for the Modernisation of Power Supply Systems implemented in years 2023-2028 which will ensure modernisation of railway network power supply systems throughout Poland.
The loan will be drawn in instalments. Each instalment may be drawn in PLN or EUR. The final maturity date will be maximum 18 years from the drawing date of the last instalment whereby the last instalment may be drawn no later than 24 months from the Agreement signing date. The interest rate will be determined before the payment of the each instalment. The Agreement does not provide for tangible collaterals. After signing of the Agreement, total nominal value of the financing from the EIB amounts to PLN 6 663 million.
Signing of a loan agreement with EIB
On November 20, 2024 an annex was signed to the term loan agreement with Bank Gospodarstwa Krajowego (BGK). As a result of the annex the amount of the loan was increased from PLN 2.5 billion to PLN 3.9 billion and the financing period has been extended from maximum of 8 years to maximum of 12 years. The final maturity date was set at December 20, 2036. In addition the annex introduces possibility to use the financing in EUR currency on the floating interest rate based on the relevant EURIBOR rate (reference rate) plus margin.
After signing the above mentioned annex, total debt resulting from the term loans from BGK may amount to no more than PLN 4.6 billion while the total debt resulting from all loan agreements with BGK may amount to no more than PLN 7.5 billion.
Significant proceedings pending in front of courts, competent arbitration authority or public administration authority are described in note 24.3 to the consolidated financial statements. This note discusses, inter alia the issue of compensation regarding the conversion of shares, issues related to the request by the Polimex-Mostostal consortium for an increase in remuneration for the construction of a CHP plant in Siechnice and environmental decision on the Turów Lignite Mine.
During the three quarters of 2024 PGE S.A. and subsidiaries did not grant guarantees to other entities or to a subsidiary, where total value of guarantees is significant.
Information on issue, redemption and repayment of debt securities and other securities is described in p. 1.3 of the foregoing report and in note 1.3 to the consolidated financial statements.
Information about transactions with related entities is presented in note 26 to the consolidated financial statements. In addition, note 6 to the consolidated financial statements indicates that PGE CG accounts for inter-segment transactions as if they related to unrelated parties - on an arm's length basis.
PGE S.A. did not publish financial forecasts.

Significant off-balance sheet items are described in notes 11 and 24 to the consolidated financial statements.
Significant factors and events that, in the issuer's opinion, will affect its results over at least the next quarter are described in the remaining sections of this report.
Agreements and other information important for the assessment of the personnel and financial situation, financial result of the PGE Capital Group and their changes, as well as information important for the assessment of the Group's ability to fulfil its obligations
In the three quarters of 2024, apart from the events indicated in the other sections of this report, there were no other events that are important for the assessment of the personnel and financial situation, financial result of the PGE Capital Group and their changes, as well as for the assessment of the Group's ability to fulfil its obligations.

To the best knowledge of the Management Board of PGE S.A., the quarterly financial report, including condensed interim consolidated financial statements of the Capital Group and quarterly financial information for PGE Polska Grupa Energetyczna S.A. and comparative data, were prepared in accordance with the governing accounting principles, presents a fair, true and reliable view of the material and financial situation of PGE Capital Group and its financial result.
The report of the Management Board on the activities of PGE Capital Group presents a true view of the development, achievements and situation of the Capital Group.

The foregoing Management Board's Report on activities of PGE Capital Group was approved for publication by the Management Board of the parent company on November 26, 2024. Warsaw, November 26, 2024
Signatures of members of the Management Board of PGE Polska Grupa Energetyczna S.A.
| President of the Management Board |
Dariusz Marzec | |
|---|---|---|
| Vice-President of the Management Board |
Maciej Górski | |
| Vice-President of the Management Board |
Przemysław Jastrzębski | |
| Vice-President of the Management Board |
Robert Kowalski | |
| Vice-President of the Management Board |
Marcin Laskowski |

| Glossary | |
|---|---|
| Ancillary control services (ACS) |
services provided to the transmission system operator, which are indispensable for the proper functioning of the National Power System and ensure the keeping of required reliability and quality standards. |
| Achievable capacity |
the maximum sustained capacity of a generating unit or generator, maintained continuously by a thermal generator for at least 15 hours or by a hydroelectric generator for at least five hours, at standardized operating conditions, as confirmed by tests. |
| ARA | USD hard coal price index in EU. Loco in harbours Amsterdam-Rotterdam-Antwerp |
| Balancing market |
a technical platform for balancing electricity supply and demand on the market. The differences between the planned (announced supply schedules) and the actually delivered/off-taken volumes of electricity are settled here. The purpose of the balancing market is to balance transactions concluded between individual market participants and actual electricity demand. The participants of the balancing market can be the generators, customers for electricity understood as entities connected to a network located in the balancing market area (including off-takers and network customers), trading companies, electricity exchanges and the TSO as the balancing company. |
| Base, baseload |
standard product on the electricity market: a constant hourly power supply per day in a given period, for example week, month, quarter or year. |
| BAT | Best Available Technology |
| Best Practices |
Documents "Best Practice for WSE Listed Companies 2016" adopted by the resolution of the WSE Supervisory Board of October 13, 2015 and effective from January 1, 2016 until June 30, 2021 and "Best Practice for WSE Listed Companies 2016 2021" adopted by the resolution of the WSE Supervisory Board of March 29, 2021 and effective from July 1, 2021. |
| Biomass | solid or liquid substances of plant or animal origin, subject to biodegradation, obtained from agricultural or forestry products, waste and remains or industries processing their products as well as certain other biodegradable waste in particular agricultural raw materials. |
| Black energy |
popular name for energy generated as a result of combustion of black coal or lignite. |
| CCGT | Combined Cycle Gas Turbine |
| Circular economy |
system that minimises the consumption of resources and the level of waste as well as emissions and energy losses by creating a closed loop of processes in which waste from one process is used as resources in other processes so as to maximally reduce the quantity of production waste |
| Co combustion |
the generation of electricity or heat based on a process of combined, simultaneous combustion in one device of biomass or biogas together with other fuels; part of the energy thus generated can be deemed to be energy generated with the use of renewable sources. |
| Co | the simultaneous generation of heat and electricity or mechanical energy in the |
| generation Constrained |
course of one and the same technological process. the generation of electricity to ensure the quality and reliability of the national |
| generation | power system; this applies to generating units in which generation must continue due to the technical limitations of the operation of the power system and the necessity of ensuring its adequate reliability. |
| CVC fund | Corporate Venture Capital; in the CVC model, portfolio companies, aside from financial support, receive the opportunity to verify their ideas in a corporate setting |
| Distribution | transport of energy through distribution grid of high (110 kV), medium (15kV) and low (400V) voltage in order to supply the customers. |
| Distribution System Operator (DSO) |
a power company engaging in the distribution of gaseous fuels or electricity, responsible for traffic in the gas or electricity distribution systems, current and long term security of operation of the system, the operation, maintenance, repairs and indispensable expansion of the distribution network, including connections to other gas or power systems. |

| Energy cluster |
civil-law arrangement that may include natural persons, legal entities, scientific units, research institutes or local government units, concerning the generation, distribution or trade in energy and energy demand balancing, with this energy being from renewable sources or other sources or fuels, within a distribution grid with nominal voltage below 110 kV, within the operational area of the given cluster, not exceeding the area of one district (powiat) in the meaning of the act on district authorities) or 5 municipalities (gmina) in the meaning of the act on municipal authorities; an energy cluster is represented by a coordinator, which is a cooperative, association, foundation appointed for this purpose or any member of the energy cluster indicated in the civil-law arrangement |
|---|---|
| ERO | Energy Regulatory Office (pol. URE). |
| EUA | European Union Allowances: transferable CO2 emission allowances; one EUA allows an operator to release one tonne of CO2. |
| EU ETS | European Union Greenhouse Gas Emission Trading Scheme) EU emission trading scheme. Its operating rules are set out in the ETS Directive, amended by the Directive 2009/29/EC of the European Parliament and of the Council of April 23, 2009 (OJ EU L. of 2009, No. 140, p. 63—87). |
| EV | Electric vehicle |
| FIT/FIP | Feed-in-Tariff (FIT) and Feed-in-Premium (FIP): system of subsidies to the market price of electricity performed by Zarządca Rozliczeń S.A. |
| Generating unit |
a technically and commercially defined set of equipment belonging to a power company and used to generate electricity or heat and to transmit power. |
| GJ | Gigajoule, a unit of work/heat in the SI system, 1 GJ = 1000/3.6 kWh = approximately 278 kWh. |
| GPZ | main power supply point, a type of transformer station used for the processing or distribution of electricity or solely for the distribution of electricity. |
| Green certificate |
popular name for energy generated from renewable energy sources. |
| GW | gigawatt, a unit of capacity in the SI system, 1 GW = 109 W. |
| GWe | one gigawatt of electric capacity. |
| GWt | one gigawatt of heat capacity. |
| HCl | hydrogen chloride. |
| Hg | mercury. |
| HICP | Harmonised Index of Consumer Prices |
| High Voltage Network (HV) |
a network with a nominal voltage of 110 kV. |
| IED | Industrial Emissions Directive |
| IGCC | Integrated Gasification Combined Cycle. |
| Installed capacity |
the formal value of active power recorded in the design documentation of a generating system as being the maximum achievable capacity of that system, confirmed by the acceptance protocols of that system (a historical value, it does not change over time. |
| IRGiT | Izba Rozliczeniowa Giełd Towarowych S.A. (commodities clearing house) |
| IRZ | Cold Intervention Reserve Service – service consisting of maintaining power units ready for energy production. Energy is produced on request of PSE S.A. |
| ITRE | European Parliament Committee on Industry, Research and Energy |
| KRI | Key Risk Indicator |
| KSE | the National Power System, a set of equipment for the distribution, transmission and generation of electricity, forming a system to allow the supply of electricity in the territory of Poland. |
| KSP | the National Transmission System, a set of equipment for the transmission of electricity in the territory of Poland. |
| kV | kilo volt, an SI unit of electric potential difference, current and electromotive force; 1kV= 103 V. |
| kWh | kilowatt-hour, a unit of electric energy in the SI system defined as the volume of electricity used by the 1 kW equipment over one hour. 1 kWh = 3,600,000 J = 3.6 MJ. |

| kWp | a power unit dedicated to determining the power of photovoltaic panels, means the amount of electricity in the peak of production. |
|---|---|
| Low Voltage Network (LV) |
a network with a nominal voltage not exceeding 1 kV. |
| LTC | long-term contracts on the purchase of capacity and electricity entered into between Polskie Sieci Elektroenergetyczne S.A. and electricity generators in the years 1994-2001. |
| Medium voltage network (MV) |
an energy network with a nominal voltage higher than 1 kV but lower than 110 kV. |
| MEV | Minimum Energy Volumes. |
| MSR | Market Stability Reserve (relating to CO2) |
| MW | a unit of capacity in the SI system, 1 MW = 106 W. |
| MWe | one megawatt of electric power. |
| MWt | one megawatt of heat power. |
| NAP | National emissions Allocation Plan, prepared separately for the national emission trading system and for the EU emission trading system by the National Administrator of the Emission Trading System. |
| NAP II | National CO2 emissions Allocation Plan for the years 2008-2012 prepared for the EU emission trading system adopted by the Ordinance of the Council of Ministers of July 1, 2008 (Dz. U. of 2008, No. 202, item 1248). |
| NH3 | ammonia |
| Nm3 | normal cubic meter; a unit of volume from outside the SI system signifying the quantity of dry gas in 1 m3 of space at a pressure of 101.325 Pa and a temperature of 0°C. |
| NOx | nitrogen oxides. |
| N:W ratio OTF |
Ration of volume of overburden removed in m3 to the mass of extracted coal in tons Organised Trading Facilities |
| Operational Capacity Reserve (ORM) |
ORM constitutes of generation capacities of active Production Schedular Units (JGWa) in operation or layover, representing excess capacity over electricity demand available to the TSO under the Energy Sale Agreements and on the Balancing Market in unforced generation |
| Peak, peakload |
a standard product on the electricity market; a constant power supply from Monday to Friday, each hour between 7:00 a.m. and 10:00 p.m. (15-hour standard for the Polish market) or between 8:00 a.m. and 8:00 p.m. (12-hour standard for the German market) in a given period, for example week, month, quarter or year. |
| Peak power pumped storage plants |
special type of hydro-power plant allowing for electricity storage. It uses the upper reservoir, to which water is pumped from the lower reservoir using electricity (usually excessive in system). The pumped storage facilities provide ancillary control services for the national power system. In periods of increased demand for electricity, water from the upper reservoir is released through the turbine. This way, electricity is produced. |
| PJ | Petajoule, a unit of work/heat in the SI system, 1 PJ = approx. 278 GWh |
| Property rights |
negotiable exchange-traded rights under green and co-generation certificates |
| Prosumer | end customer who purchases electricity under a comprehensive agreement and generates electricity only from renewable sources at a micro-installations for own purposes, unrelated to economic activities |
| PSCMI1 | Polish Steam Coal Market Index 1 - average level of prices of coal dust sold to industrial-scale power plants in Poland |
| RAB | Regulatory Asset Base. |
| Red certificate |
a certificate confirming generation of electricity in co-generation with heat. |
| Red energy | popular name for electricity co-generated with heat. |

| Regulator | the President of ERO, fulfilling the tasks assigned to him in the energy law. The regulator is responsible for, among others, giving out licenses for energy companies, approval of tariffs for energy companies, appointing Transmission System Operators and Distribution System Operators. |
|---|---|
| Renewable Energy Source (RES) |
a source of generation using wind power, solar radiation, geothermal energy, waves, sea currents and tides, flow of rivers and energy obtained from biomass, landfill biogas as well as biogas generated in sewage collection or treatment processes or the disintegration of stored plant or animal remains. |
| RIG | Readiness Interventional Reserve - the power plant's readiness to provide the active power generation service or its consumption at the request of PSE. |
| SCR | Selective catalytic reduction |
| Start-up | early-stage company established in order to build new products or services and characterised by a high level of uncertainty. The most common features of start-ups are: short operational history (up to 10 years), innovativeness, scalability, higher risk than in the case of traditional businesses but also potential higher returns on investment |
| Tariff | the list of prices and rates and terms of application of the same, devised by an energy enterprise and introduced as binding on the customers specified therein in the manner defined by an act of parliament. |
| Tariff group | a group of customers off-taking electricity or heat or using services related to electricity or heat supply to whom a single set of prices or charges and terms are applied. |
| TGE | Towarowa Giełda Energii S.A. (Polish Power Exchange), a commodity exchange on which trading can take place in electricity, liquid or gas fuels, extraction gas, emission allowances and property rights whose price depends directly or indirectly on electric energy, liquid or gas fuels and emission allowances, admitted to commodity exchange trading. |
| TPA, TPA rule |
Third Party Access, the owner or operator of the network infrastructure to third parties in order to supply goods/services to third party customers. |
| Transmission of electricity |
transport of electricity through high voltage (220 and 400 kV) transmission network from generators to distributors. |
| Transmission System Operator (TSO) |
a power company engaging in the transmission of gaseous fuels or electric energy, responsible for traffic in a gas or power transmission system, current and long-term security of operation of that system, the operation, maintenance, repair and indispensable expansion of the transmission system, including connections with other gas or power systems. In Poland, for the period from July 2, 2014 till December 31, 2030 Polskie Sieci Elektroenergetyczne S.A. was chosen as a TSO in the field of electricity transmission. |
| TWh | terawatt hour, a multiple unit for measuring of electricity unit in the system SI. 1 TWh is 109 kWh. |
| Ultra-high voltage network (UHV) |
an energy network with a voltage equal to 220 kV or higher. |
| V (volt) | electrical potential unit, electric voltage and electromotive force in the International System of Units (SI), 1 V= 1J/1C = (1 kg x m2) / (A x s3). |
| W (watt) | a unit of power in the International Systems of Units (SI), 1 W = 1J/1s = 1 kg x m2 x s-3 |
| Yellow certificate |
a certificate confirming generation of energy in gas-fired power plants and CCGT power plants. |
| Yellow energy |
popular name for energy generated in gas-fired power plants and CCGT power plants. |
| ZHZW | Commercial Management of Generation Capacities. |
Building tools?
Free accounts include 100 API calls/year for testing.
Have a question? We'll get back to you promptly.