INTERVIEW WITH THE CEO OF PGE POLSKA GRUPA ENERGETYCZNA S.A. 3
KEY FINANCIAL RESULTS OF THE PGE CAPITAL GROUP 4
2018 CALENDAR 5
1. PGE Capital Group 6
1.1. Characteristics of activities 6
1.2. Employment structure in PGE Capital Group 7
1.3. Organisational structure7
1.4. Business model9
1.5. Competitive advantages of the Group 10
2. PGE Group's strategy and its implementation 11
2.1. Mission, vision and overall objectives11
2.2. Realisation of strategic goals12
2.3. Prospects for the development 20
3. Risks in the Group's operations 23
3.1. Risk management 23
3.2. Risk factors and mitigating actions24
3.3. Strategic risk 28
4. Electricity market in 2018 and regulatory and business environment 29
4.1. Macroeconomic environment29
4.2. Market environment30
4.3. Prices of certificates35
4.4. Prices of CO2 emission rights35
4.5. Competitive environment37
4.6. Regulatory environment 41
4.7. Supply markets49
5. Activities of PGE Capital Group in 2018 50
5.1. Business model50
5.2. Business segments51
5.3. PGE Group's key financial results52
5.4. Operational segments59
5.5. Significant events of the reporting period and subsequent events85
5.6. Management of financial resources and financial liquidity 89
6. Parent company of PGE Group – PGE S.A 96
6.1. Key financial results of PGE S.A96
6.2. Key operational figures of PGE S.A100
6.3. Ownership structure100
6.4. Dividend policy101
6.5. PGE S.A. shares on the stock exchange101
6.6. Rating102
7. Other elements of the report 104
7.1. Significant changes in organisation of the Capital Group 104
7.2. Significant off-balance sheet items106
7.3. Publication of financial forecasts106
7.4.
7.5.
Entity authorised to audit of financial statements106
Information on entity authorised to audit financial statements106
8. Statement on implementation of Corporate Governance 107
8.1. Corporate governance principles which the Company was obliged to follow in 2018 107
8.2.
8.3.
Rules for amendments to the Company's Statutes110
Composition and the description of operations of the management and supervisory bodies of the Company and
committees of the supervisory body 112
8.4. Information about shares and other securities123
9. Statement on non-financial data 125
10. Statements of the ManagementBoard 125
11. Approval of the Management Board's Report 126

INTERVIEW WITH THE CEO OF PGE POLSKA GRUPA ENERGETYCZNA S.A.

Year 2018 abounded in interesting and important events for the energy industry. Which of them were of the most significance to PGE Group ?

The past year was characterised by transformation. Poland's energy industry began changing, and nothing will stop this evolution. We, energy community of PGE Group, have been seeing the need for wise changes in the energy industry for some time. As the leader in electricity and heat production in Poland, we feel obligated to initiate these changes and stimulate changes in the entire sector. We want to be the leader of Poland's energy transformation.

PGE Group's flagship investments in Opole and Turów are of key importance to us. The construction of these modern and efficient generating units came close to the finish line in 2018. We are also implementing other projects, which are less spectacular but equally important. These include numerous modernisation works that improve production efficiency and reduce the environmental footprint.

Last year was also a time of decisions concerning the entire industry. The capacity market counts among the most significant ones, creating an opportunity for a sustainable transformation of the sector, while retaining energy security. The rising volatility of our

surroundings requires flexibility from us, which is why we have made the decision to build two gas units at the Dolna Odra plant, with a capacity of 700 MW each.

What else has PGE done towards transformation?

PGE has begun changing, and we have strong arguments for it. Thanks to an RES auction that we won, we began implementing a nearly 100 MW onshore wind farm complex. We are also launching an ambitious offshore programme in the Baltic Sea. Halfway through the next decade, we want to have built the first 1 000 MW, and increase this to 2 500 MW by 2030. This is a gigantic undertaking, which is why we are also looking for partners who will support us in implementing our offshore plan. At the same time, we are waiting for specifics regarding Poland's future energy policy to 2040, the final shape of which will let us decide which of the Group's development paths to take after 2020.

What is PGE Group doing with regard to the challenges of climate policy, emission reductions and concern for air quality?

Implementing the investments we have already planned will contribute to avoiding 60 million tonnes of CO2 emissions in years 2016-2026. These plans are not just about modern conventional energy in Opole and Turów or the already mentioned onshore and offshore wind projects. These are also investments in efficient and low-emission production of heat in cogeneration – in line with the District Heating Strategy, we are planning to increase the share of low-emission fuels in the energy mix of PGE Energia Ciepła, our company responsible for district heating, to 50% by 2030.

The battle for clean air is a very up-to-date and important topic, but its success depends on actions on many fronts. First of all, we are reducing emissions at our industrial power and combined heat-and-power plants through investments and modernisations that bring us closer to more eco-friendly energy operations. In fact, we are already seeing success in this area. Over the past three decades, PGE's power plants reduced the emissions of sulphur by 93%, nitrogen by 61% and particulate by 99%. Given the climate changes taking place and CO2 emissions, diversification of generation sources towards zero- and low-emission ones and thus also reducing exposure to increases in the prices of emission allowances is a natural challenge. This is a factor that influences our investment decisions. We are actively fighting low emission, what is a strong incentive for development of modern cogeneration based district heating. Many of our branches recorded the highest ever numbers of connections and customers in the city district heating network in 2018. The rising demand for district heating is motivating us for further investments. Building a new CHP, Czechnica, in the town of Siechnice is one of the key projects.

The Group's largest investments are nearly finished. How are these capital-intensive projects affecting the Group's financial situation?

As our flagship projects move towards the end of the investment cycle, this will translate into lower investment expenditures for PGE Group. On the other hand, new capacities are providing us with larger revenue from the sale of electricity from highlyefficient sources. I consider the Group's results for 2018 as good in the current market context. I am looking into the future with optimism and I am confident of the positive results of the activities undertaken by the entire Group.

KEY FINANCIAL RESULTS OF THE PGE CAPITAL GROUP

Year ended Year ended
Key financial data Unit December 31, 2018 December 31, 2017 % change
Sales revenues PLN
million
25 946 23 100 12%
EBIT PLN
million
2 471 3 552 -30%
EBITDA PLN
million
6 364 7 650 -17%
EBITDA margin % 25% 33%
Recurring EBITDA (EBITDA adjusted for one-offs) PLN
million
6 701 6 479 3%
Recurring EBITDA margin % 26% 28%
Net profit PLN
million
1 511 2 605 -42%
LTC compensations PLN
million
-120 1 284 -
LTC revenues PLN
million
-120 1 215 -
Reversal of LTC write-offs (other operating
revenues)
PLN
million
0 69 -
Capital expenditures PLN
million
6 856 6 751 2%
Net cash from operating activities PLN
million
5 102 7 934 -36%
Net cash from investing activities PLN
million
-6 465 -7 775 -17%
Net cash from financial activities PLN
million
91 -274 -
Working capital PLN
million
-3 509 524 -
Net debt EBITDA x 1.51 0.99
One-offs affecting EBITDA
LTC compensations PLN
million
-120 1 284 -
Change in reclamation provision PLN
million
-146 -42 248%
Change in actuarial provision PLN
million
-71 -71 0%
Total PLN
million
-337 1 171 -

2018 CALENDAR

1. PGE Capital Group

1.1. Characteristics of activities

Capital Group of PGE Polska Grupa Energetyczna S.A. ("PGE Capital Group", the "Capital Group", "PGE Group", the "Group") is the largest vertically integrated producer of electricity and heat in Poland. With a mix of own fuel sources, generation assets and distribution network, PGE Group provides a safe and reliable supply of electricity to more than five million households, businesses and institutions.

The parent company of PGE Capital Group is PGE Polska Grupa Energetyczna S.A. (also "PGE S.A.", "PGE", the "Company", the "Issuer").

PGE Group in 2018 organized its activities in five business segments:

CONVENTIONAL GENERATION

Core business of the segment includes extraction of lignite, production of electricity and heat from conventional sources as well as transmission and distribution of heat.

RENEWABLES

Core business of the segment includes electricity generation from renewable sources and in pumped-storage power plants.

SUPPLY

Core business of the segment includes trading of electricity across the country, wholesale trading of electricity on domestic and international market, trading of CO2 allowances and energy certificates and fuels and provision of services of the Corporate Centre to companies from the PGE Group.

DISTRIBUTION

Core business of the segment includes supply of electricity to final off-takers through the grid and HV, MV and LV infrastructure.

OTHER OPERATIONS

Other operations include services, through the subsidiaries, to PGE Group, which includes organisation of capital raising in form of Eurobonds, provision of IT, payroll and HR services and transportation services. Its activities also include subsidiaries formed to prepare and implement a project to build a nuclear power plant, to manage investment funds and to invest in start-ups.

1.2. Employment structure in PGE Capital Group

PGE Group is one of the five largest employers in Poland, providing stable jobs to more than 41 000 people across over 200 locations throughout the country. It is thanks to their experience and involvement that we are able to build a values-based organisation that combines social responsibility with business targets. PGE Group is a place for people with passion and motivation to act. The Group's ambitious goal is to become the most efficient energy group in Poland. This also means the introduction of best practices in corporate governance as regards human capital management, support for business decisions and efficiency management as well as the standardisation of support processes.

Table: Employment level.

FTEs Number of employees Number of employees %
December 31, 2018 December 31, 2017 change
Total in PGE Group, including: 41 442 41 231 1%
Conventional Generation 25 098 25 382 -1%
Renewables 529 510 4%
Distribution 10 257 10 200 1%
Supply 2 379 2 219 7%
Other operations 3 179 2 920 9%

1.3. Organisational structure

PGE Group as of the end of 2018 consisted of:

  • PGE S.A. the parent company,
  • 57 subsidiaries subject to consolidation,
  • 4 associates,
  • 1 jointly controlled entity.

All of PGE Group's companies are organised in four main operating segments that constitute business lines, i.e. Conventional Generation, Renewables, Distribution, Supply, as well as other operations.

Given its size, internal organisational changes and acquisitions, PGE Group is in the process of streamlining its structures and integration. The following diagram illustrates the Group's structure. A full composition of PGE Group, divided into segments as well as direct and indirect consolidated subsidiaries, is presented in note 1.3 to the Consolidated Financial Statements.

Diagram: Structure of PGE Capital Group*.

*Simplified structure – includes key entities.

In January 2019, PGE completed the integration process for its acquired district heating assets. Six combined heat-and-power plants previously owned by PGE Górnictwo i Energetyka Konwencjonalna ("PGE GiEK") were transferred to PGE Energia Ciepła S.A. ("PGE EC"), which had already owned eight CHPs and the Rybnik power plant. PGE EC is the entity integrating PGE Group's district heating activities and the leader of this process, having after consolidation and with subsidiaries an approx. 25% share in domestic production of heat in cogeneration. Heating assets consolidation is an element of PGE's consistently implemented District Heating Strategy, announced in December 2017, which introduces a new business line – District Heating from January 2019.

1.4. Business model

PGE Group is the largest vertically integrated producer and supplier of electricity and the largest producer of district heating in Poland. The Group's activities span the entire value chain: from lignite mining at own mines, through generation of electricity and heat, to distribution and sales.

* Estimated data concerning sales to end off-takers and distribution.

PGE Group's generating assets account for approx. 43% of electricity output (including Conventional Generation segment approx. 42%) in Poland and use a variety of sources. Conventional installations are based on lignite from PGE Group's own mines as well as hard coal, gas and biomass from external suppliers. Renewable sources are also used in electricity generation: wind energy, hydro energy and solar energy.

Using its over 290 000 km of power lines, PGE Group distributes electricity to customers over an area encompassing approx. 40% of Poland's territory.

With a combination of own lignite resources, generation assets and distribution grids, PGE provides safe and reliable supplies of electricity to more than five million customers throughout Poland, including households, businesses and institutions. This means that it supplies a third of electricity consumers in Poland. PGE is also the leader in district heating production.

1.5. Competitive advantages of the Group

  • Leader in installed capacity and electricity production
  • Focused on baseload generation, absolute cost leader in Poland - approx. 60% of power generated from own fuel (2 lignite mines)
  • Highly diversified and youngest generation fleet in Poland
  • Regulated assets operator (Dolna Odra Power Plant and pumped-storage plants)
  • Installed 550 MW in wind
  • 2019 Regulatory Asset Base in distribution: PLN 16.8 billion

Assets Strong financials Strategy

  • Stable and diversified revenues
  • EBITDA margin at 25% in 2018 - highest among Polish power utilities
  • Over 40% of EBITDA from regulated activities (distribution & cogeneration)
  • Strong investment grade credit ratings with stable outlook (Fitch and Moody's)
  • Healthy leverage net debt/LTM EBITDA at 1.5x
  • Financing secured for financial and operational activities

  • Strategy for 2016-2020 aimed at keeping the leading position on Polish market

  • Developing modern conventional electricity
  • Developing new technologies and business models
  • Strategic investment options
  • Reduction of controllable costs and optimization of maintenance costs
  • Flexibility and efficiency of generation units
  • District heating strategy

2. PGE Group's strategy and its implementation

2.1. Mission, vision and overall objectives

In accordance with the strategy adopted in September 2016, PGE's mission is to ensure security and growth based on reliability of supply, technical excellence, modern services and partnership relationships.

Increase its value for shareholders and the key role in ensuring Poland's energy security are the overall objectives which PGE Group is pursuing.

VALUES OF PGE GROUP

PGE Group's strategy is being implemented in accordance with values Partnership, Growth, Responsibility and principles in everyday work included in the Code of Ethics of PGE Group. PGE Group is a responsible organization, aware of its impact on the environment, thus in its operations focuses on reducing impact on natural environment, operating based on ethical principles and involvement in activities for the benefit of local communities.

2.2. Realisation of strategic goals

LEADER IN ELECTRICITY GENERATION, ACTIVELY SEEKING DEVELOPMENT OPPORTUNITIES

PGE Group's aspiration is maintaining after 2020 the leading position in the area of electricity generation with more than 40% share in the domestic market. PGE Group is continuing its flagship investments in Opole and Turów and has a flexible approach to plans for developing new generating capacities, opting to take the most economically and technically beneficial decisions on a case by case basis, taking into account the specific location and technological conditions of each asset. The company carries out modernisations of conventional plants and combined heat-and-power plants in an optimal scope so that they are adapted to new industrial emission standards BAT. The implementation of a capacity market, being a mechanism enhancing the national energy security, will have a positive impact on the economic effectiveness of modernisation projects.

The purchase of EDF Polska's assets was finalised on November 13, 2017. With this agreement, PGE Group's installed electricity capacities increased by 25% to 16.23 GWe at the end of 2018. PGE Group strengthened its top position in the power segment and became the largest supplier of heat in the country, with a 18% share of the Polish district heating market. PGE Group's District Heating Strategy was unveiled on December 14, 2017, which highlights our ambitions in this area, inter alia:

  • increase of local market share to two-thirds for district heating networks managed by PGE Energia Ciepła,
  • construction of 1 000 MWe of new cogeneration capacities,
  • increase of low-emission fuel's share in fuel mix to 50%.

PGE Group intends to strengthen its position in the renewables segment, with a target of approx. 25% of national renewables output by 2030. Having succeeded in RES auctions in November 2018, project Klaster, which involves the development of three wind farms with capacity totalling 97.17 MW, together with ancillary infrastructure and grid connections, will be implemented by mid-2020. On December 5, 2018, PGE Group invited over a dozen potential business partners for talks regarding the construction and operation of wind farms in the Baltic Sea with capacity totalling up to 2 545 MW as the first stage of PGE Group's offshore programme. A decision on the investment's environmental conditions is expected to be received in 2019. According to the schedule, electricity should start flowing from PGE Group's first offshore wind farm around 2025, while commercial operation is expected to begin in 2026.

Increased involvement in the photovoltaics and dispersed sources segment will contribute towards achieving an ambitious renewables target. PGE Group is implementing a number of pilot projects in micro-grids and energy clusters, which are to help in creating optimal business model.

To retain its leading position in the generation segment over the long term, PGE Group has three strategic options, thanks to which it can make an optimal choice in the context of future energy and climate policies:

  • construction of offshore wind farms with capacity totalling up to 2 545 MW,
  • construction of Poland's first nuclear power plant, once a model ensuring the investment's economic feasibility is developed and taking into account Group's investment capabilities,
  • modern coal-based energy, including the development of new lignite deposits, in the event that climate policy is substantially relaxed.
Key
indicators
Implementation 2017-2018 Progress and target How we intend to achieve the target by
2020 and in later years
LEADER IN GENERATION, ACTIVELY TAKING ADVANTAGE OF GROWTH OPPORTUNITIES
Optimal adaptation of power plants and
Share of the
electricity
generation
market

Continuation of
construction of 2 units at
Opole power plant.

Continuation of
construction of new unit
at Turów power plant.

Launch of preparatory
phase for construction of
new gas-fired unit at
Dolna Odra plant.

Modernisation of units
1-3 in Turów power
plant.

Acquisition of EDF's
>40%
43%
37%
2017
2018
2020
CHP plants to new industrial emission
standards BAT.

Optimisation of generation portfolio in
terms of participating in the capacity
market.

Construction of 1 000 MWe of new
cogeneration capacities by 2030.

Development of gas-fired units.

Use of strategic options for long-term
development of capacities:

construction of offshore
wind farms,

construction of the first
Polish nuclear power
Share of the
renewables
market
assets, directly
contributing to growth in
PGE's market share .

Preparations for the first
offshore projectsin
terms of the future
auction, including
environmental surveys,
wind surveys,

negotiations with
potential strategic
partners.

Success of project
"Klaster" (97.17 MW) in
RES auction.
target
25%
8.7%
8.7%
2017
2018
2030
target
plant,

development of modern
coal-based energy
generation.

The launch of a 1 045 MWe offshore
wind farm half-way through the next
decade, with potential expansion by 1
500 MWe by the end of the next
decade.

Increase of low-emission fuel's share in
district heating segment to 50%.

Increase of our exposure to PV and the
diffuse source segment.

RELIABLE AND ACTIVE UTILITY AND SERVICE SUPPLIER

Currently on-going investments in the distribution segment are intended to increase the reliability of supply and reduce SAIDI and SAIFI by 56% compared to 2015 and the average connection time by 40%. The achievement of these quality targets will be supported by, among others, targeted modernisation of infrastructure, the development of electricity quality monitoring systems, intelligent grid metering and automation as well as the construction of a digital transmission system.

In the retail area, PGE Group is planning to focus on strengthening relations with clients through gaining more knowledge about their needs. In response to identified expectations, PGE Group will expand its offering by, for example, adding new product and services that are complementary to electricity as well as through the development of new sales and communication channels. Lumi – PGE Group's new brand – debuted on the market in 2018 with an attractive electricity sales offering for the residents of Warsaw. PGE's online store and mobile information hubs were also launched. Green energy and anti-smog offerings are also interesting for customers.

Attaining the status of a reliable, credible and modern supplier will allow PGE Group to retain a low client migration score in the mass segment. Thanks to its activities in 2018, PGE Obrót S.A. received the Customer-Friendly Company Emblem and was selected as a Trustworthy Brand for businesses.

Key
indicators
Implementation 2017-2018 Progress and target How we intend to achieve the
target by 2020 and in later years
RELIABLE AND ACTIVE UTILITY AND SERVICE SUPPLIER
SAIDI
(minutes)

Systematic improvement in
quality indicators in recent
years was distorted by sudden
weather events.

Launch of Telephone Reporting
Centre, which is active
throughout PGE Dystrybucja's
entire area, handling the
emergency line 991.

Launch of innovative system for
557
2017
299
196
2018
2020 target

Further improvement in supply
reliability and reduction in SAIDI
and SAIFI by 56% between 2015
and 2020.

Development of integrated and
automated system for managing
LV distribution network
infrastructure cooperating with
diffuse energy sources and
accumulators installed at
prosumer installations.
SAIFI
(minutes per
customer)
detecting and isolating short
circuit incidents on overhead
MV lines.

Targeted modernisation of grid
infrastructure.

Implementation of innovative
metering system at Białystok
branch and Łódź branch.
5.48
2017
3.92
2.11
2018
2020 target

Construction of system for
automatic reconfiguration of LV
grid to improve the quality of
distribution services in normal
and emergency work mode.

Development of autonomous
mechanisms for reducing the
effects of LV line failures.

Increase in earthing rate of the
network.
New
customer
connection
time
(days)

Construction of harmonised
connection system.

Connection process simplified
and shortened to 7 months.

Adaptation of distribution grid
and company organisation for
work with new sources –
12 500 micro-installations
connected in 2018 alone.
215
2017
211
180
2018
2020 target

Optimisation of process of
connecting to the distribution
network by enhancing online
communication, increasing the
functionalities of IT systems and
streamlining procedures.
Customer
satisfaction
score
(in points,
PGE Obrót)

Continuous monitoring of
customer satisfaction indicators
and reliability assessments.

Expanded product offering for
retail sales.

Implementation of electronic
invoicing and remote contract
execution.

New retail sales brand – Lumi.

Launch of new sales and
customer service channels (PGE
e-shop, mobile electronic
75.9
2017
79.6
2018
2020

Development of product offering
and communication channels
using digital platforms and
intelligent devices.

Consistent enhancement of long
term relations with clients.

Retention of low client migration
rate in mass segment.

target

customer service office,

chatbot).

POLAND'S MOST EFFICIENT AND FLEXIBLE ENERGY GROUP

PGE Group's cost and operational efficiency is one of key preconditions for accomplishing the other strategic goals. On the other hand, flexibility is key to achieving the ability to respond quickly to opportunities arising in PGE Group's environment.

Initiatives related to reducing PGE Group's controlled costs and the development and maintenance of efficient generation capacities, adapted to a new market model, will help to maintain the net debt to EBITDA ratio at a level guaranteeing implementation of PGE Group's ambitious investment programme.

A harmonised approach to planning expenditures thanks to a newly-implemented Asset Management Policy, which takes into account asset significance, among other things, will make it possible to keep asset maintenance costs and modernisation and replacement expenditures at a level guaranteeing satisfactory profitability of operations as well as maintenance of appropriate availability and security of electricity supplies.

Additional annual EBITDA contributed by the District Heating Strategy is estimated at approx. PLN 1 billion until 2030, driven by a 10% reduction in repair costs (by 2023, compared to 2017) and higher asset management efficiency.

Key indicators Implementation 2017-2018 Progress and target How we intend to achieve the
target by 2020 and in later years
POLAND'S MOST EFFICIENT AND FLEXIBLE ENERGY GROUP
Net debt /
EBITDA

PGE Group's initiatives aimed at
reducing controllable costs and
the construction and
maintenance of generation
capacities.

Granting of capacity contracts
for 2021-2023

Standardisation and
optimisation of support
functions at PGE Group level.

Commencement of
implementation of integrated
management system for
production assets.

Update of the Human Capital
Management Strategy.
Maintaining
the rating
1.51
0.99
2017
2018
2020
target

Additional EBITDA result from
implementation of District
Heating Strategy estimated at
approx. PLN 1 billion in 2030.

Increase in asset management
efficiency.

Retention of competitiveness
of lignite mining.

Use of funding programmes for
investments, modernisations
and research and development
programmes.

LEADER IN DEVELOPMENT OF NEW BUSINESS MODELS AND OPERATING SEGMENTS

The PGE Group's strategy places particular emphasis on the development of new business models and operating segments in order to diversify revenues structure and to increase EBITDA from new operations. This will be possible through PGE Group's involvement in cooperating in the area of development and commercialisation of new technologies with credible partners having competences allowing to obtain synergies and competitive advantages. New technological solutions that are of interest to PGE Group include energy warehouses, electromobility, including car sharing, construction of charging stations, diffuse energy sources and intelligent solutions for buildings and cities and ICT technologies supporting implementation of new business models and improving currently pursued processes.

Involvement in the development and commercialisation of new technologies will allow PGE Group to introduce to the market a modern and comprehensive offering for clients, covering, among other things, photovoltaics, electromobility, microgrids, intelligent home solutions (Smart Energy project), natural gas and broad package of electricity-related services.

PGE Group intends to build up its brand of a leader on the energy efficiency market. New ESCO (Energy Saving Company) activities will provide clients with benefits such as reduced energy consumption costs, supply continuity and improved image. This will enable PGE Group to develop long-term beneficial relations with customers. A wide scope of initiatives to improve the effectiveness of energy infrastructure and buildings belonging to the Group will also be implemented.

PGE Group's activities in the area of equity investments in innovative start-ups are carried out through PGE Ventures sp. z o.o. – a specialised CVC fund, which intends to invest up to PLN 100 million in the most innovative projects by 2025. Moreover, using funding available from programmes operated by the Polish Development Fund (PFR) and the National Centre for Research and Development (NCBiR), PGE Ventures sp. z o.o. is co-creating external venture-type investment funds with total capitalisation amounting to PLN 140 million. PGE Group's activities related to start-up incubation and acceleration at the earliest growth stage are conducted by PGE Nowa Energia sp. z o.o., which intends to spend up to PLN 1.5 million annually on acceleration activities. Some of these projects are being implemented in cooperation with business lines, which co-finance certain stages of projects.

STRATEGIC OPTIONS OF PGE GROUP AFTER 2020

Retaining the top position on the electricity generation market in the long term necessitates market and regulatory analyses, continuous development and innovativeness. PGE Group has a programme of technologically diverse investment projects that address the three strategic options embedded in PGE Group's strategy for 2016-2020. Selection of the Group's development path will largely depend on the national and foreign surroundings. The final shape of Poland's Energy Policy 2040, the EU's climate and energy policy, the power system's needs as well as market model and the cost to finance specific undertakings – all of this will have impact on the investment decisions concerning specific projects.

Main strategic options after 2020 are:

  • Construction of off-shore wind farms,
  • Construction of first Polish nuclear power plant,
  • Development of modern coal-fired generation connected with new lignite deposits, mainly Złoczew deposit.

ACTIVITIES RELATED TO OFFSHORE WIND ENERGY

Offshore programme – background and work status

PGE Group's Offshore Programme was launched in 2009. In 2012, SPVs Baltica 1, 2 and 3 received permits to build and use artificial islands for installing offshore wind farms with total maximum capacity of 3.5 GW. Works that are currently underway are focusing on the Baltica 2 and 3 sites – jointly called the "Baltica" project. The Baltica 1 area is being considered for a prospective location for another stage of the Programme. In 2014, Baltica 3 signed a connection agreement with PSE S.A. for 1 045 MW. In January 2019, Baltica 2 received technical conditions for connecting 1 498 MW.

Activities in Project Baltica's technical area are mainly focusing on:

  • conducting works intended to secure a decision on environmental conditions an application for issue of such a decision was submitted to the Regional Directorate for Environmental Protection in Gdańsk in December 2017,
  • conducting wind speed measurements using floating lidar and obtaining wind speed measurements from other reference sources,
  • designing an optimal distribution of turbines and preparing preliminary productivity analyses,
  • developing a concept for capacity offtake and securing land for connection paths and the end station,
  • preparing preliminary geotechnical surveys intended to examine the geological and geotechnical conditions at Project Baltica's sites in order to select optimal types of foundation. Characteristics of offshore projects and development supporting solutions are presented on different forums, including works of parliamentary groups.

Business partnership

In order to minimise project risk and maximise the learning curve, PGE intends to implement the Programme's first stage, i.e. Project Baltica with capacity of up to 2.5 GW, with an experienced industry partner. In December 2018, PGE's Management Board agreed to begin a process intended to bring in an industry partner for this Project and send out transaction documents as an invitation to participate in this process. In January 2019, 13 entities with extensive experience in building and operating offshore wind farms expressed interest in purchasing a 50% stake in Baltica 2 and 3. The process to select a partner is expected to be completed by the end of 2019.

Offshore wind energy and Poland's energy policy

Offshore wind farms feature prominently in Poland's draft energy policy sent out for consultations on November 23, 2018 and the draft National plan for energy and climate for 2021-2030, published on January 19, 2019. According to the draft energy policy, offshore wind capacities are to reach 4.6 GW by 2030, 6.1 GW by 2035 and 10.3 GW by 2040. The development of offshore energy will contribute to implementing objectives that are significant from the viewpoint of Poland energy policy: it is cost-effective, contributes to meeting the EU's renewables targets, lowers exposure to CO2 emission costs and additionally has a positive impact on economic growth.

Regulatory environment

The Act of February 20, 2015 on renewable energy sources makes it possible to seek government support for offshore wind farms that have a connection agreement and a decision on environmental conditions as part of an auction system. Offshore wind farms compete in one "basket" with other technologies that have similar energy generation costs: hydro, biogas and geothermal plants. However, due to a potential lack of a sufficient number of projects to ensure competitiveness in this technological "basket," the drafts of Poland's energy policy and national plan for energy and climate include the option to introduce a support mechanism dedicated for offshore wind farms.

Social acceptance

Given that PGE Group's offshore wind farms' location is beyond territorial waters, i.e. more than 12 nautical miles from the coast (over 22 km), no significant risk of a lack of social acceptance for the Offshore Programme is identified. It should be emphasised that the experience of western European countries shows that if other users of maritime areas are respected, especially the fishing community, then the development of offshore energy is accompanied by a positive social attitude, mainly thanks to development of the local value chain and new job creation. These experiences should also prove true in Poland's case, given the existing industrial and ship-building infrastructure in our country, which provides components to build offshore wind farms.

ACTIVITIES RELATED TO NUCLEAR ENERGY

Business partnership

PGE EJ1 sp. z o.o. ("PGE EJ1") is PGE Group's entity directly responsible for preparing the investment process, conducting environmental and location surveys, obtaining all of the necessary decisions for the construction of the first Polish nuclear power plant, and implementing the investment. In the future, PGE EJ1 will serve as the nuclear plant's operator. PGE EJ1 was established in 2010. In 2014, a shareholder agreement was signed, pursuant to which Enea S.A., KGHM Polska Miedź S.A. and TAURON Polska Energia S.A. (the "Shareholders") each purchased from PGE a 10% stake in PGE EJ1 (30% in total). The shareholder agreement requires the parties to jointly finance, proportionately to the stakes held, activities related to implementing the investment. In the fourth quarter of 2018, PGE's Management Board expressed preliminary interest in purchasing all of PGE EJ1's shares from the remaining Shareholders. PGE aims to carry out operational and cost restructuring at PGE EJ1 and integrate it within PGE Group, which would ensure that the Group's intellectual and organisational potential in the area of nuclear power is utilised in an optimal manner. All of the Shareholders have confirmed their preliminary interest in selling their stakes in PGE EJ1. The execution of transaction will be possible after the preparation of valuation of PGE EJ1 by the independent adviser and after obtaining corporate approvals from all concerned parties.

Site characterisation and environmental surveys

PGE EJ1 is currently conducting location and environmental surveys at two potential sites in the Pomeranian Voivodeship – "Lubiatowo-Kopalino" in the Choczewo municipality and "Żarnowiec" in the Gniewino and Krokowa municipalities. The surveys focus on activities necessary to prepare a report on the undertaking's environmental impact and a site report.

Selecting an appropriate location is one of the key aspects in ensuring nuclear safety and the efficient and reliable operation of a nuclear power plant. The results of these works are necessary in order to develop solutions that ensure the power plant's safe operation and minimise its impact on the natural environment and the everyday life of local residents.

Social acceptance

At the same time, with a view toward ensuring social acceptance for the project to build the first Polish nuclear power plant, PGE Group is conducting activities aiming to maintain a high level of community support at the planned nuclear plant sites and to deliver knowledge about nuclear power. In 2018, works were continued within the Site Municipality Development Support Programme intended to reinforce partner relations with the local communities and authorities of the municipalities by providing support to initiatives that are of significance to the residents and development of the region.

Prospects for the project implementation and financing capabilities

Decisions with regard to the continuation of the Programme will be made based on decisions by the Minister of Energy concerning a role of nuclear energy in Polish fuel mix, mode for the procurement of nuclear power plant technology, investment financing model and an updated Programme for Poland's Nuclear Power.

Compensations from WorleyParsons

WorleyParsons initiated a lawsuit for payment of PLN 59 million for due remuneration, according to the claimant, and return of an amount unduly collected, according to the claimant, by PGE EJ1 from a bank guarantee, and subsequently expanded its claim to PLN 104 million (i.e. by PLN 45 million). On March 31, 2018, the company filed a response to WorleyParsons' expanded claim. PGE Group does not accept the claim and regards its possible admission by the court as unlikely.

ACTIVITIES RELATED TO DEVELOPMENT OF ZŁOCZEW DEPOSIT

Development of the Złoczew deposit can only be implemented once the conditions specified in the Programme for the lignite mining sector in Poland, adopted by the Council of Ministers in 2018, are met. These conditions especially include:

  • a directional decision being made regarding the role of lignite in the national energy mix in the long term,
  • development and implementation of solutions ensuring the economic feasibility of new deposit projects (these solutions must be approved by the EU),
  • securing funding for this undertaking.

Implementation of the strategic options will thus largely depend on the national and international regulatory environment. The final shape of Poland's energy policy, the EU's climate and energy policy, permissible emission from installations fuelled by fossil fuels, the needs of the power system or the market model and the cost to finance specific undertakings – all of this will have an impact on the investment decision regarding implementation of specific investments.

Development of Złoczew deposit – background and status

Work on the project "Obtaining a concession for mining coal from the Złoczew deposit" began in 2008. In 2008-2018, a range of studies and documentation were prepared, providing information on the deposit, including its structure, quality parameters, hydrogeology, technological conditions related to coal mining. Works aimed at obtaining a concession were conducted in parallel. These include:

  • activities intended to obtain a decision on environmental conditions for the "Złoczew deposit development" undertaking,
  • works related to adapting spatial development conditions and directions for all four municipalities within which the Złoczew deposit is located,
  • application to the Minister of the Environment for granting of a concession.

Due to appeals being lodged against the environmental decision and spatial development studies, the concession award date is unknown at this point. Securing the concession without including the investment in these studies and without a legally binding environmental decision is not possible.

Current development concept for Złoczew deposit

Works intended to determine the preferred approach to coal development at the Złoczew deposit were also conducted in recent years. The base scenario for Złoczew deposit development currently is to build the Złoczew mine and maximally use the existing infrastructure at the Bełchatów power plant. This concept would necessitate the transport of coal from the Złoczew open-pit mine to the Bełchatów plant. At the current stage of conceptual work, two variants are being contemplated – conveyor belts and rail transport.

2.3. Prospects for the development

KEY DIRECTIONS OF CHANGES POTENTIAL IMPACT ON PGE
MACROECONOMIC
ENVIRONMENT -
GLOBAL

Economic downturn symptoms in eurozone:

European Commission's GDP forecast for 2019:
1.3%,

Severe decline in industrial production (-4.2%
y/y in December 2018 ),

Industrial PMI: 50.5 (in February 2019: 49.2).

Central bank interest rates at most of the developed
economies are very low or negative. If a recession
comes, the lack of tools for further monetary
stimulus might be a problem.

The risk of introducing barriers in international trade
may translate into lower global GDP growth.

Decreased consumption might reduce exports from
Poland, translating into lower demand for electricity
in the country, and thus lower electricity production
in conventional units.

A slowdown in the eurozone might mean lower
demand for fossil fuels and a decline in fuel prices
for PGE Group.

A potential economic downturn might also mean
lower CO2 emissions, which might limit the prices
for emission allowances in EU ETS, thus lower costs
of redemption of CO2 allowances in PGE Group.
MACROECONOMIC
ENVIRONMENT -
POLAND

Real GDP growth in 2018 at 5.1% (preliminary
estimate from Central Statistical Office of Poland).

The key growth drivers were domestic demand and
investments. However, private consumption growth
and net exports declined towards the end of the
year.

In subsequent years, forecasts from the European
Commission and the National Bank of Poland see a
considerable decline in GDP growth:

2019: 3.5-3.6%,

2020: 3.2-3.4%.

Numerous warning signs include:

Decline in industrial PMI in December 2018
below 50 points to 47.6 points, i.e. into recession
area and the lowest level since 2013,

Lower economic growth in the eurozone,

Expected slowdown in growth of public
investment and use of EU funding.

GDP growth levels as forecasted should translate
into further - though slower - domestic growth in
demand for energy (depending on weather
conditions) and should have positive impact on load
factor of conventional generating assets and on
distribution and sales volumes.

Given the new efficient generation capacities that
are expected to enter the power system, the lower
growth in electricity demand might translate into
lower electricity prices on the wholesale market.

Growth in indicators for construction and assembly
works prices and cost pressure in the specialised
construction segment might result in growth in
actual investment expendituresfor realisation of
planned investment program or higher costs of
third-party services. Lack of qualified employees may
result in delays in pursuing investment and repair
projects.
TRENDS ON FUEL
MARKETS

Hard coal in global markets in a slight down trend
due to high inventory and expected economic
slowdown.

On-going investments in the hard coal mining area in
the country should end up increasing this
commodity's output.

At the same time, as new highly-efficient generation
units are commissioned, the use of this fuel for
electricity production purposes is expected to
decrease.

Systematic growth in demand for natural gas in
Poland and in the region is expected due to new
investments in gas-fired units and highly-efficient
cogeneration units as well as a gradual shift in
Germany's fuel mix.

Concurrent expansion of capacity for natural gas
supply to Poland (expansion of LNG terminal, Baltic
Pipe project, infrastructure projects by LNG
exporters).

Act of December 28, 2018 regulates electricity prices
for final off-takers.

Increasing trading capacity on interconnectors with
Germany following completion of grid investments

Lower risk of domestic coal non-availability for PGE
Group's production purposes and potential decline
in price over the long term.

New potential natural gas supply will make it
possible to develop the Dolna Odra power plant
using CCGT technology.

Higher capacity for natural gas imports will make
room for investments in high-efficiency gas-based
cogeneration in the new support system.

Profitability of Supply segment depending on level of
compensations available due to regulated prices and
pressure on liquidity until the payment of first
compensations payment.

Higher trade availability of potentially cheaper
electricity may attribute to the growth of electricity
import to Poland, thus limiting increase of wholesale
electricity prices and load factors of the Group's
units.

Capacity market is a Chance for graduał
transformation of capacity structure in NPS directing
towards construction of highly-efficient generation
units working in base-load, flexible peak units and
reduction of units not meeting the environmental
requirements.
KEY DIRECTIONS OF CHANGES POTENTIAL IMPACT ON PGE

Implementation of capacity market allowing for
securing of revenues for construction and
modernisation projects of generation units with
limited possibilities for support for existing coal-fired
units from year2025.
DEVELOPMENT OF
NEW
TECHNOLOGIES

We are observing rising competitiveness of wind
(including offshore) and PV technologies, as
confirmed by prices obtained in RES auctions.

In certain countries, full-scale new energy storage
technologies are dynamically developing, providing
regulatory services, among others.

Systematic development of prosumer energy and
dynamic growth in number of micro-installations.

Development of electromobility.

Increasing the competitiveness of new renewable
energy sources has impact on their development
and reducing the load factorsfor older conventional
units.

Declining costs of offshore technologies make
offshore one of the options for PGE Group's
development.

The commercialisation of energy storage on an
industrial scale will make it possible to better use
renewables, supplementing conventional capacities
in the system balancing role.

Along with the development of prosumer energy,
grid operations at local level are becoming more
volatile, which necessitates investments in
infrastructure (connections, modernisations), while
limiting the electricity distribution volumes. In
Conventional Generation higher demand for highly
flexible generation units in order to balance
dispersed sources.

The development of electromobility will drive
demand for electricity, especially at night, but it
requires investments in the development of grid
infrastructure and charging stations, as well as
charging management system. It is also possible to
use cars' batteries as energy storage for RES
production.

PGE Group's use of new technologies might create
development opportunities in new roles and
business areas.

PROSPECTS FOR GROWTH OF ACHIEVABLE CAPACITIES IN YEARS 2019-2020 (MW GROSS)

1 824 215
16 287* +905 MW ELO5
+905 MW ELO6
+15 MW ELT1
+10 MW ELR
+0.1 MW MEW
-6 MW ECG TG5
-5 MW ECG TG6
+496 MW ELT 11
+97 MW Klaster
+15 MW ELT3
-370 MW ELB1***
-222 MW EDO1
-232 MW EDO2
+0.7 MW MEW
17 896**
2018 2019 2020 Total

* including 10 886 MW gross achievable capacities in conventional units of PGE GiEK S.A. and 3 212 MW in Acquired assets (Rybnik power plant, EC Gdańsk, EC Gdynia, EC Kraków, EC Wrocław, EC Czechnica, EC Zawidawie, EC Zielona Góra, EC Toruń).

** including 12 387 MW gross achievable capacities in conventional units of PGE GiEK S.A. and 3 222 MW in Acquired assets.

*** Unit no. 1 in Bełchatów power plant will be decommissioned as from June 1, 2019.

Explanation:
ELB – Bełchatów power plant ELT – Turów power plant ECG – Gorzów CHP
EDO – Dolna Odra power plant ELR – Rybnik power plant MEW – Small hydro power plants
ELO – Opole power plant Project Klaster – wind farms Karnice II, Starza, Rybice

Chart presenting the growth of capacity illustrates commissioning and decommissioning of capacity of the PGE Capital Group. The schedules may change. Data do not include potential capacity growth related to investments in renewables installations that are dependent on the results of future RES auctions.

EVALUATION OF INVESTMENT CAPACITIES

On-going and future investments are and will be financed from funds generated by the core activity of the PGE Group, funds obtained from the issue of bonds, both on domestic and international markets, and from other types of external financing, e.g. bank loans. Financial results achieved by the PGE Group and available credit limits secure sufficient resources to achieve its midterm investment goals, including capital investments. Scale of development of the Group's efficiency, particularly lowering the operating expenses, will be significant for the ability to finance the investment program in the long term.

For selected undertakings, PGE Group will also consider financing in project finance formula.

3. Risksin the Group's operations

3.1. Risk management

PGE S.A., as the Corporate Centre managing the Group, creates and implements integrated risk management architecture at PGE Group. In particular, it shapes PGE Group's risk management policies, standards and practices, designs and develops internal IT tools to support these processes, specifies global risk appetite and adequate limits as well as monitors these.

PGE Capital Group companies, as well as other entities from the electrical and power sector, are exposed to a number of risks and threats resulting from the specific operating activities and operating in specific market and regulatory environment.

In PGE Group risk management process is pursued based on the GRC (Governance - Risk - Compliance) model. It allows adaptation and integration of each of the operational areas at all levels of management. Having established a top-level Risk Committee, which reports directly to the Management Board, supervision over the effectiveness of risk management in the Group is ensured. Function definition within corporate risk management allows an independent assessment of particular risks, their impact on PGE Group and limiting and controlling major risks using the capital exposed to risk concept via dedicated instruments. Formation of a separate compliance function within the Group guarantees that PGE Group's activities are in line with legal conditions and ensures observance of the adopted internal standards.

The PGE Capital Group has consequently developed a comprehensive risk management system. We measure and assess risks in the key companies of the Group. Mechanism allowing identification of areas exposed to risk and risk level measurement methods are constantly verified and developed. Thanks to that, the significant risks concerning various areas of operations are identified and kept within the assumed limits by reducing negative effects of such risks and by taking preventive or corrective measures, in accordance with the presented cycle.

3.2. Risk factors and mitigating actions

The main risks and threats of PGE S.A. and the PGE Group are presented below along with their assessment and outlook in the horizon of the next year.

Risk level low medium high Mitigating actions
Risk outlook
decrease

growth

stable
and main tools used for the management of the risk
Low level Risk does not pose a threat and may be tolerated,
Medium level Risk which needs preparation of the proper reaction based on analysis of costs and benefits,
High level Intolerable risk, which needs immediate and active reaction, leading simultaneously to limitation of possible consequences and of probability of occurrence thereof.
Market and
product
risks
Related to prices and
volumes of offered
products and services
Prices of electricity and related products –
the future levels and volatility of commodity
prices relative to open contract positions -
products (property rights, CO2 emission
allowances).
resulting from a lack of certainty with regard to
this
particularly concerns electricity and associated
Actions:

Using consistent guidance in respect of process organisation in the context of commercial strategy and mid-term
planning (strategy for hedging key exposures in the area of electricity and related product trading that correspond
to the adopted risk appetite in the mid-term).

Establishing position hedging levels with consideration given to the results of analysing pricing risk in respect of
electricity and related products, VaR-based. Target hedging levels are specified taking into consideration the
Group's financial standing, including in particular its strategic objectives.

Research, monitoring and analysing the electricity and related products markets in order to optimally use
generation and selling capacities.

Acquiring new customers
-
diversification of channels to reach final off-takers
and diversification of target groups
by maintaining an extensive product portfolio and adapting offering to market.
Electricity sales volumes –
determining the demand and supply of
electricity, directly affecting the volume of
market sales by PGE Group.
this risk derives from
a lack of certainty with regard to the conditions

Current clients retention -
a diversified portfolio of customer loyalty schemes and client-acquisition activities and
special offers dedicated to former clients who moved over to the competitors.

Care for
a high level of customer service by developing employees' competences and building relations with
business and retail clients.

Use of tools to supporting customer relations processes allows the Group better sales planning and organisation
of sales.
Tariffs (regulated prices) –
requirement to approve rates
services and electricity and heat prices for
particular groups of entities.
resulting from the
for distribution
Property risks
Related to development
and maintenance of the
assets
Failures –
connected with the operation and
degradation over time of energy equipment and
facilities (maintenance and repair work,
diagnostics).
Actions
:

Active pursuing of a strategy for building up and modernization of the production capacities.


Performing maintenance repairs in line with the highest sector standards –
breakdown rates in the country
PGE Group's plants have the lowest
Damage to property –
connected with the
physical protection of energy equipment and
facilities against destructive external factors
(including fire, weather phenomena and
intentional damage).

Our main generation assets were insured against failure and damage to property .


or for particular types of assets,

the distribution grid.

Diversification of the current structure of the production sources due to energy generation technology.
Assets are insured based on an analysis of insurance costs, capabilities of insurance markets for particular risks
costs related to asset replacement and potential lost revenue
The reliability of the power supply to the end users has been systematically improved through modernization of
Investment and development –
connected with
strategic plans for expanding the generation,
distribution and sales potential as well as on
going investments.
Operational risks
Related to pursuing of
ongoing economic
processes
Electricity and heat production

connected
with production planning and impact of the
factors that determine production capacities.
Actions
:

Optimisation of costs inter alia through monitoring of fuel prices and reserves and securing supply through long
term contracts with suppliers and through price fixing formulas.
Fuel management

connected with
uncertainty regarding the costs, quality,
timeliness and volumes of fuel supply (mainly
coal) and production raw material as well as the
effectiveness of inventory management
processes.

Sales margins are secured by purchasing deficit CO2
emission allowances

Optimisation of equipment lifecycles and the availability of key assets.

Inspections, repairs and modernisation of the existing assets

PGE's active participation in internship programmes and cooperation with educational institutions in order to
secure a pipeline of qualified personnel

Assessment and training of personnel in order to make optimal use of it within the Group's structures

Conducting an intensive and effective dialogue in order to avoid escalation of potential disputes with the social
Human Resources

pertaining to provision of
personnel
with the relevant experience,
competences
and ability
to perform specific
tasks.
partners and to work out the most favourable solutions with regard to employment and employment costs
within PGE Capital Group connected therewith.
Social dialogue

connected with a failure in
achieving agreement between the Group's
management and employees, what could lead to
strikes/collective labour disputes.
Regulatory and legal
risks
Related to compliance
with external and
internal legal provisions
Legal changes in support systems –
connected
with uncertainty as
to the future shape of the
support system for production of certified
energy.
Actions:

Monitoring of the changes being introduced or proposed provides that our operations in key business segments are
carried in compliance with the law and that PGE Capital Group has solutions which take into account potential
changes in the legal environment

Active participation of
PGE S.A. as the member of the Polish Electricity Committee that opened its office in Brussels.
Through the Committee's operations, the Company
actively influences proceeding and shaping of EU law and
engages a dialogue with the EU institutions.

Adaptation of internal regulations and practices to make sure that the activities are in compliance with the power
sector regulations and binding law.

Improvement of activities aimed at protecting and improving the state of the environment by implementing
technological and organisational solutions ensuring efficient and effective management in this area.
Environmental protection –
resulting from
industry regulations specifying which
"environmental" requirements energy
installations should
meet and what the
principles for using the natural environment are.
The future environmental regulations and
uncertainty concerning their final shape (in
particular with regard to the revision of BAT /
BREF) may translate into a change in the level of
capital expenditures of the PGE Group.
Concessions –
resulting from the statutory
requirement to hold concessions with regard to
conducted operations.
Discriminatory activities –
connected with
application by the Group of practices that limit
or
eliminate competition and infringe on legal
regulations or consumer interests.
Taxes

related to uncertainty surrounding the
future shape of tax regulations and their
interpretation.
Financial risks
Related to finance
management
Credit risk

connected with the counterparty
default, partial and/or late payment of
receivables or a different type of breach of
contractual conditions (for example failure to
deliver/collect goods or failure to pay for any
associated damages or contractual penalties).
Actions:

Prior to executing a transaction, a counterparty assessment is carried out and forms a base for applying credit
limits, that are regularly updated and monitored. Exposures that exceed established limits are hedged in
accordance with the Group's credit risk management policy.

Applying
a central financing model, which assumes –
as a rule –
that external capital
is raised by PGE S.A. PGE Group
subsidiaries use a variety of intra-group financing sources and liquidity risk is monitored using periodic planning for
Liquidity risk

connected with the possibility of
losing the ability to meet current liabilities and
obtaining financing sources for business
operations.
operating, investing and financing activities

As regards currency risk and interest rate risk, PGE Group has implemented internal management procedures. PGE
Group companies execute derivative transactions involving interest rate-
and/or currency-based instruments (IRS,
CCIRS) only in order to hedge identified risk exposures.
Interest rate risk

resulting in particular from
the negative impact of changes in market
interest rates on PGE Group's cash flows
generated by floating-rate financial assets and
liabilities.
Foreign exchange risk

understood in particular
as
risk that PGE Group's cash flows denominated
in currencies other than the functional currency
are exposed to due to negative exchange rate
movements.

3.3. Strategic risk

PGE Group does not focus exclusively on risks concerning on-going activities. Risks that may have an impact on the Group's functioning in a longer timeframe are also subject to identification, assessment and analysis. Assessment of impact on the Group's objectives, image and business continuity is performed at the top management level. This allows us to prepare for arising challenges and ensure the Group's development in the long term.

Unlike threats to PGE's day-to-day business and results, strategic risks might have an impact on strategy implementation and the future of the entire organisation. Their identification is the key to ensuring PGE Group's sustainability.

Presented below are the key identified strategic risks along with their assessment.

Impact   
very low low medium High very high
Cybersecurity
Risk associated with intentional disruption of generation and distribution assets and IT systems used at PGE Group.
Forces of nature
Risk associated with more frequent extreme weather events having impact on ability to generate and distribute
electricity, as well as prices of generation and distribution costs of electricity and heat.
Legal
and scope of EU regulations having impact on the Group Risk associated with the changes of national legislation governing PGE Group's activities and an increase in the volume
Environmental restrictions
mining activities Risk connected with stricter environmental restrictions applicable to PGE Group's electricity and heat production and
 Energy policy
Risk associated with changes in the concept for the energy sector in Poland and PGE Group's role in it
 Human resources
Risk associated with restricted availability of employees who are of key importance to PGE Group's processes
Employee and client safety
Risk associated with unexpected events that generate naturally irreversible material losses and heavy injuries or deaths
 Competition
the energy market Risk associated with the development by competition of a product offering that would decrease PGE Group's share of
 Technological revolution
Risk of technological change causing a limited competitiveness of electricity and heat production in baseload assets
owned by the Group and their distribution using grid assets owned by PGE Group
 Macroeconomics and geopolitics
commodity prices that have impact on PGE Group's activities Risk associated with changes in economic and geopolitical situation, causing swings in macroeconomic indicators and

In analysing these risks as threats for PGE, the Company tries at the same time to identify any opportunities that such changes might bring about. Countering risks becomes an opportunity for the Group's development if we manage to adapt to a changing world in advance.

4. Electricity market in 2018 and regulatory and business environment

4.1. Macroeconomic environment

PGE Group's main operating area is Poland, and the domestic macroeconomic backdrop has a substantial impact on Group's results. At the same time, the condition of Poland's economy remains largely tied to the situation across the European Union and in global markets. The Group's financial results are affected by both the situation in specific segments of the economy and the financial markets, which affect the terms of PGE Group's debt financing.

As a rule of thumb, there is a historical correlation between rising electricity demand and economic growth in Poland. Considering PGE Group's position on the Polish power generation market, as well as its substantial share in the electricity sales and distribution market, changes in power and heat demand may have a significant impact on the Group's results.

In 2018, gross electricity consumption went up 1.7 y/y. The increase was higher than in the previous year, when consumption went up 2.1% compared to 2016.

Economic trends in 2018 remained positive in general. According to estimates by Central Statistical Office of Poland, real gross domestic product in the fourth quarter of 2018 was 4.6% y/y.

Diagram: Seasonally adjusted GDP change vs. change in domestic gross electricity consumption.

Source: Central Statistical Office of Poland, PSE S.A., estimate by ING Bank Śląski for Q4 2018.

The Purchasing Managers' Index (PMI) for industry reached 52.1 points on average in 2018 (53.6 points on average in 2017), what is a result above 50 points, above which the respondents expect the sector's situation to improve. However in December 2018 PMI declined from the November reading of 49.5 points to 47.6 points, signalling deterioration in the Polish industrial sector. Production volumes and new orders also declined. The number of new export orders and production backlog declined for the fifth month in a row, while employment did not meaningfully change since November. The Eurozone PMI in 2017 averaged 57.4 points, compared to 55.0 points in 2018 (PMI Manufacturing for the Eurozone in December 2018 recorded 51.4 points).

Seasonally adjusted GDP Gross energy consumption

Diagram: Manufacturing PMI in Poland and Eurozone (in points).

Source: Markit Economics

Development in the Polish economy is reflected by inter alia dynamics in overall industrial production. In 2018 it went up by 5.8% y/y, compared to 6.6% in 2017. The change resulted from increase in industrial production by 5.7% y/y in 2018 versus 7.3% in 2017. Production in the whole energy sector increased by 9.0% y/y in 2018 vs 5.5% in 2017. The value of industrial manufacturing depends on volumes of goods produced and prices. PPI in 2018 amounted to 2.1%. CPI reading in 2018 amounted to 1.1% y/y.

4.2. Market environment

ELECTRICITY PRICES – DOMESTIC MARKET

Day-ahead market (RDN)

Market/measure Unit Q4 2018 Q4 2017 Change y/y 2018 2017 Change y/y
RDN – average price PLN/MWh 245 165 48% 223 158 41%
RDN – trading volume TWh 6.74 5.64 20% 23.55 21.24 11%

Analysis – selected price factors affecting RDN quotations

Factor Unit Q4 2018 Q4 2017 Change y/y 2018 2017 Change y/y
CO2 emission rights EUR/t 19.66 7.38 166% 16.51 5.97 177%
Polish Energy Industry
Coal Index PSCMI1
PLN/GJ 11.22 9.54 18% 10.98 9.26 19%
Wind generation NPS TWh 3.70 4.63 -20% 11.68 13.86 -16%

In the fourth quarter of 2018 the average energy price on the Day-Ahead Market1 reached PLN 245/MWh and was 48% higher than the average price (PLN 165/MWh) quoted in analogical period of 2017. The increase in price was due to the situation on related markets: CO2 emission allowance prices in the fourth quarter of 2018 were by 166% higher than in the same period of base year. Moreover, an increase in coal prices was observed – the average level of the PSCMI1 in the fourth quarter of 2018 reached PLN 11.22/GJ, i.e. 18% higher than in the comparative period (PLN 9.54/GJ) of the previous year. The growth in electricity prices also had to do with weather conditions and a 20% y/y decline in energy supply from wind assets in the National Power System.

In full year 2018, the average price on the day-ahead market was PLN 223/MWh, which is 41% higher than the price recorded in the preceding year (PLN 158/MWh). The increase in price on the day-ahead market was due to cost pressure and the situation on related markets. CO2 emission allowance prices in 2018 were 177% y/y. The PSCMI1 index in 2018 averaged PLN 10.98/GJ - up by 19% y/y i.e. from PLN 9.26/GJ. Wind-based generation declined 16% y/y cumulatively.

Chart: Monthly prices and price volatility at the day ahead market in 2017–2018 (TGE)*

* Average monthly price of RDN index calculated on the base of hourly quotations (fixing), weighted by the trading volume.

1 Statistic calculated on the basis of fixings data

Forward market

Market/measure Unit Q4 2018 Q4 017 Change y/y 2018 2017 Change y/y
BASE Y+1 – average price PLN/MWh 281 175 61% 243 168 45%
BASE Y+1 – trading volume TWh 38.70 17.68 119% 125.80 46.33 172%
PEAK5 Y+1 – average price PLN/MWh 378 223 70% 348 216 61%
PEAK5 Y+1 – trading
volume
TWh 5.28 3.08 71% 10.00 6.44 55%

Electricity prices on forward market are shaped by the similar fundamental factors, as the prices on the day ahead market described in the previous paragraph. Observed growth y/y – for the fourth quarter 2018 and full year 2018 – were related to, above all, trends on the related markets: CO2 emission rights and hard coal.

Revenues from electricity sales are recognized along with the delivery of electricity (not contracting) – growth of forward prices will be visible in the Group's revenues in 2019. Growth of prices results from pressure on variable costs side.

The increased volume on forward market is connected with the amendment of the Energy law, which obliges the energy companies to sell all produced electricity on the commodity exchange or on regulated markets.

Chart: Monthly prices and price volatility on the forward market in 2017–2018 (TGE)*.

* Monthly average index level for forward contracts for the next year (Y+1), baseload and peak, calculation based on daily quotations, weighted by the trading volume.

INTERNATIONAL MARKET

Wholesale market (comparison of day-ahead markets)

Chart: Comparison of average electricity prices on Polish market and on selected European markets in 2018 (prices in PLN/MWh, average exchange rate EUR/PLN 4.26).

Source: TGE, EEX, EPEX, Nordpool, OTE a.s., PXE.

In the fourth quarter of 2018, growth in wholesale electricity prices in neighbouring countries was in the range of PLN 85- 92/MWh (i.e. 61-64% q/q). From this perspective the price growth in Poland by PLN 80/MWh (i.e. by 49%) is in line with the regional trend. The common electricity price growth driver in the region was the situation on related commodity markets: growth in prices on the coal market and the CO2 emission allowance market. In the fourth quarter of 2018, the average electricity price in Poland was higher than in Sweden (by PLN 21/MWh), Germany (by PLN 16/MWh) and the Czech Republic (by PLN 7/MWh). At the same time, the price differential between Poland and its neighbours decreased on a y/y and q/q basis. On a y/y basis, the average energy price in neighbouring countries increased by PLN 41-64/MWh (i.e. by 26-44%). From this perspective, the PLN 65/MWh (i.e. 42%) y/y growth in price in Poland is in line with the regional trend. In 2018, the average energy price in Poland was PLN 25-32/MWh higher than in Sweden, Czech Republic and Germany. The price differential between Poland and its neighbours was greater than in the previous year - resulting in growth in net imports.

International trading

Chart: Monthly imports, exports and cross-border exchange balance in 2017-2018 (in GWh).

Source: own work based on PSE S.A. data.

In the fourth quarter of 2018, Poland remained a net importer of electricity: trading balance reached 1.0 TWh (import 2.0 TWh, export 1.0 TWh). It is a result similar to the analogical period of 2017, when a trading balance reached 1.1 TWh (including import 1.8 TWh and export 0.7 TWh). In full year 2018 trading balance amounted to 5.7 TWh (import 8.2 TWh, export 2.5 TWh). In previous year Poland also was a net importer of electricity with trading balance of 3.4 TWh (import 6.6 TWh, export 3.2 TWh). In the whole year 2018 net import increased by approximately 2.3 TWh compared to the base period.

Diagram: Geographical structure of commercial exchange in 2018 (GWh).

Source: own work based on PSE S.A. data.

Retail market

The diversity of electricity prices for retail customers in the European Union depends not only on the level of the wholesale prices of electricity. The fiscal system, regulation mechanisms and support schemes in particular countries all have significant impact on the final price of electricity. In Poland in the first half of 20182 an additional burden for individual customers accounted for approx. 34% of the electricity price and in comparison to EU average of 31%. In Denmark and Germany the proportion of additional charges in the price of electricity exceeded 50%.

Chart: Comparison of average prices for individual customers in selected EU countries in the first half of 20183 (prices in PLN/MWh, average exchange rate EUR/PLN 4.22).

Source: own work based on Eurostat data.

Diagram: The share of additional charges in electricity prices for the individual customers in selected EU countries in the first half of 20184 (prices in PLN/MWh, average exchange rate EUR/PLN 4.22).

Source: own work based on Eurostat data.

2 Eurostat data are published in semi-annual intervals.

3 Eurostat data are published in semi-annual intervals.

4 Eurostat data are published in semi-annual intervals.

4.3. Prices of certificates

In the fourth quarter of 2018, the average price of green certificates (index OZEX_A) reached PLN 149/MWh and was 243% y/y. The price growth resulted from demand factors (a regulation of the Minister of Energy that introduced an obligation to redeem green certificates from 15.4% in 2017 to 17.5% in 2018 and to 18.5% in 2019) and supply factors (wind-based generation down by 20% y/y in the fourth quarter of 2018 and limited co-firing). Additionally, the decrease in certificates supply was driven by the closure of a certification system for new units and the upcoming end of a 15-year support period for new installations that had entered the system in 2005. The average prices of green certificates in all four quarters of 2018 were above the substitute fee due to a limited capability of paying the substitute fee. The average price of yellow certificates in the fourth quarter of 2018 reached PLN 111/MWh and was 5% lower than in the same period last year. The decline in prices results from a 34% y/y increase in the supply of energy produced in gas-fired cogeneration sources in full year 2018. The fourth quarter of 2018 was marked by comparable production on a year-on-year basis, which reduced the down trend from the previous quarter. The obligation to redeem yellow certificates increased to 8% in 2018, compared to 7% in 2017.

35 28 43 43 63 74 115 149 Q1'17 Q2'17 Q3'17 Q4'17 Q1'18 Q2'18 Q3'18 Q4'18 Green certificates and substitution fee substitution fee 300.03 92.04 48.54

Chart: Average quarterly prices of certificates.

Yellow certificates

Source: Own work based on TGE quotations. The yellow certificates prices presented on the chart are weighted average blended price – for products PMGM-16, PMGM-17, PMGM-18.

4.4. Prices of CO2 emission rights

EUA (European Union Allowances) prices are one of the key factors determining wholesale energy prices and PGE Group's financial results. Installations emitting CO2 in the process of electricity or heat production bear the expenses for purchasing EUA allowances to cover the deficit (i.e. the difference between CO2 emissions at PGE Group's generating units and the free-of-charge allowances received under derogation in accordance with the National Investment Plan). Wherein, last allocations granted free of charge are planned for realisations of investment tasks for 2019, what means that the free allocations in accordance with the currently used method will end in 2020.

In the fourth quarter of 2018, the weighted average price of EUA DEC 18 reached EUR 19.66/t and was 166% q/q higher than the average price for EUA DEC 17 (EUR 7.38/t). In full year 2018, the weighted average price for EUA DEC 18 reached EUR 16.51/t, up by 177% y/y from the average price for EUA DEC 17 (EUR 5.96/t).

The increase in CO2 emission prices observed in 2018 is a result of market perception of the EU ETS reform – this issue is illustrated on the chart below.

Chart: Prices of CO2 emission rights.

Source own work based on ICE quotations.

EMISSION RIGHTS GRANTED FREE OF CHARGE FOR YEARS 2013-2020

The Regulation of the Council of Ministers, that sets the allocation of allowances for particular units of electricity producers in period 2013-2020, was adopted on April 8, 2014. Analogically, allocations of allowances for heat producers were set by the Regulation of the Council of Ministers of March 31, 2014.

PGE's installations accounts were credited with free allowances for heat for 2018 and energy for 2017, while free allowances for electricity for 2018 will be received by the Group by the end of April 2019, after verification of reports from investments submitted to the National Investment Plan.

At the same time, redemption of emission rights resulting from CO2 emissions in 2017 was completed in April 2018.

Table: Emission of CO2 broken down into electricity and heat production in relations to allocation of CO2 emission rights for 2018 (in Mg).

Operator CO2 emissions in 2018* Allocation of CO2 emission rights for
2018**
CO₂ emission for electricity production 65 324 810 12 560 070
CO₂ emission for heat production 4 861 320 1 510 286
TOTAL CO₂ emission for electricity and heat production 70 186 130 14 070 356

* Estimates, emissions not verified - the data will be settled and certified by the authorised verifier of CO2 emission on the ground of yearly reports of volume of CO2 emissions.

** Amount of granted CO2 emission rights will be confirmed in the Regulation of the Council of Ministers in the first quarter of 2019.

4.5. Competitive environment

The electricity sector in Poland comprises four operating segments:

  • generation of electricity,
  • transmission, responsibility of the transmission system operator PSE S.A.,
  • distribution,
  • retail sales.

District heating sector may be also distinguished, within which PGE is active in heat generation, distribution and sales.

The key participants of the electricity market in Poland are four nationwide, vertically integrated energy groups: PGE Group, capital group of TAURON Polska Energia S.A., capital group of Enea S.A. and capital group of Energa S.A.

After the acquisition of EDF Polska assets, PGE Group strengthened its position in the generation segment and is the undisputed leader, with a 43% market share. The Group produces more electricity than all of the competitors on the consolidated market combined, whilst having the largest achievable capacities, both conventional and renewable. Aside from integrated energy groups, significant producers on the market include Zespół Elektrowni Pątnów Adamów Konin S.A. ("ZE PAK"), PKN Orlen S.A. ("Orlen") and PGNiG TERMIKA S.A. ("PGNiG"). Although ZE PAK's production is based on industrial plants, Orlen's and PGNiG's production is based on CHPs, the output of which depends on demand for district heating. ZE PAK's market share declined due to the shut-down of the Adamów plant from 2018, while Orlen's share significantly grew with the launch of gas-and-steam units in Włocławek and Płock.

Nearly half of the electricity produced in the country is hard coal-based - and this is a key fuel for PGE Group's competitors. One-third of the electricity produced in Poland is lignite-based. Aside from PGE Group, ZE PAK also bases its electricity production on lignite. The use of other fuels is of relatively low significance from the viewpoint of the national power system, although it should be noted that an increase in gas-based production is related to Orlen's new assets.

Chart: Share of largest Polish electricity generators in installed capacity and net generation in the first half of 2018.

a

Source: own work based on information published by the companies and Agencja Rynku Energii S.A. ("ARE").

The heat production market in Poland is highly dispersed, with the four leading producers accounting for less than 40% of production countrywide, and thanks to the acquisition of EDF's cogeneration assets, PGE Group became the undisputed leader of this market, too with a share reaching almost 18% in the first half of 2018. This market is of a local nature and bears the traits of a natural monopoly, with heating prices being set in an administrative procedure – tariffs approved by the President of the Energy Regulatory Office. The dominant producers focus their production activities in different urban areas therefore sector competition is limited. With this transaction, PGE gained access to district heating markets in the Wrocław agglomeration, Tri-City area, Kraków, Toruń and Zielona Góra. Besides PGE Group, the key producers of heat are PGNiG (focused on production mainly in the Warsaw agglomeration) and Veolia Group (Poznań agglomeration, Łódź).

Energy production from renewable sources is much more dispersed than the conventional generation market. Energy from biomass is produced at both dedicated installations and in a co-firing process with other energy sources across the country. In

previous years wind power sector was the most dynamically developing sector, with PGE Group's leading role. Having delivered four new wind projects in 2015, PGE Group became an entity with the largest installed wind capacity – 550 MW (through PGE EO S.A.). PGE Group has approximately 9% share of total wind capacity in Poland, which reached close to 5.9 GW in 2018. Other notable wind farm operators include: EDP Renováveis Polska sp. z o.o., innogy Renewables Polska sp. z o.o., Vortex Energy Polska sp. z o.o., Polenergia S.A., TAURON Ekoenergia sp. z o.o., ENERGA Wytwarzanie S.A. and E.ON Energie Odnawialne sp. z o.o., ENGIE Zielona Góra sp. z o.o. Competition among the existing wind assets covers competition on the electricity market (given that as of January 1, 2018 the obligation to purchase electricity from renewable energy sources of 500 kW or more was cancelled) and competition related to to participation in green certificates scheme. They are subject of free market trade, however, due to significant oversupply this are administrative decisions with regard to the level of obligation to redeem that essentially influence the prices. The competition within new support scheme for RES takes place in auctions via lower offered amount of support.

In the distribution area, the country is divided into regions, with five large distribution system operators (the "DSO") on the market, who are required to carve out distribution activities from their other business. Aside from the above-mentioned energy groups, another significant entity is innogy Stoen Operator sp. z o.o. (formerly RWE Stoen Operator sp. z o.o.), an RWE Group company responsible for electricity distribution in Warsaw, as well as PKP Energetyka S.A. managing the railway electric network throughout the country. A historical division of the distribution areas has substantial impact on the operating conditions of the business, and this specific situation is reflected in the distribution tariffs approved by the URE president. PGE Group operates in an area that is less urbanised and industrialised, meaning that it has 5.4 million clients throughout an area of 122 ths km2 . For comparison, TAURON has a similar number of clients in an area nearly twice smaller and distributes a larger amount of energy.

Chart: Areas of operation of Polish distribution system operators.

Source: own work.

Chart: Share of particular energy groups in volume of energy distributed and sales of electricity to final off-takers in the first half of 2018.

Source: own work based on information published by the companies and ERO.

In the retail segment, which covers sales to end customers – individual, small and medium enterprises as well as large industrial customers – most of the sales are conducted by the four largest energy groups and innogy Polska S.A. (formerly RWE Polska S.A.). PGE Group and TAURON remain the leaders, having approximately 60% of the market. Both PGE and TAURON sell electricity to over five million clients. Despite a growing number of competitors in the segment, including companies for which electricity is not a core product, companies from outside the four largest Polish groups continue to control little market share. The leaders control close to 90% of the market, while other significant player is innogy, based on sales connected with serving as distributor for the Warsaw area, as well as PKP Energetyka.

ENERGY GROUP PROFILES

The electricity sector is divided into segments, what is reflected in the operating segments of the respective energy groups. In contrast to the other energy groups in Poland, whose dominant EBITDA driver is the electricity distribution segment, PGE Group derives much of its operating profit from the generation segment, even though the group is the country's second-largest electricity distributor by volume. This allows to optimally deploy its competences and capitalise on opportunities arising in the generation area (both conventional and renewable) as well as in wholesale energy trade, whilst generating high and stable EBITDA on regulated activities.

With acquisitions of the Bogdanka mine and Połaniec power plant and the launch of a new unit at the Kozienice power plant, Enea increased its share of EBITDA from the generation segment. This brought Enea's profile closer to that of PGE Group.

A key feature of all the groups is a relatively small contribution of retail sales to operating profit, which is a result of low sales margins, driven by strong competition in the segment.

Chart: Profiles of Polish energy groups (size of the chart is proportionate to share in the first half of 2018 EBITDA of respective business segments and the amount of total EBITDA).

* Generation – conventional generation, generation from renewables, mining and heat generation

Source: own work based on information published by the companies.

4.6. Regulatory environment

DOMESTIC REGULATORY ENVIRONMENT

Segments Regulation Regulation
objectives
Latest conclusions Nextstage Impact
on
PGE
Capacity
market
notification
(Act
on
capacity
market).
The
Act
on
the
capacity
market
intends
to
implement the
capacity market,
where
the
commodity
will
be
net
available
capacity,
which
can
be
offered
by
producers
and
recipients
of
energy
(DSR),
receiving
remuneration
for
readiness
to
deliver
it,
with
an
obligation
to
deliver
during
peak
capacity
balance
periods
(so
called
threat
periods).
The
European
Commission
did
not
object
to
the
aid
programme
specified
in
the
Act
on
the
capacity
market
(decision
of
February 7, 2018).
- This will make it possible from 2021
to generate income from capacity
availability along with revenue from
the sale of electricity.
It
will
allow
for
covering
expenses
related
to
the
modernisation
of
generation
assets.
Act on promoting of
electricity produced
in highly-efficient
cogeneration.
This act intends to support units producing electricity in
highly-efficient cogeneration
in as far as the costs of
such production exceed the market price of energy:

units <50MW -
existing and modernised: guaranteed
bonus, the level of which is set by the Minister of
Energy; new and significantly modernised: bonus
set
in auctions,

units >50MW -
existing and modernised: guaranteed
bonus, the level of which is set annually by the
Minister of Energy; new and significantly modernised:
bonus set in selection.
The
law
was
voted
through
in
December 2018.
It came into force on
January 1, 2019, with
payments of bonuses
and the hosting of
auctions and selections
suspended until
approval from the
European Commission is
received.
Expected
European
Commission
approval
-
second quarter of 2019.
Six
regulations
must
be
issued
in
order
to
implement
the
act;
their
drafts
are in progress.
This will secure stable revenue (for
up to 15 years) covering the costs of
substantial modernisations of
existing cogeneration units and the
construction of new ones.
Updated act on
renewable energy
sources.
The
update
introduces
arrangements
made
with
the
European
Commission
under
the
notification
procedure
and
involves
a change in the way in which public aid is
calculated and a change in the structure of technological
baskets in auctions.
Moreover,
the
update
removes
provisions
concerning
closed-end
distribution
systems
and
energy
clusters
and
clarifies
the
way
in
which
the
support
system
for
installations
with
less
than
1
MW
capacity
(FIT/FIP)
Voted
through
in
June
2018,
entered into force in July 2018.
European
Commission
approval
received
in
December
2017.
The
update
is
a
consequence
of
arrangements
made
with
the
European
Commission.
- As
regards
biomass
-
removal
of
the
requirement
for
local
biomass,
which
increases
freedom
in
purchasing
this
commodity
Greater
access
to
support
for
wind
and
PV
installations
with
small
capacity
(removal
of
administrative
constraints).

operate as well as support for biomass.

Segments Regulation Regulation
objectives
Latest conclusions Nextstage Impact
on
PGE
Updated
act
on
renewable
energy
sources
concerning
change
in
amount
of
obligatory
redemption
of
origin
certificates.
In
2017,
the
obligation
to
redeem
origin
certificates
amounted
to
15.4%
of
electricity
volume
sold,
while
in
2018
this
increased
to
17.5%.
- - In
2017,
given
the
average
price
of
PMOZE_A
of
PLN
35.6/MWh,
the
cost
for
the
electricity
off-taker
reached
PLN
5.5/MWh. In
2018,
given
the
average
price
of
PMOZE_A
of
PLN
97.7/MWh,
the
cost
for
the
electricity
off-taker
reached
PLN
17.1/MWh.
It
should
be
noted
that
energy
contracting
for
a
given
year
takes
place
in
the
preceding
year,
therefore
the
cost
for
end
customers
of
approx.
PLN
5/MWh
for
2017
materialised
in
2018,
while
the
cost
for
2018
will
show
up
in
energy
bills
in
2019.
Updated water law. This
law
intends
to
make
it
possible
to
unequivocally
present
the
value
that
is
to
be
used in determining the
fixed fee
in
the
case
of
water-law
permits
or
integrated
permits
issued
on
the
basis
of
previous
regulations.
The Permanent Committee at
the Council of Ministers is
working on the law (December
2018).
The
law
is
expected
to
enter
into
force
prior to
the end of the 8th term
of the Polish
parliament.
Removal
of
existing
interpretation
inconsistencies
concerning
payment
of
fees
for
water
services.
Act on
electromobility and
alternative fuels.
The
act
aims
to
create
an
electromobility
market
(charging
services)
and
define
the
rules for developing
and operating infrastructure for
use
of
alternative
fuels
in
transport,
including
technical
requirements
that
the
infrastructure
must
meet.
The
law
was
voted
through
in
January 2018.
- Introduction
of
conditions
for
the
development
of
publicly
available
charging
stations
without
concession
and
with
simplified
procedures
for
station
construction.
Obligation
for
the
Distribution
System
Operator
to
build
publicly
available
charging
stations
if
the
minimum
numbers
of
charging
stations
specified
in
the
act
are
not
met.
Updated
Energy
law.
The updated energy law contains a number of changes,
including:

Comprehensive
regulation
for
energy storage.

Introduction
of
mandatory remote readings at
metering installations
and
designation
of
metering
information
operator.
Public
consultations
on
the
draft
act
ended
in
November
2018.
Reconciliation
conference
(second
quarter
of
2019).
Work
in
parliament
and
senate
(third
quarter
of
2019).
Adoption of the act
(fourth quarter of 2019).
Changes
for
the
Distribution
System
Operator
connected
with
the
contemplated
introduction
of
mandatory
intelligent
metering
installations
(additional
obligation
for
the
DSO)
and
introduction
of
a
central
model
for
metering
data
management.
This
will
make
it
possible
to
recover
electricity.
Segments Regulation Regulation
objectives
Latest conclusions Nextstage Impact
on
PGE
Regulating
the
status
of
energy
storage
and
introduction
of
administrative
facilitations
for
their
construction.
Introduction
of
closed-end
distribution
areas
might
have
an
impact
on
the
development
of
micro
grids.
Updated
energy
law
-
exchange
obligation.

Introduction
of
a
100% exchange obligation
while
maintaining
the
existing
exemptions
from
the
exchange
commitment
(e.g.
renewable
energy,
cogeneration).

Regulation of reserve sales.
Voted
through
in
November
2018,
entered into force on
January 1, 2019.
- The
need
to
adapt
trading
strategy
to
new
level
of
exchange
obligation.
Act
on
determining
maximum
energy
prices
in
2019.

Reduction in excise duty rates for electricity.

Reduction in transition fee rates.

Introduction
of
maximum
prices
for
electricity
in
2019
(in
both
trade
and
distribution)
and
introduction
of
compensation
for
trading
companies.
Voted
through
in
November
2018,
entered into force on
January 1, 2019.
Regulation
of
the
Minister
of
Energy,
which
is
to
constitute
the
basis
for
determining
the
amount
of
compensation
for
trading
companies
and
the
distribution
system
operator
expected
in
the
first quarter of
2019.
The
act
has
an
impact
on
trading
companies
due
to
the
obligation
to
specify
electricity
sales
and
distribution
prices
in
2019
at
the
2018
level
and
amendments
to
the
existing
contracts.
Regulation
of
the
Minister
of
Energy
amending
regulation
on
detailed
rules
for
determining
and
calculating
tariffs
and
settlements
in
trade
of
electricity.
The
amendments
will
concern:

A
mechanism
that
takes
into
account
in
regulatory
accounts for power system operator tariffs the
differences
in
actual
revenue
generated
in
previous
years
and
revenue
resulting
from
their
tariffs
approved
for
previous
years.

Application
of
quality regulation
mechanisms
in
the
tariff
process
for
power
system
operators .

Awarding
discounts
for failure to meet electricity
quality parameters
and
customer
service
quality
standards.
The
draft
has
been
submitted
for public consultations.
Analysis
of
comments
submitted
during
consultations.
Introducing
a
regulatory
account
might
result
in
decreased
revenue
from
distribution
in
certain
years.
Segments Regulation Regulation
objectives
Latest conclusions Nextstage Impact
on
PGE
Climate-energy package that sets out greenhouse gas emission reduction targets by 2030
EU
ETS
directive
and
implementing
and
delegated
acts
Combating
climate
change
and
performance
of
obligations
resulting
from
the
Paris
Agreement.
Development
of
appropriate
investment
incentives
through
a
CO2
price
signal
to
develop
low-emission
sources.
On
March
19,
2018,
Directive
(EU)
2018/410
of
the
European
Parliament
and
of
the
Council
amending
Directive
2003/87/EC
to
enhance
cost-effective
emission
reductions
and
low-carbon
investments,
and
Decision
(EU)
2015/1814,
was
published
in
the
EU's
Official
Journal,
in
connection
with
which
the
EU
ETS
and
MSR
amendment
entered
into
force
on
April
8,
2018.
Key
objectives
in
the
revised
EU
ETS:

Increase
LRF
to
2.2% annually from 2021.

Doubling
of
the
volumes
of
allowances
for
the
market
stability
reserve
("MSR")
in
2019-2023
from 12% to 24%,
together
with
the
introduction
of
cyclical
cancellations
of
allowances
from
2023
in
an
amount
exceeding
the
volume
of
such
allowances
that
was
the
subject
of
auctions
in
the
preceding
year.

Amendment
rules
for
derogation
(art.
10c)
and
the
Modernisation Fund
(art.
10d),
including
the
exclusion
of
fossil
fuel-based
investments
from
financing
under
the
Modernisation
Fund.

Continued
allocation of free emission allowances
for
district
heating
and
highly-efficient
cogeneration
in
respect
of
the
production
of
heat
or
cooling
(art.
10a).

Formation of the Innovation Fund
in
order
to
support
innovations
in
low-emission
technologies
in
evenly
distributed
locations
throughout
the
EU.
Transposition
date
for
most
of
the
directive's
provisions
into
national
law
-
October
9,
2019.
The
European
Commission
is
working
on
implementing
and
delegated
acts
and
guidelines
for
implementing
the
revised
EU
ETS
at
the
EU
level.
For
PGE
Group,
the
following
items
will
be
of
key
significance:

implementing
act
setting
out
the
way
in
which
the
Modernisation
Fund
operates,

delegated
act
concerning
allocating
of
free
allowances
for
heating,

delegated
act
specifying
operating
rules
for
the
Innovation
Fund.
The
above
acts
are
expected
to
be
adopted
in
the
first half of 2019.
Improvement
in
the
competitiveness
of
renewable
and
gas
sources
to
the
detriment
of
hard
coal-based
and
subsequently
lignite-based
generation
assets.
Increase
in
operating
costs
for
conventional
generation
of
electricity.
Option
to
obtain
direct
investment
support
from
2021
from
the
Modernisation
Fund
or
Innovation
Fund.
Segments Regulation Regulation
objectives
Latest conclusions Nextstage Impact
on
PGE
"Clean
energy
for
all
Europeans"
RED II Directive Promoting
the
development
of
renewable
energy
sources
in
the
power,
district
heating
and
transport
sectors,
intended
for
the
EU
to
reach
the
32%
renewables target
in
overall
consumption
by
2030.
Key
adopted
issues
(the
directive
came
into
force
on
December
24,
2018)
include:

Necessity
to
declare national contributions
-
no
specific
country
targets
were
given.

Support
system
stability.

Introduction
of
simplifications
and
faster investment processes
for renewables.

Indicative target
for
annual
increase
of
renewables
in
district
heating
and
cooling.

Restrictions
concerning
electricity
production
at
biomass
units.

Criteria
for
sustainable development and greenhouse gas
emission reductions
for
biomass
fuels.
Mandatory
transposition
of
the
directive
to
national
law
-
by
June 30, 2021
Increase
in
share
of
renewables
with
zero
variable
cost
will
cause
a
change
in
conventional
units'
operation
profile.
Impact
on
investment
programme
in
generation
segment
(including
renewables)
and
district
heating
by
necessity
to
take
into
account
development
of
renewables
units.
Impact
on
supply
segment
through
development
of
prosumer
segment,
constituting
an
alternative
for
end
users
to
buying
energy.
Governance
regulation
Introduction
of
framework
for
implementation
of
the
EU's
energy
and
climate
targets
by
establishing
a
system
for
setting
and
monitoring
targets
by
member
states.
Key
issues
adopted
(regulation
provisions
of
importance
to
the
electricity
sector
went
into
force
on
January
10,
2019:

Need for Poland to submit to the European Commission an
Integrated National Plan for Energy and Climate,
with
a
declaration
on
the
trajectory
of
renewables
development
and
improvement
in
energy
efficiency
as
well
as
long-term
policy
for
reduction
of
CO2
emissions
and
development
of
cross-border
connections.
A
draft
Integrated
National
Plan
for
Energy
and
Climate
has
been
submitted by Poland
to
the
European
Commission.
Deadline
for
final
version
of
the
plan
-
by
December 31, 2019.
Regulation's
impact
the
same
as
Directives
RED
II
and
EED.
This
results
from
the
fact
that
the
regulation's
key
provisions
introduce
mechanisms
intended
to
achieve
the
EU's
targets
specified
in
these
directives,
collectively
by
EU
member
states.
EED
Directive
Promoting
improvements
in
energy
efficiency
as
regards
both
primary
energy
consumption
and
final
energy
consumption,
intended
for
the
EU
to
reach
its
target
32.5%
improvement in energy
efficiency by
2030.
Key
adopted
issues
(the
directive
went
into
force
on
December
24,
2018)
include:

Need
to
declare
energy efficiency improvements
-
targets
are
not
binding.

Extension
of
the
obligation
to
generate
savings
in
final
energy
consumption
(implemented
currently
mainly
through
the
white
certificate
system),
combined
with
a
change
in
the
way
in
which
the
required
level
of
savings
is
calculated
(each
year
0.8% of
final
energy consumption).

Change
in
the
level
of
default
coefficient
for
conversion
of
final
energy
consumption
into
primary
energy
consumption.
Mandatory
transposition
of
the
directive
to
national
law
-
by
June 25, 2020.
Impact
on
all
segments,
i.e.
reduction
of
growth
in
energy
consumption
by
taking
energy
efficiency
actions.
Impact
on
supply
segment
resulting
from
costs
of
white
certificate
system.
Segments Regulation Regulation
objectives
Latest conclusions Nextstage Impact
on
PGE
EMR regulation Establishment
of
legal
framework
for
further
integration
of
internal
electricity
market.
The
last
trilogue
took
place
on
December
18-19,
2018,
during
which
the
final wording of the regulation on internal electricity market.
The
agreement
must
be
accepted
by
the
European
Parliament
and
Council.
Key
assumptions
in
the
adopted
regulation:

Rules regarding the application of EPS 550 and protection of
vested rights:

The
developed
solution
includes
an
exemption
from
the
In
March 2019,
an
agreement
as
to
the
final
wording
of
the
Regulation
is
to
be
approved
by
the
European
Parliament,
following
by
a
formal
vote
at
the
Council.
Capacity
contracts
executed
by
PGE
Group
in
auctions
won
on
the
capacity
market
in
2018
and
2019
will
have
vested
rights
protected
throughout
their
entire
term.
requirements
specified
in
chapter
IV
of
the
Regulation
(including
EPS
550)
for
contracts
executed
prior
to
December
31,
2019,
including
multiannual
contracts
executed
prior
to
that
date.

If
capacity
contracts
are
executed
after
the
regulation
enters
into
force:
The
regulation
will
presumably
enter
into
force
in
the
first half
of 2019.
The
regulation
will
be
in
force
from
January 1, 2020.
Coal
units
that
exceed
the
emissions
standard
550
g
CO2/kWh
(EPS
550)
and
350
kg
CO2
will
not
participate
in
the
capacity
market
from
July
1,
2025.

for
units
emitting
more
than
550
g
of
CO2/kWh
(EPS
550)
or
350
kg
CO2/KWe/year
(carbon
budget)
that
start
commercial
production
of
electricity
prior
to
entry
into
force
of
the
regulation,
a
transition
period
until
July
1,
2025
would
apply,

for
units
emitting
more
than
550
g
CO2/kWh
(EPS
550)
and
begin
commercial
production
of
electricity
after
entry
into
force
of
the
regulation,
no
transition
period
applies.

Definition of capacity mechanisms
that
excludes
ancillary
services
and
constraint
management
measures
from
the
definition.

Introduction
of
ERAA and NRAA,
including
a
prohibition
on
executing
new
capacity
contracts
if
these
assessments
do
not
identify
a
capacity
deficit.

Introduced
special
rules
dedicated
to
strategic reserves.

Introduced
obligation
for
members
states
with
an
identified
capacity deficit
(including
those
already
using
capacity
mechanisms)
o
prepare
and
implement
a
plan
of
implementing
activities,
in
which
market-type
measures
will
be
used
first.

Share
of
crossborder capacity
in
the
capacity
market.

Requirement
to
make
70% of crossborder capacities
available
for
market
purposes.

Frameworks
to
develop
a
European organisation for
distribution operators
("EU
DSO
entity"),
which
will
co-author
European
grid
codes.

Retention
of
priority
availability
for
renewables
and
high
efficiency
cogeneration,
as
a
rule
for
units
with
capacity
up
to
0.4
MW
and
for
existing
units
regardless
of
their
capacity
that
meet
certain
conditions.
This
means
that
capacity
contracts
(mainly
annual)
for
existing
units
(including
units
modernised
to
BAT
conclusions
that
do
not
meet
the
CAPEX
threshold
for
multiannual
contracts)
will
be
performed
until
mid-2025
at
the
latest.
In
connection
with
this,
the
adopted
regulations
have
an
impact
on
re-assessment
of
the
justification
for
investments
intended
to
adapt
large
combustion
facilities
to
BAT
conclusions.
Need
to
re-assess
capacity
sufficiency
taking
into
account
lack
of
support
for
existing
generating
assets
after
2025.
Further
business
consequences
will
also
result
from
the
way
in
which
the
solutions
included
in
the
Regulation
are
implemented
wherever
there
is
room
to
act
by
national
authorities.
Segments Regulation Regulation
objectives
Latest conclusions Nextstage Impact
on
PGE
EMD
Directive
Key goals of EMD
directive revision:

Strengthen the
consumer's role on
the electricity
market,

Protect
energy
poor
and
sensitive
customers,

Ensure
decarbonisation,
especially
by
promoting
and
developing
electromobility.
The
last
trilogue
took
place
on
December
18/19,
2018,
during
which
the
final
wording
of
the
directive
on
common rules for internal
electricity market
was
agreed.
The
agreement
must
be
accepted
by
the
European
Parliament
and
Council.
The
key
agreed
issued
include:

Requirement
to
implement intelligent metres.

Restrictions
in
DSO
activities
as
regards
energy storage and
servicing
EV charging stations.

New terms for changing electricity sellers.

Introduction
of
exemption
from
rule
of
free
energy
prices,
making
it
possible
to
temporarily apply regulated prices
for
households.

Introduction
of
contracts with dynamic pricing.

Support
for
the
development
of
energy
communities.
In March 2019,
an
agreement
as
to
the
final
wording
of
the
Directive
is
to
be
approved
by
the
European
Parliament,
following
by
a
formal
vote
at
the
Council.
The
Directive
will
enter
into
force
20
days
after
it
is
published
in
the
EU's
Official
Journal.
Mandatory
transposition
of
the
directive
to
national
law
-
by
December 31, 2020.
Impact
on
the
distribution
segment,
especially
as
regards
restricting
activity
related
to
energy
storage
and
operating
EV
charging
stations
and
imposition
of
obligation
to
implement
intelligent
metering.
Impact
on
supply
segment,
mainly
through
imposition
of
additional
information
requirements
for
consumers,
reduction
of
time
to
replace
seller,
development
of
contracts
with
dynamic
pricing.
These
regulations
concern
the
EU's
Multiannual
Financial
Framework
and
financing
for
sustainable
economic
growth
EU's Multiannual
Financial
Framework
EU's
financial
framework
(income
and
expenditures)
established
for
2021-
2027.
The
European
Commission
in
May
and
June
2018
presented
the
key
assumptions
for
the
EU's
Multiannual
Financial
Framework
(MFF)
for
2021-2027
and
proposals
for
several
legislative
acts.
In
November and December 2018,
the
European
Parliament
adopted
a
position
on
the
MFF's
key
assumptions
(including
the
proposal
to
form
a
fund
to
support
the
transformation
of
coal-dependent
countries
and
regions)
and
on
certain
other
legislative
acts
concerning
MFF.
The
European
Parliament
is
working
on
its
position
with
regard
to
the
regional
development
fund
and
cohesion
fund.
Key issues proposed by the European Commission:

Increase
funding
for
climate
targets
from
20%
(2014-2020)
to
25%
of
the
overall
EU
budget
(2021-2027).

Expand the catalogue of
criteria
based
on
which
regional
development
and
cohesion
funds
will
be
awarded.

Exclude the following
from
this
funding:

investments
in
emission
reductions
at
units
subject
to
EU
ETS,

investments
in
generation,
storage
and
combustion
of
fossil
fuels,

funding
for
the
construction
of
nuclear
power
plants
and
scrapping
costs.

Establishment
of
new
source
of
EU
funds:
up
to
30% of
revenue from the sale of allocated emission allowances
under
art.
10
sec.
2
letter
a
of
EU
ETS
directive
and
up
to
30%
of the market equivalent of allowances allocated free of
Adoption
of
position
by
the
European
Parliament
in
reference
to
the
other
legislative
acts
concerning
MFF
-
first half of 2019.
Work
at
the
Council
on
adoption
of
a
general
approach
to
MFF
and
the
related
specific
legislative
acts
-
2019/2020.
Impact
of
regulation
on
decrease
in
funding
that
can
be
secured
by
PGE
Group
companies
for
investments.
Segments Regulation Regulation
objectives
Latest conclusions Nextstage Impact
on
PGE
charge
to
electricity
producers.
EU
package
for
funding
sustainable
economic
growth
Implementation
of
regulations
intended
to
facilitate funding
for
sustainable
economic
growth
in
EU.
The
European
Commission
in
March
2018
presented
an
action
plan
for
financing
sustainable
economic
growth,
and
in
May
2018
presented
proposals
of
the
first
legislative
acts
concerning
this
issue.
In
December
2018,
the
European
Parliament
adopted
a
position
on
the
regulation
concerning
information
obligations
and
regulation
concerning
reference
indicators.
As
regards
the
two
regulations
above,
the
Council
adopted
a
general
approach
in
December
2018.
Key
issues
proposed
by
the
European
Commission:

Involvement of private financial sector
in
reaching
targets
by
providing
funding
for
sustainable
investments.

Indication
of
criteria
based
on
which
economic
activities
will
be
assessed
to
determine
whether
they
are
environmentally
sustainable.
In
this
aspect,
activities
concerning
the
shut-down
of
anthropogenic
greenhouse
gas
emissions,
including
from
sources
based
on
fossil
fuels,
will
be
taken
into
account.

Indication
of
criteria
to
be
used
for
assessing
how
harmful
activity is to slowing down climate change and
whether
it
does
not
qualify
as
environmentally
sustainable.
These
criteria
include
activities
that
contribute
to
a
significant
increase
in
greenhouse
gas
emissions.

Establishment of information obligation
for
institutional
participants
in
financial
markets
in
reference
to
the
way
in
which
risks
associated
with
sustainable
development
are
taking
into
account
in
the
process
of
making
investment
decisions
or
providing
financial
advisory.

Establishment
of
reference indicators
taking
into
account
CO2
emissions.
Trilogues
concerning
the
regulation
on
information
obligations
and
regulation
on
reference
indicators
-
January
2019.
Adoption
of
these
regulations
-
first half of 2019.
The
European
Parliament
is
working
on
a
position
regarding
the
regulation
for
criteria
based
on
which
economic
activities
will
be
assessed
to
determine
whether
they
are
environmentally
sustainable.
The
European
Parliament's
position
is
expected
in
the
first
half
of
2019. The
Council
is
expected
to
adopt
a
general
approach
in
the
second half of
2019.
Possible
impact
of
regulation
on
availability
and
cost
of
funding
obtained
by
PGE
Group
companies
for
investments.

4.7. Supply markets

Lignite, hard coal, natural gas and biomass are key fuels used to generate electricity and heat by power plants and heat and power plants belonging to the PGE Group. The cost of fuel procurement constitutes a major share in electricity generation costs. PGE S.A., on the ground of Agreement for Commercial Management of Generation Capacities, secures hard coal, gas and biomass supplies to the companies.

Lignite supplies are carried out within a framework of regular cooperation between branches operating in the structure of PGE GiEK. The KWB Bełchatów mine supplies lignite to the Bełchatów power plant and the KWB Turów mine supplies it to the Turów power plant. The Group set up internal rules with respect to the performance and settlement of lignite supplies between individual branches of PGE GiEK.

The main supplier of the hard coal for the electricity and heat production needs in branches of PGE GiEK and PGE EC S.A. and its subsidiaries is Polska Grupa Górnicza S.A.

Biomass is obtained via procurement procedures mainly from suppliers operating on the Polish biomass market.

Main supplier of gas for production needs of electricity and heat in the branches of PGE EC and its subsidiaries is PGNiG S.A.

As regards fuel supplies at PGE Group in 2018, no threats were identified such as could have disrupted continuity of the production process.

5. Activities of PGE Capital Group in 2018

5.1. Business model

PGE Capital Group is Poland's largest vertically integrated producer and supplier of electricity and largest producer of district heating. Operations cover the entire value chain: from lignite extraction through production of electricity at power plants and CHP plants as well as renewables to electricity distributions and sales.

* Estimated data concerning sales to final off-takers and distribution.

PGE Group generates 43% of the electricity (including Conventional Generation approx. 42%) produced in Poland and 25% of heat from cogeneration. Additionally, 9% of domestic renewable energy comes from our assets. PGE Group's distribution lines cover approx. 40% of Poland's territory and supply electricity to 5.4 million final customers, i.e. 25% of the country's users. We have 5.3 million clients on the retail market, accounting for approx. 30% of the final off-takers in Poland.

In 2018, PGE Group generated EBITDA of approx. PLN 6.4 billion.

The Conventional Generation segment, which includes the conventional generation of electricity and heat, made the largest contribution to revenue and EBITDA. Investment expenditures of approx. PLN 4.9 billion were made in the Conventional Generation segment. Half of these expenditures are incurred in connection with development investments - the construction of high-efficiency conventional generation capacities – 1 800 MW units in Opole and a 490 MW unit in Turów. The other significant investments are intended to raise the efficiency of existing assets and environment-related modernisations.

The Distribution segment is the second largest business line in terms of its share in PGE Group's results. The segment is responsible for providing electricity supply services. Investment expenditures in this segment reached approx. PLN 1.9 billion, mainly related to grid modernisation and replacement and new off-takers connections.

The Renewables segment is responsible for the generation of electricity from renewable sources and management of pumped storage capacities. The Group is actively investing in the development of renewable energy sources. Having won a RES auction in 2018, it is developing a wind farm with capacity of nearly 100 MW. PGE Group pursues one of the Group's strategic development options after 2020, i.e. it's implementing a project to develop offshore wind farms. The Group's plan is to reach 1 GW in 2026 and 2.5 GW by 2030.

The Supply segment focuses on wholesale and retail trade of electricity and related products.

5.2. Business segments

5.3. PGE Group's key financial results

The best way to measure the profitability of energy companies is EBITDA5 . This is a result before depreciation, amortization, income tax and interest from drawn interest bearing debt. It reflects cash flows from operating activities and makes it possible to compare the results of companies regardless of the value of their assets, level of debt and existing income tax rates.

PGE Group's consolidated results are composed of the financial results of each of its operating segments. The Conventional Generation segment made the largest contribution to the Group's result, accounting for nearly half of annual EBITDA. The Distribution segment had the second-largest share, accounting for almost 40% of EBITDA. The Renewables and Supply segments contributed respectively 7% and 4% to the Group's EBITDA.

EBITDA of the Capital Group by segments (PLN million)

5 EBITDA is calculated as follows: operating profit + depreciation & amortisation, liquidation and write-offs (fixed assets, intangible assets, NI and goodwill) recognized in the financial result.

5 500 6 000 6 500 7 000 7 500 8 000

Chart: Key factors affecting recurring EBITDA in PGE Capital Group (in PLN million).

EBITDA
2017
Higher price
of electricity -
Conventional
Generation
segment
Costs
of fuel
CO2
Costs
Result on
distribution
Margin on
the sale of
electricity
to final
customers
Personnel
costs
Other EBITDA
Acquired
assets*
EBITDA
2018
Change 730 -262 -389 145 -185 -59 -387 629
EBITDA reported 2017 7 650
One-offs 2017 1 171
Recurring EBITDA 2017 6 479 1 948 1 171 4 262 4 345 193
Recurring EBITDA 2018 2 210 1 560 4 407 4 404 822 6 701
One-offs 2018 -337
EBITDA reported 2018 6 364

One-offs reducing the reported result

One-offs increasing the reported result

* EBITDA of companies: PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A., PGE Paliwa sp. z o.o., PGE Ekoserwis sp. z o.o.,Torec sp. z o.o., Zower sp. z o.o.

CONSOLIDATED STATEMENT OF FINANCIAL POSITION

Chart: Structure of assets and equity and liabilities.

As at December 31, 2018 As at December 31, 2017

Total equity

Long-term liabilities

Short-term liabilities

CONSOLIDATED STATEMENT OF CASH FLOWS

Chart: Net change in cash (in PLN million).

Chart: Net debt (in PLN million).

GEOGRAPHICAL AREAS

The Group earns income mainly in the domestic market. Detailed information on income breakdown by geographic area is presented in note 6.2 to the consolidated financial statements.

BALANCE OF ENERGY OF PGE CAPITAL GROUP

Balance of electricity

Table: Sales, purchase, production and consumption of electricity in the PGE Capital Group (in TWh).

Volume 2018 2017 zmiana %
A. Sales of electricity outside the PGE Capital Group: 76.78 65.78 17%
Sales to end-users* 42.57 40.43 5%
Sales on the wholesale and balancing market 34.21 25.35 35%
B. Purchases of electricity from outside of PGE Group (wholesale and
balancing market)
15.17 13.76 10%
C. Net production of electricity in units of PGE Capital Group 65.91 56.79 16%
D. Own consumption DSO, KWB, ESP (D=C+B-A) 4.30 4.77 -10%

*Sale mainly by PGE Obrót S.A. and PGE Energia Ciepła S.A.

The total volume of purchased and generated electricity is higher than the volume of electricity sold. The difference presented in point D results from the necessity to cover grid losses in the distribution business (Distribution System Operator), consumption of energy at lignite mines and consumption of energy at pumped-storage plants.

The higher volume of sales to end customers resulted from recognition of sales generated by PGE Energia Ciepła S.A. The higher sales volume on the wholesale and balancing market results mainly from placing generation capacity of the newly acquired assets. Additionally, the volume growth was driven by favourable market conditions.

Production of electricity

Table: Production of electricity (in TWh).

Electricity generation volume 2018 2017 % change
Electricity production in TWh, including: 65.91 56.79 16%
Lignite-fired power plants 38.90 38.95 0%
Coal-fired power plants 16.61 11.11 50%
including co-combustion of biomass 0.14 0.13 8%
Coal-fired CHP plants 4.29 1.47 192%
including co-combustion of biomass 0.02 0.00 0%
Gas-fired CHP plants 4.12 2.87 44%
Biomass-fired CHP plants 0.16 0.20 -20%
CHP plants fuelled by municipal waste 0.01 0.00 0%
Pumped-storage power plants 0.39 0.44 -11%
Hydroelectric plants 0.37 0.47 -21%
Wind power plants 1.06 1.28 -17%
Including Acquired assets *: 10.40 1.58 558%

* Rybnik power plant, EC Gdańsk, EC Gdynia, EC Kraków, EC Wrocław, EC Czechnica, EC Zawidawie, EC Zielona Góra, EC Toruń.

The main impact on the level of electricity generation in 2018, compared to 2017, was higher generation at hard coal-fired power plants (growth by 5.5 TWh). Out of this value, 4.5 TWh results from inclusion of full year of Rybnik power plant's generation, while in 2017 it included only generation from the period under consolidation, i.e. from November 14, 2017 until December 31, 2017. Higher generation at Opole power plant resulted from larger use of the power plant's units by PSE S.A. and repair-related downtime being lower by 960 hours (unit no. 3 remained in medium overhaul from March 3, 2017 till May 4, 2017). Higher production at Opole power plant compensated for lower output at Dolna Odra power plant, due to lower use of units by PSE S.A.

Hard coal-based CHP plants produced by 2.82 TWh more electricity. Out of this 2.81 TWh results from recognition of full-year production of Gdańsk CHP, Gdynia CHP, Wrocław CHP, Czechnica CHP and Kraków CHP, while in 2017 it included only generation from the period under consolidation, i.e. from November 14, 2017 until December 31, 2017.

The growth in production at gas-fired combined heat-and-power plants is 1.25 TWh. Main reason is the recognition of full-year production of Toruń CHP, Zielona Góra CHP and Zawidawie CHP (up by 1.46 TWh), while in 2017 it included only generation from the period under consolidation, i.e. from November 14, 2017 until December 31, 2017. The decline in electricity production was recorded in the gas-fired CHPs previously owned by the Group.

Production in lignite-based power plants and biomass CHP plants was similar y/y.

The lower output at wind farms results from worse windiness than expected, mainly in February and period May- December 2018.

Output at hydropower plants is lower y/y, resulting from less favourable hydrological conditions (mainly in May, June, August, September, October, November and December 2018) – due to hydrological drought.

Slightly lower production in pumped storage power plants results from the nature of these generation units, which in 2018, were used to a lower extent by PSE S.A.

Table: Production of heat (PJ).

Heat production volume 2018 2017 % change
Heat production in PJ, including: 51.18 29.24 75%
Lignite-fired power plants 0.34 0.11 209%
Coal-fired power plants 2.68 2.76 -3%
Coal-fired CHP plants 36.99 16.25 128%
Gas-fired CHP plants 10.34 9.31 11%
Biomass-fired CHP plants 0.83 0.81 2%
Including Acquired assets* 32.83 10.60 210%

* Rybnik power plant, EC Gdańsk, EC Gdynia, EC Kraków, EC Wrocław, EC Czechnica, EC Zawidawie, EC Zielona Góra, EC Toruń.

Higher heat production volume in 2018 y/y resulted mainly from the higher generation in the Acquired assets due to the recognition of full-year production of Rybnik power plant, Gdańsk CHP, Gdynia CHP, Kraków CHP, Wrocław CHP, Czechnica CHP, Toruń CHP, Zielona Góra CHP and Zawidawie CHP, while in 2017 it included only generation from the period under consolidation, i.e. from November 14, 2017 until December 31, 2017.

Sales of heat

In 2018 the heat sales volume in PGE Capital Group totalled 49.66 PJ and were higher by 24.81 PJ y/y. The above growth includes recognition of full year sales of heat by the Acquired assets from Conventional Generation segment, while in 2017 it included only heat sales from the period under consolidation, i.e. from November 14, 2017 until December 31, 2017 (increase by 25.52 PJ) and lower sales by branches of PGE GiEK S.A. (-0.71 PJ), what resulted largely from decreased demand for heat caused by the higher average outside temperatures.

5.4. Operational segments

CONVENTIONAL GENERATION

Segment description and its business model

This segment includes lignite mining, generation of electricity and heat in conventional sources as well as the transmission and distribution of district heating.

*in accounting terms.

The main source of revenue in the Conventional Generation segment is revenue from the sale of electricity on the wholesale market, based on electricity prices that are shaped by supply and demand mechanisms, taking into account the variable costs of generation. At the same time, the segment's key cost items, given their size and volatility, and thus their impact on operating results, are the cost of production fuels used, mainly hard coal and natural gas, as well as fees for CO2 emissions. Lignite-based production, which is of key significance for the Group, is based on own mines, therefore its cost is relatively stable and reflected mainly in fixed-cost items, i.e. personnel costs, third-party services and depreciation.

The segment's second source of revenue is revenue from the sale and distribution of heat. This is regulated revenue. Energy companies independently set tariffs and present them to the President of the Energy Regulatory Office (URE President) for approval. Heat production at PGE Group takes place in cogeneration units, which offer the opportunity to set tariffs for heat using a simplified approach (compared to tariffs based on a full cost structure), based on reference prices, which are mainly based on the average sales prices for heat generated in units with specific fuel other than cogeneration units. They are published each year by the ERO President. Tariffs for heat production for cogeneration units in a given tariff year thus reflect changes in the costs of heat-generation units (not co-generation units) in the previous calendar year. The cost approach is applied in the case of tariffs for heat distribution, which allows to cover justified costs (mainly the costs of heat losses and property tax) and a return on invested capital, in line with guidelines from the ERO President. Distribution tariffs for heat are in place at branches in Gorzów and Zgierz, as well as by Kogeneracja S.A., PGE Toruń and Zielona Góra CHP.

Electricity production in high-efficiency cogeneration is additionally compensated. Until 2018, CHPs generated revenue from the sale of energy origin certificates, i.e. cogeneration certificates (yellow and red). From 2019, due to a change in support model, they will receive support at a level covering increased operating costs related to production. For large units, this will be set on an individual basis. A similar support mechanism is in place for biomass-fired generating assets. This type of production is also additionally compensated by awarding origin certificates, i.e. green certificates, the sale of which generates additional revenue for units in the conventional generation segment.

A significant item in the segment's revenue constitutes revenues from the provision of regulatory system services based on an agreement with the Polish transmission system operator, PSE S.A. This revenue is in parallel to revenue generated on the electricity market and is related to the need to ensure stable operations for the national power system. Regulatory system services are provided by power plants of PGE GiEK and by Rybnik power plant.

ASSETS

Conventional Generation in PGE Capital Group includes PGE GiEK S.A. based in Bełchatów. As at December 31, 2018 the company comprised of 12 branches which are located in nine voivodships. Branches included 2 lignite mines, 4 conventional power plants and 8 CHP plants. From November 14, 2017 Conventional Generation segments included also part of assets acquired from EDF i.e. 5 companies, including 1 conventional power plant and 8 CHP plants. On January 2, 2019 6 CHP plants were separated from PGE GiEK and transferred to PGE EC (see p. 7.1 of this report).

The Group is the leader of lignite mining (its share in the extraction market of this raw material accounting for 87% 6 of domestic extraction), it is also the largest generator of electricity as it generates approx. 43% 7 of domestic gross electricity production (including approx. 42% 8 by Conventional Generation) and largest heat producer. The generation is based on lignite extracted from mines owned by the company as well as hard coal, gas and biomass.

Diagram: Main assets of the Conventional Generation segment.

6 Own calculations based on data from Central Statistical Office for 2018.

7 Own calculations based on data from ARE for 2018.

8 Own calculations based on data from ARE for 2018.

Main fuel types Annual electricity
generation (TWh)
Annual heat generation
(TJ)
Installed
capacity
(MWe)
Installed
capacity
(MWt)
2018 2017 2018 2017 2018 2018
Hard coal 11.99 11.02 8.05 8.31 3 176 1 418
Lignite 38.98 39.05 3.18 3.20 6 836 726
Gas 2.41 2.62 6.24 6.32 611 1 460
Biomass 0.30 0.33 0.83 0.81 83 179
Municipal waste 0.01 0.00 0.05 0.00 9 28
TOTAL PGE GiEK S.A. 53.69 53.02 18.35 18.64 10 715 3 811
Hard coal * 8.67 10.10 28.78 29.26 3 014 4 267
Gas* 1.71 1.61 4.05 3.58 307 687
Biomass* 0.02 0.04 0.00 0.00 0 0
TOTAL Acquired assets* (full year) 10.40 11.75 32.83 32.84 3 321 4 954
including Acquired assets from November 14, 2017 - 1.58 - 7.00 - -
TOTAL Conventional Generation 64.09 54.60 51.18 25.64 14 036 8 765

Table: Installed capacity and production in Conventional Generation segment.

*The units' volumes for 2017 are on a pro-forma basis and are presented for illustration purposes in order to adequately show the scale of the acquired assets in comparison with PGE GiEK S.A.'s generating units (without the distortion related to proportional recognition in annual results). Acquired assets: Rybnik power plant, Gdańsk CHP, Gdynia CHP, Kraków CHP, Wrocław CHP, Czechnica CHP, Zawidawie CHP, Zielona Góra CHP, Toruń CHP.

Diagram: Change of installed capacity in Conventional Generation.

*PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A.

LIGNITE MINING

Lignite resources

Lignite deposit reserves are determined based on a reserves inventory maintained in the reserves register for a given year up to February 28 as at December 31 of a preceding year (art. 101 p. 3 of the Geological and Mining Act). The following table presents lignite reserves as of the end of 2018, together with volumes extracted in 2018.

Table: Lignite resources data as at the end of 2018 and lignite output in 2018.

Deposit Resources - as at the end of
2018
(Mg million) (Mg million)
Bełchatów – Field Bełchatów Industrial 24.84 11.23
Bełchatów – Field Szczerców Industrial 663.81 33.08
Turów Industrial 294.70 6.53

Diagram: Lignite extraction (tonnes million).

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

Chart: Key changes of recurring EBITDA in Conventional Generation (in PLN million) – managerial perspective.

EBITDA
2017
production
difference
in price
production
difference
in volume
of the
electricity
trade
from
agreement
with TSO
Costs
of fuel
Costs of
CO2
repair
services
Other Capitalised
costs
Acquired
assets*
EBITDA
2018
Odchylenie 730 106 -268 -53 -230 -389 -66 -183 100 589
Reported EBITDA 2017 4 099
One-offs 2017 1 206
Recurring EBITDA 2017 2 893 8 514 243 289 1 950 1 171 600 896 181
Recurring EBITDA 2018 9 350 -25 236 2 180 1 560 666 996 770 3 229
One-offs 2018 -291
Reported EBITDA 2018 2 938

*PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A.

One-offs which reduce EBITDA reported in 2017

One-offs which increase EBITDA reported in 2018

Key factors affecting the recurring EBITDA result of Conventional Generation segment in 2017 on y/y basis included:

  • Increase in electricity sales prices, which caused an increase in revenue from sales. (see p. 4.2 of this report).
  • Higher electricity production volume in PGE GiEK S.A. by 0.66 TWh, due to higher degree of use of units by PSE S.A. resulting from increased demand in NPS and lower wind generation, with lower repairs at centrally dispatched generation units by 8 189h (see p. 5.3 of this report).
  • Lower result on optimisation of electricity portfolio, due to lower margin realized on electricity trading by PLN 41/MWh as a result of higher purchase price of electricity mainly caused by higher prices of CO2 emission rights (impact on result PLN -383 million) with the higher volume of electricity trading by 3 TWh (impact on result PLN +115 million).
  • Lower revenues from ancillary control services, mainly lower revenues from Operational Capacity Reserve ("OCR") due to lower volume of OCR in Opole and Dolna Odra power plant due to higher trading factor of those power plants.
  • Higher fuel consumption costs, mainly hard coal, what was caused by the higher prices of that raw material on the domestic and international market, what directly translated into higher contractual prices, and higher production based on this fuel. Main changes on different types of fuel are presented on the chart below.
  • Higher CO2 costs as a result of higher price of allowances. This effect was accelerated by unfavourable impact of lower allocation of allowances granted free of charge and higher emission of CO2 resulting from increased production.
  • Higher repairs expenses mainly as a result of higher number of tasks pursued.
  • Higher capitalised costs, mainly as a result of greater involvement of own services into investment execution. The above effect was offset by lower capitalisation of overburden removal costs in mines due to lower N:W ratio (mainly due to significantly higher growth of lignite mined in relation to growth of overburden mining in Szczerców field).
  • Difference on EBITDA generated by the Acquired assets in 2018 as compared to the result achieved in the period subject ot consolidation in 2017, i.e. from November 14, 2017 until December 31, 2017.

The reported EBITDA was also impacted by one-offs: LTC compensations, change in reclamation provision and change in actuarial provision.

Chart: Costs of production fuels consumption in Conventional Generation (in PLN million).

*PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A.

2018 2017
Fuel type Volume Cost Volume Cost
(tons ths) (PLN million) (tons ths) (PLN million)
Hard coal 5 846 1 528 5 565 1 336
Gas (cubic metres ths) 652 015 510 683 985 476
Biomass 421 97 518 97
Fuel oil – light and heavy 27 45 28 41
TOTAL PGE GiEK S.A. 2 180 1 950
Hard coal 5 240 1 321 835 184
Gas (cubic metres ths) 484 671 317 72 865 51
Biomass 38 7 11 2
Fuel oil – light and heavy 17 32 3 5
TOTAL Acquired assets* 1 677 242
Hard coal 11 086 2 849 6 400 1 520
Gas (cubic metres ths) 1 136 686 827 756 850 527
Biomass 459 104 529 99
Fuel oil – light and heavy 44 77 31 46
TOTAL Conventional Generation 3 857 2 192

Table: Data on use of production fuels consumption in Conventional Generation.

*PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A. Data for 2017 cover period from November 14, 2017.

Table: Availability and capacity factors in Conventional Generation.

2018 2017 2016 2015
Availability*
Power plants - lignite 82.9% 86.9% 85.6% 84.9%
Power plants – hard coal 84.8% 81.0% 89.3% 88.1%
CHP 75.9% 80.6% 89.0% 89.6%
Capacity factor*
Power plants - lignite 75.5% 75.3% 71.8% 71.8%
Power plants – hard coal 52.0% 47.4% 51.5% 48.3%
CHP 42.8% 45.1% 47.4% 49.3%

* Without units no. 1-2 in Dolna Odra power plant (cold reserve) and unit no. 1 in Bełchatów power plant (peak reserve unit). Ratios for 2017- 2018 include the Acquired assets (full year 2017, i.e. without distortion connected with the proportional recognition in the annual results). Data for 2015-2016 do not include the Acquired assets.

CAPITAL EXPENDITURES

Table: Capital expenditures incurred in Conventional Generation segment in 2018 and 2017.

PLN million 2018 2017 % change
Investments in generating capacities, including: 3 961 4 238 -7%

Development
2 353 2 963 -21%

Modernisation and replacement
1 608 1 275 26%
Other 132 127 4%
Acquire assets* 533 168 217%
TOTAL 4 626 4 533 2%
Capitalised costs of overburden removal in mines 269 366 -27%
TOTAL with capitalized costs of overburden removal 4 895 4 899 0%

*PGE Energia Ciepła S.A., PGE Toruń S.A., PGE Gaz Toruń sp. z o.o., EC Zielona Góra S.A., Kogeneracja S.A. Data for 2017 as from November 14, 2017.

KEY DEVELOPMENTS IN 2018 IN THE CONVENTIONAL GENERATION SEGMENT

Key development investments:

  • Construction of cooling towers for units 5 and 6 at Opole power plant was completed in February 2018.
  • In October 2018 an annex no. 9 to the agreement for construction of units no. 5 and 6 in Opole power plant, that extends the construction time, for unit 5 to June 15, 2019 and for unit 6 to September 30, 2019.
  • In October 2018, a permit for use was secured for a thermal waste processing installation with energy recovery at the CHP Rzeszów, which was subsequently put into service and received the status of regional installation
  • A boiler pressure test was successfully conducted for unit 7 at Turów power plant in November 2018.
  • In December 2018, the boiler at unit 5 at Opole power plant was fired up using coal, while in January 2019 the first synchronisation with the national power system took place.

Key modernisation investments related to emission reductions:

  • An SCR installation for unit A at the Pomorzany plant was put into service in April 2018.
  • In May 2018, agreements were executed with contracts to build sealed lid for flue gas desulphurisation systems at units 2 and 5-11, expand the limestone mill room and adapt units 12 and 14 to BAT requirements as regards mercury and ammonia emissions at the Bełchatów power plant.
  • In May-September 2018, agreements were executed with contractors for a limited modernisation of unit 2 at the Bełchatów power plant.
  • In June 2018, agreements were executed with contractors to modernise electrostatic precipitators for units 1-4 and reduce NOx emissionsto below 150 mg/Nm3 for units 1, 2 and 4 at the Opole power plant, in order to adapt it to BAT conclusions.
  • In June 2018, once modernisation works were completed, unit 2 at the Turów power plant was launched and synchronised with the grid.
  • In July 2018, agreements were executed with contractors for flue gas desulphurisation systemsfor units 3-6 at the Bełchatów power plant.
  • In September 2018, an agreement was signed to deliver and assemble a catalytic flue gas denitrification system for OP-650 boilers for units 5, 6, 7 and 8 at the Dolna Odra plant.

KEY PROJECTS IN 2018

Aim of the project Budget (net,
without costs
of financing)
Capital
expenditures
incurred so
far
(net,
without costs
of financing)
Capital
expenditures
in 2018
(net,
without costs
of financing)
Fuel/ Net
efficiency
Contractor Expected date of
completion
Status
Construction of new units in Opole power plant
Construction of
two power units
of 900 MW each
PLN 10.94
billion
PLN 9.19
billion
PLN 0.88
billion
Hard coal/
45.5%
Syndicate of companies:
Rafako, Polimex-Mostostal
and Mostostal
Warszawa
with co-operation of GE as
Project manager on behalf of
the syndicate
unit 5 –
June 15,
2019;
unit 6 –
September 30,
2019.
A hot start-up of unit 5 is ongoing. The first coal was fired
in the boiler
5 in December 2018.
The first
synchronisation with the NPS
took place in mid-January
2019
and on February 7, 2019 unit no. 5 for the first time
achieved 930 MW, exceeding its contracted installed. As
regards unit 6, final assembly works are under-way and
equipment
and systems
are
being started. General
Contractor plans combustion of boiler 6 for the first week
of April 2019. Overall work progress on this project at the
end of December 2018 was approx.
96%.
Construction of new unit in Turów power plant
Construction of
power unit with a
capacity of 490
MW
PLN 3.98
billion
PLN 2.59
billion
PLN 1.03
billion
Lignite/
43.1%
syndicate
of
companies:
MHPSE,
Budimex
and
Tecnicas Reunidas
H1 2020. In the fourth quarter of 2018, a boiler pressure test was
successfully conducted. Assembly works in the machine
room and boiler room continue at the construction site.
Assembly of steam pipelines and turboset support
systems is on-going. Assembly works on installations
outside of the unit were continued. Painting the internal
surface of cooling tower was completed. Assembly of
bays in the coal-feed system was continued. Cable laying
is taking place at the unit's control building.
Construction of a Thermal Processing Installation with Energy Recovery at Rzeszów CHP
Construction of a
thermal
processing
installation with
energy recovery
at Rzeszów CHP
with capacity of
approx. 8 MWe in
condensation
(approx. 4.6 MWe
+ 16.5 MWt in
co-generation)
PLN
293
million
PLN
290.2
million
PLN 172.7
million
Municipal
waste/
86%
TM.E. S.p.A.
Termomeccanica Ecologia
and
Astaldi S.p.A.
According to the
contract the
installation was to
be commissioned in
June 2018, finally it
was commissioned
at the end of
October 2018.
The investment is completed. On October 26, 2018, the
installation received a use permit and was commissioned.
Through a resolution of the Podkarpacie Voivodship
Assembly, the installation was given the status of a
regional communal waste processing installation.

RESPONSIBLE APPROACH TO NATURAL ENVIRONMENT

Companies in the Conventional Generation segment responsibly use natural resources while conducting operations in accordance with the existing legal regulations and requirements, including environmental protection standards. The Conventional Generation area is constantly improving its environmental performance and is more effective every year.

The environmental management system

Branches of PGE GiEK and PGE EC have applied Integrated Management System Model, which covers among other things an Environment Management System in accordance with PN-EN ISO 14001. This is an internationally recognised standard that sets out the methods for implementing effective environment management systems. The main objective of the ISO 14001 standard is contributing to protecting the environment and preventing pollution in a manner that takes into consideration both social and economic needs in line with the idea of sustainable development.

The concept of a unified Environment Management System is intended to harmonise documentation and improve effectiveness of managing the environmental protection area. This includes, among other things, central management of environmental aspects across all of the branches of the companies. This documentation is subject to updating during cyclical reviews.

Audits re-certifying the environmental management systems at PGE GiEK and PGE Energia Ciepła branches and companies took place in 2018, confirming compliance with the ISO PN-EN 14001:2015 standard. The audit results showed that both the developed regulations and the actions taken within the environmental management system are compliant with the standard's requirements and represent good practices that raise operational performance.

Additionally at the company's branches: Zespół Elektrowni Dolna Odra and Opole power plant, and at PGE Energia Ciepła S.A. Branch Wybrzeże in Gdańsk, an eco-management and audit system (EMAS PI:2999) is in place, which together with an environmental declaration was subject to review in 2018 by an accredited independent reviewer in accordance with new requirements. Registration in the EMAS system means compliance with the highest standards in environmental management and audit.

Air protection

The production of electricity and heat from fossil fuels has an impact on the quality of air, which is why PGE Group places strong emphasis on minimising emissions and avoiding the most harmful ones.

Installations of PGE GiEK and PGE EC operate in line with emission standards set out in the IED Directive or use the derogation mechanisms provided therein. Derogation is intended to give existing installations additional time to technically adapt to the more rigorous emission requirements specified in the IED or exempt them from the requirement to observe these if modernising such a facility would be unjustified due to a limited expected lifecycle. Regardless of the permissible norms, PGE Group strives to meet the highest standards and that's why we began an adaptation programme for BAT standards, taking into account the best available technologies.

Due to consistent pro-environmental investments, the Group's generation assets systematically lower emissions of NOx, Sox and dust in the air. In 1989-2018, the Group's power plants: Bełchatów, Opole, Turów, Dolna Odra and Rybnik, reduced emissions as follows: SO2 by 93%, NOx by 61 %, particulate matter by 99%.

Diagram: Emission of NOx , SO2 and particulates into the air (in kg/MWh) in the Group's power plants.

CO2 emissions

The third settlement period within the EU ETS (Emissions Trading System), covering years 2013-2020, began in 2013. During this period, rules for allocating free allowances for CO2 emissions to all EU ETS participants changed, in particular for producers of electricity and heat. As a rule, starting from 2013, each subsequent year of the third settlement period is a line decline of the number of free CO2 emission allowances allocated to installations.

It is estimated that PGE GiEK S.A. installations will receive a total of 145 296 727 allowances during the 2013-2020 period, including:

  • 7 301 373 allowances for heat production,
  • 137 995 354 allowances for electricity production (without allowances for new capacities).

It is estimated that PGE EC S.A. installations will receive a total of 42 938 820 allowances during the 2013-2020 period, including:

  • 10 505 171 allowances for heat production,
  • 32 433 649 allowances for electricity production (without allowances for new capacities).

The volume of free allowance in PGE GiEK and PGE EC constitutes approx. 30% of companies' installations needs.

The volume of CO2 emissions for 2018 in installations of PGE GiEK (not verified yet) amounts to 58 916 246 tons. Based on the balance of allowances and actual CO2 emissions, a shortage of 46 839 067 allowances exists. This shortage is compensated through the purchase of allowances on the market.

The volume of CO2 emissions for 2018 in PGE EC S.A. (not verified yet) amounts to 11 269 883 tons. tons. Based on the balance of allowances and actual CO2 emissions (not verified), a shortage of 9 276 706 allowances exists. This shortage is compensated through the purchase of allowances on the market.

A breakdown of CO2 emissions in main installations of Conventional Generation is presented in p. 6.7 Selected indicators in environmental issues in PGE Capital Group of PGE Group's report on non-financial data for 2018.

Management of waste and by-products

Waste is mainly produced directly in combustion processes or in ancillary processes to the generation of electricity and heat.

PGE Group companies are consistently improving and expanding the scale of application for their combustion waste. Very good economic results from the use of these substances are generated as regards ash and slag from hard coal combustion and gypsum from flue gas desulphurisation. The economic effects of ash from lignite combustion may still be increased. The lower share in

industrial use of limestone ash from lignite combustion has to do with its chemical and physical properties and considerable price volatility. The scale of use for such waste is also of significance. The use of such waste is determined also by the use of mainly ash from hard coal combustion, which features much better properties and outperforms combustion waste from lignite firing.

Over 7 million tonnes of combustion waste was generated at PGE GiEK's installations in 2018. Approx. 560,000 tonnes of combustion waste was generated at PGE EC's installations.

Waste from lignite combustion account for more than 90% of all combustion waste produced in PGE GiEK. The specific properties of ashes from lignite combustion and the high variability of their parameters limit the potential for the commercial use of these substances. This results in the necessity to deposit them at storage sites (Bełchatów power plant) or filling unused transformed land therewith. Such recovery process is being applied at Turów power plant, where waste is deposited together with overburden at the landfill of the mine KWB Turów (lignite mine).

Combustion waste from burning hard coal, given their attractive properties, have a range of applications in the cement industry, construction and road building. Some of this waste is deposited at combustion waste landfills or temporarily at waste warehouses. Approx. 600,000 tonnes of hard coal-combustion waste was generated at PGE GiEK's installations and approx. 560,000 tonnes of hard coal-combustion waste was generated at PGE EC's installations.

A significant portion of the ash generating in hard coal and lignite firing as well as part of the synthetic gypsum are generated as a by-product and are not classified as waste. In 2018, PGE GiEK created 1.5 million tonnes of by-product, including approx. 800,000 tonnes of by-product from hard coal firing, approx. 400,000 tonnes of by-product from lignite firing and approx. 300,000 tonnes of by-product from flue gas desulphurisation. PGE EC and Kogeneracja S.A. identified approximately 1.5 million tons of byproducts from coal combustion, specifically 1 073 000 tonnes of ash and 225 000 tonnes of slag and 189 000 tonnes of gypsum.

A breakdown of the total weight of waste generated by companies of PGE Group's Conventional Generation segment (PGE GiEK and PGE EC) is presented in p. 6.7 Selected indicators in environmental issues in PGE Capital Group of PGE Group's report on nonfinancial data for 2018.

Management of waste water

Conditions for managing waste water are specified in relevant permits, including in particular integrated permits and water-law permits. In branches od PGE GiEK and PGE EC monitoring is conducted on an on-going basis as regards the quantity and quality of water collected and waste discharged.

For technological purposes, in PGE GiEK water is collected from groundwater. At PGE EC, water for technological purposes is collected from surface waters, groundwater or water-supply networks, depending on location. In order to limit the quantity of raw water consumption, closed-circuits are used, and old technological water and waste water are used in other processes. Waste water created as a result of power plant and heat-and-power plant production activities is subject to a purification process, including multi-stage cleansing, and subsequently discharged to groundwater or transferred to municipal companies.

Mining of lignite in an open-pit mine, which takes place at two PGE GiEK S.A. lignite mines – Bełchatów and Turów, requires the rockmass to be initially dewatered, which has substantial impact on hydrogeological conditions. Water management at lignite plants is related to dewatering both inside the rockmass and at the surface of the pit. Water from the pit is taken out to field reservoirs, the task of which is final purification of water through natural sedimentation of suspensions, assisted by plant filters. Once the water is purified, it is at least class II in purity terms.

A breakdown of the overall volume of waste water generated by companies of PGE Group's Conventional Generation segment (PGE GiEK and PGE EC) is presented in p. 6.7 Selected indicators in environmental issues in PGE Capital Group of PGE Group's report on non-financial data for 2018.

Reclamation of adversely transformed land

Post-mining areas that are no longer used for deposit mining and storing overburden are subject to on-going reclamation during the entire period of mining activity in accordance with conditions specified by the proper environment protection authorities. In the light of existing legal regulations (Act on protection of farming and forest land, Geological and mining law), post-mining terrain must be rehabilitated, and the rehabilitation requirement applies to the natural or legal persons who remove such land from production and cause it to lose value.

Reclamation performed at the Conventional Generation segment consists of returning useful and natural values of land (as close to natural as possible). Land reclamation is performed through technical reclamation (land shaping and construction of essential technical infrastructure) and biological reclamation (ground preparations, introduction and maintenance of plants). Rehabilitation

of sites significantly reduces fugitive emissions (for example pariculates from landfills or heaps) and improves the quality of water being discharged into surface water reservoirs. Within Conventional Generation segment large-scale reclamations are mainly being conducted within the following open-pit lignite mines: KWB Turów and KWB Bełchatów.

Large-scale production entails substantial obligations towards the natural environment. Years of experience and the implementation of innovative and effective eco-friendly technological solutions allows to significantly mitigate the effects of lignite mining. Reclamations conducted thus far have given rise to vast forest and water complexes where many animal and plant species are present. Already in the near future, the main reclamation task for the KWB Bełchatów will be the reclamation of both end-excavations in the water direction and the creation of a landscape with a large leisure complex. This undertaking will reach the scale of the difficulties which have no equivalent in our country. Targeted reclamation activity of this mine will be determined by need of water filled reclamation of the excavation. Therefore, research, design and implementation works in this direction are carried out well in advance of the end of exploitation date, and in the first place relate to the nearby post-exploitation excavation of the Bełchatów Field, although water reclamation will be possible only for both end excavations at the same time.

Mitigation of noise emissions

PGE GiEK and PGE EC are in continuous operation. Permitted level of noise emissions to the environment is determined in law and permits issued for the companies. Noise emission measurements are performed every two years or ad hoc upon request or complaint by external entities.

Noise emission measurements taken in 2018 in branches of PGE GiEK (Gorzów CHP, Rzeszów CHP, Zgierz CHP, Bydgoszcz CHPs, Turów power plant, Opole power plant, Bełchatów power plant and ZEDO) and branches and subsidiaries of PGE EC did not show breaches of permissible noise emission levels. Measurements taken in 2018 within the impact areas of lignite mines (KWB Turów, KWB Bełchatów) did not show any larger breaches. In one case at KWB Bełchatów, the terms of a decision regarding permissible noise at night were breached. In order to further reduce noise emissions on the areas of the open pit mines, the steel idlers are continuously being replaced with silent idlers.

RENEWABLES

Segment description and its business model

This segment is involved in the generation of electricity from renewable sources and in pumped storage plants.

* in accounting terms.

The Renewables segment is mainly based on revenue from the sale of electricity, however contrary to production at industrial plants within the Conventional Generation segment, this revenue is subject to a larger degree to changes in weather conditions and prices on the spot market due to the renewables sales model in place. Electricity output volume translates into property rights (green) and revenue from the sale of energy origin certificates obtained by the segment's assets, excluding hydropower plants over 5 MWe.

A stable part of the segment's results is related to the provision of system services using pumped-storage plants, which is performed on the basis of an agreement with the transmission system operator, PSE S.A.

On the cost side, the most important items include: depreciation of segment assets, use of energy to pump water at pumpedstorage plants and third-party services, mainly in the form of repair services. Property tax and employee wages also constitute a significant cost item in this segment.

Assets

The PGE Capital Group's operations in renewable energy are managed by the PGE Energia Odnawialna S.A. Assets in the segment include:

  • 14 wind farms,
  • 1 photovoltaic power plant,
  • 29 run-of-river hydro power plants,
  • 4 pumped-storage power plants, including 2 with natural flow.

Diagram: Main assets of the Renewables segment.

Table: Installed capacity and production in power plants of Renewables segment.

Types of power plants Annual energy generation (GWh) Installed
capacity
(MWe)
2018 2017 2018
Run-of-river hydro power plant 241.79 330.35 95.76
pumped-storage power plants 388.68 438.84 1 256.00
pumped-storage power plants with natural flow* 134.55 141.73 286.64
Wind farms 1 063.33 1 284.16 549.98
PV 0.58 0.52 0.60

*including generation from pump-storage cycle of 5.0 GWh and generation from natural flow of 129.5 GWh. Total generation from pump-storage cycle in 2018 amounted to 393.7 GWh and generation from water totalled 371.3 GWh.

Diagram: Change in installed capacity in Renewables segment.

* Increase of installed capacity in 2017 was caused by the decision of the ERO President changing concessions for electricity. The change consisted of correction of installed capacities of the generation sources.

Table: Availability and capacity factor in Renewables.

2018 2017 2016 2015
Availability
Run-of-river hydro power plants 86.2% 92.0% 93.2% 95.7%
Wind farms 97.4% 97.4% 97.8% 97.9%
Capacity factor
Run-of-river hydro power plants 29.5% 38.1% 36.7% 29.4%
Wind farms 23.7% 29.4% 25.2% 28.9%

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

EBITDA
2017
Electricity
revenues
-wind
Certificates
revenues
- wind
Electricity
revenues
- hydro
Certificates
revenues
- hydro
Revenues
ancillary
control
services*
Costs Other EBITDA
2018
Change -8 67 2 5 2 35 -4
EBITDA 2017 364 214 58 83 4 244 305
EBITDA 2018 206 125 85 9 246 270 463

* Excluding revenues and costs relating to Balancing market not affecting EBITDA result.

Key factors affecting the results of Renewables in 2018 y/y were:

  • Decrease in revenues from electricity sales from wind farms resulting mainly from decreasing electricity sales volume by 273 GWh, connected with less favourable wind conditions in February and in period May-December 2018.
  • The increase of revenues from sales of certificates from wind farms resulting from: (i) realised sales of certificates and revaluation of inventories, what attributed to the increase of revenues by approx. PLN (+) 35 million; (ii) valuation of certificates at a price approx. PLN 43/MWh higher in 2018, which increased revenue y/y by approx. PLN (+) 32 million, at the same time with the lower production of certificates by approx. 221 GWh due to less favourable wind conditions in February and in period May-December 2018;
  • The increase of sales revenues of electricity from hydro power plants mainly due to sale price higher by PLN 48/MWh y/y.
  • The increase of revenues from sales of certificates from hydro power plants resulting from: (i) valuation of ongoing production of certificates at a price higher by approx. PLN 51/MWh in 2018 what attributed to the increase of revenues y/y by approx. PLN (+) 4 million; (ii) realised sales of certificates and revaluation of inventories, what attributed to the increase of revenues by approx. PLN (+) 1 million.
  • Higher sales revenues from ancillary control services result mainly from valorisation of remuneration for services provided by pumped storage power plants, in accordance with the provisions of the contract.
  • Decrease in costs results mainly from mainly from a correction of property tax concerning wind farms due to changes in legislation.

CAPITAL EXPENDITURES

Table: Capital expenditures incurred in Renewables segment in 2018 and 2017.

PLN million 2018 2017 % change
Investments in generating capacities, including: 96 75 28%

Development
18 22 -18%

Modernisation and replacement
78 53 47%
Other 7 6 17%
TOTAL 103 81 27%

RESPONSIBLE APPROACH TO NATURAL ENVIRONMENT

PGE Group is the leader in producing electricity from renewable sources in Poland, with an approx. 9% market share. The energy produced in the Renewables segment could not be produced without natural resources: water, wind and sun. Taking this into account, PGE Group in its daily activities follows a responsible approach to the environment, in which segment's assets operate and uses resources in rational way – especially water, that drives the turbines od hydro power plants and pumped storage power plants.

Segment's generation sources

Investing in renewable sources since 2007, the wind asset portfolio currently has approx. 550 MWe. The renewable energy segment's assets include the largest pumped storage plants in Poland that contribute to system stability during peak demand for electricity as well as numerous run-of-the-river hydro-power plants. Aside from generating clean and ecological energy, PGE Group's hydroelectricity assets, which have their own reservoirs, play a very important role in flood control. They can divert and smooth out flood waves in rivers and thus control their safe discharge in volumes that cause no losses or damages. Water storage at hydro-power plants' reservoirs is also of key significance during draught. By supplying additional water to rivers, they support local fauna and flora. In addition, the operation of turbines adds oxygen to the water, which has a positive impact on the entire ecosystem. All hydro-power assets in the renewable energy segment have modernised installations that have no adverse effect on waters and do not change their physical and chemical properties, e.g. temperature.

PGE Energia Odnawialna runs monitoring of birds and bats on its wind farms. Aim of this research is determination of real impact of wind farm operations on animals. Constructions of towers and wind turbines are also used – they prevent from nesting, and special marking on ends of windmill blades, which allow to see potential obstacles.

Renewables segment companies pursue investments that focus on maintaining riverbeds, participating in the costs being incurred by river administrators and participating in the costs of restocking, which is a way of compensating for making fish migration more difficult on account of damming facilities being built across rivers. In accordance with environmental protection requirements, PGE Energia Odnawialna builds hydro-technical fish ladders at its facilities - their task is to make it possible for fish and invertebrates to safely and comfortably migrate. Another one was built in 2018, at the Krzywaniec barrage.

A breakdown of the data on waste water generated by PGE EO is presented in PGE Group's report on non-financial data for 2018 in chapter 6.7 Selected indicators in environmental issues in PGE Capital Group.

Environmental development projects

The Renewables segment is also implementing development projects that focus on the use of wind energy, water energy - also offshore - and photovoltaics. According to PGE Group's strategy, PGE plans to achieve a 25% share of the domestic renewables market by 2030. Development investments in this and other areas take into account the present economic situation.

One of PGE Group's strategic options is to build offshore wind farms. PGE aspires to build approx. 2.5 GW of installed capacity in offshore wind farms in the Baltic Sea by 2030. This aim will depend on the final version of Poland's energy policy. This project is to be developed in the southern part of the Baltic Sea, approx. 30 km from the coastal towns of Ustka, Łeba and Władysławowo. This investment will be an important development impulse for Poland. Gdańsk, Gdynia, Szczecin and Świnoujście can become the main construction centres for offshore energy in the southern section of the Baltic Sea, while Łeba, Ustka and Darłowo can become important service hubs.

PGE Group is currently conducting a two-year wind measurement campaign in the Baltic Sea and is awaiting an environmental decision. Subsidiaries Baltica 2 and Baltica 3 have obtained terms for grid connection from PSE (approx. 2.5 GW of installed capacity). Works on securing the connection path on land are also under-way, and rights to properties are being secured. Preliminary geological and geotechnical surveys will be conducted in the nearest future in order to select the optimal type of foundation.

PGE Group also sees potential to further develop onshore wind energy. This is proven by the project to build three wind farms: Starza, Rybice and Karnice II, together with associated infrastructure and power off-take. The investment in the Zachodniopomorskie Voivodship with total installed capacity of approx. 97 MW will bring PGE's total installed wind capacity to nearly 650 MW and strengthen its position as the largest producer of green energy in Poland. Realisation of the project will be possible thanks to the win of Klaster in auction for sale of electricity in RES installations. Auction organized by the ERO was directed to producers of electricity in PV plants and wind farms with a total installed capacity of more than 1 MW.

Also of significance are investments being implemented by companies in the renewable energy segment that focus on maintaining riverbeds, participating in the costs being incurred by river administrators and participating in the costs of restocking, which is a way of compensating for making fish migration more difficult on account of damming facilities being built across rivers.

DISTRIBUTION

Segment description and its business model

Core business of the segment includes supply of electricity to final off-takers through the grid and HV, MV and LV infrastructure.

*in accounting terms.

Segment revenue is based on a tariff for electricity distribution services, which is approved by the ERO President every year at company request and is regulated. The tariff allows costs related to the distribution system operator's on-going activities to be transferred. These are both justified operating costs, depreciation as well as costs related to the necessity to cover grid losses on electricity distribution or the purchase of transmission services from the transmission system operator. At the same time, the tariff reflects the transferred costs in fees such as the RES fee, transition fee or - starting from 2019 - cogeneration fee (see note 5 to the consolidated financial statements).

The key element shaping the distribution segment's result is return on PGE's invested capital. This is based on the Regulatory Asset Base ("RAB"), which is established on the basis of completed investments and taking into account asset depreciation. The Regulatory Asset Base serves as the basis for calculating return on capital, using weighted average cost of capital, which is published by the ERO President in accordance with a set formula and using as the risk free rate the average yield on 10-year State Treasury bonds with the longest maturity during the 18-month period preceding the tariff application submission, as quoted on the BondSpot treasury market. Moreover, the level of return on capital depends on achievement of individual quality targets set by the ERO President for efficiency indicators that cover: interruption time, interruption frequency, connection time and (not yet taken into account) time to provide metering and settlement data.

VOLUME, CUSTOMERS AND OPERATING DATA

PGE Dystrybucja S.A. operates in the area of 122,433 sq. km and delivers electricity to approximately 5.4 million.

Diagram: Area of PGE distribution grid.

Table: Volume of distributed energy and number of customers in 2018 and 2017.

Tariff Number of customers according to power take-off
Volume (TWh)*
points
2018 2017 2018 2017
A tariff group 5.67 5.44 108 109
B tariff group 14.15 13.51 11 739 11 423
C+R tariff groups 7.01 6.89 480 864 480 345
G tariff group 9.58 9.50 4 909 493 4 858 798
TOTAL 36.41 35.34 5 402 204 5 350 675

* with additional estimation of sales.

Table: Key operational data in 2018 and 2017, 2016 and 2015.

Operational data Unit 2018 2017 2016 2015
Number of stations, including: pieces 94 198 93 493 92 328 92 258
number of transformer stations pieces 93 764 93 104 92 474 91 874
MVA power MVA 31 570 30 826 29 903 29 500
Total length of power lines km 290 235 287 864 285 701 283 804
HV lines km 10 282 10 278 10 197 10 143
MV lines km 112 512 111 588 110 798 109 938
LV lines km 167 440 165 998 164 706 163 723
Grid loss ratio % 5.1 5.4 5.8 5.9
SAIDI ratio, including: minutes 299 557 401 442
Planned minutes 87 95 119 159
Unplanned with catastrophic minutes 212 462 282 283
SAIFI ratio, including: per customer 3.92 5.48 4.49 4.72
Planned per customer 0.47 0.48 0.61 0.7
Unplanned with catastrophic per customer 3.45 5.00 3.88 4.02
Connection time days 211 215 248 291

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

Chart: Key changes of EBITDA in Distribution (in PLN million) – managerial perspective.

* Excluding cost of transmission services from PSE S.A.

** Reactive energy, capacity excess, additional services, resumption of supplies.

*** Adjusted for revenues from the Balancing market.

Key factors affecting the results of Distribution in 2018 y/y included:

  • Increased volume of distributed energy by 1 071.5 GWh, resulting from inter alia higher number of customers measured by power take-off points (by approx. 51.5 thousand) and growth of the economic activity of customers, mainly from groups A and B, in the area of operation of PGE Dystrybucja S.A.
  • A slight drop of the average rate by approximately PLN 0.2/MWh after decreasing revenues by cost of fees for PSE S.A.
  • Increase of other revenues from distribution activities mainly from passive power and excessive capacity what results from behaviour of off-takers, whose power consumption is higher than volume contracted in the agreement with PGE Dystrybucja S.A.
  • Lower costs of energy to cover balancing difference as a result the recognition of electricity estimates for covering the balancing difference.
  • Increase of costs of tax on real estate in connection with an increase of: (i) grid assets value as a result of investments, (ii) tax rates binding in 2018.
  • Increase in personnel costs, related to ongoing process to optimise salaries.
  • Change in other resulting mainly from lower costs of office supplies and office equipment and advisory services.

CAPITAL EXPENDITURES

Table: Capital expenditures incurred in Distribution segment in 2018 and 2017.

PLN million 2018 2017 % change
Development investments 727 745 -2%
Modernisation and replacement 1 045 903 16%
Other 81 68 19%
TOTAL 1 853 1 716 8%

RESPONSIBLE APPROACH TO NATURAL ENVIRONMENT

The Distribution segment manifests its responsible approach to the natural environment through compliance with legal regulations and best sector's standards concerning the operation of its power networks and equipment. This also involves investment and repair tasks that are conducted in such a way as to minimise their burden and impact on the surrounding natural environment.

The construction of new power facilities or the conversion of existing facilities is based on decisions on environmental conditions. The matter of environmental decisions was included in the appropriate procedure.

PGE Dystrybucja S.A. has been implementing a project to limit grid losses for years, mainly by replacing transformers with lowloss equipment and by converting and modernising the grid. These investments are contributing to the improvements in quality parameters of electricity supplies and to reducing grid operation costs. In 2018, as a result of a number of efficiency initiatives, the grid loss ratio was reduced from 5.4% to 5.1%.

Distribution segment is subject to mandatory notification of installations that emit an electromagnetic field. New or modernised installations being operated by PGE Dystrybucja S.A. are notified to the relevant environmental protection authorities on an ongoing basis.

In 2018 PGE Dystrybucja undertook a number of activities intended to maintain the natural character of the environment. The most important activities included:

  • conducting environmental impact assessments at the technical design stage of investment processes,
  • continuing activities intended to protect the natural environment from insulating oil pollution in the event of an emergency leak from transformers used on 110 kV substations, by constructing sealed containers (basins) under power transformers,
  • continuing activities within a programme to protect white stork nests, consisting of installing special structures on low-voltage lines facilitating the set up and protection of stork nests,
  • introduction of modern small-format power equipment and grid elements in order to decrease area occupied by infrastructure,
  • replacement of transformersin order to limit electricity grid losses.

SUPPLY

Segment description and its business model

Supply segment activities include Group's wholesale and retail trading of electricity. Wholesale trading include mainly electricity trading on behalf of and for Conventional Generation segment and Renewables segment.

*in accounting terms.

As part of retail-market activities, the key source of revenue is sale of electricity to final customers. This is sale to business and institutional clients, which constitutes approx. 3/4 of the sales volume, and to retail clients. The segment's revenue also includes the sale of fuels, mainly: pulverised coal and fat coal, which is sold by PGE Paliwa sp. z o.o., and sale of gas.

Electricity sales are matched by the costs to purchase electricity on the wholesale market and costs to redeem certificates as part of the support system for renewable sources, cogeneration and energy efficiency.

The Supply segment also covers costs related to the Group's corporate centre.

OPERATIONAL DATA

Table: Volume of electricity sales to final off-takers and number of customers in 2018 and 2017.

Tariff Volume (TWh)* Number of customers according to power take-off
points
2018 2017 2018 2017
A tariff group 10.21 9.84 153 167
B tariff group 13.65 14.01 11 718 11 553
C+R tariff groups 6.76 6.90 447 081 435 771
G tariff group 9.77 9.27 4 812 012 4 731 621
TOTAL 40.39 40.02 5 270 964 5 179 112

*PGE Obrót S.A.

KEY FACTORS FOR THE RESULTS OF THE SEGMENT

Chart: Key changes of EBITDA in Supply (in PLN million) – managerial perspective.

EBITDA
2017
Result on
electricity – margin
Result on
electricity
volume
Certificates
redemption
costs
Result on
gas trading
Revenues
from services
provided to
segments of
the Group
Other EBITDA
2018
Change -183 -2 -64 -21 36 -53
Reported EBITDA
2017
811 1 479 744 16 554
Recurring EBITDA
2018
1 294 808 -5 590 524
One-offs 2018 -261
Reported EBITDA
2018
263

One-offs reducing reported result

Key factors affecting recurring EBITDA of Supply segment in 2018 y/y included:

  • Lower result from electricity by PLN 185 million resulting mainly from achieving lower unit margin on sale of electricity, related to increase of prices on the wholesale market, particularly on spot market(see p. 4.2 of this report), partly used for balancing of electricity demand resulting from sales to final off-takers.
  • Increase in costs to redeem certificates mainly as a result of increased demand for certificates stemming from increased obligation to redeem green, yellow and purple certificates higher prices of green certificates redemption.
  • Lower result on gas trading, mainly due to a decline in gas sale margins as a consequence of higher wholesale market prices having impact on the cost of balancing transactions with the Conventional Generation segment and retail customers' demand on the SPOT market.
  • Increase of revenues from services performed within the Group resulting mainly from increased revenues from the Agreement for Commercial Management of Generation Capacities ("ZHZW") (PLN (+) 108 million), as a consequence of higher sale and purchase prices of electricity under management and higher trading volume (+ 9.2 TWh including introduction of PGE EC to the agreement + 6.2 TWh) and decreased revenues from so called support agreements (PLN - 72 million) caused by different method of settlements with the companies.
  • Lower result in other mainly as a result of: (i) lower revenue from wind farm balancing services, (ii) higher operating costs in the segment, (iii) better result on other operations.

Reported EBITDA in 2018 is a consequence of creation of provision for contracts that generate liabilities in PGE Obrót S.A., in the connection with the implementation of the Act of December 28, 2018 on amending the act on excise tax and some other acts (see p. 4.6 of this report).

RESPONSIBLE APPROACH TO NATURAL ENVIRONMENT

PGE Obrót S.A. is one of the leading electricity sellers in Poland. The company implements a responsible approach to the natural environment through an offering for clients who care about ecology and the origin of their electricity. The "Naturally, it's energy" offering is prepared for all existing and future PGE customers who have eco-friendly activities listed in their strategies. This covers the sale of electricity generated in renewable sources and comes with a guarantee of origin for this energy. Clients who decide to select this offering receive a certificate from PGE Obrót S.A. showing what percentage of the energy purchased in a given year comes from renewable sources.

Until September 2018 "Save on light" offering directed to household segment was continued (in March 2018 the name was changed to "House full of light"). Together with "Save on light for small business" and "Business in good light" PGE Obrót S.A. offered energy-saving solutions to its customers. This deal included electricity sales together with an additional product - a package of LED bulbs / lamps.

One of elements of extensive combat for clean air is "Anti-Smog Offering" introduced in January 2018. This offer is directed to those customers planning to use electricity for heating purposes as well as those who charge electric vehicles, who decide to increase electricity consumption during night hours 22:00 – 6:00. This offer is available for individual customers of PGE Obrót S.A. being consumers from historical market (area of PGE Dystrybucja).

OTHER OPERATIONS

Segment description and its business model

Other operations include services, through the subsidiaries, to PGE Group, which includes capital raising and provision of IT, payroll and HR services and transportation services. Its activities also include subsidiaries formed to prepare and implement a project to build a nuclear power plant, to manage investment funds and to invest in start-ups.

Increase in EBITDA of Other Operations segment by approx. PLN 38 million is mainly related to increased EBITDA of: PGE Systemy S.A. by PLN approx. 21 million (due to extended range of services for companies from other segments of PGE Capital Group) and PGE Ekoserwis Sp. z o.o. in amount of approx. PLN 11 million.

Capital expenditures

Capital expenditures in Other Operations in 2018 amounted to PLN 162 million compared to PLN 126 million in 2017.

Within the above amount, the highest capital expenditures in 2018 were incurred by the following companies:

  • PGE Systemy S.A. for IT infrastructure and software development PLN 76 million;
  • PGE EJ 1 sp. z o.o. for nuclear project development PLN 79 million.

5.5. Significant events of the reporting period and subsequent events

TENDER OFFER FOR SHARES OF ZESPÓŁ ELEKTROCIEPŁOWNI WROCŁAWSKICH KOGENERACJA S.A. AND ITS RESULT

On February 1, 2018 the Management Board of PGE announced tender offer for sale of 2 383 999 dematerialised ordinary bearer shares issued by Kogeneracja S.A., entitling to 16.00% of votes on the General Meeting of Kogeneracja S.A. The proposed price was PLN 81.80 for each share. The subscription period lasted from February 21, 2018 till March 6, 2018. The tender offer resulted in acquisition of 1 202 172 shares of Kogeneracja S.A., entitling to 1 202 172 of votes on the General Meeting of Kogeneracja S.A. representing 8.07% of total shares and votes on the General Meeting of Kogeneracja S.A.

More information on that issue in current reports of PGE S.A. and in note 1.3 to the consolidated financial statements.

Current reports of PGE S.A.:

SIGNING OF THE LOAN AGREEMENT OF PLN 4.1 BILLION

Information on the Signing of the loan agreement was published in the current report:

Signing of the loan agreement

TENDER OFFER FOR SHARES OF POLENERGIA AND ITS RESULT

On May 22, 2018 the Management Board of PGE announced a tender offer for sale of 45 443 547 ordinary bearer shares, i.e. all shares issued by Polenergia S.A., entitling to 100% of votes on the General Meeting of Polenergia S.A., at a price of PLN 16.29 for each share. PGE was also the entity acquiring the shares in the tender offer.

PGE has taken decision not to acquire the shares of Polenergia S.A. due to the fact that some of the conditions of the tender were not satisfied.

More information on that issue in current reports of PGE S.A. and in note 33.3 to the consolidated financial statements.

Current reports of PGE S.A.:

CHANGE OF COMMISSIONING DATES OF UNITS 5 AND 6 IN OPOLE POWER PLANT

As a result of negotiations with the General Contractor (syndicate of Polimex-Mostostal S.A., Mostostal Warszawa S.A. i Rafako S.A.) and GE Power, new commissioning dates of units 5 and 6 in Opole power plant have been estimated and remuneration of the General Contractor was confirmed, provided that the commissioning dates for the units, agreed in the annex, are met.

Modified commissioning dates declared by the General Contractor are: May 31, 2019 for unit 5 and September 30, 2019 for unit 6. On October 10, 2018 PGE GiEK, subsidiary of PGE, signed an annex with the General Contractor to the agreement for construction of units 5 and 6 in Opole power plant.

Current reports of PGE S.A.:

AGREEMENT WITH PGG

On November 20, 2018 PGE has signed the agreement for supplies of hard coal with Polska Grupa Górnicza S.A. Under the agreement, the parties estimated the volume of hard coal supplies for PGE GiEK, KOGENERACJA S.A. and PGE EC S.A. for years 2019-2022.

Current report of PGE S.A.:

Agreement with PGG for hard coal supplies >>

RESULTS OF CAPACITY MARKET AUCTIONS

The first three capacity market auctions for delivery years 2021, 2022 and 2023 were held in November and December 2018. As a result, PGE contracted capacities for the Group's existing, modernised and new generation assets. Contracts for the underconstruction units at the Opole and Turów power plants are executed for a 15-year period, guaranteeing stable and long-term remuneration for readiness to delivery capacity to the system, which will supplement revenue from the sale of electricity. The auction clearing prices were respectively: PLN 240.32/kW/year (2021), PLN 198.00/kW/year (2022) and PLN 202.99/kW/year (2023). In the case of multiannual capacity contracts, the price will be subject to annual indexation using the weighted average price index for consumer goods and services.

* Net achievable capacities.

Current reports of PGE S.A.:

INITIAL INTEREST IN BUYING ALL SHARES IN THE COMPANY PGE EJ1

On November 28, 2018 the Management Board of PGE expressed initial interest in purchasing all shares in the company PGE EJ1 sp. z o.o. The execution of transaction will be possible after the preparation of valuation by the independent adviser and after obtaining corporate approvals from all concerned parties.

Current report of PGE S.A.:

Initial interest in buying all shares in the company PGE EJ1>>

ANNEX TO THE AGREEMENT WITH POLSKA GRUPA GÓRNICZA S.A. FOR HARD COAL SUPPLIES FOR UNITS 5 AND 6 IN OPOLE POWER PLANT

On November 30, 2018 PGE has received the information that PGG signed an annex to the agreement dated August 13, 2013 concerning hard coal supplies for units 5 and 6 in Opole Power Plant. Parties of the annex adjusted arrangements to meet the current legal and formal requirements and abandoned the determination of hard coal price based on indicators involving the average electricity price, average market price of hard coal and average cost of CO2 emission allowances. Parties of the agreement set hard coal price for the period till December 31, 2022.

Current report of PGE S.A.:

Annex to the agreement with Polska Grupa Górnicza >>

BEGINNING OF TALKS REGARDING POTENTIAL COOPERATION ON CONSTRUCTION PROJECT OF 1 000 MW UNIT IN OSTROŁĘKA

In response to the invitation from Energa S.A. and Enea S.A., on January 7, 2019 the companies started talks that may potentially result in involvement of PGE in the construction project of 1 000 MW unit in Ostrołęka, which is currently pursued by Energa and Enea.

Current report of PGE S.A.:

Beginning of talks regarding potential cooperation on construction project of 1 000 MW unit in Ostrołęka>>

CHANGES IN THE MANAGEMENT BOARD AND SUPERVISORY BOARD

Changes in the Management Board and Supervisory Board are described in p. 8.3 of this report.

LEGAL ASPECTS

Claims for annulment of the resolutions of the General Meetings of PGE S.A.

Information on claims for annulment of the resolutions of the General Meetings of PGE S.A. are described in note 27.4 to the consolidated financial statements.

The issue of compensation regarding the conversion of shares

Information on the issue of compensation regarding the conversion of shares are described in note 27.4 to the consolidated financial statements.

INFORMATION CONCERNING PROCEEDINGS IN FRONT OF COURT, BODY APPROPRIATE FOR ARBITRATION PROCEEDINGS OR IN FRONT OF PUBLIC ADMINISTRATION AUTHORITIES

Significant proceedings pending in front of courts, competent arbitration authority or public administration authority are described in note 27.4 to the consolidated financial statements.

Claims related to agreements for sale of certificates signed with Energa-Obrót S.A.

Information on claims related to agreements for sale of certificates signed with Energa-Obrót S.A. are described in note 27.1 to the consolidated financial statements.

Non-contractual use of property

Information on disputes and claims regarding non-contractual use of property are described in note 27.2 to the consolidated financial statements.

Termination by Enea S.A. of agreements for sale of certificates

Information on termination by Enea S.A. of agreements for sale of certificates are described in note 27.4 to the consolidated financial statements.

INFORMATION CONCERNING THE GUARANTEES FOR LOANS GRANTED BY THE COMPANY OR A SUBSIDIARY

Within the Group, in 2018 PGE S.A. and subsidiaries did not grant guarantees to other entities or to a subsidiary, where a value of guarantees constitutes at least 10% of the Company's equity.

CHANGE OF ACCOUNTING RULES

Change of accounting rules is described in note 5 to the consolidated financial statements.

INFORMATION ON ISSUE, REDEMPTION AND REPAYMENT OF DEBT SECURITIES AND OTHER SECURITIES

Information on issue, redemption and repayment of debt securities and other securities is described in p. 7.1 of the foregoing report and in note 1.3 to the consolidated financial statements.

TRANSACTIONS WITH RELATED ENTITIES

Information about transactions with related entities is presented in note 31.2 to the consolidated financial statements.

SIGNIFICANT OFF-BALANCE SHEET ITEMS

Significant off-balance sheet items are described in note 27 to the consolidated financial statements.

ACT ON AMENDING THE ACT ON EXCISE TAX AND SOME OTHER ACTS

Changes in the act are described in note 33.2 to the consolidated financial statements.

5.6. Management of financial resources and financial liquidity

NET DEBT OF THE GROUP AND MAIN FINANCIAL RATIOS

Table: Group's net debt as at December 31, 2018 and December 31, 2017.

PLN million As at As at
December 31, 2018 December 31, 2017
Cash on hand and cash at bank 1 023 1 309
Overnight deposits 33 34
Short-term deposits 156 1 209
VAT - Split payment 69 -
Cash and cash equivalents 1 281 2 552
Adjustment for restricted cash* -180 -92
Investments held until maturity date
(short-term deposits)
7 6
Cash at PGE Group's disposal 1 108 2 466
Current loans and borrowings 2 273 570
Bonds issued - current 2 186 1 051
Current lease 2 2
Non-current loans and borrowings 5 663 5 788
Bonds issued – non-current 583 2 632
Non-current lease 1 2
Gross financial debt (short and long-term) 10 708 10 045
Net financial debt 9 600 7 579

* Restricted cash includes collaterals for settlements of the Group entities with Izba Rozliczeniowa Giełd Towarowych S.A. (Warsaw Commodity Clearing House), funds on VAT accounts and security deposits.

Table: Key financial ratios.

PGE's existing financing model takes into account the use of funds from its core activities, debt financing in the form of commercial bank credit facilities and bond programmes, credit facilities from Bank Gospodarstwa Krajowego, credit facilities from multilateral institutions such as the European Investment Bank or the European Bank for Reconstruction and Development as well as in the form of preferential financing. In order to effectively manage liquidity, within the Group we have introduced a cashpooling system, with participation of 27 Group companies.

Until 2014, PGE maintained a net cash position and investment expenditures were financed from operating cash flows. However, an ambitious investment programme of approx. PLN 34 billion scheduled for 2016-2020 requires long-term planning and external financing.

The most important available external financing sources for PGE Group are as follows:

  • Domestic bond programme of PLN 5 billion.
  • Euro Medium Term Note (EMTN) bond programme of up to EUR 2 billion.
  • 2 credit facilities from Bank Gospodarstwa Krajowego as part of the "Inwestycje polskie" ("Polish investments") programme, amounting to PLN 1.5 billion in total.
  • Syndicated loan of PLN 5.5 billion, including a term facility of PLN 3.63 billion and revolving facility of PLN 1.87 billion.
  • PLN 2 billion credit facility from the European Investment Bank PLN 1.5 billion will be used for projects related to distribution network modernisation and expansion, while PLN 490 million will be used to finance and re-finance the construction of cogeneration units.
  • PLN 500 million credit facility from the European Bank for Reconstruction and Development to support implementation of a long-term programme for distribution network development and modernisation.
  • Syndicated revolving loan of PLN 4.1 billion intended for financing of the ongoing operations, financing of the investment and capital expenses and refinancing of the financial liabilities.
  • Current-account overdraft facilities.

PGE Group's financing policy features diverse maturities for specific financial instruments, which along with the diversification of financing sources, helps the Group to optimise its financing costs. The Group aspires to implement a responsible financial policy, which entails maintaining its net debt to EBITDA ratios at a level that makes it possible to retain investment-grade ratings.

Diagram: Currency profile of the Group's debt (including hedging transactions) and the Group's debt breakdown by fixed and floating rate (including hedging transactions).

Diagram: Gross debt and net debt (PLN million).

External long-term debt is mainly drawn by PGE S.A. (the parent company) and PGE Sweden AB (Swedish SPV for Eurobonds issues). Some historical investments loans exist in PGE GiEK S.A. From the fourth quarter of 2017 the graph includes debt of PGE EC and its subsidiaries.

Diagram: Debt maturity profile (PLN million) as at December 31, 2018.

BONDS ISSUED

Company
(Issuer)
Party of the agreement Type of financing Signing date of the
program
(yyyy-mm-dd)
Maturity date of the
program
(yyyy-mm-dd)
Maximum value of
the program
(million)
Utilisation
(million)
Currency
PGE S.A. Bank Polska Kasa Opieki S.A. and
ING Bank Śląski S.A.
Domestic market bonds 2011-08-29 - 5 000 0 PLN
PGE Sweden BNP Paribas, CITIGROUP Global
Markets Ltd., ING Bank N.V.,
London Branch, Nordea Bank
Danmark A/S, Powszechna Kasa
Oszczędności Bank Polski S.A. and
Societe Generale
Eurobonds 2015-05-22 - 2 000 638 EUR
Maturity
2019-06-09 500 EUR
2029-08-01 138 EUR

INTRA-GROUP BONDS

Company
(Issuer)
Party of the agreement Type of financing Signing date of the
program
(yyyy-mm-dd)
Maturity date of the
program
(yyyy-mm-dd)
Maximum value of
the program (million)
Utilisation
(million)
Currency
PGE GiEK S.A. ING Bank Śląski S.A. Intra-group bonds 2011-06-20 2025-12-31 11 558 8 180 PLN
PGE GiEK S.A. ING Bank Śląski S.A. Intra-group bonds 2010-09-13 2025-12-31 4 091 0 PLN
PGE GiEK S.A. Powszechna Kasa Oszczędności
Bank Polski S.A.
Intra-group bonds 2009-11-30 2025-12-31 3 700 3700 PLN
PGE EO S.A. ING Bank Śląski S.A. Intra-group bonds 2013-09-20 2020-12-31 2 000 1 262 PLN

BANK LOANS AND ADVANCES

Table: Information about most important loans and advances agreements signed in 2018.

Company (Lender) Party of the agreement Type of financing Signing date
(yyyy-mm-dd)
Maturity date
(yyyy-mm-dd)
Liability limit
(million)*
Currency Fixed/
floating
rate
PGE S.A. Consortium of banks Bank loan 2018-09-17 2023-12-17 4100 PLN Floating
PGE S.A. Powszechna Kasa Oszczędności
Bank Polski S.A.
Current account credit 2018-04-30 2020-04-29 500 PLN Floating
PGE S.A. Bank Gospodarstwa Krajowego Current account credit 2018-06-01 2021-05-31 500 PLN Floating
PGE S.A. Bank Polska Kasa Opieki S.A. Current account credit 2018-07-05 2021-07-03 500 PLN Floating

*Values over PLN 100 million.

INTRA-GROUP LOANS

Company
(Borrower)
Party of the agreement Type of financing Signing date
(yyyy-mm-dd)
Maturity date
(yyyy-mm-dd)
Liability limit
(million)*
Currency Fixed/
floating
rate
PGE Energia Ciepła S.A. PGE S.A. Advance 2018-02-23 2021-02-23 2600 PLN Fixed
PGE Energia Ciepła S.A. PGE S.A. Advance 2018-01-29 2021-01-29 230 PLN Fixed

* Values over PLN 100 million.

Loans granted

In 2018, PGE S.A. and Group companies granted advances as above.

Guarantees

In connection with the establishment of the EMTN Programme, on May 22, 2014 Deed of guarantee was issued by PGE for the liabilities of PGE Sweden AB (publ). Guarantee amounts to EUR 2,500 million and refers to liabilities of PGE Sweden AB (publ) arising from the issue of the Eurobonds under the Programme up to EUR 2,000 million. Guarantee will be valid until December 31, 2041. Financial terms of the guarantee will depend on the terms of Eurobonds issued by PGE Sweden AB (publ) and the remuneration for the guarantee will be reflected in the interest rates applied to loans granted to PGE S.A.

Pursuing the cash management project, on December 22, 2014 PGE S.A. concluded an agreement (valid until December 21, 2017) for the guarantee line in amount of PLN 250 million with Bank Polska Kasa Opieki S.A. Under the agreement PGE S.A. requested issuance of bank guarantees for the liabilities of PGE S.A. and selected companies from the PGE Group. Pursuant to the provisions of the agreement for the guarantee line, the guarantees may be valid for 5 years from the agreement expiry date.

Table: Main guarantees granted by the PGE Group companies as at December 31, 2017.

Company Entity entitled to guarantee
(Beneficiary)
Entity whose liabilities are
subject to guarantee
(Debtor)
Validity of guarantee
Form of security
(yyyy-mm-dd)
Value of guarantee
(million)
Currency
PGE S.A. Bondholders PGE Sweden AB Guarantee of financial instrument;
Guarantee issued for liabilities of PGE
Sweden AB resulting from issue of
Eurobonds under the Program of up to
EUR 2,000 million
2014-05-22 2041-12-31 2 500 EUR
PGE S.A. Nordic Investment Bank PGE GiEK S.A. Guarantee of
liabilities of PGE GiEK S.A.
towards NIB in connection with the loan
agreement of
PGE GIEK S.A.
2017-05-24 2024-06-20 109 EUR
PGE Energia Ciepła
S.A.
Bank Polska Kasa Opieki
S.A.
PGE Paliwa sp. z o.o. Guarantee of financial instrument 2017-09-21 2020-12-31 48 USD

The total amount of guarantees granted by the companies of the PGE Capital Group and mandatory on December 31, 2018 amounted to more than EUR 2 600 million, approximately PLN 1 800 million and USD 73 million.

Table: Main guarantees in PLN received by the PGE Group companies and valid as at December 31, 2018.

Company Guarantee issuer Entity for whose liabilities a
guarantee was issued
(Debtor)
Typ zabezpieczenia Validity of guarantee
(yyyy-mm-dd)
Value of guarantee
(million)*
Currency
PGE GiEK S.A. Bank Zachodni WBK S.A. GE Power sp. z o.o. Performance bond 2018-07-31 2019-06-30 317 PLN
PGE GiEK S.A. Dusseldorf Mizuho Mitsubishi Hitachi Power
Systems Europe GmbH
Performance bond related to
construction of new power unit in
Turów
power plant
2014-07-10 2020-06-30 238 PLN
PGE GiEK S.A. PKO BP S.A. Polimex Projekt Opole sp. z
o.o.
Performance bond related to
construction of power units no. 5 and 6
in Opole power plant
2014-01-29 2019-07-15 199 PLN
PGE GiEK S.A. Millennium Insurance
Company Ltd
Mostostal Power
Development sp. z o.o.
Performance bond related to
construction of power units no. 5 and 6
in Opole power plant
2014-01-29 2019-06-30 193 PLN
PGE GiEK S.A. Bank Zachodni WBK S.A. GE Power sp. z o.o. Performance bond 2018-07-31 2019-06-30 187 PLN
PGE GiEK S.A. MUFG Bank (EUROPE) N.V. Mitsubishi Hitachi Power
Systems Europe GmbH
Advance payments guarantee 2015-01-09 2021-06-01 129 PLN

* Values over PLN 100 million.

The total amount of guarantees received by the companies of the PGE Capital Group and mandatory on December 31, 2018 amounted to more than PLN 2 400 million, more than EUR 32 million and USD 0.6 million. Guarantees were received in connection with investments being pursued and day-to-day operations and include mainly: advance payments guarantees and performance bonds.

Description of structure of main capital deposits or main capital investments made within the Issuer's Capital Group in a given financial year

Information on PGE Group's structure are presented in note 1.3 to the consolidated financial statements. Investments in associates and entities jointly controlled valued using the equity method are presented in note 12 to the consolidated financial statements. Changes in the Capital Group's structure which took place in 2018 and capital investments related thereto are described in p. 7.1 of this report.

6. Parent company of PGE Group – PGE S.A.

Pursuant to art. 55 section 2a of the Accounting Act and § 71 section 8 Regulation of the Minister of Finance on current and periodic information, the Company has prepared the report on activities of PGE S.A. and of the Capital Group in form of one document. Other required elements of the report on activities of the Companies which are not included in chapter 6, are identical with the ones in the report on activities of PGE Capital Group.

6.1. Key financial results of PGE S.A.

Year ended Year ended %
Key financial data Unit December 31, 2018 December 31, 2017 change
Sales revenues PLN
million
11 450 9 185 25%
EBIT PLN
million
549 541 1%
EBITDA PLN
million
562 557 1%
EBITDA margin % 5% 6%
Net profit/loss PLN
million
-203 4 544 -
Net earnings per share PLN -0.11 2.43 -
Net cash from operating activities PLN
million
558 801 -30%
Net cash from investing activities PLN
million
-2 563 -582 340%
Net cash from financial activities PLN
million
407 -318 -
Working capital PLN
million
-660 2 032 -
Shares in subsidiaries PLN
million
32 024 32 568 -2%
Net debt/EBITDA x 11.34 10.36

REVENUES BY GEOGRAPHICAL AREAS

PGE S.A. earns revenue mostly on domestic market (over 99%).

Chart: Key changes of EBITDA in PGE S.A. (in PLN million).

EBITDA
2017
Result on
electricity
sales
Revenues form
ZHZW
and ZDEE
Result on sale of
gas and
certificates
Result on other
operations
Cost of
organisation's
activity
EBITDA
2018
Change -196 346 -17 -97 -31
EBITDA 2017 557 199 455 8 135 240
EBITDA 2018 3 801 -9 38 271 562

Key factors affecting the results of PGE S.A. in 2018 on y/y basis included:

  • The lower result on sales of electricity is mainly a result of resignation from the margin added to the electricity prices sold to PGE Obrót S.A., and remuneration for securing retail demand results from separate ZDEE agreement, and appears in revenues from ZHZW and ZDEE agreements.
  • Increased revenues from the Group companies from the services under the agreement for Commercial Management of Generation Capacities and ZDEE resulting from agreements signed by PGE S.A.: (i) from January 2018 with PGE Obrót S.A. for Security of Electricity Supply (ZDEE), (ii) from July 2018 with PGE Energia Ciepła S.A. for Commercial Management of Generation Capacities on behalf of PGE Energia Ciepła S.A. (ZHZW). In addition, growth of revenue results also from higher value of electricity under management on behalf of PGE GiEK.
  • Lower result on gas sales is mainly result of balancing the transactions with PGE Obrót S.A. and Enesta sp. z o.o. through purchase of gas on spot market. Gas delivered to PGE Obrót S.A. and Enesta sp. z o.o. as a consequence of non-balancing of offtaker's demand, was sold to those companies at fixed price.
  • Lower result on other operations was mainly caused by decrease of revenues from support and licence agreements.
  • Increase in operating costs due to higher personnel expenses as a consequence of increased (inter alia in July 2018 60 employees were relocated from PGE Energia Ciepła S.A. to PGE S.A.), growing expenses for sponsoring and advertising and higher costs of IT services.

Table: Financial operations.

PLN million Year ended
December 31, 2018
Year ended
December 31, 2017
% change
Financial revenues 638 4 594 -86%
Dividends from PGE Capital Group companies 46 2 872 -98%
Interest 428 368 16%
Revaluation 161 63 156%
Reversal of impairment losses 0 1 289 -
Other, including: profit from divestment, foreign exchange gains 3 2 50%
Financial expenses 1 336 586 128%
Interest 329 327 1%
Revaluation 204 0 -
Impairment losses 799 253 216%
Other, including: foreign exchange losses and other 4 6 -33%
Result on financial operations -698 4 008 -

Key factors affecting the results of PGE S.A. in 2018 on y/y basis included:

  • Decreased revenues from dividends mainly as a result of lack of dividend revenues in 2018 from PGE GiEK and PGE Dystrybucja S.A.
  • Increased revenues from interests results mainly from higher interests from loans granted to the Group companies and higher interest from purchased bonds issued by the Group companies.
  • Change on impairment loss: in 2018 it includes impairment loss on expected credit loss related to shares of PGE Obrót S.A. and PGE Sweden AB, and in 2017 PGE S.A. recognised revenues from partial decrease of impairment on shares of PGE Obrót S.A. and costs of impairment loss on shares of Exatel S.A., partial impairment loss on shares in PGE EJ 1 and partial impairment loss on Autostrada Wielkopolska S.A. bonds.
  • Revenues and costs related to revaluation, include valuation of forward transactions on CO2 allowances trading, financial instruments trading valuation of option for purchase of shares of Polimex-Mostostal S.A.

STATEMENT OF FINANCIAL POSITION

Chart: Structure of assets and equity and liabilities.

As at December 31, 2018 As at December 31, 2017

Non-current assets Current assets

As at December 31, 2018 As at December 31, 2017

STATEMENT OF CASH FLOWS

Chart: Net change in cash (in PLN million).

NET DEBT OF PGE S.A. AND MAIN FINANCIAL RATIOS

Table: Company's net debt as at December 31, 2018 and December 31, 2017.

PLN million As at
December 31, 2018
As at
December 31, 2017
Cash on hand and cash at bank 211 732
Overnight deposits 0 1
Short-term deposits 0 1 099
Funds on VAT accounts 24 0
Cash and cash equivalents 235 1 832
Investments held until maturity date
(short-term deposits)
0 0
Short-term loans and debt securities (PGE Group) 3 360 1 744
Loans and receivables - cash pooling 1 204 134
Cash at the Company's disposal 4 799 3 710
Current loans and borrowings 4 098 188
Bonds issued - current 0 1 000
Short-term liabilities - cash pooling 1 446 576
Non-current loans and borrowings 5 628 7 714
Bonds issued – non-current 0 0
Gross financial debt (short and long-term) 11 172 9 478
Net financial debt 6 373 5 768

Chart: Key financial ratios.

6.2. Key operational figures of PGE S.A.

Table: Volume of electricity sales (in TWh).

Sales volume 2018 2017 zmiana %
Sale of electricity to the Group companies 44.92 38.59 16%
Sale of electricity on the power exchange and in bilateral
transactions outside the Group
2.70 4.84 -44%
Sale within the balancing group and on the balancing market 1.27 1.25 2%
Total electricity sales 48.89 44.68 9%

PGE S.A. acts as a wholesale trading competence centre for the PGE Capital Group. Growth of volume of electricity sales in 2018 y/y is a result of increase in trading volumes, mainly in transactions with PGE Obrót S.A. Sales to PGE Obrót S.A. are realised in order to secure the demand of the retail customers for electricity supplies.

Table: Volume of natural gas sales.

Sales volume 2018 2017 zmiana %
Sale of natural gas to the Group 2.99 3.21 -7%
Sale of natural gas outside the Group 2.68 4.31 -38%
Total natural gas sales 5.67 7.52 -25%

Lower sales volume of natural gas y/y is a result of decreasing sales to entities outside the PGE Group and on the exchange. This results from lower competitiveness of PGE S.A. offer, what is caused by the fact that from the second half of 2017 an act on inventories came into force, upon which gas importers are obliged to maintain/ purchase inventory capacities, where PGNiG S.A. is the monopolist on Polish market. Considering the costs of this type of services, PGE S.A. does not import price-competitive foreign gas mainly from Germany, that could be later offered on OTC market to large customers or be actively traded on TGE exchange.

Sales of gas to the Group decreased largely due to lower demand of generating units of PGE GiEK. Supply volume to PGE Obrót S.A. also decreased, what results mainly from decline in sales to large customers from professional segment, an effect of losing two customers with significant gas consumption (Grupa Żywiec and Nida Media), whereas no other high volume consumption customers were not acquired.

6.3. Ownership structure

State Treasury is a main shareholder of PGE S.A. State Treasury and holds 1 072 984 098 Company's ordinary shares with nominal value of PLN 10.25 each, representing 57.39% of company's share capital and entitling to perform 1 072 984 098 votes at the general meeting of the Company. State Treasury stake represents 57.39% of the total number of votes.

State Treasury is the only shareholder holding at least 5% of the Company's shares (more information on the ownership structure in p. 8.4 of this report).

6.4. Dividend policy

In May 2017 the Management Board decided to recommended to suspend dividend payment from the profit for years 2016, 2017 and 2018 facing the need to finance an ambitious development program and limitation of the debt level increase.

After that period, the Management Board of the Company intends to make a recommendation to the General Meeting of the Company of dividend payment for shareholders at the level of 40-50% of the consolidated net profit attributable to the equity holders adjusted by the value of impairment loss on property, plant and equipment and intangible fixed assets. The dividend policy is subject to reservation that the amount for each individual dividend distribution will depend, in particular, on the Company's overall indebtedness, expected capital expenditures and prospective acquisitions

In accordance with the updated dividend policy, the Ordinary General Meeting on July 19, 2018 adopted a resolution on allocation of net profit of the Company for 2017 in amount of PLN 4.5 billion for the reserve capital of the Company.

6.5. PGE S.A.shares on the stock exchange

PGE shares are listed in the continuous trading system on the Main Market of Warsaw Stock Exchange ("WSE"). PGE has the largest market capitalization among Polish companies from power sector listed on WSE. PGE shares are included in the most important WSE indexes: WIG20 – the index of the largest and most liquid companies, WIG – the index of all companies from the Main Market, and WIG Energia – the index of power sector companies. Moreover, continuously since 2011, PGE S.A.'s shares are also listed in the RESPECT Index – index including Polish companies operating in compliance with best corporate governance, information governance and investors relations standards and also in adherence to environmental, social and personnel criteria. In 2018 PGE shares quotation were in range PLN 8.55-13.40. Average market capitalisation (value of all shares of the Company) in 2018 amounted to PLN 19.3 billion. Average trading volume amounted to 2.2 million shares per session and average trading amount reached PLN 23 million.

Chart: Quotes of PGE share price (in PLN) in relation to the WIG, WIG - ENERGY and RESPECT Index.

Source: Bloomberg.

Chart: Key events on the background of stock quotes of PGE in 2018 (PLN).

Source: Bloomberg, Company's data.

Table: Key data on PGE shares

2018 2017
Turnover (PLN) 5 610 112 265 6 908 723 518
Average number of transactions per
session (pcs)
2 174 005 2 274 482
Maximum price during the year (PLN)1 13.40 14.95
Minimum price during the year (PLN)1 8.55 10.04
1

Stock prices relate to closing.

Source: Bloomberg.

All Company shares are bearer shares. Shares are not privileged, however the Company's Statute provides for special rights for the State Treasury, e.g. with respect to the appointment of members of the Supervisory Board. (more information on special powers for the State Treasury in section 8.4 of this report).

6.6. Rating

PGE S.A. holds ratings assigned by two rating agencies: Fitch Ratings Ltd. ("Fitch") and Moody's Investors Service Limited ("Moody's").

Moody's Fitch Ratings
Long-term company rating Baa1 BBB+
Rating outlook stable stable
Date of rating assignment September 2, 2009 September 2, 2009
Date of the latest rating confirmation November 7, 2018 February 15, 2019
Poland long-term rating A2 A
Rating outlook stable stable

In 2018 and 2019 both rating agencies: Moody's and Fitch affirmed long-term rating of PGE S.A. at investment grade respectively at Baa1 and BBB+, both with stable outlook. Both agencies underline affirmation results from strong market position of PGE in the Polish electricity sector. Fitch in its latest release dated February 2019 especially underlines projected revenues from the capacity market, transfer of higher prices of CO2 emission rights into the wholesale electricity prices, advanced stage of construction of power units in Opole and Turów PGE's expansion in more stable district heating sector. Rating acknowledges also high capital expenditures and planned acquisitions, likely return to dividend payment from 2020 and higher average CO2 emission rate in comparison to the Western European peers. Moody's in its latest release dated November 2018 PGE's emphasises strong position as the largest energy group in Poland, increasing share of revenues from regulated activities following the acquisition of district heating assets from EDF in 2017, as well as strong balance sheet and relatively low net debt/EBITDA ratio. Among risk factors Moody's indicates high emission rate of conventional units in view of rising prices of CO2 emission rights and lower amount of allowances granted free of charge, as well as high capital expenditures and high exposure to electricity prices volatility.

Ratings assigned by both agencies confirm PGE's long-term credibility on the credit market.

7. Other elements of the report

7.1. Significant changes in organisation of the Capital Group

Changes which occurred in the PGE Capital Group's structure in the period from January 1, 2018 until the publication date of this report, are presented in note 1.3 to consolidated financial statements and described below.

MERGERS

Segment Acquiring company /acquired
company
Date of
transaction/
registration in the
National Court
Register
Comment
Conventional Generation ELTUR -
SERWIS sp. z o.o. /TOP
SERWIS sp. z o.o.
February 26, 2018
April 12, 2018 merger
registered in the
National Court Register
On February 26, 2018 the Extraordinary Assembly of Partners of ELTUR -
SERWIS sp. z o.o. (acquiring company) and TOP
SERWIS sp.
z
o.o. (acquired company) adopted resolutions on merger of the companies in mode of art.
492 § 1 p. 1 of the
Polish Commercial Companies Code (merger through acquisition), ), through transferring of all assets of the acquired
company to the acquiring company in exchange for the shares, which the acquiring company allotted to PGE S.A. as a sole
shareholder of the acquired company. The share capital of the acquiring company was increased by PLN 50
000, i.e. from PLN
34
824
500 to PLN 34
874
500.
Renewables PGE Energia Odnawialna S.A.
/PGE Energia Natury PEW
sp.
z
o.o.
March 27 and 29, 2018
May 2, 2018 merger
registered in the
National Court Register
The Extraordinary General Meeting of PGE Energia Odnawialna S.A. (acquiring company) and the Extraordinary Assembly of
Partners of PGE Energia Natury PEW sp.
z o.o. (acquired company) on –
respectively –
March 29, 2018 and March 27, 2018
adopted resolutions on merger of the companies in mode of art.
492 § 1 p. 1 of the Polish Commercial Companies Code
(merger through acquisition), through transferring of all assets of the acquired company to the acquiring company without
issue of new shares in exchange for the shares in the share capital of the acquired company, pursuant to art. 516 of the Polish
Commercial Companies Code and dissolution of the acquired company without its liquidation. PGE Energia Odnawialna S.A.
was the sole shareholder of PGE Energia Natury PEW sp. z o.o.
Conventional Generation PGE Energia Ciepła S.A./
Investment III B.V.
July 9, 2018
September 4, 2018
merger registered in
the National Court
Register
On July 9, 2018 an Extraordinary General Meeting of PGE Energia Ciepła S.A. (acquiring company) and an Extraordinary
General Meeting of Investment III B.V., based in Amsterdam (the Netherlands) (acquired company) adopted resolutions on a
cross-border merger pursuant to art. 492 § 1 point 1 in connection with art. 5161
of the Polish Commercial Companies Code
(merger through acquisition), through the transfer onto the acquiring company of all of the acquired company's assets
without issuing new shares of the acquiring company in exchange for the acquired company's shares, pursuant to art. 515 in
connection with art. 5161
of the Polish Commercial Companies Code, and on dissolution of the acquired company without
liquidation proceedings. PGE EC was the sole shareholder of Investment III B.V.

DE-MERGERS

Segment Spun off company /acquiring
company
Date of
transaction/
registration in the
Comment
National Court
Register
Conventional Generation PGE GiEK S.A./ PGE Energia
Ciepła S.A.
October 18, 2018
On January 2, 2019 de
merger was registered
in the National Court
Register
The Extraordinary General Meetings of PGE GiEK and PGE EC adopted resolutions on the division of PGE GiEK (divided
company) through a carve out, pursuant to art. 529 § 1 point 4 of the Polish Commercial Companies Code, by way of transfer
to PGE EC (acquiring company) of selected PGE GiEK assets in the form of six PGE GiEK branches (Branches), i.e.: (1)
Zespół
Elektrociepłowni Bydgoszcz, (2)
Elektrociepłownia Gorzów, (3)
Elektrociepłownia Zgierz, (4)
Elektrociepłownia Lublin
Wrotków, (5)
Elektrociepłownia Kielce and (6)
Elektrociepłownia Rzeszów. The Branches constitute an organised part of
enterprise and are functionally related to the generation of electricity, generation of electricity and heat in cogeneration and
distribution of heat and electricity. The transfer of the Branches to PGE EC was carried out by lowering PGE GiEK's share
capital by PLN 406
847 180 and increasing PGE EC's share capital by PLN 763
432 450 through cancelling 40
684 718 shares of
PGE GiEK, with nominal value of PLN 10 each, and issue of 76
343 245 new shares of PGE EC, with nominal value of PLN 10
each. As the sole shareholder of PGE GiEK, PGE S.A. acquired all new shares in PGE EC's increased share capital in exchange
for the cancelled PGE GiEK shares.

LIQUIDATION OF COMPANIES

Segment Company Date Comment
Distribution Centralny System Wymiany December 4,2018 On December 4,
2018 the Extraordinary Assembly of Partners of
Centralny System Wymiany Informacji sp. z o.o., in which
Informacji sp. z o.o. based in PGE Dystrybucja S.A. holds 4 shares representing
20% in the share capital, adopted a resolution on dissolution of company
Poznań and commencing of liquidation process.

7.2. Significant off-balance sheet items

Significant off-balance sheet items are described in note 28 to the consolidated financial statements.

7.3. Publication of financial forecasts

PGE S.A. did not publish financial forecasts.

7.4. Entity authorised to audit of financial statements

An entity authorised to audit stand-alone financial statements of PGE S.A. and consolidated financial statements of PGE Capital Group for 2018 is Ernst & Young Audyt Polska sp. z o.o. sp. k. on the ground of the agreement signed on July 17, 2017. More information regarding the co-operation of PGE Capital Group with the auditor is presented in note 32 to the consolidated financial statements.

7.5. Information on entity authorised to audit financial statements

Based on a statement from the Supervisory Board, the Management Board of PGE S.A. announces that the entity authorised to audit separate financial statements and consolidated financial statements, carrying out the audit of the annual financial statements: separate and consolidated, was selected in accordance with the provisions of law, especially as regards audit firm selection and selection procedure:

  • the audit firm and members of the team performing the audit met the conditions for preparing an impartial and independent report on audit of annual financial statements in accordance with the existing regulations, professional standards and professional ethics rules,
  • the existing regulations concerning audit firm and lead statutory auditor rotation and mandatory grace periods are being observed,
  • has a policy for selecting audit firms and a policy for provision of additional non-audit services to the issuer by the audit firm, entity related to the audit firm or a member of its network, including services conditionally exempted from the prohibition concerning audit firm services.

8. Statement on implementation of Corporate Governance

This Statement on implementation of corporate governance in PGE S.A. in 2017 was prepared on the basis of § 70 section 6 point 5 of the Regulation of the Minister of Finance dated March 29, 2018 on current and periodic information published by issuers of securities and on conditions under which such information may be recognized as being equivalent to information required by the regulations of law of a state which is not a member state.

8.1. Corporate governance principles which the Company was obliged to follow in 2018

In 2018 PGE S.A. was obliged to follow the corporate governance principles described in "Best Practices of WSE Listed Companies" (further: Best Practices). Best Practices were adopted with the Resolution of the Board of the Warsaw Stock Exchange ("WSE") no. 26/1413/2015 on October 13, 2015, which came into force on January 1, 2016 and should be obliged by PGE starting from that date.

Management Board of PGE S.A. approved Best Practices for application in the Company by the resolution no. 19/03/2016 of January 19, 2016. The Management Board of the Company acts with due diligence to obey the principles of Best Practices.

For the full text of the Best Practices, see the official corporate governance website of the Warsaw Stock Exchange: https://www.gpw.pl/best-practice.

INFORMATION ON EXCEPTIONS IN APPLICATION OF THE CORPORATE GOVERNANCE PRINCIPLES

In 2018 the Company was applying the Best Practices with the exception of 2 recommendations IV.R.2, VI.R.1.

Recommendation IV.R.2 in Chapter IV "General Meeting, Shareholder Relations" on enabling its shareholders to participate in a General Meeting using electronic communication means.

The Management Board of PGE twice proposed to shareholders introduction to the Statute and to the Regulations of the General Meeting provisions enabling organization of general meetings in the way prescribed in Code of Best Practices. Such proposal was not approved by shareholders during Ordinary General Meeting of May 30, 2012 and during Extraordinary General Meeting of June 27, 2013. The Management Board of PGE does not exclude adoption of the above-mentioned rule in future.

In opinion of PGE's Management Board, non-compliance with the above rule will not affect the reliability of the information policy and does not cause a risk of limitations or difficulties for shareholders to participate in general meetings. The Company provides real-life broadcast of the general meeting.

Recommendation VI.R.1 in Chapter VI "Remuneration" on having remuneration policy and principles of determining remuneration for company's governing bodies and key managers.

In 2018 the Company did not have an uniform remuneration policy and principles determining the remuneration. The Company and its subsidiaries are bound to apply the provisions of various collective agreements, which significantly restricts the freedom of designing the remuneration policy. At the end of June 2017 the uniform rules were implemented with regard to remunerations of management boards and supervisory boards in companies being part of the Group, consistent with the rules determined in the Act of June 9, 2016 on the principles of determining the amount of remuneration for persons managing certain companies. From November 14, 2017 companies acquired from EDF Polska S.A. were included in the Group, in which the rules for remuneration of corporate bodies were adapted to those binding in PGE Group during 2018.

INFORMATION ABOUT THE DIVERSITY POLICY

PGE Polska Grupa Energetyczna S.A. has not developed a diversity policy applicable to the Company's governing bodies and key managers. Recruitment process for the managing positions includes such elements as proper education, professional experience, qualifications and competences of the candidates and does not disqualify any candidates in terms of elements of the diversity policy that are indicated in the principle.

DESCRIPTION OF THE BASIC CHARACTERISTICS OF INTERNAL CONTROL SYSTEMS AND RISK MANAGEMENT SYSTEMS USED IN THE COMPANY DURING PREPARATION OF THE FINANCIAL STATEMENTS AND CONSOLIDATED FINANCIAL STATEMENTS

The Company applies the following mechanisms of internal control and risk management during preparation of the financial statements: internal procedures which regulate the process, management mechanisms for information system used for transaction recording and financial reporting with protection mechanisms, principles of supervision over preparation of financial statements, principles of verification and evaluation of reports, internal audit, corporate risk management and other elements of control.

EU IFRS-compliant accounting policy of the PGE Capital Group is binding for the Group companies using IFRS for preparation of their statutory financial statements and at preparation of the IFRS-compliant reporting packages for the consolidation. Before every reporting period the companies subject to consolidation receive detailed guidelines from PGE S.A. with regard to method and closing date of the accounting books, preparation and submitting the reporting packages and template updated for a given period.

The Company keeps accounting books in the integrated information system. The system ensures division of competencies, coherent entries in the books and control between the general ledger and subsidiary ledgers. The system can be modified to ensure adequacy of the technical solutions to the changing accounting principles and legal standards.

Director of the Reporting and Tax Department of the Company is responsible for the preparation of stand-alone and consolidated financial statements. The management of the particular companies are responsible for preparation of the reporting packages under consolidation.

Statutory auditors perform an independent assessment of reliability and correct preparation of the financial statements of PGE S.A. and financial statements of companies subject to consolidation.

The PGE Group has implemented a multi-stage process of approving financial statements with the participation of Supervisory Boards. Stand-alone and consolidated financial statements of PGE S.A. are evaluated by the Supervisory Board. The Audit Committee operates within the Supervisory Board and is responsible, among others, for: monitoring the independence of the statutory auditor, monitoring the effectiveness of internal control systems, reviewing interim and annual financial statements of the. Stand-alone financial statements of the companies subject to consolidation are evaluated by the Supervisory Boards of such companies. The financial statements are approved by the General Meetings of the companies.

PGE S.A., as a company listed on the Warsaw Stock Exhcnage, complies with the guidelines included in the Best Practices of WSE Listed Companies concerning maintaining efficient internal audit, according to the size of the company and the type and scale of the business. In PGE S.A. and in the Capital Group internal audit is pursued by own structures, introduced and developed with the use international standards of proffesional internal auditors promoted by Institute of Internal Auditors (IIA). Audit structures cover all key companies of the Group, with the leading role of internal audit unit in PGE, including realisation of audit in the Group and co-ordination and supervision over audit structures in the Group companies.

Internal audit in PGE S.A. operates based on formally adopted Internal Audit Regulations, which defines audit as "activities independent and objective, which aims to increase value of PGE Capital Group and streamlining its operational activity. It includes systematic and harmonised method of assesment of processes: risk management, mechanism o internal controls and corporate governance and attributes to their improvement. It helps organization in achieving its goals, by delivering information on efficiency of those processes, as well as through advisory." Internal audit covers all organisational units and business areas of PGE Group, excluding protection of classified information, which is regulated by act of February 9, 2018 on protection of classified information (Journal of Laws 2018, item 412). The results of the audits are presented to the Management Board and the Audit Committee.

SHAREHOLDERS WITH A SIGNIFICANT STAKE

Shareholders holding directly or indirectly by subsidiaries at least 5% of the total votes at Company's General Meeting are presented in p. 8.4 of the foregoing report.

SHAREHOLDERS WITH SPECIAL CONTROL POWERS

Company shares are ordinary, bearer shares listed at the regulated market of the Warsaw Stock Exchange. Company shares are not privileged.

Despite the fact that the Company shares are not privileged, the Statutes provides for special powers for the State Treasury as long as it is the shareholder of the Company. In accordance with statutory provisions, the State Treasury may demand in writing that the Management Board convene the General Meeting, demand that certain matters be placed on the agenda, submit draft resolutions pertaining to matters placed on the agenda of the General Meeting or matters which may be placed on the agenda.

The State Treasury is authorised to appoint one member of the Supervisory Board by means of a written statement submitted to the Management Board of the Company. Such nomination or dismissal takes effect from the date on which the relevant notification is delivered to the Management Board and does not require a General Meeting resolution. The State Treasury may exercise this power regardless of the voting right when appointing other members of the Supervisory Board.

On the ground of the Statutes, the State Treasury holds special right with regard to selection of the Supervisory Board members. Selection of half of members of the Supervisory Board, appointed by the General Meeting, shall be elected from among persons indicated by the State Treasury. The Supervisory Board selects the Chairperson of the Supervisory Board from among its members wherein the Chairperson of the Supervisory Board shall be elected from among persons indicated by the State Treasury. This State Treasury's right is valid until its stake in the Company falls below 20%.

LIMITATIONS REGARDING EXERCISE OF THE VOTING RIGHTS FROM THE EXISTING SHARES

As from June 29, 2011 the Statutes of the Company provide the limitations regarding exercise of the voting rights in shares. The voting right of shareholders shall be limited in such manner that at the General Meeting, none of them may exercise more than 10% of the total number of votes existing in the Company as at the date of holding the General Meeting, subject to the provision that for the purposes of determining the obligations of entities acquiring considerable blocks of shares as provided for in the Act on public offerings, conditions for introducing financial instruments to an organised trading system and public companies of July 29, 2005, such limitation of the voting right shall be regarded as non-existent.

The above limitation does not apply to the State Treasury and shareholders acting with the State Treasury on the basis of agreements concerning the joint exercise of the voting right related to shares.

In addition, for the purposes of limiting the voting right, votes belonging to shareholders between whom there exists a relationship of domination or dependence (Shareholders Group) shall be cumulated; in the event that the cumulated number of votes exceeds 10% (ten per cent) of the total number of votes in the Company, it shall be subject to reduction.

The accumulation of votes shall consist in the summing of the number of votes remaining at the disposal of shareholders belonging to a Shareholders Group.

The reduction of votes shall consist in decreasing the total number of votes in the Company to which shareholders belonging to a Shareholders Group are entitled at the General Meeting to the threshold of 10% (ten per cent) of the total number of votes in the Company.

The accumulation and reduction of votes together with the detailed description of the shareholders between whom there exists a relationship of domination or dependence are governed by the principles included in the Company's Statutes.

Moreover, each shareholder who intends to participate in the General Meeting, directly or by proxy, shall be obliged, without a separate call, to notify the Management Board or the Chairperson of the General Meeting of the fact that he holds, directly or indirectly more than 10% (ten per cent) of the total number of votes in the Company. This obligation does not apply to the State Treasury. A person who has failed to comply or has complied improperly with that obligation to provide information may exercise the voting right exclusively from one share until the remedy of such failure to. The exercise of the voting right from the other shares by such person shall be ineffective.

Irrespective of the above provision, in order to establish a basis for the accumulation and reduction of votes, a shareholder, the Management Board, the Supervisory Board and the particular members of these bodies may demand that a shareholder provide information whether he is a person having the status of a dominant or dependent entity with respect to another shareholder. The right referred to in the preceding sentence shall also cover the right to demand that a shareholder disclose the number of votes that such shareholder holds independently or together with other shareholders.

At the time when the share of the Company's share capital held by the State Treasury falls below 5%, the limitation of the above voting right shall expire.

LIMITATIONS REGARDING THE TRANSFER OF OWNERSHIP OF THE COMPANY'S SECURITIES

There are no limitations regarding the transfer of ownership of the Company's securities, that the Company is aware of, apart from the limitations regarding the shares of the Company that belong to the State Treasury, resulting from the Act of December 16, 2016 on rules of management of the state assets. Disposal of shares in violation of this prohibition is invalid.

8.2. Rules for amendments to the Company's Statutes

In accordance with provisions of the Code of Commercial Companies, any amendments to the Company's Statutes require a resolution to be passed by the General Meeting and an entry to the register of entrepreneurs. A resolution on amendments to the Company's Statutes is made with a majority of three fourth votes. The General Meeting of the Company may authorise the Supervisory Board to agree on the uniform text of the amended Company's Statutes or introduce other editing changes as specified in the resolution of the General Meeting. Amendments to the Company's Statutes shall be valid from the day an entry is made to the register of entrepreneurs.

MODE OF OPERATION OF THE GENERAL MEETING OF THE COMPANY, ITS KEY POWERS AND THE RIGHTS OF SHAREHOLDERS AND THE MANNER OF THEIR EXECUTION

Rules of the General Meeting are determined in the Code of Commercial Companies and the Company's Statutes. The additional issues related to the activities of the General Meeting are regulated by the Rules of the General Meeting approved on March 30, 2010 by the Extraordinary General Meeting.

The Company's Statutes and the Rules of the General Meeting are available on the PGE's website at www.gkpge.pl.

CONVENING AND CANCELLING THE GENERAL MEETING.

The General Meeting is convened in the manner and in circumstances described in the Code of Commercial Companies and the Company's Statutes. The detailed method of convening and cancelling the General Meeting is defined in the Rules of the General Meeting.

Pursuant to the Statutes of the Company, the Management Board shall convene the General Meeting on its own initiative, at the written demand of the Supervisory Board or demand of the shareholder or shareholders representing at least one twentieth of the share capital or at the written demand of the State Treasury as long as the State Treasury remains a shareholder of the Company.

The General Meeting should be convened within two weeks of the demand, by the Supervisory Board, shareholder or the State Treasury. If the General Meeting is not convened within two weeks of the demand, the registry court may authorise the shareholder or shareholders making such a demand to convene the Extraordinary General Meeting. Announcement about the convening of the general Meeting of the Company and Materials issued to shareholders in connection with the General Meeting, in particular draft resolutions proposed for voting by the General Meeting and other essential materials are provided by the Company at least 26 days before the date of the General Meeting of the Company on the corporate website www.gkpge.pl, in the manner specified for submitting current information pursuant to regulations on public offering and conditions governing the introduction of financial instruments to organised trading, and public companies.

Cancelling of the General Meeting or changing the date of the Meeting supervenes through announcement on the company's website. The Company makes efforts to ensure that cancelling of the General Meeting or changing the date of the Meeting creates the least negative results for the Company and the shareholders.

Cancelling of the General Meeting is possible only on the petitioners' permission or when holding of the meeting faces extraordinary obstacles or is nonrepresentational.

Cancelling of the General Meeting and changing the date of the Meeting shall occur promptly after occurrence of rationale justifying the cancelling or change of date, but not later than seven days before the date of the General Meeting, except when it is not possible or excessively difficult under the given circumstances, then the cancelling or change of date may occur at any time before the General Meeting date.

COMPETENCIES OF THE GENERAL MEETING OF THE COMPANY.

According to the provisions of the Code of Commercial Companies and Company's Statutes the General Meeting's main competences include adoption of resolutions on the following matters:

  • review and approval of the report of the Management Board on the activities of the Company, financial statements and the consolidated financial statements for the past financial year,
  • granting approval of fulfilment of duties by the Members of the Supervisory Board and Members of the Management Board,
  • decision on the distribution of profit or covering the loss,
  • appointment and recall of Members of the Supervisory Board and determination of rules of remuneration for the Members of the Supervisory Board,
  • acquisition and lease of the undertaking or its organised part and placing a limited material right thereon,
  • concluding credit, loan, suretyship or similar agreement with a member of the Management Board, Supervisory Board, proxy, liquidator or in the name of any of such persons,
  • increase and reduction of the share capital of the Company,
  • issue of convertible bonds or preferential bonds, issue of subscription warrants,
  • decisions regarding claims for repair of damage caused during founding of the company and management or supervision over the company,
  • merger, transformation and division of the Company,
  • redemption of shares,
  • amendment to the Statutes and change of the subject of activities of the Company,
  • dissolution and liquidation of the Company.

The sale and purchase of real property, perpetual usufruct or share in real properties does not require a resolution of the General Meeting.

In accordance with the changes adopted by the Extraordinary General Meeting in November 2018, the consent of the General Meeting is required for:

  • the Company's disposal of shares/interests in a company with respect to which frequencies from the ranges 452.5-457.5 MHz and 462.5-467.5 MHz have been reserved pursuant to a decision on frequency reservation to be issued, after consultations with the minister competent for energy-related matters, by the President of the Electronic Communication Office,
  • the determination of the manner of voting at the General Meeting of a company with respect to which frequencies from the ranges 452.5-457.5 MHz and 462.5-467.5 MHz have been reserved pursuant to a decision on frequency reservation to be issued, after consultations with the minister competent for energy-related matters, by the President of the Electronic Communication Office, on matters concerning amendments to such a company's statutes / agreement.

The General Meeting of Shareholders may vote on resolutions pertaining only to matters included on the detailed agenda, with reservation to art. 404 of the Code of Commercial Companies.

PARTICIPATION IN THE GENERAL MEETING OF THE COMPANY

The right to participate in the General Meeting is available only to persons who are shareholders of the Company sixteen days before the date of the General Meeting (date of registration of participation in the General Meeting). Lienors and users, who have the voting right, may participate in the General Meeting, if they are registered in the stockholders' ledger as at the date of registration of participation in the General Meeting.

A shareholder may participate in the General Meeting provided that the shareholder presents a personal certificate confirming the right to participate in the General Meeting issued by the entity which keeps the securities account.

A shareholder participates in the General Meeting and exercises the right to vote in person or through the Proxy. Proxy to participate in the General Meeting and exercise the right to vote must be granted in writing or in electronic form. Proxy granted in electronic form should be sent to the e-mail address of the Company stated in the announcement on the General Meeting. From the date the General Meeting is convened, the Company provides a form with a specimen of proxy in electronic form on its website. The Proxy of a shareholder exercises all the rights of the shareholder unless proxy provides otherwise. If the shareholder has shares recorded in more than one securities account, the shareholder may appoint a Proxy to exercise rights in shares recorded in each account.

VOTING AT THE GENERAL MEETING OF THE COMPANY

Resolutions of the General Meeting are passed with the absolute majority of votes, subject to other provisions of the Code of Commercial Companies and the Company's Statutes.

One Company share carries the right to one vote at the General Meeting of Shareholders.

Subject to governing provisions of the law and of the Statutes, the voting shall be open. A secret voting is administered during appointments of members of Company's authorities or liquidators, and motions for recalling or prosecuting and during voting on other personal matters. A secret voting should be also administered when requested by at least one of the shareholders present or represented at the General Meeting. The General Meeting may pass a resolution to override secret voting for matters pertaining to founding of a commission appointed by the General Meeting.

8.3. Composition and the description of operations of the management and supervisory bodies of the Company and committees of the supervisory body

MANAGEMENT BOARD

Management Board members

As at December 31, 2018 the Management Board consisted of:

Name and surname of the Management Board Position
Henryk Baranowski President of the Management Board
Wojciech Kowalczyk Vice-President for Capital Investments
Marek Pastuszko Vice-President for Corporate Affairs
Paweł Śliwa Vice-President for Innovations
Ryszard Wasiłek Vice-President for Operations
Emil Wojtowicz Vice-President for Finance

Henryk Baranowski – President of the Management Board

Mr. Henryk Baranowski is a graduate of Faculty of Electrical Engineering at the Warsaw University of Technology with specialty of power engineering. He also completed postgraduate studies in business management of power utilities on the energy market at the Warsaw University of Technology and postgraduate studies in financial management of companies at the Warsaw School of Economics. He also completed Executive MBA program at Business School of the Warsaw University of Technology, HEC School of Management, London Business School and Norwegian School of Economics and Business Administration.

In years 2013-2015 employed as the Director for Business Development, and later as the Director for Sales and Marketing of Energy Sector at Alstom Power Polska. From 2006 to 2008 held a position of the Vice-President of the Management Board in PGE, and in years 2001- 2006 the President of the Management Board in PSE-Info Sp. z o.o. In period 1990-2001 associated with PSES.A., where he held a position of, among others, ICT Director. From November 2015 till March 2016 he held a position of the Undersecretary of the State in the Ministry of State Treasury supervising works of Key Companies Department and Corporate Governance Department.

Wojciech Kowalczyk – Vice-President for Capital Investments

Mr. Wojciech Kowalczyk graduated from the Foreign Trade Faculty of the Main School of Planning and Statistics (currently named Warsaw School of Economics).

Since March 2016 Mr. Wojciech Kowalczyk was the Undersecretary of the State in the Ministry of Energy. Between November 2014 and March 2016 he was the Secretary of the State and the Government Plenipotentiary for the restructuring of coal mining within structures of the Ministry of Economy, subsequently the Ministry of State Treasury and the Ministry of Energy.

In years 2012-2014 Mr. Wojciech Kowalczyk was the Undersecretary of the State in the Ministry of Finance, where he supervised the development of financial market, banking, insurance and capital sector and public debt. In years 2011-2012 he worked at Bank Gospodarstwa Krajowego, inter alia, as a Vice-President of the Management Board, responsible for financial markets, bank products and investment projects.

In years 1995-2001 and 2004-2010 Mr. Wojciech Kowalczyk was employed in Bank Handlowy, where he was responsible for bank's activities at the debt securities market. In years 2001- 2004 he worked as a Director of Debt Securities Market at Merrill Lynch International in London.

Marek Pastuszko – Vice-President for Corporate Affairs

A legal counsel, graduated from Law and Administration Faculty at the University of Warsaw and from postgraduate studies on European Substantive Law at the University of Finance and Management in Warsaw.

Between October 2006 and July 2008 he was the President of the Management Board at PGE Energia S.A. As a Director of Law Section at the Organisation Department and as a Task Manager of the PGE's IPO Project he participated in the preparations of the Company for the IPO on the Warsaw Stock Exchange. For two years he worked as a legal counsel at the international law firm Bird & Bird. Since May 2010 Mr. Marek Pastuszko held a position of Deputy Director of Legal Department at the Gas Transmission Operator GAZ-SYSTEM. Earlier he was associated with the finance and insurance market. He was employed at Towarzystwo Ubezpieczeń i Reasekuracji Polisa and Towarzystwo Ubezpieczeń na Życie Polisa (insurance companies) inter alia as a Director of Law and Organization Department. He acted as a legal counsel at PTE Kredyt Banku S.A. (General Pension Society) and at the law firm Hunton & Willliams, T. Kacymirow, J. Michalski, Z. Mrowiec. He was also employed in Telekomunikacja Polska as Director of the Department of Agreements Verification. In years 2003-2006 he was hired in Art Marketing Syndicate S.A. as a legal counsel and Coordinator of Legal Department.

He was also a Supervisory Board member in companies from power market (PSE-Operator, Agencja Rynku Energii, BOT Górnictwo i Energetyka and PGE RZE Dystrybucja).

Paweł Śliwa – Vice-President for Innovations

Mr. Paweł Śliwa graduated from Law and Administration Faculty at the Maria Curie-Skłodowska University in Lublin, branch in Rzeszów. He completed PhD studies on the Cardinal Stefan Wyszyński University in Warsaw. Completed attorney apprenticeship in Regional Bar Council in Rzeszów.

From March 1, 2016 till March 22, 2016 he held a position of the Supervisory Board member of PGE. Since November 2011 a judge at the Court of State. Since 2002 Mr. Paweł Śliwa has run a Law Firm in Gorlice. Since October 2010 a councilor in the legislative assembly of Małopolskie voivodship. In years 2005-2012 run a Solicitor's Partnership in Gorlice. In years 2006-2007 he held the position of the Vice-Chairman of the Supervisory Board of Ruch S.A

Ryszard Wasiłek – Vice-President for Operations

Mr. Ryszard Wasiłek graduated from the Faculty of Mechanical Engineering at the Szczecin Uni-versity of Technology, and completed postgraduate studies District Heating and Heating of the Warsaw University of Technology, Faculty of Environmental Engineering.

From 2003 till 2016 he was the President of the Management Board of a district heating company Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. in Stargard. I years 1990-1994 Mr. Ryszard Wasiłek served as the Deputy President of Stargard, responsible for economic policy and in years 1994-2003 worked at KielArt Sp. z o.o. in Szczecin as CEO – Chairman.

He's been a Member of the Council of the Stargard Chamber of Commerce (since 2004), a Mem-ber of the Regional Council of the Polish Chamber of District Heating – North-Western Region (since 2010), a Member of the National Council of the Polish Chamber of District Heating (since 2014). In years 1993-1994 Ryszard Wasiłek was also the President of the Western Pomerania Municipal Community "Euroregion Pomerania".

Emil Wojtowicz - Vice-President for Finance

Mr. Emil Wojtowicz is a graduate of Warsaw School of Economics (Finances and Banking).

In years 2009-2016 Partner and Vice-President of the Management Board in SmartCon Sp. z o.o. – independent IT advisory company, specializing in implementation of Enterprise Performance Management (EPM) systems offered by Oracle and SAP. In years 2007-2008 he held the position of Vice-President of the Management Board in PGE, supervising finance department, including accounting, controlling and treasury areas. Mr. Emil Wojtowicz was also responsible for the preparatory process for the IPO of PGE.

In years 2001-2007 he was employed in Deloitte and was responsible for valuations, due diligence and economic fraud investigation. In years 2006-2007 he was responsible for financial advisory to the power sector companies, including among others PGE, PKN Orlen and Grupa Lotos. In years 1998-2001 employed at Ernst & Young Management Consulting Services (later Cap Gemini Ernst & Young) and was responsible for due diligence, valuations, business plans and advisory projects.

RULES OF APPOINTING AND RECALLING THE MANAGEMENT PERSONNEL

The Management Board of the Company consists of from one to seven members, including President. The remaining members fulfil the functions of Vice-Presidents. Members of the Management Board are appointed for a joint three-year term of office.

The Management Board or individual members of the Management Board are appointed and recalled by the Supervisory Board, following a competitive procedure intended to test and evaluate the candidates' qualifications and to select the best candidate for the position of Management Board member, with the stipulation that candidates for this post must meet the conditions specified in § 15 sec. 3 and 4 of PGE's Articles of Association. In addition, each member of the Management Board may be recalled or suspended by the General Meeting or, for major reasons, suspended by the Supervisory Board. A resolution of the Supervisory Board on the suspension of a member of the Management Board must include a justification. The Supervisory Board may delegate members of the Supervisory Board to perform activities of the members of the Management Board on a temporary basis. A member of the Management Board submits his/her resignation in writing to the Supervisory Board at the address of the registered office of the Company.

COMPETENCIES OF THE MANAGEMENT BOARD

The Management Board administers affairs of the Company and represents the Company in all court and out-of-court affairs. The Management Board deals with all the matters related to managing the affairs of the Company, not reserved by the law or Statutes for the General Meeting or the Supervisory Board.

Co-operation of two Members of the Management Board or one member of the Management Board with a proxy is required to make statements on behalf of the Company. In the event that the Management Board comprises one member, declarations of intent on behalf of the Company may be made by the sole Management Board member.

The modus operandi of the Management Board and internal division of competence among Management Board members as regards managing the Company's affairs are specified in regulations of the Management Board.

Pursuant to the Statutes of the Company, resolutions of the Management Board are required for all matters that go beyond the scope of ordinary acts of the Company.

In accordance with the PGE's Statutes, resolutions of the Management Board are required particularly for the following:

  • the Company's acquisition or disposal of the following components of assets: real property, perpetual usufruct, interest in real property or perpetual usufruct, shares, interests or other participation rights,
  • incurring credits and loans,
  • granting sureties and guarantees by the Company and issuance of promissory notes,
  • making donations and releasing from debts,
  • concluding agreements not related to the Company's business activities specified in § 3 clause 1 of the Statutes,
  • appointing commercial proxies,
  • appointing Company proxies authorised to incur liabilities with a value exceeding EUR100,000, excluding (i) the powers of attorney to conclude agreements or incur liabilities related to trade in electricity and gas, related products and rights related thereto, and related to the purchase and sale of fuels and raw materials (ii) powers of attorney ad litem,
  • adopting the Regulations of the Management Board,
  • approving the Company's Organisational Regulations,
  • establishing and closing branches,
  • establishing of another company,
  • adopting the Company's yearly and long-term financial plans, including investment, marketing and sponsorship plans,
  • approving the rules of conducting sponsorship activity,
  • adopting the Company's development strategy,
  • determining the method of exercising the voting right at general meetings or general meetings of the companies in which the Company holds shares or interests,
  • making advanced payments towards planned dividends,
  • approving the materials submitted by the Management Board to the Supervisory Board.

Regardless of the above mentioned matters, resolutions of the Management Board are required for any matter referred by the Management Board to the Supervisory Board or the General Meeting.

The Statutes does not provide for detailed regulations which authorise Members of the Management Board to decide on the issue or buy-out of shares.

ACTIVITIES AND ORGANISATION OF WORK OF THE MANAGEMENT BOARD

The Management Board manages Company's affairs in a transparent and effective manner based on and within the limits of the governing provisions of the law, including the Code of Commercial Companies, provisions of the Company's Statutes, Rules of the Management Board and other internal regulations governing in the Company.

The works of the Management Board are headed by the President of the Management Board. Meetings of the Management Board are convened by the President of the Management Board on his/her own initiative or on the motion of a member of the Management Board. Management Board meetings may take place without having been formally called, provided that all Management Board members were effectively notified about the meeting and none of the Management Board members object to the meeting taking place and to the proposed meeting agenda.

Minutes are taken for each meeting of the Management Board and signed by the members of the Management Board, not excluding persons who filed a dissenting opinion or were temporarily absent when adopting any of the resolutions. The minutes are stored in the Book of Minutes. Resolutions of the Management Board are passed with an absolute majority of votes in an open voting. In case of voting parity, the President of the Management Board has the decisive vote. A secret voting is administered by a member of the Management Board. All members of the Management Board must be properly notified of the scheduled meeting for the resolutions to be valid. A member of the Management Board may present an opposing opinion with a justification to be included in the minutes.

Resolutions may be made in writing or using means of direct remote communications.

Competencies of members of the Management Board regarding the ordinary management to operating areas in which individual members of the Management Board perform the leading role. For the functions performed, each member of the Management Board is assigned appropriate scope of responsibilities for the Company's affairs.

SUPERVISORY BOARD

Supervisory Board members

Until July 9, 2018 the Supervisory Board consisted of:

Name and surname Position
Anna Kowalik Chairman of the Supervisory Board
Artur Składanek Vice-Chairman of the Supervisory Board – independent
Grzegorz Kuczyński Secretary of the Supervisory Board - independent
Janina Goss Supervisory Board Member - independent
Tomasz Hapunowicz Supervisory Board Member - independent
Witold Kozłowski Supervisory Board Member - independent
Mieczysław Sawaryn Supervisory Board Member - independent

On July 9, 2018 Mr Witold Kozłowski resigned from the Supervisory Board.

From July 10, 2018 until July 19, 2018 the Supervisory Board consisted of:

Name and surname Position
Anna Kowalik Chairman of the Supervisory Board
Artur Składanek Secretary of the Supervisory Board - independent
Grzegorz Kuczyński Supervisory Board Member - independent
Janina Goss Supervisory Board Member - independent
Tomasz Hapunowicz Supervisory Board Member - independent
Mieczysław Sawaryn Supervisory Board Member - independent

Due to the expiry of the 10th term of the Supervisory Board, on July 19, 2018 the Ordinary General Meeting of the Company appointed eight members to the Supervisory Board of the 11th term as from July 20, 2018: Anna Kowalik, Artur Składanek, Grzegorz Kuczyński, Mieczysław Sawaryn, Janina Goss, Tomasz Hapunowicz, Jerzy Sawicki and Artur Bartoszewicz.

In connection with the above, from July 20, 2018 until November 14, 2018 the Supervisory Board consisted of:

Name and surname Position
Anna Kowalik Chairman of the Supervisory Board
Artur Składanek Vice-Chairman of the Supervisory Board – independent
Grzegorz Kuczyński Secretary of the Supervisory Board - independent
Artur Bartoszewicz Supervisory Board Member - independent
Janina Goss Supervisory Board Member - independent
Tomasz Hapunowicz Supervisory Board Member - independent
Mieczysław Sawaryn Supervisory Board Member - independent
Jerzy Sawicki Supervisory Board Member - independent

On November 14, 2018 the Extraordinary General Meeting of the Company recalled Mr Artur Bartoszewicz from the Supervisory Board.

On November 14, 2018 the Extraordinary General Meeting of the Company appointed Mr Radosław Winiarski to the Supervisory Board.

As at the publication date of this report, the Supervisory Board of the Company consists of:

Name and surname Position
Anna Kowalik Chairman of the Supervisory Board
Artur Składanek Vice-Chairman of the Supervisory Board – independent
Grzegorz Kuczyński Secretary of the Supervisory Board - independent
Janina Goss Supervisory Board Member - independent
Tomasz Hapunowicz Supervisory Board Member - independent
Mieczysław Sawaryn Supervisory Board Member - independent
Jerzy Sawicki Supervisory Board Member - independent
Radosław Winiarski Supervisory Board Member

RULES OF APPOINTING AND RECALLING OF THE SUPERVISORY PERSONNEL

According to the valid Statutes, Members of the Supervisory Board are appointed for a joint term of office of three years. The Supervisory Board consists of five to nine members appointed and recalled by the General Meeting. The Supervisory Board elected by way of group voting shall consist of five members. Member of the Supervisory Board may be appointed and dismissed by the General Meeting at all times, with the exception of the Supervisory Board member appointed by the State Treasury by way of a written declaration submitted to the Management Board (State Treasury's entitlement is valid until it remains a shareholder). Moreover, a half of members of the Supervisory Board (except the Supervisory Board member mentioned in the previous sentence), shall be elected from among persons identified by the State Treasury, until its stake in the share capital falls below 20%. At the time when this right of the State Treasury expires, another shareholder with the highest stake in the Company's share capital acquires that right, provided that he holds at least 20% in the Company's share capital.

According to the provisions of the Statutes, the Supervisory Board shall include at least one person appointed by the General Meeting from among persons meeting the criteria of independence specified in the principles of corporate governance adopted by the Board of the Warsaw Stock Exchange. Proposing a candidate for this position a shareholder nominating such candidate shall be obliged to submit to the minutes of the General Meeting such candidate's written declaration confirming his/her independency.

The State Treasury's failure to appoint one member of the Supervisory Board or the General Meeting's failure to elect members of the Management Board meeting the criteria of independence or the absence of such persons in the composition of the Supervisory Board shall not prevent the Supervisory Board from adopting valid resolutions.

ACTIVITIES AND ORGANISATION OF THE SUPERVISORY BOARD

The operating procedure of the Supervisory Board is described in the Statutes of the Company and in the Rules of the Supervisory Board. The Supervisory Board performs its obligations collectively, however, it may delegate individual members for temporary and independent performance of certain supervisory activities. The Supervisory Board meets as required, not less often than once every two months.

Meetings of the Supervisory Board are convened by the Chairman of the Supervisory Board or the Vice-Chairman in the absence of the Chairman. The meeting of the Supervisory Board is convened by sending out a written invitation to all members of the Supervisory Board at least seven days before the schedule date of the meeting. This period of seven days may be shortened to two days for major reasons. The Meeting of the Supervisory Board may be also convened on demand of each member of the Supervisory Board or the motion of the Management Board (the person filing the motion proposes the agenda). Then the meeting should be convened within two weeks. If the Chairman of the Supervisory Board fails to convene the meeting within that period, the person filing the motion may convene the meeting on his/her own, stating the date, place and proposed agenda. The agenda may be changed if all members of the Supervisory Board are present at the meeting and no one objects to the change.

Supervisory Board meetings may take place without having been formally called, provided that all Supervisory Board members are present at the meeting and none of the Supervisory Board members object to the meeting taking place and to the proposed meeting agenda.

The Supervisory Board passes resolutions if at least half of the members of the Supervisory Board are present at the meeting and all the members have been invited. The Supervisory Board passes resolutions in an open voting. A secret voting is administered when requested by a member of the Supervisory Board, and during voting on personal matters. Resolutions of the Supervisory Board may be made in writing or using means of direct remote communications. The latter cannot be used for resolutions on the appointment or recalling of the Chairman, Vice-Chairman and Secretary of the Supervisory Board, and appointment, recalling or suspending a member of the Management Board oraz determining the remuneration and other contractual terms and executing agreements with Management Board members.

COMPETENCIES OF THE SUPERVISORY BOARD

The Supervisory Board maintains a continuous supervision over activities of the Company in all areas of the Company's activities pursuant to the provisions of the Statutes.

The Statutes of the Company and the Rules of the Supervisory Board are available on the corporate website at www.gkpge.pl.

COMMITTEES

In accordance with the Company's Statutes, the Rules of the Supervisory Board or a resolution of the General Meeting may provide for establishment of committees within the Supervisory Board, in particular the audit committee and the appointment and remuneration committee. The current Rules of the Supervisory Board provide that the Supervisory Board may appoint standing or ad hoc committees, acting as collective advisory and opinion-making bodies of the Supervisory Board. The particular goal of the committees is to provide the Supervisory Board with opinions and recommendations on matters within the competencies of the committees. The committees are established by the Supervisory Board out of its members. The committee consists of 3 to 5 persons. The committee appoints a chairman out of its members. The chairman convenes meetings of the committee, manages works of the committee and represents the committee in relations with the authorities and employees of the Company. The mandate of a committee member expires with the expiry of the mandate of the member of the Supervisory Board, resignation from membership in the committee or recalling from the committee by the Supervisory Board. Each Member of the Supervisory Board may participate in committee meetings. The committee chairman may invite to the meetings members of the Management Board, Company employees and other persons whose participation is advisable. Decisions of the committee are made on a consensus basis, unless the regulations of a given committee state otherwise. The following standing committees are currently part of the Supervisory Board: the Audit Committee, the Strategy and Development Committee, the Appointment and Remuneration Committee, and the Corporate Governance Committee.

Range of competencies of particular Committees of the Supervisory Board is presented in details in the Rules of the Supervisory Board that is available on the corporate website at www.gkpge.pl

The Audit Committee

The Audit Committee is a collegial advisory and opinion-forming body at the Supervisory Board of PGE Polska Grupa Energetyczna S.A. and its main objectives are as follows:

  • submission to the Supervisory Board of recommendations and opinions on matters related to assessing the correctness and effectiveness of internal control at PGE Polska Grupa Energetyczna S.A. and PGE Group,
  • cooperation with the statutory auditors of PGE Polska Grupa Energetyczna S.A.,
  • performance of the functions specified in the Act on statutory auditors, audit firms and public oversight (Polish Journal of Laws of 2017, item 1089)

The Supervisory Board Audit Committee had the following members in 2018: Mr. Grzegorz Kuczyński (Chairperson of the Audit Committee), Mrs. Anna Kowalik, Mrs. Janina Goss, Mr. Artur Składanek, Mr. Artur Bartoszewicz, Mr. Radosław Winiarski.

The Audit Committee Members met the requirements specified in the Act on statutory auditors, audit firms and public oversight (Polish Journal of Laws of 2017, item 1089), i.e.:

  • independence criterion: Mrs. Janina Goss, Mr. Grzegorz Kuczyński, Mr. Artur Składanek, Mr. Artur Bartoszewicz,
  • having knowledge and skills in accounting or auditing financial statements due to their education and experience: Mrs. Anna Kowalik, Mrs. Janina Goss, Mr. Grzegorz Kuczyński, and Mr. Radosław Winiarski,
  • having knowledge and skills in the industry in which the Company operates due to their education and professional experience: Mrs. Anna Kowalik, Mr. Artur Składanek and Mr. Radosław Winiarski.

The CVs of Supervisory Board Audit Committee Members, containing details on their education and professional experience and confirming their compliance with the requirements specified in the Act on statutory auditors, audit firms and public oversight (Polish Journal of Laws of 2017, item 1089), as referred to above, are available at the website of PGE S.A.: www.gkpge.pl and in current reports 16/2018 and 32/2018.

Details on the composition of the Audit Committee in 2018 are presented in a further part of this report.

The Supervisory Board Audit Committee at PGE Polska Grupa Energetyczna S.A. held 12 meetings in 2018.

Given the need to determine detailed tasks and operational rules for the Audit Committee as a consequence of new tasks being assigned to audit committees following entry into force of the act on statutory auditors, audit firms and public oversight (Journal of Laws of 2017, item 1089), Regulations for the Audit Committee at the Supervisory Board of PGE Polska Grupa Energetyczna S.A. were adopted in 2017.

On October 10, 2017 the Audit Committee at the Supervisory Board of PGE Polska Grupa Energetyczna S.A. adopted a Policy and Procedure for selecting audit firms to conduct audits and a Policy for providing services unrelated to audit by the audit firm performing the audit, its related parties and members of this audit firm's network ("Permitted services policy").

In accordance with the adopted Permitted services policy, a statutory auditor or audit firm conducting a statutory audit at PGE Polska Grupa Energetyczna S.A. or any of its network members may not provide any prohibited non-audit services directly or indirectly to PGE Polska Grupa Energetyczna S.A. and PGE Group companies.

Pursuant to Regulation (EU) No 537/2014 of the European Parliament and of the Council of 16 April 2014 on specific requirements regarding statutory audit of public-interest entities and repealing Commission Decision 2005/909/EC (EU Official Journal L.2014.158.77) and the Act on statutory auditors, audit firms and public oversight (Polish Journal of Laws of 2017, item 1089), prohibited non-audit services, in accordance with the Permitted services policy, are all services with the following exceptions:

  • conducting economic and financial due diligence,
  • issuing of comfort letters in connection with prospectuses issued by the audited entity, conducted in compliance with the national standard for related services and consisting of agreed procedures,
  • assurance services as regards pro forma financial information, earnings forecasts or estimated results published in a prospectus of the audited entity,
  • auditing of historic financial information for the prospectus referred to in Commission Regulation (EC) No 809/2004 of 29 April 2004 implementing Directive 2003/71/EC of the European Parliament and of the Council as regards information contained in prospectuses as well as the format, incorporation by reference and publication of such prospectuses and dissemination of advertisements,

  • verification of consolidation packages,

  • confirming compliance with conditions included in credit agreements based on analysis of financial information from financial statements audited by the audit firm,
  • assurance services concerning reporting on corporate governance, risk management and corporate social responsibility,
  • services consisting of evaluating the compliance of information disclosed by financial institutions and investments firms with information disclosure requirements concerning capital adequacy and variable pay components,
  • assurances concerning financial statements or other financial information intended for supervision authorities, supervisory board or other supervisory body of the company or owners, exceeding the scope of statutory audit and intended to help these entities in compliance with their statutory obligations,
  • open workshops, thematic conferences, industry meetings or other events that are open in nature and are not prepared for or adapted to the needs of PGE S.A., PGE Group companies or their employees.

The provision of these services by a statutory auditor or audit firm performing a statutory audit of PGE S.A. or by members of the network to which the statutory auditor or audit firm belongs for PGE S.A. and PGE Group Companies is possible only in as far as this is not linked to tax policy after the Audit Committee at PGE S.A.'s Supervisory Board carries out an assessment of independence threats and precautions as referred to in the Act on statutory auditors, audit firms and public oversight (Polish Journal of Laws of 2018, item 1089).

In 2018, the audit firm Ernst & Young Audyt Polska sp. z o.o. sp.k. auditing the financial statements of PGE S.A. provided permitted non-audit services based on consent given by way of resolutions by the Supervisory Board Audit Committee. Prior to these services being rendered, the Audit Committee performed an assessment of independence threats and precautions, as referred to in the Act on statutory auditors, audit firms and public oversight (Polish Journal of Laws of 2018, item 1089). Furthermore, the Audit Committee periodically analyses reports from performance of permitted services by audit firms for PGE Group companies.

In accordance with the Policy and Procedure for selecting audit firms to conduct audits, selecting audit firms to audit the Company's financial statements and PGE Group's consolidated financial statements takes place in accordance with the rules specified in this Policy and Procedure, with observance of the laws, especially the Act on statutory auditors, audit firms and public oversight (Polish Journal of Laws of 2018, item 1089), Accounting Act (Polish Journal of Laws of 2018, item 395) and Regulation (EU) No 537/2014 of the European Parliament and of the Council of 16 April 2014 on specific requirements regarding statutory audit of public-interest entities and repealing Commission Decision 2005/909/EC (EU Official Journal L.2014.158.77), and taking into account guidelines from the Prime Minister on procedures for selecting and cooperating with audit firms auditing the annual financial statements of companies with a State Treasury shareholding.

The Supervisory Board selects the audit firm to conduct an audit of financial statements.

The first agreement concerning the audit of financial statements with an audit firm is executed for a period not shorter than two years, with an option to extend it for subsequent two-year periods.

The maximum time for continuous financial statement audit commissions by the same audit firm or an audit firm linked to this audit firm or any member of a network operating in EU member states to which these audit firms belong may not exceed five years, with the stipulation that the lead statutory auditor may audit financial statements again after at least three years from the end of the most recent audit of financial statements.

Executing an agreement for audit of financial statements is preceded by a procedure intended to ensure that the audit firm is selected in an independent and impartial manner.

The procedure to select an audit firm is prepared and conducted in accordance with rules for fair competition, equal treatment of audit firms, proportionality and transparency.

Prior to starting the procedure to select an audit firm, the Audit Committee specifies and presents to the Supervisory Board a recommendation on the procedure to select an audit firm.

By way of a resolution and based on this recommendation, the Supervisory Board sets at least the following:

  • criteria for selecting the audit firm,
  • methodology for evaluating proposals for audit of the Company's financial statements,
  • the content of the notice or invitation to submit proposals for audit of the Company's financial statements.

Based on a Supervisory Board resolution, the procedure to select an audit firm is conducted by a tender commission, appointed in accordance with the Procurement Procedure in place at PGE Polska Grupa Energetyczna S.A.

On July 17, 2017, an agreement was executed with the audit firm Ernst & Young Audyt Polska sp. z o.o. sp.k., based in Warsaw. The subject of the agreement was audit of annual and consolidated financial statements for 2017 and 2018.

The procedure to select a statutory auditor preceding the selection of Ernst & Young Audyt Polska sp. z o.o. sp.k. had began and ended before the Act on statutory auditors, audit firms and public oversight (Polish Journal of Laws of 2018, item 1089) entered into force. Given the above, in accordance with the interim provision specified in art. 283 of the aforementioned act, art. 130 sec. 2-7 of the aforementioned act did not apply in selecting the above-mentioned audit firm. Thus, the provision concerning the conditions for and content of the Audit Committee recommendation did not apply in selecting Ernst & Young Polska sp. z o.o. sp.k.

The Corporate Governance Committee

The Corporate Governance Committee evaluates the implementation of the corporate governance principles in the Company and presents the Supervisory Board with initiatives in this area, provides opinions on normative acts and other documents of the Company presented to the Supervisory Board, which considerably affect the corporate governance, initiates and prepares proposals of changes for normative acts of the Supervisory Board.

Strategy and Development Committee

The Strategy and Development Committee provides opinions and recommendations to the Supervisory Board regarding planned investments which considerably affect the Company's assets.

Appointment and Remuneration Committee

The Appointment and Remuneration Committee is responsible for facilitating achievement of strategic goals of the Company by presenting the Supervisory Board with opinions and motions on the development of the management structure, including remuneration system and selection of properly qualified personnel.

Table: Composition of the committees in 2018

Name and surname of
the member of the
Supervisory Board
Audit Committee Corporate Governance
Committee
Strategy and
Development
Committee
Appointment and
Remuneration
Committee
Artur Bartoszewicz Member
from 24.07.2018
till 14.11.2018
Member
from 24.07.2018
till 14.11.2018
Janina Goss Member Member
Tomasz Hapunowicz Member
Member
from 23.01.2018
from 23.01.2018
Chairman
from 24.07.2018
Anna Kowalik Member Member
od 23.01.2018
Member
Witold Kozłowski Member
Chairman till
09.07.2018
Member
till 09.07.2018
Member
till 09.07.2018
Member
Member
Grzegorz Kuczyński
Member
from 23.01.2018
Chairman
till 24.07.2018
Mieczysław Sawaryn Member Member
Chairman
Jerzy Sawicki Member
from 24.07.2018
Member
from 24.07.2018
Member
from 24.07.2018
Artur Składanek Member Member
Chairman
Radosław Winiarski Member
from 20.11.2018
Member
from 20.11.2018

REMUNERATION OF THE MANAGEMENT OF PGE S.A.

Rules with respect to the determination of remuneration for the Management Board Members of PGE S.A.

Rules with respect to the determination of remuneration for the Management Board Members of PGE S.A.

On September 9, 2016, the Act of June 9, 2016 on the principles of determining the amount of remuneration for persons managing certain companies – so called new Public Sector Salary Cap Act – came into force. The new Public Sector Salary Cap Act determines, inter alia, principles for determining remuneration in companies with a stake of the State Treasury (for example PGE), in particular determines the way in which the remuneration of the members of the Management Board and Supervisory Board is set (rules for determining remuneration of the Management Board and Supervisory Board are adopted by the General Meeting and the Supervisory Board adopts resolutions on specific conditions of the management board remuneration).The act also determines select provisions of management services agreements executed with management board members.

On December 14, 2016, the Company's Extraordinary General Meeting, convened at the request of the Minister of Energy representing the State Treasury, adopted resolution 4 on determining the rules for remuneration for members of the Management Board of PGE Polska Grupa Energetyczna S.A., subsequently changed through resolution 37 of the Company's Ordinary General Meeting of June 27, 2017. According to this resolution, remuneration for Management Board members consists of a fixed component in the form of a monthly base salary, and a variable component constituting supplementary pay for the Company's financial year, depended on progress in achieving management objectives. According to these General Meeting resolutions, the Supervisory Board of PGE Polska Grupa Energetyczna S.A. adopted resolutions in 2017 on the execution of management services agreements with Management Board members that correspond to the rules of the new Public Sector Salary Cap Act. In 2018 the Supervisory Board determined management objectives and indicators for assessing their performance.

Name and surname of the Management Board member Remuneration and benefits achieved
by the Management Board members
in PGE S.A. in 2018 (in PLN)
Henryk Baranowski 792 680.40 1
Wojciech Kowalczyk 739 835.04 1
Marek Pastuszko 739 835.04 1
Paweł Śliwa 739 835.04 1
Ryszard Wasiłek 739 835.041
Emil Wojtowicz 739 835.041

Table: Remuneration and benefits received in 2018 by the Members of the Management Board of PGE S.A. from PGE S.A.

1Item including remuneration for the period of service at the Management Board.

The total remuneration achieved by the Management Board members in 2018 amounted to PLN 4.49 million (according to PIT11). In cost perspective (including provisions), in 2018 the remuneration of all persons who acted as Management Board members of PGE S.A., amounted to PLN 7.86 million.

Rules with respect to the determination of remuneration for the Supervisory Board Members of PGE S.A.

The amounts of remuneration of the Supervisory Board Members of PGE S.A. were determined by the resolution no. 5 of the Extraordinary General Meeting of December 14, 2016 concerning the principles of determining the amount of remuneration for members of the Supervisory Board of PGE S.A., pursuant to which the monthly remuneration of members of the Supervisory Board was set as a product of the average remuneration in the business sector exclusive of profit-based bonuses in the fourth quarter of the previous year as announced by the President of the Central Statistical Office of Poland and the following factor: 1.7 (for the chairperson of the Supervisory Board), 1.5 (for the other members of the Supervisory Board). The level of remuneration set for members of the Supervisory Board of PGE Polska Grupa Energetyczna S.A. corresponds to the rules specified in the new Public Sector Salary Cap Act.

Table: Remuneration received by the Supervisory Board Members of PGE S.A. who in 2018 performed their functions in PGE S.A.

Name and surname of the
Supervisory Board member
Remuneration achieved
by the Supervisory Board
members in PGE S.A. in 2018
(in PLN)
Anna Kowalik 89 837.16
Janina Goss 79 268.04
Mieczysław Sawaryn 79 268.04
Artur Składanek 79 268.04
Grzegorz Kuczyński 79 268.04
Witold Kozłowski 41 551.80
Tomasz Hapunowicz 77 563.35
Artur Bartoszewicz 25 456.70
Jerzy Sawicki 35 585.38
Radosław Winiarski 10 348.90

Total remuneration earned in 2018 by the members of the Supervisory Board in PGE S.A. amounted to PLN 597 thousand. In cost perspective (including provisions), the remuneration of all persons who acted as Supervisory Board members amounted to PLN 685 thousand in 2018.

8.4. Information about shares and other securities

SHARE CAPITAL AND OWNERSHIP STRUCTURE

As at January 1, 2018 and December 31, 2018 the share capital of PGE S.A. amounted to PLN 19 165 048 497.25 PLN and split into 1 869 760 829 shares with a nominal value of PLN 10.25 each.

Table: Share capital of the Company.

Series/
issue
Type of
shares
Type of privilege Number of shares Value of series/issue at
nominal value
Capital payment
method
"A" ordinary n/a 1 470 576 500 15 073 409 125.00 contribution in
kind/cash
"B" ordinary n/a 259 513 500 2 660 013 375.00 cash
"C" ordinary n/a 73 228 888 750 596 102.00 merger with PGE GiE
S.A.
"D" ordinary n/a 66 441 941 681 029 895.25 merger with PGE
Energia S.A.
Total 1 869 760 829 19 165 048 497.25

Table: Ownership structure of the Company's share capital as at December 31, 2018*.

State Treasury Other shareholders * Total
nominal value
of shares
(PLN)
% share in the
share capital and
votes
nominal value of
shares
(PLN)
% share in the
share capital and
votes
nominal value
of shares
(PLN)
% share in the
share capital and
votes
Akcje na
31.12.2018
10 998 087 004.50 57.39 8 166 961 492.75 42.61 19 165 048 497.25 100.00

* Ownership structure presented on the basis of information available to the Company.

All of the Company shares have been paid.

Although the Company's shares are not privileged, the Statutes of the Company provide for special rights of the State Treasury until it remains a shareholder of the Company.

SHAREHOLDERS WITH A SIGNIFICANT STAKE

According to the best knowledge, on the ground of the letter from the Ministry of the State Treasury of April 27, 2016, the State Treasury holds 1 072 984 098 ordinary shares of the Company, representing 57.39% of the Company's share capital and entitling to 1 072 984 098 votes on the General Meeting of the Company, constituting 57.39% of total votes.

Table: Shareholders holding directly or indirectly by subsidiaries at least 5% of the total votes at the General Meeting of PGE S.A.

Shareholder Number of shares Number of votes % in total votes on
General Meeting
State Treasury 1 072 984 098 1 072 984 098 57.39%
Others 796 776 731 796 776 731 42.61%
Razem 1 869 760 829 1 869 760 829 100.00%

Treasury shares

As at December 31, 2017 PGE S.A. and subsidiaries did not hold any treasury shares.

Shares of the parent company owned by the members of management and supervisory authorities

According to the best knowledge of the Management Board of the Company, members of management and supervisory authorities of the Company as of the date of submission of this report and as of the date of publishing of the consolidated report for the third quarter of 2018 did not hold shares of PGE S.A.

Table: PGE S.A. shares held by the persons acting on behalf of material direct subsidiaries of PGE S.A.

Shareholder Position Number of
shares as of
submission
date of the
annual report
Nominal value
of shares as of
submission date of
the annual report
(PLN)
Management Board of PGE GiEK S.A. 9 768 100 122
Krzysztof Domagała Member of the Management
Board
7 869 80 657
Andrzej Kopertowski Vice-President of the
Management Board
1 211 12 413
Stanisław Żuk Vice-President of the
Management Board
688 7 052
Management Board of PGE Obrót S.A. 3 416 35 014
Jan Mądrzak Vice-President of the
Management Board
3 416 35 014
Management Board of PGE Dom
Maklerski S.A.
72 738
Rafał Kucharski Member of the Management
Board
72 738
Management Board of KOGENERACJA
S.A.
300 3 075
Paweł Strączyński Vice-President of the
Management Board
300 3 075

Control system of employeesshare scheme

In 2017, PGE S.A. did not maintain any employees share schemes.

Use of proceeds from issues

In 2017, PGE S.A. did not maintain any employees share schemes.

Proceeds from the issue of bonds were used for financing of the on-going activities as well as for financing of the investments conducted by PGE Group companies (see p. 5.6 of this report).

9. Statement on non-financial data

A separate report on non-financial data of PGE Polska Grupa Energetyczna S.A. and PGE Group for 2018, drafted in accordance with art. 49b sec. 9 of the Accounting Act, was published together with the Management Board's report on activities of PGE Polska Grupa Energetyczna S.A. and PGE Group for 2018 and is available at PGE Group's website in the section dedicated to financial data for 2018: https://www.gkpge.pl.

10. Statements of the Management Board

STATEMENT ON THE RELIABLE PREPARATION OF THE FINANCIAL STATEMENTS

To the best knowledge of the Management Board of PGE S.A., the annual separate financial statements and consolidated financial statements and comparable data were prepared in accordance with the governing accounting principles, present a fair, true and reliable view of the material and financial situation as well as financial result of the parent company and of PGE Capital Group.

The report of the Management Board on the activities of PGE Polska Grupa Energetyczna S.A. and PGE Capital Group presents a true view of the development, achievements and situation of PGE Polska Grupa Energetyczna S.A. and the Capital Group, and provides a description of the basic risks and threats.

STATEMENT ON THE ENTITY AUTHORISED TO AUDIT THE FINANCIAL STATEMENTS

The Management Board of PGE S.A. declares that the entity authorised to audit the separate and consolidated financial statements, which audits the annual financial statements: separate and consolidate, has been appointed in accordance with provisions of the law. The entity and the statutory auditors fulfilled all the requirements for issuing an unbiased and independent opinion on the audit, in accordance with the governing provisions and professional standards.

11. Approval of the Management Board's Report

The foregoing Management Board's Report on activities of PGE Polska Grupa Energetyczna S.A. and PGE Capital Group was approved for publication by the Management Board of the parent company on March 8, 2019.

Warsaw, March 8, 2019

Signatures of members of the Management Board of PGE Polska Grupa Energetyczna S.A.

President
of the
Management Henryk
Board Baranowski
Management Wojciech
Board Kowalczyk
Vice-President
Marek
Board Pastuszko
Vice-President
of the
Management
Board Paweł Śliwa
Vice-President
of the
Management Ryszard
Board Wasiłek
Vice-President
of the
Management Emil
Board Wojtowicz
Vice-President
of the
of the
Management

Glossary
AKPiA Control, measurement and automation apparatus area
Ancillary control
services (ACS)
services provided to the transmission system operator, which are indispensable for the proper
functioning of the National Power System and ensure the keeping of required reliability and quality
standards.
Achievable capacity the maximum sustained capacity of a generating unit or generator, maintained continuously by a
thermal generator for at least 15 hours or by a hydroelectric generator for at least five hours, at
standardized operating conditions, as confirmed by tests.
Balancing market a technical platform for balancing electricity supply and demand on the market. The differences between
the planned (announced supply schedules) and the actually delivered/off-taken volumes of electricity are
settled here. The purpose of the balancing market is to balance transactions concluded between
individual market participants and actual electricity demand. The participants of the balancing market
can be the generators, customers for electricity understood as entities connected to a network located in
the balancing market area (including off-takers and network customers), trading companies, electricity
exchanges and the TSO as the balancing company.
Base, baseload standard product on the electricity market: a constant hourly power supply per day in a given period, for
example week, month, quarter or year.
BAT Best Available Technology
Best Practices Document "Best Practice for GPW Listed Companies 2016" adopted by the resolution of the GPW
Supervisory Board of October 13, 2015 and effective from January 1, 2016.
Biomass solid or liquid substances of plant or animal origin, subject to biodegradation, obtained from agricultural
or forestry products, waste and remains or industries processing their products as well as certain other
biodegradable waste in particular agricultural raw materials.
Black energy popular name for energy generated as a result of combustion of black coal or lignite.
Circular economy system that minimises the consumption of resources and the level of waste as well as emissions and
energy losses by creating a closed loop of processes in which waste from one process is used as
resources in other processes so as to maximally reduce the quantity of production waste
Co-combustion the generation of electricity or heat based on a process of combined, simultaneous combustion in one
device of biomass or biogas together with other fuels; part of the energy thus generated can be deemed
to be energy generated with the use of renewable sources.
Co-generation the simultaneous generation of heat and electricity or mechanical energy in the course of one and the
same technological process.
Constrained
generation
the generation of electricity to ensure the quality and reliability of the national power system; this
applies to generating units in which generation must continue due to the technical limitations of the
operation of the power system and the necessity of ensuring its adequate reliability.
CVC fund Corporate Venture Capital; in the CVC model, portfolio companies, aside from financial support, receive
the opportunity to verify their ideas in a corporate setting
Distribution transport of energy through distribution grid of high (110 kV), medium (15kV) and low (400V) voltage in
order to supply the customers.
Distribution System
Operator (DSO)
a power company engaging in the distribution of gaseous fuels or electricity, responsible for traffic in the
gas or electricity distribution systems, current and long-term security of operation of the system, the
operation, maintenance, repairs and indispensable expansion of the distribution network, including
connections to other gas or power systems.
Energy cluster civil-law arrangement that may include natural persons, legal entities, scientific units, research institutes
or local government units, concerning the generation, distribution or trade in energy and energy demand
balancing, with this energy being from renewable sources or other sources or fuels, within a distribution
grid with nominal voltage below 110 kV, within the operational area of the given cluster, not exceeding
the area of one district (powiat) in the meaning of the act on district authorities) or 5 municipalities
(gmina) in the meaning of the act on municipal authorities; an energy cluster is represented by a
coordinator, which is a cooperative, association, foundation appointed for this purpose or any member
of the energy cluster indicated in the civil-law arrangement
ERO Energy Regulatory Office (pol. URE).
EUA European Union Allowances: transferable CO2 emission allowances; one EUA allows an operator to
release one tonne of CO2
EU ETS European Union Greenhouse Gas Emission Trading Scheme) EU emission trading scheme. Its operating
rules are set out in the ETS Directive, amended by the Directive 2009/29/EC of the European Parliament
and of the Council of April 23, 2009 (OJ EU L. of 2009, No. 140, p. 63—87).
Generating unit a technically and commercially defined set of equipment belonging to a power company and used to
generate electricity or heat and to transmit power.
GJ Gigajoule, a unit of work/heat in the SI system, 1 GJ = 1000/3.6 kWh = approximately 278 kWh.
GPZ main power supply point, a type of transformer station used for the processing or distribution of
Green certificate electricity or solely for the distribution of electricity.
GW popular name for energy generated from renewable energy sources.
gigawatt, a unit of capacity in the SI system, 1 GW = 109 W.
GWe
GWt
one gigawatt of electric capacity.
one gigawatt of heat capacity.
HICP Harmonised Index of Consumer Prices
High Voltage Network
(HV) a network with a nominal voltage of 110 kV.
IED Industrial Emissions Directive
IGCC Integrated Gasification Combined Cycle.
Installed capacity the formal value of active power recorded in the design documentation of a generating system as being
the maximum achievable capacity of that system, confirmed by the acceptance protocols of that system
(a historical value, it does not change over time.
IRiESP the Transmission Network Operation and Maintenance Manual required to be prepared by a
transmission system operator pursuant to the Energy Law; instructions prepared for power networks
that specify in detail the terms and conditions of using these networks by system users as well as terms
and conditions for traffic handling, operation and planning the development of these networks; sections
on transmission system balancing and system limitation management, including information on
comments received from system users and their consideration, are submitted to the ERO President for
approval by way of a decision.
IRZ Cold Intervention Reserve Service – service consisting of maintaining power units ready for energy
production. Energy is produced on request of PSE S.A.
KSE the National Power System, a set of equipment for the distribution, transmission and generation of
electricity, forming a system to allow the supply of electricity in the territory of Poland.
KSP the National Transmission System, a set of equipment for the transmission of electricity in the territory
of Poland.
kV kilo volt, an SI unit of electric potential difference, current and electromotive force; 1kV= 103 V.
kWh kilowatt-hour, a unit of electric energy in the SI system defined as the volume of electricity used by the 1
kW equipment over one hour. 1 kWh = 3,600,000 J = 3.6 MJ.
Low Voltage Network
(LV)
a network with a nominal voltage not exceeding 1 kV.
LTC long-term contracts on the purchase of capacity and electricity entered into between Polskie Sieci
Elektroenergetyczne S.A. and electricity generators in the years 1994-2001.
Medium-voltage
network (MV)
an energy network with a nominal voltage higher than 1 kV but lower than 110 kV.
MEV Minimum Energy Volumes.
MSR Market Stability Reserve (relating to CO2
)
MW a unit of capacity in the SI system, 1 MW = 106 W.
Mwe one megawatt of electric power.
MWt one megawatt of heat power.
NAP National emissions Allocation Plan, prepared separately for the national emission trading system and for
the EU emission trading system by the National Administrator of the Emission Trading System.
NAP II National CO2 emissions Allocation Plan for the years 2008-2012 prepared for the EU emission trading
system adopted by the Ordinance of the Council of Ministers of July 1, 2008 (Dz. U. of 2008, No. 202,
item 1248).
Nm3 normal cubic meter; a unit of volume from outside the SI system signifying the quantity of dry gas in 1
m3 of space at a pressure of 101.325 Pa and a temperature of 0°C.
NOx nitrogen oxides.
N:W ratio Ration of volume of overburden removed in m3
to the mass of extracted coal in tons
OTF Organized Trading Facilities
Operational Capacity
Reserve (ORM)
ORM constitutes of generation capacities of active Production Schedular Units (JGWa) in operation or
layover, representing excess capacity over electricity demand available to the TSO under the Energy Sale
Agreements and on the Balancing Market in unforced generation
Peak, peakload a standard product on the electricity market; a constant power supply from Monday to Friday, each hour
between 7:00 a.m. and 10:00 p.m. (15-hour standard for the Polish market) or between 8:00 a.m. and
8:00 p.m. (12-hour standard for the German market) in a given period, for example week, month,
quarter or year.
Peak power pumped
storage plants
special type of hydro-power plant allowing for electricity storage. It uses the upper reservoir, to which
water is pumped from the lower reservoir using electricity (usually excessive in system). The pumped
storage facilities provide ancillary control services for the national power system. In periods of increased
demand for electricity, water from the upper reservoir is released through the turbine. This way,
electricity is produced.
PJ Petajoule, a unit of work/heat in the SI system, 1 PJ = approx. 278 GWh
Property rights negotiable exchange-traded rights under green and co-generation certificates
Prosumer end customer who purchases electricity under a comprehensive agreement and generates electricity
only from renewable sources at a micro-installations for own purposes, unrelated to economic activities
PSCMI1 Polish Energy Coal Market Index 1 - average level of prices of coal dust sold to industrial-scale power
plants in Poland
RAB Regulatory Asset Base.
Red certificate a certificate confirming generation of electricity in co-generation with heat.
Red energy popular name for electricity co-generated with heat.
Regulator the President of ERO, fulfilling the tasks assigned to him in the energy law. The regulator is responsible
for, among others, giving out licenses for energy companies, approval of energy tariffs, appointing
Transmission System Operators and Distribution System Operators.
Renewable Energy
Source (RES)
a source of generation using wind power, solar radiation, geothermal energy, waves, sea currents and
tides, flow of rivers and energy obtained from biomass, landfill biogas as well as biogas generated in
sewage collection or treatment processes or the disintegration of stored plant or animal remains.
SAIDI System Average Interruption Duration Index - index of average system interruption time (long, very long
and disastrous), expressed in minutes per customer per year, which is the sum of the interruption
duration multiplied by the number of consumers exposed to the effects of this interruption during the
year, divided by the total number of off-takers. SAIDI does not include interruptions lasting less than
three minutes and is determined separately for planned and unplanned interruptions. It applies to
breakdowns in the low (LV), medium (MV) and high voltage (HV), wherein SAIDI in quality tariff does not
include interruptions on low voltage.
SAIFI System Average Interruption Frequency Index - index of average system amount of interruptions ( long,
very long and disastrous ), determined as number of off-takers exposed to the effects of all such
interruptions during the year divided by the total number of off-takers. SAIFI does not include
interruptions lasting less than three minutes and is determined separately for planned and unplanned
interruptions. It applies to breakdowns in the low (LV), medium (MV) and high voltage (HV), wherein
SAIFI in quality tariff does not include interruptions on low voltage .
SCR Selective catalytic reduction
SNCR Selective non-catalytic reduction
Start-up early-stage company established in order to build new products or services and characterised by a high
level of uncertainty. The most common features of start-ups are: short operational history (up to 10
years), innovativeness, scalability, higher risk than in the case of traditional businesses but also potential
higher returns on investment
Tariff the list of prices and rates and terms of application of the same, devised by an energy enterprise and
introduced as binding on the customers specified therein in the manner defined by an act of parliament.
Tariff group a group of customers off-taking electricity or heat or using services related to electricity or heat supply to
whom a single set of prices or charges and terms are applied.
TGE Towarowa Giełda Energii S.A. (Polish Power Exchange), a commodity exchange on which trading can take
place in electricity, liquid or gas fuels, extraction gas, emission allowances and property rights whose
price depends directly or indirectly on electric energy, liquid or gas fuels and emission allowances,
admitted to commodity exchange trading.
TPA, TPA rule Third Party Access, the owner or operator of the network infrastructure to third parties in order to
supply goods/services to third party customers.
Transmission transport of electricity through high voltage (220 and 400 kV) transmission network from generators to
distributors.
Transmission System
Operator (TSO)
TWh
a power company engaging in the transmission of gaseous fuels or electric energy, responsible for traffic
in a gas or power transmission system, current and long-term security of operation of that system, the
operation, maintenance, repair and indispensable expansion of the transmission system, including
connections with other gas or power systems. In Poland, for the period from July 2, 2014 till December
31, 2030 Polskie Sieci Elektroenergetyczne S.A. was chosen as a TSO in the field of electricity
transmission.
terawatt hour, a multiple unit for measuring of electricity unit in the system SI. 1 TWh is 109
kWh.
Ultra-high-voltage
network (UHV)
an energy network with a voltage equal to 220 kV or higher.
V (volt) electrical potential unit, electric voltage and electromotive force in the International System of Units (SI),
1 V= 1J/1C = (1 kg x m2
3
) / (A x s
).
W (watt) a unit of power in the International Systems of Units (SI), 1 W = 1J/1s = 1 kg x m2
-3
x s
Yellow certificate a certificate confirming generation of energy in gas-fired power plants and CCGT power plants.
Yellow energy popular name for energy generated in gas-fired power plants and CCGT power plants.