Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

PERSEUS MINING LIMITED Investor Presentation 2018

Apr 16, 2018

46513_rns_2018-04-16_8b1e945f-b938-4e51-8b36-46dc5ba34d41.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

European Gold Forum 2018

CORPORATE PRESENTATION

Jeff Quartermaine Managing Director & CEO

18 April 2018

ASX/TSX: PRU www.perseusmining.com

1

==> picture [72 x 72] intentionally omitted <==

Cautionary Statements

Disclaimer

No representation or warranty, express or implied, is made by Perseus that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, each of Perseus, its directors, officers, employees, advisers and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of the material contained in this presentation, or any opinions or beliefs contained in this presentation, and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission there from. To the maximum extent permitted by the law, Perseus disclaims any obligation to update or keep current the information contained in this presentation or to correct any inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any opinions expressed in the presentation are subject to change without notice.

Forward-Looking Statements

This report contains forward-looking information which is based on the assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of gold, continuing commercial production at the Edikan Gold Mine and the Sissingué Gold Mine without any major disruption, development of a mine at Yaouré, the receipt of required governmental approvals, the accuracy of capital and operating cost estimates, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used by the Company. Although management believes that the assumptions made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the forward-looking information will prove to be accurate. Forward-looking information involves known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, the actual market price of gold, the actual results of current exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's publicly filed documents. The Company believes that the assumptions and expectations reflected in the forward-looking information are reasonable. Assumptions have been made regarding, among other things, the Company’s ability to carry on its exploration and development activities, the timely receipt of required approvals, the price of gold, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers should not place undue reliance on forward-looking information. Perseus does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

2

==> picture [72 x 72] intentionally omitted <==

Cautionary Statements

ASX Listing Rule and National Instrument 43-101 Compliance Note

All production targets for Edikan, Sissingué and Yaouré referred to in this report are underpinned by estimated Ore Reserves which have been prepared by competent persons in accordance with the requirements of the JORC Code.

The information in this report in relation to Edikan Mineral Resource and Ore Reserve estimates was first reported by the Company in compliance with the JORC Code 2012 and NI43-101 in a market announcement released on 21 February 2017 and was updated for depletion in the Financial Statements released on 30 August 2017. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market release continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Central Ashanti Gold Project, Ghana” dated 30 May 2011 continue to apply.

The information in this report that relates to Mineral Resources for Sissingué was first reported by the Company in compliance with the JORC Code 2012 and NI43-101 in a market announcement released on 15 December 2016. The information in this report that relates to Mineral Resources for Fimbiasso was first reported by the Company in compliance with the JORC Code 2012 and NI43-101 in a market announcement released on 20 February 2017. The information in this report that relates to Ore Reserves for the Sissingué and Fimbiasso was first reported by the Company in compliance with the JORC Code 2012 and NI43-101 in a market announcement released on 31 March 2017. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in those market releases continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Sissingué Gold Project, Côte d’Ivoire” dated 29 May 2015 continue to apply.

The information in this report in relation to Yaouré Mineral Resource and Ore Reserve estimates was previously reported by the Company in compliance with the JORC Code 2012 and NI43-101 in a market announcement released on 3 November 2017. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market release continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Yaouré Gold Project, Côte d’Ivoire” dated 18 December 2017 continue to apply.

3

==> picture [72 x 72] intentionally omitted <==

==> picture [62 x 355] intentionally omitted <==

----- Start of picture text -----

Debt
----- End of picture text -----

Snapshot Of Perseus Mining Limited

Internationally owned, emerging West African focussed gold producer, developer and explorer

Sizeable Mineral Resource & Ore Reserve inventory

Strong production growth profile based on two existing operating mines and one near-development project

Balance sheet capacity and strong future cash flows to fund growth Experienced board & management team who can deliver

……translates to a compelling investment opportunity

4

==> picture [72 x 72] intentionally omitted <==

Recent Achievements

  • Achieved a major turnaround in operating performance at Edikan Gold Mine

  • Completed development of Sissingué Gold Mine ahead of schedule and on budget – ‘commercial production’ declared Apr 1, 2018

  • Completed a positive Definitive Feasibility Study for a third mine, Yaouré Gold Mine, in Oct 2017 - development on track for a possible start late 2018

  • Placed Perseus in a sound financial position, with significant balance sheet capacity to fund a strong growth profile

5

==> picture [73 x 72] intentionally omitted <==

Clearly defined and simple strategy for value creation

Drive continuous improvement in productivity

Expedite new developments

Successfully develop and operate multiple, gold mines in a spread of West African geopolitical settings Deploy capital prudently and efficiently

Leverage team’s extensive skills and experience

Maintain strong ‘Social Licence’

6

==> picture [72 x 72] intentionally omitted <==

Geo-politically diversified asset base in West Africa

==> picture [521 x 32] intentionally omitted <==

----- Start of picture text -----

Our Locations
----- End of picture text -----

Assets

==> picture [683 x 314] intentionally omitted <==

----- Start of picture text -----

Côte d’Ivoire - Sissingué (86%) [1,2 ]
M&I Mineral Resource: 0.8Moz
Ore Reserve: 0.4Moz
Ghana - Edikan (90%) [1]
M&I Mineral Resource: 4.9Moz
Côte d’Ivoire - Yaouré (90%) [3 ] Ore Reserve: 1.9Moz
M&I Mineral Resource: 1.9Moz
Ore Reserve: 1.5Moz
----- End of picture text -----

  • 1 Ore Reserve and Mineral Resource figures stated on 100% basis. , as at 30 June 2017 2 Includes Fimbiasso (formerly called Bélé ) Mineral Resources

Sissingué Gold Mine (5.0+ years) Edikan Gold Mine (6+ years) Yaouré Gold Development Project (8.5+ years)

  • 3 Ore Reserves and Mineral Resources stated on 100% basis ,as at 2 November 2017

7

==> picture [72 x 72] intentionally omitted <==

Edikan Gold Mine – Perseus’s first operating mine

  • Large scale, low grade, multi-pit, open cut gold mining operation that’s produced >1.2 Moz since first gold in 2011

  • 4.9 Moz in M&I Mineral Resources including 1.9 Moz in P&P Ore Reserve at 30 June 2017

  • In 2017, produced 208,226 ozs at an AISC of US$1,109 per oz, 36% more gold, at 26% less cost than in 2016

  • Strong start to 2018, producing 54,622 ozs at a production cost of US$993 per oz in March 2018 quarter

  • Six years of mine life remaining from 30 June 2018 with potential to extend

8

==> picture [72 x 72] intentionally omitted <==

Sissingué Gold Mine – Perseus’s newest mine

==> picture [341 x 369] intentionally omitted <==

  • Smaller, high grade, low cost operation that combines the Sissingué, Fimbiasso East and West deposits

  • Completed construction ahead of schedule and on budget. Commercial production from 1 April 2018

  • Strong start to operations in March 2018 quarter producing 9,405 ozs – all operating parameters in line with or better than expectations

  • 0.8Moz in M&I Mineral Resources including 0.4Moz in P&P Ore Reserves at 30 June 2017

  • Significant potential to extend mine life through continuing exploration of satellite deposits

9

==> picture [72 x 72] intentionally omitted <==

Producing gold ahead of schedule and on budget

==> picture [274 x 206] intentionally omitted <==

==> picture [274 x 206] intentionally omitted <==

==> picture [274 x 206] intentionally omitted <==

==> picture [282 x 198] intentionally omitted <==

==> picture [274 x 198] intentionally omitted <==

==> picture [274 x 200] intentionally omitted <==

10

==> picture [72 x 72] intentionally omitted <==

Yaouré Gold Project – Perseus’s next gold mine

==> picture [402 x 378] intentionally omitted <==

  • High quality development project located close to excellent existing infrastructure.

  • Positive DFS completed in October 2017 confirmed Yaouré to be:

  • Economically attractive – IRR of 27% gold & 32 month payback period at US$1,250

  • Technically robust - 3.3MTPA plant with average annual gold production of 215,000 ounces at an AISC of US$734/oz for first 5 years

  • Readily financeable - realistic capital cost of US$263 million and robust cash flows to service debt

  • Potential to extend 8.5 year mine life through in-pit drilling and exploration of highly prospective surrounding 513 km[2] land package

11

==> picture [72 x 72] intentionally omitted <==

Yaouré Gold Project –Way Forward

  • Programme started to drill out mineralisation near prospective plant and tailings dam sites and convert Inferred Mineral Resources to Ore Reserves

  • Drill results needed for Front End Engineering and Design (FEED) due to start in June 2018 quarter

  • Applied for Exploitation Permit (EP) in January 2018. Mining Convention to be negotiated following grant of EP

  • Early construction works to start once EP granted. Targeting mid-year start.

  • Targeting end of December 2018 to have funding and execution plans in place to allow decision on start of full scale construction

  • Likely 18 month full scale construction period with first production forecast for 2020

12

==> picture [72 x 72] intentionally omitted <==

Attractive long term growth profile

==> picture [589 x 379] intentionally omitted <==

----- Start of picture text -----

Production (koz /yr)
AISC (US$/oz)
600 1,600
500
1,200
400
300 800
200
400
100
0 0
2016 2017 2018 2019 2020 2021
Edikan (LHS) Sissingue (LHS) Yaoure (EST) (LHS) AISC USD/OZ (RHS)
----- End of picture text -----

  • Growth derived from existing assets and JORC Ore Reserves

  • No incremental discovery or acquisition required

  • Delivery of growth a function of:

  • Operating risk - Edikan and Sissingué

  • Financing, development & operating risk - Yaouré

13

==> picture [72 x 72] intentionally omitted <==

Robust Financial Position

  • Working capital of ~US$31M including cash and bullion of ~US$46M at 31 March 2018

  • US$65M debt drawn under credit facilities with further credit of US$5M available as required

  • 130.5M April 2019, A$0.44 warrants currently in the money, potential to yield ~US$45M

  • Significant capacity to borrow at a corporate level to supplement internal cash flows to fund development of Yaouré

  • Strong after tax cash flows forecast from Edikan and Sissingué operations at a gold price of US$1,300/ounce

  • Projected cash flow forecast and debt service capacity underpinned by hedge book of 166,000 ounces of gold forward sales at a weighted average price of US$1,312/ounce at 31 March 2018

14

==> picture [960 x 100] intentionally omitted <==

PERSEUS’S VALUE PROPOSITION

==> picture [73 x 72] intentionally omitted <==

15

==> picture [72 x 72] intentionally omitted <==

Capital Structure

As at 12 April 2018 AUD USD
ASX Share price per share 0.49 0.38
Shares outstanding 1,033 m 1,033 m
**Warrants outstanding1 ** 131 m 131 m
Market capitalisation 507 m 389 m
**Less: Cash2 ** 60 m 46 m
Plus: Debt 3 85 m 65 m
Enterprise value 532 m 408 m

Note:

  1. 143,050,770 warrants were issued as part of the Amara acquisition consideration. Each warrant is exercisable at $0.44 on or before 19 April 2019. If all remaining 130,506,532 warrants outstanding are exercised (12,544,238 warrants have already been exercised) Perseus will receive ~A$57.42m / US$44.1m assuming A$/US$ exchange rate of 0.7686

  2. Includes 31 March 2018 cash balance of A$59.5m which includes 14,240ozs of gold on hand at 31 March 2018, valued at A$24.5m based on a gold price of US$1,324/oz and A$:US$ exchange rate of 0.7686.

  3. Includes US$25m of debt drawn under Edikan’s revolving working capital facility, and US$40 million drawn under the Sissingue Project Loan converted to AUD at a A$:US$ exchange rate of 0.7686 (as at 31 March 2018).

16

==> picture [72 x 72] intentionally omitted <==

Track record of improved operating performance

==> picture [586 x 385] intentionally omitted <==

----- Start of picture text -----

70,000 $2,000
$1,800
60,000
$1,600
50,000 $1,400
$1,200
40,000
$1,000
30,000
$800
$600
20,000
$400
10,000
$200
- $-
Dec 16 Mar 17 Jun 17 Sep 17 Dec 17 Mar 18
Qtr Qtr Qtr Qtr Qtr Qtr
EDIKAN SISSINGUE AISC Production Cost
Ounces
USD per ounce
----- End of picture text -----

17

==> picture [72 x 72] intentionally omitted <==

Short term – on track for for guidance

Parameter Units Guidance FY2018 Guidance FY2018 Guidance FY2018
Dec 17 Half1 Jun 18 Half Full Year
Gold Production ‘000 ounces 108 140-160 250-285
All-In Site Costs $US per ounce 1,104 950 – 1,050 950 – 1,100

Note:

  1. As at 15 March 2018, Perseus is on track to achieve production and cost guidance for the June 2018 Half Year and for FY2018

18

==> picture [72 x 72] intentionally omitted <==

Long term - growth locked in and being delivered

==> picture [609 x 352] intentionally omitted <==

----- Start of picture text -----

Production (koz /yr)
AISC (US$/oz)
600 1,600
500
1,200
400
300 800
200
400
100
0 0
2016 2017 2018 2019 2020 2021
----- End of picture text -----

..and as the track record of performance extends and de-risking continues, Perseus’s share price should respond, further closing the value gap.

==> picture [479 x 11] intentionally omitted <==

----- Start of picture text -----

Edikan (LHS) Sissingue (LHS) Yaoure (EST) (LHS) AISC USD/OZ (RHS)
----- End of picture text -----

19

==> picture [72 x 72] intentionally omitted <==

Value Proposition Is Clear….

  • At A$0.49 per share, Perseus’s shares trades at a discount to broker’s consensus NAV/share

  • Value gap reflects perceptions of operating, financing and development risk

  • A major turn-around has occurred at Perseus with mounting evidence of derisking of the business

  • Value gap closing with recent strong performance and recognition of growth profile but still a compelling investment opportunity……..

20

==> picture [579 x 540] intentionally omitted <==

Contact Us

==> picture [203 x 88] intentionally omitted <==

ASX/TSX: PRU www.perseusmining.com

Jeff Quartermaine Managing Director & CEO +61 8 6144 1700

Nathan Ryan Media Relations (Australia) +61 420 582 887

21

==> picture [72 x 72] intentionally omitted <==

APPENDICES

==> picture [921 x 151] intentionally omitted <==

22

Aerial view of Processing facility at Perseus’s second mine, Sissingué,

==> picture [72 x 72] intentionally omitted <==

Experienced Board of Directors & Management team

==> picture [96 x 111] intentionally omitted <==

Sean Harvey Non-Executive Chairman

==> picture [86 x 99] intentionally omitted <==

==> picture [109 x 111] intentionally omitted <==

Jeff Quartermaine Managing Director and CEO

==> picture [99 x 111] intentionally omitted <==

==> picture [100 x 109] intentionally omitted <==

Colin Carson Executive Director

==> picture [97 x 99] intentionally omitted <==

John McGloin Non-Executive Director

Sally-Anne Layman Non-Executive Director

Mike Bohm Non-Executive Director

23

==> picture [72 x 72] intentionally omitted <==

Perseus’s Senior Management Team

Role

Team Member

Chief Executive Officer & Managing Director Jeffrey Quartermaine Executive Director – Commercial Services Colin Carson Chief Operating Officer Chris Woodall Chief Financial Officer Elissa Brown

Chief Financial Officer

Group General Manager (Technical Services) Group General Manager (Development) Group General Manager (Exploration)

Paul Thompson Matt Scully

Doug Jones Stephen Ndede Merlin Thomas Martijn Bosboom

General Manager – Edikan Gold Mine General Manager – Sissingué Gold Mine General Counsel and Company Secretary

Experienced and capable senior management team ably supported by strong in-country operating teams & oversight by credible Board of Directors

24

==> picture [72 x 72] intentionally omitted <==

Strong ‘social licence to operate’ in West Africa

  • Perseus’s strong social licence to operate in both Ghana and Côte d’Ivoire is:

  • Built on trust and track record of delivering on promises

  • A critical defence against negative external forces e.g. security threats, illegal “artisanal” miners etc.

  • Linked to workforce productivity especially when high proportion of mine labour is drawn from local catchment area

  • Management of expectations of government and the community combined with delivery on promises are the keys to success

25

==> picture [72 x 72] intentionally omitted <==

Delivery on promises is important in the context of social licence

==> picture [335 x 252] intentionally omitted <==

==> picture [580 x 361] intentionally omitted <==

==> picture [301 x 73] intentionally omitted <==

26

==> picture [960 x 39] intentionally omitted <==

Edikan Measured + Indicated Mineral Resource Estimate

==> picture [195 x 56] intentionally omitted <==

Deposit Deposit
Type
Measured Resources Measured Resources Measured Resources Indicated Resources Indicated Resources Indicated Resources Measured + Indicated Resources Measured + Indicated Resources Measured + Indicated Resources
Quantity
Mt
Grade
g/t gold
Gold ‘000
oz
Quantity
Mt
Grade
g/t gold
Gold ‘000
oz
Quantity
Mt
Grade
g/t gold
Gold
‘000 oz
AF Gap1,2,3
Fobinso1,2,3
Esuajah North1,2,3
Fetish1,2,3,4
Chirawewa North1,2,3
Chirawewa South1,2,3
Bokitsi South1,2,3
Open Pit
Open Pit
Open Pit
Open Pit
Open Pit
Open Pit
Open Pit
11.0
0.97
341
2.4
1.09
85
9.9
0.95
302
9.6
1.00
310
1.1
0.79
27
0.1
1.16
5
0.9
2.57
71
35.6
0.84
961
11.3
0.94
344
17.9
0.88
510
23.9
0.90
691
4.8
0.79
122
0.4
1.07
15
1.1
1.90
66
46.6
0.87
1,302
13.8
0.97
428
27.8
0.91
812
33.5
0.93
1,001
5.9
0.79
149
0.6
1.09
21
1.9
2.20
137
Sub-Total Open Pit 34.9
1.02
1,141
95.1
0.89
2,709
130.1
0.92
3,850
Esuajah South5
Heap Leach6
ROM Stockpiles
U/ground
Stockpile
Stockpile
8.5
1.9
533
-
-
-
2.5
0.64
51
6.3
1.7
353
4.3
0.6
89
-
-
-
14.8
1.8
879
4.3
0.6
89
2.5
0.64
51
Total 45.9
1.16
1,725
105.7
0.92
3,151
151.6
0.99
4,869

Notes:

  1. Based on January 2017 resource estimates. 2. Depleted to 30 June 2017 mining surfaces. 3. 0.4g/t gold cut-off applied.

  2. Includes Bokitsi North lode. 5. 0.7g/t gold cut-off grade applied. 6. At zero cut-off grade.

  3. All Mineral Resources current as at 30 June 2017. 8. Mineral Resources are inclusive of Ore Reserves. 9. Rounding of numbers to appropriate precisions may have resulted in apparent inconsistencies

27

==> picture [960 x 39] intentionally omitted <==

Edikan Ore Reserve Estimate

==> picture [195 x 56] intentionally omitted <==

Deposit Proved Reserves Proved Reserves Proved Reserves Probable Reserves Probable Reserves Probable Reserves Proved & Probable
Reserves
Proved & Probable
Reserves
Proved & Probable
Reserves
Strip
Ratio5
Quantity
Mt
Grade
g/t gold
Gold
‘000 oz
Quantity
Mt
Grade
g/t gold
Gold
‘000 oz
Quantity
Mt
Grade
g/t gold
Gold
‘000 oz
AF Gap
Fobinso1
Esuajah North1
Fetish1
Chirawewa1
Bokitsi South
5.5
1.09
191
1..0
1.22
38
5.1
1.10
179
4.5
1.21
176
0.2
0.95
6
0.5
2.98
44
6.0
1.07
208
3.1
1.13
111
6.5
1.04
218
7.7
1.11
275
1.2
0.97
37
0.1
2.82
10
11.5
1.08
399
4.0
1.15
149
11.6
1.07
396
12.2
1.15
451
1.4
0.97
43
0.6
2.95
54
3.6
1.9
2.1
3.2
1.2
7.5
Sub TOTAL 16.7
1.18
634
24.6
1.09
857
41.2
1.12
1,491
2.9
Esuajah South UG
Heap Leach
ROM Stockpiles
-
-
-
-
-
-
2.5
0.64
51
4.9
1.99
312
4.4
0.63
89
-
-
-
4.9
1.99
312
4.4
0.63
89
2.5
0.64
51
0
0
0
Total 19.1
1.11
685
33.8
1.16
1,259
53.0
1.14
1,943
2.2

Notes:

  1. Allows for mining depletion to 30 June 2017.

  2. Based on December 2016 Ore Reserve estimate.

  3. All Ore Reserves current as at 30 June 2017.

  4. Variable gold grade cut-off based on recovery of each material type in each deposit: Oxide 0.35 – 0.40 g/t, Transition 0.50 – 0.65 g/t and Fresh 0.45 – 0.55 g/t. 5. Inferred Mineral Resource is considered as waste, t : t.

  5. Numbers contain some rounding.

28

==> picture [960 x 39] intentionally omitted <==

==> picture [195 x 56] intentionally omitted <==

Sissingué - Measured + Indicated Mineral Resource Estimate[1]

==> picture [657 x 400] intentionally omitted <==

  1. Includes Sissingué, Bélé East and Bélé West mineral deposits, compliant with JORC Code 2012

29

==> picture [960 x 39] intentionally omitted <==

Sissingué - Ore Reserve Estimate[1]

==> picture [195 x 56] intentionally omitted <==

==> picture [805 x 270] intentionally omitted <==

  1. Includes Sissingué, Bélé East and Bélé West Ore Reserves, compliant with JORC Code 2012

30

==> picture [960 x 39] intentionally omitted <==

Yaouré - Measured + Indicated Mineral Resource Estimate

==> picture [195 x 56] intentionally omitted <==

Deposit Deposit
Type
Indicated Resources Inferred Resources
Quantity
Grade
Gold
Quantity
Grade
Gold
Mt
g/t gold
Mozs
Mt
g/t gold
Mozs
CMA
Yaouré
Open Pit
Open Pit
24.8
1.81
1.44
16.5
0.81
0.43
16
1.2
0.6
30
0.9
0.9
Sub-Total Open Pit 41.3
1.41
1.87
46
1.0
1.5
Heap Leach4 Stockpile 1.8
1.02
0.06

Total
43.1
1.39
1.93
46
1.0
1.5

==> picture [757 x 139] intentionally omitted <==

31

==> picture [960 x 39] intentionally omitted <==

Yaouré - Ore Reserve Estimate

==> picture [195 x 56] intentionally omitted <==

Deposit
Deposit Type
Proved
Quantity
Grade
Gold
Mt
g/t gold
koz
Deposit
Deposit Type
Proved
Quantity
Grade
Gold
Mt
g/t gold
koz
Deposit
Deposit Type
Proved
Quantity
Grade
Gold
Mt
g/t gold
koz
Probable Proved + Probable
Quantity
Grade
Gold
Quantity
Grade
Gold
Mt
g/t gold
Moz
Mt
g/t gold
Moz
CMA
Yaouré
Sub-Total
Heap Leach
6
Open Pit
Open Pit
Open Pit
Stockpile
20.7
1.97
1.31
4.7
1.04
0.15
25.3
1.80
1.47
1.4
1.14
0.05
20.7
1.97
1.31
4.7
1.04
0.15
25.3
1.80
1.47
1.4
1.14
0.05
Total 26.8
1.76
1.52
26.8
1.76
1.52

Notes:

Numbers are rounded and may not add up correctly in the table All the estimates are on a dry tonne basis

Based on November 2017 Mineral Resource estimation

Variable gold cut-off grade based on material type Inferred Mineral Resource is treated as mineralised waste

Heap Leach refers to decommissioned heap leach pads established by prior owners of Yaouré

32