DECEMBER 2017 QUARTER ACTIVITIES REPORT

OVERVIEW

==> picture [156 x 48] intentionally omitted <==

ASX/TSX code : PRU

Perseus has delivered its fourth consecutive quarter of strong operating performance across all parts of its business and materially advanced its transformation into a West African focussed, multi-mine gold producer, developer and explorer. Highlights of the December 2017 quarter included:

Capital structure as at 30 Jan 2018:

Ordinary shares: 1,033,285,944 Outstanding warrants: 130,511,203 Unvested performance rights: 19,700,000

Directors:

Mr Sean Harvey Non-Executive Chairman Mr Jeff Quartermaine Managing Director & CEO Mr Mike Bohm Non-Executive Director Mr Colin Carson

Executive Director Mr Alex Davidson

Non-Executive Director Ms Sally-Anne Layman Non-Executive Director Mr John McGloin Non-Executive Director

Registered Office:

Level 2

437 Roberts Road Subiaco WA 6008 Telephone: +61 8 6144 1700 Email: [email protected] Website: www.perseusmining.com

Contacts:

For clarification of details, contact:

Jeff Quartermaine - Managing Director & CEO by email at [email protected]

or

Nathan Ryan - Media Relations on +61 4 20 582 887 or by email at [email protected]

  • Perseus’s Edikan Gold Mine in Ghana (“Edikan”) produced 56,699 ounces of gold for the quarter, 11% more than in the previous quarter and 76% more than the corresponding period in 2016.

  • Annual gold production of 208,226 ounces in calendar year 2017 was the highest annual total since commercial production started in 2012.

  • Edikan’s quarterly production cost was US$998 per ounce and its all-in site cost (“AISC”) was US$1,093 per ounce, 2% less than the prior quarter and 41% less than the corresponding period in 2016. On an annual basis, the AISC was US$1,109 per ounce, 28% less than in 2016.

  • The average price of gold sold during the quarter was US$1,260 per ounce and for the full year, US$1,275 per ounce, generating positive cash margins of US$167 per ounce and US$166 per ounce in each of the periods.

  • Development of the Sissingué Gold Mine in Côte d’Ivoire (“Sissingué”), Perseus’s second operating mine, progressed strongly with first gold being poured at Sissingué on 26 January 2018, a month ahead of schedule and on budget. The mine is on track to start commercial gold production on or before 31 March 2018.

  • The positive Definitive Feasibility Study for the Yaouré Gold Project in Côte d’Ivoire (“Yaouré”), Perseus’s planned third gold mine, confirmed that Yaouré is economically attractive and has a strong production and relatively low cost profile over its currently defined 8.5 year mine life, with significant potential for extension.

  • Perseus’s stated production and cost guidance for the June 2018 half year is unchanged at 140-160,000 ounces at an AISC of US$950–US$1,050 per ounce. Guidance is also unchanged for the full 2018 fiscal year at 250285,000 ounces at an AISC of US$950–US$1,100 per ounce underlining the Company’s steady progress towards achieving its goal of annual production of 500,000 ounces from three operating gold mines.

  • At 31 December 2017, Perseus held cash and bullion of A$45.3 million, had undrawn lines of credit of US$20 million and outstanding bank debt of US$50 million. Perseus also had the price of 150,522 ounces of gold hedged at an average forward price of US$1,285 per ounce.

30 January 2018

Page 1

==> picture [119 x 36] intentionally omitted <==

OPERATIONS

Edikan Gold Mine, Ghana

==> picture [256 x 55] intentionally omitted <==

Edikan’s operating performance during the Quarter is summarised as follows:

Table 2: Quarterly Performance Statistics

Parameter Unit June 2017
Half Year
Sept 2017
Quarter
Dec 2017
Quarter
Dec 2017
Half Year
2017
Full Year
Gold Production & Sales
Total material mined:
8,814,705
20,433,900
4,659,710
1.08
3.4
4,059,189
0.6
3,462,456
1.13
86
108,008
103,946
1,274
3.13
10.32
1.50
1,007
80
1,087
17
1,104
0.54
17,024,917
38,601,292
9,296,498
1.07
3.2
4,059,189
0.6
7,091,779
1.07
85
208,226
212,796
1,275
3.04
9.97
1.48
988
85
1,073
36
1,109
1.37

Volume
bcm1
8,210,212 4,762,944 4,051,761

Weight
Tonnes
18,167,392 10,908,941 9,524,959
Total ore mined
Tonnes
Average ore grade mined
g/t gold
Strip ratio
t:t
Ore stockpiles:
4,636,788
1.05
2.9
2,285,282
1.07
3.8
2,374,428
1.10
3.0

Quantity
Tonnes
2,861,934 3,565,601 4,059,189

Grade
g/t gold
0.6 0.7 0.6
Ore milled
Tonnes
Milled head grade
g/t gold
Gold recovery
%
Gold produced
Ozs
Gold sales3
Ozs
Average sales price
US$/oz
Unit Costs
Mining cost
US$/t mined
Processing cost
US$/t milled
G & A cost
US$M/month
All-In Site Cost
Production cost
US$/oz
Royalties
US$/oz
Sub-total
US$/oz
Sustaining capital
US$/oz
Total All-In Site Cost
US$/oz
3,629,323
1.02
84
100,218
108,850
1,276
2.93
9.63
1.42
965
90
1,055
57
1,112
1,581,616
1.16
87
51,309
50,105
1,290
2.83
10.61
1.53
1,017
83
1,100
16
1,116
1,880,839
1.10
86
56,699
53,842
1,260
3.49
10.08
1.47
998
78
1,076
17
1,093
Site Exploration Cost
_US$M _
0.83 0.26 0.28

Notes: 1 . Denotes bank cubic metres 2. Denotes grams of gold/tonne of ore

3. Gold sales are recognised in Perseus’s accounts when the contracted gold refiner takes delivery of gold in the gold room.

Edikan produced 56,699 ounces of gold during the December 2017 quarter, continuing the trend of strong production performance achieved in the previous three quarters. The result was 11% higher than in the September 2017 quarter and 76% more than the December 2016 quarter.

On a full year basis, gold production totalled 208,226 ounces in calendar year 2017, the highest annual production since commercial production started at Edikan in 2012, and 36% more than the amount of gold produced in calendar year 2016.

30 January 2018

Page 2

==> picture [119 x 36] intentionally omitted <==

The strong result for the quarter was driven primarily by improved plant run-time and throughput rate of 10% and 8% respectively, resulting in 19% more ore being processed during the quarter relative to the prior period. (Refer to Table 3 .) This material improvement can be attributed to a range of factors including improved maintenance practices, improved blending of the mill feed, improved fragmentation of mill feed using an increased powder factor and a mobile crusher to supplement the primary crusher.

Table 3: Plant Performance Statistics

Mar 2017
Quarter
Jun 2017
Quarter
Sept 2017
Quarter
Dec 2017
Quarter
Full Year
2017
Crusher
Run time (%)
Hourly throughput rate (t)
SAG Mill
Run time (%)
Hourly throughput rate (t)
58
1,249
90
932
54
1,335
89
938
43
1,487
85
845
50 49
1,350 1,413
94 89
911 880
Gold recovery rate(%) 83 86 87 86 86

The 19% quarter on quarter increase in mill throughput was partially offset by a 5% lower average head grade of processed ore at 1.10 g/t gold and a 1% decrease in the gold recovery rate to 86% during the quarter. In combination, the net result was that 11% more gold was produced in the December 2017 quarter relative to the September 2017 quarter and 8% more gold was produced in the December 2017 half year relative to the June 2017 half year, confirming the strong trend of operating improvement at Edikan.

An exercise conducted during the Quarter aimed at checking the reconciliation of tonnes, head grade and contained gold ounces estimated in the Edikan Mineral Resource block model relative to estimates by grade control modelling has indicated that over a 12 month period from the date of adoption of MIK modelling techniques in January 2017, reconciliation of contained metal was close to 100%. A feature of this analysis was that while reconciliation over an extended period is very good, on a short term horizon, significant positive and negative variances do occur. A similar variability occurs in the reconciliation between the grade control model and the mill, which has a direct impact on month to month gold production and also impacts quarterly gold production. Arising from the reconciliation exercise, a series of potential improvements in the modelling, mining and processing areas aimed at reducing variability were identified and are being implemented.

Unit mining costs increased from $2.83/tonne to US$3.49/tonne reflecting lower total material movements over which to spread the contractor’s fixed costs (which contributed to half of the unit cost increase), adoption of a higher powder factor to improve rock breakage and greater haul distances as pits deepened. Unit processing costs decreased 5% from $10.61/tonne from US$10.08/tonne notwithstanding the 19% increase in tonnes of ore processed. The increase in total processing cost base (which is divided by the number of tonnes processed to calculate unit costs) was the result of several factors including increased rehandling of ore on the ROM to improve the blend of ore feed plus the temporary use of a mobile crusher to supplement the primary crusher pending a major overhaul carried out in December 2017. G&A costs were relatively flat quarter-on-quarter at an average of US$1.47 million per month compared to US$1.53 million in the prior quarter.

Unit production costs for the Quarter (including all mining including waste stripping, processing and G&A costs but excluding royalty) decreased by 2% to US$998 per ounce compared to US$1,017 per ounce in the prior period. After accounting for a slight decrease in royalty payments and a slight increase in sustaining capital, the AISC for the Quarter at Edikan was US$1,093 per ounce, about 2% lower than the AISC in the September 2017 quarter (US$1,117 per ounce) and about 2% lower than the average AISC of the previous three quarters (US$1,113 per ounce).

30 January 2018

Page 3

==> picture [119 x 36] intentionally omitted <==

Outlook for Operations in financial year ending 30 June 2018

Looking forward to the second half of FY2018, Perseus will continue producing gold from Edikan and will also start producing gold from Sissingué, part way through the period. Total production and AISC guidance for the Perseus Group for FY2018 remains unchanged as follows:

Table 4: FY2018 Group Production and Cost Guidance

Parameter Units Production and Cost Guidance Production and Cost Guidance
June 2018 Half Year Full Fiscal Year 2018
Group gold production
Group average all-In site costs
‘000 ounces
$US per ounce
140-160,000
950-1,050
250-285,000
950-1,100

DEVELOPMENT

Sissingué Gold Mine, Côte d’Ivoire

Recent Achievements

Development of Perseus’s second gold mine at Sissingué progressed strongly on all fronts during the quarter with construction ahead of schedule and on budget. Subsequent to the end of the Quarter:

  • Crushed ore was introduced to the mill and CIL plant for the first time on 13 January 2018;

  • First gold was produced approximately one month ahead of schedule on 26 January 2018;

  • The ramp up of operations to full scale commercial production is on schedule for completion on or before 31 March 2018;

  • Current forecasts indicate that the US$107 million capital cost estimate for the full development of the Sissingué mine and infrastructure, excluding early works but including operational readiness initiatives, will not be exceeded.

Outlook for Sissingué

Based on the updated life of mine plan for Sissingué published in March 2017, estimated gold production totals 358,000 ounces over the life of mine including approximately 80,000 ounces per annum for the first 3.25 years and approximately 70,000 ounces per annum over the full five year life of mine. Forecast average weighted allin site costs, including all direct production costs, royalties, waste stripping costs and sustaining capital expenditure, are estimated at approximately US$630 per ounce over the mine life.

Significant potential exists to increase Sissingué’s currently delineated Mineral Resources, Ore Reserves and mine life. Perseus has developed exploration programmes targeting mineralisation located within trucking distance of the mine and implementation of these programmes is scheduled to start in the March 2018 quarter.

30 January 2018

Page 4

==> picture [119 x 36] intentionally omitted <==

==> picture [493 x 332] intentionally omitted <==

Aerial view of Sissingué Plant site

Yaouré Gold Project, Côte d’Ivoire

Definitive Feasibility Study

The Definitive Feasibility Study for Yaouré, Perseus’s prospective third gold mine, was completed on schedule during the Quarter, confirming the high quality of the project and the significant potential contribution that it can make to Perseus’s short to medium term plans. The DFS has demonstrated that:

  • Yaouré economics are attractive at a range of gold prices and discount rates:

Table 5: Key Economic Parameters

Gold Price
(US$/Oz)
IRR1
(%)
Payback
(Months)
NPV5
NPV10
US$ m
A$/sh
US$ m
A$/sh
Payback
(Months)
NPV5
NPV10
US$ m
A$/sh
US$ m
A$/sh
Payback
(Months)
NPV5
NPV10
US$ m
A$/sh
US$ m
A$/sh
Payback
(Months)
NPV5
NPV10
US$ m
A$/sh
US$ m
A$/sh
Payback
(Months)
NPV5
NPV10
US$ m
A$/sh
US$ m
A$/sh
1,200 23 35 210 0.26 130 0.16
1,250 27 32 259 0.33 170 0.21
1,300 30 30 302 0.38 205 0.26
1,350 33 28 351 0.44 245 0.31

1 After tax, ungeared

  • Yaouré is technically very robust, with attractive operating metrics based on an estimated Ore Reserve of 26.8 Mt of ore grading 1.76g/t gold containing 1.52 million ounces of gold.

30 January 2018

Page 5

==> picture [119 x 36] intentionally omitted <==

Table 6: Key Operating and Cost Parameters

Technical Parameters Annual Average
Years 1-5
Total Life
of Mine2
Ore mined Mt 4.61 26.81
Strip ratio t:t 5.4:11 5.1:11
Ore processed Mt 3.3 26.8
Head grade g/t gold 2.27 1.76
Gold recovery rate % 90.1 90.1
Gold production ‘000 ounces 215 1,367
Unit Operating Costs
Production costs US$/oz 670 690
Royalty US$/oz 44 44
Sustaining capital US$/oz 20 25
Average All-in site costs
US$/oz
734
759

1 Includes ore mined ex-pit plus ore drawn from decommissioned heap leach pads

2 Total mine life is 8.5 years

  • An upfront development cost of US$263 million including US$11 million of pre-stripping costs is well within Perseus’s funding capacity using internally generated cash from its Edikan and Sissingué Gold Mines combined with bank finance.

  • Yaouré has good potential for growth, being located on a very prospective tenement package that provides significant potential to incrementally expand Mineral Resources and Ore Reserves and rapidly extend expected mine life through further drilling in and around the planned pits as well as systematic exploration of the surrounding 513 km[2] land holding.

  • Yaouré is highly likely to create the significant value envisaged by Perseus when the project was studied in detail prior to its acquisition in April 2016.

The Way Forward for Yaouré

In January 2018, Perseus lodged an application with the Ivorian Minerals Commission for the granting of an Exploitation Permit (“EP”) covering the Yaouré project development area. Negotiation with the government of Côte d’Ivoire of a Mining Convention to apply throughout the projected life of Yaouré is expected to start while the EP application is being considered.

Following the award of the EP, which is currently expected in the June 2018 quarter, the final instalment of crop and land compensation will be paid to relevant stakeholders and minor early works designed to secure the site and facilitate a rapid ramp up of full scale construction activities once a development decision is taken, are expected to start.

Perseus has engaged the services of a leading corporate advisor to assist in evaluating the full range of financing alternatives that are available to fund the development of Yaouré. In selecting components of the preferred funding package, Perseus’s key objective will be to maximise returns for existing shareholders and in this regard, speed and risk of execution will also be important factors to consider. The evaluation of alternatives is expected to be complete by the end of the March 2018 quarter. Implementation of a board approved financing plan is expected to follow shortly there-after.

Further critical tasks to be undertaken during the June 2018 Half Year to prepare for a development decision in the December 2018 Half Year include:

30 January 2018

Page 6

==> picture [119 x 36] intentionally omitted <==

  • A planned exploration programme aimed at delineating Mineral Resources in areas where mineralisation was discovered during recent sterilisation drilling of the previously proposed plant site and tailings dam is planned for execution during the March 2018 quarter. Further drilling will also be undertaken to upgrade Inferred Mineral Resources located within the optimised pit shell to Measured or Indicated categories. This work is expected to result in an upgrade in Yaouré’s Ore Reserves later in 2018.

  • Front end engineering and design (“FEED”) of the Yaouré mine and infrastructure is planned to start in the June 2018 quarter once information from the resource drilling programme is to hand to assist in finalising the location of key infrastructure. This work will provide an estimate of capital costs that is accurate to +/10%, information that is essential for finalising financing plans.

  • Development of a comprehensive execution plan including a comprehensive contracting strategy, work force planning and operations readiness plan will start during the June 2018 quarter based on information derived from FEED.

EXPLORATION

Côte d’Ivoire Exploration

==> picture [129 x 53] intentionally omitted <==

Sissingué Exploitation Permit

Papara Prospect

The Papara prospect is an area of extensive artisanal mining located 20 kilometres north of the Sissingué mine site ( Appendix A - Figure 1 ). Regolith mapping, combined with interpretation of airborne magnetic and radiometric data and scout auger drilling was conducted during the quarter to better define regolith geology and provide a better understanding of the widespread gold in soil anomalism throughout the district. This work identified several targets for follow-up detailed augering, most notably at the Tiongoli and Zekoundougou prospects, to commence in the next quarter.

Regolith mapping, combined with interpretation of airborne magnetic and radiometric data, was also conducted over the southern part of the Sissingué permit, covering the Zanikan-Gbeni-Katara district. This is an area of extensive artisanal workings and widespread soil gold anomalism, but as in the Papara district, historical wide spaced rotary air blast (“RAB”) drilling encountered only sporadic anomalous bedrock mineralisation. Interpretation of the aero magnetics and relogging of chips from the historical drilling, combined with inspection of artisanal pits confirmed the presence of dioritic intrusives similar to those hosting the Papara mineralisation, increasing the chances that significant mineralisation may be found nearby. Detailed augering to refine Perseus’s understanding of the geochemical anomalism is planned to commence in the next quarter.

Mahalé Exploration Permit

Data from the airborne magnetic and radiometric survey flown earlier in 2017 was used to inform regolith mapping and a reassessment of historical soil geochemistry covering the Bélé East and West prospects. Areas of combined soil and auger anomalism, structural complexity and magnetic anomalism will be prioritised for air core (“AC”) drilling during the next quarter.

Yaouré Exploration Permits

A total of 1,809 metres of AC drilling (Refer to Appendix A - Figures 2, 3 and Table 1 and Appendix B .) was completed over extensions of the CMA zone to the northeast of previous sterilisation drilling for the planned mill site. The sterilisation drilling returned several anomalous intersections, suggesting the CMA zone may follow the contact between basalts that host the main CMA zone and the volcaniclastic basin to the northeast. The more significant results returned from the AC drilling programme included:

30 January 2018

Page 7

==> picture [119 x 36] intentionally omitted <==

Table 7: Selection of Yaouré drill results

Drill Hole
Number
Location Intercept
YAC0662 223,546E; 779,067N 3m @ 31.71 g/t Au from 51m, including 1m @ 86.68 g/t
YAC0659 223,143E; 778,792N 4m @ 2.86 g/t Au from 14m, including 1m @ 9.71 g/t Au from 14m
YAC0660 223,129E; 778,821N 2m @2.60 g/t from 53m
YAC0663 223,531E; 779,088N 6m @1.58 g/t Au from surface
YAC0653 223,228E; 778,653N 3m @ 1.57 g/t from 22m, including 1m @ 3.32 g/t Au from 22m
YAC0658 223,161E; 778,772N 9m @ 1.48 g/t Au from 47m, including 2m @ 3.53 g/t Au from 53m
YAC0649 223,031E; 778,994N 2m @ 1.24 g/t Au from 55m

These intercepts occur along strike from east-west trending artisanal workings in basalts, and is a different zone to an historical intercept of 9m at 1.07 g/t that appears to be on or close to the basalt-volcaniclastic contact. Drilling to infill between the initial lines to undercut some of the better intersections, and to extend drill coverage to the interpreted basalt-volcaniclastic contact, is currently in progress.

Zouan Hounien Exploration Permit

Results were received from auger sampling over the northern part of this permit, located in the Ity district of western Côte d’Ivoire. Previous soil sampling by the Company had identified patchy, low level gold anomalism in a favourable structural position several kilometres west of Endeavour Mining’s multi-million ounce Ity deposit. Unfortunately the auger sampling confirmed the low tenor of the gold in soil anomalism extends into bedrock, thereby severely downgrading the potential of the property. The Company will look to relinquish its interest in this property.

Ghana Exploration

Exploration activities in Ghana continued to focus on following up targets generated from the interpretation and targeting exercise conducted at Edikan by consulting group Corporate Geoscience Group in late 2016. (Refer to Appendix B - Figure 4 ).

Drilling of resistivity anomalies defined by airborne electro-magnetics, interpreted to reflect potential granite bodies, has confirmed the presence of weakly mineralised granitic dyke swarms along the Esuajah intrusive trend. Although the gold grades of these dykes have not been economic where intersected, they are being worked by artisanal miners further south on the Company’s permits at the Abreshia prospect. This zone is being mapped and sampled by the Company’s geologists prior to planned drill testing.

Soil sampling was completed over two other CGSG targets, Huntado and Saa, and encouraging gold-in-soil anomalism was identified at both sites. Deep auger drilling is planned to further refine these targets prior to drill testing.

CORPORATE

Cash and Bullion

Based on the gold price of US$1,291 per ounce and an A$:US$ exchange rate of 0.7807 as at 31 December 2017, the total value of available cash and bullion on hand at the end of the Quarter was $45.3 million. This sum that includes cash of A$21.8 million and 14,218 ounces of bullion on hand, valued at A$23.5 million, is $2.8 million less than the $48.1 million balance of cash and bullion as at 30 September 2017. The decrease in cash and bullion during the Quarter takes into account positive inflows from Edikan (A$12.3 million), negative working capital movements (A$22.1 million), Sissingué facility draw down (US$15.0 million), revolving corporate debt facility draw down (US$15.0 million), capital investment at Sissingué (A$19.2 million), exploration and evaluation expenditure (A$3.4 million) and corporate costs.

30 January 2018

Page 8

==> picture [119 x 36] intentionally omitted <==

Gold Price Hedging

At the end of the Quarter, gold forward sales contracts were in place for 150,522 ounces of gold at a weighted average price of US$1,285 perounce.

Debt Financing

During the Quarter, a further US$15 million was drawn under the US$40 million Sissingué project debt facility provided by Macquarie Bank Limited, bringing the total drawn amount US$25 million. The US$15 million balance remaining available under the facility may be drawn in coming months to fund completion of the Sissingué mine development.

The Company’s US$20 million working capital debt facility provided to Perseus’s Ghanaian subsidiary by Macquarie Bank Limited was converted into a US$30 million revolving line of credit to improve flexibility in terms of managing working capital and fund high potential exploration activities in coming months. The amount drawn at the end of the Quarter was US$25 million. Perseus has no other debts other than its trade creditors that are payable in the ordinary course of business.

PROGRAM FOR THE MARCH 2018 QUARTER

Edikan

  • Produce gold at a total all-in site cost is in line with June 2018 Half Year guidance;

  • Continue to implement practices aimed at optimising and improving mine to mill performance;

  • Continue training operating and maintenance staff;

  • Continue to implement business improvement initiatives across all departments at Edikan; and

  • Assess exploration targets and prepare drill programmes for targets identified by the recent review of geological datasets relating to the Edikan mining leases.

Sissingué

  • Complete commissioning of the Sissingué mine and plant and ramp up to full scale gold production.

  • Complete implementation of operational readiness plans; and

  • Resume drilling at the Papara prospect with the aim of determining the potential for additional Mineral Resources which could be processed at the Sissingué processing facility.

Yaouré

  • File documentation required for an application for an Exploitation Permit to operate the Yaouré mine and commence discussions on the terms of a Mining Convention for the mine;

  • Plan and commence implementation of the next phase of Resource definition drilling adjacent to the proposed Yaouré and CMA pits;

  • Plan a programme of early work to establish the project site in readiness for a decision to commence full scale construction; and

  • Develop a definitive financing plan to fund the Yaouré development and commence preparations for implementation of the plan.

Jeff Quartermaine Managing Director and Chief Executive Officer

30 January 2018

30 January 2018

Page 9

==> picture [119 x 36] intentionally omitted <==

To discuss any aspect of this announcement, please contact:

Managing Director: Jeff Quartermaine at telephone +61 8 6144 1700 or email [email protected];

Media Relations : Nathan Ryan at telephone +61 4 20 582 887 or email [email protected] (Melbourne)

Competent Person Statement :

All production targets for Edikan, Sissingué and Yaouré referred to in this report are underpinned by estimated Ore Reserves which have been prepared by competent persons in accordance with the requirements of the JORC Code.

The information in this report in relation to Edikan Mineral Resource and Ore Reserve estimates was first reported by the Company in compliance with the JORC Code 2012 and NI43-101 in a market announcement released on 21 February 2017 and was updated for depletion in the Financial Statements released on 30 August 2017. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market release continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Central Ashanti Gold Project, Ghana” dated 30 May 2011 continue to apply.

The information in this report that relates to Mineral Resources for Sissingué was first reported by the Company in compliance with the JORC Code 2012 and NI43-101 in a market announcement released on 15 December 2016. The information in this report that relates to Mineral Resources for Bélé was first reported by the Company in compliance with the JORC Code 2012 and NI43-101 in a market announcement released on 20 February 2017. The information in this report that relates to Ore Reserves for the Sissingué and Bélé was first reported by the Company in compliance with the JORC Code 2012 and NI43-101 in a market announcement released on 31 March 2017. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in those market releases continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Sissingué Gold Project, Côte d’Ivoire” dated 29 May 2015 continue to apply.

The information in this report in relation to Yaouré Mineral Resource and Ore Reserve estimates was previously published in a market release dated 3 November 2017. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market release continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Yaouré Gold Project, Côte d’Ivoire” dated 18 December 2017 continue to apply.

The information in this report and the attachments that relates to exploration drilling results at the Yaouré Gold Project is based on, and fairly represents, information and supporting documentation prepared by Dr Douglas Jones, a Competent Person who is a Chartered Professional Geologist. Dr Jones is the Group General Manager Exploration of the Company. Dr Jones has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’”) and to qualify as a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Dr Jones consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Caution Regarding Forward Looking Information :

This report contains forward-looking information which is based on the assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of gold, continuing commercial production at the Edikan Gold Mine without any major disruption, development of a mine at Sissingué and/or Yaouré, the receipt of required governmental approvals, the accuracy of capital and operating cost estimates, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used by the Company. Although management believes that the assumptions made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the forward-looking information will prove to be accurate.

30 January 2018

Page 10

==> picture [119 x 36] intentionally omitted <==

Forward-looking information involves known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, the actual market price of gold, the actual results of current exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's publicly filed documents. The Company believes that the assumptions and expectations reflected in the forward-looking information are reasonable. Assumptions have been made regarding, among other things, the Company’s ability to carry on its exploration and development activities, the timely receipt of required approvals, the price of gold, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers should not place undue reliance on forward-looking information. Perseus does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

30 January 2018

Page 11

==> picture [119 x 36] intentionally omitted <==

APPENDIX A – EXPLORATION PROJECTS

==> picture [307 x 11] intentionally omitted <==

----- Start of picture text -----

Figure 1: Sissingué Gold Project and Mahalé Permits and Prospects
----- End of picture text -----

==> picture [486 x 581] intentionally omitted <==

30 January 2018

Page 12

==> picture [119 x 36] intentionally omitted <==

Figure 2: CMA NE - completed holes showing anomalous intercepts and interpreted basin contact

==> picture [425 x 420] intentionally omitted <==

Figure 3: CMA NE – section through YAC0662

==> picture [503 x 244] intentionally omitted <==

30 January 2018

Page 13

==> picture [119 x 36] intentionally omitted <==

Figure 4: Edikan Project – VTEM Channel 8 Resistivity showing ‘granite’ targets CGSG 1, 3, 6 & 26

==> picture [504 x 417] intentionally omitted <==

30 January 2018

Page 14

==> picture [119 x 36] intentionally omitted <==

Table 1: Yaouré drill holes and significant intercepts

Hole_ID East North RL Depth Drill
Type
Azimuth Dip No of
Samples
From To Width Aug/t
(mE) (mN) (m) (m) (°) (°)
YAC0641 223591.692 778983.667 235.427 62 AC 330 -60 NSI
YAC0642 223577.371 779008.457 233.734 56 AC 330 -60 NSI
YAC0643 223561.648 779036.249 231.971 41 AC 330 -60 NSI
YAC0644 223085.938 778899.714 237.387 43 AC 330 -60 NSI
YAC0645 223074.037 778920.847 236.77 37 AC 330 -60 NSI
YAC0646 223065.469 778934.76 236.025 48 AC 330 -60 NSI
YAC0647 223054.291 778953.484 234.589 42 AC 330 -60 5 1 6 5 0.37
YAC0647 223054.291 778953.484 234.589 42 AC 330 -60 2 28 30 2 0.6
YAC0648 223043.633 778972.316 233.315 57 AC 330 -60 4 1 5 4 0.41
YAC0649 223031.472 778994.109 231.149 57 AC 330 -60 3 7 10 3 0.59
YAC0649 223031.472 778994.109 231.149 57 AC 330 -60 2 55 57 2 1.24
YAC0650 223016.861 779020.119 228.579 62 AC 330 -60 3 3 6 3 0.86
YAC0650 223016.861 779020.119 228.579 62 AC 330 -60 3 43 46 3 0.85
YAC0651 222988.453 779068.599 221.532 61 AC 330 -60 NSI
YAC0652 223240.317 778631.983 251.678 53 AC 330 -60 2 19 21 2 0.73
YAC0653 223228.291 778653.106 251.19 53 AC 330 -60 3 22 25 3 1.57
YAC0653 223228.291 778653.106 251.19 53 AC 330 -60 11 28 39 11 0.6
YAC0653 223228.291 778653.106 251.19 53 AC 330 -60 4 47 51 4 0.44
YAC0654 223215.97 778674.373 250.637 56 AC 330 -60 7 37 44 7 0.54
YAC0655 223199.457 778702.866 248.158 62 AC 330 -60 5 55 60 5 0.53
YAC0656 223185.599 778726.798 247.456 53 AC 330 -60 3 40 43 3 0.58
YAC0657 223174.213 778746.886 246.773 56 AC 330 -60 NSI
YAC0658 223161 778772 240 56 AC 330 -60 2 27 29 2 0.51
YAC0658 223161 778772 240 56 AC 330 -60 9 47 56 9 1.48
YAC0659 223143 778792 240 63 AC 330 -60 4 14 18 4 2.86
YAC0660 223129 778821 240 56 AC 330 -60 2 53 55 2 2.6
YAC0661 223118 778849 240 62 AC 330 -60 NSI
YAC0662 223546 779067 240 54 AC 330 -60 3 51 54 3 31.71
YAC0663 223531 779088 240 59 AC 330 -60 6 0 6 6 1.58
YAC0664 223521 779109 240 53 AC 330 -60 NSI
YAC0665 223506 779135 240 56 AC 330 -60 NSI
YAC0666 223492 779158 240 56 AC 330 -60 NSI
YAC0667 223479 779180 240 50 AC 330 -60 NSI
YAC0668 223453 779220 240 62 AC 330 -60 3 28 31 3 0.41
YAC0669 223437 779250 240 61 AC 330 -60 NSI
YAC0670 223463 778890 240 62 AC 330 -60 NSI

30 January 2018

Page 15

==> picture [119 x 36] intentionally omitted <==

APPENDIX B – JORC TABLE 1

JORC Code, 2012 Edition – Table 1 Section 1 Sampling Techniques and Data

Criteria JORC Code Explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.

Reverse Circulation (RC) drill holes were routinely
sampled at 1m intervals down the hole. RC samples
were collected at the drill rig by riffle splitting drill
spoils to collect a nominal 1-2 kg sub sample and
composited into 2m samples for assay.

Air Core (AC) drill holes were routinely sampled at
1m intervals down the hole. AC samples were
collected at the drill rig by riffle splitting drill spoils
to collect a nominal 2-3 kg sub.

Half-core from Diamond core drilling (DD) were
taken systematically from the ‘right’ hand side; 1.5 m
in oxide and transition, 1 m in fresh

Routine standard reference material, sample blanks,
and
sample
duplicates
were
routinely
inserted/collected in the sample sequence.

RC, AC and DD samples were submitted to Bureau
Veritas Cote d’Ivoire for preparation and analysis by
50g Fire Assay.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc.).
 All RC holes were completed by reverse circulation (RC)
drilling techniques with a hole diameter of 5.5 inch and a
face sampling down hole hammer. Air Core drilling was
completed with a 3.5 inch hammer.
 Diamond drilling used HQ diameter in weathered, and NQ
in fresh rock. All drill core was oriented using a Reflex EX
Trac tool.
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
 Riffle split samples were weighed to monitor sample
recovery
 Diamond core recovery was measured. Recoveries in fresh
rock average 98%
 No apparent relation has been observed between sample
recovery and grade
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
 All drill samples were geologically logged by Company
Geologists.
 Geological logging recorded rock types, the abundance of
quartz and sulphides and degree of weathering using a
standardized logging system.
 Small samples of coarse and sieved RC drill material were
affixed to “chip boards” to aid geological logging and for
future reference. Sieved and washed AC materials were
kept in chip boxes for future reference

30 January 2018

Page 16

==> picture [119 x 36] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
 All RC and AC samples were riffle split at the drill rig.
 Samples were obtained dry.
 Routine field sample duplicates were taken to evaluate
representivity of samples with the results stored in the
master drill database for reference.
 At the Bureau Veritas laboratory, samples were weighed,
dried and crushed to -2mm in a jaw crusher. A 1.5kg split of
the crushed sample was subsequently pulverised in a ring
mill to achieve a nominal particle size of 85% passing 75um.
 Sample sizes and laboratory preparation techniques are
considered to be appropriate for this stage of gold
exploration.
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (ie lack of
bias) and precision have been established.
 Analysis for gold was undertaken at Bureau Veritas Cote
d’Ivoire lab by 50g Fire Assay with AAS finish to a lower
detection limit of 0.01ppm. Fire assay is considered a total
assay technique.
 No geophysical tools or other non-assay instruments were
used in the analyses reported.
 QAQC samples nominally

Blanks at 1 in 50

Certified standards at 1 in25

Field duplicates of RC samples at 1 in 50
 Review of standard reference material, sample blanks and
duplicates suggest there are no significant analytical bias or
preparation errors in the reported analyses.
 Internal laboratory QAQC checks are reported by the
laboratory and routine review of the laboratory QAQC
suggests the laboratory is performing within acceptable
limits.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
 Drill hole data is captured by Company geologists at the
drill rig and manually entered into a digital database.
 The digital data is verified and validated by the Company’s
database Manager before loading into a master drill hole
database on a regularly backed-up server.
 Reported drill hole intercepts are compiled by the
Company’s Group Exploration Manager.
 Twin holes were not drilled to verify results.
 There were no adjustments to assay data.
Location of data
points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
 Drill hole collars were set out in UTM grid_Zone30N for
Yaouré.
 Drill hole collars were positioned using hand held GPS,
accurate to +/- 2-3m in the horizontal.
 Drill holes were routinely surveyed for down hole deviation
using the Flexit tool. DD holes were surveyed at 12m and
then every 30m. RC holes were surveyed at 9m and at end
of the hole. AC holes were not surveyed downhole.
 Locational accuracy at collar and down the drill hole is
considered appropriate for this early stage of exploration.

30 January 2018

Page 17

==> picture [119 x 36] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
 All reported RC and DD holes were drilled on 40m to 80m
spaced SW-NE orientated drill sections with hole spacing
on sections at 40m. Reported AC holes were drilled heel-
to-toe on nominal 160m-spaced fences.
 The reported drilling has not been used to estimate any
mineral resources or reserves.
 Prior to assaying, 1m RC sub-samples have been
composited by weight to form 2m composites samples. AC
samples were assayed for each meter.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
 Exploration is at an early stage and the true orientation of
mineralisation has not yet been confirmed.
Sample security The measures taken to ensure sample security.  Samples were stored in a fenced compound within the
Company’s accommodation camp in Tengréla or at secured
Yaouré site offices prior to sample collection and road
transport to the laboratory of Bureau Veritas in Abidjan.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
 The Company’s sampling techniques employed in Ivory
Coast were last reviewed in a site visit to the Tengréla Gold
Project bySnowden miningconsultants in December 2016.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code Explanation Commentary Commentary
Mineral tenement
and land tenure
status
Type,
reference
name/number,
location
and
ownership including agreements or material issues
with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical
sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.







Reported AC results are from the CMA-NE Extension
Prospect, within the Yaoure exploration permit (tenement
PR397)
The Yaouré permit is valid until 01 December 2018.
The Government of Côte d’Ivoire is entitled to a royalty on
production as follows:
Spot price per ounce - London PM Fix
Royalty
Rate
Less than or equal to US$1000
3%
Higher than US$1000 and less than or
equal to US$1300
3.5%
Higher than US$1300 and less than or
equal to US$1600
4%
Higher than US$1600 and less than or
equal to US$2000
5%
Higher than US$2000
6%
The
CMA
NE
Extension
areas
have
no
known
environmental liabilities.
Exploration done
by other parties
Acknowledgment and appraisal of exploration by
other parties.
 Historical exploration at CMA NE Extension includes limited
work by French Bureau des Recherches Géologiques et
Minières (BRGM) and Amara Mining. Limited drilling by
the latter returned scattered anomalous intersections in
RC drilling.

30 January 2018

Page 18

==> picture [119 x 36] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Geology Deposit type, geological setting and style of
mineralisation.
 The CMA NE Extension is underlain by mafic volcanics with
minor porphyries, which are unconformably overlain by
volcaniclastics.
 Gold mineralisation at CMA NE Extension is related to the
contact between basalts and volcaniclastics, and also in
altered and quartz veined basalts.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole colla_r
o _elevation or RL (Reduced Level – elevation above

sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
 Reported results are summarised in Table 2 within the
attached announcement.
 The drill holes reported in this announcement have the
following parameters:
 Grid co-ordinates are UTM WGS84_30N.
 Collar elevation is defined as height above sea level in
metres (RL)
 Dip is the inclination of the hole from the horizontal.
Azimuth is reported in WGS 84_29N degrees as the
direction toward which the hole is drilled.
 Down hole length of the hole is the distance from the
surface to the end of the hole, as measured along the drill
trace
 Intersection depth is the distance down the hole as
measured along the drill trace.
 Intersection width is the down hole distance of an
intersection as measured along the drill trace
 Hole length is the distance from the surface to the end of
the hole, as measured along the drill trace.
 Previously reported drilling results (pre-2017) have not
been repeated in this announcement.
Data aggregation
methods
In
reporting
Exploration
Results,
weighting
averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
 A minimum cut-off grade of 0.3 g/t Au is applied to the
reported intervals.
 Intervals of Internal dilution (<0.3 g/t Au) within a reported
interval cannot exceed 2m.
 No grade top cut has been applied. One sample at Yaouré
has 86.68 g/t
 Samples have been weighted by length of sample interval
 No metal equivalent reporting is used or applied.
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (eg ‘down hole length, true width not known’).
 The reported results are from early stage exploration
drilling; the orientation of geological structure is currently
not known with certainty.
 Results are reported as down hole length, true width is
unknown.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
 Drill hole plans are shown in Figure 2. Assay results are
tabulated in body text of this announcement

30 January 2018

Page 19

==> picture [119 x 36] intentionally omitted <==

Criteria JORC Code Explanation Commentary
Balanced reporting Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced
to
avoid
misleading
reporting
of
Exploration Results.
 Results have been comprehensively reported in this
announcement.
 All drill holes completed, including holes with no significant
gold intersections, are reported.
Other substantive
exploration data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating substances.
 There is no other exploration data which is considered
material to the results reported in this announcement
Further work The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions,
including
the
main
geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
 Further drilling is warranted at CMA NE Extension to assess
the gold at the contact between the mafic volcanics and
the volcaniclastics, and to define the strike length of the
intersected mineralisation

30 January 2018

Page 20