22 JULY 2025

NEWS RELEASE

PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

Perseus Mining Limited (ASX/TSX: PRU) is pleased to provide an update on ongoing resource definition drilling currently being conducted at its Nyanzaga Gold Project (NGP) in Tanzania and to announce some of the more significant drill results achieved since our last exploration announcement, dated 5 December 2024 (see ASX release “Confidence Boosting Infill Drilling at Nyanzaga Project).

The current drilling program has been designed to further inform and advance Perseus’s proposed open pit mining scenario at NGP as detailed in the Feasibility Study update, released to the market on 25 April 2025 (see ASX release “Perseus Mining proceeds with development of the Nyanzaga Gold Project”).

Drill holes have been designed to infill existing drilling, collect additional information including metallurgical and geotechnical data and most importantly evaluate potential strike and depth extensions to the mineralisation.

As of the end of June 2025, a total of 35,623 m of combined reverse circulation (RC) and diamond (DD) meters have been drilled into the Tusker and Kilimani deposits since the last update in December 2024 (refer to Appendix 1 – Figure 3 ). Since acquiring the NGP in April 2025, Perseus has drilled a total of 58,609 m, with the majority of this being resource definition drilling into the Tusker and Kilimani deposits.

Infill drilling was designed to improve the average drill spacing across the deposit from 40 m × 40 m to a nominal drill pattern of 20 m × 40 m and was completed across the main Tusker mineralisation and the adjacent Kilimani deposit. Drilling remains ongoing across both Tusker and Kilimani and continues to support the current mineralisation interpretation across both deposits.

Drill hole data and related drill results are tabulated in Appendix 2 , however more significant results received from the recent drilling include:

TUSKER DEPOSIT

  • NYZRCDD1374C: 51 m @ 4.43 g/t gold from 269 m including 4 m @ 42.04 g/t gold from 274 m;

  • NYZDD1389: 36 m @ 6.28 g/t gold from 292 m including 4 m @ 47.82 g/t gold from 314 m;

  • NYZDD1390: 10 m @ 15.38 g/t gold from 264 m;

  • NYZDD1490: 33 m @ 3.14 g/t gold from 275 m including 2 m @ 32.28 g/t gold from 161 m;

  • 61 m @ 4.35 g/t gold from 235 m;

  • NYZRCDD1347: 62 m @ 2.38 g/t gold from 432 m;

  • NYZRCDD1351: 63 m @ 6.49 g/t gold from 435 m including 1 m @ 307.8 g/t gold from 438 m;

  • 16 m @ 6.15 g/t gold from 501 m including 6 m @ 14.73 g/t gold from 511 m;

  • NYZRCDD1372: 69 m @ 3.94 g/t gold from 335 m including 21 m @ 7.99 g/t gold from 375 m;

  • NYZRCDD1373: 57 m @ 6.50 g/t gold from 203 m including 11 m @ 26.93 g/t gold from 208 m;

PERSEUS MINING LIMITED

Level 2, 437 Roberts Road, Subiaco WA 6008 ABN: 27 106 808 986

1

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

  • NYZRCDD1397: 59 m @ 4.39 g/t gold from 442 m and 64 m @ 2.91 g/t gold from 660 m including 23 m @ 4.36 g/t gold from 695 m

  • NYZRCDD1399: 54 m @ 9.69 g/t gold from 577 m including 2 m @ 118.3 g/t gold from 591 m and 5 m @ 20.15 g/t gold from 601 m;

  • NYZRCDD1401: 23 m @ 20.87 g/t gold from 496 m;

  • NYZRCDD1404: 46 m @ 3.15 g/t gold from 550 m including 11 m @ 9.81 g/t gold from 567 m;

  • NYZRCDD1405: 52 m @ 3.01 g/t gold from 506 m; 81 m @ 4.00 g/t gold from 597 m including 8 m @ 16.74 g/t gold from 625 m;

  • NYZRCDD1419: 52 m @ 3.17 g/t gold from 348 m;

  • NYZRCDD1422: 84 m @ 3.24 g/t gold from 339 m including 11 m @ 9.15 g/t gold from 392 m;

KILIMANI DEPOSIT

  • NYZRC1424: 22 m @ 4.14 g/t gold from 47 m;

  • NYZRC1471: 44 m @ 4.36 g/t gold from 0 m including 3 m @ 43.56 g/t gold from 25 m;

Further geotechnical, metallurgical and sterilisation drilling programs are on-going or planned, and are scheduled to be completed by December 2025. The results of this work, together with other key activities, will be incorporated into an updated Ore Reserve statement that is to be released to the market in the March 2026 quarter.

Perseus’s Managing Director and CEO, Jeff Quartermaine, said:

“In announcing our Final Investment Decision in April 2025 for the development of the Nyanzaga Gold Project, we advised the market that our decision was based on only the first phase of a Mineral Resource confirmation drilling program, and that a second phase of drilling was planned with the aim of updating Nyanzaga’s Mineral Resources and Ore Reserves prior to the commencement of gold production in January 2027.

The drill results that have been announced today have resulted from this second phase of drilling and reinforce our confidence in our ability to expand Nyanzaga’s Mineral Resources and Reserves and as a result, potentially extend the life of the mine beyond the currently predicted Phase 1 of 11 years.

Of particular interest to us are the excellent drill results that have been achieved as part of the current drill program at depths below the bottom of the currently envisaged large open pit. While more drilling is required to confirm extensions of mineralisation at depth, the early indications suggest further exploitation of the mineralisation, including the potential for application of UG mining methods, may be possible resulting in even a further extension of the mine life.”

PERSEUSMINING.COM

2

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

THE NYANZAGA GOLD PROJECT, TANZANIA

The NGP (or the Project) is located in north-western Tanzania, within the Sengerema District of the Mwanza Region, south of Lake Victoria approximately 60 kilometres southwest of Mwanza (Tanzania’s second largest city) ( Figure 2 ).

The Project is located on the north-eastern flank of the Sukumaland Archaean Greenstone Belt of the Lake Victoria Goldfield, approximately 60 km east of Anglogold Ashanti’s Geita Gold Mine and 35 km northeast of Barrick’s Bulyanhulu Gold Mine. The Project area covers Nyanzian greenstone volcanic rocks and sediments typical of the greenstone belts of the central craton.

The NGP Mineral Resource Estimate includes an Indicated Resource of 74.2 Mt grading 1.33 g/t Au for 3.2 Moz Au and an Inferred Resource of 15.0 Mt grading 1.2 g/t Au for 0.6 Moz Au ( Table 1 ). It has a Probable Ore Reserve Estimate of 52.0 Mt grading 1.40 g/t Au for 2.3 Moz Au ( Table 2 ).

Table 1: Nyanzaga Gold Project Mineral Resources[1,2,3,4,5,6]

MEASUR ED & INDIC ATED
MEASU RED RESOU RCES INDICAT ED RESOU RCES INFERR ED RESOUR CES
R ESOURCES
PROJECT
QUANTITY GRADE GOLD QUANTITY GRADE GOLD QUANTITY GRADE GOLD QUANTITY GRADE GOLD
Mt g/t gold ’'000 oz Mt g/t gold ’000 oz Mt g/t gold ’000 oz Mt g/t gold ’000 oz
Tusker7 - - - 71.1 1.34 3,061
71.1

1.34
3,061 14.6 1.2 571
Kilimani - - - 3.1 1.00 101
3.1

1.00
101 0.4 1.2 13
Total - - - 74.2 1.33 3,162
74.2

1.33
3,162 15.0 1.2 584

Notes for Table 1:

1 Based on October 2024 Mineral Resource estimate

2 0.3 g/t gold cut-off applied to in-situ open pit material

3 In-situ open pit resources are constrained to US$2,000/oz pit shells

4 Rounding of numbers to appropriate precision may result in summary inconsistencies

5 Mineral Resources are inclusive of Ore Reserves

6 Mineral Resources are reported on a 100% basis

7 The previously disclosed Nyanzaga deposit has been termed Tusker for clarity

Table 2: Nyanzaga Gold Project Ore Reserves[1,2,3,4,5,6]

PROVED P ROBABLE PROVED AND PROBA BLE
PROJECT QUANTITY GRADE GOLD QUANTITY GRADE GOLD QUANTITY GRADE GOLD
Mt g/t gold ’000 oz Mt g/t gold ’000 oz Mt g/t gold ’000 oz
Tusker7 - - - 49.4 1.42 2,255 49.4 1.42 2,255
Kilimani - - - 2.6 1.02 86 2.6 1.02 86
Total - - - 52.0 1.40 2,342 52.0 1.40 2,342

Notes for Table 2:

1 Based on October 2024 Mineral Resource estimate

2 Based on April 2025 Ore Reserve estimate

3 Pit designs are based on US$1,700/oz gold metal price

4 Variable gold grade cut-offs for each material type, ranging from 0.33 g/t to 0.6 g/t

5 Inferred Mineral Resource is considered as waste for optimisation purposes

6 Rounding of numbers to appropriate precision may have resulted in apparent inconsistencies

7 The previously disclosed Nyanzaga deposit has been termed Tusker for clarity

OVERVIEW OF WORK PROGRAMS & RESULTS

Perseus released a resource development update in December 2024 (see ASX announcement “Confidence Boosting Infill Drilling at Nyanzaga” dated 5 December 2024) and followed this up with a final investment decision (FID) in April 2025 (ASX release “Perseus Mining Proceeds with Development of the Nyanzaga Gold Project” dated 28 April 2025). This release is an update of resource definition drilling and studies completed since the last resource definition release.

Work completed to date has supported and advanced the understanding of all aspects of the Nyanzaga Gold Project (NGP), derisking the project and demonstrating the potential to increase the NGP Mineral Resources. Activities continue with a focus on resource definition, geotechnical, and metallurgical drilling, and associated studies proposed to optimise design parameters.

PERSEUSMINING.COM

3

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Since the last update in December 2024 a total of 35,623 m of combined Reverse circulation (RC) and Diamond (DD) meters have been drilled into the Tusker and Kilimani Deposits. This includes resource definition, metallurgical and geotechnical drilling. Since acquiring the project in April 2025 Perseus has drilled a total of 58,609 m, with the majority (49,749 m) of this being resource definition drilling into the Tusker and Kilimani Deposits.

Infill drilling was designed to improve the average drill spacing across the deposit from 40 m × 40 m to a nominal drill pattern of 20 m × 40 m and was completed across the main Tusker mineralisation and the adjacent Kilimani deposit. Drilling remains ongoing across both Tusker and Kilimani and continues to support the current mineralisation interpretation across both deposit areas.

Of particular interest is new drilling below the FID reserve pit design demonstrates continuation of mineralisation at depth and indicates the potential for resource/reserve addition (see Figure 6 Figure 6 and Figure 7Figure 7).

In addition to the results presented in the highlights above, other notable results include:

Hole Intercept
TUSKER DEPOSIT
NYZDD1355C 32 [email protected]/tgold from 243 m
NYZDD1385 66 m @ 2.03 g/t gold from 293 mincluding5 m @ 6.87 g/t gold from 297 mand
6 [email protected]/tgold from 328 m
NYZRCDD1348 86 [email protected]/tgold from 260 mincluding4 [email protected]/tgold from 339 m
NYZRCDD1349A 64 [email protected]/tgold from 371 m
NYZRCDD1352 92 [email protected]/tgold from 549 mincluding16 [email protected]/tgold from 603 m
NYZRCDD1353 54 m @ 3.86 g/t gold from 158 mincluding26 m @ 6.94 g/t gold from 164 m
77 [email protected]/tgold from 495 mincluding7 [email protected]/tgold from 543 m
NYZRCDD1359 81 [email protected]/tgold from 477 m
NYZRCDD1365 44 [email protected]/tgold from 268 m
NYZRCDD1368 11 [email protected]/tgold from 245 m
NYZRCDD1370 57 [email protected]/tgold from 333 m
NYZRCDD1378B 39 [email protected]/tgold from 300 m
NYZRCDD1398A 25 [email protected]/tgold from 563 mincluding6 [email protected]/tgold from 569 m
NYZRCDD1400 8 [email protected]/tgold from 485 m
NYZRCDD1406 50 [email protected]/tgold from 714 m
NYZRCDD1407 70 [email protected]/tgold from 583 mincluding13 [email protected]/tgold from 618 m
NYZRCDD1425 78 [email protected]/tgold from 334 mincluding8 [email protected]/tgold from 401 m
NYZRCDD1429 11 m @ 9.11 g/t gold from 446 m
42 [email protected]/tgold from 460 m
KILIMANI DEPOSIT
NYZRC1426 11 [email protected]/tgold from 9 m
NYZRC1449 8 [email protected]/tgold from 41 m

Figures illustrating the key aspects of the Nyanzaga Gold Project activities are presented in Appendix 1 .

Drill collar details and significant intercepts (>2 m above 0.5 g/t gold) are summarised in Table 3 and Table 4 in Appendix 2 for Tusker and Kilimani respectively .

Note assays are incomplete - not all assays have been received at the time of reporting including holes marked by * and noted in the figure captions.

This announcement has been approved for release by Perseus Mining Limited’s Managing Director and Chief Executive Officer, Jeff Quartermaine.

PERSEUSMINING.COM

4

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

COMPETENT PERSON STATEMENT:

The information in this report and the attachments that relate to exploration drilling results at the Nyanzaga Gold Project is based on, and fairly represents, information and supporting documentation prepared by Mr Glen Edwards, a Competent Person who is a Chartered Professional Geologist. Mr Edwards is the General Manager Exploration of the Company. Mr Edwards has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC Code 2012”) and to qualify as a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr Edwards consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Mineral Resources and Ore Reserve at Nyanzaga was updated by the Company in a market announcement “Perseus Mining proceeds with development of the Nyanzaga Gold Project” released on 28 April 2025. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market release continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Nyanzaga Gold Project” dated 10 June 2025 continue to apply.

CAUTION REGARDING FORWARD LOOKING INFORMATION:

This report contains forward-looking information which is based on the assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of gold, continuing commercial production at the Yaouré Gold Mine, the Edikan Gold Mine and the Sissingué Gold Mine without any major disruption, development of a mine at Nyanzaga, the receipt of required governmental approvals, the accuracy of capital and operating cost estimates, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used by the Company. Although management believes that the assumptions made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the forwardlooking information will prove to be accurate. Forward-looking information involves known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, the actual market price of gold, the actual results of current exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's publicly filed documents. Readers should not place undue reliance on forward-looking information. Perseus does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

ASX/TSX CODE: PRU

CAPITAL STRUCTURE: Ordinary shares: 1,353,975,467 Performance rights: 9,343,976

REGISTERED OFFICE:

Level 2 437 Roberts Road Subiaco WA 6008 Telephone: +61 8 6144 1700

www.perseusmining.com

DIRECTORS:

Rick Menell Non-Executive Chairman

Jeff Quartermaine Managing Director & CEO Amber Banfield Non-Executive Director Elissa Cornelius Non-Executive Director

Dan Lougher Non-Executive Director

CONTACTS:

Jeff Quartermaine Managing Director & CEO [email protected]

Stephen Forman

Investor Relations +61 484 036 681 [email protected]

Nathan Ryan Media +61 420 582 887 [email protected]

John McGloin Non-Executive Director James Rutherford Non-Executive Director

PERSEUSMINING.COM

5

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

APPENDIX 1 - FIGURES

==> picture [460 x 517] intentionally omitted <==

Figure 1: Location of Perseus Mining Limited’s mining operations and development projects

PERSEUSMINING.COM

6

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

==> picture [469 x 451] intentionally omitted <==

Figure 2: Nyanzaga Project Location

PERSEUSMINING.COM

7

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

==> picture [456 x 457] intentionally omitted <==

----- Start of picture text -----

Kilimani
Tusker
----- End of picture text -----

Figure 3: Nyanzaga Gold Project drill plan showing drill collars forming this release with Ore Reserve pit design

PERSEUSMINING.COM

8

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

==> picture [456 x 417] intentionally omitted <==

Figure 4:Tusker Deposit - cross section at 9,672,300mN looking north showing selected new intercepts and historical drill traces on simplified geology

PERSEUSMINING.COM

9

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

==> picture [456 x 417] intentionally omitted <==

Figure 5: Tusker Deposit - cross section at 9,672,340mN looking north showing selected new intercepts and historical drill traces on simplified geology

PERSEUSMINING.COM

10

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

==> picture [456 x 438] intentionally omitted <==

Figure 6: Tusker Deposit - cross section at 9,672,500mN looking north showing selected new intercepts and historical drill traces on simplified geology

PERSEUSMINING.COM

11

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

==> picture [456 x 422] intentionally omitted <==

Figure 7: Tusker Deposit - cross section at 9,672,540mN looking north showing selected new intercepts and historical drill traces on simplified geology

PERSEUSMINING.COM

12

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

==> picture [456 x 376] intentionally omitted <==

Figure 8: Kilimani Deposit – Oblique cross section looking northeast showing selected new intercepts and historical drill traces

PERSEUSMINING.COM

13

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

==> picture [456 x 376] intentionally omitted <==

Figure 9: Kilimani Deposit – Oblique cross section looking northeast showing selected new intercepts and historical drill traces

PERSEUSMINING.COM

14

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

APPENDIX 2 – DRILL HOLE DETAILS AND SIGNIFICANT INTERCEPTS

Table 3: Nyanzaga Gold Project – Tusker drill holes and significant assays based on lower cut-off of 0.5 g/t gold Au with maximum 2 m internal waste

Hole ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
NYZDD1346A
DD
467592.79
9672499.00
1287.11
267.9
-60.4
606.4
incl.
incl.
incl.
36
41
5
0.84
47
81.1
34.1
1.14
61
63
2
5.00
93.1
108.1
15
0.76
117
119
2
0.83
122
138
16
0.81
141
149
8
0.74
153
167
14
0.66
170
175
5
0.86
179
198
19
0.87
206
215
9
0.61
222
317
95
1.22
320
324
4
0.78
328
335
7
0.78
340
420
80
1.58
358
363
5
5.91
423
452
29
1.17
455
458
3
1.53
472
484
12
1.48
481
483
2
3.04
488
495
7
0.81
NYZDD1355C
DD
467673.91
9672662.73
1247.81
269.2
-60.7
410.5
incl.
and
incl.
120
124
4
0.46
143
152
9
1.27
223
226
3
1.70
243
275
32
5.41
245
247
2
8.01
251
274
23
6.45
278
290
12
1.11
293
335
42
1.68
307
310
3
3.49
345
381
36
0.83
NYZDD1366B
DD
467684.33
9672377.75
1277.88
268.6
-61.9
510.2
175
185
10
0.54
191
199
8
3.72
203
225
22
1.02
228
230
2
5.98
235
237
2
0.95
242
259
17
0.61
262
269
7
1.71
273
276
3
14.92
287
369
82
1.79
373
376
3
1.05
417
421
4
2.44
496
500
4
0.68
NYZDD1374C
DD
467651.72
9672335.79
1296.44
269.6
-60.0
410
incl.
incl.
incl.
152
166
14
0.83
171
173
2
1.15
176
187
11
1.27
196
225
29
1.43
243
247
4
0.41
253
265
12
0.58
269
320
51
4.43
274
278
4
42.04
323
335
12
5.43
329
334
5
11.25
339
345
6
3.64
343
345
2
9.45
349
351
2
1.46
NYZDD1377A
DD
467711.08
9672220.68
1282.94
270.0
-60.0
480.8
incl.
297
300
3
0.65
305
312
7
1.24
316
369
53
1.59
354
356
2
12.97
389
393
4
1.27
468
470
2
1.09
NYZDD1384
DD
467718.22
9672298.66
1271.76
270.0
-60.0
510.1
incl.
incl.
incl.
239
265
26
2.83
246
251
5
8.17
269
271
2
1.21
295
298
3
0.61
301
306
5
0.65
309
322
13
1.51
313
316
3
3.64
325
357
32
2.41
349
351
2
5.62

PERSEUSMINING.COM

15

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
361
367
6
1.20
443
445
2
1.06
NYZD D1385
DD
467649.52
9672381.72
1290.02
269.5
-60.3
460
incl.
incl.
and
120
124
4
1.06
136
184
48
0.69
187
191
4
0.59
195
197
2
0.64
201
205
4
0.64
210
215
5
0.66
219
230
11
0.72
236
251
15
2.86
255
281
26
1.03
284
290
6
2.87
288
290
2
5.31
293
359
66
2.03
297
302
5
6.87
328
334
6
3.11
372
375
3
0.58
421
427
6
5.14
NYZDD 1387A
DD
468154.94
9671275.09
1182.77
230.4
-58.3
250.3
74
76
2
0.63
NYZD D1388
DD
467618.80
9672296.06
1311.87
267.6
-62.4
360.8
incl.
and
163
212
49
1.65
163
165
2
6.90
182
184
2
5.57
219
250
31
0.92
256
263
7
0.76
289
293
4
0.65
320
323
3
1.06
NYZD D1389
DD
467686.64
9672295.17
1283.56
267.8
-61.5
440.2
incl.
234
242
8
0.44
251
257
6
1.12
263
269
6
1.15
273
289
16
3.90
292
328
36
6.28
314
318
4
47.82
331
346
15
0.64
NYZD D1390
DD
467604.67
9672340.71
1314.09
268.1
-59.8
529
incl.
incl.
incl.
incl.
incl.
116
148
32
1.70
140
143
3
4.29
155
159
4
1.38
166
177
11
0.78
180
192
12
0.97
198
203
5
0.79
206
213
7
1.87
227
229
2
0.59
243
246
3
4.45
251
261
10
5.17
264
274
10
15.38
264
269
5
30.12
277
301
24
1.78
289
294
5
4.20
304
311
7
3.32
304
308
4
5.41
339
341
2
4.87
382
385
3
1.19
389
400
11
5.69
389
391
2
18.17
507
511
4
1.08
517
519
2
1.00
NYZD D1391
DD
468164.99
9671450.01
1185.02
218.0
-59.2
251
No significant intercepts
NYZD D1392
DD
467589.66
9672378.91
1315.14
269.6
-59.9
430.1
incl.
and
and
incl.
and
83
168
85
1.82
93
100
7
6.72
103
105
2
6.70
125
127
2
5.21
173
175
2
0.68
179
181
2
1.53
184
187
3
0.79
192
262
70
1.85
232
236
4
3.63
253
256
3
5.95
275
324
49
5.71
344
346
2
1.03
390
393
3
2.60
NYZDD 1393B
DD
467165.69
9672196.74
1292.71
134.7
-60.4
120
No significant intercepts
NYZD D1394
DD
467049.99
9672325.98
1251.85
133.5
-59.7
250.6
202
208
6
0.55
NYZDD 1395A
DD
466942.01
9672447.98
1226.09
134.0
-59.8
440.7
No significant intercepts
NYZD D1396
DD
467087.65
9672540.23
1231.18
133.2
-60.9
410
294
306
12
0.70
NYZD D1483
DD
467458.87
9672292.95
1362.75
220.1
-74.1
148.5
incl.
111
129
18
2.66
113
121
8
4.41
132
135
3
0.51
138
141
3
0.96

PERSEUSMINING.COM

16

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
NYZD D1490
DD
467620.00
9672340.00
1309.00
269.9
-60.2
370
incl.
incl.
and
108
111
3
0.58
119
127
8
0.79
130
163
33
3.14
161
163
2
32.28
167
211
44
1.21
235
296
61
4.35
262
266
4
19.90
279
289
10
3.51
299
302
3
0.75
323
326
3
3.12
335
337
2
3.47
354
360
6
2.08
NYZRCD D1344
RC/DD
467641.97
9672659.59
1254.89
269.8
-59.2
555.2
incl.
incl.
0
2
2
0.62
79
82
3
0.76
88
96
8
3.57
88
92
4
6.64
104
109
5
0.62
127
129
2
0.61
221
223
2
1.46
242
248
6
0.94
276
316
40
1.77
299
306
7
4.14
319
351
32
0.86
355
357
2
0.77
416
430
14
1.20
436
468
32
1.06
474
496
22
1.40
500
515
15
2.44
NYZRCD D1347
RC/DD
467696.69
9672496.65
1259.30
268.7
-60.0
580.4
incl.
0
4
4
0.95
199
262
63
0.75
265
282
17
0.82
286
328
42
1.00
331
337
6
0.92
340
354
14
0.60
360
370
10
0.78
373
403
30
2.65
407
414
7
1.28
432
494
62
2.38
458
463
5
4.44
497
502
5
3.66
515
517
2
0.84
NYZRCD D1348
RC/DD
467295.92
9672462.03
1280.83
89.6
-58.6
360.2
incl.
231
237
6
1.23
242
256
14
1.81
260
346
86
2.07
339
343
4
21.43
350
360.2
10.2
1.21
NYZRCD D1349A
RC/DD
467715.14
9672456.78
1259.31
267.2
-57.2
650.4
198
219
21
2.43
224
297
73
1.10
303
310
7
0.78
313
339
26
1.18
346
368
22
0.86
371
435
64
2.04
526
529
3
0.97
537
541
4
0.40
589
593
4
0.46
NYZRCD D1351
RC/DD
467698.91
9672540.21
1252.74
267.1
-57.2
590.8
incl.
and
and
and
incl.
0
2
2
0.68
170
174
4
1.08
183
187
4
0.51
202
215
13
0.60
219
221
2
0.73
226
235
9
0.52
243
246
3
0.61
253
279
26
0.94
282
288
6
0.98
293
306
13
0.85
316
322
6
0.60
326
334
8
0.88
337
378
41
1.00
382
417
35
0.93
428
430
2
0.70
435
498
63
6.49
438
439
1
307.80
451
453
2
5.73
475
478
3
3.54
486
489
3
4.44
501
517
16
6.15
511
517
6
14.73

PERSEUSMINING.COM

17

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
NYZRCD D1352
RC/DD
467741.24
9672583.73
1244.64
268.0
-57.3
700
incl.
and
incl.
incl.
and
and
0
6
6
0.89
197
199
2
0.68
207
247
40
2.55
211
217
6
7.22
220
225
5
3.28
254
257
3
1.39
260
262
2
1.40
267
300
33
0.86
304
308
4
0.91
313
323
10
1.40
326
335
9
0.72
345
362
17
0.58
365
370
5
2.98
374
442
68
1.03
446
474
28
1.42
469
471
2
8.22
479
487
8
0.83
490
526
36
1.96
549
641
92
3.77
584
594
10
5.61
603
619
16
8.75
629
640
11
6.01
NYZRCD D1353
RC/DD
467697.25
9672578.96
1248.65
268.8
-57.7
610.1
incl.
incl.
and
incl.
and
2
4
2
0.94
158
212
54
3.86
164
190
26
6.94
222
266
44
1.09
269
297
28
0.62
301
310
9
0.61
313
385
72
0.86
388
468
80
1.60
437
439
2
4.00
448
450
2
3.87
488
490
2
1.07
495
572
77
2.17
543
550
7
5.58
554
558
4
10.49
576
587
11
0.68
NYZRCD D1354
RC/DD
467660.39
9672579.36
1256.31
267.9
-56.1
537.7
103
107
4
1.19
125
128
3
1.23
129
140
11
1.09
145
161
16
0.69
167
178
11
0.84
182
188
6
0.50
191
219
28
0.80
222
232
10
1.17
239
244
5
0.71
248
296
48
0.98
299
302
3
0.42
307
310
3
1.00
313
321
8
0.88
324
326
2
0.83
331
398
67
1.15
514
523
9
0.88
527
537
10
1.15
NYZRCD D1357
RC/DD
467627.96
9672497.26
1278.86
268.1
-57.9
540
incl.
incl.
and
incl.
50
79
29
1.33
53
55
2
4.62
82
97
15
1.48
107
154
47
1.13
158
183
25
1.24
192
197
5
0.86
200
214
14
0.97
218
229
11
0.76
236
284
48
1.65
255
260
5
3.93
263
267
4
3.56
288
303
15
1.05
307
323
16
0.81
345
352
7
0.70
355
411
56
1.51
380
386
6
3.28
415
426
11
1.11
430
433
3
3.76
451
453
2
1.17
530
532
2
0.80
NYZRCD D1359
RC/DD
467781.75
9672461.48
1245.53
267.0
-57.6
610.05
incl.
248
332
84
1.23
254
259
5
4.76
336
402
66
2.19

PERSEUSMINING.COM

18

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
incl.
incl.
and
and
and
382
386
4
16.88
405
409
4
3.75
412
418
6
0.80
445
473
28
1.37
477
558
81
3.87
490
492
2
4.51
518
521
3
24.08
529
532
3
21.11
537
547
10
8.09
563
565
2
0.80
604
606
2
1.54
NYZRCD D1362
RC/DD
467315.31
9672378.90
1307.89
90.6
-59.8
240.5
incl.
and
181
183
2
0.75
204
207
3
0.64
210
240.5
30.5
1.08
216
218
2
5.03
232
235
3
3.17
NYZRCD D1363
RC/DD
467385.34
9672492.63
1289.83
90.5
-60.3
290.9
66
68
2
2.06
130
197
67
0.79
202
208
6
0.66
212
215
3
1.77
219
240
21
1.59
247
254
7
1.19
268
285
17
3.87
NYZRCD D1364
RC/DD
467369.13
9672455.85
1298.74
90.3
-59.4
261.4
incl.
incl.
158
218
60
1.55
164
166
2
6.99
221
261.4
40.4
1.39
245
248
3
3.04
NYZRCD D1365
RC/DD
467239.67
9672417.03
1275.66
91.7
-61.3
378.5
incl.
incl.
174
178
4
0.61
184
204
20
0.49
211
220
9
0.87
223
232
9
0.96
260
262
2
0.98
268
312
44
2.08
277
279
2
3.45
316
378.5
62.5
1.77
335
339
4
4.70
NYZRCD D1367
RC/DD
467690.78
9672420.49
1271.81
268.1
-58.2
550.8
192
226
34
0.81
230
247
17
0.93
250
312
62
1.00
317
384
67
1.54
393
395
2
0.71
463
466
3
0.52
NYZRCD D1368
RC/DD
467659.71
9672263.46
1299.35
270.8
-60.0
550.4
incl.
179
183
4
0.60
197
213
16
1.49
205
207
2
6.87
245
256
11
8.30
267
285
18
0.58
289
301
12
0.98
354
356
2
1.55
390
393
3
1.95
398
405
7
3.71
465
467
2
0.64
490
492
2
0.81
NYZRCD D1369
RC/DD
467233.97
9672381.23
1281.08
89.5
-59.9
270.8
173
193
20
0.80
196
203
7
1.12
NYZRCD D1370
RC/DD
467725.65
9672378.74
1265.16
268.2
-58.7
519.4
incl.
and
and
187
191
4
0.58
217
221
4
0.94
225
230
5
0.96
235
239
4
0.88
243
251
8
0.55
258
270
12
0.50
273
318
45
1.30
333
390
57
2.27
339
345
6
3.41
349
356
7
5.95
380
383
3
4.70
409
412
3
0.52
428
430
2
0.88
NYZRCD D1371
RC/DD
467259.99
9672297.08
1295.84
88.0
-59.9
240.7
166
168
2
0.64
221
223
2
1.21
NYZRCD D1372
RC/DD
467729.31
9672337.22
1268.35
268.0
-59.2
620
242
254
12
0.75
257
268
11
0.79
276
280
4
0.75
283
292
9
1.37
295
306
11
1.39
315
321
6
1.88
326
330
4
1.71

PERSEUSMINING.COM

19

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
incl.
and
335
404
69
3.94
362
369
7
3.27
375
396
21
7.99
541
546
5
0.90
573
581
8
0.98
603
608
5
2.91
618
620
2
1.26
NYZRCD D1373
RC/DD
467379.01
9672292.93
1348.24
90.3
-59.9
360.6
incl.
incl.
and
and
incl.
94
96
2
0.82
181
190
9
3.08
188
190
2
5.44
203
260
57
6.50
203
205
2
8.01
208
219
11
26.93
223
225
2
6.78
277
289
12
3.43
286
289
3
11.16
NYZRCD D1375
RC/DD
467441.72
9672374.85
1336.28
88.4
-60.4
260
incl.
122
137
15
0.98
142
162
20
1.13
171
203
32
1.96
184
186
2
15.97
210
229
19
0.65
232
247
15
0.69
250
259
9
0.74
NYZRCD D1376
RC/DD
467613.61
9672175.50
1323.99
269.2
-60.6
300.8
74
76
2
1.15
163
166
3
4.05
NYZRCD D1378B
RC/DD
467693.31
9672260.19
1286.03
269.9
-60.0
480
incl.
and
207
209
2
0.98
245
249
4
0.98
274
285
11
1.22
288
296
8
0.95
300
339
39
2.54
309
311
2
4.92
317
323
6
7.93
363
366
3
4.87
NYZRCD D1379
RC/DD
467655.91
9672221.56
1304.53
269.2
-60.2
390.5
38
41
3
1.17
142
144
2
0.89
239
247
8
0.57
250
252
2
0.61
269
273
4
0.64
NYZRCD D1380
RC/DD
467654.02
9672181.84
1306.61
270.6
-61.3
460.3
302
304
2
0.89
358
362
4
0.47
397
400
3
1.43
NYZRCD D1381
RC/DD
467334.52
9672307.55
1328.77
89.7
-58.8
310.4
incl.
incl.
incl.
123
128
5
0.78
156
189
33
1.93
171
173
2
4.08
192
204
12
5.50
194
200
6
9.61
207
209
2
0.76
282
287
5
3.33
283
285
2
6.80
291
305
14
1.10
NYZRCD D1382A
RC/DD
467383.64
9672334.90
1340.15
88.5
-59.4
240
151
153
2
1.41
158
190
32
1.06
194
196
2
0.72
205
214
9
0.85
222
234
12
2.03
NYZRCD D1383
RC/DD
467358.56
9672377.37
1322.43
87.9
-61.1
290
134
137
3
0.45
152
154
2
0.56
160
163
3
1.02
191
205
14
0.91
208
267
59
0.96
271
287
16
0.78
NYZRCD D1397
RC/DD
467820.36
9672539.75
1236.98
270.3
-60.2
750
incl.
incl.
incl.
and
incl.
and
and
1
8
7
0.59
369
437
68
1.32
442
501
59
4.39
480
482
2
8.71
504
512
8
0.62
522
549
27
2.41
524
527
3
8.47
555
612
57
1.58
604
606
2
4.74
609
612
3
6.40
622
630
8
0.73
636
656
20
0.75
660
724
64
2.91
675
679
4
7.20
688
691
3
3.76
695
718
23
4.36

PERSEUSMINING.COM

20

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
NYZRCD D1398A
RC/DD
467020.02
9672615.92
1226.02
88.0
-59.7
625.1
incl.
563
588
25
8.29
569
575
6
30.66
593
601
8
1.25
610
614
4
0.97
620
625.1
5.1
0.61
NYZRCD D1399
RC/DD
467778.86
9672539.24
1241.01
268.1
-59.0
695.4
incl.
and
incl.
incl.
and
and
0
6
6
0.46
250
253
3
2.87
284
288
4
0.78
298
312
14
1.38
315
393
78
0.99
396
429
33
1.25
432
466
34
2.37
441
443
2
6.24
449
452
3
10.04
469
494
25
1.28
497
501
4
2.01
508
547
39
1.40
520
524
4
4.56
557
574
17
1.31
577
631
54
9.69
591
593
2
118.33
596
598
2
6.46
601
606
5
20.15
634
636
2
1.60
NYZRCD D1400
RC/DD
467064.12
9672538.59
1229.88
87.2
-59.8
520.1
470
482
12
6.27
485
493
8
12.72
499
510
11
1.78
NYZRCD D1401
RC/DD
467758.34
9672499.98
1243.50
269.4
-57.9
650
incl.
4
6
2
0.72
253
259
6
1.66
262
266
4
0.82
271
295
24
0.68
300
357
57
0.67
361
390
29
1.28
395
472
77
1.12
496
519
23
20.87
523
588
65
1.80
559
570
11
4.83
629
631
2
0.90
NYZRCD D1404
RC/DD
467738.16
9672538.91
1244.31
268.0
-58.1
650.1
incl.
incl.
incl.
207
209
2
2.77
219
233
14
0.71
244
248
4
2.48
253
262
9
0.80
275
287
12
0.57
290
312
22
0.61
316
339
23
1.74
343
346
3
0.66
349
390
41
0.82
393
482
89
1.68
462
469
7
4.92
507
509
2
2.63
514
530
16
1.54
525
528
3
4.71
550
596
46
3.15
567
578
11
9.81
NYZRCD D1405
RC/DD
467799.98
9672497.51
1239.16
268.4
-62.1
720
incl.
incl.
and
and
incl.
and
and
and
3
6
3
1.33
341
381
40
0.99
384
389
5
0.81
392
395
3
0.65
404
410
6
0.90
431
433
2
0.57
458
467
9
0.82
470
474
4
6.27
472
474
2
11.46
478
481
3
1.54
486
499
13
0.97
506
558
52
3.01
528
533
5
7.06
537
541
4
8.32
552
555
3
15.51
565
579
14
3.15
597
678
81
4.00
600
604
4
11.47
616
619
3
4.52
625
633
8
16.74
666
670
4
5.27
681
700
19
1.16
NYZRCD D1406
RC/DD
467878.31
9672457.98
1231.13
268.0
-58.0
800
541
545
4
0.67

PERSEUSMINING.COM

21

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
incl.
incl.
and
554
556
2
0.69
569
571
2
0.59
575
582
7
0.55
585
595
10
1.12
601
610
9
0.55
619
631
12
4.18
621
623
2
7.79
634
637
3
0.69
640
647
7
1.15
669
711
42
0.66
714
764
50
3.09
741
744
3
8.65
754
757
3
5.54
767
769
2
0.67
NYZRCD D1407
RC/DD
467835.96
9672461.25
1235.31
268.1
-57.9
728.2
incl.
incl.
and
359
367
8
0.81
370
373
3
0.73
382
389
7
1.09
394
396
2
0.57
415
417
2
1.11
471
475
4
0.80
485
529
44
1.60
515
518
3
5.28
532
546
14
1.34
557
560
3
1.16
563
567
4
0.89
583
653
70
3.15
618
631
13
10.24
641
645
4
5.23
657
668
11
1.39
694
697
3
2.68
NYZRCD D1408
RC/DD
467122.91
9672496.25
1234.89
88.7
-60.7
480.6
405
417
12
1.02
421
436
15
1.28
440
443
3
0.62
NYZRCD D1409*
RC/DD
467838.35
9672380.10
1236.69
268.3
-58.3
750
Assayspending
NYZRCD D1410
RC/DD
467138.81
9672455.59
1241.82
89.5
-60.7
450.6
incl.
240
242
2
0.53
247
250
3
0.83
253
262
9
0.82
277
279
2
0.66
293
297
4
0.79
301
303
2
0.58
306
317
11
0.68
321
343
22
0.53
348
352
4
0.51
355
372
17
0.68
379
381
2
0.61
384
403
19
1.63
397
400
3
4.54
407
411
4
0.60
NYZRCD D1411
RC/DD
467203.06
9672414.82
1264.18
88.6
-60.0
430.7
183
185
2
0.66
188
202
14
0.63
206
208
2
0.93
278
285
7
0.75
298
300
2
1.09
316
319
3
0.48
324
327
3
17.65
345
349
4
0.62
359
382
23
2.85
385
392
7
0.63
NYZRCD D1412*
RC/DD
467836.90
9672422.46
1236.08
268.1
-58.0
720
Assayspending
NYZRCD D1413
RC/DD
467221.57
9672452.69
1262.94
90.1
-60.4
420.4
incl.
and
and
and
and
200
202
2
0.62
259
261
2
1.04
326
329
3
0.58
332
386
54
2.77
324
327
3
17.65
340
347
7
4.14
352
363
11
4.70
368
374
6
3.24
377
380
3
4.03
414
416
2
0.72
NYZRCD D1414*
RC/DD
467794.97
9672378.06
1244.82
267.8
-58.1
700
Assayspending
NYZRCD D1419
RC/DD
467760.82
9672342.18
1256.02
269.6
-59.8
590.7
incl.
incl.
and
and
242
247
5
1.03
251
330
79
1.11
266
268
2
4.53
348
400
52
3.17
358
363
5
6.68
369
375
6
7.04
382
387
5
3.99

PERSEUSMINING.COM

22

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
508
510
2
0.52
587
590.7
3.7
1.97
NYZRCD D1422
RC/DD
467764.39
9672299.46
1258.02
270.7
-59.7
570.5
incl.
and
and
and
and
215
218
3
0.53
245
249
4
0.55
253
256
3
0.75
259
263
4
0.89
266
276
10
0.80
279
291
12
0.76
302
320
18
1.23
331
334
3
0.77
339
423
84
3.24
351
356
5
3.60
374
380
6
5.30
384
389
5
4.83
392
403
11
9.15
410
415
5
3.88
NYZRCD D1425
RC/DD
467759.62
9672259.29
1261.83
270.9
-59.5
570.5
incl.
and
and
and
incl.
258
262
4
0.78
266
301
35
1.10
334
412
78
3.12
352
356
4
3.78
361
364
3
6.41
372
374
2
13.03
401
409
8
11.86
417
442
25
3.27
417
420.5
3.5
16.59
466
468
2
5.41
482
484
2
1.56
489
491
2
0.60
NYZRCD D1429
RC/DD
467793.74
9672221.06
1252.09
269.7
-60.5
650.94
incl.
incl.
incl.
and
and
283
301
18
0.76
308
318
10
0.76
321
340
19
3.39
329
331
2
21.22
343
358
15
1.82
345
347
2
4.47
446
457
11
9.11
460
502
42
3.53
465
467
2
4.88
479
488
9
8.91
492
495
3
7.98
505
518
13
1.11
598
602
4
0.60
642
644
2
0.93
NYZRCD D1430*
RC/DD
467800.27
9672296.95
1248.44
270.2
-60.7
650
Assayspending
NYZRCD D1431*
RC/DD
467795.95
9672339.96
1246.40
269.3
-61.2
650
Assayspending
NYZRCD D1435
RC/DD
467743.13
9672177.90
1269.72
268.2
-61.1
530.8
incl.
and
and
269
273
4
0.30
324
331
7
0.52
336
338
2
1.00
341
385
44
1.87
346
349
3
5.43
357
360
3
3.12
367
371
4
4.73
389
393
4
8.22
NYZRCD D1437*
RC/DD
467694.64
9672180.53
1287.49
269.7
-60.8
450.3
185
187
2
1.02
270
290
20
0.72
301
305
4
0.69
312
316
4
0.66
322
325
3
0.54
410
414
4
1.08
NYZRCD D1439
RC/DD
467362.28
9672418.78
1308.03
89.4
-60.5
320.3
128
130
2
0.82
161
164
3
0.67
168
221
53
1.20
224
233
9
1.27
236
253
17
0.74
268
294
26
1.07
301
307
6
0.56
315
320.3
5.3
1.11
NYZRCD D1440
RC/DD
467401.26
9672380.95
1327.69
88.4
-59.3
260.3
incl.
118
126
8
1.30
135
139
4
0.97
144
151
7
0.55
159
195
36
1.37
199
221
22
1.42
218
220
2
8.49
228
251
23
0.86
    • Hole in progress. Partial assays only

PERSEUSMINING.COM

23

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Table 4: Nyanzaga Gold Project – Kilimani drill holes and significant assays based on lower cut-off of 0.5 g/t gold Au with maximum 2 m internal waste

Hole ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
NYZRC1415
RC
467341.65
9672337.51
1325.65
91.8
-60.3
100
No significant intercepts
NYZRC1416
RC
467985.92
9672777.66
1258.80
33.0
-53.6
106
i
78
94
16
1.96
91
93
2
8.57
NYZRC1418A
RC
467956.45
9672805.92
1259.73
34.0
-55.8
100
78
81
3
1.03
NYZRC1421
RC
467888.22
9672846.77
1262.11
35.1
-55.1
150
incl.
incl.
3
6
3
4.71
4
6
2
6.57
33
39
6
0.42
44
50
6
0.97
57
64
7
0.90
57
62
5
5.42
76
81
5
0.69
86
95
9
0.52
101
104
3
0.77
139
142
3
0.92
NYZRC1423
RC
467865.74
9672811.74
1255.38
33.5
-54.0
150
45
53
8
0.78
56
60
4
0.64
63
69
6
1.53
129
133
4
0.61
139
142
3
0.68
146
149
3
1.80
NYZRC1424
RC
467980.66
9672835.11
1266.74
35.1
-54.9
150
42
44
2
0.65
47
69
22
4.14
84
89
5
0.59
116
129
13
0.90
NYZRC1426
RC
468067.30
9672820.73
1271.43
35.0
-55.1
150
incl.
9
20
11
9.41
9
16
7
14.14
124
126
2
1.20
NYZRC1432
RC
468043.62
9672787.38
1262.40
32.1
-56.4
116
55
57
2
1.65
60
65
5
1.04
77
81
4
0.70
89
91
2
0.70
NYZRC1433
RC
468130.06
9672776.21
1269.56
32.4
-56.0
114
0
11
11
0.87
16
19
3
0.76
40
45
5
0.85
52
57
5
0.72
61
63
2
1.63
91
95
4
0.66
108
110
2
0.61
NYZRC1434
RC
468163.87
9672754.46
1270.04
32.0
-56.0
113
1
6
5
0.78
17
39
22
0.66
42
50
8
0.96
53
59
6
0.77
69
73
4
0.73
NYZRC1436
RC
468197.00
9672731.74
1269.57
34.1
-56.0
108
6
22
16
0.94
26
31
5
0.81
34
47
13
0.50
57
60
3
1.61
63
67
4
0.44
70
77
7
0.62
NYZRC1438B
RC
468100.39
9672800.83
1271.43
36.7
-56.5
150
incl.
7
10
3
0.64
14
19
5
0.80
41
49
8
2.53
42
44
2
7.42
58
67
9
0.55
77
111
34
0.71
117
119
2
0.60
123
125
2
0.62
NYZRC1442
RC
467966.57
9672891.51
1277.14
34.3
-55.5
150
8
10
2
0.72
94
97
3
0.57
100
108
8
0.55
111
114
3
0.54
NYZRC1443
RC
467637.05
9672975.13
1267.68
34.3
-54.8
126
No significant intercepts
NYZRC1444
RC
467656.08
9673008.81
1272.49
35.6
-55.0
96
18
29
11
1.34
48
53
5
1.06
64
67
3
0.56
NYZRC1445
RC
468219.71
9672759.15
1277.69
34.0
-56.0
104
4
44
40
0.87
47
51
4
0.66
NYZRC1446
RC
468186.47
9672779.95
1278.52
34.0
-56.0
114
16
26
10
1.00
30
53
23
1.07
65
76
11
1.19
90
93
3
1.13
97
100
3
1.45
NYZRC1447
RC
467671.53
9672954.65
1265.82
33.7
-55.2
142
89
92
3
0.59
NYZRC1448
RC
468153.89
9672807.75
1282.12
33.8
-55.9
121
5
9
4
1.04

PERSEUSMINING.COM

24

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
18
20
2
1.24
32
70
38
0.99
82
90
8
0.63
97
117
20
1.15
NYZRC 1449
RC
467911.22
9672875.30
1269.25
33.8
-56.0
150
incl.
8
10
2
1.05
17
20
3
0.68
25
32
7
0.61
41
49
8
11.90
42
44
2
43.39
60
63
3
0.56
70
81
11
0.86
93
95
2
0.77
NYZRC 1450
RC
467714.72
9673022.74
1275.16
33.0
-55.1
100
13
16
3
0.96
NYZRC 1451
RC
468094.51
9672856.23
1281.02
34.0
-56.0
126
23
34
11
0.92
43
50
7
0.71
54
56
2
1.00
NYZRC 1452
RC
468124.28
9672831.95
1280.92
34.0
-56.0
150
incl.
16
18
2
0.75
24
39
15
0.87
43
68
25
1.15
74
86
12
0.88
99
106
7
4.17
99
101
2
10.70
NYZRC 1453
RC
467804.82
9673006.99
1282.06
35.9
-56.0
150
9
19
10
0.98
23
34
11
0.87
58
68
10
1.21
NYZRC 1455
RC
467836.67
9672982.18
1284.07
33.9
-55.5
150
1
14
13
1.24
25
33
8
0.44
55
59
4
1.06
71
76
5
0.82
NYZRC 1456
RC
467768.94
9673028.76
1279.78
32.2
-55.4
97
22
25
3
0.71
NYZRC 1457
RC
467932.57
9672912.82
1280.19
34.0
-55.2
150
0
24
24
0.95
36
39
3
0.70
102
109
7
0.52
125
129
4
0.57
137
141
4
0.74
NYZRC 1458
RC
467810.80
9672953.52
1276.60
34.3
-54.1
150
incl.
6
11
5
0.56
16
27
11
1.17
35
47
12
0.65
51
58
7
0.91
70
76
6
3.41
79
90
11
6.16
82
86
4
15.40
92
100
8
0.96
NYZRC 1459
RC
467901.12
9672789.12
1250.18
34.0
-55.9
150
45
47
2
0.73
NYZRC 1460
RC
467780.65
9672972.51
1275.73
35.5
-54.2
150
35
44
9
0.81
48
53
5
0.70
NYZRC 1461
RC
467856.83
9672869.86
1265.89
34.0
-56.0
150
13
18
5
0.47
22
27
5
1.33
38
42
4
1.97
54
61
7
0.57
NYZRC 1462
RC
467757.14
9672939.55
1267.67
33.0
-53.6
150
11
14
3
0.73
18
31
13
0.92
41
43
2
0.54
60
62
2
0.77
90
97
7
1.03
110
116
6
0.83
NYZRC 1463
RC
468242.54
9672793.86
1289.65
34.0
-56.1
86
1
10
9
0.69
14
20
6
1.17
28
30
2
1.96
37
46
9
1.18
50
63
13
0.82
68
74
6
0.64
NYZRC 1465
RC
467725.49
9672958.60
1266.66
35.5
-54.9
114
7
10
3
0.77
37
47
10
0.72
82
84
2
0.62
NYZRC 1466A
RC
468209.89
9672818.77
1290.59
34.0
-56.0
106
incl.
21
46
25
2.05
23
25
2
12.99
51
54
3
0.60
57
60
3
1.24
67
69
2
0.70
93
95
2
0.58
NYZRC 1467
RC
468177.45
9672836.63
1290.30
33.9
-56.0
149
0
4
4
0.71
12
15
3
4.59
24
31
7
0.79
55
58
3
3.98
70
84
14
0.76
88
92
4
0.90

PERSEUSMINING.COM

25

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Hol e ID
Drill Type
East
(Arc 1960 Z36S)
North
(Arc 1960 Z36S)
Elevation
(Arc 1960 Z36S)
Azimuth (°)
Dip (°)
Depth (m)
From (m)
To (m)
Interval (m)
Au (g/t)
95
100
5
0.86
NYZRC 1468
RC
467680.47
9672897.62
1260.62
36.7
-55.5
148
71
93
22
1.29
137
139
2
0.55
NYZRC 1470
RC
468032.04
9672844.17
1271.38
33.8
-55.8
150
incl.
0
3
3
0.82
18
30
12
2.69
19
23
4
6.78
NYZRC 1471
RC
467898.96
9672939.69
1286.57
33.9
-56.2
150
incl.
0
44
44
4.36
25
28
3
43.56
82
84
2
1.27
90
92
2
0.77
111
113
2
0.96
NYZRC 1472
RC
467872.59
9672962.75
1288.00
34.1
-55.0
150
incl.
and
and
0
46
46
1.84
24
26
2
3.55
33
37
4
3.74
43
46
3
9.40
55
57
2
0.62
NYZRC 1473
RC
467709.44
9672876.10
1259.04
35.6
-54.5
118
74
82
8
0.97
97
112
15
0.85
NYZRC 1474
RC
467882.89
9672900.67
1276.04
34.0
-56.0
150
21
28
7
0.91
45
49
4
0.60
58
61
3
0.63
64
76
12
1.16
79
84
5
1.06
88
93
5
1.41
NYZRC 1475
RC
467763.71
9672882.70
1261.32
33.6
-54.3
150
40
42
2
0.56
51
54
3
0.62
57
61
4
0.70
65
76
11
1.02
85
87
2
0.72
NYZRC 1476A
RC
467796.16
9672856.70
1259.10
35.0
-55.1
150
incl.
4
9
5
1.03
18
29
11
0.63
65
70
5
1.12
72
74
2
0.80
86
90
4
0.41
132
148
16
1.98
136
139
3
6.93
NYZRC 1477
RC
468264.37
9672825.72
1301.77
34.0
-56.1
150
4
7
3
0.60
13
15
2
1.78
18
21
3
1.25
30
35
5
0.84
NYZRC 1478
RC
467787.95
9672919.07
1269.04
36.4
-56.6
130
71
76
5
0.67
106
109
3
0.66
NYZRC 1479
RC
467823.91
9672891.13
1269.04
35.4
-55.2
110
23
26
3
0.46
66
71
5
0.58
NYZRC 1480
RC
467688.48
9672983.97
1270.23
35.3
-55.0
126
30
38
8
0.65
NYZRC 1481
RC
467749.10
9672998.13
1274.12
34.4
-55.4
103
0
19
19
1.18
26
33
7
0.63
49
51
2
0.70
NYZRC 1482
RC
467844.99
9672935.30
1284.00
35.6
-64.2
150
3
9
6
0.85
26
30
4
0.59
34
66
32
1.31
69
77
8
1.08
80
82
2
0.59
86
89
3
0.60
93
100
7
0.86

PERSEUSMINING.COM

26

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

APPENDIX 3 – JORC TABLE 1

The following table provides the reporting criteria for the reporting of Mineral Resource and Ore Reserves, in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Criteria in each section apply to all preceding and succeeding sections.

SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria Commentary
Sampling
techniques
General Commentary

Samples for geological logging, assay, geotechnical, metallurgical and density test work are
collected via drilling.

Diamond core drilling uses double and triple tube techniques and samples were taken at nominal
1 m intervals.

Reverse circulation (RC) drill holes were sampled in 1 m intervals and reduced to a sample weight
of 3 kg to 4 kg via a cyclone and splitter system.

For RC samples prior to 2005, samples were normally combined into 3 m composite samples for
assaying. Where composite samples returned gold assays greater than a nominal threshold,
second splits were generated for the constituent one metre samples and those were submitted
for assay. The one metre assays are prioritised over the original composite assays in the acQuire
database.
Deposit Specific Commentary
Tusker

Drilling is predominantly DD with RC pre-collars on 20 mN × 40 mE spacing across the main
mineralised areas. Additionally, a limited area has infill to 20 mN × 20 mE. Holes were aligned
towards either 90° or 270° and dip at -60°.
Kilimani

Drilling is predominantly RC with minor DD at a nominal 20 m (along strike) × 40 m (across strike)
pattern. Holes were aligned to either 035° or 215° with inclinations nominally -60°.
Drilling techniques General Commentary

RC drilling prior to 2010 used 6” diameter face-sampling bit. After 2010 RC drilling used a 5¼”
diameter face-sampling bit

Diamond drilling utilised PQ (85 mm diameter) or HQ triple-tube (61.1 mm dia.) drilling in
weathered materials and NQ2 (50.6 mm dia.) or NQ (47.6 mm dia.) core in fresh rock. Pre-
collared holes were normally drilled to NQ or NQ2 diameter from the commencement of coring.

A variety of core orientation devices have been used. These include Reflex ACT, Easy Mark, Spear
or Ball Mark. The diamond drill core orientations were marked and measured at the drill site by
the driller and subsequently checked by the geologists who then drew orientation lines on the
core.
Drill sample
recovery
General Commentary

Diamond core recoveries were measured linearly per drill run. Core recoveries average
approximately 85% in weathered materials and above 98% in fresh rock.

RC sample recoveries were measured by weighing bulk recovered samples. Preliminary
evaluation indicates that RC sample recoveries have been satisfactory.

There is no material relationship between sample recoveries and gold grades.
Logging General Commentary

RC drill chips were logged geologically, including rock type, weathering, oxidation, lithology,
alteration, structure, mineralisation (including estimated percent sulphide concentrations) and
veining.

Diamond drill core was geologically and structurally logged. Geological loggingmethods are
identical to RC logging. Structural logging includes joints, fractures, roughness and infill type of
structures and veins as well as recovery and RQD.

All holes are logged in their entirety.

Prior to 2025 all logging, including comments, was manually entered into spreadsheets, from
where it is imported into an acQuire relational database maintained by Perseus. Since 2025
drilling has been digital into an acQuire offline logging object and subsequently uploaded directly
to acQuire.

Digital loggingof structures in drill core usinga Reflex IQ-logger was implemented from 2021.

PERSEUSMINING.COM

27

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Criteria Commentary

Logging is considered qualitative in nature.

Diamond core was photographed prior to being processed, however photographs for some holes
are not able to be located.
Sub-sampling
techniques and
sample preparation
General Commentary

Diamond core was cut in half using a diamond saw. All samples were collected from the same
side of the core with the remaining half stored in core trays.

Sample preparation of diamond core and RC chips for subsequent fire assay analysis used
industry standard techniques. After drying, the sample is subject to a primary crush to 2 mm,
then approximately 1.5 kg of sub-sample was split off and pulverised with a 300 gram of pulp
selected for analysis. Internal laboratory checks required at least 85% of the pulp passing
- 75 microns.

Sample preparation for photon assay involved crushing to 2 mm, then a nominal 500 g of sub-
sample was split off for analysis.

From 2010 to 2012 the combined frequency of certified reference materials, blanks, and field
duplicates was at a rate of 1:10. Diamond core duplicates were submitted from the second half
of the core.

From 2017 onwards QC procedures included the use of certified reference materials (1:20),
blanks (1:20), and RC field duplicates (1:20). Duplicate splits of diamond core were collected as
a second sample from the coarse reject at the laboratory.

In the period 2005 to 2012 most sample preparation has been undertaken at SGS Mwanza
laboratory. Sample preparation in the period 2016-2017 was completed at both SGS Mwanza
and Intertek Genalysis Johannesburg. For the 2021-2022 drilling sample preparation was
completed at Nesch Mintech in Mwanza. From 2024 onwards samples were submitted to
MSALABS in Geita for sample preparation.

Sample sizes are considered appropriate and representative for the style of mineralisation, the
thickness and consistency of the mineralised intersections and the grade ranges encountered.
Quality of assay
data and laboratory
tests
General Commentary

The majority of RC and diamond core samples up to 2021 have been assayed by 50 g fire assay
with AAS finish by commercial laboratories including SGS (Mwanza) and Intertek (Perth). The fire
assay technique is considered a total extraction technique.

Samples during 2021 and 2022 were assayed by 50 g fire assay with AAS finish by Nesch Mintech
(Mwanza).

From 2024 gold analyses have been attained via the photon assay determination method at
MSALABS in Geita. This method is considered a measure of the total gold content.

Assessment of the results of QC assays shows acceptable levels of accuracy and precision with
no significant bias.
Verification of
sampling and
assaying
General Commentary

Downhole survey data and collar survey data were provided by drilling contractors and surveyors
respectively in digital format.

Numerous significant mineralised intersections have been checked against visual alteration and
sulphide mineralisation in drill chips and core.

Geology, structure and geotechnical logs are paper based. Sample intervals are recorded in pre-
numbered sample ticket books. All logging, sample interval and survey data are manually
entered to digital form on site and stored in an acQuire™ relational database. Data exports are
normally in the form of csv files or via ODBC connections to tailored SQL views.

The acQuire database is managed by a dedicated Database Manager.

Unsampled intervals were coded with -9999 while results reported below detection were
assigned half the relevant detection limit.

Data verification procedures include automated checks to:
–prevent repetition of sample numbers
–prevent overlap of from-to intervals in logging and sample interval data
–ensure that total hole depths in collar, assay and geology tables match
–ensure that drill collar coordinates are within the project’s geographic limits
–Down-hole survey data are examined for large deviations in dip or azimuth that may
represent erroneous data or data entry errors and corrected on a case-by-case basis
including estimates of dips and azimuths where the original data appear to be in error.

Additional data checks include viewing drill hole traces, geological logging and assays in plan and
section views.
Deposit Specific Commentary

PERSEUSMINING.COM

28

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Criteria Commentary
Tusker

While no dedicated diamond holes have been completed to twin RC drilling, the results of
infill drilling on 20 m sections typically confirms the position and tenor of mineralisation
reported from historical drilling, allowing for variability associated with nuggety gold
mineralisation.
Location of data
points
General Commentary

All drill hole collars at Nyanzaga were surveyed by Nile Precision Surveys by DGPS techniques in
2017. Collars drilled in 2021 and 2022 were surveyed by Gleam survey contractors.

The 2017 collar survey identified an error in the local base station coordinates with respect to
the Arc 1960 projection. In 2024 all collars were adjusted to align with the corrected Arc 1960
coordinates.

All collars from 2024 onwards have been surveyed using contract or company surveyors using
DGPS techniques.

All RC and diamond core holes are typically surveyed at 50 m intervals using Reflex or Flexi It
Single Shot tools, with additional Gyro downhole surveys, when deemed necessary.

A topographic surface has been established by a LiDAR survey conducted in 2019. The
topographic surface is reliable to ± 0.2 m.

Topographic control is adequate for the current work being undertaken at Nyanzaga.
Data spacing and
distribution
General Commentary

The mineralisation domains have demonstrated sufficient continuity in both geology and grade
to support the definition of Mineral Resources, and the classifications applied under the 2012
JORC Code guidelines.

With the exception of 3 m and 4 m composites collected from RC pre-collars, all samples from
RC drilling were collected at 1 m intervals. If gold assay results from the composite samples were
above the specified threshold the constituent individual 1 m samples were submitted and
assigned priority in the database.
Deposit Specific Commentary
Tusker

Drilling is via RC and DD typically on 20 mN × 40 mE spacing extending to 40 mN × 40 mE at the
margins with a limited area defined by 20 mN × 20 mE.
Kilimani

Drilling is predominantly RC with minor DD at a nominal 20 m (along strike) × 40 m (across strike)
pattern.
Orientation of data
in relation to
geological structure
General Commentary

Drilling at each of the deposits was oriented to intersect the dominant mineralisation at as near
optimal orientation as was practicable.

The orientation of mineralisation relevant to drilling was not considered likely to have introduced
any material bias.
Sample security General Commentary

RC and core samples were removed from the field and stored in a secure compound at the end
of each day’s work program by company personnel. RC field sample splits and samples of half
diamond core were placed in numbered bags and those bags, in turn, placed into poly-woven
sacks that were closed with plastic cable ties prior to transport to the relevant commercial
laboratory.

Security guards were employed at drilling sites, the core yard compound and the sample
preparation facility on a 24 hour per day basis.

Samples were stored on site and collected by representatives of the analysis laboratory or
delivered by company personnel to the required facility. Company personnel had no further
involvement in the analysis of the samples.

Results of field duplicates along with the general consistency of assay results between
neighbouring drill holes and drilling methods provide confidence in the general reliability of the
assay data.
Audits or reviews General Commentary

Audit review of the various drill sampling techniques and assaying have been undertaken. The
samplingmethodologyapplied to data follow standard industry practices. Aprocedure ofQAQC

PERSEUSMINING.COM

29

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Criteria Commentary involving appropriate standards, duplicates, blanks and internal laboratory checks is and has been routinely employed in all drilling phases.

SECTION 2 REPORTING OF EXPLORATION RESULTS

Criteria Commentary Commentary Commentary Commentary Commentary Commentary Commentary
Mineral
tenement and
land tenure
status
General Commentary

The Nyanzaga Gold Project is located north-western Tanzania, approximately 60 km south-
southwest of Mwanza in the Sengerema District.

The Project lies within the granted SML 653/2021 covering an area of 23.36 km2. SML 653/2021 was
granted on 13 December 2021 for a period of 15 years. The company also has a number of
Prospecting Licences surrounding the SML.

Statutory royalties of 6% are payable to the Tanzanian Government, based on the gross value
method. This is in addition to the 0.3% community levy and 1% clearing fee on the value of all
minerals exported from Tanzania from 1 July 2017.

The Tanzanian Government holds a 20% free carried interest in Sotta Mining Corporation Limited
(SMCL) being the joint venture company which holds the SML. There is a Framework Agreement and
Shareholders Agreement in place governing the operations of the joint venture company.
Tenement ID
Current Holder
Current
Status
Application
Date
Grant Date
Expiry Date
Area
(km2)
SML653/2021
Sotta Mining Corporation
Limited(100%)
Active
10/10/2017
13/12/2021
12/12/2036
23.36
PL1873/2022
Sotta Mining Corporation
Limited(100%)
Active
1/02/2022
29/03/2022
28/03/2026
17.03
PL1874/2022
Sotta Mining Corporation
Limited(100%)
Active
1/02/2022
29/03/2022
28/03/2026
21.22
PL12427/2023
Sotta Mining Corporation
Limited(100%)
Active
6/07/2023
24/07/2023
23/07/2027
37.26
PL12428/2023
Sotta Mining Corporation
Limited(100%)
Active
6/07/2023
24/07/2023
23/07/2027
42.78
PL12429/2023
Sotta Mining Corporation
Limited(100%)
Active
6/07/2023
24/07/2023
23/07/2027
4.20
PL12430/2023
Sotta Mining Corporation
Limited(100%)
Active
6/07/2023
24/07/2023
23/07/2027
1.37
PL10877/2016
Perseus Tanzania Limited
(100%)
Active
11/03/2016
7/10/2016
6/10/2025
7.42
PL10911/2016
Perseus Tanzania Limited
(100%)
Active
21/04/2016
23/09/2016
22/09/2025
10.91
PL11186/2018
Perseus Tanzania Limited
(100%)
Active
14/12/2016
26/10/2018
25/10/2025
18.21
PL11961/2017
Perseus Tanzania Limited
(100%)
Application
31/05/2017
3.53
Tenement ID Current Holder Current
Status
Application
Date
Grant Date Expiry Date Area
(km2)
SML653/2021 Sotta Mining Corporation
Limited(100%)
Active 10/10/2017 13/12/2021 12/12/2036 23.36
PL1873/2022 Sotta Mining Corporation
Limited(100%)
Active 1/02/2022 29/03/2022 28/03/2026 17.03
PL1874/2022 Sotta Mining Corporation
Limited(100%)
Active 1/02/2022 29/03/2022 28/03/2026 21.22
PL12427/2023 Sotta Mining Corporation
Limited(100%)
Active 6/07/2023 24/07/2023 23/07/2027 37.26
PL12428/2023 Sotta Mining Corporation
Limited(100%)
Active 6/07/2023 24/07/2023 23/07/2027 42.78
PL12429/2023 Sotta Mining Corporation
Limited(100%)
Active 6/07/2023 24/07/2023 23/07/2027 4.20
PL12430/2023 Sotta Mining Corporation
Limited(100%)
Active 6/07/2023 24/07/2023 23/07/2027 1.37
PL10877/2016 Perseus Tanzania Limited
(100%)
Active 11/03/2016 7/10/2016 6/10/2025 7.42
PL10911/2016 Perseus Tanzania Limited
(100%)
Active 21/04/2016 23/09/2016 22/09/2025 10.91
PL11186/2018 Perseus Tanzania Limited
(100%)
Active 14/12/2016 26/10/2018 25/10/2025 18.21
PL11961/2017 Perseus Tanzania Limited
(100%)
Application 31/05/2017 3.53
Exploration
done by other
parties
General Commentary

In 1996 the Maiden Gold JV with Sub Sahara Resources acquired aerial photography, Landsat
imagery and airborne magnetic and radiometric survey data. In addition they completed soil and
rock chip sampling, geological mapping, a helicopter-borne magnetic and radiometric geophysical
survey and a small RC drill program.

In the period 1997-1998 AVGold (in JV with Sub Sahara) completed residual soil sampling, rock chip
and trench sampling and a ground magnetic survey.

During 1999 to 2001 Anglovaal Mining Ltd (in JV with Sub Sahara) conducted further soil sampling,
rock chip sampling, trenching, ground magnetic survey, IP and resistivity survey and limited RC and
diamond drilling.

In 2002 the Placer Dome JV with Sub Sahara Resources completed trenching, structural mapping,
petrographic studies, RAB/AC, RC and diamond drilling.

During 2003 Sub Sahara Resources compiled previous work including literature surveys, geological
mapping, air photo and Landsat TM analysis, geophysical surveys, geological mapping, geochemical
soil and rock chip surveys and various RAB, RC and DDH drilling programs.

From 2004 to 2009 the Barrick Exploration Africa Ltd (BEAL) JV with Sub Sahara Resources embarked
on a detailed surface mapping, relogging, analysis and interpretation program to consolidate a
geological model and acceptable interpretative map. They also carried out additional soil and rock
chipsampling, petrographic analysis, geological field mappingas well as RAB,CBI,RC and diamond

PERSEUSMINING.COM

30

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Criteria Commentary
drilling. A high resolution airborne geophysical survey (including magnetic, IP and resistivity) was
flown over the Nyanzaga project area totalling 400 km2. To improve the resolution of the target
delineation process, BEAL contracted Geotech Airborne Limited and completed a helicopter
Versatile Time Domain Electromagnetic (VTEM) survey in August 2006. Metallurgical test work and
an independent Mineral Resource estimate was also completed (independent consultant).

In the period 2009 to 2010 Western Metals/Indago Resources completed work focused on targeting
and mitigating the identified risks in the Mineral Resource estimate. The main objectives were to
develop confidence in continuity of mineralisation in the Nyanzaga deposit to a level required for a
Feasibility Study. The independent consultant was retained by Indago to undertake an update
Mineral Resource Estimate which was completed in May 2009. Drilling was completed on extensions
and higher-grade zones internal to the optimised pit shell.

From 2010 to 2014 Acacia undertook an extensive step out and infill drilling program and updated
the geological and Mineral Resource models.

During 2015 to 2022 – OreCorp Limited completed extensive work, primarily at Nyanzaga (including
Kilimani) and also on regional targets. This work has included detailed mapping including structural
and alteration mapping, drilling and soil sampling.
Geology General Commentary

The Tusker and Kilimani projects are located on the north-eastern flank of the Sukumaland Archaean
Greenstone Belt. It is hosted within Nyanzian greenstone volcanic rocks and sediments typical of
greenstone belts of the East African craton.

The Tusker and Kilimani deposits are orogenic gold deposit types.
Deposit Specific Commentary
Tusker

The Tusker deposit occurs within a sequence of folded Nyanzian sedimentary and volcanic rocks. The
current interpretation of the Nyanzaga deposit has recognised a sequence of mudstone, sandstone
and chert that are interpreted to form a northerly plunging antiform.

The mineralisation is hosted by a cyclical sequence of chemical and clastic sediments
(chert/sandstone/siltstone) bound by footwall and hanging wall volcanoclastic units.

At Tusker, three key alteration assemblages have been identified: Stage 1 - crustiform carbonate
stockwork; Stage 2 – silica-sericite dolomite breccia replacement overprint; and Stage 3 – silica
sulphide-gold veins.
Kilimani

At Kilimani, most of the recognised mineralisation occurs in the oxidised profile. Where intersected
in fresh material, the mineralisation is associated with strongly carbonate stock work and
disseminated replacement. Mineralisation at Kilimani is reported as stratigraphically controlled in
thin chert, mudstone and sandstones.

At Kilimani, the distribution of the gold mineralisation is related to dilation associated with: 1)
competency contrast near the sedimentary cycle boundaries resulting in stratabound mineralisation;
and 2) sub-vertical faulting, fracturing and brecciation related to the folding and subsequent
shearing along the NE limb of the fold.
Drill hole
Information
General Commentary

Drill hole details including easting, northing, and elevation (in Arc 1960, Zone 36S), dip and azimuth
(UTM grid), and total hole length, and which form the basis of this release are presented in Appendix
2.

All information is presented.
Data
aggregation
methods
General Commentary

Details of intercepts from holes forming the basis of this release are presented in Appendix 2.

Significant intercepts are reported based on a minimum width of 2 m, a maximum consecutive
internal dilution of no more than 2 m, no upper or lower cut, and at a cut-off grade of 0.5 g/t Au.

Where no significant intercepts are reported these are listed.

All information is presented.

No metal equivalents are used for reporting.
Relationship
between
mineralisation
widths and
General Commentary

Drilling results are quoted as downhole intersections. True mineralisation width is interpreted as
approximately 50% to 70% of intersection length for holes drilled dipping at 60° at a bearing of 270°
grid.

PERSEUSMINING.COM

31

NEWS RELEASE | PERSEUS MINING DELIVERS ENCOURAGING DRILLING RESULTS FROM ITS CURRENT DRILL PROGRAM AT THE NYANZAGA GOLD PROJECT

==> picture [111 x 34] intentionally omitted <==

Criteria Commentary
intercept
lengths

The geological interpretation, field mapping and drilling results support the interpretation of a folded
plunging anticline within the Tusker mineralisation. Due to the variable orientations, drilling
sometimes intersects mineralised structures at a high angle. The influence of these high angle
intercepts is largely mitigated by the generation of a three-dimensional geology and mineralisation
model controlling the modelled volumes and zones of influence.
Diagrams General Commentary

Suitable plans demonstrating the location and orientation of drilling relative to mineralisation and
significant intercepts are presented in the body of this release.
Balanced
reporting
General Commentary

All significant intercepts are presented. Where holes have no significant intercepts defined these are
also listed.
Other
substantive
exploration
data
General Commentary

Other substantive exploration data completed at the Project includes:
–Airborne and ground magnetics, radiometric, VTEM, gravity and IP geophysical survey work was
carried out that defines the stratigraphy, structures possibly influencing mineralisation and
chargeability signatures reflecting the extent of disseminated sulphide replacement at depth.
Additionally, satellite imagery (GeoImagery) and meta data images were procured.
–Bulk density measurements were carried out on core samples at 1 m down hole intervals in
selected DD drill holes across the Tusker and Kilimani areas.
–Geotechnical data has been collected by recording alpha, beta, dip direction and structure type.
–Investigations for the potential of acid rock drainage within the project areas have been initiated.
–Metallurgical drilling and associated test work has been completed across the Tusker and
Kilimani mineralisation areas.
Further work General Commentary

Perseus is currently completing ongoing drilling and studies activities to further refine the results of
the Feasibility Study (FS) published in April 2025.

This work will result in an updated Mineral Resource Estimate together with revised assumptions
regarding key modifying factors, together with cost and revenue modelling, supporting reporting of
an updated Ore Reserve.