19 JANUARY 2022 NEWS RELEASE
HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
Perseus Mining Limited (ASX/TSX: PRU) is pleased to report continued exploration success at its Yaouré Gold Mine in Côte d’Ivoire.
HIGHLIGHTS
-
Recent results from Perseus’s ongoing infill and down-dip extension drilling on the CMA structure at Yaouré confirm strong potential for further mineral resources beneath the CMA open pit (“ CMA Underground prospect ”).
-
Infill drilling of the Inferred resource continues to confirm gold mineralisation consistent with previous results from this area, with recent drill intercepts including:
-
YRC1881D: 10m @ 6.61 g/t Au from 236m
-
YRC1883D: 8.10m @ 7.27 g/t Au from 328.10m
-
YRC1903D: 10m @ 3.03 g/t Au from 337, including 3m @ 8.76 g/t Au from 337m
-
YRC1904D: 13m @ 3.77 g/t Au from 294m
-
YRC1905D: 9.8m @ 4.18 g/t Au from 245m
-
YRC1909D: 6m @ 7.57 g/t Au from 304m
-
YRC1911D: 8m @ 4.40 g/t Au from 227m
-
- YRC1913D: 6.3m @ 4.52 g/t from 194.7 and 5.1m @ 6.12 g/t from 305.9m
-
YRC1915D: 10.60m @ 4.36 g/t from 271.4m
-
YRC1916D: 4m @ 4.93 g/t Au from 214.4m, 5.2m @ 2.69 g/t Au from 221.7m, 4m @ 4.21 g/t Au from 235m & 13.2m @ 1.31 g/t Au from 242m
-
YRC1947D: 16.2m @ 5.58 g/t Au from 270m
-
YRC2019D: 15m @ 3.49 g/t Au from 268m including 7m @ 4.91 g/t Au from 268m
-
Results returned high-grade intersections in the CMA hanging-wall, reflecting either CMA splays or oblique S- structures:
-
YRC1883D: 1.67m @ 62.29 g/t Au from 314.80m
-
YRC1897D: 4m @ 17.09 g/t Au from 64m
-
YRC1989D: 8m @ 11.42 g/t Au from 60m
-
YRC2047D: 16m @ 3.39 g/t Au from 56m including 4m @ 10.75 g/t Au from 68m
-
Perseus will use results to upgrade the CMA Underground Inferred Mineral Resource estimate to Indicated status, enabling a Pre-Feasibility Study (PFS) for an underground mining operation to be completed by late June 2022, including an initial Ore Reserve estimate.
PERSEUS MINING LIMITED
Level 2, 437 Roberts Road, Subiaco WA 6008 ABN: 27 106 808 986
1
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
-
Step-out drilling on the down-dip extensions of the CMA structure also returned encouraging results, including:
-
YRC1850AD: 5m @ 3.93 g/t Au from 605m and 4m @ 3.98 g/t Au from 628m
-
YRC1855D: 11.10m @ 3.39 g/t Au from 450.40m, including 5m @ 7.16 g/t Au from 452m.
Perseus’s Managing Director and CEO Jeff Quartermaine said:
“With our three gold mines, Yaouré, Edikan and Sissingué, now producing gold at an annualised rate of over 500,000 ounces per year, Perseus’s focus has turned to maintaining this level of production out to the end of the current decade and beyond.
“Our latest infill and step out drilling results from below Yaouré’s CMA open pit confirm previous drill results that indicated that material quantities of additional Indicated Mineral Resources, capable of being economically mined using underground mining methods, may be delineated.
“We are aiming to complete a Preliminary Feasibility Study of this mining operation by the end of the June Quarter 2022, however, timing of the completion of this work will depend on the ultimate footprint size of the orebody as determined by the current drilling programme.”
CMA UNDERGROUND RESOURCE DRILLING, YAOURÉ
Perseus focused recent exploration activities on the Yaouré permits at CMA Underground and CMA down-dip extensions within 2 kilometres of the Yaouré mill (Appendix 1 - Figure 1.1). Results continue to demonstrate the potential for the Company to materially grow its gold inventory at Yaouré organically, through further drilling success.
As noted in Perseus’s ASX release “Positive Exploration Results at Perseus’s Yaouré Mine” dated 14 October 2021, recent drilling at the CMA Underground prospect focused on infill drilling to firm up previously defined underground resources extending below the currently planned CMA pit. Perseus defined an Inferred Mineral Resource of 1.8 million tonnes grading 6.1 g/t Au, extending to a maximum 275 metre down dip beneath the open pit resource (refer Resources and Reserves ASX announcement 24 August 2021), with potential to extend mineralisation further down dip beyond this (Appendix 1 – Figure 1.2). Perseus has also completed a Scoping Study which identified the potential to mine the CMA structure using underground mining methods (refer to “Perseus Mining Completes Scoping Study for Potential Underground Mine at Yaouré” dated 5th November 2018).
Following completion of drilling within the cutback zone of the CMA South open pit, Perseus extended infill drilling north along the CMA structure where grades are generally higher than at the southern end. Drilling during the last quarter comprised 12,437 metres in 56 reverse circulation (“RC”) pre-collared diamond (“DD”) holes, infilling the existing 50 x 50 metres coverage to a nominal 25 x 25 metres pattern to allow conversion of the Inferred resource to Indicated. Results continued to provide encouragement, with intercepts generally consistent with those previously encountered in both thickness and grade (Appendix 1 - Figures 1.3-1.4) . Of note has been the presence of 2-3 stacked lodes in places, either as a result of anastomosing of the main lode or structural repetition. This feature has also been noted in the open pit workings, locally significantly increasing the ounces of gold per vertical metre.
The style of mineralisation remains consistent with that encountered previously, comprising pervasive, moderate to strong, pink-pale brown albite and carbonate alteration developed within a well-defined structure marked by quartz carbonate veins, fault veins, multi dilatant fault breccia, cataclasis and shearing.
Better intercepts from the CMA infill drilling are shown in Table 1 below, with a complete summary of significant results included in Appendix 2 – Table 2.1 .
CMA DOWN-DIP DRILLING, YAOURÉ
Perseus stepped up drilling to investigate the next 300 metre down-dip from the current CMA Underground resource, with 9,511 metres drilled in 18 RC pre-collared DD holes. This work focused within the “Magazine Zone” ahead of
PERSEUSMINING.COM
2
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
stocking of the magazine with explosives. The step-out program is also guided by Perseus’s early 2020 3D seismic survey that clearly identified the CMA structure extending to depth beyond the current drill coverage.
Perseus is undertaking drilling on an initial 100 x 200 metres pattern to better define the position of the CMA structure and the intensity of mineralisation. If results are encouraging, this will be infilled to 100 x 100 metres to allow an initial Inferred Mineral Resource Estimate.
Better intercepts from the Yaouré step out drilling are shown in Table 1 below and in Appendix 1 - Figures 1.5 & 1.6 , with a complete summary of significant results included in Appendix 2 – Table 2.2 .
Table 1: Intercepts from CMA Underground and CMA Down-dip Drilling
| Hole ID | From (m) | To (m) | Gold Intercept | Comment |
|---|---|---|---|---|
| CMA Underground Resource Drilling | ||||
| YRC1874D 237.15 245 7.85m @ 3.51 g/t CMA FW lode |
||||
| YRC1876D 218 227 9m @ 2.63 g/t CMA FW lode |
||||
| YRC1877D 170.1 172 1.9m @ 3.23 g/t CMA FW lode |
||||
| YRC1877D 176 177.4 1.4m @ 4.13 g/t CMA FW lode |
||||
| YRC1878D 285.8 288 2.2m @ 2.84 g/t CMA FW lode |
||||
| YRC1878D 322 324 2m @ 2.9 g/t CMA FW lode |
||||
| YRC1878D 338 345 7m @ 2.27 g/t CMA FW lode |
||||
| YRC1879D 97 99 2m @ 2.27 g/t CMA HW lode |
||||
| YRC1879D 282.7 286 3.3m @ 1.4 g/t CMA FW lode |
||||
| YRC1880D 232 242 10m @ 3.71 g/t CMA FW lode |
||||
| YRC1881D 236 246 10m @ 6.61 g/t CMA FW lode |
||||
| YRC1882D 298 301 3m @ 3.86 g/t CMA FW lode |
||||
| YRC1883D 314.8 316.47 1.67m @ 62.29 g/t S-structure |
||||
| YRC1883D 328.1 336.2 8.1m @ 7.27 g/t CMA FW lode |
||||
| YRC1885D 282.3 285.3 3m @ 2.04 g/t CMA FW lode |
||||
| YRC1886D 279 293 14m @ 2.05 g/t CMA FW lode |
||||
| Including 279 283 4m @ 6.34 g/t CMA FW lode |
||||
| YRC1887D 297.7 298.8 1.1m @ 7.28 g/t CMA FW lode |
||||
| YRC1888D 237 241 4m @ 2.17 g/t CMA FW lode |
||||
| YRC1888D 282 287 5m @ 2.29 g/t CMA FW lode |
||||
| Including 284 286 2m @ 5.18 g/t CMA FW lode |
||||
| YRC1889D 283 286 3m @ 2.55 g/t CMA FW lode |
||||
| YRC1891D 277 291 14m @ 2.83 g/t CMA FW lode |
||||
| Including 277 286 9m @ 4.06 g/t CMA FW lode |
||||
| YRC1897D 64 68 4m @ 17.09 g/t CMA HW Splay |
||||
| YRC1899D 285 287 2m @ 8.58 g/t CMA FW lode |
||||
| YRC1899D 295 297 2m @ 4.15 g/t CMA FW lode |
||||
| YRC1900D 235 237 2m @ 2.48 g/t CMA FW lode |
||||
| YRC1902D 280 288 8m @ 4.24 g/t CMA FW lode |
||||
| YRC1903D 337 347 10m @ 3.03 g/t CMA FW lode |
||||
| Including 337 340 3m @ 8.76 g/t CMA FW lode |
PERSEUSMINING.COM
3
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | From (m) | To (m) | Gold Intercept | Comment |
|---|---|---|---|---|
| YRC1904D 52 56 |
4m @ 8.14 g/t CMA HW Splay |
|||
| YRC1904D 294 307 |
13m @ 3.77 g/t CMA FW lode |
|||
| YRC1905D 245 254.8 |
9.8m @ 4.18 g/t CMA FW lode |
|||
| YRC1906D 256 268 |
12m @ 3.16 g/t CMA FW lode |
|||
| YRC1907D 255 262 |
7m @ 2.06 g/t CMA FW lode |
|||
| Including 255 259 |
4m @ 3.48 g/t CMA FW lode |
|||
| YRC1908D 289 291 |
2m @ 2.3 g/t CMA FW lode |
|||
| YRC1909D 304 310 |
6m @ 7.57 g/t CMA FW lode |
|||
| YRC1911D 227 235 |
8m @ 4.4 g/t CMA FW lode |
|||
| YRC1912AD 240 244.3 |
4.3m @ 8.83 g/t CMA FW lode |
|||
| YRC1913D 194 204 |
10m @ 2.95 g/t CMA FW lode |
|||
| Including 194.7 201 |
6.3m @ 4.52 g/t CMA FW lode |
|||
| YRC1913D 302 314 |
12m @ 2.82 g/t CMA FW lode |
|||
| Including 305.9 311 |
5.1m @ 6.12 g/t CMA FW lode |
|||
| YRC1914D 257 264 |
7m @ 4.82 g/t CMA FW lode |
|||
| YRC1915D 165 167 |
2m @ 2.27 g/t CMA HW Splay |
|||
| YRC1915D 271.4 282 |
10.6m @ 4.36 g/t CMA FW lode |
|||
| YRC1916D 214.4 218.4 |
4m @ 4.93 g/t CMA FW lode |
|||
| YRC1916D 221.7 226.9 |
5.2m @ 2.69 g/t CMA FW lode |
|||
| YRC1916D 235 239 |
4m @ 4.21 g/t CMA FW lode |
|||
| YRC1918D 261 263.1 |
2.1m @ 3.53 g/t CMA FW lode |
|||
| YRC1921D 56 60 |
4m @ 2.67 g/t CMA HW Splay |
|||
| YRC1922D 229 239.5 |
10.5m @ 4.36 g/t CMA FW lode |
|||
| YRC1923D 258 267 |
9m @ 3.22 g/t CMA FW lode |
|||
| YRC1929D 342.6 348 |
5.4m @ 2.16 g/t CMA FW lode |
|||
| YRC1938D 281 286 |
5m @ 3.5 g/t CMA FW lode |
|||
| YRC1939D 257 261 |
4m @ 2.1 g/t CMA FW lode |
|||
| YRC1943D 314 320 |
6m @ 2.29 g/t CMA FW lode |
|||
| YRC1943D 336.65 340 |
3.35m @ 5.87 g/t CMA FW lode |
|||
| YRC1945D 305.8 312 |
6.2m @ 4.62 g/t CMA FW lode |
|||
| YRC1945D 327 331.6 |
4.6m @ 3.64 g/t CMA FW lode |
|||
| YRC1946D 267.6 270 |
2.4m @ 4.69 g/t CMA FW lode |
|||
| YRC1946D 276 282 |
6m @ 5.26 g/t CMA FW lode |
|||
| YRC1946D 285 288 |
3m @ 3.69 g/t CMA FW lode |
|||
| YRC1947D 270 286.2 |
16.2m @ 5.58 g/t CMA FW lode |
|||
| YRC1963D 290 296 |
6m @ 4.18 g/t CMA FW lode |
|||
| YRC1989D 60 68 |
8m @ 11.42 g/t CMA HW Splay |
|||
| YRC1990D 72 76 |
4m @ 3.75 g/t CMA HW Splay |
|||
| YRC2005D 56 60 |
4m @ 3.08 g/t CMA HW Splay |
|||
| YRC2019D 268 283 |
15m @ 3.49 g/t CMA FW lode |
|||
| YRC2044D 278.4 284.6 |
6.2m @ 2.99 g/t CMA FW lode |
PERSEUSMINING.COM
4
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | From (m) | To (m) | Gold Intercept | Comment |
|---|---|---|---|---|
| YRC2045D 271 273 |
2m @ 4.36 g/t CMA FW lode |
|||
| YRC2045D 278 283 |
5m @ 3.44 g/t CMA FW lode |
|||
| YRC2047D 56 72 |
16m @ 3.39 g/t CMA HW Splay |
|||
| Including 68 72 |
4m @ 10.75 g/t CMA HW Splay |
|||
| YRC2047D 138.3 142 |
3.7m @ 3.11 g/t CMA FW lode |
|||
| CMA Down-dip Drilling | ||||
| YRC1850AD 604 612 |
8m @ 2.64 g/t CMA FW lode |
|||
| Including 605 610 |
5m @ 3.93 g/t CMA FW lode |
|||
| YRC1850AD 625 632 |
7m @ 2.52 g/t CMA FW lode |
|||
| Including 628 632 |
4m @ 3.98 g/t CMA FW lode |
|||
| YRC1854D 193 196 |
3m @ 1.87 g/t CMA HW Splay |
|||
| Including 194 196 |
2m @ 2.59 g/t CMA HW Splay |
|||
| YRC1855AD 450.4 461.5 |
11.1m @ 3.39 g/t CMA FW lode |
|||
| Including 452 457 |
5m @ 7.16 g/t CMA FW lode |
|||
| YRC1857D 464 470 |
6m @ 2.32 g/t CMA FW lode |
|||
| YRC1858D 479 487 |
8m @ 2.22 g/t CMA FW lode |
|||
| Including 482 485 |
3m @ 5.07 g/t CMA FW lode |
|||
| YRC1859D 473 477 |
4m @ 2.2 g/t CMA FW lode |
|||
| YRC1861D 549 555 |
6m @ 2.48 g/t CMA FW lode |
|||
| Including 550 552 |
2m @ 6.9 g/t CMA FW lode |
|||
| YRC1871D 532 534 |
2m @ 6.32 g/t CMA FW lode |
|||
| YRC1871D 549 551 |
2m @ 2.66 g/t CMA FW lode |
|||
| YRC2033D 586 588 |
2m @ 2.13 g/t CMA FW lode |
|||
| YRC2043D 60 64 |
4m @ 3.8 g/t CMA HW Splay |
NEXT STEPS AT CMA
Perseus’s ongoing exploration and study programmes at Yaouré will focus on:
-
Continuation of drilling to convert the Inferred Resource at CMA to an Ore Reserve to be potentially exploited by underground mining methods and drilling down dip of the Inferred Resource to identify the potential for further resource extensions.
-
Perseus is completing drilling to convert the Inferred CMA resource to an Ore Reserve as the first part of a PreFeasibility Study (PFS). Geotechnical, hydrological, mining and metallurgical studies have commenced as drilling and assaying results become available. Target completion for the PFS remains the end of the June Quarter 2022, with timing dependent on the ultimate footprint size of the orebody.
-
Continuation of drill testing of targets generated from the 3D seismic survey, with an initial focus on near-surface targets.
-
Aircore drilling and augering at early-stage regional prospects such as Degbezere NE.
This announcement has been approved for release by Perseus’s Managing Director and Chief Executive Officer, Jeff Quartermaine.
PERSEUSMINING.COM
5
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
Competent Person Statement:
The information in this report and the attachments that relate to exploration drilling results at the Yaouré Project is based on, and fairly represents, information and supporting documentation prepared by Dr Douglas Jones, a Competent Person who is a Chartered Professional Geologist. Dr Jones is the Group General Manager Exploration of the Company. Dr Jones has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’”) and to qualify as a “Qualified Person” under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Dr Jones consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
Caution Regarding Forward Looking Information:
This report contains forward-looking information which is based on the assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of gold, continuing commercial production at the Yaouré Gold Mine, the Edikan Gold Mine and the Sissingué Gold Mine without any major disruption due to the COVID-19 pandemic or otherwise, the receipt of required governmental approvals, the accuracy of capital and operating cost estimates, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used by the Company. Although management believes that the assumptions made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the forward-looking information will prove to be accurate. Forward-looking information involves known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, the actual market price of gold, the actual results of current exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's publicly filed documents. The Company believes that the assumptions and expectations reflected in the forward-looking information are reasonable. Assumptions have been made regarding, among other things, the Company’s ability to carry on its exploration and development activities, the timely receipt of required approvals, the price of gold, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers should not place undue reliance on forward-looking information. Perseus does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
ASX/TSX CODE: PRU CONTACTS: Jeff Quartermaine REGISTERED OFFICE: Managing Director & CEO Level 2 [email protected] 437 Roberts Road Subiaco WA 6008 Nathan Ryan Telephone: +61 8 6144 1700 Media Relations Email: [email protected] +61 4 20 582 887 [email protected]
www.perseusmining.com
Claire Hall Corporate Communications [email protected]
PERSEUSMINING.COM
6
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
APPENDIX 1 - FIGURES
Figure 1.1: Yaouré Gold Project – Tenements and Prospects
==> picture [435 x 451] intentionally omitted <==
PERSEUSMINING.COM
7
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
Figure 1.2: CMA Underground Resource Drilling and Results Summary
==> picture [424 x 608] intentionally omitted <==
PERSEUSMINING.COM
8
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
==> picture [231 x 9] intentionally omitted <==
----- Start of picture text -----
Figure 1.3: CMA Underground Resource – Long Section
----- End of picture text -----
==> picture [442 x 291] intentionally omitted <==
Figure 1.4: CMA Underground Resource – Drill Section 777485mN
==> picture [411 x 347] intentionally omitted <==
PERSEUSMINING.COM
9
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
Figure 1.5: CMA Down-Dip Extensions Drilling & Results Summary
==> picture [456 x 654] intentionally omitted <==
PERSEUSMINING.COM
10
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
Figure 1.6: CMA Down-Dip Extensions Drilling – Drill Section 777435mN
==> picture [456 x 385] intentionally omitted <==
PERSEUSMINING.COM
11
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
APPENDIX 2 – SIGNIFICANT INTERCEPTS TABLES
Table 2.1: CMA Underground Resource Drilling - drill holes and significant assays
(Based on lower cut-off of 0.5 g/t Au with maximum 2m internal waste <0.5 g/t)
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| YRC1874D 221644.55 777035.52 RC_DD 270 -60 253.5 1 16 20 4 0.22 |
|||||||||||
| YRC1874D 221644.55 777035.52 RC_DD 270 -60 253.5 10 154.6 163 8.4 0.45 |
|||||||||||
| YRC1874D 221644.55 777035.52 RC_DD 270 -60 253.5 3 170.8 173 2.2 0.42 |
|||||||||||
| YRC1874D 221644.55 777035.52 RC_DD 270 -60 253.5 7 178 185 7 0.41 |
|||||||||||
| YRC1874D 221644.55 777035.52 RC_DD 270 -60 253.5 5 191.7 196 4.3 0.37 |
|||||||||||
| YRC1874D 221644.55 777035.52 RC_DD 270 -60 253.5 2 204 206 2 0.37 |
|||||||||||
| YRC1874D 221644.55 777035.52 RC_DD 270 -60 253.5 8 237.2 245 7.85 3.51 |
|||||||||||
| YRC1875D 221701.84 777035.19 RC_DD 270 -60 270.7 2 74 76 2 0.57 |
|||||||||||
| YRC1875D 221701.84 777035.19 RC_DD 270 -60 270.7 2 118 120 2 0.32 |
|||||||||||
| YRC1875D 221701.84 777035.19 RC_DD 270 -60 270.7 10 133 141.3 8.3 3.49 |
|||||||||||
| YRC1875D 221701.84 777035.19 RC_DD 270 -60 270.7 4 158 161.15 3.15 0.46 |
|||||||||||
| YRC1875D 221701.84 777035.19 RC_DD 270 -60 270.7 4 196 200 4 0.47 |
|||||||||||
| YRC1875D 221701.84 777035.19 RC_DD 270 -60 270.7 2 264 266 2 0.7 |
|||||||||||
| YRC1876D 221631.3 776985.27 RC_DD 270 -60 240.4 1 16 20 4 0.29 |
|||||||||||
| YRC1876D 221631.3 776985.27 RC_DD 270 -60 240.4 1 28 32 4 0.27 |
|||||||||||
| YRC1876D 221631.3 776985.27 RC_DD 270 -60 240.4 1 40 44 4 0.23 |
|||||||||||
| YRC1876D 221631.3 776985.27 RC_DD 270 -60 240.4 3 180 183 3 0.4 |
|||||||||||
| YRC1876D 221631.3 776985.27 RC_DD 270 -60 240.4 4 204 208 4 0.3 |
|||||||||||
| YRC1876D 221631.3 776985.27 RC_DD 270 -60 240.4 12 216 228 12 2.01 |
|||||||||||
| YRC1877D 221859.52 776985.28 RC_DD 270 -60 387.7 2 0 8 8 0.57 |
|||||||||||
| YRC1877D 221859.52 776985.28 RC_DD 270 -60 387.7 6 124 130 6 0.62 |
|||||||||||
| YRC1877D 221859.52 776985.28 RC_DD 270 -60 387.7 2 138 140 2 0.24 |
|||||||||||
| YRC1877D 221859.52 776985.28 RC_DD 270 -60 387.7 2 144 146 2 0.34 |
|||||||||||
| YRC1877D 221859.52 776985.28 RC_DD 270 -60 387.7 14 166 177.4 11.4 1.33 |
|||||||||||
| Including 2 170.1 172 1.9 3.23 |
|||||||||||
| Including 2 176 177.4 1.4 4.13 |
|||||||||||
| YRC1877D 221859.52 776985.28 RC_DD 270 -60 387.7 5 237 242 5 0.69 |
|||||||||||
| YRC1877D 221859.52 776985.28 RC_DD 270 -60 387.7 6 257 262 5 0.28 |
|||||||||||
| YRC1877D 221859.52 776985.28 RC_DD 270 -60 387.7 5 268.8 273 4.2 0.98 |
|||||||||||
| YRC1878D 221790.83 776984.8 RC_DD 270 -60 354.3 1 16 20 4 0.43 |
|||||||||||
| YRC1878D 221790.83 776984.8 RC_DD 270 -60 354.3 33 268.2 298 29.8 0.7 |
|||||||||||
| Including 285.8 288 2.2 2.84 |
|||||||||||
| YRC1878D 221790.83 776984.8 RC_DD 270 -60 354.3 17 307 324 17 0.9 |
|||||||||||
| Including 322 324 2 2.9 |
|||||||||||
| YRC1878D 221790.83 776984.8 RC_DD 270 -60 354.3 2 329 331 2 2.27 |
|||||||||||
| YRC1878D 221790.83 776984.8 RC_DD 270 -60 354.3 7 338 345 7 2.27 |
PERSEUSMINING.COM
12
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| YRC1879D 221862.13 776984.86 |
RC_DD 270 -60 396.7 1 0 4 4 0.4 |
||||||||||
| YRC1879D 221862.13 776984.86 |
RC_DD 270 -60 396.7 4 97 101 4 1.21 |
||||||||||
| Including | 2 97 99 2 2.27 |
||||||||||
| YRC1879D 221862.13 776984.86 |
RC_DD 270 -60 396.7 2 137 139 2 0.85 |
||||||||||
| YRC1879D 221862.13 776984.86 |
RC_DD 270 -60 396.7 13 256 269 13 0.67 |
||||||||||
| YRC1879D 221862.13 776984.86 |
RC_DD 270 -60 396.7 4 282.7 286 3.3 1.4 |
||||||||||
| YRC1880D 221647.19 776934.85 |
RC_DD 270 -55 254.9 2 153 155 2 0.52 |
||||||||||
| YRC1880D 221647.19 776934.85 |
RC_DD 270 -55 254.9 3 159 162 3 0.66 |
||||||||||
| YRC1880D 221647.19 776934.85 |
RC_DD 270 -55 254.9 12 232 242 10 3.71 |
||||||||||
| Including | 10 232 240 8 4.52 |
||||||||||
| YRC1881D 221650.05 776935.02 |
RC_DD 270 -60 255.6 2 44 52 8 0.43 |
||||||||||
| YRC1881D 221650.05 776935.02 |
RC_DD 270 -60 255.6 1 64 68 4 0.72 |
||||||||||
| YRC1881D 221650.05 776935.02 |
RC_DD 270 -60 255.6 10 236 246 10 6.61 |
||||||||||
| YRC1882D 221862.21 776935.01 |
RC_DD 270 -65 378.3 1 0 4 4 0.39 |
||||||||||
| YRC1882D 221862.21 776935.01 |
RC_DD 270 -65 378.3 3 298 301 3 3.86 |
||||||||||
| YRC1882D 221862.21 776935.01 |
RC_DD 270 -65 378.3 6 321 327 6 0.99 |
||||||||||
| YRC1882D 221862.21 776935.01 |
RC_DD 270 -65 378.3 6 330 336 6 0.66 |
||||||||||
| YRC1883D 221780.17 776884.96 |
RC_DD 270 -50 354.7 2 0 8 8 0.36 |
||||||||||
| YRC1883D 221780.17 776884.96 |
RC_DD 270 -50 354.7 9 328.1 336.2 8.1 7.27 |
||||||||||
| YRC1884D 221785.13 776884.89 |
RC_DD 270 -65 346.8 1 0 4 4 0.38 |
||||||||||
| YRC1884D 221785.13 776884.89 |
RC_DD 270 -65 346.8 4 142.5 146.7 4.2 0.68 |
||||||||||
| YRC1884D 221785.13 776884.89 |
RC_DD 270 -65 346.8 25 269 294 25 0.54 |
||||||||||
| YRC1884D 221785.13 776884.89 |
RC_DD 270 -65 346.8 23 316.4 339 22.6 0.85 |
||||||||||
| YRC1885D 221713.76 776835.11 |
RC_DD 270 -60 301.9 1 0 4 4 0.28 |
||||||||||
| YRC1885D 221713.76 776835.11 |
RC_DD 270 -60 301.9 1 56 60 4 0.42 |
||||||||||
| YRC1885D 221713.76 776835.11 |
RC_DD 270 -60 301.9 8 279 287.3 8.3 0.91 |
||||||||||
| Including | 282.3 285.3 3 2.04 |
||||||||||
| YRC1886D 221719.48 776785.18 |
RC_DD 270 -55 297 2 0 8 8 0.45 |
||||||||||
| YRC1886D 221719.48 776785.18 |
RC_DD 270 -55 297 1 44 48 4 0.39 |
||||||||||
| YRC1886D 221719.48 776785.18 |
RC_DD 270 -55 297 2 188 190 2 0.28 |
||||||||||
| YRC1886D 221719.48 776785.18 |
RC_DD 270 -55 297 14 279 293 14 2.05 |
||||||||||
| Including | 4 279 283 4 6.34 |
||||||||||
| YRC1887D 221723.44 776785.23 |
RC_DD 270 -65 303.2 2 0 8 8 0.27 |
||||||||||
| YRC1887D 221723.44 776785.23 |
RC_DD 270 -65 303.2 1 40 44 4 0.49 |
||||||||||
| YRC1887D 221723.44 776785.23 |
RC_DD 270 -65 303.2 1 72 76 4 0.5 |
||||||||||
| YRC1887D 221723.44 776785.23 |
RC_DD 270 -65 303.2 2 249.5 251.5 2 0.67 |
||||||||||
| YRC1887D 221723.44 776785.23 |
RC_DD 270 -65 303.2 10 288.5 298.8 10.3 1.33 |
||||||||||
| Including | 297.7 298.8 1.1 7.28 |
||||||||||
| YRC1888D 221718.75 776735.16 |
RC_DD 270 -55 300.4 2 0 8 8 0.31 |
||||||||||
| YRC1888D 221718.75 776735.16 |
RC_DD 270 -55 300.4 8 203 211 8 0.22 |
PERSEUSMINING.COM
13
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| YRC1888D 221718.75 776735.16 |
RC_DD 270 -55 300.4 7 222 227 5 1.26 |
||||||||||
| YRC1888D 221718.75 776735.16 |
RC_DD 270 -55 300.4 5 237 241 4 2.17 |
||||||||||
| YRC1888D 221718.75 776735.16 |
RC_DD 270 -55 300.4 5 282 287 5 2.29 |
||||||||||
| Including | 284 286 2 5.18 |
||||||||||
| YRC1889D 221714.49 776735.05 |
RC_DD 270 -45 300.1 2 0 8 8 0.46 |
||||||||||
| YRC1889D 221714.49 776735.05 |
RC_DD 270 -45 300.1 2 249 251 2 0.59 |
||||||||||
| YRC1889D 221714.49 776735.05 |
RC_DD 270 -45 300.1 7 282 289 7 1.35 |
||||||||||
| Including | 283 286 3 2.55 |
||||||||||
| YRC1890D 221699.21 776685.04 |
RC_DD 270 -45 285 2 0 8 8 0.7 |
||||||||||
| YRC1890D 221699.21 776685.04 |
RC_DD 270 -45 285 1 64 68 4 0.28 |
||||||||||
| YRC1890D 221699.21 776685.04 |
RC_DD 270 -45 285 7 225 231 6 0.78 |
||||||||||
| YRC1890D 221699.21 776685.04 |
RC_DD 270 -45 285 4 274 278 4 0.64 |
||||||||||
| YRC1891D 221709.7 776834.9 |
RC_DD 270 -45 302.2 1 0 4 4 0.25 |
||||||||||
| YRC1891D 221709.7 776834.9 |
RC_DD 270 -45 302.2 14 277 291 14 2.83 |
||||||||||
| Including | 277 286 9 4.06 |
||||||||||
| YRC1892D 221649.74 776584.57 |
RC_DD 270 -65 252.1 1 44 48 4 0.4 |
||||||||||
| YRC1892D 221649.74 776584.57 |
RC_DD 270 -65 252.1 1 72 76 4 0.29 |
||||||||||
| YRC1892D 221649.74 776584.57 |
RC_DD 270 -65 252.1 3 227 230 3 1.45 |
||||||||||
| YRC1893D 221658.13 776534.89 |
RC_DD 270 -55 267.8 1 4 8 4 0.72 |
||||||||||
| YRC1893D 221658.13 776534.89 |
RC_DD 270 -55 267.8 2 28 36 8 0.77 |
||||||||||
| YRC1893D 221658.13 776534.89 |
RC_DD 270 -55 267.8 1 44 48 4 0.26 |
||||||||||
| YRC1893D 221658.13 776534.89 |
RC_DD 270 -55 267.8 2 112 114 2 0.2 |
||||||||||
| YRC1893D 221658.13 776534.89 |
RC_DD 270 -55 267.8 3 240 243 3 1.59 |
||||||||||
| YRC1893D 221658.13 776534.89 |
RC_DD 270 -55 267.8 5 247 252 5 0.56 |
||||||||||
| YRC1894D 221662.28 776534.95 |
RC_DD 270 -65 275.9 1 8 12 4 0.3 |
||||||||||
| YRC1894D 221662.28 776534.95 |
RC_DD 270 -65 275.9 1 16 20 4 1.11 |
||||||||||
| YRC1894D 221662.28 776534.95 |
RC_DD 270 -65 275.9 11 161 172 11 0.81 |
||||||||||
| YRC1894D 221662.28 776534.95 |
RC_DD 270 -65 275.9 9 176 185 9 0.36 |
||||||||||
| YRC1894D 221662.28 776534.95 |
RC_DD 270 -65 275.9 3 237 240 3 0.88 |
||||||||||
| YRC1895D 221821.37 777036.08 |
RC_DD 270 -65 369.5 1 28 32 4 1.05 |
||||||||||
| YRC1895D 221821.37 777036.08 |
RC_DD 270 -65 369.5 1 56 60 4 0.22 |
||||||||||
| YRC1895D 221821.37 777036.08 |
RC_DD 270 -65 369.5 5 140 144 4 0.43 |
||||||||||
| YRC1895D 221821.37 777036.08 |
RC_DD 270 -65 369.5 2 335 337 2 2.95 |
||||||||||
| YRC1895D 221821.37 777036.08 |
RC_DD 270 -65 369.5 6 357 362 5 1.94 |
||||||||||
| YRC1896D 221776.01 777035.1 |
RC_DD 270 -65 327.3 1 12 16 4 0.25 |
||||||||||
| YRC1896D 221776.01 777035.1 |
RC_DD 270 -65 327.3 2 310 312 2 0.52 |
||||||||||
| YRC1897D 221569.43 776484.82 |
RC_DD 270 -55 210.7 1 4 8 4 0.22 |
||||||||||
| YRC1897D 221569.43 776484.82 |
RC_DD 270 -55 210.7 1 12 16 4 0.36 |
||||||||||
| YRC1897D 221569.43 776484.82 |
RC_DD 270 -55 210.7 1 56 60 4 0.93 |
||||||||||
| YRC1897D 221569.43 776484.82 |
RC_DD 270 -55 210.7 1 64 68 4 17.09 |
PERSEUSMINING.COM
14
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| YRC1897D 221569.43 776484.82 |
RC_DD 270 -55 210.7 2 144 146 2 0.42 |
||||||||||
| YRC1897D 221569.43 776484.82 |
RC_DD 270 -55 210.7 5 196 201 5 0.58 |
||||||||||
| YRC1898D 221572.09 776484.99 |
RC_DD 270 -65 219.7 2 0 8 8 0.43 |
||||||||||
| YRC1898D 221572.09 776484.99 |
RC_DD 270 -65 219.7 2 108 110 2 0.8 |
||||||||||
| YRC1898D 221572.09 776484.99 |
RC_DD 270 -65 219.7 4 154 158 4 0.23 |
||||||||||
| YRC1898D 221572.09 776484.99 |
RC_DD 270 -65 219.7 3 173.3 176 2.7 0.57 |
||||||||||
| YRC1898D 221572.09 776484.99 |
RC_DD 270 -65 219.7 7 180 186 6 0.47 |
||||||||||
| YRC1898D 221572.09 776484.99 |
RC_DD 270 -65 219.7 9 196 205 9 0.68 |
||||||||||
| YRC1899D 221741.49 777135.16 |
RC_DD 270 -65 312.7 1 40 44 4 0.45 |
||||||||||
| YRC1899D 221741.49 777135.16 |
RC_DD 270 -65 312.7 2 285 287 2 8.58 |
||||||||||
| YRC1899D 221741.49 777135.16 |
RC_DD 270 -65 312.7 9 294 303 9 1.29 |
||||||||||
| Including | 295 297 2 4.15 |
||||||||||
| YRC1900D 221619.77 777184.91 |
RC_DD 270 -60 253.3 2 125 127 2 1.18 |
||||||||||
| YRC1900D 221619.77 777184.91 |
RC_DD 270 -60 253.3 4 234 238 4 1.49 |
||||||||||
| Including | 235 237 2 2.48 |
||||||||||
| YRC1901AD 221657.27 777185.2 |
RC_DD 270 -60 271.2 4 105 108 3 1.03 |
||||||||||
| YRC1901AD 221657.27 777185.2 |
RC_DD 270 -60 271.2 6 252 258 6 0.72 |
||||||||||
| YRC1902D 221711.18 777084.89 |
RC_DD 270 -63 300 1 0 4 4 1.44 |
||||||||||
| YRC1902D 221711.18 777084.89 |
RC_DD 270 -63 300 1 60 64 4 0.2 |
||||||||||
| YRC1902D 221711.18 777084.89 |
RC_DD 270 -63 300 16 277 293 16 2.27 |
||||||||||
| Including | 280 288 8 4.24 |
||||||||||
| YRC1903D 221819.58 777084.87 |
RC_DD 270 -58 363.2 2 0 8 8 0.41 |
||||||||||
| YRC1903D 221819.58 777084.87 |
RC_DD 270 -58 363.2 2 154 156 2 0.78 |
||||||||||
| YRC1903D 221819.58 777084.87 |
RC_DD 270 -58 363.2 15 337 352 15 2.71 |
||||||||||
| Including | 337 347 10 3.03 |
||||||||||
| YRC1904D 221765.22 777185.04 |
RC_DD 270 -71 327.2 1 36 40 4 0.4 |
||||||||||
| YRC1904D 221765.22 777185.04 |
RC_DD 270 -71 327.2 1 52 56 4 8.14 |
||||||||||
| YRC1904D 221765.22 777185.04 |
RC_DD 270 -71 327.2 2 85 87 2 0.46 |
||||||||||
| YRC1904D 221765.22 777185.04 |
RC_DD 270 -71 327.2 13 294 307 13 3.77 |
||||||||||
| Including | 296 307 11 4.33 |
||||||||||
| YRC1905D 221663.62 777285.32 |
RC_DD 270 -73 267.3 4 199 203 4 0.46 |
||||||||||
| YRC1905D 221663.62 777285.32 |
RC_DD 270 -73 267.3 11 245 254.8 9.8 4.18 |
||||||||||
| YRC1906D 221670.08 777334.56 |
RC_DD 270 -56 283.3 2 250 252 2 0.4 |
||||||||||
| YRC1906D 221670.08 777334.56 |
RC_DD 270 -56 283.3 12 256 268 12 3.16 |
||||||||||
| YRC1907D 221672.47 777334.47 |
RC_DD 270 -63 270.9 7 255 262 7 2.06 |
||||||||||
| Including | 255 259 4 3.48 |
||||||||||
| YRC1907D 221672.47 777334.47 |
RC_DD 270 -63 270.9 2 266 268 2 0.24 |
||||||||||
| YRC1908D 221738.52 777334.39 |
RC_DD 270 -70 306.2 1 36 40 4 0.23 |
||||||||||
| YRC1908D 221738.52 777334.39 |
RC_DD 270 -70 306.2 6 125 131 6 0.88 |
||||||||||
| YRC1908D 221738.52 777334.39 |
RC_DD 270 -70 306.2 2 289 291 2 2.3 |
PERSEUSMINING.COM
15
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| YRC1909D 221762 777385.29 |
RC_DD 270 -66 315.4 2 168 170 2 0.72 |
||||||||||
| YRC1909D 221762 777385.29 |
RC_DD 270 -66 315.4 6 304 310 6 7.57 |
||||||||||
| Including | 304 309 5 9.02 |
||||||||||
| YRC1911D 221619.49 777434.94 |
RC_DD 270 -61 255.7 6 8 32 24 0.48 |
||||||||||
| YRC1911D 221619.49 777434.94 |
RC_DD 270 -61 255.7 8 227 235 8 4.4 |
||||||||||
| Including | 227 232 5 6.85 |
||||||||||
| YRC1911D 221619.49 777434.94 |
RC_DD 270 -61 255.7 11 238 249.4 11.4 0.3 |
||||||||||
| YRC1911D 221619.49 777434.94 |
RC_DD 270 -61 255.7 2 252.5 254.6 2.1 0.76 |
||||||||||
| YRC1912AD 221650.57 777435.08 |
RC_DD 270 -62 267.3 1 20 24 4 0.29 |
||||||||||
| YRC1912AD 221650.57 777435.08 |
RC_DD 270 -62 267.3 4 240 244.3 4.3 8.83 |
||||||||||
| YRC1913D 221761.56 777434.93 |
RC_DD 270 -62 317.9 2 134 136 2 0.5 |
||||||||||
| YRC1913D 221761.56 777434.93 |
RC_DD 270 -62 317.9 11 194 204 10 2.95 |
||||||||||
| Including | 194.7 201 6.3 4.52 |
||||||||||
| YRC1913D 221761.56 777434.93 |
RC_DD 270 -62 317.9 12 302 314 12 2.82 |
||||||||||
| Including | 305.9 311 5.1 6.12 |
||||||||||
| YRC1914D 221669.2 777485.08 |
RC_DD 270 -59 270.9 3 168 171 3 0.45 |
||||||||||
| YRC1914D 221669.2 777485.08 |
RC_DD 270 -59 270.9 8 257 264 7 4.82 |
||||||||||
| YRC1914D 221669.2 777485.08 |
RC_DD 270 -59 270.9 4 267 270.9 3.9 0.22 |
||||||||||
| YRC1915D 221700.01 777484.96 |
RC_DD 270 -61 294.7 1 8 12 4 0.23 |
||||||||||
| YRC1915D 221700.01 777484.96 |
RC_DD 270 -61 294.7 1 48 52 4 0.26 |
||||||||||
| YRC1915D 221700.01 777484.96 |
RC_DD 270 -61 294.7 2 165 167 2 2.27 |
||||||||||
| YRC1915D 221700.01 777484.96 |
RC_DD 270 -61 294.7 2 180 182 2 0.23 |
||||||||||
| YRC1915D 221700.01 777484.96 |
RC_DD 270 -61 294.7 11 271.4 282 10.6 4.36 |
||||||||||
| YRC1916D 221564.91 777535.38 |
RC_DD 270 -61 261.3 3 44 56 12 0.37 |
||||||||||
| YRC1916D 221564.91 777535.38 |
RC_DD 270 -61 261.3 14 213.2 226.9 13.7 2.6 |
||||||||||
| Including | 214.4 218.4 4 4.93 |
||||||||||
| Including | 221.7 226.9 5.2 2.69 |
||||||||||
| YRC1916D 221564.91 777535.38 |
RC_DD 270 -61 261.3 32 229 261.3 32.3 1.24 |
||||||||||
| YRC1917AD 221679.78 776634.68 |
RC_DD 270 -59 267.7 1 0 4 4 0.2 |
||||||||||
| YRC1917AD 221679.78 776634.68 |
RC_DD 270 -59 267.7 2 91 93 2 1.77 |
||||||||||
| YRC1917AD 221679.78 776634.68 |
RC_DD 270 -59 267.7 2 252 254 2 0.73 |
||||||||||
| YRC1918D 221709.67 777534.61 |
RC_DD 270 -70 272.2 1 0 4 4 0.37 |
||||||||||
| YRC1918D 221709.67 777534.61 |
RC_DD 270 -70 272.2 2 68 76 8 0.95 |
||||||||||
| YRC1918D 221709.67 777534.61 |
RC_DD 270 -70 272.2 3 107.4 110 2.6 1.3 |
||||||||||
| YRC1918D 221709.67 777534.61 |
RC_DD 270 -70 272.2 8 257 263.1 6.1 1.61 |
||||||||||
| Including | 261 263.1 2.1 3.53 |
||||||||||
| YRC1922D 221639.72 777034.48 |
RC_DD 270 -60 249.2 1 4 8 4 0.2 |
||||||||||
| YRC1922D 221639.72 777034.48 |
RC_DD 270 -60 249.2 5 177.2 181.9 4.7 0.33 |
||||||||||
| YRC1922D 221639.72 777034.48 |
RC_DD 270 -60 249.2 3 216.2 219.2 3 0.55 |
||||||||||
| YRC1922D 221639.72 777034.48 |
RC_DD 270 -60 249.2 21 225.7 246.2 20.5 2.56 |
PERSEUSMINING.COM
16
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Including | 229 239.5 10.5 4.36 |
||||||||||
| YRC1923D 221699.12 777034.43 |
RC_DD 270 -60 270.1 3 107 109.4 2.4 0.36 |
||||||||||
| YRC1923D 221699.12 777034.43 |
RC_DD 270 -60 270.1 4 112 116 4 0.39 |
||||||||||
| YRC1923D 221699.12 777034.43 |
RC_DD 270 -60 270.1 3 119 121.4 2.4 0.31 |
||||||||||
| YRC1923D 221699.12 777034.43 |
RC_DD 270 -60 270.1 10 141 149 8 0.23 |
||||||||||
| YRC1923D 221699.12 777034.43 |
RC_DD 270 -60 270.1 7 155.3 162 6.75 0.34 |
||||||||||
| YRC1923D 221699.12 777034.43 |
RC_DD 270 -60 270.1 4 188 192 4 0.45 |
||||||||||
| YRC1923D 221699.12 777034.43 |
RC_DD 270 -60 270.1 4 197.7 201 3.3 1.48 |
||||||||||
| YRC1923D 221699.12 777034.43 |
RC_DD 270 -60 270.1 7 204 211 7 0.34 |
||||||||||
| YRC1923D 221699.12 777034.43 |
RC_DD 270 -60 270.1 10 258 267 9 3.22 |
||||||||||
| YRC1925D 221859.83 776934.23 |
RC_DD 270 -67 377 1 0 4 4 0.45 |
||||||||||
| YRC1925D 221859.83 776934.23 |
RC_DD 270 -67 377 32 316.9 347.2 30.3 0.8 |
||||||||||
| YRC1925D 221859.83 776934.23 |
RC_DD 270 -67 377 4 355 359 4 0.5 |
||||||||||
| YRC1926D 221712.03 776834.49 |
RC_DD 270 -58 297.3 2 0 8 8 0.27 |
||||||||||
| YRC1926D 221712.03 776834.49 |
RC_DD 270 -58 297.3 4 141.4 144 2.6 1.43 |
||||||||||
| YRC1926D 221712.03 776834.49 |
RC_DD 270 -58 297.3 5 265 270 5 1.3 |
||||||||||
| YRC1926D 221712.03 776834.49 |
RC_DD 270 -58 297.3 12 277 288.2 11.2 0.81 |
||||||||||
| YRC1926D 221712.03 776834.49 |
RC_DD 270 -58 297.3 8 291 297.3 6.3 0.77 |
||||||||||
| YRC1927D 221716.46 776834.78 |
RC_DD 270 -68 303.3 1 0 4 4 0.39 |
||||||||||
| YRC1927D 221716.46 776834.78 |
RC_DD 270 -68 303.3 2 260.3 262.5 2.2 0.76 |
||||||||||
| YRC1927D 221716.46 776834.78 |
RC_DD 270 -68 303.3 2 277.7 279.7 2 0.53 |
||||||||||
| YRC1927D 221716.46 776834.78 |
RC_DD 270 -68 303.3 7 284.9 291.3 6.4 1.18 |
||||||||||
| YRC1928D 221789.84 776984.54 |
RC_DD 270 -59 342 1 68 72 4 0.21 |
||||||||||
| YRC1928D 221789.84 776984.54 |
RC_DD 270 -59 342 3 335.6 338.1 2.5 2.34 |
||||||||||
| YRC1929D 221793.3 776985.16 |
RC_DD 270 -68 360.1 1 12 16 4 0.53 |
||||||||||
| YRC1929D 221793.3 776985.16 |
RC_DD 270 -68 360.1 6 238.9 243.5 4.65 1.02 |
||||||||||
| YRC1929D 221793.3 776985.16 |
RC_DD 270 -68 360.1 4 245.6 248 2.4 0.9 |
||||||||||
| YRC1929D 221793.3 776985.16 |
RC_DD 270 -68 360.1 9 261 268.9 7.9 0.49 |
||||||||||
| YRC1929D 221793.3 776985.16 |
RC_DD 270 -68 360.1 2 328 330 2 2 |
||||||||||
| YRC1929D 221793.3 776985.16 |
RC_DD 270 -68 360.1 12 337 348 11 1.21 |
||||||||||
| Including | 342.6 348 5.4 2.16 |
||||||||||
| YRC1929D 221793.3 776985.16 |
RC_DD 270 -68 360.1 3 353 355 2 1.97 |
||||||||||
| YRC1938D 221721.76 776784.57 |
RC_DD 270 -63 297.5 2 0 8 8 0.38 |
||||||||||
| YRC1938D 221721.76 776784.57 |
RC_DD 270 -63 297.5 1 44 48 4 0.75 |
||||||||||
| YRC1938D 221721.76 776784.57 |
RC_DD 270 -63 297.5 1 64 68 4 0.43 |
||||||||||
| YRC1938D 221721.76 776784.57 |
RC_DD 270 -63 297.5 5 281 286 5 3.5 |
||||||||||
| YRC1939D 221716.49 776734.95 |
RC_DD 270 -55 296 2 0 8 8 0.29 |
||||||||||
| YRC1939D 221716.49 776734.95 |
RC_DD 270 -55 296 4 257 261 4 2.1 |
||||||||||
| YRC1939D 221716.49 776734.95 |
RC_DD 270 -55 296 5 285 290 5 0.35 |
||||||||||
| YRC1940D 221701.83 776684.41 |
RC_DD 270 -66 288.4 2 0 8 8 0.48 |
PERSEUSMINING.COM
17
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| YRC1940D 221701.83 776684.41 |
RC_DD 270 -66 288.4 3 132 135 3 0.76 |
||||||||||
| YRC1940D 221701.83 776684.41 |
RC_DD 270 -66 288.4 4 183 187 4 1.36 |
||||||||||
| YRC1940D 221701.83 776684.41 |
RC_DD 270 -66 288.4 6 273 279 6 0.53 |
||||||||||
| YRC1943D 221779.59 776934.95 |
RC_DD 270 -66 348.2 2 0 8 8 0.28 |
||||||||||
| YRC1943D 221779.59 776934.95 |
RC_DD 270 -66 348.2 1 28 32 4 0.51 |
||||||||||
| YRC1943D 221779.59 776934.95 |
RC_DD 270 -66 348.2 1 40 44 4 0.22 |
||||||||||
| YRC1943D 221779.59 776934.95 |
RC_DD 270 -66 348.2 5 104.2 109 4.8 0.56 |
||||||||||
| YRC1943D 221779.59 776934.95 |
RC_DD 270 -66 348.2 2 284 286 2 0.44 |
||||||||||
| YRC1943D 221779.59 776934.95 |
RC_DD 270 -66 348.2 2 308 310 2 0.46 |
||||||||||
| YRC1943D 221779.59 776934.95 |
RC_DD 270 -66 348.2 15 313.1 326.4 13.3 1.44 |
||||||||||
| Including | 314 320 6 2.29 |
||||||||||
| YRC1943D 221779.59 776934.95 |
RC_DD 270 -66 348.2 13 329 341 12 2.01 |
||||||||||
| YRC1945D 221782.44 776884.65 |
RC_DD 270 -64 341.2 1 0 4 4 0.52 |
||||||||||
| YRC1945D 221782.44 776884.65 |
RC_DD 270 -64 341.2 2 290 292 2 1.42 |
||||||||||
| YRC1945D 221782.44 776884.65 |
RC_DD 270 -64 341.2 7 305.8 312 6.2 4.62 |
||||||||||
| YRC1945D 221782.44 776884.65 |
RC_DD 270 -64 341.2 9 324.8 332.2 7.4 2.51 |
||||||||||
| Including | 327 331.6 4.6 3.64 |
||||||||||
| YRC1946D 221717.4 776934.99 |
RC_DD 270 -70 291.8 4 267.6 270 2.4 4.69 |
||||||||||
| YRC1946D 221717.4 776934.99 |
RC_DD 270 -70 291.8 17 275 291.8 16.8 2.72 |
||||||||||
| Including | 276 282 6 5.26 |
||||||||||
| Including | 285 288 3 3.69 |
||||||||||
| YRC1947D 221715.51 776934.8 |
RC_DD 270 -65 294.4 1 0 4 4 0.23 |
||||||||||
| YRC1947D 221715.51 776934.8 |
RC_DD 270 -65 294.4 2 125 127 2 0.21 |
||||||||||
| YRC1947D 221715.51 776934.8 |
RC_DD 270 -65 294.4 17 270 286.2 16.2 5.58 |
||||||||||
| YRC1947D 221715.51 776934.8 |
RC_DD 270 -65 294.4 4 289 293 4 0.23 |
||||||||||
| YRC1948D 221648.15 776584.97 |
RC_DD 270 -65 243.2 1 28 32 4 0.62 |
||||||||||
| YRC1948D 221648.15 776584.97 |
RC_DD 270 -65 243.2 1 36 40 4 0.24 |
||||||||||
| YRC1948D 221648.15 776584.97 |
RC_DD 270 -65 243.2 2 77.6 80 2.4 0.58 |
||||||||||
| YRC1948D 221648.15 776584.97 |
RC_DD 270 -65 243.2 2 97 99 2 0.21 |
||||||||||
| YRC1948D 221648.15 776584.97 |
RC_DD 270 -65 243.2 6 225 231 6 1.56 |
||||||||||
| YRC1950D 221656.25 776535.11 |
RC_DD 270 -52 270.6 3 24 36 12 0.59 |
||||||||||
| YRC1950D 221656.25 776535.11 |
RC_DD 270 -52 270.6 9 239.6 247.6 8 0.43 |
||||||||||
| YRC1950D 221656.25 776535.11 |
RC_DD 270 -52 270.6 2 262 264 2 0.23 |
||||||||||
| YRC1963D 221762.89 777285.22 |
RC_DD 270 -66 310.2 1 20 24 4 0.47 |
||||||||||
| YRC1963D 221762.89 777285.22 |
RC_DD 270 -66 310.2 6 290 296 6 4.18 |
||||||||||
| YRC1989D 221646.97 776560.28 |
RC_DD 270 -58 258 1 0 4 4 0.27 |
||||||||||
| YRC1989D 221646.97 776560.28 |
RC_DD 270 -58 258 2 60 68 8 11.42 |
||||||||||
| YRC1989D 221646.97 776560.28 |
RC_DD 270 -58 258 4 134 138 4 0.66 |
||||||||||
| YRC2019D 221700 776910 |
RC_DD 270 -50 299.8 2 159 161 2 0.33 |
||||||||||
| YRC2019D 221700 776910 |
RC_DD 270 -50 299.8 17 268 283 15 3.49 |
PERSEUSMINING.COM
18
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| YRC2044D 221701.26 776910.13 |
RC_DD 270 -55 293.8 2 90 92 2 1.09 |
||||||||||
| YRC2044D 221701.26 776910.13 |
RC_DD 270 -55 293.8 14 271 284.6 13.6 1.68 |
||||||||||
| Including | 278.4 284.6 6.2 2.99 |
||||||||||
| YRC2045D 221707.41 776857.18 |
RC_DD 270 -55 290.8 2 271 273 2 4.36 |
||||||||||
| YRC2045D 221707.41 776857.18 |
RC_DD 270 -55 290.8 5 278 283 5 3.44 |
||||||||||
| YRC2046D 221631.7 776509.84 |
RC_DD 270 -51 260.9 1 0 4 4 0.24 |
||||||||||
| YRC2046D 221631.7 776509.84 |
RC_DD 270 -51 260.9 1 12 16 4 0.58 |
||||||||||
| YRC2046D 221631.7 776509.84 |
RC_DD 270 -51 260.9 4 180.4 184.8 4.4 0.34 |
||||||||||
| YRC2046D 221631.7 776509.84 |
RC_DD 270 -51 260.9 3 210.3 213 2.7 0.2 |
||||||||||
| YRC2046D 221631.7 776509.84 |
RC_DD 270 -51 260.9 8 224 232 8 0.53 |
||||||||||
| YRC2046D 221631.7 776509.84 |
RC_DD 270 -51 260.9 18 235 253 18 1.19 |
||||||||||
| YRC2047D 221644.7 776559.8 |
RC_DD 270 -52 254.8 1 0 4 4 0.23 |
||||||||||
| YRC2047D 221644.7 776559.8 |
RC_DD 270 -52 254.8 4 56 72 16 3.39 |
||||||||||
| Including | 68 72 4 10.75 |
||||||||||
| YRC2047D 221644.7 776559.8 |
RC_DD 270 -52 254.8 4 138.3 142 3.7 3.11 |
||||||||||
| YRC2047D 221644.7 776559.8 |
RC_DD 270 -52 254.8 7 226 233 7 0.52 |
||||||||||
| YRC2047D 221644.7 776559.8 |
RC_DD 270 -52 254.8 5 236 241 5 1.33 |
PERSEUSMINING.COM
19
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
Table 2.2: CMA Down-Dip Extension - drill holes and significant assays
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| YRC1850AD 222234.5 777335.2 RC_DD 270 -60 678.4 2 0 8 8 0.93 |
|||||||||||
| YRC1850AD 222234.5 777335.2 RC_DD 270 -60 678.4 1 76 80 4 0.25 |
|||||||||||
| YRC1850AD 222234.5 777335.2 RC_DD 270 -60 678.4 9 604 612 8 2.64 |
|||||||||||
| Including 6 605 610 5 3.93 |
|||||||||||
| YRC1850AD 222234.5 777335.2 RC_DD 270 -60 678.4 7 625 632 7 2.52 |
|||||||||||
| Including 4 628 632 4 3.98 |
|||||||||||
| YRC1850AD 222234.5 777335.2 RC_DD 270 -60 678.4 6 635 641 6 0.44 |
|||||||||||
| YRC1850AD 222234.5 777335.2 RC_DD 270 -60 678.4 2 653 655 2 1.37 |
|||||||||||
| YRC1850AD 222234.5 777335.2 RC_DD 270 -60 678.4 9 661 668 7 0.52 |
|||||||||||
| YRC1852D 222180.68 777135.16 RC_DD 270 -60 633.9 1 24 28 4 0.38 |
|||||||||||
| YRC1852D 222180.68 777135.16 RC_DD 270 -60 633.9 1 96 100 4 0.29 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 1 0 4 4 0.29 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 1 16 20 4 0.32 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 1 24 28 4 0.22 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 1 32 36 4 0.26 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 2 177 179 2 0.51 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 3 193 196 3 1.87 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 2 231 233 2 0.3 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 4 247 251 4.05 0.22 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 6 264 270 6 0.4 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 2 347 349 2 0.32 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 4 356 360 4 0.88 |
|||||||||||
| YRC1854D 222102.52 776934.69 RC_DD 270 -55 541.7 4 489 493 4 0.69 |
|||||||||||
| YRC1855AD 221973.92 777435.47 RC_DD 270 -60 486.2 1 48 52 4 0.24 |
|||||||||||
| YRC1855AD 221973.92 777435.47 RC_DD 270 -60 486.2 3 442 445 3 0.31 |
|||||||||||
| YRC1855AD 221973.92 777435.47 RC_DD 270 -60 486.2 12 450.4 461. 5 11.1 3.39 |
|||||||||||
| Including 5 452 457 5 7.16 |
|||||||||||
| YRC1857D 221987.23 777535.06 RC_DD 270 -60 502.5 2 434 436 2 0.89 |
|||||||||||
| YRC1857D 221987.23 777535.06 RC_DD 270 -60 502.5 11 464 475 11 1.44 |
|||||||||||
| Including 6 464 470 6 2.32 |
|||||||||||
| YRC1858D 221978.02 777635.2 RC_DD 270 -60 528.1 3 473 476 3 1.17 |
|||||||||||
| YRC1858D 221978.02 777635.2 RC_DD 270 -60 528.1 11 479 487 8 2.22 |
|||||||||||
| Including 4 482 485 3 5.07 |
|||||||||||
| YRC1859D 221919.44 777734.92 RC_DD 270 -60 489.6 4 473 477 4 2.2 |
|||||||||||
| YRC1860D 222061.08 777735.27 RC_DD 270 -60 564.5 2 92 100 8 0.65 |
|||||||||||
| YRC1860D 222061.08 777735.27 RC_DD 270 -60 564.5 3 552 555 3 0.57 |
|||||||||||
| YRC1861D 222131.66 777635.59 RC_DD 270 -60 611.5 3 506 509 3 0.51 |
|||||||||||
| YRC1861D 222131.66 777635.59 RC_DD 270 -60 611.5 6 549 555 6 2.48 |
|||||||||||
| Including 2 550 552 2 6.9 |
PERSEUSMINING.COM
20
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Hole ID | East | North | Drill Type |
Azimuth | Dip | Depth | No of samples |
From | To | Width | Grade |
|---|---|---|---|---|---|---|---|---|---|---|---|
| YRC1862D 222021.17 777234.97 RC_DD 270 -60 510.1 1 40 44 4 0.31 |
|||||||||||
| YRC1862D 222021.17 777234.97 RC_DD 270 -60 510.1 7 460 467 7 0.35 |
|||||||||||
| YRC1871D 222133.11 777535.1 RC_DD 270 -60 588.5 1 36 40 4 0.2 |
|||||||||||
| YRC1871D 222133.11 777535.1 RC_DD 270 -60 588.5 1 88 92 4 0.52 |
|||||||||||
| YRC1871D 222133.11 777535.1 RC_DD 270 -60 588.5 2 525 527 2 0.3 |
|||||||||||
| YRC1871D 222133.11 777535.1 RC_DD 270 -60 588.5 2 532 534 2 6.32 |
|||||||||||
| YRC1871D 222133.11 777535.1 RC_DD 270 -60 588.5 5 546 551 5 1.25 |
|||||||||||
| YRC1871D 222133.11 777535.1 RC_DD 270 -60 588.5 4 554 558 4 0.53 |
|||||||||||
| YRC2033D 222145.53 777432.85 RC_DD 270 -60 603.3 1 4 8 4 0.32 |
|||||||||||
| YRC2033D 222145.53 777432.85 RC_DD 270 -60 603.3 4 24 40 16 0.28 |
|||||||||||
| YRC2033D 222145.53 777432.85 RC_DD 270 -60 603.3 5 48 68 20 0.39 |
|||||||||||
| YRC2033D 222145.53 777432.85 RC_DD 270 -60 603.3 2 72 80 8 0.42 |
|||||||||||
| YRC2033D 222145.53 777432.85 RC_DD 270 -60 603.3 2 84 90 6 0.24 |
|||||||||||
| YRC2033D 222145.53 777432.85 RC_DD 270 -60 603.3 2 545 547 2 0.34 |
|||||||||||
| YRC2033D 222145.53 777432.85 RC_DD 270 -60 603.3 3 569.5 572 2.5 1 |
|||||||||||
| YRC2033D 222145.53 777432.85 RC_DD 270 -60 603.3 2 586 588 2 2.13 |
|||||||||||
| YRC2036D 222203.35 777735.18 RC_DD 270 -60 619.5 3 76 88 12 0.57 |
|||||||||||
| YRC2036D 222203.35 777735.18 RC_DD 270 -60 619.5 1 92 96 4 0.3 |
|||||||||||
| YRC2037D 222210.18 777534.99 RC_DD 270 -60 648.2 2 0 8 8 0.43 |
PERSEUSMINING.COM
21
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
APPENDIX 3 – JORC TABLE 1 – YAOURÉ EXPLORATION
JORC 2012 Table 1 – Section 1 sampling techniques and data
(Criteria in this section apply to all succeeding sections)
| Criteria | JORC Code Explanation | Commentary |
|---|---|---|
| Sampling | Nature and quality of sampling (e.g. cut | Drilling to define underground resources at CMA Lode commenced in July |
| techniques | channels, random chips, or specific | 2021 and is ongoing at the date of the report to which this table refers. Drilling |
| specialised industry standard measurement | completed in the period to 8 January 2022 comprises: | |
| tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). |
5,675 metres of RC drilling and 16,689 metres of core drilling in 78 completed pre-collared diamond core holes, and |
|
| These examples should not be taken as | 6.997 metres of RC drilling in 95 pre-collars drilled ahead of core drilling. | |
| limiting the broad meaning of sampling. | ||
| Drilling to test down-dip of the CMA Lode Inferred resource commenced in | ||
| Include reference to measures taken to | August 2021. Drilling completed in the period to 8 January 2022 comprises: | |
| ensure sample representivity and the | ||
| appropriate calibration of any measurement | 1,551 metres of RC drilling and 6,655 metres of core drilling in 16 completed | |
| tools or systems used. | pre-collared diamond core holes, and | |
| Aspects of the determination of | 1,622 metres of RC drilling in 18 pre-collars drilled ahead of core drilling. | |
| mineralisation that are Material to the Public Report. In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation |
RC drilling used face-sampling hammers with 136mm hole diameter. Samples were collected at one metre intervals and logged visually for recovery, sample condition (dry, damp, wet) and contamination. Sample recoveries were measured by weighing bulk recovered samples. RC samples from pre-collars where mineralisation is not expected were normally composited to 4m intervals for assaying. |
|
| may be required, such as where there is | Diamond drilling utilised HQ triple-tube (61.1mm Ø) drilling in weathered | |
| coarse gold that has inherent sampling | materials and NQ2 (50.6mm Ø) or NQ (47.6mm Ø) core in fresh rock. | |
| problems. Unusual commodities or | ||
| mineralisation types (e.g. submarine | ||
| nodules) may warrant disclosure of detailed | ||
| information. | ||
| Drilling | Drill type (e.g. core, reverse circulation, | RC drilling used face-sampling hammers with 136mm hole diameter. Samples |
| techniques | open-hole hammer, rotary air blast, auger, | were collected at one metre intervals. RC samples from pre-collars where |
| Bangka, sonic, etc.) and details (e.g. core | mineralisation is not expected were normally composited to 4m intervals for | |
| diameter, triple or standard tube, depth of | assaying. | |
| diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc.). |
Diamond drilling utilised HQ triple-tube (61.1mm Ø) drilling in weathered materials and NQ2 (50.6mm Ø) or NQ (47.6mm Ø) core in fresh rock. Core in fresh rock was oriented using a MAGSHOT II (Wellforce) and an ORISHOT II |
|
| (Reflex) device. | ||
| Drill sample | Method of recording and assessing core and |
RC drill samples were logged visually for sample condition (dry, damp, wet) |
| recovery | chip sample recoveries and results assessed. | and contamination. Sample recoveries were measured by weighing bulk |
| Measures taken to maximise sample recovery and ensure representative nature of the samples. |
recovered samples. Preliminary evaluation indicates that RC sample recoveries have been satisfactory. There were no wet samples logged in the CMA UG RC pre-collar holes. |
|
| Whether a relationship exists between sample recovery and grade and whether |
Diamond core recoveries were measured linearly per drill run. Core recoveries average approximately 85% in weathered materials and 100% in fresh rock. |
|
| sample bias may have occurred due to | The Competent Person considers that there are presently insufficient data | |
| preferential loss/gain of fine/coarse | available to permit a meaningful examination of potential relationships | |
| material. | between sample recovery and gold grade. | |
| Logging | Whether core and chip samples have been | Geological logs are available for the entire lengths of all drill holes. The logging |
| geologically and geotechnically logged to a | is qualitative in nature. | |
| level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. |
Sieved samples of RC chips from each metre of drilling were logged for colour, rock type, alteration type and intensity, vein quartz content, sulphide mineralisation, weathering and oxidation. The chips are stored in plastic chip |
|
| Whether logging is qualitative or | trays and the trays photographed. | |
| quantitative in nature. Core (or costean, channel, etc.) photography. |
Diamond drill core was logged for geology, structure and geotechnical characteristics. Geological logging included colour, lithology, weathering, |
|
| The total length and percentage of the | oxidation, vein type and vein volume percentage, sulphide species and their | |
| relevant intersections logged. | estimated percentage, alteration and alteration intensity. Structural logging | |
| included fault, fold, cleavage and joint orientation, lithological contacts and | ||
| vein orientations. Drill core was photographed prior to cutting. |
PERSEUSMINING.COM
22
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Criteria | JORC Code Explanation | Commentary |
|---|---|---|
| Sub- | If core, whether cut or sawn and whether | RC drill samples were collected at drill sites over one metre intervals and |
| sampling | quarter, half or all core taken. | manually split using multi-stage riffle splitters to produce assay sub-samples |
| techniques | averaging around 3kg. All RC holes have been assayed in entirety. RC samples | |
| and sample | from pre-collars where mineralisation is not expected were normally | |
| preparation | If non-core, whether riffled, tube sampled, | composited to 4m intervals for assaying. |
| rotary split, etc. and whether sampled wet or dry. |
In weathered materials, diamond core was halved using spatulas or knives. In fresh rock, core was sawn in half using a diamond blade saw, with one half |
|
| For all sample types, the nature, quality and | sent for assaying and the other half stored in core trays for reference. Samples | |
| appropriateness of the sample preparation | were normally taken at 1 metre intervals. For CMA underground resource | |
| technique. | definition holes, only core intervals with visible alteration and mineralisation | |
| plus approximately 10m up- and down-hole were sampled. For exploration | ||
| Quality control procedures adopted for all | drill holes, all diamond drill core has been assayed. | |
| sub-sampling stages to maximise | ||
| representivity of samples. | All sample preparation has been undertaken at Perseus’s Yaouré sample | |
| preparation facility operated and supervised by Perseus personnel. | ||
| Measures taken to ensure that the sampling | ||
| is representative of the in-situ material | Preparation of core and RC samples followed a standard path of drying at 105 | |
| collected, including for instance results for | degrees C for at least 12 hours, crushing the entire sample to 85% passing - | |
| field duplicate/second-half sampling. | 2mm and grinding a 1.5kg split to 85% passing 75 microns. 300g pulp | |
| subsamples are selected by multiple scoop passes. | ||
| Whether sample sizes are appropriate to the | ||
| grain size of the material being sampled. | Quality control measures adopted to confirm the representivity of samples | |
| from RC and diamond drilling include: | ||
| • Field re-splits of RC samples at an average frequency of around one |
||
| duplicate per 20 primary samples respectively. | ||
| • Submission of coarse blanks at an average of around 1 blank per 20 |
||
| primary samples | ||
| • Use of quartz wash between every sample in crushing and pulverising |
||
| equipment | ||
| • Screening of approximately 1:20 pulp samples to check grind size |
||
| Sample preparation techniques are considered appropriate to the style of | ||
| mineralisation. Available information indicates that sample sizes are | ||
| appropriate to the grain size of the material being sampled. | ||
| Quality of | The nature, quality and appropriateness of | All RC and diamond core samples have been assayed by 50g fire assay with |
| assay data | the assaying and laboratory procedures used | AAS determination by Intertek Testing Services Ghana at their Tarkwa assay |
| and | and whether the technique is considered | laboratory or by Bureau Veritas at their Abidjan laboratory. The technique is |
| laboratory | partial or total. | considered a total extraction technique. |
| tests | ||
| For geophysical tools, spectrometers, | Quality control procedures include submission of coarse blanks (1:20) and | |
| handheld XRF instruments, etc., the | certified reference standards (1:20). | |
| parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied |
The available information indicates that the assaying of RC and core samples is free from any significant biases and is of acceptable accuracy. |
|
| and their derivation, etc. | ||
| Nature of quality control procedures | ||
| adopted (e.g. standards, blanks, duplicates, | ||
| external laboratory checks) and whether | ||
| acceptable levels of accuracy (i.e. lack of | ||
| bias) and precision have been established. | ||
| Verification | The verification of significant intersections by | Numerous significant mineralised intersections have been checked against |
| of sampling | either independent or alternative company | visual alteration and sulphide mineralisation in drill chips and core. |
| and assaying |
personnel. The use of twinned holes. |
None of the holes in the report to which this table relates have been deliberately twinned. |
| Documentation of primary data, data entry | Geology, structure and geotechnical logs are paper based. Sample intervals | |
| procedures, data verification, data storage | are recorded in pre-numbered sample ticket books. All logging, sample | |
| (physical and electronic) protocols. | interval and survey data are manually entered to digital form on site and | |
| Discuss any adjustment to assay data. | stored in an acQuire relational database. Data exports are normally in the form of MS Access files. |
|
| Data verification procedures include automated checks to: |
-
prevent repetition of sample numbers
-
• prevent overlap of from-to intervals in logging and sample interval data • ensure that total hole depths in collar, assay and geology tables match
PERSEUSMINING.COM
23
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Criteria | JORC Code Explanation | Commentary |
|---|---|---|
| • ensure that drill collar coordinates are within the project’s geographic |
||
| limits | ||
| Down-hole survey data are examined for large deviations in dip or azimuth | ||
| that may represent erroneous data or data entry errors and corrected on a | ||
| case-by-case basis including estimates of dips and azimuths where the original | ||
| data appear to be in error. | ||
| Additional data checks include viewing drill hole traces, geological logging and | ||
| assays in plan and section views. | ||
| Location of | Accuracy and quality of surveys used to | Drill hole collars have been surveyed by qualified mine surveyors using |
| data points | locate drill holes (collar and down-hole |
differential GPS equipment with coordinates recorded in UTM grid, WGS84 |
| surveys), trenches, mine workings and other | Zone 30N datum. | |
| locations used in Mineral Resource | ||
| estimation. | All RC and diamond core holes have been surveyed at 12m depth and at | |
| approximately 30m down-hole increments using digital compass instruments. | ||
| Specification of the grid system used. | A topographic surface has been established by a LiDAR survey conducted in | |
| Quality and adequacy of topographic | 2017. The topographic surface is reliable to +/- 0.2m. | |
| control. | ||
| Topographic control is adequate for the current work being undertaken at | ||
| Yaouré. | ||
| Data | Data spacing for reporting of Exploration | The CMA Lode is delineated by regular drilling at 50mN x 25mE spaced holes |
| spacing | Results. | to between 150 and 200 metres below natural surface. Partial coverage at |
| and distribution |
Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate |
50mN x 50mE spacing extends to between 200 and 275 metres below surface. Holes have generally been drilled dipping at -55 to -75 degrees toward 270 degrees (UTM grid) azimuth. |
| for the Mineral Resource and Ore Reserve | ||
| estimation procedure(s) and classifications | ||
| applied. | ||
| Whether sample compositing has been | ||
| applied. | ||
| Orientation | Whether the orientation of sampling |
Drill holes are oriented approximately orthogonal to the dip and strike of the |
| of data in | achieves unbiased sampling of possible | CMA Lode. Drill intercept lengths closely approximate true widths of |
| relation to | structures and the extent to which this is | mineralisation. |
| geological structure |
known, considering the deposit type. | The relationship between drill intercept lengths and true widths of |
| If the relationship between the drilling | mineralisation in the CMA East Seismic Target area is not known at the time of | |
| orientation and the orientation of key | this report. | |
| mineralised structures is considered to have | ||
| introduced a sampling bias, this should be | ||
| assessed and reported if material. | ||
| Sample | The measures taken to ensure sample | RC and core samples were delivered to the secure core yard compound at |
| security | security. | Yaouré mine by Perseus personnel. RC field sample splits and samples of half |
| diamond core were placed in numbered bags and those bags, in turn, placed | ||
| into polywoven sacks that were closed with plastic cable ties prior to transport | ||
| to the Yaouré sample preparation facility by Perseus personnel. Security | ||
| guards were employed at drilling sites, the core yard compound and the | ||
| sample preparation facility on a 24 hour per day basis. | ||
| Results of field duplicates along with the general consistency of assay results | ||
| between neighbouring drill holes and drilling methods provide confidence in | ||
| the general reliability of the assay data. | ||
| Audits or | The results of any audits or reviews of | The Yaouré sample preparation facility has previously been subject to formal |
| reviews | sampling techniques and data. | audit, the last being in 2017. Standard operating procedures have not changed |
| materially since that audit. | ||
| The Competent Person has reviewed the available sampling and assaying | ||
| quality control data and found no errors or bias likely to significantly affect the | ||
| reliability of the exploration data. These reviews included review of database | ||
| consistency, comparisons between database records and laboratory source | ||
| files, and review of QAQC information. | ||
| The Competent Person considers that the sample preparation, security and | ||
| analytical procedures adopted for the CMA resource drilling provide an | ||
| adequate basis for the reporting of Exploration Results. |
PERSEUSMINING.COM
24
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
JORC 2012 Table 1 – Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
| Criteria JORC Code explanation |
Commentary |
|---|---|
| Mineral tenement and land tenure status Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area. |
The drill holes discussed in the report to which this table relates are located within the Yaouré exploitation permit (PE50). The permit has an expiry date of 23 April 2030. The permit is held by Perseus’s subsidiary Perseus Mining Yaouré SA in which the government of Côte d’Ivoire holds 10% free carried interest. Additionally, the Government of Côte d’Ivoire is entitled to a royalty on nett revenue (revenue minus transport and refining costs) as follows: |
| Spot price per ounce - London PM Fix Royalty Rate |
|
| Less than or equal to US$1,000 3% |
|
| Higher than US$1,000 and less than or equal to US$1,300 3.5% |
|
| Higher than US$1,300 and less than or equal to US$1,600 4% |
|
| Higher than US$1,600 and less than or equal to US$2,000 5% |
|
| Higher than US$2,000 6% |
|
| A further 0.5% of nett revenue is required to be paid to a local community development fund. The reported exploration areas have no known exploration-specific environmental liabilities. |
|
| Exploration done by other parties Acknowledgment and appraisal of exploration by other parties. |
Exploration geochemical sampling, trenching and exploration and resource definition drilling have previously been carried out by BRGM, Cluff and Amara. Drill hole data deriving from work by Cluff and Amara are considered reliable. |
| Geology Deposit type, geological setting and style of mineralisation. |
Yaouré may be described as orogenic lode-style gold mineralisation. The Yaouré project comprises two adjacent deposits, Yaouré and CMA, that occur near the south-eastern flank of the Bouaflé greenstone belt in central Côte d’Ivoire. Mineralisation is hosted by Paleoproterozoic aged metabasalts and felsic intrusive rocks of the Birimian Supergroup. The rocks are metamorphosed to lower greenschist facies and only locally feature penetrative deformation fabrics. In both deposits, gold is associated with disseminated pyrite. At CMA deposit, mineralisation is associated with quartz-albite-carbonate veining in reverse fault structures that dip at 25 to 35 degrees to the east. Yaouré deposit comprises several mineralisation styles controlled by east-dipping structures, similar to CMA, in addition to mineralisation associated with quartz- tourmaline-chlorite-carbonate veining controlled by NE and NW striking, sub- vertical faults and also stockwork quartz veins with associated alteration selvages hosted by a granodiorite intrusive body. The combined deposits extend over an area around 1.4 km east west by 2.1 km north-south. |
PERSEUSMINING.COM
25
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Drill hole | A summary of all information material to | A table of drill hole and intercept details is included in the report to which this |
| Information | the understanding of the exploration | table relates. |
| results including a tabulation of the | ||
| following information for all Material drill | ||
| holes: | ||
| • easting and northing of the drill |
||
| hole collar | ||
| • elevation or RL (Reduced Level – |
||
| elevation above sea level in metres) | ||
| of the drill hole collar | ||
| • dip and azimuth of the hole |
||
| • down hole length and interception |
||
| depth | ||
| • hole length. |
||
| If the exclusion of this information is | ||
| justified on the basis that the information | ||
| is not Material and this exclusion does not | ||
| detract from the understanding of the | ||
| report, the Competent Person should | ||
| clearly explain why this is the case. | ||
| Data | In reporting Exploration Results, | The cut-off grade, minimum down-hole length and maximum included |
| aggregation | weighting averaging techniques, | internal waste are clearly stated in the report to which this table relates. |
| methods | maximum and/or minimum grade | Higher-grade “included” intercepts are clearly reported. |
| truncations (e.g. cutting of high grades) | Drill hole intercepts have not been reported as metal equivalents. | |
| and cut-off grades are usually Material | ||
| and should be stated. | ||
| Where aggregate intercepts incorporate | ||
| short lengths of high-grade results and | ||
| longer lengths of low-grade results, the | ||
| procedure used for such aggregation | ||
| should be stated and some typical | ||
| examples of such aggregations should be | ||
| shown in detail. | ||
| The assumptions used for any reporting of | ||
| metal equivalent values should be clearly | ||
| stated. | ||
| Relationship | These relationships are particularly | The geometry of the CMA Lode has been clearly demonstrated by previous |
| between | important in the reporting of Exploration | drilling. The lengths of drill intercepts of that structure in the report to which |
| mineralization | Results. | this table relates closely approximate true widths. |
| widths and | If the geometry of the mineralisation with | |
| intercept | respect to the drill hole angle is known, its | The relationship between drill intercept lengths and true widths of |
| lengths | nature should be reported. | mineralisation in the CMA East Seismic Target is not known at the time of this |
| If it is not known and only the down hole | report . | |
| lengths are reported, there should be a | ||
| clear statement to this effect (e.g. ‘down | ||
| _hole length, true width not known’). _ | ||
| Diagrams | Appropriate maps and sections (with | Appropriate plans and sections are included in the report to which this table |
| scales) and tabulations of intercepts | relates. | |
| should be included for any significant | ||
| discovery being reported These should | ||
| include, but not be limited to a plan view | ||
| of drill hole collar locations and | ||
| appropriate sectional views. | ||
| Balanced | Where comprehensive reporting of all | Holes that did not intercept significant mineralisation are shown on plans and |
| reporting | Exploration Results is not practicable, | cross-sections and “NSI” holes are included in tables of intercepts. |
| representative reporting of both low and | ||
| high grades and/or widths should be | ||
| practiced to avoid misleading reporting of | ||
| Exploration Results. |
PERSEUSMINING.COM
26
NEWS RELEASE | HIGH GRADE RESULTS CONTINUE AT YAOURÉ GOLD MINE
==> picture [110 x 35] intentionally omitted <==
| Criteria | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|
| Other | Other exploration data, if meaningful and | The Yaouré property has been subject to extensive exploration, including: | |
| substantive exploration |
material, should be reported including (but not limited to): geological |
• | Soil sampling, surface mapping |
| data | observations; geophysical survey results; | • | Approximately 300,000 metres of drilling |
| geochemical survey results; bulk samples | |||
| – size and method of treatment; | • | Previous mining by_Compagnie Miniere d’Afrique_(CMA) and Cluff | |
| metallurgical test results; bulk density, | Mining | ||
| groundwater, geotechnical and rock characteristics; potential deleterious or |
• | Airborne EM, gravity, radiometrics and magnetic surveys | |
| contaminating substances. | • | 2D & 3D seismic surveys. | |
| The CMA Lode is presently being exploited by open pit mining. | |||
| Further work | The nature and scale of planned further | Perseus intends to continue drilling at CMA to delineate an Indicated Mineral | |
| work (e.g. tests for lateral extensions or | Resource and to undertake such studies as are required to complete an | ||
| depth extensions or large-scale step-out | economic evaluation of material that may be exploited by underground | ||
| drilling). | mining. | ||
| Diagrams clearly highlighting the areas of | |||
| possible extensions, including the main | |||
| geological interpretations and future | |||
| drilling areas, provided this information is | |||
| not commercially sensitive. |
PERSEUSMINING.COM
27