AI assistant
PERSEUS MINING LIMITED — Annual Report 2024
Aug 27, 2024
46513_rns_2024-08-27_eddbbcfc-398c-4008-bc2f-d58a466d6035.pdf
Annual Report
Open in viewerOpens in your device viewer
==> picture [230 x 230] intentionally omitted <==
==> picture [290 x 88] intentionally omitted <==
28 AUGUST 2024 ASX/TSX: PRU | WWW.PERSEUSMINING.COM
CAUTIONARY STATEMENTS
COMPETENT PERSON STATEMENT:
All production targets referred to in this report are underpinned by estimated Ore Reserves which have been prepared by competent persons in accordance with the requirements of the JORC Code.
Edikan
The information in this release that relates to the Open Pit and Underground Mineral Resources and Ore Reserve at Edikan was updated by the Company in a market announcement “Perseus Mining updates Mineral Resources and Ore Reserves” released on 21 August 2024. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market release continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Edikan Gold Mine, Ghana” dated 7 April 2022 continue to apply.
Canadian National Instrument NI43-101 disclosure
The information in this release relating to the Nyanzaga Gold Project is extracted from the OreCorp ASX announcements dated 12 September 2017 titled “MRE Update for the Nyanzaga Project Increasing Category and Grade”, 5 May 2022 titled “DFS Completion and Kilimani Mineral Resource Estimate update within the Nyanzaga Special Mining Licence – Tanzania”, and 22 August 2022 titled “Nyanzaga DFS Delivers Robust Results” available on www.perseusmining.com. A Qualified Person has not done sufficient work to classify the Historical Estimates as current. As such, any Mineral Resource and Mineral Reserve estimates included in this section are Historical Estimates as defined in Canadian National Instrument 43-101 and are not reported as current Perseus estimates. The OreCorp Feasibility Study includes key assumptions for commodity prices, gold mining and processing costs, and there have been no material changes in assumptions. The OreCorp Feasibility Study in its current form is considered to be a comprehensive compilation of all available data applicable to the estimation of Mineral Resources and Mineral Reserves. Reference is made to Perseus’s news release dated 31 May 2024 titled "Perseus progresses Nyanzaga Gold Project” for further clarifying statements. Perseus confirms the applicability of these statements have not materially changed.
Sissingué, Fimbiasso and Bagoé
The information in this report that relates to the Mineral Resources and Ore Reserve at the Sissingue Gold Mine including Fimbiasso and Bagoé was updated by the Company in a market announcement “Perseus Mining updates Mineral Resources and Ore Reserves” released on 21 August 2024. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market release continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Sissingué Gold Project, Côte d’Ivoire” dated 29 May 2015continue to apply.
Yaouré
The information in this report that relates to the Mineral Resources and Ore Reserve at Yaouré was updated by the Company in a market announcement “Perseus Mining announces Open Pit and Underground Ore Reserve update at Yaouré” released on 21 August 2024. The Company confirms that all material assumptions underpinning those estimates and the production targets, or the forecast financial information derived therefrom, in that market release continue to apply and have not materially changed. The Company further confirms that material assumptions underpinning the estimates of Ore Reserves described in “Technical Report — Yaouré Gold Project, Côte d’Ivoire” dated 19 December 2023 continue to apply.
Nyanzaga Gold Project
ASX Listing Rules disclosure
All information on the Nyanzaga Mineral Resource and Ore Reserve estimates has been extracted from the OreCorp ASX announcements dated 12 September 2017 titled “MRE Update for the Nyanzaga Project Increasing Category and Grade”, 5 May 2022 titled “DFS Completion and Kilimani Mineral Resource Estimate update within the Nyanzaga Special Mining Licence – Tanzania”, and 22 August 2022 titled “Nyanzaga DFS Delivers Robust Results” available on www.perseusmining.com. Perseus confirms that it is not aware of any new information or data that materially affect the information included in the original ASX announcements and that all material assumptions and technical parameters underpinning the estimates in the ASX announcements continue to apply and have not materially changed. Perseus confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original ASX announcements.
CAUTION REGARDING FORWARD LOOKING INFORMATION :
This report contains forward-looking information which is based on the assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Assumptions have been made by the Company regarding, among other things: the price of gold, continuing commercial production at the Yaouré Gold Mine, the Edikan Gold Mine and the Sissingué Gold Mine without any major disruption, the receipt of required governmental approvals, the accuracy of capital and operating cost estimates, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used by the Company. Although management believes that the assumptions made by the Company and the expectations represented by such information are reasonable, there can be no assurance that the forward-looking information will prove to be accurate. Forward-looking information involves known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forwardlooking information. Such factors include, among others, the actual market price of gold, the actual results of current exploration, the actual results of future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's publicly filed documents. The Company believes that the assumptions and expectations reflected in the forward-looking information are reasonable. Assumptions have been made regarding, among other things, the Company’s ability to carry on its exploration and development activities, the timely receipt of required approvals, the price of gold, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers should not place undue reliance on forward-looking information. Perseus does not undertake to update forward-looking information, except in accordance with applicable securities laws.
PERSEUS MINING
2
OPERATING & FINANCIAL RESULTS
PERSEUS MINING LIMITED PERSEUSMINING.COM
3
EXCELLENT RESULTS FOR THE 2024 FINANCIAL YEAR
==> picture [100 x 103] intentionally omitted <==
==> picture [103 x 103] intentionally omitted <==
==> picture [103 x 103] intentionally omitted <==
==> picture [103 x 101] intentionally omitted <==
==> picture [104 x 103] intentionally omitted <==
==> picture [97 x 99] intentionally omitted <==
GOLD PRODUCED ALL-IN SITE COST AVG GOLD SALE PRICE CASH MARGIN[ (3)] NOTIONAL CASHFLOW[(2)] NET CASH & BULLION 509,977 oz[(1)] US$1,053/oz[(1)] US$2,014/oz US$961/oz US$490M US$587M[ (4)] Down 4.7%[ (2)] Up US$94/oz[(2)] Up US$211/oz[(2)] Up $117/oz[(2)] Up US$38M[(2)] Up US$65M[(2)]
Perseus firmly on track to fund growth & continue capital returns to shareholders
(1) Within production guidance range of 491,000 to 517,000 ounces and cost guidance range of US$1,000 to US$1,100 per ounce. (2) Compared to FY23.
(3) Cash Margin equals Average Sales Price minus All-in Site Cost (AISC). Notional Cashflow equals Cash Margin multiplied by Gold Produced.
- (4) Zero debt, US$300 million undrawn line of credit.
PERSEUS MINING PERSEUSMINING.COM
4
STRONG PERFORMANCE ACROSS KEY FINANCIAL METRICS
==> picture [763 x 235] intentionally omitted <==
----- Start of picture text -----
REVENUE PROFIT BEFORE TAX PROFIT AFTER TAX OPERATING CASH FLOW [(2)] NET TANGIBLE ASSETS
US$1,025.8M US$467.1M US$364.8M US$429.2M US$1,216.7M
Up 7% [(1)] Up 22% [(1)] Up 14% [(1)] Up 1% [(1)] Up 9% [(1)]
----- End of picture text -----
==> picture [100 x 100] intentionally omitted <==
==> picture [100 x 10] intentionally omitted <==
----- Start of picture text -----
FINAL DIVIDEND
----- End of picture text -----
3.75 cents/ps (A$)
(1) Financial Year ended 30 June 2024 (FY24) compared to Financial Year ended 30 June 2023 (FY23)
(2) Net cash inflows from operating activities
PERSEUS MINING
5
GROWTH IN EARNINGS(1)
==> picture [438 x 302] intentionally omitted <==
----- Start of picture text -----
Revenue EBITDA [(2) ] Gross Profit from
US$1,025.8M US$625.2M Operations
US$483.5M
Up 7%
Up 13%
Up 19%
FY24 Profit Basic Earnings Earnings Per
After Tax Per Share [(3)] Ounce [(4) ]
US$364.8M 23.62cps US$717.1
Up 14% Up 12% Up 20%
----- End of picture text -----
==> picture [374 x 353] intentionally omitted <==
----- Start of picture text -----
EARNINGS (US$M)
625
553
484
409 406
365
321
254
226
203
149
104
FY21 FY22 FY23 FY24
Profit after tax Gross profit from operations EBITDA from operations
----- End of picture text -----
-
(1) FY24 compared to FY23
-
(2) Gross profit from operations before depreciation and amortisation
-
(3) Earnings per Share is calculated utilising Profit attributable to Owners of Perseus Mining Limited divided by weighted average number of shares on issue (4) Earnings per Ounce is calculated utilising Profit After Tax divided by Gold Sold (oz)
PERSEUS MINING
6
GROWTH IN CASHFLOW[(1)]
==> picture [783 x 389] intentionally omitted <==
----- Start of picture text -----
CASHFLOW FROM OPERATIONS [(2) ] (US$M)
500 Operating Cash Flow from
Operations
US$429.2M [(2)]
400 Up 1%
300 Operating Cash Flow Per Share
31.26cps [(3)]
200 Up 0%
Operating Cash Flow Per Ounce
100 US$844 [(4)]
Up 6%
0
FY21 FY22 FY23 FY24
----- End of picture text -----
- (1) FY24 compared to FY23
==> picture [130 x 342] intentionally omitted <==
- (2) Net cash inflows from operating activities
(3) Operating cash flow per share is calculated as Net cash inflows from operating activities divided by weighted average number of outstanding ordinary shares
- (4) Operating cash flow per ounces is calculated as Net cash inflows from operating activities divided by ounces produced
PERSEUS MINING
7
GROWTH IN GOLD PRODUCTION AT ATTRACTIVE MARGINS
==> picture [486 x 341] intentionally omitted <==
-
Perseus group has:
-
Averaged 513,091 ounces of gold production at AISC of US$988/ounce for the last 3 financial years.
-
Achieved or exceeded production & AISC market guidance since H1 2020 (Start Covid).
-
AISCs reasonably stable in an inflationary environment resulting in an increased margin as the gold price has risen.
-
Resulted in Cash and Bullion balance of US$587M (+ zero debt) post Nyanzaga acquisition.
PERSEUS MINING
8
GROWTH IN NET TANGIBLE ASSETS[(1)]
NET CASH POSITION US$ MILLION Cash and bullion[(2)] 587 - Total Interest-Bearing Liabilities Net Cash Position 30 June 2024 587
==> picture [572 x 91] intentionally omitted <==
----- Start of picture text -----
TOTAL ASSETS [3] NET TANGIBLE ASSETS [3]
US$2.0B US$1.2B
----- End of picture text -----
NO DEBT US$300m of undrawn capacity
NET TANGIBLE ASSETS PER SHARE[3] US$0.89
- (1) Net Tangible Asset as at 30 June 2023 US$1.1B
(2) Equals “cash and equivalents” plus market value of unsold bullion on hand
(3) As at 30 June 2024
PERSEUS MINING PERSEUSMINING.COM
9
CONTINUE TO SUCCESSFULLY EXECUTE OUR BUSINESS PLANS
Consistently deliver production & costs in line with market expectations
==> picture [490 x 297] intentionally omitted <==
==> picture [440 x 280] intentionally omitted <==
PERSEUS MINING
10
DELIVERING ON BOTH PRODUCTION AND COST GUIDANCE
| PARAMETER | UNITS | JUNE 2024 HALF YEAR | JUNE 2024 HALF YEAR | 2024 FINANCIAL YEAR | 2024 FINANCIAL YEAR |
|---|---|---|---|---|---|
| Guidance | Actual | Guidance | Actual | ||
| Yaouré Gold Mine | |||||
| Production Ounces |
100,000 to 113,000 116,478 235,000 to 247,000 250,857 |
||||
| All-in Site Cost USD per ounce |
1,150 to 1,300 1,103 900 to 1000 943 |
||||
| Edikan Gold Mine | |||||
| Production Ounces |
90,000 to 100,000 96,433 191,000 to 201,000 195,080 |
||||
| All-in Site Cost USD per ounce |
1,100 to 1,250 999 1,000 to 1,100 1,001 |
||||
| Sissingué Gold Mine | |||||
| Production Ounces |
36,000 to 41,000 35,489 65,000 to 69,000 64,040 |
||||
| All-in Site Cost USD per ounce |
1,450 to 1,650 1,578 1,400 to 1,500 1,641 |
||||
| PERSEUS GROUP | |||||
| Production Ounces |
226,000 to 254,000 248,400 491,000 to 517,000 509,977 |
||||
| All-in Site Cost USD per ounce |
1,180 to 1,340 1,130 1,000 to 1,100 1,053 |
PERSEUS MINING
11
PRODUCTION & COST MARKET GUIDANCE – DECEMBER 2024 HALF YEAR
| PARAMETER | UNITS | JUNE 2024 HALF YEAR (ACTUAL) |
DECEMBER 2024 HALF YEAR (FORECAST) |
2024 CALENDAR YEAR (FORECAST) |
|---|---|---|---|---|
| Yaouré Gold Mine | ||||
| Production Ounces 116,478 108,000 to 124,000 224,478 to 240,478 |
||||
| All-in Site Cost USD per ounce 1,103 1,175 to 1,275 1,140 to 1,186 |
||||
| Edikan Gold Mine | ||||
| Production Ounces 96,433 82,000 to 98,000 178,433 to 194,433 |
||||
| All-in Site Cost USD per ounce 999 1,200 to 1,300 1,100 to 1,137 |
||||
| Sissingué Gold Mine | ||||
| Production Ounces 35,489 30,000 to 38,000 65,489 to 73,489 |
||||
| All-in Site Cost USD per ounce 1,578 1,500 to 1,600 1,538 to 1,588 |
||||
| PERSEUS GROUP | ||||
| Production Ounces 248,400 220,000 to 260,000 468,400 to 508,400 |
||||
| All-in Site Cost USD per ounce 1,130 1,230 to 1,330 1,182 to 1,223 |
PERSEUS MINING
12
CAPITAL MANAGEMENT FRAMEWORK
Targets & Priorities
➢ RELIABLE AND STRONG OPERATING CASH FLOW
-
Optimise Operating Cash flow
-
Ensure commitments to all stakeholders are fully funded .
-
➢ MAINTAIN BALANCE SHEET RESILIENCE under a range of trading conditions:
-
Liquidity
-
Net Debt /Gearing targets
-
Cash reserves to sustain Dividend policy - Minimum of 1% Annual Yield
-
➢ DISCRETIONARY INVESTMENT
-
Asset Optimisation – simplification, efficiency and cost reduction
-
Fund Growth strategy
-
Return surplus capital to shareholders - Special Dividend and/or Share Buy Back
FY 24 Delivery
FY24 generated US$429M in Operating Cash Flow Dividends paid to Government Shareholders US$11.6M Income taxes and withholding taxes paid US$110M
US$887M liquidity (US$587M cash and bullion, US$300M undrawn corporate bank facility)
US$195m investment in OreCorp Limited to acquire the Nyanzaga Gold Project in Tanzania
Five (5) AUD cps returned to shareholders via dividends Announced intention to do a A$100M share-buy-back
==> picture [44 x 48] intentionally omitted <==
==> picture [44 x 47] intentionally omitted <==
==> picture [45 x 47] intentionally omitted <==
PERSEUS MINING PERSEUSMINING.COM
13
Interim (cps) Total Final cps
DISTRIBUTIONS TO SHAREHOLDERS
-
Perseus’s Dividend Policy aims to reward shareholders while maintaining balanced capital structure and capacity to fund corporate growth.
-
Considering Perseus’s FY24 financial performance, the Board has declared a FY24 Final Dividend of:
-
3.75 AUD cents per share (~A$51.5M)
-
Total Return to shareholders in FY24 via distributions of 5.00 AUD cps
-
Interim Dividend of 1.25 AUD cps paid 5 April 2024
-
Final Dividend of 3.75 AUD cps, ex-dividend on 9 September 2024, payment date 9 October 2024
-
Total return of ~A$168M to Shareholders via distributions in 3 years, commencing with the maiden distribution in August 2021.
-
Announced an intention to undertake an on-market share buy-back of A$100M to commence on or about 24 September 2024 and be completed within 12 months
==> picture [398 x 455] intentionally omitted <==
----- Start of picture text -----
DIVIDENDS PER SHARE PAID BY PRU
(CPS) 5.0 cps
3.75
2.48
1.64
1.50
1.06 1.25
0.81
-
FY21 FY22 FY23 FY24
Interim Dividend AUD Final Dividend AUD Capital Return AUD
80. TOTAL DIVIDENDS PAID BY PRU (AUD)
70.
60.
50.
51.5
40.
30. 34.1
20. 22.4
10. 18.4 14.5 17.2
10.
. .
FY21 FY22 FY23 FY24
CENTS PER SHARE
AUD MILLION
----- End of picture text -----
PERSEUS MINING
14
==> picture [430 x 124] intentionally omitted <==
SUSTAINABILITY PERFORMANCE
PERSEUS MINING LIMITED PERSEUSMINING.COM
15
SUSTAINABILITY
==> picture [367 x 51] intentionally omitted <==
==> picture [107 x 34] intentionally omitted <==
==> picture [72 x 70] intentionally omitted <==
SAFETY
-
Safety performance across the Group improved in FY24. Group 12-month rolling average Total Recordable Injury Frequency Rate (TRIFR) for FY24 was 1.06, below the target of 1.14, and 12% lower than 1.20 achieved in FY23.
-
Group 12-month rolling average Lost Time Injury Frequency Rate (LTIFR) across the Group for FY24 fell to 0.15 compared to 0.24 in FY23.
-
Emphasis has been placed on our SHED programme with behaviour-based initiatives and deployment of the Fatality Risk Management programme with employees and contractors.
==> picture [72 x 70] intentionally omitted <==
COMMUNITY
-
Total economic contributions to host countries Ghana, Côte d’Ivoire and Sudan for FY24 increased to ~US$717 million (approximately 70% of revenue). This represents 89% of procurement on PO value basis paid to local suppliers and includes ~US$3.6 million in community contributions.
-
Local and national employment remain stable at 96% and the proportion of female employees also remained stable at 12% .
-
One significant community event (Category 3 or above) reported during FY24.
==> picture [72 x 70] intentionally omitted <==
ENVIRONMENT
-
Total Scope 1 and 2 Greenhouse Gas emissions intensity per ounce of gold produced increased slightly to 0.53 tCO2e/oz for FY24 compared to 0.51 in FY23, due to slightly less ounces produced in FY24.
-
Zero significant environmental or tailings dam integrity issues (Consequence 3) reported during FY24.
PERSEUS MINING
16
ORGANIC GROWTH
PERSEUS MINING LIMITED PERSEUSMINING.COM
17
CMA UNDERGROUND MINE DEVELOPMENT PROJECT
Sound progress made towards FID on the CMA Underground Mine Development Project in October 2024.
Critical Pre-FID Activities
➢ Recruitment of UG Mining Team Key Personnel
-
UG Manager – Commenced 2 July 2024.
-
Initial task to oversee operational readiness activities and onboarding of UG Mining Contractor.
-
Perseus initial HR plan mapped out and being implemented.
➢ Progress permits and legislation
-
Legislation – Awaiting next steps on commencing under Ministerial Order.
-
Environmental & Social Impact Assessment (ESIA) and Environmental Management Plan (EMP) being reviewed to ensure UG impacts are incorporated.
PERSEUS MINING
PERSEUSMINING.COM
18
CMA UNDERGROUND DEVELOPMENT PROJECT
Critical Pre-FID Activities
➢ UG Mining Tender (ITT)
-
Tenders received.
-
Detailed technical and commercial assessment underway.
-
Longer contract terms will be considered.
==> picture [76 x 63] intentionally omitted <==
==> picture [60 x 73] intentionally omitted <==
==> picture [79 x 74] intentionally omitted <==
==> picture [77 x 63] intentionally omitted <==
==> picture [130 x 46] intentionally omitted <==
➢ Mine Services Area and Administration
- Infrastructure design and layouts will be validated
with preferred UG contractor.
➢ UG Power Supply confirmed
- Incremental 6 MW required for full backup power capacity.
➢ Operational Readiness
-
Generate long lead procurement schedule, infrastructure and operational.
-
FS mine design optimisation.
PERSEUS MINING PERSEUSMINING.COM
19
HIGH-LEVEL SCHEDULE
==> picture [787 x 419] intentionally omitted <==
PERSEUS MINING PERSEUSMINING.COM
20
==> picture [961 x 83] intentionally omitted <==
INORGANIC GROWTH
PERSEUS MINING LIMITED
PERSEUSMINING.COM
17
INORGANIC BUSINESS GROWTH
NYANZAGA GOLD PROJECT - TANZANIA
-
Nyanzaga Gold Project, is a pre-development project located in northwest Tanzania with a reported Probable Ore Reserve of 40.08 Mt @ 2.02 g/t gold for 2.60 million ounces of gold[1] .
-
An 80% interest in the project was acquired by Perseus through the off-market acquisition of OreCorp Limited (ASX:ORR) in Q4 FY2024. Tanzanian government owns the remaining 20% interest and is carried by Perseus.
-
Perseus has received strong support from the Tanzanian Government since assuming control of the project and targeting a Final Investment Decision (FID) in December 2024, commencement of construction in expected January 2025, & first gold Q1 2027.
-
All key licences required for development and operation of the project have been granted.
-
A program of parallel paths have commenced for FID project definition, including resource definition drilling, technical studies for feasibility update, and Front-End Engineering and Design.
-
Early works on site establishment have commenced, with key personnel mobilised.
- These estimates have been prepared in accordance with the JORC Code (2012) and have not been reported in accordance with NI 43-101. A Qualified Person has not done sufficient work to classify the resource estimate as current in accordance with NI 43-101. Please refer to further disclosure required by NI 43-101 together with a more detailed resource table in Perseus’s market release dated 31 May 2024 “Perseus progresses Nyanzaga Gold Project”.
PERSEUS MINING PERSEUSMINING.COM
22
HIGH LEVEL SCHEDULE
==> picture [703 x 406] intentionally omitted <==
PERSEUS MINING PERSEUSMINING.COM
23
==> picture [277 x 78] intentionally omitted <==
For more information please contact: This presentation was authorised for release by the Board of Perseus Mining Limited
ASX/TSX: PRU | WWW.PERSEUSMINING.COM