AI assistant
PEEL MINING LIMITED — Investor Presentation 2015
Jun 15, 2015
65545_rns_2015-06-15_bd4bb498-146e-49ac-bfed-d4f1e4544540.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [780 x 374] intentionally omitted <==
-
- High grade copper zinc lead in the Cobar Superbasin
-
Michael Oates, Chief Geologist Australian Copper Conference
-
The views expressed here other than historical fact constitute forward-looking statements. Forward-looking statements are based upon estimates and assumptions considered reasonable by the Company, albeit subject to uncertainties and contingencies of unknown factors that may cause variation in such forward-looking statements beyond the Company’s ability to control or predict. Nothing in this release should be construed as either an offer to sell or a solicitation of an offer to buy or sell shares in any jurisdiction.
Competent Persons Statement
-
The information in this report that relates to Exploration Results is based on information compiled by Mr Robert Tyson, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Tyson is Managing Director of Peel Mining Ltd. Mr Tyson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr Tyson consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
-
The information in this report that relates to the Mallee Bull Mineral Resource estimates, and reported by the Company in compliance with JORC 2012 in a market release dated 27 May 2014,. is based on information compiled by Jonathon Abbott, a Competent Person who is a Member of the Australian Institute of Geoscientists. Jonathon Abbott is a full time employee of MPR Geological Consultants Pty Ltd and is an independent consultant to Peel Mining Ltd. Mr Abbott has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Abbott consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
Capital Structure
Shares on issue (ASX:PEX): 132 million Options: 4 million Market cap (@ 31.5 cps): $42 million Cash (at end Apr 2015) $3 million
Substantial Shareholders
Hampton Hill Mining NL 17.15% and assoc Point Nominees Pty Ltd 11.64% Ariki Investments Pty Ltd 8.72% Rob Tyson 5.30%
Drill. Discover. Deliver.
-
Low admin costs; high exploration to admin ratio
-
Fund via dilution at project level – CBH/JOGMEC
-
Competent, hands-on technical team
==> picture [358 x 206] intentionally omitted <==
----- Start of picture text -----
•
Innovative methodologies
Drill often
Make discoveries
Deliver wealth to shareholders
----- End of picture text -----
NSW and WA-focused Company
==> picture [515 x 394] intentionally omitted <==
==> picture [150 x 274] intentionally omitted <==
Cobar Superbasin Mines and Deposits
Approximate pre-mining Deposit Metals resources ~50Mt @ 8% Zn, 5% Pb, Endeavor Zn-Pb-Ag 50 g/t Ag CSA Cu ~50Mt @ 3% Cu Au-Cu-PbPeak ~10Mt @ 7 g/t Au Zn-Ag Hera Au-Pb-Zn ~2.5Mt @ 8 g/t AuEq Nymagee Cu-Ag-Pb-Zn ~9Mt @ 1.5% Cu Tritton Cu ~35 Mt @ 2% Cu Mineral Au-Cu-Ag~6Mt @ 3 g/t Au, 1% Cu Hill Pb-Zn
An excellent place to explore:
-
Highly prospective geology
-
High grade mineral deposits
-
Long-life mining operations
-
Excellent infrastructure
-
Supportive, mining-skilled community
-
Large-scale landholdings = less landowners
==> picture [562 x 412] intentionally omitted <==
----- Start of picture text -----
Cobar Nymagee
100km 40km
Lake Cargelligo
125km
Condobolin
120km
----- End of picture text -----
Key attributes:
-
EL7461 (80 km[2] ) & ML1361 (1 km[2] )
-
50:50 JV with CBH
-
Mallee Bull copper deposit
-
May Day gold deposit
-
Gilgunnia and 4-Mile Goldfields
-
100 km via Kidman Way to Cobar
-
50 km to Nymagee-Hera
-
15 km to MoombaSydney gas pipeline
-
Peel owns 20k acre 4- Mile Station (on which Mallee Bull resides)
6
Timeline:
-
August 2011 – discovery drillhole
-
May 2012 – CBH farmin.
-
August 2012 – confirmation of major discovery
-
March 2014 – CBH farmin complete
T1
-
May 2014 – maiden resource
-
September 2014 – scoping study completed
-
February 2015 – Orion 3D survey
-
May 2015 – new highgrade Zn-Pb-Ag discovery
7
-
Some of the most significant copper results reported anywhere in the world in 2012/13 with better drill results including:
-
⁻ –
-
69m @ 3.48% Cu, 34 g/t Ag, 0.14 g/t Au from 533m MBDD009
-
⁻ –
-
53m @ 4.08% Cu, 42 g/t Ag, 0.22 g/t Au from 470m MBDD009W1
-
⁻ –
-
84m @ 4.42% Cu, 38 g/t Ag, 0.14 g/t Au from 575m MBDD009W2W1
| Cut off CuEq % |
Category | Kt | Grade | Grade | Grade | Grade | Contained Metal | Contained Metal | Contained Metal | Contained Metal |
|---|---|---|---|---|---|---|---|---|---|---|
| CuEq | Cu % | Ag g/t | Au g/t | CuEq Kt | Cu kT | Ag koz | Au koz | |||
| 1.0 | Indicated | 620 | 2.22 | 1.73 | 29.0 | 0.54 | 14 | 10.7 | 578 | 11 |
| Inferred | 3,300 | 2.8 | 2.4 | 32 | 0.3 | 93 | 79 | 3,395 | 32 | |
| Total | 3,920 | 2.7 | 2.3 | 32 | 0.3 | 107 | 90 | 3,973 | 43 | |
| * See Copper Equivalent information on page 19. |
- See Copper Equivalent information on page 19.
Resource Estimate Characteristics:
53m @ 4.08% Cu, 42 g/t Ag, 0.22 g/t Au
84m @ 4.42% Cu, 38 g/t Ag, 69m @ 3.48% 0.14 g/t Au Cu, 34 g/t Ag, 0.14 g/t Au
-
Mineral Resource estimate drilling comprised 51 diamond drillholes for 21,083m and 19 RC drillholes for 4,422m
Drillhole spacing varies from 20m by 20m and tighter in the upper to central areas to greater than 80m by 80m in peripheral areas and at depth
-
Mineralised domains extend from 125m below surface to 815m below surface
-
Mineralisation remains open along strike, up and down dip
-
Metallurgical flotation testwork indicates excellent copper recoveries of up to 95%
-
No estimates for Pb-Zn, however significant mineralisation is present
13.25% Cu, 119 g/t Ag, 0.17 g/t Au • 12.35% Cu, 35 g/t Ag, 0.04 g/t Au 9.52% Cu, 41 g/t Ag, 0.05 g/t Au 18.65% Cu, 108 g/t Ag, 0.19 g/t Au 12.95% Cu, 113 g/t Ag, 0.08 g/t Au 15.95% Cu, 182 g/t Ag, 0.16 g/t Au 11.6% Cu, 49 g/t Ag, 0.09 g/t Au 15.3% Cu, 128 g/t Ag, 0.32 g/t Au 16.35% Cu, 69 g/t Ag, 0.25 g/t Au 17.55% Cu, 70 g/t Ag, 0.35 g/t Au 18.8% Cu, 84 g/t Ag, 0.12 g/t Au 8.1% Cu, 59 g/t Ag, 0.04 g/t Au 5.2% Cu, 36 g/t Ag, 0.03 g/t Au 7.32% Cu, 63 g/t Ag, 0.25 g/t Au
Search for extensions/additions to Mallee Bull continuing with :
| ⁻ | Downhole EM | |
|---|---|---|
| ⁻ | Gravity | |
| ⁻ | Tenement-wide mapping | |
| ⁻ | Portable XRF geochem | |
| ⁻ | Innovative Orion 3D DC/IP/MT | |
| ⁻ | High-res airborne magnetics | |
| ⁻ | Airborne EM | To do |
| ⁻ | Structural modelling | To do |
| ⁻ | Drilling | More |
| to | ||
| come |
T1 target:
- Defined by
⁻ Strong IP chargeability (>90 mrads) ⁻ Low DC resistivity (<2 ohm-m) ⁻ Coherent and extensive gravity high
==> picture [72 x 71] intentionally omitted <==
----- Start of picture text -----
T1
----- End of picture text -----
==> picture [164 x 38] intentionally omitted <==
----- Start of picture text -----
IP Chargeability
Mallee Bull Modelled Gravity –
180m below surface
500m Halfwidth Highpass Filter
----- End of picture text -----
Drilling to date has tested: ⁻ 60m of 300m strike length at >50 mrads IP chargeability ⁻ 60m of 300m strike length of modeled gravity high
High-grade primary Zn-Pb-Ag-Au rich mineralization intersected to within 50m of surface
Strong Zn-Pb mineralization to >500m below surface on northern end of current Mallee Bull resource domain remains open
T1 geophysical target returns near surface high-grade mineralisation:
- 12m @ 20.30% Zn, 14.81% Pb, 0.54% Cu, 308 g/t Ag and 1.59g/t Au from 83m in MBRC024
T1 Target
-
10m @ 15.8% Zn, 7.6% Pb, 322 g/t Ag and 1.28 g/t Au from 106m in MBRC018
-
6m @ 10.30% Zn, 4.98% Pb, 159 g/t Ag, 0.76 g/t Au from 95m in MBRC021
-
6m @ 10.57% Zn, 4.81% Pb, 53g/t Ag and 0.39g/t Au from 121m in MBRC023
-
4m @ 8.21% Zn, 3.35% Pb, 113 g/t Ag, 1.02 g/t Au from 88m in MBRC019
-
7m @ 6.1% Zn, 3.4% Pb, 76 g/t Ag and 0.25 g/t Au from 131m in MBRC016
Mallee Bull Next Steps:
Gravity Anomaly Open
==> picture [115 x 115] intentionally omitted <==
----- Start of picture text -----
T1
----- End of picture text -----
• Assay results for final 11 drillholes pending
-
Additional shallow ~3000m RC drilling proposed to test for further near-surface mineralization
-
Additional broad-scale RAB to test prospective stratigraphy
-
Review and test geophysical methodologies targeting ZnPb rich mineralisation
• Zinc-lead metallurgical testwork
Peel Mining Cobar Superbasin Tenure
==> picture [463 x 406] intentionally omitted <==
==> picture [287 x 399] intentionally omitted <==
-
Comprises 15 tenements covering more than 3,000 km[2]
-
Key terms of the MoA are:
-
⁻ Stage 1 – JOGMEC has right to earn a 40% interest in the Cobar Superbasin Project by funding $4,000,000 of exploration expenditure over a period of up to 3 years
-
⁻ Stage 2 – JOGMEC has right to earn a further 10% interest in the Project tenements, by funding a further $3,000,000 of exploration expenditure a period of up to 2 further years
-
⁻ Peel to act as Operator of the project during farm-in ⁻ JOGMEC has right to assign its interest
-
⁻ Yr 1 work programme comprising $1m expenditure completed
-
⁻ Yr 2 work programme comprising $1.5m expenditure due to commence July/August 2015
-
==> picture [281 x 406] intentionally omitted <==
-
Wirlong and Red Shaft Prospects
-
⁻ >6km strike of sheared Shuttleton volcanics and sediments present between prospects
-
⁻ At Wirlong extensive Cu and Pb soil geochemical anomalies comprising: >100ppm Cu = 750m x 125m; >700ppm Pb = 450m x 75m
-
⁻ At Red Shaft multi-element geochem anomalies including gold values >2 g/t returned over a 70m zone
-
• Recent work/results:
-
⁻ 4m @ 3.04% Cu, 12 g/t Ag, 0.19% Zn from 196m in WLRC005
-
⁻ 2m @ 2.99% Cu, 1.08 g/t Au, 16 g/t Ag, 0.41% Zn from 322m in WLRC006
-
⁻ 9m @ 2.19% Pb, 0.11% Zn from 1m and 6m @ 1.01% Pb from 13m in WLRABB004
-
⁻ 15m @ 0.86 g/t Au from 7m in RSRAB035
-
⁻ Follow-up planned
==> picture [455 x 396] intentionally omitted <==
•
-
Recent work/results:
-
⁻ Hi-res airborne magnetics, gravity, 6 RC/diamond drillholes for 1,868m, 51 RAB drillholes for 1,786m
-
⁻ Portable XRF analysis of RAB shows broad, shallow Pb/Zn anomalism with better results incl. 5m @ 0.15% Cu, 0.29% Pb, 0.18% Zn from 27m in PSCRAB008
-
⁻ PSCDD002 returns 1m @ 82.3 g/t Ag, 1.48% Cu, 9.16% Pb, 5.36% Zn from 499m and 1m @ 25.4 g/t Ag, 3.65% Pb, 6.91% Zn from 502m
-
⁻ Follow-up planned
==> picture [268 x 402] intentionally omitted <==
-
Mundoe Prospect
-
⁻ 50 km south of Mallee Bull
-
⁻ 2 km long multi-element geochemical anomaly
-
⁻ Coincident geophysical anomalies
-
⁻ Historic drill results incl. 3m @ 2.90% Pb, 0.87% Zn, 30 g/t Ag and 0.4 g/t Au; 6m @ 1.66% Cu, 103 g/t Ag; 3m @ 122 /t Ag, 0.3 g/t Au and 12m @ 1.09% Cu and 60 g/t Ag
-
⁻ PEX drill results in 2012 incl. 13m @ 28 g/t Ag, 0.76% Cu and 19m @ 0.33 g/t Au, 23m @ 25 g/t Ag and 0.4% Cu
-
• Recent work/results:
-
⁻ Hi-res airborne magnetics, 3 RC drillholes for 693m
-
⁻ 26m @ 15.2 g/t Ag, 0.33% Cu from and 1m @ 71 g/t Ag, 2.89% Cu from 165m in MURC011
-
⁻ 8m @ 55.3 g/t Ag, 0.15% Cu from 205m including 1m @ 56 g/t Ag, 0.45% Cu from 205m and 2m @ 138 g/t Ag, 0.13% Cu from 209m in MURC012
1 Cobar Basin = worldclass mineral province
2 Mallee Bull = high grade copper-zinc-lead deposit
3
Farm-in/JV funding of core Cobar assets
4 Large strategic landholding with exciting prospects 5
Drill. Discover. Deliver.
19
Metal equivalent Calculations
- ⁻ Mineral Resource estimates include copper equivalent grades incorporating copper, silver and gold values. The copper equivalent grades are based on copper, silver and gold prices of $7000/t, $20.00/oz and $1300/oz with overall recoveries of 95%, 90% and 66% respectively. These estimates are based on Peel’s interpretation of potential commodity prices and the Company’s interpretation of first pass metallurgical test work performed on Mallee Bull diamond core using the following formula: Cu equivalent (%) = Cu (%) + 0.009 x Ag (g/t) + 0.415 x Au (g/t). It is the company’s opinion that all elements included in the metal equivalent calculation have a reasonable potential to be recovered and sold. Additional test work is required to demonstrate potential metallurgical recoveries for cobalt, lead and zinc.
JORC Code
-
⁻ All information within this presentation relating to Mineral Resources is referred to Table 1 as appended into ASX market release “Highgrade Copper Resource at Mallee Bull” dated 27.05.2014.
-
⁻ Any previously reported information within this announcement is referred to Table 1 of PEX’s Quarterly Activity Statement dated 31.10.2014 or other previously released Quarterly Activity Statements or to the Competent Persons Statements in the Disclaimer.
==> picture [483 x 322] intentionally omitted <==
For more information: Rob Tyson Managing Director [email protected] Unit 1, 34 Kings Park Road, West Perth, WA 6005 Tel: 08 9382 3955