MARCH 2021 QUARTERLY REPORT 29 APRIL 2021

HIGHLIGHTS FOR MARCH QUARTER 2021

  • Maiden resource definition drilling at Wirlong yields new high-grade copper hits including:
    • o 9m @ 4.33% Cu, 14g/t Ag, 0.34g/t Au from 181m within 51m @ 1.35% Cu, 6g/t Ag, 0.11g/t Au from 177m in WLRC068
    • o 15m @ 3.80% Cu, 17g/t Ag, 0.04g/t Au from 255m in WLRC069
    • o 10m @ 4.02% Cu, 16g/t Ag from 275m within 28m @ 1.83% Cu, 8g/t Ag from 263m in WLRC071
    • o 21m @ 2.00% Cu, 9g/t Ag from 283m and 11m @ 1.73% Cu, 5g/t Ag from 337m and 19m @ 1.58% Cu, 5g/t Ag from 359m within 163m @ 1.08% Cu, 4g/t Ag from 233m in WLRC073
    • o 7m @ 5.78% Cu, 19g/t Ag from 249m in WLRC079
    • o 9m @ 4.10% Cu, 15g/t Ag from 270m within 42m @ 1.26% Cu, 5g/t Ag from 258m to end of hole in WLRC083
  • Further Wirlong mineralised intercepts returned with assays pending
  • Updated May Day Indicated Mineral Resource Estimate (MRE) of 1.07 Mt at 1.02 g/t Au, 26.3 g/t Ag, 0.74% Zn, 0.50% Pb reported
  • Drilling at Southern Nights targeting strike and dip extensions to the previously intersected Au-Pb-Ag rich sulphide mineralisation at the southern end of Southern Nights commenced late in the quarter
  • Updated concept study to include results from ore sorting testwork for the a centrally located processing plant completed by GR Engineering Services
  • Ongoing metallurgical testwork for South Cobar Project

PLANS FOR JUNE QUARTER 2021

  • Commencement of mineral resource infill drilling at Mallee Bull to upgrade the current resource
  • Continued resource definition drilling at Wirlong in advance of a maiden Mineral Resource Estimate
  • Ongoing metallurgical testwork and ore sorting testwork at May Day, Mallee Bull and Southern Nights and Wirlong
  • Commence geotechnical drilling program to assist with a scoping study for May Day
  • Undertake Hydrological study work drilling
  • Progress the full concept study of the Company's Hub and Spoke development strategy across its South Cobar Project (SCP) assets

CORPORATE

CAPITAL RAISING

In March, Peel announced plans to undertake a capital raising via a placement and 1 for 8 entitlement offer to fund drilling and studies to reach a development decision for its copper-focused South Cobar Project. The placement component completed in the quarter saw 70,000,000 fully paid ordinary shares issued to institutional, sophisticated and professional investors at an issue price of $0.265 per Share ("Placement") raise $18.55 million (before costs). The pro-rata non-renounceable entitlement offer of one Share for every eight Shares held by eligible shareholders on the record date, closed post quarter end and raised a further $1.71M through the issue of 6,453,943 fully paid shares at an issue price of $0.265 per Share. The Entitlement Offer was not underwritten and accordingly the Company will reserve the right to place Shortfall Shares from the offer up until 15th June 2021.

The Company intends to use the funds rasied on the following activities: resource drilling and estimation at Wirlong, Mallee Bull and Southern Nights to primarily indicated classification; scoping and prefeasibility study activities on the copper-focused South Cobar Project; and for ongoing working capital.

SALE OF NON-CORE ASSETS

During the quarter, the company's 100% owned subsidiary, Peel Far West Pty Ltd ("PFW") entered into a binding sale agreement to sell its non-core Koonenberry Project exploration licences to Odin Metals Limited (ASX:ODM) ("Odin"). The Koonenberry Project exploration licences (EL8721, EL8722, EL8790, EL8791 and EL8909) are located East of Broken Hill, NSW and cover the under-explored Koonenberry Belt.

The consideration payable by Odin Metals Limited to PFW (or its nominee) to acquire a 100% ownership interest in the Licences was:

  • the issue of 50,000,000 fully paid ordinary shares in Odin, subject to Odin first obtaining shareholder approval for the issue under Listing Rule 7.1, which has now been granted; and
  • a 1% net smelter return royalty, payable quarterly from the date on which saleable mineral or metallic product is first produced from the Licences.

Completion of the Proposed Sale is awaiting approval under Section 121 of the Mining Act 1992 (NSW) for PFW to transfer the Licences to ODM prior to the consideration shares being issue. This is expected in the upcoming quarter. The Consideration Shares will be escrowed for 12 months from the date that Odin obtains shareholder approval under Listing Rule 7.1.

PRE-DEVELOPMENT ACTIVITIES

SOUTH COBAR PROJECT HUB & SPOKE STRATEGY

Peel's Cobar assets now referred to as the South Cobar Project (SCP) - include the Mallee Bull, May Day, Wirlong, Southern Nights and Wagga Tank deposits. The company is now focused on a Hub and Spoke development strategy for the project, which is centred on establishing critical mass via high quality mineral resource definition at each of Peel's deposits to support a new centrally located processing plant.

Peel Mining Limited ACN 119 343 734

Figure 1 - Hub and Spoke Development Model

In September quarter 2020, Peel commissioned GR Engineering Services (GRES) to complete a technical report regarding a conceptual processing plant as part of the "Hub and Spoke" model, with the mill envisaged to be centrally located amongst Peels' projects. Initially GRES completed a preliminary process plant technical report for the conventional flowsheet that considers crushing, grinding, gravity, flotation and cyanidation process stages for the recovery of gold, silver, copper, lead and zinc relevant to the various mineralisation styles within Peel's deposits. Moreover, positive results from ore-sorting at Southern Nights and Mallee Bull deposits provided encouragement for the inclusion of this pre-concentration technology in the future process plant design; hence Peel engaged GRES to integrate ore-sorting technology into an updated processing plant technical report.

Figure 2 - South Cobar Project Technical Report Baseline Flowsheet

During the quarter, GRES completed an updated processing plant technical report that includes ore-sorting technology. An alternative flowsheet incorporating ore sorting considers two stage crush, ore sort preconcentration, grind, gravity, flotation and cyanidation of the flotation tailing. The ore sorting testwork has been completed by two vendors – Steinert tested a sample from the Southern Nights deposits and Tomra tested three samples from the Mallee Bull deposit (massive sulfide, breccia, and low grade breccia). The Steinert test, completed on the Southern Nights materials, tested ore sorted material of the -60mm +31.5mm 'coarse' stream and -31.5mm +10mm 'fine' stream to reject waste. The Tomra tests, using the three Mallee Bull samples were completed using different size fractions; +19mm and -19mm +8mm. The detailed report will form the basis for future feasibility studies.

Figure 3 - South Cobar Project Technical Report Ore Sort Flowsheet

HIGH-LEVEL MINING EVALUATION OF MAY DAY

MPR Geological Consultants Pty Ltd (MPR) estimated resources for the May Day deposit based on drilling information, NSR and mining and processing parameters supplied by Peel. In addition to constructing a resource model with estimates for gold, silver, lead and zinc, MPR also generated an optimal pit to give estimates with reasonable prospects of eventual economic extraction by open pit mining. Estimates with potential for extraction by underground mining are reported within optimal stope shapes produced by Antica Consulting trimmed by the optimal pit constraining open pit resources.

All model blocks within the optimal pit and optimal stope shapes constraining resources are classified as Indicated, reflecting the consistently close spaced drilling in these areas. Further design and planning work of the open pit and underground mine designs will be included in future concept studies.

Next Steps

Peel has engaged a drilling contractor to drill water monitoring bores at the Mallee Bull, May Day, Wirlong and Wagga Tank-Southern Nights deposits. The information collected along with dust monitoring and flora and fauna studies form part of the Company's pre-development environmental baseline studies.

EXPLORATION ACTIVITIES

WIRLONG - COPPER, SILVER; WESTERN NSW (PEX 100%).

Wirlong is located ~75km south of Cobar or about 40km north of May Day. Wirlong represents a classic Cobar-style Cu-Ag deposit analogous to the CSA mine. The prospect is pre-resource, however internal modelling shows good potential to establish a copper-rich Maiden Mineral Resource Estimate. Strong copper mineralisation commences at ~60m below surface and has been defined to at least 600m below surface. The deposit remains open along strike and at depth.

During the quarter drilling continued as part of a resource definition drilling programme to establish a Maiden copper-dominant resource at the Wirlong prospect. The resource definition program consists of ~15,000m of drilling and is anticipated to be completed in the June quarter of 2021. Drilling at Wirlong has been designed to drill test the upper ~300m of the Wirlong Central zone where high-grade copper (chalcopyrite) mineralisation is understood to be structurally controlled on a NW-SE orientation.

Drilling was initially planned to be completed utilising primarily RC drilling, however significant drillhole deviation since commencement has seen the Company shift to diamond drilling to increase drill targeting effectiveness. Diamond drilling will also provide further structural knowledge, geotechnical information and metallurgical testwork material.

Sixteen (16) RC drillholes were completed during the quarter (WLRC072-WLRC088) for a total of 4380.5m as well as 11 diamond drillholes for a total of 4019.7m. An additional 3 diamond drillholes were completed post quarter end with diamond drilling ongoing at the time of reporting. Assay results have been returned for the entire RC drilling program and for four diamond drillholes (WLDD006-WLDD009).

Highlights from RC and diamond assays returned and released to the market so far include:

  • 9m @ 4.33% Cu, 14g/t Ag, 0.34g/t Au from 181m within 51m @ 1.35% Cu, 6g/t Ag, 0.11g/t Au from 177m in WLRC068
  • 15m @ 3.80% Cu, 17g/t Ag, 0.04g/t Au from 255m in WLRC069
  • 10m @ 4.02% Cu, 16g/t Ag from 275m within 28m @ 1.83% Cu, 8g/t Ag from 263m in WLRC071
  • 21m @ 2.00% Cu, 9g/t Ag from 283m and 11m @ 1.73% Cu, 5g/t Ag from 337m and 19m @ 1.58% Cu, 5g/t Ag from 359m within 163m @ 1.08% Cu, 4g/t Ag from 233m in WLRC073
  • 9m @ 1.78% Cu, 5g/t Ag from 294m in WLRC075
  • 11m @ 2.08% Cu, 16g/t Ag from 268m and 6m @ 1.40% Cu, 6g/t Ag from 303m and 7m @ 3.58% Cu, 8g/t Ag from 334m within 91m @ 0.93% Cu, 5g/t Ag from 254m in WLRC077
  • 7m @ 5.78% Cu, 19g/t Ag from 249m in WLRC079
  • 13m @ 1.83% Cu, 10g/t Ag from 172m and 12m @ 1.70% Cu, 10g/t Ag from 137m within 72m @ 1.01% Cu, 6g/t Ag from 120m in WLRC080
  • 9m @ 4.10% Cu, 15g/t Ag from 270m within 42m @ 1.26% Cu, 5g/t Ag from 258m to end of hole; and 26m @ 0.58% Cu, 5g/t Ag from 122m; and 2m @ 2.17% Cu, 22g/t Ag from 206m; and 24m @ 0.54% Cu, 2g/t Ag from 222m in WLRC083
  • 2m @ 1.11% Cu, 13g/t Ag from 262m in WLRC087
  • 3m @ 4.34% Cu, 13g/t Ag from 255m and 4m @ 2.17% Cu, 8g/t Ag from 231m within 51m @ 0.94% Cu, 3g/t Ag from 208m to end of hole in WLRC088
  • 3.61m @ 3.12% Cu, 25g/t Ag from 165m; and 3m @ 0.67% Cu, 10g/t Ag from 213m; and 5m @ 2.84% Cu, 10g/t Ag from 291m; and 4m @ 1.67% Cu, 6g/t Ag from 340m within 11m @ 0.88% Cu, 5g/t Ag from 333m in WLDD006
  • 4m @ 1.70% Cu, 6g/t Ag from 255m in WLDD007
  • 10m @ 2.09% Cu, 8g/t Ag from 193m in WLDD008

Recently returned assays results confirm significant copper mineralisation in multiple drillholes, including broad mineralised zones (with higher-grade internal zones) and narrower mineralised zones including highgrade mineralisation. Significantly, mineralisation is consistent with the position of an electromagnetic

conductor plate, and also with a revised structural model, further supporting Peel's geophysical and geological modelling.

Next Steps

Drilling will continue during the quarter in order to establish a maiden resource at the deposit. Preliminary metallurgical testwork, as well as ore sorting trials, are planned along with resource modelling and estimation. This work will form the basis of a scoping study on the deposit.

Figure 4 - Wirlong long section with pierce points

MAY DAY - GOLD, SILVER, ZINC, LEAD, COPPER; WESTERN NSW (PEX 100%)

The Mineral Resource Estimate (MRE) for the May Day deposit was updated during the quarter in accordance with the JORC Code (2012 Edition) and was reported within an optimal pit shell, and optimised stope shapes generated at appropriate relevant NSR cut-offs. Drilling in the May Day area comprises 169 open-hole percussion holes, 106 RC holes and 21 diamond holes for a combined 23,947m of drilling completed by Peel and previous property owners. The modeling dataset includes only RC and diamond drilling. The mineralised domain estimation dataset is dominated by composites from Peel's RC and diamond sampling which contribute 69% and 16% of the remnant data respectively. Full details of the resource can be found in the announcement released 31st March 2021 – "May Day Indicated Mineral Resource Estimate". Table 1 presents the estimates by oxidation zone.

COMBINED MAY DAY INDICATED MINERAL RESOURCE ESTIMATES (ROUNDED)
Cut off$NSR TonnesKt Aug/t Agg/t Zn% Pb%
Oxide $27/t 510 1.03 20.4 - -
Open Pit Sulphide $37/t 390 1.00 28.2 1.31 0.84
Subtotal 900 1.02 23.8 0.57 0.36
Underground (Sulphide)$80/t 170 1.03 39.4 1.67 1.21
Combined 1,070 1.02 26.3 0.74 0.50

Table 1 – March 2021 May Day Indicated Mineral Resource Estimates

The figures in this table are rounded to reflect the precision of the estimates and include rounding errors.

The Indicated MRE for the May Day deposit is 1.07 Mt at 1.02 g/t Au, 26.3 g/t Ag, 0.74% Zn, 0.50% Pb containing 35,100 oz gold; 903,000 oz silver; 7,950 t zinc and 5,330 t lead.

The May Day MRE was reported using an NSR cut-off value to determine the proportion of the deposit having reasonable prospects for eventual economic extraction. The NSR methodology is common practice at polymetallic mines and deposits and considers metallurgical recoveries for each of the product streams, along with metal prices, exchange rates, payabilities, deductions/penalties, transport, treatment/refining charges, and royalties.

The general formula for calculating the NSR is:

NSR = (metal grades x expected metallurgical recoveries x expected payabilities x metal prices) – (deductions/penalties + transport + treatment/refining charges + royalties)

Overall metal recoveries included in the NSR calculation are based on results of metallurgical test work on samples of May Day mineralisation, which were as follows: oxide mineralisation: - gold 90%, silver 20%; fresh mineralisation: - gold 80%, silver 60%, zinc 60%, and lead 50%. The NSR calculation also included estimates of metal payabilities and other offsite costs for the oxide and sulphide processing streams based on Peel's interpretation of potential processing routes.

Metallurgical testwork by Peel at ALS Burnie and NAGROM Perth, along with testwork completed by previous explorers, has guided the company's metallurgical assumptions for the May Day Mineral Resource Estimate. Work by Peel to date has been limited in nature with investigation of gravity precious metals recovery, cyanide leach and base metal flotation.

The gold equivalent parameters and pit and stope shape optimisations underlying the MRE reflect a conceptual sequential processing flowsheet for the project comprising the following:

  • Oxide mineralisation gravity concentration and CIL extraction of gold and silver
  • Fresh mineralisation gravity concentration; bulk base metal float; and cyanide leach

Cumulative metallurgical recoveries for the metals of interest are listed in Table 2. Metallurgical testwork at ALS Burnie is ongoing and the conceptual processing flowsheet is subject to change in the future.

It is Peel Mining's opinion that all elements included in the conceptual processing flowsheet have a reasonable potential to be recovered and sold.

Metal OxideCumulative Recovery (%) SulphideCumulative Recovery (%)
Gold 90 80
Silver 20 60
Lead - 50
Zinc - 60

Table 2 – Metallurgical recovery assumptions used in MRE

May Day mineralisation is shear-hosted/related with primary sulphides comprising pyrite-sphaleritegalena-chalcopyrite. Assays received to date show strong, continuous, and wide gold-polymetallic intercepts, confirming substantial true width (~25m) at relatively shallow depths. A high-grade core proximal to the hanging wall is evident with an approximate true thickness of up to ~12m. Results received this quarter compliment previously received assays which also confirmed good down-dip continuity (minimum 180m down dip continuity from the base of the pit) of the May Day mineral system.

During the quarter finalised assay results have been returned for the remaining holes with some of the highlights returned and released to the market including:

  • 8.1m @ 1.24g/t Au, 34g/t Ag, 0.74% Zn, 1.84% Pb, 1.07% Cu from 21m and 7.9m @ 2.09g/t Au, 31g/t Ag, 0.88% Zn, 0.33% Pb, 0.09% Cu from 40.1m in MDDD004
  • 23m @ 1.83g/t Au, 78g/t Ag, 2.23% Zn, 1.36% Pb, 0.34% Cu from 21m in MDDD005
  • 11m @ 1.70g/t Au, 62g/t Ag, 3.60% Zn, 2.63% Pb, 0.84% Cu from 42m and 9.3m @ 3.35g/t Au, 46g/t Ag, 2.22% Zn, 2.16% Pb, 0.15% Cu from 61m in MDDD006

Significantly, strong mineralisation remains open down dip of the deepest drillholes on a number of sections, including MDDD002 and MDRC052, presenting a future exploration target.

Next Steps

Further metallurgical test work is being conducted to maximise recoveries. The Company also plans to drill metallurgical and geotechnical drillholes for use in further ore sorting testwork and open pit design on the project. As noted above, the Company is currently undertaking scoping study work on the deposit to include in its South Cobar Project Concept Study.

Figure 6 May Day pit optimisation cross section

Peel Mining Limited ACN 119 343 734

Figure 7 May Day pit optimisation long section

SOUTHERN NIGHTS - ZINC, LEAD, SILVER, COPPER, GOLD; WESTERN NSW (PEX 100%).

The Southern Nights deposit is located on the western edge of the Cobar Superbasin, ~130 km south of Cobar or ~30km northwest of Mount Hope and is host to the polymetallic VMS-type deposit. Mineralisation straddles a broad zone of intense tectonic brecciation and hydrothermal alteration (sericite-chlorite with local silicification) and occur as sub-vertical elongate shoots/lenses. Drilling by Peel to date has focused on defining the geometry and extent of large-scale Zn-rich mineralisation at Southern Nights.

During the quarter final assay results were returned for extensional drilling completed at Southern Nights in the second half of 2020. The drillholes were designed to intercept downdip or along strike from the current resource model making use of previously completed RC pre-collars. Several drillholes returned substantial intercepts outside of the current resource model including high-grade precious metal mineralisation. Of relevance, drillhole WTRCDD234 was extended to test downdip of a previous high-grade gold intercept returned in WTRCDD161 of 2m @ 23g/t Au, 2.74% Cu, 36g/t Ag, 0.5% Zn, 0.14% Pb from 330m. As noted below, WTRCDD234 intersected a significant gold intercept ~50m immediately down dip of the intercept in WTRCDD161. This area remains open along strike and down dip.

Significant assay results released to the market include:

  • 2m @ 3.65g/t Au, 654g/t Ag, 2.89% Zn, 1.52% Pb, 0.02% Cu from 363.6m in WTRCDD181
  • 3.5m @ 2.49% Cu, 0.86g/t Au, 6.03% Zn, 0.90% Pb, 22g/t Ag from 446m and 2.7m @ 2.71% Cu, 1.80g/t Au, 0.70% Zn, 0.57% Pb, 73g/t Ag from 465.4m in WTRCDD194
  • 5.5m @ 6.62% Zn, 2.26% Pb, 216g/t Ag, 0.51% Cu, 0.3g/t Au from 436.6m in WTRCDD195
  • 2.0m @ 10.45g/t Au, 0.42% Cu from 380m in WTRCDD234

Other results of note from this program were listed in the December 2020 quarterly and included significant massive sulphide Zn-Pb-Ag-Cu-Au:

  • 4.6m @ 12.48% Zn, 4.22% Pb, 58g/t Ag, 0.36% Cu, 0.25g/t Au from 273.45m in WTRCDD243
  • 8m @ 6.30% Zn, 2.74% Pb, 63 g/t Ag, 0.93% Cu, 0.27 g/t Au from 276m in WTRCDD244

Extensional drilling re-commenced at the end of the quarter as part of a NSW Government funded New Frontiers Coopperative Drilling program to follow up previously returned results. Two drillholes were completed post quarter end testing the southern extensions to the system with one hole failing to reach target. Assays are pending for hole WTDD002 at the time of reporting.

Next Steps

Further infill and extensional drilling at Southern Nights has been planned. Detailed metallurgical testwork focused on improved metal selectivity and recoveries, as well as ore sorting with trials remain ongoing at the time of reporting. An IP survey is planned to commence in the June quarter.

WAGGA TANK - ZINC, LEAD, SILVER, COPPER, GOLD; WESTERN NSW (PEX 100%).

The Wagga Tank deposit is located on the western edge of the Cobar Superbasin, ~130 km south of Cobar or ~30km northwest of Mount Hope situated 800m north of Southern Nights and is host to the polymetallic VMS-type deposit. Mineralisation straddles a broad zone of intense tectonic brecciation and hydrothermal alteration (sericite-chlorite with local silicification) and occur as sub-vertical elongate shoots/lenses. Drilling by Peel to date has focused on defining the geometry and extent of the Zn-Pb-Ag-Au-Cu rich mineralisation at Wagga Tank.

Next Steps

Planning of resource definition drilling targeting a shallow oxide gold target at Wagga Tank has commenced and is subject to regulatory approvals and access negotiations. Metallurgical testwork will continue in the coming quarter, as part of a scoping study on this project.

MALLEE BULL - COPPER, SILVER, GOLD, LEAD, ZINC; WESTERN NSW (PEX 100%)

The Mallee Bull deposit is a Cobar-style copper dominant polymetallic deposit located 100km south of Cobar, NSW. The Company plans to undertake infill resource drilling in an effort to define a predominantly Indicated classified resource. An existing internal scoping study for Mallee Bull will then be updated to reflect its potential contribution to the conceptual Hub and Spoke development model. Currently, the Mallee Bull deposit has a JORC compliant Mineral Resource of 6.76 million tonnes at 1.8% copper, 31 g/t silver, 0.4 g/t gold, 0.6% lead and 0.6% zinc (2.6% copper equivalent) containing approximately 175,000t copper equivalent (using a 1% copper equivalent cut-off).

Next Steps

Resource infill and definition drilling is planned to commence imminently at Mallee Bull. The drilling program, which is anticipated to comprise ~20,000m of diamond drilling, is designed to establish a predominantly Indicated Resource classification. The drilling is anticipated to be completed in the second half of 2021.

Metallurgical testwork, geotechnical studies, and underground mining studies will be ongoing to assist the Company with collating and releasing a scoping study on the project as part of the broader South Cobar Deposit Concept Study.

Peel Mining Limited ACN 119 343 734

FINANCE

At the end of the quarter the Company had AUD$19.886 million cash at bank. As mentioned above, the Company completed a rights issue post quarter end which raised an additional AUD$1.710 million.

Included in the Appendix 5B – Section 6 are amounts paid to the Directors of the Company during the March quarter totalling $156,200, comprising $128,643 of normal remuneration payments of Director and Managing Director fees and $12,155 of associated superannuation. Payments of $15,402 were made to Mr Simon Hadfield (Peel Mining's Chairman) for rental of office space and associated costs.

This announcement has been authorised by the Board of Directors of the Company.

For further information, please contact: Rob Tyson – Peel Mining, Managing Director +61 (0)420 234 020.

Figure 8 Southern Nights drill plan

COMPETENT PERSONS STATEMENTS AND MINERAL RESOURCE ESTIMATES

The information in this report that relates to Exploration Results is based on information compiled by Mr Rob Tyson, who is a fulltime employee of the company. Mr Tyson is a member of the Australasian Institute of Mining and Metallurgy. Mr Tyson has sufficient experience of relevance to the styles of mineralisation and the types of deposits under consideration, and to the activities undertaken, to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Tyson consents to the inclusion in this report of the matters based on information in the form and context in which it appears. Exploration results are based on standard industry practices, including sampling, assay methods, and appropriate quality assurance quality control (QAQC) measures.

Past Exploration results reported in this announcement have been previously prepared and disclosed by Peel Mining Ltd in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings are presented here have not been materially modified from the original market announcement. Refer to www.peelmining.com.au for details on past exploration results.

COMBINED MAY DAY INDICATED MINERAL RESOURCE ESTIMATES (ROUNDED)
Cut off$NSR TonnesKt Aug/t Agg/t Zn% Pb%
Oxide $27/t 510 1.03 20.4 - -
Open Pit Sulphide $37/t 390 1.00 28.2 1.31 0.84
Subtotal 900 1.02 23.8 0.57 0.36
Underground (Sulphide)$80/t 170 1.03 39.4 1.67 1.21
Combined 1,070 1.02 26.3 0.74 0.50

MAY DAY

The information in this announcement that relates to Mineral Resource estimates is based on information compiled by Mr Jonathon Abbott, who is a Member of The Australian Institute of Geoscientists. Mr Abbott is a full time employee of MPR Geological Consultants Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves". Mr Abbott consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

MALLEE BULL

ResourceClassification Kt CuEq % Cu % Ag g/t Au g/t Pb % Zn %
Indicated 1,340 2.15 0.91 30 0.4 0.96 1.23
Inferred 5,420 2.7 2 31 0.4 0.5 0.4
Total Resource 6,760 2.6 1.8 31 0.4 0.6 0.6

The information referred to in this announcement in relation to the Mallee Bull Resource Estimate is based on information compiled by Mr Jonathon Abbott, a Competent Person who is a Member of the Australian Institute of Geoscientists. At the time of calculating the Resource Estimate Mr Abbott was a full-time employee of MPR Geological Consultants Pty Ltd and is an independent consultant to Peel Mining Ltd. Mr Abbott has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code of Reporting of Mineral Resources and Ore Reserves'. Mr Abbott consented to the release of the matters based on his information in the form and context in which it appears.

Southern Nights Mineral Resource Estimate
ResourceClassification Tonnes(Kt) Zn(%) Pb(%) Ag(g/t) Cu(%) Au(g/t)
Indicated 2,540 5.90 2.30 88.9 0.19 0.33
Inferred 1,600 3.7 1.4 59 0.3 0.3
Total Resource 4,140 5.0 2.0 77 0.2 0.3
Wagga Tank Mineral Resource Estimate
ResourceClassification Tonnes(Kt) Zn(%) Pb(%) Ag(g/t) Cu(%) Au(g/t)
Indicated 410 4.67 2.52 64.3 0.50 0.53
Inferred 400 5.3 2.3 98 0.3 0.5
Total Resource 810 5.0 2.4 81 0.4 0.5
Combined Southern Nights-Wagga Tank Mineral Resource Estimate
ResourceClassification Tonnes(Kt) Zn(%) Pb(%) Ag(g/t) Cu(%) Au(g/t)
Indicated 2,950 5.73 2.33 85.5 0.23 0.36
Inferred 2,000 4.0 1.6 67 0.3 0.3
Total Resource 4,950 5.0 2.0 78 0.3 0.4

WAGGA TANK – SOUTHERN NIGHTS

The information in this report that relates to Exploration Results and sampling information is based on information compiled by Mr Jason McNamara who, at the time of reporting, was a fulltime employee of the company. Mr McNamara is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr McNamara has sufficient experience of relevance to the styles of mineralisation and the types of deposits under consideration, and to the activities undertaken, to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr McNamara consents to the inclusion in this report of the matters based on information in the form and context in which it appears. Exploration results are based on standard industry practices, including sampling, assay methods, and appropriate quality assurance quality control (QAQC) measures.

The information in this announcement that relates to grade estimation and the Mineral Resource Estimate for Southern Nights-Wagga Tank is based on information compiled by Mr Jonathon Abbott, who is a Member of The Australian Institute of Geoscientists. Mr Abbott is a full time employee of MPR Geological Consultants Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves". Mr Abbott consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

This release may include aspirational targets. These targets are based on management's expectations and beliefs concerning future events as of the time of the release of this document. Targets are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of Peel Mining that could cause actual results to differ materially from such statements. Peel Mining makes no undertaking to subsequently update or revise the forward-looking statements made in this release to reflect events or circumstances after the date of this release.

Peel Mining Limited ACN 119 343 734

Figure 9 - South Cobar Project Tenements and Prospects

Peel Mining Limited ACN 119 343 734

DRILL HOLES DRILLED IN THE QUARTER ENDED OF 31 MARCH 2021

Hole ID Easting Northing Azi Dip Final Depth (m)
WLDD006 418328.00 6447061.00 199.77 -61.15 372.80
WLDD007 418285.00 6447075.00 206.60 -53.00 300.40
WLDD008 418312.00 6447033.00 205.64 -55.91 280.10
WLDD009 418403.00 6447029.00 201.70 -59.98 426.70
WLDD010 418286.00 6447077.00 202.90 -58.90 339.50
WLDD011 418404.00 6447032.00 203.20 -65.77 388.70
WLDD012 418291.00 6447082.00 204.10 -62.00 405.60
WLDD013 418418.00 6447058.00 203.35 -63.86 549.80
WLDD014 418301.00 6447093.00 207.50 -60.00 144.40
WLDD015* 418369.00 6447055.00 203.30 -65.07 411.70
WLDD016* 418297.00 6447093.00 202.60 -64.00 400.00
WLDD017** 418382.00 6447075.00 199.04 -63.99 468.80
WLDD018** 418312.00 6447030.00 204.80 -44.80 Current
WLDD019** 418417.00 6447138.00 203.10 -63.85 Current

WIRLONG DIAMOND DRILLHOLE COLLARS

*Drillholes commenced in March 2021 quarter and completed post quarter end.

**Drillholes commenced post quarter end.

WIRLONG RC DRILLHOLE COLLARS

Hole ID Easting Northing Azi Dip Final Depth (m)
WLRC073 418369.26 6447055.99 184.59 -69.57 396.00
WLRC074 418378.52 6446987.56 199.61 -59.69 263.00
WLRC075 418365.89 6447052.82 201.68 -72.29 438.00
WLRC076 418309.37 6447029.00 202.82 -47.89 213.00
WLRC077 418361.61 6447040.12 198.41 -68.00 380.00
WLRC078 418389.17 6446930.74 202.42 -51.68 179.00
WLRC079 418310.34 6447033.06 200.36 -60.44 299.00
WLRC080 418393.97 6446942.44 192.88 -60.88 243.00
WLRC081 418330.00 6447058.00 199.95 -60.47 204.00
WLRC082 418239.97 6447012.65 200.20 -50.85 198.00
WLRC083 418393.00 6447014.00 200.28 -60.11 300.00
WLRC084 418241.58 6447015.88 189.66 -60.26 221.50
WLRC085 418245.00 6447081.00 195.78 -56.62 290.00
WLRC086 418240.37 6447067.17 187.00 -51.30 201.00
WLRC087 418286.00 6447076.00 193.02 -61.69 296.00
WLRC088 418415.00 6446966.00 195.38 -60.91 259.00

SOUTHERN NIGHTS COLLARS

Hole ID Easting Northing Azi Dip Final Depth (m)
WTDD002* 378291.00 6385639.00 86.37 -61.81 372.70
WTRC247** 378288.00 6385611.00 90.00 -60.00 108.00

*Drillholes commenced in March 2021 quarter and completed post quarter end.

**Drillholes commenced post quarter end.

PEEL MINING LIMITED TENEMENT HOLDINGS

TENEMENT PROJECT LOCATION OWNERSHIP CHANGE IN QUARTER
EL7519 Gilgunnia South Cobar, NSW 100%
EL7976 Mundoe Cobar, NSW 100%
EL8070 Tara Cobar, NSW 100%
EL8071 Manuka Cobar, NSW 100%
EL8105 Mirrabooka Cobar, NSW 100%
EL8112 Yackerboon Cobar, NSW 100%
EL8113 Iris Vale Cobar, NSW 100%
EL8114 Yara Cobar, NSW 100%
EL8117 Illewong Cobar, NSW 100%
EL8125 Hillview Cobar, NSW 100%
EL8126 Norma Vale Cobar, NSW 100%
EL8201 Mundoe North Cobar, NSW 100%
EL8307 Sandy Creek Cobar, NSW 100%
EL8314 Glenwood Cobar, NSW 100%
EL8345 Pine Ridge Cobar, NSW 100%
EL8534 Burthong Cobar, NSW 100%
EL7461 Gilgunnia Cobar, NSW 100%
ML1361 May Day Cobar, NSW 100%
EL6695 Wagga Tank Cobar, NSW 100%
EL7226 Wongawood Cobar, NSW 100%
EL7484 Mt View Cobar, NSW 100%
EL8414 Mt Walton Cobar, NSW 100%
EL8447 Linera Cobar, NSW 100%
EL8751 Nombinnie Cobar, NSW 100%
EL6961 McGraw Cobar, NSW 100%
EL7711 Ruby Silver Armidale, NSW 100%
EL8326 Attunga Attunga, NSW 100%
EL8450 Beanbah Cobar, NSW 100%
EL8451 Michelago Cooma, NSW 100%
EL8656 Marigold Cobar, NSW 100%
EL8655 Brambah Cobar, NSW 100%
EL8872 Gromit Cobar, NSW 100%
EL8900 Florida Cobar, NSW 100%
EL8721 Bilpa Broken Hill, NSW 100% Transfer Pending
EL8722 Cymbric Vale Broken Hill, NSW 100% Transfer Pending
EL8790 Comarto Broken Hill, NSW 100% Transfer Pending
EL8791 Devon Broken Hill, NSW 100% Transfer Pending
EL8877 Thunderdome Broken Hill, NSW 100%
EL8909 Grassmere North Broken Hill, NSW 100% Transfer Pending
EL9108 Thunderdome South Broken Hill, NSW 100% Granted

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Name of entity
Peel Mining Limited
ABN Quarter ended ("current quarter")
42 119 343 734 31 March 2021
Consolidated statement of cash flows Current quarter$A'000 Year to date(9months)$A'000
1. Cash flows from operating activities
1.1 Receipts from customers - -
1.2 Payments for
(a)exploration & evaluation - -
(b)development - -
(c)production - -
(d)staff costs (130) (418)
(e)administration and corporate costs (348) (755)
1.3 Dividends received (see note 3) - -
1.4 Interest received 4 31
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - 78
1.8 Other (provide details if material) (125) (122)
1.9 Net cash from / (used in) operatingactivities (599) (1,186)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities - -
(b) tenements - -
(c) property, plant and equipment (129) (166)
(d) exploration & evaluation (2,174) (23,650)
(e) investments - -
(f) other non-current assets - -
Consolidated statement of cash flows Current quarter$A'000 Year to date(9months)$A'000
2.2 Proceeds from the disposal of:
(a)entities - -
(b)tenements - 10
(c)property, plant and equipment - -
(d)investments - 2,893
(e)other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - (48)
2.6 Net cash from / (used in) investingactivities (2,303) (20,961)
3. Cash flows from financing activities
3.1 Proceeds from issues of equity securities(excluding convertible debt securities) 18,550 35,693
3.2 Proceeds from issue of convertible debtsecurities - -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equitysecurities or convertible debt securities (944) (1,879)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans andborrowings - -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financingactivities 17,606 33,814
4. Net increase / (decrease) in cash andcash equivalents for the period
4.1 Cash and cash equivalents at beginning ofperiod 5,162 8,199
4.2 Net cash from / (used in) operatingactivities (item 1.9 above) (599) (1,186)
4.3 Net cash from / (used in) investing activities(item 2.6 above) (2,303) (20,961)
4.4 Net cash from / (used in) financing activities(item 3.10 above) 17,606 33,814
Consolidated statement of cash flows Current quarter$A'000 Year to date(9months)$A'000
4.5 Effect of movement in exchange rates oncash held - -
4.6 Cash and cash equivalents at end ofperiod 19,866 19,866
5. Reconciliation of cash and cashequivalentsat the end of the quarter (as shown in theconsolidated statement of cash flows) to therelated items in the accounts Current quarter$A'000 Previous quarter$A'000
5.1 Bank balances 19,866 5,162
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end ofquarter (should equal item 4.6 above) 19,866 5,162
6. Payments to related partiesof the entityand theirassociates Current quarter$A'000
6.1 Aggregate amount of payments to related parties and theirassociates included in item 1 156
6.2 Aggregate amount of payments to related parties and theirassociates included in item 2 -
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and anexplanation for, such payments.
7. FinancingfacilitiesNote: the term "facility' includes all forms of financingarrangements available to the entity.Add notes as necessary for an understanding of thesources of finance available to the entity. Total facilityamountat quarterend$A'000 Amount drawnatquarter end$A'000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interestrate, maturity date and whether it is secured or unsecured. If any additional financingfacilities have been entered into or are proposed to be entered into after quarter end,include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A'000
8.1 Net cash from / (used in) operating activities (item 1.9) (599)
8.2 (Payments for exploration & evaluation classified as investingactivities) (item 2.1(d)) (2,174)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (2,773)
8.4 Cash and cash equivalents at quarter end (item 4.6) 19,866
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 19,866
8.7 item 8.3) Estimated quarters of funding available (item 8.6 divided by 7.16
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as "N/A".Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1Does the entity expect that it will continue to have the current level of net operatingcash flows for the time being and, if not, why not?
Answer:
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise furthercash to fund its operations and, if so, what are those steps and how likely does itbelieve that they will be successful?
Answer:8.8.3Does the entity expect to be able to continue its operations and to meet its businessobjectives and, if so, on what basis?
Answer:
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
  • 2 This statement gives a true and fair view of the matters disclosed.

Date: 29/04/2021

Authorised by: The Board of Directors (Name of body or officer authorising release – see note 4)

Notes

    1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity's activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
    1. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
    1. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
    1. If this report has been authorised for release to the market by your board of directors, you can insert here: "By the board". If it has been authorised for release to the market by a committee of your board of directors, you can insert here: "By the [name of board committeeeg Audit and Risk Committee]". If it has been authorised for release to the market by a disclosure committee, you can insert here: "By the Disclosure Committee".
    1. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council's Corporate Governance Principles and Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.