IMPRESSIVE INFILL COPPER HITS AT PEEL'S MALLEE BULL
KEY POINTS
MALLEE BULL
• First assays from Mallee Bull resource upgrade drilling include several broad high-grade copper intercepts at shallower depths than previously seen**:**
MBDD037
- o 62m @ 2.14% Cu, 15g/t Ag from 324m including:
- 25m @ 4.18% Cu, 24g/t Ag from 361m
MBDD038
- o 36m @ 3.55% Cu, 72g/t Ag from 345m including:
- 14.4m @ 4.71% Cu, 103g/t Ag from 359m
- Mallee Bull copper resource upgrade drilling continuing with two diamond rigs operating and ~9,000m of ~20,000m diamond drilling program completed
- Drilling designed primarily to convert Inferred classified resources to Indicated classification
- Peel has observed significant zones of strong copper mineralisation in recent drilling; processing and sampling is continuing, with further results expected in the coming weeks
- Peel expects to deliver Mallee Bull Resource upgrade in December 2021 quarter.
Peel Mining Limited (ASX:PEX) (Peel or the Company) is pleased to report initial assays from resource upgrade drilling at its 100%-owned Mallee Bull copper deposit, centred ~100km south of Cobar, NSW, have confirmed new broad high-grade copper-mineralised intercepts at shallower depths than previously seen.
Peel is progressing to establish critical mass via the definition of high-quality mineral resources at each of its deposits. Drilling at the Mallee Bull and Wirlong copper deposits is part of the Company's copper first strategy, focusing on advancing the Mallee Bull and Wirlong copper assets as a priority.
PEEL MINING MANAGING DIRECTOR ROB TYSON COMMENTED:
"The initial assays from resource upgrade drilling at Mallee Bull reinforce the high-grade nature of this important copper-rich deposit. Significantly, drillholes MBDD037 and MBDD038 returned broad highgrade copper mineralisation at depths closer to surface than seen before, an exciting development as we seek to improve the quality of the mineral resource.
"Drilling at Mallee Bull is advancing well with ~45% of the resource definition program now complete. Processing of Mallee Bull drillcore is taking place on a campaign basis in conjunction with our resource drilling at Wirlong, and further results are anticipated to be received in the coming weeks.
"Peel's field activities have been largely unaffected by the ongoing health emergency in Sydney, however we remain alert to the situation. I thank Peel's field staff for their understanding and positive approach."

MALLEE BULL
Mallee Bull is amongst Australia's highest grade undeveloped copper deposits, and resource upgrade drilling is part of Peel's strategy to advance each of its deposits to mineable resources, to achieve critical mass in support of a new substantial centrally located processing plant.
The 2017 resource estimate for Mallee Bull (see Table 1) comprises 6.76 Mt at 1.8% Cu, 31g/t Ag, 0.4g/t Au, 0.6% Pb, 0.6% Zn (2.6% CuEq) containing approximately 119,000t Cu, 6.6 Moz Ag, 83,000 oz Au, 38,000t Pb, 38,000t Zn) (using a 1% CuEq cut-off) – Table 1. Refer to Peel Mining's ASX Announcement dated 6th July 2017 "Mallee Bull Resource Grows by 65% to 175,000t CuEq" for further details.
As previously reported, Peel identified significant copper mineralisation in multiple drillholes recently completed as part of resource definition drilling, including MBDD037 and MBDD038, and assays have confirmed these observations, with better results including:
MBDD037
- o 62m @ 2.14% Cu, 15g/t Ag from 324m including:
- 25m @ 4.18% Cu, 24g/t Ag from 361m
MBDD038
- o 36m @ 3.55% Cu, 72g/t Ag from 345m including:
- 3m @ 6.75% Cu, 75g/t Ag from 346m
- 14.4m @ 4.71% Cu, 103g/t Ag from 359m
- 3m @ 6.70% Cu, 88g/t Ag from 377m
MBDD042
- o 2m @ 1.41% Cu, 33g/t Ag from 318m
- o 4m @ 0.94% Cu, 51g/t Ag, 0.78g/t Au 4.10% Pb, 0.66% Zn, from 327m
MBDD043
- o 9.67m @ 1.08% Cu, 11g/t Ag from 267.33m including:
- 3.46m @ 2.05% Cu, 21g/t Ag from 270m
Recent drilling continues to return visibly significant zones of strong copper mineralisation. Processing and sampling is ongoing, with further assays pending for a number of drillholes as noted in Table 3. Table 5 shows visual estimates of mineralisation for unreported drillholes MBDD033 to 055.
Although mineralisation at Mallee Bull commences at ~60m below surface and has been defined to at least 800m below surface (and remains open along strike and at depth), the bulk of Mallee Bull's contained copper is located from ~350m below surface where resources are predominantly of an Inferred nature. The resource upgrade drilling program, comprising ~20,000m of diamond drilling, is primarily designed to convert Inferred classified resources to Indicated classification.
Resource upgrade drilling at Mallee Bull is progressing well and at the time of reporting was approximately 45% (>9,000m) complete. Two, double shifting multi-purpose drill rigs are completing the program, with initial focus on the zone between 300m and 500m below surface.
MALLEE BULL BACKGROUND
The Mallee Bull copper deposit is located approximately 100km south of Cobar in western NSW and is situated on a 20,000-acre pastoral lease owned by Peel Mining.
In 2010, Peel was granted exploration lease EL7461 which encompassed the historic Gilgunnia and 4- Mile goldfields. Exploration initially focused on the known polymetallic potential of the May Day deposit located within ML1361 (wholly contained within EL7461) until a 2010 airborne electromagnetic geophysical survey resulted in the recognition of a coincident late time conducting anomaly and

magnetic high proximal to the historic 4-Mile goldfields. A subsequent ground-based geophysical survey confirmed the anomaly in early 2011, and follow-up RC and diamond drilling resulted in the discovery of strongly anomalous polymetallic (Cu-Pb-Zn-Ag-Au) mineralisation.
In 2012, CBH Resources entered a farm-in agreement to acquire 50% of the Mallee Bull and May Day projects for $8.3m expenditure. During the JV partnership, seven drill programs were completed at Mallee Bull, providing the basis for the reporting of a maiden mineral resource in 2014 and an updated mineral resource in 2017 (see Table 1). In 2020, Peel regained 100% control of the Mallee Bull and May Day deposits.
Table 1: Mallee Bull 2017 Mineral Resource estimate based on 1% CuEq cut-off grade. The figures in this table are rounded to reflect the precision of the estimates and include rounding errors.
| ResourceClassification | Kt | CuEq % | Cu % | Ag g/t | Au g/t | Pb % | Zn % |
|---|---|---|---|---|---|---|---|
| Indicated | 1,340 | 2.15 | 0.91 | 30 | 0.4 | 0.96 | 1.23 |
| Inferred | 5,420 | 2.7 | 2.0 | 31 | 0.4 | 0.5 | 0.4 |
| Total Resource | 6,760 | 2.6 | 1.8 | 31 | 0.4 | 0.6 | 0.6 |
Since discovery in 2011, drilling activities at Mallee Bull and proximal targets have comprised 125 RAB holes, 153 RC holes (including 42 with diamond tails), and 51 diamond holes (including 11 wedge holes) for a total of ~9,500m of RAB drilling, ~28,400m of RC drilling, and ~30,500m of diamond drilling at end 2020. Mineralisation at Mallee Bull commences at ~60m below surface and has been defined to at least 800m below surface and remains open along strike and at depth. Other exploration activities completed at Mallee Bull and surrounds include extensive surface geochemical sampling, geological mapping, and numerous airborne, surface and downhole geophysical surveys.
Mallee Bull has historically returned many significant drill intercepts – see Table 2:
| Mineralisation | Hole ID | Fromm | To m | Widthm | Cu% | Agg/t | Aug/t | Zn % | Pb % |
|---|---|---|---|---|---|---|---|---|---|
| 4MRCDD006 | 267.35 | 274 | 6.65 | 3.10 | 34 | 0.93 | 0.13 | 0.65 | |
| 4MRC016 | 233 | 244 | 11 | 2.71 | 36 | 0.26 | 0.07 | 0.11 | |
| 4MRC024 | 174 | 184 | 10 | 2.22 | 33 | 0.44 | 0.16 | 0.11 | |
| MBDD002 | 361 | 404 | 43 | 1.63 | 29 | 1.76 | 0.07 | 0.15 | |
| and | 415 | 446 | 31 | 2.58 | 47 | 0.18 | 0.53 | 0.74 | |
| MBDD003 | 409 | 423 | 14 | 1.92 | 56 | 0.29 | 0.04 | 0.10 | |
| and | 441 | 466 | 25 | 3.24 | 34 | 0.08 | 0.04 | 0.36 | |
| MBDD006 | 396 | 418 | 22 | 1.48 | 28 | 0.63 | 0.12 | 0.21 | |
| Copper | and | 445 | 457 | 12 | 1.26 | 16 | 0.19 | 0.03 | 0.11 |
| and | 461 | 475 | 14 | 2.37 | 14 | 0.17 | 0.03 | 0.08 | |
| MBDD009 | 538 | 592 | 54 | 4.16 | 40 | 0.16 | 0.05 | 0.27 | |
| and | 596 | 602 | 6 | 1.73 | 16 | 0.06 | 0.10 | 0.16 | |
| MBDD009W1 | 468 | 523 | 55 | 3.95 | 41 | 0.22 | 0.05 | 0.30 | |
| MBDD009W2 | 708 | 727 | 19 | 2.41 | 44 | 0.12 | 0.02 | 0.04 | |
| MBDD009W2W1 | 575 | 659 | 84 | 4.42 | 38 | 0.14 | 0.03 | 0.10 | |
| MBDD009W3 | 502 | 512 | 10 | 4.53 | 31 | 0.13 | 0.07 | 0.06 | |
| MBDD010 | 634 | 666 | 32 | 3.62 | 46 | 0.21 | 0.05 | 0.08 |
Table 2: Mallee Bull Selection of Significant Intercepts
Peel Mining Limited ACN 119 343 734
Unit 1, 34 Kings Park Rd, West Perth, WA 6005. Ph: (08) 9382 3955. E: [email protected] www.peelmining.com.au

| Mineralisation | Hole ID | Fromm | To m | Widthm | Cu% | Agg/t | Aug/t | Zn % | Pb % |
|---|---|---|---|---|---|---|---|---|---|
| MBRCDD050 | 465 | 527 | 62 | 3.15 | 42 | 0.28 | 0.11 | 0.12 | |
| MBRCDD064 | 233 | 242 | 9 | 3.69 | 42 | 0.64 | 0.48 | 0.61 | |
| MBRCDD110 | 262 | 276.15 | 14.15 | 4.27 | 51 | 0.25 | 0.15 | 0.11 | |
| MBRCDD115 | 296 | 307 | 11 | 9.02 | 114 | 0.37 | 0.34 | 0.37 | |
| 4MRCDD006 | 253 | 263 | 10 | 0.14 | 41 | 0.77 | 11.00 | 9.01 | |
| MBDD028 | 79 | 96 | 17 | 0.48 | 215 | N.A. | 16.94 | 11.30 | |
| MBRC018 | 104 | 119 | 15 | 0.11 | 223 | 0.88 | 10.79 | 5.31 | |
| Zinc-LeadSilver | MBRC024 | 81 | 95 | 14 | 0.47 | 266 | 1.37 | 17.53 | 12.76 |
| MBRC028 | 71 | 82 | 11 | 0.01 | 130 | N.A. | 13.80 | 8.26 | |
| MBRC085 | 87 | 103 | 16 | 0.17 | 195 | 1.11 | 11.97 | 6.21 | |
| MBRCDD065 | 73 | 91 | 18 | 0.13 | 171 | 1.18 | 12.08 | 6.81 |
Mallee Bull is interpreted to be in a favourable geological and structural position; it is situated in an interpreted high-stress environment of the "nose" of an anticline and occurs in a geological sequence of turbidite and volcaniclastic sediments which are thought to be age equivalent to the Chesney and Great Cobar Slate Formations found in the immediate Cobar region. Mineralisation occurs either as massive sulphide or hydrothermal breccia styles within a package of brecciated volcaniclastic and turbidite sediments comprising siltstones and mudstones and is interpreted to occur as a shoot/lens-like structure dipping moderately to the west. The deposit is currently subdivided into three lenses: Silver Ray, Union, and Mallee Bull.
This announcement has been approved for release by the Board of Directors.
For further information, please contact: Rob Tyson – Peel Mining: +61 (0)420 234 020 Nathan Ryan – NWR Communications: +61 (0)420 582 887
COMPETENT PERSONS STATEMENTS
The information in this report that relates to Exploration Results is based on information compiled by Mr Rob Tyson who is a fulltime employee of the company. Mr Tyson is a member of the Australasian Institute of Mining and Metallurgy. Mr Tyson has sufficient experience of relevance to the styles of mineralisation and the types of deposits under consideration, and to the activities undertaken, to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Tyson consents to the inclusion in this report of the matters based on information in the form and context in which it appears. Exploration results are based on standard industry practices, including sampling, assay methods, and appropriate quality assurance quality control (QAQC) measures.
PREVIOUS RESULTS
Previous results referred to herein have been extracted from previously released ASX announcements. Previous announcements and reports are available to view on www.peelmining.com.au and www.asx.com.au. Additional information regarding Mallee Bull is available in the Company's quarterly reports from December 2010 through to June 2021 and in progress reports as reported to the ASX. The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement.


Figure 1 - Processing of Mallee Bull drillcore at Wilkerboon


Figure 2 – Mallee Bull Drill Plan on Magnetics








Figure 5 – Mallee Bull Long Section


Figure 6 – Peel Mining Cobar Tenure

Table 3: Mallee Bull DDH Drillhole Collars
| Hole ID | Easting | Northing | Azi | Dip | Final Depth | Status |
|---|---|---|---|---|---|---|
| (grid) | (m) | |||||
| MBDD033 | 415163.49 | 6413271.23 | 86.99 | -64.00 | 351.60 | Assays pending |
| MBDD034 | 415162.24 | 6413271.17 | 87.89 | -70.67 | 404.10 | Assays pending |
| MBDD035 | 415160.50 | 6413271.17 | 84.86 | -75.88 | 441.80 | Assays pending |
| MBDD036 | 415161.77 | 6413304.94 | 86.41 | -65.36 | 370.00 | Assays pending |
| MBDD037 | 415161.43 | 6413304.99 | 86.72 | -71.76 | 440.10 | Complete |
| MBDD038 | 415155.00 | 6413340.01 | 90.90 | -68.32 | 428.60 | Complete |
| MBDD039 | 415155.00 | 6413340.01 | 89.83 | -74.92 | 444.70 | Assays pending |
| MBDD040 | 415155.00 | 6413340.01 | 95.26 | -78.93 | 471.60 | Assays pending |
| MBDD041 | 415159.00 | 6413340.01 | 91.17 | -65.26 | 399.60 | MET drillhole |
| MBDD042 | 415183.00 | 6413430.00 | 97.17 | -76.15 | 459.60 | Complete |
| MBDD043 | 415162.00 | 6413235.00 | 87.08 | -64.56 | 330.70 | Complete |
| MBDD044 | 415218.11 | 6413463.49 | 100.73 | -74.85 | 372.60 | Assays pending |
| MBDD045 | 415160.00 | 6413235.00 | 87.27 | -70.82 | 381.70 | Assays pending |
| MBDD046 | 415198.00 | 6413470.00 | 106.10 | -83.59 | 621.20 | Assays pending |
| MBDD047 | 415159.65 | 6413235.00 | 88.40 | -74.92 | 423.80 | Assays pending |
| MBDD048 | 415173.70 | 6413451.43 | 96.97 | -77.00 | 500.5 | Assays pending |
| MBDD049 | 415153.00 | 6413305.00 | 91.36 | -83.50 | 501.7 | Processing underway |
| MBDD050 | 415155.00 | 6413235.00 | 89.59 | -78.87 | 472.3 | Assays pending |
| MBDD051 | 415174.00 | 6413451.00 | 95.50 | -85.00 | 654.8 | Processing underway |
| MBDD052 | 415174.00 | 6413451.00 | 99.29 | -87.17 | 701.6 | Processing underway |
| MBDD053 | 415146.00 | 6413305.00 | 86.96 | -85.33 | 606.7 | Processing underway |
| MBDD054 | 415167.00 | 6413390.00 | 93.64 | -67.08 | Current | Continuing |
| MBDD055 | 415145.00 | 6413305.00 | 85.69 | -83.34 | Current | Continuing |
Table 4: Mallee Bull DDH Significant Assays
| Hole ID | From (m) | To (m) | Width (m) | Cu (%) | Ag (g/t) | Au (g/t) | Zn (%) | Pb (%) |
|---|---|---|---|---|---|---|---|---|
| MBDD037 | 315.00 | 323.00 | 8.00 | 0.40 | 16 | 1.25 | 0.10 | 0.19 |
| and | 324.00 | 386.00 | 62.00 | 2.14 | 15 | 0.18 | 0.07 | 0.08 |
| including | 361.00 | 386.00 | 25.00 | 4.18 | 24 | 0.13 | 0.06 | 0.10 |
| MBDD038 | 309.00 | 322.00 | 13.00 | 0.10 | 27 | 1.31 | 0.23 | 0.23 |
| and | 345.00 | 381.00 | 36.00 | 3.55 | 72 | 0.23 | 0.17 | 0.62 |
| including | 346.00 | 349.00 | 3.00 | 6.75 | 75 | 0.23 | 0.28 | 0.62 |
| and including | 359.00 | 373.40 | 14.40 | 4.71 | 103 | 0.31 | 0.16 | 0.83 |
| and including | 377.00 | 380.00 | 3.00 | 6.70 | 88 | 0.38 | 0.07 | 0.04 |
| MBDD042 | 318.00 | 320.00 | 2.00 | 1.41 | 33 | 0.74 | 0.09 | 0.40 |
| and | 327.00 | 334.00 | 7.00 | 0.45 | 24 | 0.37 | 0.62 | 2.05 |
| including | 327.00 | 331.00 | 4.00 | 0.76 | 41 | 0.63 | 0.65 | 3.37 |
| MBDD043 | 267.33 | 277.00 | 9.67 | 1.08 | 11 | 0.11 | 0.07 | 0.09 |
| including | 270.00 | 273.46 | 3.46 | 2.05 | 21 | 0.07 | 0.15 | 0.21 |
*ORANGE denotes new results.

Table 5: Mallee Bull mineralised intersection descriptions (visual observations)
| Hole ID | FinalDepth(m) | Comments on mineralisation w/ visual estimates |
|---|---|---|
| MBDD033 | 351.6 | 269.0-280.1m: Pyrite (Py) dominant massive sulphide intersection w/ trace pyrrhotite (Po)280.1-285.6m: Disseminated to quartz breccia-fill mineralisation (2% Cpy, 3% Po, 1% Py) |
| MBDD034 | 404.1 | 313.5-316.0m: Semi-massive Py w/ trace Cpy & Po316.0-338.2m: Py-dominant massive sulphide338.2-362.4m: Stringer/fracture-fill sulphides (0.5% Cpy, 0.5% Po, 0.5% Py) |
| MBDD035 | 441.8 | 353.5-354.9m: Po-dominant breccia-fill mineralisation (<1% Cpy, 2% Po)354.9-372.7m: Py-dominant massive sulphide, w/ ~10% Po372.7-378.7m: Semi-massive to stringer mineralisation (2% Cpy, 5% Po, 1% Py)378.7-405.1m: Sparse disseminated to stringer mineralisation (0.5% Cpy, 2% Po, 0.5% Py) |
| MBDD036 | 370.0 | 273.6-311.6m: Sparse quartz-sulphide stringer mineralisation (0.5% Cpy, 1% Po, <0.5% Py)311.6-316.7m: Disseminated to stringer style mineralisation (15% Cpy, 2% Po, 1% Py)316.7-327.0m: Sparse disseminated to stringer mineralisation (0.5% Cpy, 2% Po, 0.5% Py) |
| MBDD039 | 444.7 | 360.8-364.3m: Py-dominant massive sulphide364.3-367.2m: Sparsely mineralised breccia zone (2% Cpy)390.2-404.6m: Disseminated to stringer style mineralisation (2% Cpy, 3% Po, 1.5% Py)404.6-406.5m: Semi-massive sulphide Cpy-dominant (45% Cpy, 8% Po, 13% Py)406.5-410.6m: Disseminated to stringer style mineralisation (3% Cpy, 1% Po, 1% Py) |
| MBDD040 | 471.6 | 403.9-406.0m: Py-dominant semi-massive to massive sulphide406.0-406.6m: Disseminated to stringer style mineralisation (8% Cpy, 25% Po, 3% Py)406.6-417.4m: Chlorite-altered siltstone417.4-426.7m: Chlorite-altered siltstone w/ fine disseminated Po (~1%)426.6-436.2m: Disseminated to stringer style mineralisation (15% Cpy, 6% Po, 1% Py)436.2-458.2m: Fine sparse stringer mineralisation (<1% Cpy, Po, Py) |
| MBDD041 | 399.6 | 280.0-281.5m: Py-dominant finely disseminated to semi-massive sulphide282.6-288.2m: Fine sparse stringer mineralisation (<1% Cpy, Po, Py)288.2-304.8m: Disseminated to stringer style mineralisation (4% Cpy, 2% Po, 1% Py)304.8-319.3m: Fine sparse stringer mineralisation (<1% Cpy, Po, Py)319.3-330.4m: Laminated siltstone330.4-334.5m: Disseminated to stringer style mineralisation (5% Cpy, 2% Po, 1% Py)334.5-335.6m: Semi-massive to massive sulphide (70% Cpy, 10% Po, 2% Py)335.6-343.2m: Fine sparse stringer/breccia-fill mineralisation (1% Cpy, <1% Po, Py) |
| MBDD044 | 372.6 | 298.2-302.7m: Po-dominant stringer style mineralisation (0.5% Cpy, 5% Po, 0.5% Py)302.7-316.0m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py)316.0-320.6m: Stringer style mineralisation (5% Cpy, 4% Po, 1% Py)320.6-344.5m: Finely disseminated mineralisation (<1% Cpy, Po, Py)344.5-348.5m: Stringer style mineralisation (4% Cpy, 2% Po, 1% Py) |
| MBDD045 | 381.7 | 308.0-311.0m: Disseminated to breccia-fill mineralisation (2% Cpy, 3% Po, 1% Py).311.0-353.0m: Disseminated to sparse stringer style mineralisation (<0.5% Cpy, 1% Po, 0.2% Py)353.0-356.0m: Stringer style mineralisation (2% Cpy, 3% Po, 0.5% Py)356.0-356.3m: Po-dominant semi-massive sulphide (1% Cpy, 90% Po)356.3-356.6m: Quartz-rich stringer style mineralisation (1% Cpy, 1% Po, 0.2% Py)356.6-364.3m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py) |

| Hole ID | FinalDepth(m) | Comments on mineralisation w/ visual estimates |
|---|---|---|
| MBDD046 | 621.2 | 371.4-379.0m: Semi-massive sulphide mineralisation (1% Cpy, 30% Sph, 5% Gn, 10% Py, 1% Po)379.0-408.6m: Finely disseminated mineralisation (<1% Cpy, Po, Py)408.6-408.9m: Stringer style mineralisation (5% Cpy, 10% Po, 2% Py)408.9-459.2m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py)459.2-460.0m: Semi-massive sulphide mineralisation (30% Cpy, 30% P0, 5% Py)460.0-464.4m: Stringer style mineralisation (5% Cpy, 3% Po, 0.5% Py)464.4-485.0m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py)485.0-490.2m: Stringer style mineralisation (5% Cpy, 3% Po, 0.5% Py)490.2-514.8m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py)514.8-516.4m: Stringer style mineralisation (2% Cpy, 1% Po, 0.5% Py)516.4-537.8m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py)537.8-558.7m: Disseminated to stringer style mineralisation (2% Cpy, 3% Po, 0.5% Py)558.7-604.6m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py) |
| MBDD047 | 423.8 | 360.5-367.8m: Disseminated to breccia-fill mineralisation (<1% Cpy, Po, Py)367.8-386.6m: Quartz-rich stringer style mineralisation (2% Cpy, 3% Po, 0.5% Py)386.6-389.2m: Stringer style mineralisation (4% Cpy, 5% Po, 1% Py)389.2-401.7m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py)401.7-402.5m: Stringer style mineralisation (5% Cpy, 8% Po, 1% Py)402.5-409.5m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py) |
| MBDD048 | 500.5 | 352.6-356.7m: Semi-massive to massive sulphide mineralisation (1% Cpy, 30% Sph, 5% Gn, 20% Py, 5% Po)356.7-414.3m: Finely disseminated mineralisation (<1% Cpy, Po, Py)414.3-438.6m: Stringer style mineralisation (5% Cpy, 2% Po, 0.5% Py)438.6-450.6m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py)450.6-454.9m: Stringer style mineralisation (2% Cpy, 1% Po, 0.5% Py)454.9-477.5m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py) |
| MBDD049 | 501.7 | 402.5-409.3m: Aggregated to semi-massive Po409.3-419.3m: Py-dominant massive sulphide419.3-421.3m: Stringer style mineralisation (0.5% Cpy, 5% Po, 0.5% Py)421.3-423.1m: Py-dominant massive sulphide423.1-427.0m: Quartz-rich stringer style mineralisation (1% Cpy, 3% Po, 0.2% Py)427.0-428.4m: Stringer style mineralisation (3% Cpy, 5% Po, 0.5% Py)428.4-453.5m: Po-dominant stringer style to breccia fill mineralisation (1% Cpy, 5% Po, 0.5% Py)453.5-501.7m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py) |
| MBDD050 | 472.3 | 400.5-416.6m: Disseminated to blebby aggregate mineralisation (<1% Cpy, Po, Py)416.6-444.4m: Sparse stringer style mineralisation (2% Cpy, 5% Po, <1% Py)444.4-472.3m: Disseminated to sparse stringer style mineralisation (<1% Cpy, Po, Py) |
| MBDD051 | 654.8 | 395.0-403.9m: Semi-massive to massive sulphide mineralisation (1% Cpy, 15% Sph, 10% Gn, 40% Py, 5% Po)403.9-409.0m: Finely disseminated mineralisation (<1% Cpy, Po, Py)409.0-410.7m: Stringer style mineralisation (3% Cpy, 5% Sph, 3% Gn, 2% Po, 1% Po)410.7-429.2m: Finely disseminated to blebby aggregate mineralisation (~1% Cpy, Sph, Po, Py)429.2-429.4m: Blob of massive sulphide Zn-Pb mineralisation (90% Sph, 5% Gn, 5% Py)429.4-432.9m: Finely disseminated to blebby aggregate mineralisation (~1% Cpy, Sph, Po, Py)432.9-433.1m: Blob of massive sulphide Zn-Pb mineralisation (90% Sph, 5% Gn, 5% Py)433.1-447.4m: Finely disseminated to blebby aggregate mineralisation (~1% Cpy, Sph, Po, Py)447.4-449.7m: Stringer into massive sulphide mineralisation (5% Cpy, 10% Po, 40% Py)449.7-468.7m: Disseminated to sparse stringer style mineralisation (0.2% Cpy, 1% Po, 0.1% Py)468.7-496.1m: Finely disseminated mineralisation (<1% Cpy, Po, Py)496.1-543.3m: Disseminated to sparse stringer style mineralisation (0.2% Cpy, 1% Po, 0.1% Py)543.3-567.0m: Fine fracture-fill to stringer mineralisation (2% Cpy, 1% Po, 0.2% Py)567.0-605.1m: Stringer style mineralisation (5% Cpy, 3% Po, 0.5% Py)605.1-654.8m: Disseminated to sparse stringer style mineralisation (0.2% Cpy, 1% Po, 0.1% Py) |

| Hole ID | FinalDepth(m) | Comments on mineralisation w/ visual estimates |
|---|---|---|
| MBDD052 | 701.6 | 463.4-465.8m: Disseminated to semi-massive mineralisation (1% Cpy, 2% Sph, 3% Gn, 20% Py, 5% Po)465.8-473.0m: Breccia-fill mineralisation (0.5% Cpy, 0.5% Sph, 0.5% Gn, 5% Po, 20% Py)473.0-474.1m: Py-dominant semi-massive to massive sulphide mineralisation474.1-478.1m: Stringer style mineralisation (4% Cpy, 5% Po, 1% Py)478.1-484.9m: Stringer style mineralisation (0.5% Cpy, 5% Po, 1% Py)484.9-515.8m: Disseminated to blebby aggregate mineralisation (<1% Cpy, Po, Py)515.8-519.5m: Fine fracture-fill to stringer mineralisation (1% Cpy, 2% Po, 0.2% Py)519.5-611.9m: Disseminated to blebby aggregate and fracture-fill mineralisation (<1% Cpy, Po, Py)611.9-649.4m: Stringer style mineralisation (5% Cpy, 3% Po, 1% Py)649.4-658.1m: Stringer style to semi-massive sulphide mineralisation (50% Cpy, 1% Po, 0.2% Py)658.1-685.1m: Stringer style mineralisation (3% Cpy, 1% Po, 0.2% Py) |
| MBDD053 | 606.7 | 532.7-535.7m: Fracture-fill to blebby aggregate mineralisation (1% Cpy, 3% Po, 0.2% Py)535.7-536.4m: Stringer style to semi-massive sulphide mineralisation (5% Cpy, 40% Po, 1% Py)536.4-542.6m: Fine fracture-fill to stringer mineralisation (1% Cpy, 1% Po, 0.2% Py)542.6-543.6m: Stringer into massive sulphide mineralisation (5% Cpy, 60% Po, 10% Py)543.6-545.5m: Stringer style mineralisation (10% Cpy, 5% Po, 1% Py)545.5-553.9m: Fracture-fill to blebby aggregate mineralisation (1% Cpy, 3% Po, 0.2% Py)553.9-563.0m: Stringer style to semi-massive sulphide mineralisation (15% Cpy, 10% Po, 1% Py)563.0-570.3m: Stringer style mineralisation (3% Cpy, 2% Po, 0.2% Py) |
Cpy = chalcopyrite; Po = pyrrhotite; Py = pyrite; Sph = sphalerite; Gn = galena. Pure chalcopyrite contains ~34.5% Cu. Pure sphalerite contains ~67% Zn. Pure galena contains ~86.6% Pb. In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide material abundance should never be considered a proxy or substitute for laboratory analysis. Laboratory assay results are required to determine the widths and grade of the visible mineralisation reported in preliminary geological logging. The Company will update the market when laboratory analytical results become available.

JORC CODE (2012 Edition) – Table 1 Checklist of Assessment and Reporting Criteria Section 1: Sampling Techniques and Data for South Cobar Project
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Samplingtechniques | •Nature and quality of sampling (eg cut channels, random chips, orspecific specialised industry standard measurement tools appropriate tothe minerals under investigation, such as down hole gamma sondes, orhandheld XRF instruments, etc). These examples should not be taken aslimiting the broad meaning of sampling.•Include reference to measures taken to ensure sample representivityandthe appropriate calibration of any measurement tools or systems used.•Aspects of the determination of mineralisation that are Material to thePublic Report.•In cases where 'industry standard' work has been done this would berelatively simple (eg 'reverse circulation drilling was used to obtain 1 msamples from which 3 kg was pulverised to produce a 30 g charge for fireassay'). In other cases more explanation may be required, such as wherethere is coarse gold that has inherent sampling problems. Unusualcommodities or mineralisation types (eg submarine nodules) maywarrant disclosure of detailed information. | •Diamond and reverse circulation (RC) drilling were used to obtain samplesfor geologicallogging and assaying.•Diamond core was cut and sampled at 1m intervals on average or intervalsdetermined by geological contacts. RC drill holes were sampled at 1mintervals and split using a cone splitter attached to the cyclone to generate asplit of 2-4kg to ensure sample representivity.•Multi-element readings were taken of the diamond core and RC drill chipsusing an Olympus Delta Innov-X portable XRF machine or an Olympus Vantaportable XRF machine. Portable XRF machines are routinely serviced,calibrated and checked against blanks/standards. |
| Drillingtechniques | •Drill type (egcore, reverse circulation, open-hole hammer, rotary airblast, auger, Bangka, sonic, etc) and details (eg core diameter, triple orstandard tube, depth of diamond tails, face-sampling bit or other type,whether core is oriented and if so, by what method, etc). | •Drilling to date has been a combination of diamond and reverse circulation.Reverse circulation drilling utilised a 5 1/2 inch diameter hammer. PQ, HQand NQ coring was used for diamond drilling. |
| Drill samplerecovery | •Method of recording and assessing core and chip sample recoveries andresults assessed.•Measures taken to maximise sample recovery and ensure representativenature of the samples.•Whether a relationship exists between sample recovery and grade andwhether sample bias may have occurred due to preferential loss/gain offine/coarse material. | •Core recoveries are recorded by the drillers in the field at the time of drillingand checked by a geologist or technician.•RC samples are not weighed on a regular basis but no significant samplerecovery issues have been encountered in drilling programs to date.•Diamond core is reconstructed into continuous runs on an angle iron cradlefor orientation marking and depths are checked against the depths recordedon core blocks. Rod counts are routinely undertaken by drillers.•When poor sample recovery is encountered during drilling, the geologist anddriller have endeavoured to rectify the problem to ensure maximum samplerecovery.•Sample recoveries at WirlongandMallee Bull to date have generally beenhigh. |

| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Logging | •Whether core and chip samples have been geologically andgeotechnically logged to a level of detail to support appropriate MineralResource estimation, mining studies and metallurgical studies.•Whether logging is qualitative or quantitative in nature. Core (or costean,channel, etc) photography.•The total length and percentage of the relevant intersections logged. | •All core and drill chip samples are geologicallylogged. Core samples areorientated and logged for geotechnical information. Drill chip samples arelogged at 1m intervals from surface to the bottom of each individual hole toa level thatwill support appropriate future Mineral Resource studies.•Loggingof diamond core and RC samples records lithology, mineralogy,mineralisation, structure (DDH only), weathering, colour and other featuresof the samples. Core is photographed as both wet and dry. Chips arephotographed as wet samples.•All diamond and RC drill holes in the current program were geologicallylogged in full. |
| Sub-samplingtechniques andsamplepreparation | •If core, whether cut or sawn and whether quarter, half or all core taken.•If non-core, whether riffled, tube sampled, rotary split, etc and whethersampled wet or dry.•For all sample types, the nature, quality and appropriateness of thesample preparation technique.•Quality control procedures adopted for all sub-sampling stages tomaximise representivity of samples.•Measures taken to ensure that the sampling is representative of the insitu material collected, including for instance results for fieldduplicate/second-half sampling.•Whether sample sizes are appropriate to the grain size of the materialbeing sampled. | •Drill core was cut with a core saw and half core taken.•The RC drilling rigs were equipped with an in-built cyclone and splittingsystem, which provided one bulk sample of approximately 20kg and a subsample of 2-4kg per metre drilled.•All samples were split using the system described above to maximise andmaintain consistent representivity. The majority of samples were dry.•Bulk samples were placed in green plastic bags, with the sub-samplescollected placed in calico sample bags.•Field duplicates were collected by re-splitting the bulk samples from largeplastic bags. These duplicates were designed for lab checks.•Laboratory duplicate samples are split using method SPL-21d whichproduces a split sample using a riffle splitter. These samples are selected bythe geologist within moderate and high-grade zones.•A sample size of 2-4kg was collected and considered appropriate andrepresentative for the grain size and style of mineralisation. |
| Quality of assaydata andlaboratory tests | •The nature, quality and appropriateness of the assaying and laboratoryprocedures used and whether the technique is considered partial or total.•For geophysical tools, spectrometers, handheld XRF instruments, etc, theparameters used in determining the analysis including instrument makeand model, reading times, calibrations factors applied and theirderivation, etc.•Nature of quality control procedures adopted (eg standards, blanks,duplicates, external laboratory checks) and whether acceptable levels ofaccuracy (ie lack of bias) and precision have been established. | •ALS Laboratory Services were used for Au and multi-element analysis workcarried on out on 1m split RC samplesand half core DDH samples. Thelaboratory techniques below are for all samples submitted to ALS and areconsidered appropriate for the style of mineralisation at Wirlongand MalleeBull:oCRU-21 (Sample preparation code–primary crush)oPUL-23 (Sample preparation code -pulverising)oAu-AA25 Ore Grade Au 30g FA AA Finish, Au-AA26 Ore GradeAu 50g FA AA Finish |

| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| oME-ICP41 35 element aqua regia ICP-AES, with an appropriateOre Grade base metal AA finishoME-ICP61 33 element 4 acid digest ICP-AES, with anappropriate Ore Grade base metal AA finishoME-MS61 48 element 4 acid digest ICP-MS and ICP-AES, with anappropriate Ore Grade base metal AA finish•Assaying of samples in the field was by portable XRF instruments: OlympusDelta Innov-X or Olympus Vanta Analysers. Reading time for Innov-X was 20seconds per reading, reading time for Vanta was 10 & 20 seconds perreading.•The QA/QC data includes standards, duplicates and laboratory checks.Duplicates for percussion drilling are collected directly from the drill rig orthe metre sample bag using a half round section of pipe or via samplesplitter. In-house QA/QC tests are conducted by the lab on each batch ofsamples with standards supplied by the same companies that supply ourown. | ||
| Verification ofsampling andassaying | •The verification of significant intersections by either independent oralternative company personnel.•The use of twinned holes.•Documentation of primary data, data entry procedures, dataverification, data storage (physical and electronic) protocols.•Discuss any adjustment to assay data. | •All geological logging and sampling information is completed via GeobankMobile or in spreadsheets, which are then transferred to a database forvalidation and compilation at the Peel head office. Electronic copies of allinformation are backed up periodically.•No adjustments of assay data are considered necessary. |
| Location of datapoints | •Accuracy and quality of surveys used to locate drill holes (collar anddown-hole surveys), trenches, mine workings and other locations used inMineral Resource estimation.•Specification of the grid system used.•Quality and adequacy of topographic control. | •A Garmin hand-held GPS is used to define the location of the drill holes.Standard practice is for the GPS to be left at the site of the collar for a periodof 5 minutes toobtain a steady reading. Collars are routinely picked up afterby DGPS.•Down-hole surveys are conducted by the drill contractors using either aReflex gyroscopic tool with readings every 10m after drill hole completion ora Reflex electronic multi-shot camera will be used with readings for dip andmagnetic azimuth taken every 30m down-hole. QA/QC in the field involvescalibration using a test stand. The instrument is positioned with a stainlesssteel drill rod so as not to affect the magnetic azimuth.•Grid system used is MGA 94 (Zone 55). All down-hole magnetic surveys were |

| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| converted to MGA94 grid. | ||
| •DGPS pick-up delivers adequate topographic control. | ||
| Data spacing and | •Data spacing for reporting of Exploration Results. | •Data/drill hole spacing is variable and appropriate to the geology and |
| distribution | •Whether the data spacing and distribution is sufficient to establish the | historical drilling. |
| degree of geological and grade continuity appropriate for the Mineral | •3m to 6m sample compositing is applied to RC drilling for gold and/or multi | |
| Resource and Ore Reserve estimation procedure(s) and classificationsapplied. | element assay where appropriate. | |
| •Whether sample compositing has beenapplied. | ||
| Orientation ofdata in relation togeological | •Whether the orientation of sampling achieves unbiased sampling ofpossible structures and the extent to which this is known, considering thedeposit type. | •Most drillholes are planned to intersect the interpreted mineralisedstructures/lodes as near to a perpendicular angle as possible (subject toaccess tothe preferred collar position). |
| structure | •If the relationship between the drilling orientation and the orientation of | •Drillhole deviation may affect the true width of mineralisation and will be |
| key mineralised structures is considered to have introduced a sampling | further assessed when resource modelling commences. | |
| bias, this should be assessed and reported if material. | ||
| Sample security | •The measures taken to ensure sample security. | •The chain of custody is managed by the project geologist who places calicosample bags in polyweave sacks. Up to 5 calico sample bags are placed ineach sack. Each sack is clearly labelled with: |
| oPeel Mining Ltd | ||
| oAddress of Laboratory | ||
| oSample range | ||
| •Detailed records are kept of all samples that are dispatched, including details | ||
| of chain of custody. | ||
| Audits or reviews | •The results of any audits or reviews of sampling techniques and data. | •Data is validated when loading into the database. No formal external audit |
| has been conducted. |
Section 2 - Reporting of Exploration Results for South Cobar Project
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Mineral tenement and | •Type, reference name/number, location and ownership including | •The Mallee Bull prospect is located within 100%-owned tenement - |
| land tenure status | agreements or material issues with third parties such as joint ventures, | EL7461. |
| partnerships, overriding royalties, native title interests, historical sites, | •The tenementis in good standing and no known impediments exist. | |
| wilderness or national park and environmental settings. | ||
| •The security of the tenure held at the time of reporting along with any | ||
| known impediments to obtaining a licence to operate in the area. |

| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Exploration done byother parties | •Acknowledgment and appraisal of exploration by other parties. | •Work at Mallee Bull was completed in the area by several formertenement holders including Triako Resources between 2003 and 2009;it included diamond drilling, IP surveys, geological mapping andreconnaissance geochemical sampling around the historic Four MileGoldfield area. Prior to Triako Resources, Pasminco Explorationexplored the Cobar Basin area for a "Cobar-type" or "Elura-type" zinclead-silver or copper-gold-lead-zinc deposit. |
| Geology | •Deposit type, geological setting and style of mineralisation. | •The Mallee Bull prospect area lies within the Cobar-Mt Hope SiluroDevonian sedimentary and volcanic units. The northern Cobar regionconsists of predominantly sedimentary units with tuffaceous member,whilst the southern Mt Hope region consists of predominantly felsicvolcanic rocks; the Mallee Bull prospect appearsto be in an area ofoverlap between these two regions. Mineralisation at the Mallee Bulldiscovery features the Cobar-style attributes of short strike lengths(<200m), narrow widths (5-20m) and vertical continuity and occurs as ashoot-like structure dipping moderately to the west. |
| Drill hole Information | •A summary of all information material to the understanding of theexploration results including a tabulation of the following information forall Material drill holes:oeasting and northing of the drill hole collaroelevation or RL (Reduced Level –elevation above sea level in metres)of the drill hole collarodip and azimuth of the holeodown hole length and interception depthohole length.•If the exclusion of this information is justified on the basis that theinformation is not Material and this exclusion does not detract from theunderstanding of the report, the Competent Person should clearlyexplain why this is the case. | •All relevant information material to the understanding of explorationresults has been included within the body of the announcement or asappendices.•No information has been excluded. |
| Data aggregationmethods | •In reporting Exploration Results, weighting averaging techniques,maximum and/or minimum grade truncations (egcutting of high grades)and cut-off grades are usually Material and should be stated.•Where aggregate intercepts incorporate short lengths of high graderesults and longer lengths of low grade results, the procedure used for | •No length weighting or top-cuts have been applied.•No metal equivalent values are used for reporting exploration results. |

| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| such aggregation should be stated and some typical examples of suchaggregations should be shown in detail. | ||
| •The assumptions used for any reporting of metal equivalent valuesshould be clearly stated. | ||
| Relationship betweenmineralisation widthsand intercept lengths | •These relationships are particularly important in the reporting ofExploration Results.•If the geometry of the mineralisation with respect to the drill hole angleis known, its nature should be reported.•If it is not known and only the down hole lengths are reported, thereshould be a clear statement to this effect (eg 'down hole length, true widthnot known'). | •True widths are estimated to be 40-60% of the downhole width unlessotherwise indicated. |
| Diagrams | •Appropriate maps and sections (with scales) and tabulations of interceptsshould be included for any significant discovery being reported Theseshould include, but not be limited to a plan view of drill hole collarlocations and appropriate sectional views. | •Refer to Figures in the body of text. |
| Balanced reporting | •Where comprehensive reporting of all Exploration Results is notpracticable, representative reporting of both low and high grades and/orwidths should be practiced to avoid misleading reporting of ExplorationResults. | •In relation to the disclosure of visual mineralisation, the Companycautions that visual estimates of sulphide and oxide material abundanceshould never be considered a proxy or substitute for laboratory analysis.Laboratory assay results are required to determine the widths and gradeof the visible mineralisation reported in preliminary geological logging.The Company will update the market when laboratory analytical resultsbecome available. |
| Other substantiveexploration data | •Other exploration data, if meaningful and material, should be reportedincluding (but not limited to): geological observations; geophysical surveyresults; geochemical survey results; bulk samples –size and method oftreatment; metallurgical test results; bulk density, groundwater,geotechnical and rock characteristics; potential deleterious orcontaminating substances. | •No other substantive exploration data are available. |
| Further work | •The nature and scale of planned further work (egtests for lateralextensions or depth extensions or large-scale step-out drilling).•Diagrams clearly highlighting the areas of possible extensions, includingthe main geological interpretations and future drilling areas, providedthis information is not commercially sensitive. | •Further drilling (as part of the current resource drilling) and geophysicalsurveys are planned at Mallee Bull. |