AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

Panoro Energy ASA

Earnings Release Aug 22, 2024

3706_rns_2024-08-22_3564ba66-9421-4412-9b70-3eb90c0764b5.html

Earnings Release

Open in Viewer

Opens in native device viewer

Panoro Energy - 2024 Half Year Results

Panoro Energy - 2024 Half Year Results

Oslo, 22 August 2024 - Panoro Energy ASA ("Panoro" or the "Company" with OSE

Ticker: PEN) is pleased to report financial and operational performance for the

first half of 2024 in line with its expectations.

Revenue for the first half of 2024 was USD 142.7 million (up 115 percent year-on

-year) while EBITDA for the period was USD 77.8 million (up 100 percent year-on

-year).  Working interest production from Panoro's diversified portfolio was

9,168 bopd (up 27 percent year-on-year) and is set to exceed 13,000 bopd upon

completion of the current drilling campaigns underway offshore Gabon and

Equatorial Guinea when all new wells are onstream.

Following successful drilling results in Gabon which resulted in two new oil

discoveries, Panoro commissioned an interim review of reserves by its

independent auditor which has confirmed a material increase of 4 MMbbls net to

Panoro's working interest compared to estimates stated in its 2023 Annual

Statement of Reserves and 3.3 MMbbls at 30 June 2024 after adjusting for

production in the first half.

Panoro has today declared a Q2 cash distribution of NOK 50 million and continues

to make purchases of its own shares under the up to NOK 100 million share

buyback programme which has been extended to year end 2024.

John Hamilton, CEO of Panoro, commented:

"Our strong H1 results are in line with expectations and demonstrate the good

progress we are making towards our organic growth targets. With the resumption

of infill drilling at Block G offshore Equatorial Guinea, ongoing development

drilling and conventional ESP installations to come at the Dussafu block

offshore Gabon we have line of sight on growing Panoro's net production to over

13,000 bopd around year end.

Having made two material new oil discoveries on the Dussafu block offshore Gabon

we are very pleased to receive an independent validation of recoverable

reserves, which at 23.1 million barrels on a gross 2P basis is ahead of our

initial estimate of between 13 to 18 million barrels at the time of announcement

in May. With two firm infrastructure lead E&A wells upcoming in Equatorial

Guinea (Akeng Deep) and Gabon (Bourdon) as part of the current drilling

campaigns we have exposure to very exciting and potentially transformational

upside for a low financial exposure.

In line with our 2024 shareholder returns policy the Board has today declared a

Q2 cash distribution of NOK 50 million and extended the up to NOK 100 million

share buyback programme to year end, reinforcing Panoro's commitment to

converting the strong fundamentals of our high-quality and diversified asset

base into sustainable shareholder returns, whilst maintaining our growth

strategy and disciplined capital management."

Corporate and Financial Update

Interim Review of Reserves Following Gabon Discoveries

?        Adjustments to the drilling programme in Gabon during the first half of

2024 resulted in two significant oil discoveries being made, adding material new

oil reserves and fast-track development opportunities:

· Oil confirmed at north-east extension of the Hibiscus South field in May

· Oil confirmed at northern flank of the Hibiscus field in May

?        A mid-year preliminary review of reserves at Dussafu, incorporating

these recent drilling results, has been completed by independent reserve auditor

Netherland, Sewell & Associates, Inc. ("NSAI"). This review has resulted in an

increase to gross 2P reserves attributable to the Dussafu Marin Permit of 23.1

MMbbls compared to estimates at year end 2023 as stated in Panoro's 2023 Annual

Statement of Reserves. Net to Panoro's 17.5 percent working interest, this

represents a 4 MMbbls increase to the Company's 2P reserves on a proforma basis

?        Adjusting for gross production in the first half of 4.25 MMbbls (0.74

MMbbls net to Panoro's working interest) the 2P reserve addition at 30 June 2024

is therefore assessed to be 18.9 MMbbls on a gross basis and 3.3 MMbbls net to

Panoro's working interest.

?        These mid-year reserves estimates are preliminary and pending final

certification by NSAI

Production

?        Working interest production averaged 9,168bopd in the first half (H1

2023: 7,220 bopd) and was 8,729 bopd in Q2

?        Production reflects 21 days of planned shut-down of the FPSO BW Adolo

in Gabon for routine annual maintenance as previously communicated.  Production

in Equatorial Guinea has remained steady while slower regulatory approval

processes in Tunisia have delayed well workover and new projects

?        Current Group production is around 10,000 to 10,500 bopd with six wells

yet to be brought onstream (new production wells and those pending electrical

submersible pump ("ESP") replacement)

?        Group working interest production is expected to increase to over

13,000 bopd around year end when all wells in the current campaigns are onstream

?        Average full-year working interest production is expected to be

slightly below the low end guidance of 11,000 bopd primarily as a result of:

· Deferred production owing to changes in the Gabon drilling programme

resulting in two new discoveries and prioritisation of their fast-track

development

· The resulting deferral of ESP replacements in Gabon

· The alternative rig and revised schedule in Equatorial Guinea comprising two

infill wells

· Delays in Tunisia regulatory approval processes

?        The combined effect of these changes is estimated to have resulted in a

delay to production growth of two to three months compared to original estimates

Financial update

?        Reported revenue in the first half was USD 142.7 million (H1 2023: USD

66.3 million) of which USD 135.2 million was generated from the sale of

1,681,894 barrels at an average realised price of USD 80.40 per barrel after

customary fees and discounts

?        EBITDA for the first half was USD 77.8 million (H1 2023: USD 38.9

million)

?        Profit before tax for the first half was USD 42.3 million (H1 2023: USD

14.5 million) and net profit USD 24.2 million (H1 2023: USD 0.9 million)

?        Capital expenditures in the first half were USD 47.8 million (H2 2023:

USD 32.9 million) and primarily relate to ongoing drilling campaign in Gabon and

recommencement of drilling offshore Equatorial Guinea

?        Full-year 2024 capital expenditure guidance is USD 75 million although

there is some upward pressure primarily due to higher expected drilling costs in

the expanded and rescheduled Gabon and Equatorial Guinea campaigns, partially

offset by lower than expected spend in Tunisia

?        Management expects total liftings in 2024 to be approximately 3.5

million barrels

?        Positive crude oil inventory was 179,550 barrels at 30 June 2024

?        Cash at bank at 30 June was USD43.2million

?        In April, the operator of the Dussafu Marin Permit offshore Gabon

executed a Sale and Lease Back ("SLB") agreement with Minsheng Financial Leasing

Co ("MSFL") for the BW MaBoMo production facility. Panoro received sales

proceeds of USD 25.9 million, of which USD 10.2 million was used to reduce

amounts owed under the Company's Reserve Based Loan ("RBL") facility

?        Amounts owing under the RBL facility at 30 June 2024 was USD70.5million

Cash Distribution and Share Buyback Programme

· Q2 cash distribution declared of NOK 50 million to be paid on or around 13

September 2024

· Up to and including 19 August 2024 the Company had purchased 811,500 of its

own shares at a VWAP of NOK 34.0690 per share, corresponding to a total

transaction value of NOK 27.6 million and 0.69 percent of the Company's share

capital

· The share buyback programme has been extended to year end 2024 (up to NOK

100 million limit unchanged)

Production Operations Update

Equatorial Guinea - Block G (Panoro 14.25 per cent)

· Drilling has recommenced at the Ceiba Field and Okume Complex which will add

new production volume when two new infill wells will be onstream

· The first infill well has successfully been drilled and completed with

promising initial results, with both the primary and secondary reservoirs

meeting expectations. Additional information will be provided once the well

begins production, anticipated in early September

· The second infill well is expected to be completed and onstream in October

Gabon - Dussafu Marin Permit (Panoro 17.5 per cent)

· Development drilling:

· The DRM-3H production well on the Ruche field was completed in April. The

well encountered good quality oil saturated reservoir in the Gamba formation and

will be put onstream in the current campaign with a new conventional Electrical

Submersible Pump ("ESP")

· The DHBSM-2H production well, targeting the recently discovered north-east

extension of the Hibiscus South field, was completed in July and encountered

good quality oil saturated reservoir in the Gamba formation. The well was put

onstream at rates in excess of 6,500 bopd in line with expectations and is the

first to be completed with the new conventional ESP system

· The Dussafu partners have extended the contract for the Borr Norve jack-up

drilling rig until February 2025

· Drilling of the DHIBM-7H production well, targeting the recently

discovered Hibiscus Northern Flank, has commenced

· The current campaign will therefore result in a total of eight new

production wells across the Hibiscus / Hibiscus South / Ruche fields (in

addition to the six pre-existing production wells at the Tortue field)

· Following completion of the DHIBM-7H well the rig will undertake well

workovers / ESP replacements (delivery of all conventional ESP systems and

spares has been secured)

· Upon conclusion of the current campaign all wells will have conventional

ESP systems installed

· The Bourdon prospect test well (DBM-1) will be the last operation in the

current campaign in early 2025

· Gross production at Dussafu is expected to reach 40,000 bopd once all wells

in the current campaign are completed

Tunisia - TPS Assets (Panoro 49.0 per cent)

· Activity has been impacted by delays to regulatory processes but Panoro

continues to see opportunities to ultimately restore production to historic

levels

· Ongoing operations include  routine workovers to replace ESP pumps, and well

stimulations

· Detailed planning for development drilling campaign on the Rhemoura and

Guebiba fields

Exploration and Appraisal Activities

Equatorial Guinea - Block S (Panoro 12.0 per cent) and Block EG-01 (Panoro 56.0

per cent, op.)

· The Noble Venturer drill ship has also been contracted to drill the Kosmos

Energy operated Akeng Deep infrastructure led exploration ("ILX") well in Block

S once the two Block G infill wells have been drilled and completed. The Akeng

Deep ILX well is intended to test a play in the Albian, targeting an estimated

gross mean resource of ~180 million barrels of oil in close proximity to

existing infrastructure at Block G. Other partners in Block S are GEPetrol and

Trident Energy

· A successful outcome at Akeng Deep can have a positive read across to the

adjacent Panoro operated Block EG-01 where Panoro is conducting subsurface

studies based on existing 3D seismic data

· The seismic data re-processing project for EG-01 has commenced incorporating

leading edge pre-stack depth migration (PSDM) techniques

Equatorial Guinea - Heads of Terms Agreed for Block EG-23

· On 4 April Panoro announced that it has reached an agreement with the

Government of Equatorial Guinea on the key terms and conditions for the award of

offshore Block EG-23

· The Heads of Terms agreement signed by Panoro, GEPetrol (the national oil

company), and the Ministry of Mines and Hydrocarbons paved the way for a period

of exclusive negotiations to finalise a Production Sharing Contract ("PSC") for

Block EG-23 and development of a work programme and budget, which is in

progress.Panoro envisages its participating interest in Block EG-23 upon award

of a PSC will be up to 80 percent initially

· Block EG-23 is located offshore Equatorial Guinea north of Bioko Island and

adjacent to the producing Alba gas and condensate field. 19 wells have been

drilled on Block EG-23 to date resulting in seven hydrocarbon discoveries (four

oil, two gas and one gas/condensate), some of which have been tested

Bourdon - Gabon, Dussafu Marin (Panoro: 17.5 per cent)

· The Bourdon Prospect is located in a water depth of 115 metres approximately

7 kilometres to the southeast of the BW MaBoMo production facility and 14

kilometres west of the BW Adolo FPSO. The Prospect has an estimated mid-case

potential of 83 million barrels in place and 29 million barrels recoverable in

the Gamba and Dentale formations. The partner's intention is to drill the well

during the current Gabon drilling campaign

Webinar Presentation

The company will hold a live webinar presentation at 09:00 a.m. CEST during

which management will discuss the results and operations, followed by a Q&A

session.

The webinar presentation can be accessed through registering at the link below

and the online event will be equipped with features to ask live questions.

Joining instructions for participating online or through using local dial-in

numbers will be available upon completion of registration. The webinar details

are as follows:

+-------------+---------------------------------------------------------------+

|Date and |22 August 2024, 09:00 am CEST |

|Time: | |

+-------------+---------------------------------------------------------------+

|Registration:|https://attendee.gotowebinar.com/register/8863764005615337048 |

| | |

| |After registering, participants will receive a confirmation |

| |email containing information about joining the webinar. |

| | |

| |Participants can use their telephone or computer microphone and|

| |speakers (VoIP). |

+-------------+---------------------------------------------------------------+

Please join the event at least ten minutes before the scheduled start time.

A replay of the webinar will be available shortly after the event is finished

and will remain on our website (www.panoroenergy.com) for approximately 7 days.

Enquiries

Qazi Qadeer, Chief Financial Officer

Tel: +44203 405 1060

Email:[email protected]

About Panoro Energy

Panoro Energy ASA is an independent exploration and production company based in

London and listed on the main board of the Oslo Stock Exchange with the ticker

PEN. Panoro holds production, exploration and development assets in Africa,

namely interests in Block-G, Block S and Block EG-01 offshore Equatorial Guinea,

the Dussafu Marin License offshore southern Gabon, the TPS operated assets, Sfax

Offshore Exploration Permit and Ras El Besh Concession, offshore Tunisia, and

onshore Technical Co-operation Permit 218 in South Africa.

Visit us at www.panoroenergy.com.

Follow us on LinkedIn (https://www.linkedin.com/company/panoro-energy)

Talk to a Data Expert

Have a question? We'll get back to you promptly.