Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ORE RESOURCES LIMITED Capital/Financing Update 2025

Jun 24, 2025

65504_rns_2025-06-24_de20218e-6226-406a-bdaa-7df2f43cfd20.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 80] intentionally omitted <==

25 June 2025

ASX ANNOUNCEMENT

SOIL SAMPLING RESULTS IDENTIFY 1.75KM GOLD ANOMALY AT MIRIAM

Highlights

  • Fifteen (15) anomalous gold zones identified from detailed review of recent and historical surface geochemistry at Miriam.

  • Emergence of the 1.75km geochemical and geophysical Canyon target

  • Numerous soil samples returned results above 0.1 g/t Au, with a peak value of 3.03 g/t Au highlighting the potential for shallow, high-grade gold discoveries at Miriam.

  • Many of the anomalous zones are coincident with previously identified structural targets produced from magnetic geophysics[1] .

  • Results serve to further upgrade Forrest and numerous regional targets including the Jungle structural trend.

  • Historical drilling of the Forrest prospect intercepted[2] :

  • 12m @ 2.09 g/t Au from 60m (MRC97-15)

  • 10m @ 2.51 g/t Au from 30m (FGA002)

  • 10m @ 2.09 g/t Au from 30m and 4m @ 4.86 g/t Au from 73m (MRC97-5)

  • 5m @ 7.35 g/t Au from 70m (MRC97-25)

  • Initial Reverse Circulation (RC) drill program at Miriam, focused on the Forrest and Canyon targets, remains on track to commence in July 2025.

  • FBM remains well-funded to undertake all planned exploration activities through 2025 and beyond with a strong cash balance of A$7.4 million and zero debt (as at 31 March 2025).

Future Battery Minerals Ltd ( ASX: FBM ) ( FBM or the Company ) is pleased to advise that it has completed its detailed review of surface geochemistry for its 100%-owned Miriam Project, located in the W.A. Goldfields region of Western Australia.

FBM Managing Director and CEO, Nick Rathjen, commented:

“Our boots on the ground and activity focused exploration strategy have returned exceptional results, strongly evidenced by the growing exploration potential across our broader Coolgardie portfolio. The soil sample results have identified 15 new anomalous gold zones with up to 3.03 g/t Au highlighting the opportunity for further shallow, high-grade gold discoveries. Importantly, the emergence of the Canyon target with a 1.75km striking anomaly is untested and increases the scale potential for the project. Ground preparations are underway for the upcoming initial drill program at Miriam that remains on track to commence in July. In light of the strong geophysical and geochemical results and scale of the Canyon target, it’s now advanced to drill ready status and will be tested alongside Forrest in this program.”

1 Refer to FBM ASX announcement dated 17 June 2025

2 Refer to FBM ASX announcement dated 27 May 2025

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 12] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

1

==> picture [130 x 32] intentionally omitted <==

Soil sampling results identify significant gold anomalies

The Miriam Project tenure covers a region of the Coolgardie Greenstone Belt overlying series of formations and structural trends that host multiple nearby gold deposits, including Horizon Minerals’ Burbanks (466 koz @ 2.4 g/t Au), Beacon Minerals’ McPhersons Reward (132 koz @ 1.2 g/t Au) and Focus Minerals’ Three Mile Hill Mining Centre (2.7 Moz @ 1.8 g/t Au).[3]

==> picture [442 x 518] intentionally omitted <==

Figure 1: Regional map of FBM’s Coolgardie Projects and other nearby operation[4]

3 MacPhersons refer to Beacon Minerals ASX Announcement dated 6th November 2024, Three Mile Hill refer to Focus Minerals ASX Announcement dated 1[st] December 2023. Refer to Horizon Minerals Reserves & Resources

4 Bullabulling refer to Minerals 260 ASX Announcement dated 14th January 2025

==> picture [10 x 8] intentionally omitted <==

ASX: FBM

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

2

Follow Us

==> picture [130 x 32] intentionally omitted <==

Following its 100% acquisition of all mineral rights for the Miriam Project in May 2025, FBM commenced a detailed assessment of gold prospectivity at Miriam. This included a comprehensive review of available historical geological and drilling data, which resulted in the discovery of historical gold mineralised intercepts at Forrest and the identification of numerous other gold occurrences at Forrest South, Jungle and Goroke (refer ASX releases dated 19 May 2025 and 27 May 2025). More recently, FBM completed a review of magnetic geophysics, resulting in the identification of 13 prospective targets which include both broad and discrete structures of interest (refer ASX release dated 17 June 2025).

FBM’s review of surface geochemistry is now also complete. These works were conducted with the aim of identifying areas of elevated or anomalous gold and to consider their importance for the targeting of shallow regolith and bedrock hosted gold.

The Company collated all surface geochemical sampling conducted on the tenement, with a focus on soil sampling. The evaluated results also included approximately 300 samples recently collected by FBM and submitted to LabWest for analysis. This process involved the use of Ultrafine+™, an Ultra Fine Fraction process which tests clay particle size fraction soils for gold and gold pathfinder elements.

The subsequent desktop data review incorporated all soil sampling results, combined with historical datasets previously collated by Corazon Mining (ASX: CZN) and verified by FBM.

This geochemical review has been a critical piece of FBM’s ongoing evaluation of gold prospectivity at Miriam. Results from this review highlight that gold values of <10ppb Au were a reliable base/background level of gold in the in the surface soils and sediments. Values of >20ppb Au were thus deemed to be at least double the background level and considered anomalous.

Given these ranges, fifteen (15) anomalous zones indicating potential subsurface gold mineralisation have been identified and warrant follow-up exploration. Several samples returned relatively high grades for soil sampling, ranging between >0.1 g/t Au and a peak of 3.03 g/t Au. This evidences the fertility of Miriam and the surrounding area and highlights the strong underlying potential for further shallow oxide or bedrock gold discoveries.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

3

Follow Us

==> picture [130 x 32] intentionally omitted <==

==> picture [444 x 527] intentionally omitted <==

Figure 2: Miriam soil sampling results

Importantly, many of these gold anomalies are coincident with the previously reported structural targets derived from the geophysical litho-structural interpretation conducted by FBM and its geophysical consultants, Southern Geoscience Consulting. FBM considers the targets where strong coincidence across multiple data sets have been observed to be of top priority for upcoming drill testing.

A key observation is that FBM can draw insights from the known mineralisation at Forrest – where bedrock intercepts from drilling share a strong correlation to elevated gold-in-soils and distinct magnetic features – and identify commonalities to other targets. In particular, at the newly defined Canyon target, a large approximate 1.75 km long gold anomaly in soils is overlapping with a 1.75 km structural target with numerous features similar to Forrest. This structural and geochemical trend has become a high priority target to be drill tested in the upcoming programme.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

4

==> picture [130 x 32] intentionally omitted <==

==> picture [437 x 518] intentionally omitted <==

Figure 3: Miriam key geophysical / structural targets

Upcoming work programmes

FBM remains on track to commence an initial RC drill programme at Miriam in July 2025. The programme is set to focus on initial targets within the Forrest prospect, which boasts historical gold intercepts, and the new Canyon target. All key permits are in place, including an approved Conservation Management Plan and granted drilling Program of Work.

A second heritage survey is also scheduled to commence in July 2025, covering prospective areas which FBM intends to test in subsequent drilling scheduled for late Q3 2025. FBM field personnel are also currently conducting further ground truthing of the recently identified geochemical and structural anomalies in preparation for the drill testing of priority targets in the upcoming programmes.

==> picture [10 x 8] intentionally omitted <==

ASX: FBM

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

5

Follow Us

==> picture [130 x 32] intentionally omitted <==

This announcement has been authorised for release by the Board of Directors of the Company.

-END-

For further information visit www.futurebatteryminerals.comor contact: For further information visit www.futurebatteryminerals.comor contact:
Nicholas Rathjen Robin Cox
CEO & Managing Director Technical Director
E: [email protected] E: [email protected]

Competent Persons Statement

The information in this announcement that relates to exploration results is based on and fairly represents information compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

Forward-Looking Statements

This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Future Battery Minerals Limited’s planned exploration programme and other statements that are not historical facts. When used in this document, the words such as “could,” “plan,” “estimate,” “expect,” “intend,” “may”, “potential”, “should,” and similar expressions are forward-looking statements. Although Future Battery Minerals Limited believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties, and no assurance can be given that actual results will be consistent with these forward-looking statements.

Previously Reported Results

The information in this announcement that relates to Exploration Results is extracted from the ASX announcements (Original Announcements), as referenced, which are available at www.futurebatteryminerals.com.au. FBM confirms that it is not aware of any new information or data that materially affects the information included in the Original Announcements and, that all material assumptions and technical parameters underpinning the estimates in the Original Announcements continue to apply and have not materially changed. FBM confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original announcement.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

6

==> picture [130 x 32] intentionally omitted <==

About Future Battery Minerals (ASX: FBM)

THE BUSINESS: Gold and lithium exploration and development

Future Battery Minerals (ASX: FBM) is an exploration and development company focused on rapidly advancing its world-class gold and lithium projects in the Eastern Goldfields of Western Australia.

THE LOCATION: Infrastructure-rich project setting

The Eastern W.A. Goldfields is an outstanding location in which to explore for, build, and operate gold and lithium mines. It is a longestablished mining province with all the accompanying benefits, including all-year land access, skilled labour, mining services and infrastructure.

We are positioned just 15km south of the mining hub of Coolgardie (via sealed road), approximately 370km to the port of Esperance and approximately 550km to Perth via road and rail. We are proximal to multiple gold and lithium mining and processing operations and development projects of substantial scale.

This available range of potential commercialisation options, including standalone development, positions us well to monetise current and future success.

THE TEAM: Proven value generators

==> picture [190 x 220] intentionally omitted <==

Our carefully assembled team has an extensive track record of exploration success, project stewardship, development expertise and operating excellence that has repeatedly resulted in the delivery of substantial shareholder value: Nick Rathjen (MD), Robin Cox (Technical Director), Nev Power (Chairman), Rob Waugh (NED).

THE CAPACITY: Balance sheet strength and runway

We are a business and team that is resolutely focussed on the stewardship of our shareholders’ capital and the astute application of this capital for maximal return. With a cash balance of A$7.4 million and zero debt (as at 31 March 2025), we are well-funded to undertake our planned exploration, evaluation work programs and business development activities.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

7

Follow Us

==> picture [130 x 32] intentionally omitted <==

JORC Code, 2012 Edition, Table 1 Section 1: Sampling Techniques and Data

CRITERIA EXPLANATION COMMENTARY
Sampling
techniques

Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.

Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1m
samples from which 3kg was pulverised
to produce a 30g charge for fire assay’).
In other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.

Soil Sampling collects a 300g sample of
fine soil from below 300mm subsurface.

Reverse Circulation drilling collects a 1m
bulk sample. Sampling is then
composited into 4m composites for fire
assay purpose. Anomalous intercepts are
then sub assayed to their 1m sample.

Air Core drilling collects a 1m bulk
sample. Sampling is then composited into
4m composites for fire assay purpose.
Anomalous intercepts are then sub
assayed to their 1m sample.

Rotary Air Blast Drilling collects a 1m bulk
sample. Sampling is then composited into
4m composites for fire assay purpose.
Drilling
techniques

Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).

Historic results reported include drilling by
Reverse Circulation (RC), Air Core (AC)
and Rotary Air Blast (RAB).

The drill type has been specified in the
appropriate collar table.
Drill sample
recovery

Method of recording and assessing core
and chip sample recoveries and results
assessed.

Measures taken to maximise sample
recovery and ensure representative
nature of the samples.

Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarsematerial.

Drill Results reported are historic and
FBM has relied upon public domain data
reported by previous project holders.

Recovery was measured/commented in
sample logs.

No sample bias relationship has been
identified.
Logging
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.

Drill holes have been lithologically logged
by geologists in the field by respective
historic explorers

Lithological data has been compiled.
Logging is a qualitative nature.

At Forrest Gold prospect primary lithology
has been recorded. Not all drill logs

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

8

==> picture [130 x 32] intentionally omitted <==


The total length and percentage of the
relevant intersections logged.
include data such as oxidation, texture
and structure.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and
whether quarter, half or all core taken.

If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.

For all sample types, the nature, quality
and appropriateness of the sample
preparation technique

Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.

Whether sample sizes are appropriate
to the grain size of the material being
sampled.

No sub sampling of soil samples.

Soil was sieved using a 2mm nylon mesh

Soil sampling is considered a sufficient
first pass geochemical assessment of the
ground where appropriate regolith exists.

Geochemical anomalies are relative to
the surrounding geochemistry

Sampling grids are designed to cover
large area’s in order to allow identification
of anomalous zones

200g samples are appropriate

Sampling of drill chips included
compositing by spear sample on 4m
composites.

Single metre samples were riffle split to
obtain an approximate 3kg sample.
Quality of assay
data and
laboratory tests

The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.

For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.

Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.

FBM soil samples were prepared by
LabWest using UltraFine+TM. This
collected a 2um ultrafine soil and was
assayed via ICPMS.

Corazon soil samples were all assayed
for multi element geochemistry utilising a
4 Acid digest with ICPMS finish (ME-
MS61)
The Historic data represented in this
announcement was culminated from the
exploration work conducted the following
parties.

Mt Kersey Mining conducted Reverse
Circulation drilling in 1996 consisting of 9
holes. Samples were assayed via Fire
Assay for gold and aqua regia digest for
other elements at AAL Kalgoorlie

Crest Mining conducted Reverse
Circulation drilling in 1996 and 1997
consisting of 38 holes. Samples were
assayed via PM203 at ALS laboratories

Barminco conducted Reverse Circulation
drilling in 1997 consisting of 6 holes.
Samples were assayed via Fire Assay
FA1 at Amdel laboratories.

Spinifex Resources conducted 3
diamond core holes targeting the Miriam
Nickel prospect in 2000. Samples
containing gold were assayed via fire
assay at Analabs

Berkeley Resources conducted 3
diamond core and 1 RC hole targeting
the Miriam Nickel prospect in 2004.
Samples containing gold were assayed
via fire assay at Analabs.

Sipa Resources conducted Air Core (73
holes), RAB (63 holes) and RC (8 holes)
drilling, 127 soil samples between 2005
and 2007. Samples were assayed by
Ultratrace laboratories utilising methods,
ICP101, ICP102, ICP302 and fire assay
FA002andFA003

==> picture [10 x 8] intentionally omitted <==

ASX: FBM

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

9

Follow Us

==> picture [130 x 32] intentionally omitted <==

Verification of
sampling and
assaying

The verification of significant
intersections by either independent or
alternative company personnel.

The use of twinned holes.

Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.

Discuss any adjustment to assay data.

No independent verification has been
conducted

Field data is imported to the FBM
geochemistry database.

Duplicate samples are inserted at 1:25

No adjustments are made to assay data
Location of data
points

Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic
control.

Soil samples were located utilising a
hand held GPS with a accuracy +/-5m
and via local gridding

Drill holes were located utilising a hand
held GPS with a accuracy +/-5m and via
local gridding

All drill hole collar and surface sample
information has been transformed to UTM
MGA 94 Zone 51

Holes were field checked by FBM utilising
a hand held gps to validate the grid
transformation of the historic data. Field
checks found the holes to be within the
error range of the hand held gps.

Geospatial grid information is
represented in UTM MGA 94 Zone 51
Data spacing
and distribution

Data spacing for reporting of
Exploration Results.

Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.

Whether sample compositing has been
applied.

Soil sampling was conducted on 40m
sample spacing and 100 and 200m line
spacing.

At Forrest, holes were drilled on a 40m
spacing, 60m line spacing.

Regional targets were drilled on greater
than 80m hole spacing and greater than
80m line spacing

This data spacing is appropriate for
identifying continuous and non-
continuous geochemical anomalies
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.

If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.

Soil sampling has been conducted on E-
W grid lines. Geological units in the
region have a dominantly N-S to NE-SW
strike. As such the E-W drilling provides
relative oblique interceptions

Drilling has mostly been conducted on E-
W grid lines. Geological units in the
region have a dominantly N-S to NE-SW
strike. As such the E-W drilling provides
relative oblique interceptions.
Sample security
The measures taken to ensure sample
security.

Soil sampling conducted by FBM was
collected by FBM geologists, secured at
locked premise and transported directly
to a 3rdpart laboratory.

Results reported include historic sampling
and FBM has relied upon public domain
data reported by previous project holders.

FBM has not located historic data relating
to sample security
Audits or
reviews

The results of any audits or reviews of
sampling techniques and data.
No independent audit or review has been
undertaken.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

10

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

Section 2: Reporting of Exploration Results

CRITERIA EXPLANATION COMMENTARY
Mineral tenement
and land tenure
status

Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.

The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Miriam Project consists of 5
prospecting leases.
•Granted
leases
are
P15/6136,
P15/6137, P156138 and P15/6139.
P15/6135 remains in application
•Leases P15/6136-6139 are held by
Coolgardie Nickel Pty Ltd, now an
100% subsidiary of Future Battery
Minerals Ltd. P15/6135 is held by
Limelight Industries Pty Ltd until
time of grant
•The tenements are located in the
Kangaroo Hills Timber Reserve, an
approved
Conservation
Management
Plan
provides
conditional access to the tenure.
•The tenements are in good standing
and no known impediments exist.
Exploration done
by other parties
Acknowledgment and appraisal of
exploration by other parties.
The Historic data represented in this
announcement was culminated from the
exploration work conducted the following
parties.

Mt Kersey Mining conducted Reverse
Circulation drilling in 1996 consisting
of 9 holes. Samples were assayed via
Fire Assay for gold and aqua regia
digest for other elements at AAL
Kalgoorlie

Crest Mining conducted Reverse
Circulation drilling in 1996 and 1997
consisting of 38 holes. Samples were
assayed via PM203 at ALS
laboratories

Barminco conducted Reverse
Circulation drilling in 1997 consisting
of 6 holes. Samples were assayed via
Fire Assay FA1 at Amdel
laboratories.

Spinifex Resources conducted 3
diamond core holes targeting the
Miriam Nickel prospect in 2000.
Samples containing gold were
assayed via fire assay at Analabs

Berkeley Resources conducted 3
diamond core and 1 RC hole
targeting the Miriam Nickel prospect
in 2004. Samples containing gold
were assayed via fire assay at
Analabs.

Sipa Resources conducted Air Core
(73 holes), RAB (63 holes) and RC (8
holes) drilling and collected 127 soil
samples between 2005 and 2007.
Samples were assayed by Ultratrace
laboratories utilising methods,
ICP101, ICP102, ICP302 and fire
assay FA002 and FA003
Geology Deposit type, geological setting and style of
mineralisation.

The tenements are prospective for
lode and structurallyhosted gold

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

11

Follow Us

==> picture [130 x 32] intentionally omitted <==

mineralisation hosted within Archean
aged greenstone lithologies. The
project is also prospective for Lithium,
Caesium, Tantalum (LCT) enriched
pegmatites which intrudes older
Archean aged greenstone
lithologies.
Drill hole
Information

A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following information
for all Material drill holes:

easting and northing of the drill hole
collar

elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar

dip and azimuth of the hole

down hole length and interception
depth

hole length.

If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain whythisisthe case.

Drill Holes reported were announced
on the 27 May 2025.

Maximum Au assay has been
represented in the maps.
Data aggregation
methods

In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts
incorporate short lengths of high-
grade results and longer lengths of
low-grade results, the procedure used
for such aggregation should be stated
and some typical examples of such
aggregations should be shown in
detail.

The assumptions used for any
reporting of metal equivalent values
should be clearly stated.

Soil Anomalies have been grouped
into following bins, <5ppb, 5-10ppb,
10-20ppb, 20-50ppb, 50-100ppb,
100-200ppb and >200ppb

Maximum down hole gold assays
have been included in maps. Cutoff
ranges are shown in legends

Significant intercepts are considered
as intercepts >0.1g/t Au and include
up to 1m internal dilution. This is
considered a significant intercept for
first pass drilling technique such as
RAB and AC.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly
important in the reporting of Exploration
Results.

If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.

If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (eg
‘down hole length, true width not
known’).

All results are reported as down hole
length only. Mineralisation is
interpreted as flat lying lodes however
geological understanding is still
insufficient and further drilling planned
by FBM aims to address the
uncertainty.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts should
be included for any significant discovery
being reported These should include, but
not be limited to a plan view of drill hole
collar locations and appropriate sectional
views.
Relevant diagrams have been included
within the announcement.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

12

Follow Us

==> picture [130 x 32] intentionally omitted <==

Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.

Assay data has been represented for
all holes drilled in the project area.
Other
substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.

Airborne magnetic survey flown in 1996
by UTS Geophysics for Gold Mines of
Coolgardie on 30m spaced east-west
lines at ground clearance of 22m.
Survey used magnetic base station for
magnetic diurnal removal, GPS for
location control and tie lines for
magnetic levelling.

Geophysical data from Bouchers
airborne magnetic and radiometric
survey flown in 2000 by TAG for
Spinifex Nickel Pty Ltd on 40m spaced
east-west lines at a ground clearance
of 35m. Survey used magnetic base
station for magnetic diurnal removal,
GPS for location control and tie lines for
magnetic levelling, calibrated
spectrometer and standard windows for
radioelement ground concentrations.

Lithostructural interpretation of
geophysical data by Southern
Geoscience Consultants is qualitative
in nature and based primarily on
magnetic and radiometric survey data
with input from various other supporting
datasets including geological mapping
and soil sampling. The interpretation
has been performed at a scale of 1:10
000
Geophysical targets are qualitative in
nature and are generated based on the
following criteria: interpretation of
structural disruption from magnetic
survey data, muted local magnetic field
strength from magnetic survey data,
mapped pegmatite outcrop from
geological mapping, soil anomalism from
soil sampling, potassium anomalism from
radiometric survey data
Further work
The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-
out drilling).

Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.

FBM plans to conduct further target
generative exploration including
geophysical review and surface
sampling.

FBM will schedule drill testing of the
Miriam project which is scheduled for
July 2025.

Refer to figures/diagrams in the main
body of text.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

13

Follow Us

==> picture [130 x 32] intentionally omitted <==

Appendix 1 – Soil Assay Results

Table 1 – Soil Assay Results (UTM MGA 94 Zone 51)

SampleID **Sample Type ** Northing Easting RL(m) Au(ppb) Sampling Company
25MM001 SOIL 6562700 318720 400 12 FBM
25MM002 SOIL 6562700 318760 400 5 FBM
25MM003 SOIL 6562700 318800 400 9 FBM
25MM004 SOIL 6562700 318840 400 8 FBM
25MM005 SOIL 6562700 318880 400 42 FBM
25MM006 SOIL 6562700 318920 400 25 FBM
25MM007 SOIL 6562700 318960 400 13 FBM
25MM008 SOIL 6562700 319000 400 9 FBM
25MM009 SOIL 6562700 319040 400 14 FBM
25MM010 SOIL 6562700 319080 400 9 FBM
25MM011 SOIL 6562700 319120 400 10 FBM
25MM012 SOIL 6562700 319160 400 9 FBM
25MM013 SOIL 6562700 319200 400 8 FBM
25MM014 SOIL 6562700 319240 400 10 FBM
25MM015 SOIL 6562667 319276 400 11 FBM
25MM017 SOIL 6562700 319360 400 10 FBM
25MM018 SOIL 6562700 319400 400 10 FBM
25MM019 SOIL 6562700 319440 400 7 FBM
25MM020 SOIL 6562700 319480 400 12 FBM
25MM021 SOIL 6562700 319520 400 8 FBM
25MM022 SOIL 6562700 319560 400 10 FBM
25MM023 SOIL 6562700 319600 400 9 FBM
25MM024 SOIL 6562700 319640 400 14 FBM
25MM025 SOIL 6562700 319680 400 32 FBM
25MM026 SOIL 6562700 319720 400 73 FBM
25MM027 SOIL 6562700 319760 400 117 FBM
25MM028 SOIL 6562700 319800 400 46 FBM
25MM029 SOIL 6562700 319840 400 51 FBM
25MM030 SOIL 6562700 319880 400 57 FBM
25MM031 SOIL 6562700 319920 400 191 FBM
25MM032 SOIL 6562700 319960 400 42 FBM
25MM033 SOIL 6562700 320000 400 53 FBM
25MM034 SOIL 6562700 320240 400 13 FBM
25MM035 SOIL 6562700 320280 400 25 FBM
25MM036 SOIL 6562900 318760 400 6 FBM
25MM037 SOIL 6562900 318800 400 13 FBM
25MM038 SOIL 6562900 318840 400 9 FBM

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

14

==> picture [130 x 32] intentionally omitted <==

25MM039 SOIL 6562900 318880 400 6 FBM
25MM040 SOIL 6562900 318920 400 8 FBM
25MM041 SOIL 6562900 318960 400 6 FBM
25MM042 SOIL 6562900 319000 400 7 FBM
25MM043 SOIL 6562900 319040 400 16 FBM
25MM044 SOIL 6562900 319080 400 11 FBM
25MM045 SOIL 6562900 319120 400 16 FBM
25MM046 SOIL 6562900 319160 400 12 FBM
25MM047 SOIL 6562900 319200 400 5 FBM
25MM048 SOIL 6562900 319240 400 6 FBM
25MM049 SOIL 6562900 319280 400 7 FBM
25MM050 SOIL 6562900 319320 400 15 FBM
25MM051 SOIL 6562900 319360 400 9 FBM
25MM052 SOIL 6562900 319400 400 10 FBM
25MM053 SOIL 6562900 319440 400 10 FBM
25MM054 SOIL 6562900 319480 400 9 FBM
25MM055 SOIL 6562900 319520 400 9 FBM
25MM056 SOIL 6562900 319560 400 17 FBM
25MM057 SOIL 6562900 319600 400 49 FBM
25MM058 SOIL 6562900 319640 400 86 FBM
25MM059 SOIL 6562900 319680 400 174 FBM
25MM060 SOIL 6562900 319720 400 356 FBM
25MM061 SOIL 6562900 319760 400 344 FBM
25MM062 SOIL 6562900 319800 400 108 FBM
25MM063 SOIL 6562900 319840 400 125 FBM
25MM064 SOIL 6562900 319880 400 307 FBM
25MM065 SOIL 6562900 319920 400 78 FBM
25MM066 SOIL 6562900 320240 400 38 FBM
25MM067 SOIL 6562900 320280 400 43 FBM
25MM068 SOIL 6562900 320320 400 37 FBM
25MM069 SOIL 6563100 318800 400 29 FBM
25MM070 SOIL 6563100 318840 400 23 FBM
25MM071 SOIL 6563100 318880 400 11 FBM
25MM072 SOIL 6563100 318920 400 15 FBM
25MM073 SOIL 6563100 318960 400 14 FBM
25MM074 SOIL 6563100 319000 400 14 FBM
25MM075 SOIL 6563100 319040 400 7 FBM
25MM076 SOIL 6563100 319080 400 9 FBM
25MM077 SOIL 6563100 319120 400 7 FBM
25MM078 SOIL 6563100 319160 400 6 FBM
25MM079 SOIL 6563100 319200 400 6 FBM
25MM080 SOIL 6563100 319240 400 9 FBM
25MM081 SOIL 6563100 319280 400 13 FBM
25MM082 SOIL 6563100 319320 400 21 FBM
25MM083 SOIL 6563100 319360 400 14 FBM

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

15

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

25MM084 SOIL 6563100 319400 400 13 FBM
25MM085 SOIL 6563100 319440 400 6 FBM
25MM086 SOIL 6563100 319480 400 13 FBM
25MM087 SOIL 6563100 319520 400 26 FBM
25MM088 SOIL 6563100 319560 400 22 FBM
25MM089 SOIL 6563100 319600 400 24 FBM
25MM090 SOIL 6563100 319640 400 34 FBM
25MM091 SOIL 6563100 319680 400 45 FBM
25MM092 SOIL 6563100 319720 400 18 FBM
25MM093 SOIL 6563100 319760 400 47 FBM
25MM094 SOIL 6563100 319800 400 58 FBM
25MM095 SOIL 6563100 319840 400 68 FBM
25MM096 SOIL 6563100 319880 400 60 FBM
25MM097 SOIL 6563100 319920 400 37 FBM
25MM098 SOIL 6563100 319960 400 67 FBM
25MM099 SOIL 6563100 320000 400 71 FBM
25MM100 SOIL 6563100 320040 400 61 FBM
25MM101 SOIL 6563100 320080 400 309 FBM
25MM102 SOIL 6563100 320120 400 354 FBM
25MM103 SOIL 6563100 320160 400 65 FBM
25MM104 SOIL 6563100 320200 400 246 FBM
25MM105 SOIL 6563100 320320 400 43 FBM
25MM106 SOIL 6563100 320360 400 17 FBM
25MM107 SOIL 6563100 320400 400 22 FBM
25MM108 SOIL 6563100 320440 400 26 FBM
25MM109 SOIL 6563100 320480 400 17 FBM
25MM110 SOIL 6563100 320520 400 13 FBM
25MM111 SOIL 6563100 320560 400 13 FBM
25MM112 SOIL 6563100 320600 400 13 FBM
25MM113 SOIL 6563300 318840 400 10 FBM
25MM114 SOIL 6563300 318880 400 6 FBM
25MM115 SOIL 6563300 318920 400 6 FBM
25MM116 SOIL 6563300 318960 400 9 FBM
25MM117 SOIL 6563300 319000 400 FBM
25MM118 SOIL 6563300 319040 400 4 FBM
25MM119 SOIL 6563300 319080 400 4 FBM
25MM120 SOIL 6563300 319120 400 18 FBM
25MM121 SOIL 6563300 319160 400 3 FBM
25MM122 SOIL 6563300 319200 400 26 FBM
25MM123 SOIL 6563300 319240 400 23 FBM
25MM124 SOIL 6563300 319280 400 5 FBM
25MM125 SOIL 6563300 319320 400 7 FBM
25MM126 SOIL 6563300 319360 400 6 FBM
25MM127 SOIL 6563500 318880 400 5 FBM
25MM128 SOIL 6563500 318920 400 10 FBM

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

16

Follow Us

==> picture [130 x 32] intentionally omitted <==

25MM129 SOIL 6563500 318960 400 8 FBM
25MM130 SOIL 6563500 319000 400 4 FBM
25MM131 SOIL 6563500 319040 400 4 FBM
25MM132 SOIL 6563500 319080 400 3 FBM
25MM133 SOIL 6563500 319120 400 5 FBM
25MM134 SOIL 6563500 319160 400 6 FBM
25MM135 SOIL 6563500 319200 400 4 FBM
25MM136 SOIL 6563500 319240 400 17 FBM
25MM137 SOIL 6563500 319280 400 55 FBM
25MM138 SOIL 6563500 319320 400 67 FBM
25MM139 SOIL 6563500 319360 400 20 FBM
25MM140 SOIL 6563700 318920 400 7 FBM
25MM141 SOIL 6563700 318960 400 3 FBM
25MM142 SOIL 6563700 319000 400 4 FBM
25MM143 SOIL 6563700 319040 400 7 FBM
25MM144 SOIL 6563700 319080 400 27 FBM
25MM145 SOIL 6563700 319120 400 11 FBM
25MM146 SOIL 6563700 319160 400 8 FBM
25MM147 SOIL 6563700 319200 400 14 FBM
25MM148 SOIL 6563700 319240 400 42 FBM
25MM149 SOIL 6563700 319280 400 65 FBM
25MM150 SOIL 6563700 319320 400 49 FBM
25MM151 SOIL 6563700 319360 400 15 FBM
25MM152 SOIL 6563900 318960 400 13 FBM
25MM153 SOIL 6563900 319000 400 9 FBM
25MM154 SOIL 6563900 319040 400 7 FBM
25MM155 SOIL 6563900 319080 400 28 FBM
25MM156 SOIL 6563900 319120 400 19 FBM
25MM157 SOIL 6563900 319160 400 21 FBM
25MM158 SOIL 6563900 319200 400 13 FBM
25MM159 SOIL 6563900 319240 400 21 FBM
25MM160 SOIL 6563900 319280 400 16 FBM
25MM161 SOIL 6563900 319320 400 14 FBM
25MM162 SOIL 6563900 319360 400 17 FBM
25MM163 SOIL 6564100 319000 400 14 FBM
25MM164 SOIL 6564100 319040 400 20 FBM
25MM165 SOIL 6564100 319080 400 17 FBM
25MM166 SOIL 6564100 319120 400 16 FBM
25MM167 SOIL 6564100 319160 400 15 FBM
25MM168 SOIL 6564100 319200 400 7 FBM
25MM169 SOIL 6564100 319240 400 7 FBM
25MM170 SOIL 6564100 319280 400 13 FBM
25MM171 SOIL 6564100 319320 400 8 FBM
25MM172 SOIL 6564100 319360 400 16 FBM
25MM173 SOIL 6564300 319040 400 13 FBM

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

17

Follow Us

==> picture [130 x 32] intentionally omitted <==

25MM174 SOIL 6564300 319080 400 10 FBM
25MM175 SOIL 6564300 319120 400 15 FBM
25MM176 SOIL 6564300 319160 400 23 FBM
25MM177 SOIL 6564300 319200 400 17 FBM
25MM178 SOIL 6564300 319240 400 25 FBM
25MM179 SOIL 6564300 319280 400 29 FBM
25MM180 SOIL 6564300 319320 400 19 FBM
25MM181 SOIL 6564300 319360 400 27 FBM
25MM182 SOIL 6564500 319080 400 9 FBM
25MM183 SOIL 6564500 319120 400 32 FBM
25MM184 SOIL 6564500 319160 400 30 FBM
25MM185 SOIL 6564500 319200 400 21 FBM
25MM186 SOIL 6564500 319240 400 19 FBM
25MM187 SOIL 6564500 319280 400 21 FBM
25MM188 SOIL 6564500 319320 400 50 FBM
25MM189 SOIL 6564500 319360 400 37 FBM
25MM190 SOIL 6564700 319120 400 19 FBM
25MM191 SOIL 6564700 319160 400 6 FBM
25MM192 SOIL 6564700 319200 400 12 FBM
25MM193 SOIL 6564700 319240 400 19 FBM
25MM194 SOIL 6564700 319280 400 18 FBM
25MM195 SOIL 6564700 319320 400 19 FBM
25MM196 SOIL 6564900 319160 400 26 FBM
25MM197 SOIL 6564900 319200 400 16 FBM
25MM198 SOIL 6564900 319240 400 21 FBM
25MM199 SOIL 6564900 319280 400 34 FBM
25MM200 SOIL 6564900 319320 400 34 FBM
CMS0001 SOIL 6560100 319080 400 13 Corazon
CMS0002 SOIL 6560100 319120 400 14 Corazon
CMS0003 SOIL 6560100 319160 400 13 Corazon
CMS0004 SOIL 6560100 319200 400 6 Corazon
CMS0005 SOIL 6560100 319240 400 8 Corazon
CMS0006 SOIL 6560100 319280 400 15 Corazon
CMS0007 SOIL 6560100 319320 400 4 Corazon
CMS0008 SOIL 6560100 319360 400 11 Corazon
CMS0009 SOIL 6560100 319400 400 8 Corazon
CMS0010 SOIL 6560100 319440 400 10 Corazon
CMS0011 SOIL 6560100 319480 400 8 Corazon
CMS0012 SOIL 6560100 319520 400 9 Corazon
CMS0013 SOIL 6560100 319560 400 9 Corazon
CMS0014 SOIL 6560100 319600 400 10 Corazon
CMS0015 SOIL 6560100 319640 400 15 Corazon
CMS0016 SOIL 6560100 319680 400 11 Corazon
CMS0017 SOIL 6560100 319720 400 11 Corazon
CMS0018 SOIL 6560100 319760 400 12 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

18

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

CMS0019 SOIL 6560100 319800 400 11 Corazon
CMS0020 SOIL 6560100 319840 400 9 Corazon
CMS0021 SOIL 6560200 319080 400 18 Corazon
CMS0022 SOIL 6560200 319120 400 21 Corazon
CMS0023 SOIL 6560200 319160 400 3030 Corazon
CMS0024 SOIL 6560200 319200 400 15 Corazon
CMS0025 SOIL 6560200 319240 400 6 Corazon
CMS0026 SOIL 6560200 319280 400 9 Corazon
CMS0027 SOIL 6560200 319320 400 7 Corazon
CMS0028 SOIL 6560200 319360 400 8 Corazon
CMS0029 SOIL 6560200 319400 400 18 Corazon
CMS0030 SOIL 6560200 319440 400 13 Corazon
CMS0031 SOIL 6560200 319480 400 11 Corazon
CMS0032 SOIL 6560200 319520 400 7 Corazon
CMS0033 SOIL 6560200 319560 400 10 Corazon
CMS0034 SOIL 6560200 319600 400 8 Corazon
CMS0035 SOIL 6560200 319640 400 10 Corazon
CMS0036 SOIL 6560200 319680 400 12 Corazon
CMS0037 SOIL 6560200 319720 400 7 Corazon
CMS0038 SOIL 6560200 319760 400 13 Corazon
CMS0039 SOIL 6560200 319800 400 10 Corazon
CMS0040 SOIL 6560200 319840 400 19 Corazon
CMS0041 SOIL 6560200 319880 400 13 Corazon
CMS0042 SOIL 6560300 319120 400 25 Corazon
CMS0043 SOIL 6560300 319160 400 27 Corazon
CMS0044 SOIL 6560300 319200 400 21 Corazon
CMS0045 SOIL 6560300 319240 400 23 Corazon
CMS0046 SOIL 6560300 319280 400 16 Corazon
CMS0047 SOIL 6560300 319320 400 11 Corazon
CMS0048 SOIL 6560300 319360 400 11 Corazon
CMS0049 SOIL 6560300 319400 400 12 Corazon
CMS0050 SOIL 6560300 319440 400 9 Corazon
CMS0051 SOIL 6560300 319480 400 8 Corazon
CMS0052 SOIL 6560300 319520 400 10 Corazon
CMS0053 SOIL 6560300 319560 400 11 Corazon
CMS0054 SOIL 6560300 319600 400 10 Corazon
CMS0055 SOIL 6560300 319640 400 10 Corazon
CMS0056 SOIL 6560300 319680 400 12 Corazon
CMS0057 SOIL 6560300 319720 400 12 Corazon
CMS0058 SOIL 6560300 319760 400 9 Corazon
CMS0059 SOIL 6560300 319800 400 6 Corazon
CMS0060 SOIL 6560300 319840 400 10 Corazon
CMS0061 SOIL 6560300 319880 400 9 Corazon
CMS0062 SOIL 6560400 319120 400 14 Corazon
CMS0063 SOIL 6560400 319160 400 13 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

19

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0064 SOIL 6560400 319200 400 12 Corazon
CMS0065 SOIL 6560400 319240 400 14 Corazon
CMS0066 SOIL 6560400 319280 400 10 Corazon
CMS0067 SOIL 6560400 319320 400 8 Corazon
CMS0068 SOIL 6560400 319360 400 9 Corazon
CMS0069 SOIL 6560400 319400 400 14 Corazon
CMS0070 SOIL 6560400 319440 400 12 Corazon
CMS0071 SOIL 6560400 319480 400 13 Corazon
CMS0072 SOIL 6560400 319520 400 11 Corazon
CMS0073 SOIL 6560400 319560 400 7 Corazon
CMS0074 SOIL 6560400 319600 400 14 Corazon
CMS0075 SOIL 6560400 319640 400 17 Corazon
CMS0076 SOIL 6560400 319680 400 10 Corazon
CMS0077 SOIL 6560400 319720 400 6 Corazon
CMS0078 SOIL 6560400 319760 400 6 Corazon
CMS0079 SOIL 6560400 319800 400 3 Corazon
CMS0080 SOIL 6560400 319840 400 8 Corazon
CMS0081 SOIL 6560400 319880 400 5 Corazon
CMS0082 SOIL 6560400 319920 400 12 Corazon
CMS0083 SOIL 6560500 319160 400 7 Corazon
CMS0084 SOIL 6560500 319200 400 13 Corazon
CMS0085 SOIL 6560500 319240 400 16 Corazon
CMS0086 SOIL 6560500 319280 400 9 Corazon
CMS0087 SOIL 6560500 319320 400 12 Corazon
CMS0088 SOIL 6560500 319360 400 13 Corazon
CMS0089 SOIL 6560500 319400 400 21 Corazon
CMS0090 SOIL 6560500 319440 400 40 Corazon
CMS0091 SOIL 6560500 319480 400 37 Corazon
CMS0092 SOIL 6560500 319520 400 18 Corazon
CMS0093 SOIL 6560500 319560 400 20 Corazon
CMS0094 SOIL 6560500 319600 400 9 Corazon
CMS0095 SOIL 6560500 319640 400 7 Corazon
CMS0096 SOIL 6560500 319680 400 7 Corazon
CMS0097 SOIL 6560500 319720 400 12 Corazon
CMS0098 SOIL 6560500 319760 400 21 Corazon
CMS0099 SOIL 6560500 319800 400 19 Corazon
CMS0100 SOIL 6560500 319840 400 6 Corazon
CMS0101 SOIL 6560500 319880 400 3 Corazon
CMS0102 SOIL 6560500 319920 400 4 Corazon
CMS0103 SOIL 6560600 319160 400 5 Corazon
CMS0104 SOIL 6560600 319200 400 10 Corazon
CMS0105 SOIL 6560600 319240 400 10 Corazon
CMS0106 SOIL 6560600 319280 400 8 Corazon
CMS0107 SOIL 6560600 319320 400 8 Corazon
CMS0108 SOIL 6560600 319360 400 15 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

20

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0109 SOIL 6560600 319400 400 104 Corazon
CMS0110 SOIL 6560600 319440 400 65 Corazon
CMS0111 SOIL 6560600 319480 400 127 Corazon
CMS0112 SOIL 6560600 319520 400 61 Corazon
CMS0113 SOIL 6560600 319560 400 11 Corazon
CMS0114 SOIL 6560600 319600 400 6 Corazon
CMS0115 SOIL 6560600 319640 400 8 Corazon
CMS0116 SOIL 6560600 319680 400 5 Corazon
CMS0117 SOIL 6560600 319720 400 9 Corazon
CMS0118 SOIL 6560600 319760 400 47 Corazon
CMS0119 SOIL 6560600 319800 400 20 Corazon
CMS0120 SOIL 6560600 319840 400 15 Corazon
CMS0121 SOIL 6560600 319880 400 8 Corazon
CMS0122 SOIL 6560600 319920 400 4 Corazon
CMS0123 SOIL 6560600 319960 400 3 Corazon
CMS0124 SOIL 6560700 319160 400 5 Corazon
CMS0125 SOIL 6560700 319200 400 5 Corazon
CMS0126 SOIL 6560700 319240 400 3 Corazon
CMS0127 SOIL 6560700 319280 400 5 Corazon
CMS0128 SOIL 6560700 319320 400 15 Corazon
CMS0129 SOIL 6560700 319360 400 10 Corazon
CMS0130 SOIL 6560700 319400 400 46 Corazon
CMS0131 SOIL 6560700 319440 400 57 Corazon
CMS0132 SOIL 6560700 319480 400 110 Corazon
CMS0133 SOIL 6560700 319520 400 29 Corazon
CMS0134 SOIL 6560700 319560 400 54 Corazon
CMS0135 SOIL 6560700 319600 400 10 Corazon
CMS0136 SOIL 6560700 319640 400 36 Corazon
CMS0137 SOIL 6560700 319680 400 725 Corazon
CMS0138 SOIL 6560700 319720 400 11 Corazon
CMS0139 SOIL 6560700 319760 400 8 Corazon
CMS0140 SOIL 6560700 319800 400 9 Corazon
CMS0141 SOIL 6560700 319840 400 38 Corazon
CMS0142 SOIL 6560700 319880 400 18 Corazon
CMS0143 SOIL 6560700 319920 400 5 Corazon
CMS0144 SOIL 6560700 319960 400 6 Corazon
CMS0145 SOIL 6560800 319200 400 4 Corazon
CMS0146 SOIL 6560800 319240 400 11 Corazon
CMS0147 SOIL 6560800 319280 400 10 Corazon
CMS0148 SOIL 6560800 319320 400 23 Corazon
CMS0149 SOIL 6560800 319360 400 8 Corazon
CMS0150 SOIL 6560800 319400 400 6 Corazon
CMS0151 SOIL 6560800 319440 400 17 Corazon
CMS0152 SOIL 6560800 319480 400 11 Corazon
CMS0153 SOIL 6560800 319520 400 101 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

21

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

CMS0154 SOIL 6560800 319560 400 49 Corazon
CMS0155 SOIL 6560800 319600 400 17 Corazon
CMS0156 SOIL 6560800 319640 400 10 Corazon
CMS0157 SOIL 6560800 319680 400 8 Corazon
CMS0158 SOIL 6560800 319720 400 6 Corazon
CMS0159 SOIL 6560800 319760 400 8 Corazon
CMS0160 SOIL 6560800 319800 400 6 Corazon
CMS0161 SOIL 6560800 319840 400 15 Corazon
CMS0162 SOIL 6560800 319880 400 6 Corazon
CMS0163 SOIL 6560800 319920 400 14 Corazon
CMS0164 SOIL 6560800 319960 400 6 Corazon
CMS0165 SOIL 6560900 319200 400 7 Corazon
CMS0166 SOIL 6560900 319240 400 14 Corazon
CMS0167 SOIL 6560900 319280 400 5 Corazon
CMS0168 SOIL 6560900 319320 400 9 Corazon
CMS0169 SOIL 6560900 319360 400 11 Corazon
CMS0170 SOIL 6560900 319400 400 11 Corazon
CMS0171 SOIL 6560900 319440 400 15 Corazon
CMS0172 SOIL 6560900 319480 400 18 Corazon
CMS0173 SOIL 6560900 319520 400 13 Corazon
CMS0174 SOIL 6560900 319560 400 59 Corazon
CMS0175 SOIL 6560900 319600 400 97 Corazon
CMS0176 SOIL 6560900 319640 400 12 Corazon
CMS0177 SOIL 6560900 319680 400 7 Corazon
CMS0178 SOIL 6560900 319720 400 5 Corazon
CMS0179 SOIL 6560900 319760 400 11 Corazon
CMS0180 SOIL 6560900 319800 400 10 Corazon
CMS0181 SOIL 6560900 319840 400 11 Corazon
CMS0182 SOIL 6560900 319880 400 8 Corazon
CMS0183 SOIL 6560900 319920 400 141 Corazon
CMS0184 SOIL 6560900 319960 400 38 Corazon
CMS0185 SOIL 6560900 320000 400 14 Corazon
CMS0186 SOIL 6561000 319240 400 8 Corazon
CMS0187 SOIL 6561000 319280 400 11 Corazon
CMS0188 SOIL 6561000 319320 400 14 Corazon
CMS0189 SOIL 6561000 319360 400 9 Corazon
CMS0190 SOIL 6561000 319400 400 21 Corazon
CMS0191 SOIL 6561000 319440 400 25 Corazon
CMS0192 SOIL 6561000 319480 400 25 Corazon
CMS0193 SOIL 6561000 319520 400 24 Corazon
CMS0194 SOIL 6561000 319560 400 251 Corazon
CMS0195 SOIL 6561000 319600 400 109 Corazon
CMS0196 SOIL 6561000 319640 400 556 Corazon
CMS0197 SOIL 6561000 319680 400 15 Corazon
CMS0198 SOIL 6561000 319720 400 16 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

22

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0199 SOIL 6561000 319760 400 11 Corazon
CMS0200 SOIL 6561000 319800 400 7 Corazon
CMS0201 SOIL 6561000 319840 400 8 Corazon
CMS0202 SOIL 6561000 319880 400 5 Corazon
CMS0203 SOIL 6561000 319920 400 7 Corazon
CMS0204 SOIL 6561000 319960 400 8 Corazon
CMS0205 SOIL 6561000 320000 400 7 Corazon
CMS0206 SOIL 6561100 319240 400 7 Corazon
CMS0207 SOIL 6561100 319280 400 6 Corazon
CMS0208 SOIL 6561100 319320 400 18 Corazon
CMS0209 SOIL 6561100 319360 400 14 Corazon
CMS0210 SOIL 6561100 319400 400 433 Corazon
CMS0211 SOIL 6561100 319440 400 45 Corazon
CMS0212 SOIL 6561100 319480 400 49 Corazon
CMS0213 SOIL 6561100 319520 400 54 Corazon
CMS0214 SOIL 6561100 319560 400 90 Corazon
CMS0215 SOIL 6561100 319600 400 167 Corazon
CMS0216 SOIL 6561100 319640 400 122 Corazon
CMS0217 SOIL 6561100 319680 400 18 Corazon
CMS0218 SOIL 6561100 319720 400 20 Corazon
CMS0219 SOIL 6561100 319760 400 11 Corazon
CMS0220 SOIL 6561100 319800 400 8 Corazon
CMS0221 SOIL 6561100 319840 400 7 Corazon
CMS0222 SOIL 6561100 319880 400 7 Corazon
CMS0223 SOIL 6561100 319920 400 4 Corazon
CMS0224 SOIL 6561100 319960 400 7 Corazon
CMS0225 SOIL 6561100 320000 400 10 Corazon
CMS0226 SOIL 6561100 320040 400 6 Corazon
CMS0227 SOIL 6561200 319600 400 58 Corazon
CMS0228 SOIL 6561200 319640 400 22 Corazon
CMS0229 SOIL 6561200 319680 400 24 Corazon
CMS0230 SOIL 6561200 319720 400 34 Corazon
CMS0231 SOIL 6561200 319760 400 16 Corazon
CMS0232 SOIL 6561200 319800 400 9 Corazon
CMS0233 SOIL 6561200 319840 400 8 Corazon
CMS0234 SOIL 6561200 319880 400 8 Corazon
CMS0235 SOIL 6561200 319920 400 10 Corazon
CMS0236 SOIL 6561200 319960 400 4 Corazon
CMS0237 SOIL 6561200 320000 400 7 Corazon
CMS0238 SOIL 6561200 320040 400 16 Corazon
CMS0239 SOIL 6561300 319640 400 23 Corazon
CMS0240 SOIL 6561300 319680 400 27 Corazon
CMS0241 SOIL 6561300 319720 400 12 Corazon
CMS0242 SOIL 6561300 319760 400 11 Corazon
CMS0243 SOIL 6561300 319800 400 17 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

23

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0244 SOIL 6561300 319840 400 7 Corazon
CMS0245 SOIL 6561300 319880 400 13 Corazon
CMS0246 SOIL 6561300 319920 400 6 Corazon
CMS0247 SOIL 6561300 319960 400 7 Corazon
CMS0248 SOIL 6561300 320000 400 6 Corazon
CMS0249 SOIL 6561300 320040 400 6 Corazon
CMS0250 SOIL 6561400 319640 400 43 Corazon
CMS0251 SOIL 6561400 319680 400 49 Corazon
CMS0252 SOIL 6561400 319720 400 98 Corazon
CMS0253 SOIL 6561400 319760 400 50 Corazon
CMS0254 SOIL 6561400 319800 400 23 Corazon
CMS0255 SOIL 6561400 319840 400 16 Corazon
CMS0256 SOIL 6561400 319880 400 19 Corazon
CMS0257 SOIL 6561400 319920 400 24 Corazon
CMS0258 SOIL 6561400 319960 400 22 Corazon
CMS0259 SOIL 6561400 320000 400 8 Corazon
CMS0260 SOIL 6561400 320040 400 7 Corazon
CMS0261 SOIL 6561400 320080 400 7 Corazon
CMS0262 SOIL 6561500 319640 400 33 Corazon
CMS0263 SOIL 6561500 319680 400 33 Corazon
CMS0264 SOIL 6561500 319720 400 150 Corazon
CMS0265 SOIL 6561500 319760 400 1250 Corazon
CMS0266 SOIL 6561500 319800 400 18 Corazon
CMS0267 SOIL 6561500 319840 400 23 Corazon
CMS0268 SOIL 6561500 319880 400 35 Corazon
CMS0269 SOIL 6561500 319920 400 15 Corazon
CMS0270 SOIL 6561500 319960 400 7 Corazon
CMS0271 SOIL 6561500 320000 400 6 Corazon
CMS0272 SOIL 6561500 320040 400 9 Corazon
CMS0273 SOIL 6561500 320080 400 13 Corazon
CMS0274 SOIL 6561600 319080 400 131 Corazon
CMS0275 SOIL 6561600 319120 400 22 Corazon
CMS0276 SOIL 6561600 319160 400 5 Corazon
CMS0277 SOIL 6561600 319200 400 7 Corazon
CMS0278 SOIL 6561600 319240 400 11 Corazon
CMS0279 SOIL 6561600 319280 400 17 Corazon
CMS0280 SOIL 6561600 319320 400 12 Corazon
CMS0281 SOIL 6561600 319360 400 450 Corazon
CMS0282 SOIL 6561600 319400 400 20 Corazon
CMS0283 SOIL 6561600 319440 400 13 Corazon
CMS0284 SOIL 6561600 319480 400 1250 Corazon
CMS0285 SOIL 6561600 319520 400 9 Corazon
CMS0286 SOIL 6561600 319560 400 31 Corazon
CMS0287 SOIL 6561600 319600 400 77 Corazon
CMS0288 SOIL 6561600 319640 400 82 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

24

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0289 SOIL 6561600 319680 400 75 Corazon
CMS0290 SOIL 6561600 319720 400 28 Corazon
CMS0291 SOIL 6561600 319760 400 34 Corazon
CMS0292 SOIL 6561600 319800 400 42 Corazon
CMS0293 SOIL 6561600 319840 400 64 Corazon
CMS0294 SOIL 6561600 319880 400 21 Corazon
CMS0295 SOIL 6561600 319920 400 35 Corazon
CMS0296 SOIL 6561600 319960 400 13 Corazon
CMS0297 SOIL 6561600 320000 400 35 Corazon
CMS0298 SOIL 6561600 320040 400 20 Corazon
CMS0299 SOIL 6561600 320080 400 21 Corazon
CMS0300 SOIL 6561600 320120 400 13 Corazon
CMS0301 SOIL 6561700 318560 400 3 Corazon
CMS0302 SOIL 6561700 318600 400 3 Corazon
CMS0303 SOIL 6561700 318640 400 2 Corazon
CMS0304 SOIL 6561700 318680 400 5 Corazon
CMS0305 SOIL 6561700 318720 400 7 Corazon
CMS0306 SOIL 6561700 318760 400 2 Corazon
CMS0307 SOIL 6561700 318800 400 6 Corazon
CMS0308 SOIL 6561700 318840 400 9 Corazon
CMS0309 SOIL 6561700 318880 400 10 Corazon
CMS0310 SOIL 6561700 318920 400 7 Corazon
CMS0311 SOIL 6561700 318960 400 5 Corazon
CMS0312 SOIL 6561700 319000 400 6 Corazon
CMS0313 SOIL 6561700 319040 400 9 Corazon
CMS0314 SOIL 6561700 319080 400 9 Corazon
CMS0315 SOIL 6561700 319120 400 9 Corazon
CMS0316 SOIL 6561700 319160 400 9 Corazon
CMS0317 SOIL 6561700 319200 400 8 Corazon
CMS0318 SOIL 6561700 319240 400 300 Corazon
CMS0319 SOIL 6561700 319280 400 16 Corazon
CMS0320 SOIL 6561700 319320 400 18 Corazon
CMS0321 SOIL 6561700 319360 400 15 Corazon
CMS0322 SOIL 6561700 319400 400 8 Corazon
CMS0323 SOIL 6561700 319440 400 10 Corazon
CMS0324 SOIL 6561700 319480 400 16 Corazon
CMS0325 SOIL 6561700 319520 400 35 Corazon
CMS0326 SOIL 6561700 319560 400 17 Corazon
CMS0327 SOIL 6561700 319600 400 27 Corazon
CMS0328 SOIL 6561700 319640 400 34 Corazon
CMS0329 SOIL 6561700 319680 400 40 Corazon
CMS0330 SOIL 6561700 319720 400 28 Corazon
CMS0331 SOIL 6561700 319760 400 34 Corazon
CMS0332 SOIL 6561700 319800 400 22 Corazon
CMS0333 SOIL 6561700 319840 400 12 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

25

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0334 SOIL 6561700 319880 400 11 Corazon
CMS0335 SOIL 6561700 319920 400 17 Corazon
CMS0336 SOIL 6561700 319960 400 14 Corazon
CMS0337 SOIL 6561700 320000 400 25 Corazon
CMS0338 SOIL 6561700 320040 400 26 Corazon
CMS0339 SOIL 6561700 320080 400 26 Corazon
CMS0340 SOIL 6561700 320120 400 18 Corazon
CMS0341 SOIL 6561800 318560 400 2 Corazon
CMS0342 SOIL 6561800 318600 400 1 Corazon
CMS0343 SOIL 6561800 318640 400 6 Corazon
CMS0344 SOIL 6561800 318680 400 4 Corazon
CMS0345 SOIL 6561800 318720 400 4 Corazon
CMS0346 SOIL 6561800 318760 400 8 Corazon
CMS0347 SOIL 6561800 318800 400 7 Corazon
CMS0348 SOIL 6561800 318840 400 10 Corazon
CMS0349 SOIL 6561800 318880 400 7 Corazon
CMS0350 SOIL 6561800 318920 400 7 Corazon
CMS0351 SOIL 6561800 318960 400 6 Corazon
CMS0352 SOIL 6561800 319000 400 6 Corazon
CMS0353 SOIL 6561800 319040 400 6 Corazon
CMS0354 SOIL 6561800 319080 400 4 Corazon
CMS0355 SOIL 6561800 319120 400 5 Corazon
CMS0356 SOIL 6561800 319160 400 8 Corazon
CMS0357 SOIL 6561800 319200 400 6 Corazon
CMS0358 SOIL 6561800 319240 400 10 Corazon
CMS0359 SOIL 6561800 319280 400 8 Corazon
CMS0360 SOIL 6561800 319320 400 8 Corazon
CMS0361 SOIL 6561800 319360 400 6 Corazon
CMS0362 SOIL 6561800 319400 400 6 Corazon
CMS0363 SOIL 6561800 319440 400 11 Corazon
CMS0364 SOIL 6561800 319480 400 8 Corazon
CMS0365 SOIL 6561800 319520 400 11 Corazon
CMS0366 SOIL 6561800 319560 400 11 Corazon
CMS0367 SOIL 6561800 319600 400 24 Corazon
CMS0368 SOIL 6561800 319640 400 23 Corazon
CMS0369 SOIL 6561800 319680 400 20 Corazon
CMS0370 SOIL 6561800 319720 400 29 Corazon
CMS0371 SOIL 6561800 319760 400 29 Corazon
CMS0372 SOIL 6561800 319800 400 27 Corazon
CMS0373 SOIL 6561800 319840 400 35 Corazon
CMS0374 SOIL 6561800 319880 400 17 Corazon
CMS0375 SOIL 6561800 319920 400 7 Corazon
CMS0376 SOIL 6561800 319960 400 32 Corazon
CMS0377 SOIL 6561800 320000 400 9 Corazon
CMS0378 SOIL 6561800 320040 400 12 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

26

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0379 SOIL 6561800 320080 400 7 Corazon
CMS0380 SOIL 6561800 320120 400 10 Corazon
CMS0381 SOIL 6561900 318600 400 5 Corazon
CMS0382 SOIL 6561900 318640 400 4 Corazon
CMS0383 SOIL 6561900 318680 400 4 Corazon
CMS0384 SOIL 6561900 318720 400 6 Corazon
CMS0385 SOIL 6561900 318760 400 7 Corazon
CMS0386 SOIL 6561900 318800 400 6 Corazon
CMS0387 SOIL 6561900 318840 400 5 Corazon
CMS0388 SOIL 6561900 318880 400 8 Corazon
CMS0389 SOIL 6561900 318920 400 8 Corazon
CMS0390 SOIL 6561900 318960 400 8 Corazon
CMS0391 SOIL 6561900 319000 400 4 Corazon
CMS0392 SOIL 6561900 319040 400 7 Corazon
CMS0393 SOIL 6561900 319080 400 6 Corazon
CMS0394 SOIL 6561900 319120 400 3 Corazon
CMS0395 SOIL 6561900 319160 400 5 Corazon
CMS0396 SOIL 6561900 319200 400 6 Corazon
CMS0397 SOIL 6561900 319240 400 6 Corazon
CMS0398 SOIL 6561900 319280 400 9 Corazon
CMS0399 SOIL 6561900 319320 400 7 Corazon
CMS0400 SOIL 6561900 319360 400 8 Corazon
CMS0401 SOIL 6561900 319400 400 11 Corazon
CMS0402 SOIL 6561900 319440 400 11 Corazon
CMS0403 SOIL 6561900 319480 400 12 Corazon
CMS0404 SOIL 6561900 319520 400 13 Corazon
CMS0405 SOIL 6561900 319560 400 11 Corazon
CMS0406 SOIL 6561900 319600 400 15 Corazon
CMS0407 SOIL 6561900 319640 400 8 Corazon
CMS0408 SOIL 6561900 319680 400 38 Corazon
CMS0409 SOIL 6561900 319720 400 44 Corazon
CMS0410 SOIL 6561900 319760 400 42 Corazon
CMS0411 SOIL 6561900 319800 400 21 Corazon
CMS0412 SOIL 6561900 319840 400 22 Corazon
CMS0413 SOIL 6561900 319880 400 17 Corazon
CMS0414 SOIL 6561900 319920 400 11 Corazon
CMS0415 SOIL 6561900 319960 400 11 Corazon
CMS0416 SOIL 6561900 320000 400 6 Corazon
CMS0417 SOIL 6561900 320040 400 13 Corazon
CMS0418 SOIL 6561900 320080 400 12 Corazon
CMS0419 SOIL 6561900 320120 400 7 Corazon
CMS0420 SOIL 6561900 320160 400 11 Corazon
CMS0421 SOIL 6562000 318600 400 7 Corazon
CMS0422 SOIL 6562000 318640 400 3 Corazon
CMS0423 SOIL 6562000 318680 400 3 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

27

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0424 SOIL 6562000 318720 400 6 Corazon
CMS0425 SOIL 6562000 318760 400 3 Corazon
CMS0426 SOIL 6562000 318800 400 3 Corazon
CMS0427 SOIL 6562000 318840 400 4 Corazon
CMS0428 SOIL 6562000 318880 400 8 Corazon
CMS0429 SOIL 6562000 318920 400 7 Corazon
CMS0430 SOIL 6562000 318960 400 5 Corazon
CMS0431 SOIL 6562000 319000 400 5 Corazon
CMS0432 SOIL 6562000 319040 400 6 Corazon
CMS0433 SOIL 6562000 319080 400 5 Corazon
CMS0434 SOIL 6562000 319120 400 8 Corazon
CMS0435 SOIL 6562000 319160 400 6 Corazon
CMS0436 SOIL 6562000 319200 400 17 Corazon
CMS0437 SOIL 6562000 319240 400 7 Corazon
CMS0438 SOIL 6562000 319280 400 7 Corazon
CMS0439 SOIL 6562000 319320 400 8 Corazon
CMS0440 SOIL 6562000 319360 400 8 Corazon
CMS0441 SOIL 6562000 319400 400 11 Corazon
CMS0442 SOIL 6562000 319440 400 20 Corazon
CMS0443 SOIL 6562000 319480 400 25 Corazon
CMS0444 SOIL 6562000 319520 400 21 Corazon
CMS0445 SOIL 6562000 319560 400 23 Corazon
CMS0446 SOIL 6562000 319600 400 13 Corazon
CMS0447 SOIL 6562000 319640 400 17 Corazon
CMS0448 SOIL 6562000 319680 400 28 Corazon
CMS0449 SOIL 6562000 319720 400 27 Corazon
CMS0450 SOIL 6562000 319760 400 18 Corazon
CMS0451 SOIL 6562000 319800 400 25 Corazon
CMS0452 SOIL 6562000 319840 400 15 Corazon
CMS0453 SOIL 6562000 319880 400 8 Corazon
CMS0454 SOIL 6562000 319920 400 27 Corazon
CMS0455 SOIL 6562000 319960 400 11 Corazon
CMS0456 SOIL 6562000 320000 400 13 Corazon
CMS0457 SOIL 6562000 320040 400 10 Corazon
CMS0458 SOIL 6562000 320080 400 11 Corazon
CMS0459 SOIL 6562000 320120 400 5 Corazon
CMS0460 SOIL 6562000 320160 400 5 Corazon
CMS0461 SOIL 6562100 318640 400 4 Corazon
CMS0462 SOIL 6562100 318680 400 4 Corazon
CMS0463 SOIL 6562100 318720 400 6 Corazon
CMS0464 SOIL 6562100 318760 400 2 Corazon
CMS0465 SOIL 6562100 318800 400 3 Corazon
CMS0466 SOIL 6562100 318840 400 9 Corazon
CMS0467 SOIL 6562100 318880 400 4 Corazon
CMS0468 SOIL 6562100 318920 400 5 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

28

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0469 SOIL 6562100 318960 400 7 Corazon
CMS0470 SOIL 6562100 319000 400 2 Corazon
CMS0471 SOIL 6562100 319040 400 5 Corazon
CMS0472 SOIL 6562100 319080 400 4 Corazon
CMS0473 SOIL 6562100 319120 400 6 Corazon
CMS0474 SOIL 6562100 319160 400 5 Corazon
CMS0475 SOIL 6562100 319200 400 4 Corazon
CMS0476 SOIL 6562100 319240 400 11 Corazon
CMS0477 SOIL 6562100 319280 400 8 Corazon
CMS0478 SOIL 6562100 319320 400 6 Corazon
CMS0479 SOIL 6562100 319360 400 6 Corazon
CMS0480 SOIL 6562100 319400 400 9 Corazon
CMS0481 SOIL 6562100 319440 400 7 Corazon
CMS0482 SOIL 6562100 319480 400 7 Corazon
CMS0483 SOIL 6562100 319520 400 18 Corazon
CMS0484 SOIL 6562100 319560 400 16 Corazon
CMS0485 SOIL 6562100 319600 400 13 Corazon
CMS0486 SOIL 6562100 319640 400 16 Corazon
CMS0487 SOIL 6562100 319680 400 13 Corazon
CMS0488 SOIL 6562100 319720 400 25 Corazon
CMS0489 SOIL 6562100 319760 400 39 Corazon
CMS0490 SOIL 6562100 319800 400 11 Corazon
CMS0491 SOIL 6562100 319840 400 5 Corazon
CMS0492 SOIL 6562100 319880 400 6 Corazon
CMS0493 SOIL 6562100 319920 400 8 Corazon
CMS0494 SOIL 6562100 319960 400 6 Corazon
CMS0495 SOIL 6562100 320000 400 10 Corazon
CMS0496 SOIL 6562100 320040 400 14 Corazon
CMS0497 SOIL 6562100 320080 400 4 Corazon
CMS0498 SOIL 6562100 320120 400 7 Corazon
CMS0499 SOIL 6562100 320160 400 12 Corazon
CMS0500 SOIL 6562100 320200 400 15 Corazon
CMS0501 SOIL 6562200 318640 400 7 Corazon
CMS0502 SOIL 6562200 318680 400 4 Corazon
CMS0503 SOIL 6562200 318720 400 8 Corazon
CMS0504 SOIL 6562200 318760 400 2 Corazon
CMS0505 SOIL 6562200 318800 400 3 Corazon
CMS0506 SOIL 6562200 318840 400 3 Corazon
CMS0507 SOIL 6562200 318880 400 67 Corazon
CMS0508 SOIL 6562200 318920 400 6 Corazon
CMS0509 SOIL 6562200 318960 400 6 Corazon
CMS0510 SOIL 6562200 319000 400 9 Corazon
CMS0511 SOIL 6562200 319040 400 5 Corazon
CMS0512 SOIL 6562200 319080 400 6 Corazon
CMS0513 SOIL 6562200 319120 400 5 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

29

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

CMS0514 SOIL 6562200 319160 400 4 Corazon
CMS0515 SOIL 6562200 319200 400 9 Corazon
CMS0516 SOIL 6562200 319240 400 11 Corazon
CMS0517 SOIL 6562200 319280 400 6 Corazon
CMS0518 SOIL 6562200 319320 400 3 Corazon
CMS0519 SOIL 6562200 319360 400 5 Corazon
CMS0520 SOIL 6562200 319400 400 6 Corazon
CMS0521 SOIL 6562200 319440 400 11 Corazon
CMS0522 SOIL 6562200 319480 400 17 Corazon
CMS0523 SOIL 6562200 319520 400 14 Corazon
CMS0524 SOIL 6562200 319560 400 10 Corazon
CMS0525 SOIL 6562200 319600 400 9 Corazon
CMS0526 SOIL 6562200 319640 400 10 Corazon
CMS0527 SOIL 6562200 319680 400 8 Corazon
CMS0528 SOIL 6562200 319720 400 20 Corazon
CMS0529 SOIL 6562200 319760 400 7 Corazon
CMS0530 SOIL 6562200 319800 400 8 Corazon
CMS0531 SOIL 6562200 319840 400 12 Corazon
CMS0532 SOIL 6562200 319880 400 10 Corazon
CMS0533 SOIL 6562200 319920 400 12 Corazon
CMS0534 SOIL 6562200 319960 400 11 Corazon
CMS0535 SOIL 6562200 320000 400 5 Corazon
CMS0536 SOIL 6562200 320040 400 10 Corazon
CMS0537 SOIL 6562200 320080 400 21 Corazon
CMS0538 SOIL 6562200 320120 400 13 Corazon
CMS0539 SOIL 6562200 320160 400 9 Corazon
CMS0540 SOIL 6562200 320200 400 22 Corazon
CMS0541 SOIL 6562300 318680 400 5 Corazon
CMS0542 SOIL 6562300 318720 400 4 Corazon
CMS0543 SOIL 6562300 318760 400 5 Corazon
CMS0544 SOIL 6562300 318800 400 1 Corazon
CMS0545 SOIL 6562300 318840 400 3 Corazon
CMS0546 SOIL 6562300 318880 400 5 Corazon
CMS0547 SOIL 6562300 318920 400 5 Corazon
CMS0548 SOIL 6562300 318960 400 5 Corazon
CMS0549 SOIL 6562300 319000 400 8 Corazon
CMS0550 SOIL 6562300 319040 400 4 Corazon
CMS0551 SOIL 6562300 319080 400 3 Corazon
CMS0552 SOIL 6562300 319120 400 2 Corazon
CMS0553 SOIL 6562300 319160 400 3 Corazon
CMS0554 SOIL 6562300 319200 400 9 Corazon
CMS0555 SOIL 6562300 319240 400 8 Corazon
CMS0556 SOIL 6562300 319280 400 10 Corazon
CMS0557 SOIL 6562300 319320 400 4 Corazon
CMS0558 SOIL 6562300 319360 400 3 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

30

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

CMS0559 SOIL 6562300 319400 400 7 Corazon
CMS0560 SOIL 6562300 319440 400 5 Corazon
CMS0561 SOIL 6562300 319480 400 8 Corazon
CMS0562 SOIL 6562300 319520 400 5 Corazon
CMS0563 SOIL 6562300 319560 400 5 Corazon
CMS0564 SOIL 6562300 319600 400 27 Corazon
CMS0565 SOIL 6562300 319640 400 13 Corazon
CMS0566 SOIL 6562300 319680 400 7 Corazon
CMS0567 SOIL 6562300 319720 400 8 Corazon
CMS0568 SOIL 6562300 319760 400 7 Corazon
CMS0569 SOIL 6562300 319800 400 7 Corazon
CMS0570 SOIL 6562300 319840 400 8 Corazon
CMS0571 SOIL 6562300 319880 400 14 Corazon
CMS0572 SOIL 6562300 319920 400 13 Corazon
CMS0573 SOIL 6562300 319960 400 12 Corazon
CMS0574 SOIL 6562300 320000 400 9 Corazon
CMS0575 SOIL 6562300 320040 400 5 Corazon
CMS0576 SOIL 6562300 320080 400 4 Corazon
CMS0577 SOIL 6562300 320120 400 19 Corazon
CMS0578 SOIL 6562300 320160 400 20 Corazon
CMS0579 SOIL 6562300 320200 400 11 Corazon
CMS0580 SOIL 6562400 318680 400 86 Corazon
CMS0581 SOIL 6562400 318720 400 6 Corazon
CMS0582 SOIL 6562400 318760 400 4 Corazon
CMS0583 SOIL 6562400 318800 400 6 Corazon
CMS0584 SOIL 6562400 318840 400 7 Corazon
CMS0585 SOIL 6562400 318880 400 6 Corazon
CMS0586 SOIL 6562400 318920 400 9 Corazon
CMS0587 SOIL 6562400 318960 400 4 Corazon
CMS0588 SOIL 6562400 319000 400 6 Corazon
CMS0589 SOIL 6562400 319040 400 6 Corazon
CMS0590 SOIL 6562400 319080 400 9 Corazon
CMS0591 SOIL 6562400 319120 400 6 Corazon
CMS0592 SOIL 6562400 319160 400 7 Corazon
CMS0593 SOIL 6562400 319200 400 6 Corazon
CMS0594 SOIL 6562400 319240 400 13 Corazon
CMS0595 SOIL 6562400 319280 400 19 Corazon
CMS0596 SOIL 6562400 319320 400 8 Corazon
CMS0597 SOIL 6562400 319360 400 7 Corazon
CMS0598 SOIL 6562400 319400 400 6 Corazon
CMS0599 SOIL 6562400 319440 400 7 Corazon
CMS0600 SOIL 6562400 319480 400 6 Corazon
CMS0601 SOIL 6562400 319520 400 7 Corazon
CMS0602 SOIL 6562400 319560 400 8 Corazon
CMS0603 SOIL 6562400 319600 400 7 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

31

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

CMS0604 SOIL 6562400 319640 400 5 Corazon
CMS0605 SOIL 6562400 319680 400 5 Corazon
CMS0606 SOIL 6562400 319720 400 7 Corazon
CMS0607 SOIL 6562400 319760 400 9 Corazon
CMS0608 SOIL 6562400 319800 400 12 Corazon
CMS0609 SOIL 6562400 319840 400 10 Corazon
CMS0610 SOIL 6562400 319880 400 10 Corazon
CMS0611 SOIL 6562400 319920 400 9 Corazon
CMS0612 SOIL 6562400 319960 400 23 Corazon
CMS0613 SOIL 6562400 320000 400 10 Corazon
CMS0614 SOIL 6562400 320040 400 10 Corazon
CMS0615 SOIL 6562400 320080 400 8 Corazon
CMS0616 SOIL 6562400 320120 400 13 Corazon
CMS0617 SOIL 6562400 320160 400 18 Corazon
CMS0618 SOIL 6562400 320200 400 28 Corazon
CMS0619 SOIL 6562400 320240 400 32 Corazon
CMS0620 SOIL 6562500 318720 400 8 Corazon
CMS0621 SOIL 6562500 318760 400 8 Corazon
CMS0622 SOIL 6562500 318800 400 9 Corazon
CMS0623 SOIL 6562500 318840 400 5 Corazon
CMS0624 SOIL 6562500 318880 400 4 Corazon
CMS0625 SOIL 6562500 318920 400 7 Corazon
CMS0626 SOIL 6562500 318960 400 7 Corazon
CMS0627 SOIL 6562500 319000 400 5 Corazon
CMS0628 SOIL 6562500 319040 400 5 Corazon
CMS0629 SOIL 6562500 319080 400 6 Corazon
CMS0630 SOIL 6562500 319120 400 8 Corazon
CMS0631 SOIL 6562500 319160 400 5 Corazon
CMS0632 SOIL 6562500 319200 400 11 Corazon
CMS0633 SOIL 6562500 319240 400 5 Corazon
CMS0634 SOIL 6562500 319280 400 12 Corazon
CMS0635 SOIL 6562500 319320 400 8 Corazon
CMS0636 SOIL 6562500 319360 400 4 Corazon
CMS0637 SOIL 6562500 319400 400 6 Corazon
CMS0638 SOIL 6562500 319440 400 6 Corazon
CMS0639 SOIL 6562500 319480 400 5 Corazon
CMS0640 SOIL 6562500 319520 400 5 Corazon
CMS0641 SOIL 6562500 319560 400 8 Corazon
CMS0642 SOIL 6562500 319600 400 4 Corazon
CMS0643 SOIL 6562500 319640 400 4 Corazon
CMS0644 SOIL 6562500 319680 400 10 Corazon
CMS0645 SOIL 6562500 319720 400 7 Corazon
CMS0646 SOIL 6562500 319760 400 6 Corazon
CMS0647 SOIL 6562500 319800 400 18 Corazon
CMS0648 SOIL 6562500 319840 400 12 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

32

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

CMS0649 SOIL 6562500 319880 400 13 Corazon
CMS0650 SOIL 6562500 319920 400 40 Corazon
CMS0651 SOIL 6562500 319960 400 79 Corazon
CMS0652 SOIL 6562500 320000 400 37 Corazon
CMS0653 SOIL 6562500 320040 400 26 Corazon
CMS0654 SOIL 6562500 320080 400 17 Corazon
CMS0655 SOIL 6562500 320120 400 17 Corazon
CMS0656 SOIL 6562500 320160 400 18 Corazon
CMS0657 SOIL 6562500 320200 400 15 Corazon
CMS0658 SOIL 6562500 320240 400 45 Corazon
CMS0659 SOIL 6562600 318720 400 4 Corazon
CMS0660 SOIL 6562600 318760 400 8 Corazon
CMS0661 SOIL 6562600 318800 400 6 Corazon
CMS0662 SOIL 6562600 318840 400 6 Corazon
CMS0663 SOIL 6562600 318880 400 7 Corazon
CMS0664 SOIL 6562600 318920 400 7 Corazon
CMS0665 SOIL 6562600 318960 400 3 Corazon
CMS0666 SOIL 6562600 319000 400 4 Corazon
CMS0667 SOIL 6562600 319040 400 3 Corazon
CMS0668 SOIL 6562600 319080 400 2 Corazon
CMS0669 SOIL 6562600 319120 400 5 Corazon
CMS0670 SOIL 6562600 319160 400 5 Corazon
CMS0671 SOIL 6562600 319200 400 6 Corazon
CMS0672 SOIL 6562600 319240 400 6 Corazon
CMS0673 SOIL 6562600 319280 400 14 Corazon
CMS0674 SOIL 6562600 319320 400 17 Corazon
CMS0675 SOIL 6562600 319360 400 9 Corazon
CMS0676 SOIL 6562600 319400 400 8 Corazon
CMS0677 SOIL 6562600 319440 400 9 Corazon
CMS0678 SOIL 6562600 319480 400 7 Corazon
CMS0679 SOIL 6562600 319520 400 7 Corazon
CMS0680 SOIL 6562600 319560 400 12 Corazon
CMS0681 SOIL 6562600 319600 400 7 Corazon
CMS0682 SOIL 6562600 319640 400 4 Corazon
CMS0683 SOIL 6562600 319680 400 9 Corazon
CMS0684 SOIL 6562600 319720 400 13 Corazon
CMS0685 SOIL 6562600 319760 400 30 Corazon
CMS0686 SOIL 6562600 319800 400 39 Corazon
CMS0687 SOIL 6562600 319840 400 97 Corazon
CMS0688 SOIL 6562600 319880 400 60 Corazon
CMS0689 SOIL 6562600 319920 400 29 Corazon
CMS0690 SOIL 6562600 319960 400 30 Corazon
CMS0691 SOIL 6562600 320000 400 56 Corazon
CMS0692 SOIL 6562600 320040 400 31 Corazon
CMS0693 SOIL 6562600 320080 400 11 Corazon

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

33

Follow Us

==> picture [130 x 32] intentionally omitted <==

CMS0694 SOIL 6562600 320120 400 10 Corazon
CMS0695 SOIL 6562600 320160 400 6 Corazon
CMS0696 SOIL 6562600 320200 400 9 Corazon
CMS0697 SOIL 6562600 320240 400 7 Corazon
394063 SOIL 6564300 320252 400 30 SIPA
394064 SOIL 6564299 320275 400 9 SIPA
394065 SOIL 6564301 320300 400 14 SIPA
394066 SOIL 6564300 320325 400 14 SIPA
394067 SOIL 6564302 320350 400 44 SIPA
394068 SOIL 6564300 320375 400 67 SIPA
394069 SOIL 6564300 320399 400 40 SIPA
394070 SOIL 6564299 320424 400 10 SIPA
394071 SOIL 6564300 320450 400 10 SIPA
394072 SOIL 6564300 320476 400 6 SIPA
394073 SOIL 6564300 320500 400 14 SIPA
394074 SOIL 6564300 320525 400 23 SIPA
394075 SOIL 6564299 320550 400 19 SIPA
394076 SOIL 6564300 320575 400 3 SIPA
394077 SOIL 6564297 320601 400 10 SIPA
394078 SOIL 6564301 320625 400 8 SIPA
394079 SOIL 6564297 320651 400 4 SIPA
394080 SOIL 6564300 320674 400 15 SIPA
394081 SOIL 6564297 320709 400 11 SIPA
394082 SOIL 6564300 320725 400 5 SIPA
394083 SOIL 6564300 320751 400 18 SIPA
394084 SOIL 6564302 320774 400 11 SIPA
394085 SOIL 6564300 320800 400 17 SIPA
394086 SOIL 6564301 320825 400 14 SIPA
394087 SOIL 6564300 320850 400 34 SIPA
394088 SOIL 6564300 320875 400 20 SIPA
394089 SOIL 6564300 320901 400 6 SIPA
394090 SOIL 6564300 320924 400 7 SIPA
394091 SOIL 6564300 320950 400 4 SIPA
394092 SOIL 6564301 320976 400 13 SIPA
394093 SOIL 6564300 321000 400 8 SIPA
394094 SOIL 6564100 321176 400 8 SIPA
394095 SOIL 6564102 321150 400 24 SIPA
394096 SOIL 6564100 321125 400 58 SIPA
394097 SOIL 6564100 321100 400 70 SIPA
394098 SOIL 6564100 321075 400 12 SIPA
394099 SOIL 6564099 321049 400 32 SIPA
394100 SOIL 6564100 321025 400 7 SIPA
394101 SOIL 6564099 320999 400 5 SIPA
394102 SOIL 6564100 320975 400 15 SIPA
394103 SOIL 6564101 320949 400 45 SIPA

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

34

Follow Us

==> picture [130 x 32] intentionally omitted <==

394104 SOIL 6564101 320924 400 8 SIPA
394105 SOIL 6564099 320891 400 6 SIPA
394106 SOIL 6564101 320875 400 8 SIPA
394107 SOIL 6564099 320850 400 199 SIPA
394108 SOIL 6564099 320822 400 2 SIPA
394109 SOIL 6564100 320800 400 39 SIPA
394110 SOIL 6564100 320778 400 7 SIPA
394111 SOIL 6564100 320749 400 15 SIPA
394112 SOIL 6564101 320726 400 14 SIPA
394113 SOIL 6564099 320700 400 4 SIPA
394114 SOIL 6564103 320675 400 2 SIPA
394115 SOIL 6564103 320649 400 11 SIPA
394116 SOIL 6564100 320625 400 3 SIPA
394117 SOIL 6564099 320600 400 9 SIPA
394118 SOIL 6564099 320574 400 364 SIPA
394119 SOIL 6564100 320549 400 5 SIPA
394120 SOIL 6564100 320524 400 12 SIPA
394121 SOIL 6564099 320500 400 5 SIPA
394122 SOIL 6564098 320474 400 28 SIPA
394123 SOIL 6564102 320450 400 31 SIPA
394124 SOIL 6564100 320425 400 45 SIPA
394125 SOIL 6564099 320400 400 59 SIPA
394126 SOIL 6564098 320375 400 86 SIPA
394127 SOIL 6564100 320350 400 11 SIPA
394128 SOIL 6564100 320326 400 5 SIPA
394129 SOIL 6564096 320300 400 9 SIPA
394130 SOIL 6564098 320273 400 94 SIPA
394131 SOIL 6564098 320250 400 48 SIPA
394132 SOIL 6564100 320224 400 6 SIPA
394133 SOIL 6564100 320200 400 8 SIPA
394134 SOIL 6564100 320175 400 13 SIPA
394135 SOIL 6563499 320249 400 90 SIPA
394136 SOIL 6563501 320271 400 148 SIPA
394137 SOIL 6563500 320300 400 85 SIPA
394138 SOIL 6563504 320325 400 32 SIPA
394139 SOIL 6563500 320352 400 71 SIPA
394140 SOIL 6563500 320376 400 29 SIPA
394141 SOIL 6563500 320401 400 28 SIPA
394142 SOIL 6563500 320425 400 7 SIPA
394143 SOIL 6563500 320449 400 22 SIPA
394144 SOIL 6563499 320475 400 11 SIPA
394145 SOIL 6563499 320501 400 12 SIPA
394146 SOIL 6563500 320525 400 28 SIPA
394147 SOIL 6563500 320550 400 28 SIPA
394148 SOIL 6563500 320573 400 20 SIPA

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

35

Follow Us

==> picture [130 x 32] intentionally omitted <==

394149 SOIL 6563500 320600 400 10 SIPA
394150 SOIL 6563401 320574 400 14 SIPA
394151 SOIL 6563399 320549 400 57 SIPA
394152 SOIL 6563400 320524 400 13 SIPA
394153 SOIL 6563399 320499 400 98 SIPA
394154 SOIL 6563401 320476 400 30 SIPA
394155 SOIL 6563400 320451 400 8 SIPA
394156 SOIL 6563401 320424 400 25 SIPA
394157 SOIL 6563400 320399 400 7 SIPA
394158 SOIL 6563398 320374 400 13 SIPA
394159 SOIL 6563399 320350 400 8 SIPA
394160 SOIL 6563400 320327 400 36 SIPA
394161 SOIL 6563400 320300 400 21 SIPA
394162 SOIL 6563400 320274 400 38 SIPA
394163 SOIL 6563396 320250 400 13 SIPA
394164 SOIL 6563400 320225 400 22 SIPA
374874 SOIL 6564050 320600 400 17 SIPA
374875 SOIL 6564050 320543 400 15 SIPA
374876 SOIL 6564050 320486 400 37 SIPA
374877 SOIL 6564050 320429 400 32 SIPA
374878 SOIL 6564050 320371 400 26 SIPA
374879 SOIL 6564050 320314 400 54 SIPA
374880 SOIL 6564050 320257 400 33 SIPA
374881 SOIL 6564050 320200 400 20 SIPA

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

36

Follow Us