ASX ANNOUNCEMENT

OUTSTANDING METALLURGICAL RESULTS FROM KANGAROO HILLS

Highlights

  • X-Ray Diffraction (XRD) test results confirm spodumene is the predominant lithium mineral (comprising ~90% of the Li2O) in Big Red pegmatite.

  • Outstanding metallurgical results demonstrate Big Red is amenable to conventional Dense Media Separation (DMS) and Froth Flotation separation techniques.

  • Low process complexity and strong recovery from Big Red material to produce high-quality, marketable spodumene concentrate:

  • DMS: Heavy Liquid Separation (HLS) undertaken on -3.35mm +850um fraction produced spodumene concentrate grading 5.56% Li2O with a stage recovery of 52.9%.

  • Froth Flotation: Whole-of-Ore (WOO) Fines Flotation produced a spodumene concentrate with a grade of 5.50% Li2O at an overall recovery of 76.9%.

  • Hybrid flowsheet design (DMS + Froth Flotation) could be utilised to maximise process outcomes.

  • Additional metallurgical optimisation offers further potential enhancement to lithium recovery and product concentrate specifications.

  • Next phase of metallurgical testwork to be undertaken following completion of upcoming Phase 4 drill program at Kangaroo Hills.

  • The Big Red pegmatite is thick, high grade, shallow dipping from surface and open to the north, with strike extension planned to commence with the upcoming Phase 4 drill program.

Future Battery Minerals Limited (ASX: FBM) ( FBM or the Company ) is pleased to announce outstanding results from the maiden metallurgical testwork program for its 100%-owned Kangaroo Hills Lithium Project ( KHLP ) in Western Australia.

FBM Managing Director and CEO, Nicholas Rathjen, commented:

“The testwork results indicate that processing of Big Red material via a hybrid flowsheet utilising both DMS and Froth Flotation can produce a high-grade, marketable spodumene concentrate with low impurity levels at robust recoveries. Being only preliminary testing, the results also demonstrate ample opportunity for further optimisation with more refined process evaluation across subsequent metallurgical testwork phases.”

“The next stage of metallurgical testing is set to commence after completion of the upcoming Phase 4 drilling program at the KHLP. This drill program will test the interpreted extension of the Big Red mineralisation, as well as other high-potential resistivity targets in the northern part of the project. This program it will also deliver additional, and broader, mineralisation samples for the further metallurgical testwork planned for Kangaroo Hills.”

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 12] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

1

==> picture [130 x 32] intentionally omitted <==

Preliminary metallurgical testwork program overview

Nagrom Laboratories, Perth ( Nagrom ) were engaged to conduct a testwork program on mineralised material from the Big Red pegmatite at the KHLP. The results were then independently reviewed and interpreted by MinSol Engineering Pty Ltd ( MinSol ), where key personnel have significant experience in lithium processing, metallurgy, and plant design.

The purpose of this program was to assess the amenability of the Big Red mineralisation to conventional spodumene separation process techniques, namely Dense Media Separation ( DMS ) and Fines Froth Flotation.

Five (5) diamond core samples were selected for the program based on their central proximity within the identified mineralised zones at grades aligning with typical drilling assay results to date from the Big Red lithium-mineralised pegmatite:

  • Composite 1 – KHDD001[1]

  • Composite 2 – KHDD001[1]

  • Composite 3 – KHDD002[1]

  • Composite 4 – KHDD002[1]

  • Composite 5 – KHDD001[1]

A summary of these samples is provided in Table 1, with drill hole locations shown in Figure 1 and an example core sample location shown in Figure 2.

Table 1 – Composites Summary

Composite Name Hole ID Depth Grade (% Li2O)
Composite #1 KHDD001 51m – 58m 1.23
Composite #2 KHDD001 61m – 67m 1.40
Composite #3 KHDD002 23m – 28.5m 1.14
Composite #4 KHDD002 15-18m; 27-29m 1.75
Composite #5 KHDD001 45m-49m; 58m-61m 1.40

1 Refer to ASX Announcement dated 18 July 2023 – “Further High-Grade Lithium Results at Kangaroo Hills”

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

2

Follow Us

==> picture [130 x 32] intentionally omitted <==

==> picture [462 x 361] intentionally omitted <==

Figure 1 - Sample drill hole locations at Big Red pegmatite within the broader KHLP

==> picture [455 x 228] intentionally omitted <==

Figure 2 - Metallurgical composite sample location from Big Red pegmatite in KHDD001 hole[2]

  • 2 All references to 'visible observations' in this announcement are references to visual observations of samples from drill holes for which chemical assay results have been provided in the assay results table in Table 1 to Table 5 of this announcement or previous announcements.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

3

Follow Us

==> picture [130 x 32] intentionally omitted <==

Composite samples #1 to #4 were used initially to undertake preliminary liberation testwork to determine Heavy Liquid Separation ( HLS ) performance at alternate crush sizes as well as to develop a preliminary flotation reagent regime and define the deslime and magnetic separation requirements for the fine fractions.

Composite #5 was then processed through HLS at a single size fraction, followed by a Whole of Ore ( WOO ) Fines Flotation test program based on the refined parameters set by the prior testing. The testwork processing method for Composite #5 comprised the following steps:

1. Sample Preparation

  • Stage crushing to P100 3.35mm.

  • Sample split for HLS tests and WOO flotation tests.

2. Heavy Liquid Separation (HLS)

  • Wet screening at 0.85mm.

  • HLS densiometric sequential testing and analysis on the -3.35mm +0.85mm fraction at Specific Gravity ( SG ) of 2.70, 2.80, 2.85, 2.90 and 2.96.

3. WOO Fines Flotation

  • Grind establishment on 3 x 1kg charges.

  • Grinding of individual -3.35mm feed samples to P80 of 150µm.

  • Flotation feed de-sliming at 38µm.

  • Removal of iron bearing minerals by magnetic separation at +3000 Gauss.

  • Sighter flotation tests (rougher, scavenger, cleaner, re-cleaner) on the non-magnetic fraction.

XRD data for Composite #5 suggested that approximately 90% of the Li2O is present as spodumene. A detailed description of each test program is provided below for Composite #5.

DMS: Heavy Liquid Separation (HLS)

Screening the -3.35mm crushed Composite #5 at 0.85mm resulted in a mass yield of 58.27% to the oversize and 41.73% to the undersize.

The -3.35mm +0.85mm fraction was then subjected to HLS at the SGs noted above, with key results summarised in Table 2 (for SG 2.85) and Figure 3 (all SGs). While the tests were undertaken at sequential densiometric intervals, the results have been simplified to show a single product (sinks) and waste / re-treat fraction (floats).

Table 2 - Composite #5 HLS results – SG 2.85

Sample Wt.% Assays (%) Assays (%) Recovery (%) Recovery (%)
**Li2O ** Fe2O3 **Li2O ** Fe2O3
Calc Head 100.00 1.48 0.35 - -
2.85 Floats 86.63 0.76 0.29 47.10 69.81
2.85 Sinks (product) 13.37 5.56 0.80 52.90 30.19

==> picture [10 x 8] intentionally omitted <==

ASX: FBM

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

4

Follow Us

==> picture [130 x 32] intentionally omitted <==

==> picture [483 x 305] intentionally omitted <==

Figure 3 - Sequential HLS Stage Results

As per these results, at a HLS conducted at SG 2.90 the expected sinks concentrate yield would be 9.59% with a grade of 6.14% Li2O and recovery of 41.89%. HLS at SG 2.85 yielded a spodumene concentrate grading 5.56% Li2O and recovery of 52.90%.

==> picture [481 x 179] intentionally omitted <==

Figure 4 - HLS concentrate fractions grading ~6.0% Li2O (left) and ~5.5% Li2O (right)

The combined screening and HLS results are provided in Table 3 to show global recoveries to various target concentrate grades.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

5

Follow Us

==> picture [130 x 32] intentionally omitted <==

Table 3 - Global recoveries for HLS testwork – Composite #5

Target
Product
Grade
(% Li2O)
-0.85mm -0.85mm HLS Floats HLS Floats HLS Sinks HLS Sinks
Grade (%
Li2O)
Global Li2O
Recovery (%)
Grade (%
Li2O)
Global Li2O
Recovery (%)
Grade (%
Li2O)
Global Li2O
Recovery (%)
6.00 1.30 38.51 0.87 34.14 6.00 27.35
5.50 1.30 38.51 0.75 28.29 5.50 33.20
5.00 1.30 38.51 0.64 22.66 5.00 38.83

The high grade product produced indicates that a hybrid processing flowsheet incorporating both DMS and fines flotation could be utilised to maximise process outcomes at marketable product grades.

Froth Flotation: Whole of Ore (WOO) Fines Flotation

A split of the -3.35mm crushed product first underwent grinding to target a product P80 of 150µm. The ground feed was deslimed by wet screening at 38µm before the +38µm material was submitted to magnetic separation to remove typical iron bearing minerals that are found in spodumene bearing pegmatites. The non-magnetics were then tested by three flotation tests utilising common industry practise regimes and reagents.

==> picture [480 x 394] intentionally omitted <==

Figure 5 - Initial mineralised froth at the start of rougher flotation

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

6

==> picture [130 x 32] intentionally omitted <==

Results from the Composite #5 WOO Fines Flotation tests are presented in Table 4 and Figure 6.

Table 4 - WOO Fines Flotation stage test results

Stage Grade (%) Grade (%) Stage Recovery (%) Stage Recovery (%)
**Li2O ** Fe2O3 **Li2O ** Fe2O3
Re-Cleaner Con 5.87 1.06 90.27 78.91
Cleaner Con 5.54 1.03 92.21 82.83
Rougher Con 4.34 0.84 95.45 89.03
Rougher Tail 0.10 0.05 4.55 10.97
Forecast 6.00 1.07 82.81 71.49
Forecast 5.50 1.03 92.31 83.02
Forecast 5.00 0.94 93.66 85.60

==> picture [470 x 323] intentionally omitted <==

Figure 6 - WOO Fines Flotation grade / recovery stage results

The combined deslime, magnetic separation and WOO Fines Flotation results are provided below to show global recoveries for various target concentrate grades.

Table 5 - WOO Fines Flotation process grade / recovery global results

Slimes Slimes Mags Mags Global Flotation Concentrate Recovery
(% Li2O)
Global Flotation Concentrate Recovery
(% Li2O)
Global Flotation Concentrate Recovery
(% Li2O)
(% Li2O)
Grade
(Li2O)
Recovery
(% Li2O)
Grade
(Li2O)
Recovery
(% Li2O)
**@ 6.0% Li2O ** **@ 5.5% Li2O ** **@ 5.0% Li2O **
1.09 14.92 2.27 1.72 69.03 76.94 78.07

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

Future Battery Minerals Ltd [email protected] ASX: FBM Suite 10, 38 Colin St, West Perth WA 6005 +61 8 6383 7817 ABN 91 148 966 545 futurebatteryminerals.com.au Follow Us

7

==> picture [130 x 32] intentionally omitted <==

Key conclusions

These initial testwork results indicate that a hybrid flowsheet utilising both DMS and Fines Flotation can produce a high-grade, marketable spodumene concentrate with low levels of contaminants.

The testwork conducted was at a preliminary stage with the application of only first-principles processing methodologies and minimal optimisation work. This leaves potential for significant further improvement in lithium recovery and concentrate product parameters with subsequent, more advanced testwork programs detailed below.

Next phase testwork

The outcomes of this initial program have led to the following recommendations for the next stage of metallurgical evaluations following the Phase 4 drilling program at the KHLP:

  • Optimisation of DMS flowsheet, including:

  • More detailed liberation analysis.

  • Options for single and two-stage DMS flowsheets to target improved recoveries.

  • Options for processing multiple DMS size fractions.

  • Combined hybrid flowsheets to define global recoveries for DMS integration with Fines Froth Flotation.

  • Optimisation of grind size and desliming requirements for Fines Froth Flotation.

  • Optimisation of flotation parameters and reagent selection.

Upcoming Phase 4 drill program

Permitting for the KHLP Phase 4 drill program is advancing, with drilling targeted to commence in Q1 2024. The Big Red pegmatite is thick, high grade, shallow dipping from surface and remains open to the north and at depth, with the Phase 4 program planned to include RC drilling of Big Red Extension to be undertake first, followed by scout testing of Quokka, Big Red West, Big Red North and Western Grey. The program will also include further diamond drilling (DD) of Big Red for ongoing metallurgical testwork and Mineral Resource Estimate definition drilling (RC). The delivery of the maiden KHLP Mineral Resource Estimate is now targeted in Q4 2024 to allow inclusion of results from the program.

This announcement has been authorised for release by the Board of Directors of the Company.

-END-

For further information visit www.futurebatteryminerals.com or contact:

Nicholas Rathjen Robin Cox CEO & Managing Director Technical Director E : [email protected] E : [email protected] T : +61 (08) 6383 7817 T : +61 (08) 6383 7817

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

8

Follow Us

==> picture [130 x 32] intentionally omitted <==

Competent Persons Statement

The information in this release that relates to metallurgy and metallurgical test work has been reviewed by Mr Robert Simmons, MAusIMM, B. Eng. (Chemical Engineering). Mr Simmons is not an employee of the Company, but is employed as a contract consultant. Mr Simmons is a Member of the Australasian Institute of Mining and Metallurgy, he has sufficient experience with the style of processing response and type of deposit under consideration, and to the activities undertaken, to qualify as a competent person as defined in the 2012 edition of the “Australian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves” (The JORC Code). Mr Simmons consents to the inclusion in this report of the contained technical information in the form and context as it appears.

Forward-Looking Statements

This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Future Battery Minerals Ltd’s planned exploration program and other statements that are not historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Ltd believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements.

Previously Reported Results

There is information in this announcement relating to exploration results which were previously announced on 18 July 2023. Other than those disclosed in the announcement, the Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

9

==> picture [130 x 32] intentionally omitted <==

JORC Code, 2012 Edition, Table 1 (Kangaroo Hills Lithium Project) Section 1: Sampling Techniques and Data

CRITERIA EXPLANATION COMMENTARY
Sampling
techniques

Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.

Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.

Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1m
samples from which 3kg was pulverised to
produce a 30g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Future Battery Minerals Limited (FBM):

Lithium-Caesium-Tantalum (LCT) mineralisation at
the Kangaroo Hills Lithium Project (KHLP) has
been sampled from the following drilling
techniques.

Diamond core drilling (DD) reported is yet to be
sampled. Sampling will be conducted on quarter
core in order to preserve bulk sample for
metallurgical test work.

Metallurgical testwork results reported in this
announcement relate to material sourced from
Diamond Drill Holes (DDH) drilled by FBM at the
Big Red prospect.

Spodumene concentrate testwork was completed
on five (5) composite samples of ore.
Drilling techniques
Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so,bywhat method,etc).
FBM:

HQ Diamond Core drilling is reported in this
announcement.
Drill sample
recovery

Method of recording and assessing core and
chip sample recoveries and results assessed.

Measures taken to maximise sample recovery
and ensure representative nature of the
samples.

Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
FBM.

Diamond core recovery is recorded by both the
drilling contractors and measured by FBM
geologists

No relationship between sample recovery and
grade has been yet observed and no sample
bias is believed to have occurred.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.

The total length and percentage of the relevant
intersections logged.
FBM:

Core is logged lithologically by Geologists in
the field.

Natural changes in mineral abundance are
recorded
Sub-sampling
techniques and
sample preparation

If core, whether cut or sawn and whether
quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.

For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.

Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.

Whether sample sizes are appropriate to the
FBM:

Certified reference material and blank material
are inserted every 20 samples as per company
QA/QC procedure for both DD & RC.

Diamond core sampling will consist of cut core
with quarter core utilised for geochemical assay.

Metallurgical testwork results relate to material
sourced from Diamond Drill Holes (DDH) drilled
by FBM at the Big Red prospect.

Spodumene concentrate testwork was
completed on composite samples.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

10

Follow Us

==> picture [130 x 32] intentionally omitted <==

CRITERIA EXPLANATION COMMENTARY
grain size of the material being sampled.
Quality of assay
data and laboratory
tests

The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.

For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.

Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
FBM:

ALS Minerals, multi element analysis method ME-
ICP61 utilised for all samples, consisting of multi
acid digestion with HF and ICP-AES analysis. Over
limit method Ni-OG62H for ore grade Ni consisting
of four acid digestion with ICP-AES analysis. PGM-
ICP23 fire assay ICP-AES finish method used
selectively for samples considered to contain Pt,
Pd & Au. All methods are considered suitable for
the style of mineralisation targeted.

Certified Reference Material (CRM’s)and quartz
blank (Blanks) samples are inserted 1:20 for DD
& RC and 1:30 for AC as part of Future
Battery’s QA/QC procedure. Accuracy and
performance of CRM’s and Blanks are
considered after results are received.

A stoichiometric conversion of Li to Li2O is
applied consisting of a factor 2.153.
X-Ray Diffraction

Semi Quantitative X-Ray Diffraction was caried
out on rock chip samples by ALS Laboratories.

The analysis provides both a qualitative
assessment of the mineralogy and a
quantitative result.

All test work analysis has been undertaken by
Nagrom Laboratories Perth. Representative
subsamples were submitted for Li assay and
whole rock analysis (XRF/ICP), for suite which
includes SiO2, Al2O3, Fe2O3, MgO, CaO,
Na2O, K2O, TiO2, P2O5, MnO, Cr2O3, V2O5,
and loss on ignition(LOI).
Verification of
sampling and
assaying

The verification of significant intersections by
either independent or alternative company
personnel.

The use of twinned holes.

Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.
FBM:

No third-party verification has been completed
to date for drilling.

Drill holes have not been twinned

All primary paper data is held on site, digitised
data is held in a managed database off site.

No adjustments to assays have occurred.

Technical representatives from Latin and SGS
have visually inspected and verified the
metallurgical test work procedures and results.
Location of data
points

Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.

Specification of the grid system used.

Qualityand adequacyof topographic control.
FBM:

Drill collars have been surveyed using a
Differential GPS +- 0.1m accuracy.
Data spacing and
distribution

Data spacing for reporting of Exploration
Results.

Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.

Whether sample compositinghas been applied.
FBM:

Drill data spacing is sufficient to establish the
degree of geological and grade continuity
appropriate for this stage of exploration and
understanding of mineralisation
Orientation of data
in relation to
geological structure

Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.

If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a samplingbias, this should be
FBM:

Drill holes azimuth is perpendicular to
stratigraphic strike

Drill hole dip is regarded suitable for
subvertical stratigraphy and provides a near
too true width intersection to minimise
orientation bias.

Thegeometryof drill holes relative to the

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

11

Follow Us

==> picture [130 x 32] intentionally omitted <==

CRITERIA EXPLANATION COMMENTARY
assessed and reported if material. mineralised zones achieves unbiased sampling
of this deposit type.

No orientation-based sampling bias has been
identified.
Sample security
The measures taken to ensure sample security.
FBM:

Drill samples are collected in labelled
polyweave bags and closed with tight zip ties.

Samples are transported within 1-2days of hole
completion by field staff directly to ALS
laboratories.
Audits or reviews
The results of any audits or reviews of sampling
techniques and data.

No independent audit or review has been
undertaken.

Section 2: Reporting of Exploration Results


CRITERIA

EXPLANATION
COMMENTARY
Mineral tenement and
land tenure status

Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.

The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.

The Kangaroo Hill Lithium Project consists of
8 prospecting leases.

P15/5740, P15/5741, P15/5742, P15/5743,
P15/5749, P15/5750, P15/5963, P15/5965,
M15/1887 (in application), P15/6681 (in
application), P15/6813 (in application)

All leases are held by Eastern Coolgardie
Goldfields Pty Ltd (ECG), a wholly owned
subsidiary of Future Battery Minerals Ltd

No known royalties exist on the leases.

There are no material issues with regard to
access.

The tenement is in good standing and no
known impediments exist.
Exploration done by
other parties

Acknowledgment and appraisal of exploration
by other parties.

Exploration drilling has been conducted by the
previous lease holders, Metals Exploration NL,
Endeavour, St Francis Mining, Anaconda,
Spinifex Nickel, Ausminex NL - Consolidated
Nickel Pty Ltd.

Focus Minerals owned the project between
2007-2020.

Data collected by these entities has been
reviewed in detail byFBM.
Geology
Deposit type, geological setting and style of
mineralisation.

The Kangaroo Hills Lithium Project is regarded
as a Lithium Caesium Tantalum (LCT)
enriched pegmatite which intrudes older
Archaen agedgreenstone lithologies.
Drill hole Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level –
elevation above sea level in metres) of the
drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

If the exclusion of this information is justified
on the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.

Drill hole locations referenced have been
supplied in previous cross-referenced
announcements.
Data aggregation
methods

In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material
and should be stated.

Where aggregate intercepts incorporate short
lengths of high-grade results and longer
lengths of low-grade results,theprocedure

Exploration Results were reported by using
the weighted average of each sample result by
its corresponding interval length, as is industry
standard practice.

Grades >0.3% Li2O are considered significant
for mineralisation purposes.

A lower cut-off grade of 0.3% Li2O has been
used to report the Exploration results. Top-

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

12

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

CRITERIA EXPLANATION COMMENTARY
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.

The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
cuts were deemed not applicable.

Metal equivalent values have not been used.
Relationship between
mineralisation widths
and intercept lengths

These relationships are particularly important
in the reporting of Exploration Results.

If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.

If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length,
true width not known’).

Drill holes are both vertical and angled to the
East so that intersections are orthogonal to the
orientation of stratigraphy.
Diagrams
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.

Relevant diagrams have been included within
the announcement.
Balanced reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.

All significant intercepts have been previously
reported in cross referenced announcements.
Other substantive
exploration data

Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and
rock characteristics; potential deleterious or
contaminatingsubstances.

No other substantive data exists.
Further work
The nature and scale of planned further work
(eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commerciallysensitive.

Further Metallurgical testwork will be carried
out following the completion of extension
drilling, scheduled to commence Q1 2024.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

13

Follow Us