Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ORE RESOURCES LIMITED Capital/Financing Update 2024

Oct 29, 2024

65504_rns_2024-10-29_39c7ea61-9b69-4ef1-8a57-3f5f1798d431.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 80] intentionally omitted <==

30 October 2024

ASX ANNOUNCEMENT

Amended Announcement

NEW GEOCHEMICAL RESULTS DEFINE LITHIUM DRILL TARGETS AT MIRIAM

Future Battery Minerals Limited ( ASX: FBM ) ( FBM or the Company ) refers to the ASX announcement dated 30 October 2024 titled New Geochemical Results Define Lithium Drill Targets at Miriam ( Announcement ).

The Company advises that the Announcement has been amended to include discussion of results, table displaying soil sampling assay results and the locations of the soil samples. Please refer to the attached Announcement.

This announcement has been approved for release by the Managing Director.

-END-

For further information visit www.futurebatteryminerals.com or contact:

Silfia Morton Company Secretary E : [email protected]

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 13] intentionally omitted <==

==> picture [13 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

==> picture [595 x 80] intentionally omitted <==

30 October 2024

ASX ANNOUNCEMENT

NEW GEOCHEMICAL RESULTS DEFINE LITHIUM DRILL TARGETS AT MIRIAM

Highlights

  • Assays returned from wide-spaced extensional soil sampling program completed at Miriam.

  • Expanded 750m-long lithium anomaly identified, extending previously identified anomaly by circa 450m.

  • A further four new anomalous lithium zones identified, overlapping and coincident with established geophysical targets.

  • Preparations underway for initial Miriam drill program in H1 2025, with Program of Works (PoW) submitted and Reverse Circulation (RC) hole planning in progress.

  • Low-cost ground gravity surveys to commence during current quarter, further de-risking drill hole targeting.

  • FBM is well-funded to pursue future exploration programs and growth opportunities across its highly prospective project portfolio (A$4.7M cash and zero debt at 30 September 2024 0F [1] ).

Future Battery Minerals Ltd ( ASX: FBM ) ( FBM or the Company ) advises of the receipt of assay results for the recent soil sampling program at its Miriam Lithium Project ( Miriam ) in the Western Australian Goldfields region.

The Kangaroo Hills and Miriam areas have attractive near-surface, shallow dipping, thick, spodumene bearing lithium pegmatites. The projects continue to hold significant upside potential for new discoveries and resource growth, located in one of the premier mining regions in the world and proximal to existing infrastructure including the operating hard rock lithium mine, Mount Marion.

FBM Managing Director and CEO, Nick Rathjen, commented:

“Our recent wide-spaced extensional soil sampling program at Miriam is an example of cost-effective exploration, allowing us to both systematically assess the potential of this tenure and concurrently expand the number of priority targets for drill testing. The geochemistry in combination with geophysics, enhances the definition of our search area for valuable shallow subsurface mineralised pegmatites. Importantly, these targets, point to the regional scale potential for new discoveries in addition to the significant lithium we have at the Kangaroo Hills Project.

“The results from this program, which covered the mid-section of our Miriam tenure, are extremely encouraging. The substantial extension of one existing soil anomaly, coupled with the identification of four new nearby targets demonstrating robust Li anomalism, is a strong outcome. It is also important to note that these newly identified areas of lithium soil anomalism overlap with our recently generated geophysical targets, providing layers to the targets and further enhancing the overall attractiveness of these areas for prompt drill testing.”

“We continue to advance Miriam in a disciplined and pragmatic manner, with anticipation building in the lead up to our initial RC drill program in H1 2025. With a healthy cash balance to fund future work programs, we continue to exercise a systematic but energetic approach to exploration of this exciting tenure.”

1 Refer to ASX Announcement dated 23 October 2024 – “Quarterly Activities/Appendix 5B Cash Flow Report”

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 12] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

1

Follow Us

==> picture [130 x 32] intentionally omitted <==

Extensional soil sampling program delivers suite of new high-potential targets

Soil sampling is considered a low cost and fast method of defining broad geochemical anomalies for immediate drill testing or further target refinement. Soil sampling is particularly effective in terrains such as the neighbouring Kangaroo Hills Lithium Project and Miriam, where substantial in-situ regolith and little-to-no transported alluvium produce more reliable surface geochemical datasets.

==> picture [441 x 523] intentionally omitted <==

Figure 1: Location map of Kangaroo Hills and Miriam Lithium Projects

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

2

==> picture [130 x 32] intentionally omitted <==

Previous soil sampling activities at Miriam were limited to only 2.6 km (north-south) of the tenure’s approximately 6 km extent. The wide-spaced extensional soil sampling program undertaken in September and October 2024 was designed to test for potential blind, subsurface pegmatites, extending further north into the tenure (refer Figures 1 and 2). It expanded the soil sampling grid at Miriam a minimum of approximately 700m further north and up to 2.3 km further north in the northwestern area, all within areas now covered by heritage surveys. The soils program follows the recent target-generative magnetic litho-structural geophysical review of Miriam, which identified 13 discrete structural targets that may serve as potential conduits or host structures for LCT pegmatites.

The extensional soils program was completed on a 40m sample spacing by 100m line spacing grid, resulting in the retrieval of over 400 samples. The program followed on from the previous soil program conducted by Corazon Mining Ltd ( CZN or Corazon ) 1F[2] in 2023, which only tested the southern portion of Miriam, where outcropping spodumene pegmatites were present. As a result, the northern half of the Miriam tenure remains largely untested using modern LCT pegmatite exploration methods. Accordingly, FBM is utilising both geophysics and surface geochemistry across these areas for initial target generation and ranking for future drill testing.

The prior soil program undertaken by Corazon identified a 1.6 km north-south striking lithium soil anomaly that coincided with the mapped outcropping spodumene pegmatites and numerous geophysical targets. While sampling had only tested the southern end of the tenure, it was identified that a building lithium anomaly was present on the final northern-most lines of the survey.

Assays from the recent soils program have identified a 750m north-south anomaly (an approximate 450m extension) that coincides with geophysical structural targets. The assay results also reveal four other areas of robust Li anomalism across the sampled area (refer Figure 2). Pleasingly, these areas also overlap with established geophysical targets.

Discussion of Results

Analysis of the soil assay results highlighted that the typical regolith at Miriam contained levels of lithium in the <10ppm range. Utilising this value range as a baseline, areas of anomaly have been defined by increased lithium concentrations. The sampling discovered that five zones with continuous results ranging from 2540ppm Li were present within the survey area and is considered anomalous to the background values. This anomalous range correlates with previous sampling conducted in the south which covered known LCT pegmatite outcropping and spodumene occurrences and is considered a reliable Li dispersion value.

The five anomalous zones potentially indicate the presence of further sub-surface LCT pegmatites that may be further tested and validated through drilling.

2 Refer to Corazon Mining (CZN) ASX Announcement dated 29th March 2023; Miriam Lithium Soil Results

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

3

Follow Us

==> picture [130 x 32] intentionally omitted <==

==> picture [475 x 564] intentionally omitted <==

Figure 2: Key results from wide-spaced extensional soil sampling program at Miriam

Ground gravity program set to commence and first drilling in H1 2025

FBM has scheduled ground gravity geophysical surveys to commence at Miriam over the coming month . These surveys will test for relative density changes within the subsurface rocks, which may potentially represent changes in lithology from greenstone mafics to pegmatites, and will also collaborate the structural interpretation. This low-cost survey work can greatly improve drill hole targeting, particularly regarding planned drill hole depth and direction, further de-risking initial exploration drilling activities.

==> picture [10 x 8] intentionally omitted <==

ASX: FBM

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

4

Follow Us

==> picture [130 x 32] intentionally omitted <==

Preparations are also underway for FBM’s initial drill program at Miriam, scheduled for H1 2025. The PoW for drilling approval has been submitted, and initial drill hole locations are being finalised.

The initial drilling is set to target the +1.5km soil anomaly at the southern end of the Miriam tenure, which correlates with both spodumene outcrops and key geophysical targets. An initial program of RC drilling is being designed to test this high-priority target, providing key information on the thickness and orientation of the mineralised system, and paving the way for targeted follow-up programs to accurately delineate the expanding system.

This announcement has been authorised for release by the Board of Directors of the Company.

-END-

-END- -END-
For further information visitwww.futurebatteryminerals.com or contact:
Nicholas Rathjen Robin Cox
CEO & Managing Director Technical Director
E: [email protected] E: [email protected]

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

5

==> picture [130 x 32] intentionally omitted <==

Competent Persons Statement

The information in this announcement that relates to exploration results is based on and fairly represents information compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy. Mr Cox is the Company’s Chief Geologist and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Cox consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

Forward-Looking Statements

This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Future Battery Minerals Limited’s planned exploration program and other statements that are not historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential", "should," and similar expressions are forward-looking statements. Although Future Battery Minerals Limited believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements.

Previously Reported Results

The information in this announcement that relates to Exploration Results is extracted from the ASX announcements (Original Announcements), as referenced, which are available at www.futurebatteryminerals.com.au. FBM confirms that it is not aware of any new information or data that materially affects the information included in the Original Announcements and, that all material assumptions and technical parameters underpinning the estimates in the Original Announcements continue to apply and have not materially changed. FBM confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified from the original announcement.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

6

==> picture [130 x 32] intentionally omitted <==

About Future Battery Minerals (ASX: FBM)

Future Battery Minerals (ASX: FBM) is a future-facing minerals exploration and development company focused on rapidly advancing its two new world-class lithium discoveries.

Our flagship asset is the 100%-owned Kangaroo Hills Lithium Project (KHLP). The KHLP is located in the Goldfields of Western Australia, approximately 17km south of the major township of Coolgardie, and hosts the exciting Big Red, Rocky and Potoroo hard rock lithium discoveries. Immediately north and contiguous to the KHLP is the Miriam Project, the recent acquisition of which doubled our regional footprint. Miriam is located immediately along strike from the KHLP and holds a large historic lithium soil anomaly extending from an outcropping spodumene-rich pegmatite, providing a significant opportunity for future discovery success. These project areas are being rapidly advanced in parallel by FBM’s experienced team, focusing on resource growth, metallurgical testwork and development readiness.

The Goldfields are a lithium endowed province of Western Australia, with numerous operating and developing Lithium projects. Notably, the KHLP is only 30km’s directly west and 45km’s via sealed road to the Mt Marrion Lithium Mine operated by Mineral Resources Ltd (ASX: MIN). KHLP and Miriam are accessible via a sealed road leading south from Coolgardie, ensuring the Company has continuous access all year-round.

Our other key portfolio asset is the Nevada Lithium Project (NLP). A large-scale, high-grade initial lithium claystone Mineral Resource Estimate (MRE) was recently declared for the Lone Mountain deposit within the NLP, with this MRE being delivered less than 12 months from discovery. The business is evaluating a range of potential commercialisation routes for the NLP.

==> picture [487 x 236] intentionally omitted <==

About Lithium

Lithium is a soft silvery-white metal which is highly reactive and does not occur in nature in its elemental form. In nature it occurs as compounds within hard rock deposits, salt brines and claystone. Lithium and its chemical compounds have a wide range of industrial applications resulting in numerous chemical and technical uses. Lithium has the highest electrochemical potential of all metals, a key property in its role in lithium-ion batteries.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

7

Follow Us

==> picture [130 x 32] intentionally omitted <==

JORC Code, 2012 Edition, Table 1 Section 1: Sampling Techniques and Data

CRITERIA EXPLANATION COMMENTARY
Sampling
techniques

Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.

Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1m
samples from which 3kg was pulverised
to produce a 30g charge for fire assay’).
In other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.

Soils Sampling was conducted on a
planned grid consisting of 40m sample
spacing and 100m line spacing which is
consistent with the previous sampling grid
conducted by Corazon Mining.

Samples were collected with hand tools,
removing the top 10-20cm of soil in order
to remove organic matter, before digging
a further 10cm of soil for sieving.

Approximately 200g of sieved soil was
collected at each site, utilising a –0.18mm
mesh.

A total of 418 samples were collected
Corazon Rock and Soil Sampling –
A total of 636 soil samples were collected
Soil sampling was conducted on a 100mx40m
grid.
Results of the Corazon soil programme were
announced by Corazon Mining on 29thof
March 2023
Results of the Corazon rock chips were
announced on the 17thof January 2023
Drilling
techniques

Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
No Drilling results reported
Drill sample
recovery

Method of recording and assessing core
and chip sample recoveries and results
assessed.

Measures taken to maximise sample
recovery and ensure representative
nature of the samples.

Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarsematerial.
No Drilling reported
Logging
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
No logging results reported

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

8

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==


The total length and percentage of the
relevant intersections logged.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and
whether quarter, half or all core taken.

If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.

For all sample types, the nature, quality
and appropriateness of the sample
preparation technique

Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.

Whether sample sizes are appropriate
to the grain size of the material being
sampled.

Soil was sieved using a –0.18mm nylon
mesh

Soil sampling is considered a sufficient
first pass geochemical assessment of the
ground where appropriate regolith exists.

Geochemical anomalies are relative to
the surrounding geochemistry

Sampling grids are designed to cover
large area’s in order to allow identification
of anomalous zones

200g samples are appropriate
Quality of assay
data and
laboratory tests

The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.

For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.

Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.

Samples were submitted to ALS
laboratories

All samples were assayed for multi
element geochemistry utilising a 4 Acid
digest with mass spectrometry finish (ME-
MS61)

Duplicate samples are inserted at 1;25
ratio
Verification of
sampling and
assaying

The verification of significant
intersections by either independent or
alternative company personnel.

The use of twinned holes.

Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.

Discuss any adjustment to assay data.

No independent verification has been
conducted

Duplicate samples are inserted at 1:25

Field sample sheets are maintained

Field data is imported to the FBM
geochemistry database.

No adjustments are made to assay data
Location of data
points

Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic
control.

Samples are located utilising a hand held
GPS with a accuracy +/-5m. Which is
suitable for this form of sampling

Geospatial grid information is
represented in UTM MGA 94 Zone 51
Data spacing
and distribution

Data spacing for reporting of
Exploration Results.

Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation

Sample spacing was conducted on a
40mx100m grid

This data spacing is appropriate for
identifying continuous and non-
continuous geochemical anomalies

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

9

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==

procedure(s) and classifications
applied.

Whether sample compositing has been
applied.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.

If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.

Sampling was conducted on a series of
east-west lines, spaced at 100m intervals

The east west lines run near
perpendicular to the underlying lithology
strike providing unbiased sampling
Sample security
The measures taken to ensure sample
security.

Samples are collected daily in the field by
company staff and contractors

Samples are delivered to ALS
laboratories – Kalgoorlie depot in marked
pollyweave bags at the end of each shift
or completion of significant area.
Audits or
reviews

The results of any audits or reviews of
sampling techniques and data.
No independent audit or review has been
undertaken.

Section 2: Reporting of Exploration Results

CRITERIA EXPLANATION COMMENTARY
Mineral tenement
and land tenure
status

Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.

The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Miriam Project consists of 5
prospecting leases.
•Granted
leases
are
P15/6136,
P15/6137, P156138 and P15/6139.
P15/6135 remains in application
•Leases P15/6136-6139 are held by
Coolgardie Nickel Pty Ltd, now an
85% subsidiary of Future Battery
Minerals Ltd. P15/6135 is held by
Limelight Industries Pty Ltd until
time of grant
•A 2% NSR is held by Limelight
Industries Pty Ltd over all Miriam
tenure. FBM have exercised an
option to acquire the royalty.
•The tenements are located in the
Kangaroo Hills Timber Reserve, an
approved
Conservation
Management
Plan
provides
conditional access to the tenure.
•The tenements are in good standing
and no known impediments exist.
The Kangaroo Hill Lithium Project
consists of 8 prospecting leases.
•P15/5740, P15/5741, P15/5742,
P15/5743, P15/5749, P15/5750,
P15/5963, P15/5965, M15/1887 (in
application), M15/1905 (in
application), P15/6681 (in
application), P15/6813 (in
application)
•All leases are held by Eastern
Coolgardie Goldfields Pty Ltd
(ECG), a subsidiary of Future
Battery Minerals Ltd
•Tenements P15/5741, P15/5963
andP15/5965 overlap the

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

10

Follow Us

==> picture [130 x 32] intentionally omitted <==

Kangaroo Hills Timber Reserve, a
C class multi-purpose reserve
•FBM operates under an approved
Conservation Management Plan
within the reserve.
•No known royalties exist on the
KHLP leases.
•There are no material issues with
regard to access.
•The tenements are in good
standing and no known
impediments exist.
Exploration done
by other parties
Acknowledgment and appraisal of
exploration by other parties.
Corazon Miriam Soil Sampling

Sampling conducted by Corazon
Mining Ltd (asx;CZN), announced to
asx on 29thof March 2023

Sampling conducted on a 40m x
100m grid sieving soil 10cm below
surface

All samples were assayed for multi
element geochemistry utilising a 4
Acid digest with mass spectrometry
finish (ME-MS61)

.
Geology Deposit type, geological setting and style of
mineralisation.

The Miriam project is prospective for
Lithium, Caesium, Tantalum (LCT)
enriched pegmatites which intrudes
older Archean aged greenstone
lithologies.

The tenements are prospective for
lode and structurally hosted gold
mineralisation hosted within Archean
aged greenstone lithologies.
Drill hole
Information

A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following information
for all Material drill holes:

easting and northing of the drill hole
collar

elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar

dip and azimuth of the hole

down hole length and interception
depth

hole length.

If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why thisis the case.
No drill holes are reported.
Data aggregation
methods

In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually
Material and should be stated.

Soil results are grouped and
reported in the following ranges of Li
ppm; (0-10, 10-25, 25-40, 40-60, 60-
80, 80-Max)

Samples reporting >25ppm Li are
relatively anomalous for the area

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

11

Follow Us

futurebatteryminerals.com.au

==> picture [130 x 32] intentionally omitted <==


Where aggregate intercepts
incorporate short lengths of high-
grade results and longer lengths of
low-grade results, the procedure used
for such aggregation should be stated
and some typical examples of such
aggregations should be shown in
detail.

The assumptions used for any
reporting of metal equivalent values
should be clearlystated.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly
important in the reporting of Exploration
Results.

If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.

If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (eg
‘down hole length, true width not
known’).
N/A
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts should
be included for any significant discovery
being reported These should include, but
not be limited to a plan view of drill hole
collar locations and appropriate sectional
views.
Relevant diagrams have been included
within the announcement.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
N/A
Other
substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
No other substantive data exists.
Further work
The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-
out drilling).

Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.

FBM plans to conduct further target
generative exploration including
Gravity geophysics.

FBM will schedule drill testing of the
Miriam project post geophysical
surveys

Refer to figures/diagrams in the main
body of text.

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

12

Follow Us

==> picture [130 x 32] intentionally omitted <==

Appendix 2 – Soil Sampling Results (UTM MGA94 – Zone 51)

Sample ID Sample
**Type **
Northing Easting Li
(ppm)
Cs
(ppm)
Ta
(ppm)
Sn
(ppm)
24MM001 SOIL -177um 6562700 318720 16.4 1.29 0.44 4.7
24MM002 SOIL -177um 6562700 318760 19.6 1.7 0.37 3.3
24MM003 SOIL -177um 6562700 318800 21.4 1.94 0.58 2.9
24MM004 SOIL -177um 6562700 318840 10.9 0.95 0.28 1.4
24MM005 SOIL -177um 6562700 318880 15.8 0.9 0.35 2.1
24MM006 SOIL -177um 6562700 318920 17.4 1.27 0.45 3.7
24MM007 SOIL -177um 6562700 318960 15.3 1.1 0.45 1.4
24MM008 SOIL -177um 6562700 319000 21.4 1.46 1.88 2.4
24MM009 SOIL -177um 6562700 319040 26 1.5 0.63 1.8
24MM010 SOIL -177um 6562700 319080 25.1 1.48 0.52 1.7
24MM011 SOIL -177um 6562700 319120 25.5 1.65 0.52 2.6
24MM012 SOIL -177um 6562700 319160 17.4 1.23 1.48 2.8
24MM013 SOIL -177um 6562700 319200 26.1 1.75 0.47 1.8
24MM014 SOIL -177um 6562700 319240 22.7 1.83 3.12 1.6
24MM015 SOIL -177um 6562700 319280 20.2 1.74 0.41 2
24MM016 SOIL -177um 6562714 319337 15 1.33 0.4 1.6
24MM017 SOIL -177um 6562700 319360 15.2 1.5 0.35 1.3
24MM018 SOIL -177um 6562700 319400 16.4 1.62 0.38 1
24MM019 SOIL -177um 6562700 319440 15.5 1.5 0.76 5
24MM020 SOIL -177um 6562700 319480 17.6 1.6 0.44 1.2
24MM021 SOIL -177um 6562700 319520 18.4 1.68 0.39 1.3
24MM022 SOIL -177um 6562700 319560 17.8 1.74 0.37 1.3
24MM023 SOIL -177um 6562700 319600 18.4 1.66 0.38 1.4
24MM024 SOIL -177um 6562700 319640 13.7 1.08 0.48 0.9
24MM025 SOIL -177um 6562700 319680 20.6 1.75 0.84 1.1
24MM026 SOIL -177um 6562700 319720 25.6 1.6 0.5 1.1
24MM027 SOIL -177um 6562700 319760 22.7 1.46 0.51 1
24MM028 SOIL -177um 6562700 319800 23.6 1.74 0.42 1.1
24MM029 SOIL -177um 6562700 319840 21 1.17 0.43 1
24MM030 SOIL -177um 6562700 319880 18.4 0.94 0.63 0.8
24MM031 SOIL -177um 6562700 319920 25.8 1.06 0.53 0.9
24MM032 SOIL -177um 6562700 319960 25 1.57 0.42 1.1
24MM033 SOIL -177um 6562700 320000 24.4 1.6 0.63 1.6
24MM034 SOIL -177um 6562700 320240 17.4 1.78 0.51 1.7
24MM035 SOIL -177um 6562700 320280 16.7 1.31 0.57 1.1
24MM036 SOIL -177um 6562800 318760 21.4 2.13 7.35 1.2
24MM037 SOIL -177um 6562800 318800 20.7 2.06 0.46 1.2
24MM038 SOIL -177um 6562800 318840 19.3 1.9 1.76 1
24MM039 SOIL -177um 6562800 318880 16.5 1.64 0.41 0.9
24MM040 SOIL -177um 6562800 318920 15.2 1.52 0.35 0.8
24MM041 SOIL -177um 6562800 318960 13.7 1.3 0.32 0.7

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] ASX: FBM +61 8 6383 7817 futurebatteryminerals.com.au Follow Us

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

13

==> picture [130 x 32] intentionally omitted <==

24MM042 SOIL -177um 6562800 319000 12.7 1.2 0.37 0.7
24MM043 SOIL -177um 6562800 319040 14.8 1.46 0.36 0.9
24MM044 SOIL -177um 6562800 319080 15.6 1.58 0.88 0.9
24MM045 SOIL -177um 6562800 319120 19 1.88 0.37 1
24MM046 SOIL -177um 6562800 319160 14.6 1.32 0.37 0.9
24MM047 SOIL -177um 6562800 319200 18 1.44 0.39 1.1
24MM048 SOIL -177um 6562800 319240 19.6 1.48 0.45 0.9
24MM049 SOIL -177um 6562800 319280 20.3 1.62 0.44 0.9
24MM050 SOIL -177um 6562800 319320 21.8 1.84 0.47 1
24MM051 SOIL -177um 6562800 319360 17.9 1.65 0.37 1.1
24MM052 SOIL -177um 6562800 319400 18.5 1.68 0.45 0.9
24MM053 SOIL -177um 6562800 319440 19.2 1.76 0.37 0.9
24MM054 SOIL -177um 6562800 319480 17.8 1.64 0.65 1.1
24MM055 SOIL -177um 6562800 319520 18 1.65 0.44 1
24MM056 SOIL -177um 6562800 319560 18.1 1.52 1.77 1
24MM057 SOIL -177um 6562800 319600 17 1.42 0.46 1
24MM058 SOIL -177um 6562800 319640 19.1 1.43 0.65 1.2
24MM059 SOIL -177um 6562800 319680 18 1.13 1.1 1
24MM060 SOIL -177um 6562800 319720 24 1.39 0.64 1.2
24MM061 SOIL -177um 6562800 319760 22.1 1.24 0.65 1.1
24MM062 SOIL -177um 6562800 319800 28.8 1.42 0.7 1.3
24MM063 SOIL -177um 6562800 319840 25.1 1.21 1.07 0.9
24MM064 SOIL -177um 6562800 319880 15.6 0.88 0.46 0.9
24MM065 SOIL -177um 6562800 319920 19.2 1.04 0.52 1
24MM066 SOIL -177um 6562800 319960 15.3 1.56 0.45 1.2
24MM067 SOIL -177um 6562800 320280 16.1 1.86 0.41 1.4
24MM068 SOIL -177um 6562800 320320 16.8 1.94 0.42 1.4
24MM069 SOIL -177um 6562900 318760 14.2 1.48 0.4 1.3
24MM070 SOIL -177um 6562900 318800 14.6 1.46 0.35 1.2
24MM071 SOIL -177um 6562900 318840 15.6 1.53 0.56 1
24MM072 SOIL -177um 6562900 318880 15.4 0.9 0.88 1.2
24MM073 SOIL -177um 6562900 318920 24.6 1.26 0.59 1.2
24MM074 SOIL -177um 6562900 318960 23.3 1.42 0.73 1.2
24MM075 SOIL -177um 6562900 319000 21.7 1.17 0.68 1.3
24MM076 SOIL -177um 6562900 319040 27.8 1.53 0.49 1.3
24MM077 SOIL -177um 6562900 319080 25.7 1.48 0.46 1
24MM078 SOIL -177um 6562900 319120 25.8 1.48 0.46 1
24MM079 SOIL -177um 6562900 319160 24.7 1.36 0.61 1.2
24MM080 SOIL -177um 6562900 319200 26.1 1.48 1.33 1.1
24MM081 SOIL -177um 6562900 319240 29.8 1.7 3.27 1.1
24MM082 SOIL -177um 6562900 319280 28.3 1.64 2.34 1.2
24MM083 SOIL -177um 6562900 319320 19 1.27 0.4 1
24MM084 SOIL -177um 6562900 319360 29.7 1.95 2.01 1.4
24MM085 SOIL -177um 6562900 319400 24.3 1.6 0.48 1.3
24MM086 SOIL -177um 6562900 319440 20.1 1.43 0.42 1.4

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

14

Follow Us

==> picture [130 x 32] intentionally omitted <==

24MM087 SOIL -177um 6562900 319480 15.8 1.2 0.44 1.1
24MM088 SOIL -177um 6562900 319520 17.4 1.5 0.39 1.9
24MM089 SOIL -177um 6562900 319560 19.8 1.7 0.41 1.4
24MM090 SOIL -177um 6562900 319600 12.8 0.93 0.94 0.8
24MM091 SOIL -177um 6562900 319640 22.2 1.37 0.55 1.1
24MM092 SOIL -177um 6562900 319680 14.7 0.96 0.95 1
24MM093 SOIL -177um 6562900 319720 18.8 1.04 1.51 1
24MM094 SOIL -177um 6562900 319760 22.6 1.25 0.82 1
24MM095 SOIL -177um 6562900 319800 18.8 1 0.51 1.1
24MM096 SOIL -177um 6562900 319840 24.7 1.04 1.09 1.3
24MM097 SOIL -177um 6562900 319880 19.6 1.1 0.55 1
24MM098 SOIL -177um 6562900 319920 21.7 1.1 0.45 1
24MM099 SOIL -177um 6562900 320240 14.5 1.64 0.39 0.8
24MM100 SOIL -177um 6562900 320280 16.1 1.49 0.57 1.3
24MM101 SOIL -177um 6562900 320320 15 1.9 0.47 0.9
24MM102 SOIL -177um 6563000 318800 9.2 0.62 0.78 0.9
24MM103 SOIL -177um 6563000 318840 15.3 0.79 1.16 0.8
24MM104 SOIL -177um 6563000 318880 12.2 0.5 0.26 1.3
24MM105 SOIL -177um 6563000 318920 23.8 0.95 1.08 1.2
24MM106 SOIL -177um 6563000 318960 31.1 1.49 0.57 1.3
24MM107 SOIL -177um 6563000 319000 18.2 0.91 0.89 0.9
24MM108 SOIL -177um 6563000 319040 32.3 1.8 0.54 1.3
24MM109 SOIL -177um 6563000 319080 19.2 1.24 0.43 1
24MM110 SOIL -177um 6563000 319120 19.5 1.1 0.48 1
24MM111 SOIL -177um 6563000 319160 15.6 0.91 0.41 0.8
24MM112 SOIL -177um 6563000 319200 18 1.18 0.47 1.1
24MM113 SOIL -177um 6563000 319240 15.6 1.21 0.39 1.2
24MM114 SOIL -177um 6563000 319280 16 1.2 0.41 1.6
24MM115 SOIL -177um 6563000 319320 15.9 1.23 1.29 1.4
24MM116 SOIL -177um 6563000 319360 16.8 1.3 0.38 1.4
24MM117 SOIL -177um 6563000 319400 16.2 1.2 0.38 1.7
24MM118 SOIL -177um 6563000 319440 16.2 1.27 0.38 1.7
24MM119 SOIL -177um 6563000 319480 15.6 1.25 2.02 1.8
24MM120 SOIL -177um 6563000 319520 17.7 1.58 0.44 1.3
24MM121 SOIL -177um 6563000 319560 17.7 1.4 0.67 1.7
24MM122 SOIL -177um 6563000 319600 15.2 1.2 0.52 1.3
24MM123 SOIL -177um 6563000 319640 17 1.24 0.96 1.4
24MM124 SOIL -177um 6563000 319680 18.6 1.42 0.8 1.3
24MM125 SOIL -177um 6563000 319720 19 1.48 0.73 1.3
24MM126 SOIL -177um 6563000 319760 18.6 1.3 1.52 1.4
24MM127 SOIL -177um 6563000 319800 24.4 1.78 0.52 1.4
24MM128 SOIL -177um 6563000 319840 17.7 1.3 1.34 1.1
24MM129 SOIL -177um 6563000 319880 20.6 1.46 0.5 1.2
24MM130 SOIL -177um 6563000 319920 23.6 1.4 4.24 1.2
24MM131 SOIL -177um 6563000 319960 16.5 1.18 0.38 0.9

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

15

Follow Us

==> picture [130 x 32] intentionally omitted <==

24MM132 SOIL -177um 6563000 320000 18.2 1.1 0.39 1
24MM133 SOIL -177um 6563000 320040 17 1.13 3.17 0.8
24MM134 SOIL -177um 6563000 320200 11.4 1.42 0.42 1
24MM135 SOIL -177um 6563000 320240 14.4 3.95 0.35 0.8
24MM136 SOIL -177um 6563000 320280 12.5 1.52 0.46 1
24MM137 SOIL -177um 6563000 320320 13.1 2.01 0.69 1
24MM138 SOIL -177um 6563000 320360 16.5 1.42 0.56 2.2
24MM139 SOIL -177um 6563000 320400 8.1 1.16 0.52 1
24MM140 SOIL -177um 6563000 320440 9.7 1.72 0.57 1
24MM141 SOIL -177um 6563000 320480 9.8 1.7 0.47 1
24MM142 SOIL -177um 6563100 318800 15 1.08 0.37 0.8
24MM143 SOIL -177um 6563100 318840 17.6 1.44 0.48 5.9
24MM144 SOIL -177um 6563100 318880 17 1.42 3.43 1.3
24MM145 SOIL -177um 6563100 318920 18.4 1.48 0.41 1.2
24MM146 SOIL -177um 6563100 318960 15.8 1.26 0.53 1.4
24MM147 SOIL -177um 6563100 319000 16.2 1.28 0.45 1.2
24MM148 SOIL -177um 6563100 319040 18.9 1.48 0.52 1.5
24MM149 SOIL -177um 6563100 319080 16.6 1.32 0.48 1.2
24MM150 SOIL -177um 6563100 319120 14.2 1.3 0.4 1
24MM151 SOIL -177um 6563100 319160 11 0.95 1.02 1.2
24MM152 SOIL -177um 6563100 319200 16.2 1.38 0.4 1
24MM153 SOIL -177um 6563100 319240 16.8 1.32 0.55 1.1
24MM154 SOIL -177um 6563100 319280 22.3 1.72 0.42 1.2
24MM155 SOIL -177um 6563100 319320 22 1.58 0.41 1
24MM156 SOIL -177um 6563100 319360 26.3 1.86 0.59 1.2
24MM157 SOIL -177um 6563100 319400 30 1.93 0.51 1.5
24MM158 SOIL -177um 6563100 319440 17.9 1.42 0.53 1.7
24MM159 SOIL -177um 6563100 319480 18.2 1.78 0.49 1
24MM160 SOIL -177um 6563100 319520 19.1 1.57 0.53 1
24MM161 SOIL -177um 6563100 319560 24.9 1.84 0.56 1.5
24MM162 SOIL -177um 6563100 319600 24.1 1.82 0.71 1.5
24MM163 SOIL -177um 6563100 319640 25.4 1.9 0.62 1.4
24MM164 SOIL -177um 6563100 319680 19.5 1.48 0.97 1.5
24MM165 SOIL -177um 6563100 319720 23.5 1.7 0.66 1.3
24MM166 SOIL -177um 6563100 319760 19.1 1.32 0.64 1.3
24MM167 SOIL -177um 6563100 319800 23.9 1.59 0.75 1.4
24MM168 SOIL -177um 6563100 319840 24.5 1.51 0.6 1.4
24MM169 SOIL -177um 6563100 319880 22.3 1.42 0.69 1.3
24MM170 SOIL -177um 6563100 319920 23.5 1.39 0.75 1.4
24MM171 SOIL -177um 6563100 319960 21.5 1.36 0.63 1.4
24MM172 SOIL -177um 6563100 320000 19.5 1.39 0.74 1.4
24MM173 SOIL -177um 6563100 320040 22.6 1.84 0.81 1.5
24MM174 SOIL -177um 6563100 320080 27.2 1.94 0.74 1.8
24MM175 SOIL -177um 6563100 320120 16.1 1.39 1.09 3.3
24MM176 SOIL -177um 6563100 320160 16.1 1.13 0.92 1.8

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

16

Follow Us

==> picture [130 x 32] intentionally omitted <==

24MM177 SOIL -177um 6563100 320200 13.9 1.23 2.69 1.6
24MM178 SOIL -177um 6563100 320240 14.4 1.28 0.63 1.2
24MM179 SOIL -177um 6563100 320280 17 3.22 0.57 1.4
24MM180 SOIL -177um 6563100 320320 9.7 2.07 0.48 1
24MM181 SOIL -177um 6563100 320360 11.1 1.83 0.58 1.2
24MM182 SOIL -177um 6563100 320400 11 2.66 3.73 1.1
24MM183 SOIL -177um 6563100 320440 10.2 1.52 0.63 1.2
24MM184 SOIL -177um 6563100 320480 12.8 1.61 0.57 1.1
24MM185 SOIL -177um 6563100 320520 20.7 1.02 0.68 1.1
24MM186 SOIL -177um 6563100 320560 25.7 1.09 0.59 1
24MM187 SOIL -177um 6563100 320600 14 1.1 0.86 1.1
24MM188 SOIL -177um 6563200 318840 16.1 1.21 0.43 0.9
24MM189 SOIL -177um 6563200 318880 15.9 1.11 0.35 0.9
24MM190 SOIL -177um 6563200 318920 16.1 0.94 0.3 0.8
24MM191 SOIL -177um 6563200 318960 16.2 0.95 0.33 0.8
24MM192 SOIL -177um 6563200 319000 12.8 0.91 0.43 0.8
24MM193 SOIL -177um 6563200 319040 9.7 0.68 0.33 0.7
24MM194 SOIL -177um 6563200 319080 13 0.72 0.3 0.7
24MM195 SOIL -177um 6563200 319120 12.2 0.84 0.5 0.7
24MM196 SOIL -177um 6563200 319160 13.5 0.88 0.39 0.7
24MM197 SOIL -177um 6563200 319200 16.4 1.3 0.46 0.9
24MM198 SOIL -177um 6563200 319240 15.2 1.34 0.32 1
24MM199 SOIL -177um 6563200 319280 11.4 0.78 0.31 1
24MM200 SOIL -177um 6563200 319320 18 0.98 0.37 1.1
24MM201 SOIL -177um 6563200 319360 20.4 1.3 0.37 1.1
24MM202 SOIL -177um 6563200 319400 15.9 1.09 0.38 1
24MM203 SOIL -177um 6563200 319440 17.2 1.39 0.34 1.2
24MM204 SOIL -177um 6563200 319480 18 1.51 0.38 1.1
24MM205 SOIL -177um 6563200 319520 16.1 1.27 0.44 1
24MM206 SOIL -177um 6563200 319560 19.9 1.26 0.6 1.3
24MM207 SOIL -177um 6563200 319600 19.4 1.24 0.48 1.2
24MM208 SOIL -177um 6563200 319640 25.6 1.64 0.59 1.4
24MM209 SOIL -177um 6563200 319680 23.6 1.58 0.52 1.5
24MM210 SOIL -177um 6563200 319720 18.9 1.29 0.64 1.4
24MM211 SOIL -177um 6563200 319760 21.6 1.5 0.56 1.5
24MM212 SOIL -177um 6563200 319800 14.6 0.98 0.71 1.1
24MM213 SOIL -177um 6563200 319840 20.6 1.38 0.56 1.4
24MM214 SOIL -177um 6563200 319880 17.4 1.16 0.71 1.3
24MM215 SOIL -177um 6563200 319920 20.9 1.28 0.83 1.3
24MM216 SOIL -177um 6563200 319960 24 1.45 0.6 1.3
24MM217 SOIL -177um 6563200 320000 28.3 1.67 0.68 1.7
24MM218 SOIL -177um 6563200 320040 27.3 1.66 0.69 1.6
24MM219 SOIL -177um 6563200 320080 29.6 1.72 0.56 1.6
24MM220 SOIL -177um 6563200 320120 30.9 1.86 0.58 2
24MM221 SOIL -177um 6563200 320160 29 1.9 0.59 1.5

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

17

Follow Us

==> picture [130 x 32] intentionally omitted <==

24MM222 SOIL -177um 6563200 320200 24.3 1.54 0.54 1.3
24MM223 SOIL -177um 6563200 320240 17.5 1.03 0.43 1
24MM224 SOIL -177um 6563200 320280 15.3 1.18 0.47 1.1
24MM225 SOIL -177um 6563200 320320 16.2 1.61 0.67 1.2
24MM226 SOIL -177um 6563200 320360 19.1 2.14 4.23 1.8
24MM227 SOIL -177um 6563200 320400 15.6 1.8 0.53 1.3
24MM228 SOIL -177um 6563200 320440 15.3 1.79 0.4 1.5
24MM229 SOIL -177um 6563200 320480 10.1 0.92 0.74 1.3
24MM230 SOIL -177um 6563200 320520 9.6 0.92 1.34 1
24MM231 SOIL -177um 6563200 320560 8.9 0.78 0.8 0.9
24MM232 SOIL -177um 6563200 320600 11.9 1.06 0.71 1.4
24MM233 SOIL -177um 6563200 320640 9.5 0.9 1.65 1.4
24MM234 SOIL -177um 6563200 320680 13 2.03 0.98 1
24MM235 SOIL -177um 6563200 320720 12.2 1.71 0.39 0.9
24MM236 SOIL -177um 6563300 318840 13 0.9 0.54 1.2
24MM237 SOIL -177um 6563300 318880 12.6 0.9 0.29 1
24MM238 SOIL -177um 6563300 318920 14.8 1.03 0.35 0.9
24MM239 SOIL -177um 6563300 318960 12.6 1.11 0.36 0.9
24MM240 SOIL -177um 6563300 319000 13.6 1.19 0.36 0.9
24MM241 SOIL -177um 6563300 319040 12.2 1.03 0.34 0.8
24MM242 SOIL -177um 6563300 319080 11.7 0.92 0.5 0.8
24MM243 SOIL -177um 6563300 319120 11.5 0.96 0.43 0.7
24MM244 SOIL -177um 6563300 319160 12.5 0.94 0.42 0.8
24MM245 SOIL -177um 6563300 319200 13.6 1.1 0.35 0.8
24MM246 SOIL -177um 6563300 319240 16.8 1.38 0.39 1.1
24MM247 SOIL -177um 6563300 319280 14 1.23 0.36 1.2
24MM248 SOIL -177um 6563300 319320 13.1 1.02 0.44 1.2
24MM249 SOIL -177um 6563300 319360 15.1 1.09 0.39 1.3
24MM250 SOIL -177um 6563400 318880 13.1 0.99 0.42 0.8
24MM251 SOIL -177um 6563400 318920 13.6 1.14 0.65 1.2
24MM252 SOIL -177um 6563400 318960 12.5 1.02 0.6 0.8
24MM253 SOIL -177um 6563400 319000 13.7 1.11 6.19 0.8
24MM254 SOIL -177um 6563400 319040 14.2 1.22 0.4 0.8
24MM255 SOIL -177um 6563400 319080 15.8 1.76 0.57 1
24MM256 SOIL -177um 6563400 319120 11.5 1.12 0.31 0.6
24MM257 SOIL -177um 6563400 319160 14 1.42 0.44 0.8
24MM258 SOIL -177um 6563400 319200 11.4 1.01 0.34 0.7
24MM259 SOIL -177um 6563400 319240 22.1 0.83 0.31 0.8
24MM260 SOIL -177um 6563400 319280 23 0.82 0.43 1.8
24MM261 SOIL -177um 6563400 319320 24.2 1.11 0.52 1.4
24MM262 SOIL -177um 6563400 319360 20.4 1.16 0.42 1.2
24MM263 SOIL -177um 6563500 318880 13.5 1.12 0.44 0.9
24MM264 SOIL -177um 6563500 318920 13.9 1.16 0.37 0.9
24MM265 SOIL -177um 6563500 318960 12.5 1.03 0.43 0.8
24MM266 SOIL -177um 6563500 319000 10 0.77 0.36 0.6

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

18

Follow Us

==> picture [130 x 32] intentionally omitted <==

24MM267 SOIL -177um 6563500 319040 11.6 0.91 0.3 0.7
24MM268 SOIL -177um 6563500 319080 10.1 0.77 0.49 0.8
24MM269 SOIL -177um 6563500 319120 10.6 0.89 0.33 0.8
24MM270 SOIL -177um 6563500 319160 13 1.16 0.38 0.9
24MM271 SOIL -177um 6563500 319200 14.6 1.36 0.34 1
24MM272 SOIL -177um 6563500 319240 21.3 0.75 0.36 1.1
24MM273 SOIL -177um 6563500 319280 17.4 0.88 0.42 0.9
24MM274 SOIL -177um 6563500 319320 24 1.34 0.86 1.3
24MM275 SOIL -177um 6563500 319360 24.3 1.5 0.59 1.4
24MM276 SOIL -177um 6563600 318920 13.3 1.22 0.54 0.9
24MM277 SOIL -177um 6563600 318960 16.7 1.56 1.7 1.1
24MM278 SOIL -177um 6563600 319000 17.6 1.68 0.52 1.2
24MM279 SOIL -177um 6563600 319040 13.3 1.12 1.13 1.1
24MM280 SOIL -177um 6563600 319080 12.3 0.7 0.25 0.7
24MM281 SOIL -177um 6563600 319120 12.1 1.15 0.4 0.8
24MM282 SOIL -177um 6563600 319160 12.3 1.43 0.42 0.8
24MM283 SOIL -177um 6563600 319200 14 1.12 2.33 0.9
24MM284 SOIL -177um 6563600 319240 27.8 1.46 0.68 1.3
24MM285 SOIL -177um 6563600 319280 21.3 1.8 1.36 1.3
24MM286 SOIL -177um 6563600 319320 23.1 1.82 3.5 1.3
24MM287 SOIL -177um 6563600 319360 20.1 1.65 0.57 1.3
24MM288 SOIL -177um 6563700 318920 21.7 1.64 0.43 1.2
24MM289 SOIL -177um 6563700 318960 22.8 1.8 0.53 1.3
24MM290 SOIL -177um 6563700 319000 19.2 1.5 1.55 1.1
24MM291 SOIL -177um 6563700 319040 18.3 1.42 0.58 1.1
24MM292 SOIL -177um 6563700 319080 14 1.04 0.35 1
24MM293 SOIL -177um 6563700 319120 10.9 1.08 0.25 0.6
24MM294 SOIL -177um 6563700 319160 11.2 1.09 0.29 0.6
24MM295 SOIL -177um 6563700 319200 12.7 1.12 0.34 0.8
24MM296 SOIL -177um 6563700 319240 15.4 0.67 0.27 0.8
24MM297 SOIL -177um 6563700 319280 23.2 1.94 0.62 1.4
24MM298 SOIL -177um 6563700 319320 20 1.26 0.5 1.2
24MM299 SOIL -177um 6563700 319360 15.8 1.32 0.51 1.2
24MM300 SOIL -177um 6563800 318920 11.7 0.81 0.86 0.9
24MM301 SOIL -177um 6563800 318960 9.2 0.76 0.62 1
24MM302 SOIL -177um 6563800 319000 9.9 0.85 0.29 0.9
24MM303 SOIL -177um 6563800 319040 11.6 0.97 0.31 0.8
24MM304 SOIL -177um 6563800 319080 12.5 1.1 0.28 0.8
24MM305 SOIL -177um 6563800 319120 9.8 0.98 0.25 0.7
24MM306 SOIL -177um 6563800 319160 11.8 1.12 0.27 0.8
24MM307 SOIL -177um 6563800 319200 12.3 1.1 0.31 0.9
24MM308 SOIL -177um 6563800 319240 12 1.12 0.29 0.9
24MM309 SOIL -177um 6563800 319280 11.2 1.04 0.76 0.8
24MM310 SOIL -177um 6563800 319320 13.7 1.3 0.33 0.9
24MM311 SOIL -177um 6563800 319360 17.4 1.74 0.36 1.1

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

19

Follow Us

==> picture [130 x 32] intentionally omitted <==

24MM312 SOIL -177um 6563900 318960 10.3 1.12 0.27 0.8
24MM313 SOIL -177um 6563900 319000 8.4 0.9 0.26 0.6
24MM314 SOIL -177um 6563900 319040 10 1.02 4.98 0.7
24MM315 SOIL -177um 6563900 319080 9.9 0.93 1.6 0.6
24MM316 SOIL -177um 6563900 319120 11.3 1.05 0.32 0.7
24MM317 SOIL -177um 6563900 319160 10.9 1.02 0.31 0.7
24MM318 SOIL -177um 6563900 319200 11 1 0.31 0.7
24MM319 SOIL -177um 6563900 319240 14.3 1.32 0.49 1.3
24MM320 SOIL -177um 6563900 319280 15.3 1.46 0.48 0.9
24MM321 SOIL -177um 6563900 319320 19.6 1.92 0.38 1.1
24MM322 SOIL -177um 6563900 319360 15 1.3 0.4 0.9
24MM323 SOIL -177um 6564000 318960 16.5 1.77 0.39 0.8
24MM324 SOIL -177um 6564000 319000 12.9 1.36 0.33 0.6
24MM325 SOIL -177um 6564000 319040 12 1.04 0.29 0.6
24MM326 SOIL -177um 6564000 319080 13.7 1.16 0.32 0.7
24MM327 SOIL -177um 6564000 319120 13.3 1.32 0.35 0.8
24MM328 SOIL -177um 6564000 319160 13.2 1.12 0.31 0.6
24MM329 SOIL -177um 6564000 319200 13.6 1.28 0.35 0.9
24MM330 SOIL -177um 6564000 319240 16.5 1.72 0.36 1
24MM331 SOIL -177um 6564000 319280 17.1 1.56 0.36 1
24MM332 SOIL -177um 6564000 319320 13.7 1.2 1.04 0.7
24MM333 SOIL -177um 6564000 319360 11.6 0.79 0.37 0.6
24MM334 SOIL -177um 6564100 319000 12.1 1.08 0.38 0.6
24MM335 SOIL -177um 6564100 319040 12.7 1.12 0.76 0.7
24MM336 SOIL -177um 6564100 319080 13.9 1.31 0.48 0.8
24MM337 SOIL -177um 6564100 319120 13.6 1.18 0.6 1
24MM338 SOIL -177um 6564100 319160 17.9 1.74 0.37 0.9
24MM339 SOIL -177um 6564100 319200 13.8 1.18 0.31 0.7
24MM340 SOIL -177um 6564100 319240 11.8 0.94 0.45 0.8
24MM341 SOIL -177um 6564100 319280 14.6 1.02 0.49 1
24MM342 SOIL -177um 6564100 319320 12.1 0.84 0.31 0.9
24MM343 SOIL -177um 6564100 319360 16.4 1.4 0.41 1.1
24MM344 SOIL -177um 6564200 319000 15.1 1.42 0.36 1
24MM345 SOIL -177um 6564200 319040 17 1.56 0.55 1
24MM346 SOIL -177um 6564200 319080 18.6 1.78 0.34 0.9
24MM347 SOIL -177um 6564200 319120 18.4 1.76 0.38 1
24MM348 SOIL -177um 6564200 319160 13 1.23 0.29 0.7
24MM349 SOIL -177um 6564200 319200 16.8 1.23 0.65 0.9
24MM350 SOIL -177um 6564200 319240 14.2 0.97 0.39 0.8
24MM351 SOIL -177um 6564200 319280 16.6 1.28 1.92 0.9
24MM352 SOIL -177um 6564200 319320 14.7 1.14 0.41 0.8
24MM353 SOIL -177um 6564200 319360 14.6 1.03 0.32 0.8
24MM354 SOIL -177um 6564300 319040 16.7 1.48 0.51 1.3
24MM355 SOIL -177um 6564300 319080 18.1 1.6 0.37 0.9
24MM356 SOIL -177um 6564300 319120 18 1.62 0.35 0.9

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

20

Follow Us

==> picture [130 x 32] intentionally omitted <==

24MM357 SOIL -177um 6564300 319160 16.4 1.3 0.38 0.8
24MM358 SOIL -177um 6564300 319200 17.7 1.64 0.31 0.8
24MM359 SOIL -177um 6564300 319240 15.6 1.22 0.48 0.9
24MM360 SOIL -177um 6564300 319280 12.6 0.99 0.51 0.7
24MM361 SOIL -177um 6564300 319320 13.6 0.89 0.5 0.7
24MM362 SOIL -177um 6564300 319360 12.2 0.77 0.32 0.6
24MM363 SOIL -177um 6564400 319040 16.3 1.29 0.43 0.9
24MM364 SOIL -177um 6564400 319080 15.6 1.37 0.37 0.8
24MM365 SOIL -177um 6564400 319120 16.8 1.5 0.36 0.9
24MM366 SOIL -177um 6564400 319160 17.2 1.64 0.33 0.9
24MM367 SOIL -177um 6564400 319200 15.1 1.32 0.35 0.8
24MM368 SOIL -177um 6564400 319240 12.4 1.13 0.32 0.8
24MM369 SOIL -177um 6564400 319280 12.8 0.97 0.34 0.7
24MM370 SOIL -177um 6564400 319320 15.5 1.38 0.54 1.2
24MM371 SOIL -177um 6564400 319360 14.5 1.16 0.43 0.9
24MM372 SOIL -177um 6564500 319080 10.3 0.77 2.95 0.7
24MM373 SOIL -177um 6564500 319120 17.4 1.16 0.29 0.9
24MM374 SOIL -177um 6564500 319160 12.9 1.07 0.33 0.7
24MM375 SOIL -177um 6564500 319200 13.8 1.2 1.24 0.7
24MM376 SOIL -177um 6564500 319240 15.8 1.36 0.32 0.8
24MM377 SOIL -177um 6564500 319280 13.4 1.16 0.36 0.8
24MM378 SOIL -177um 6564500 319320 11.2 0.87 0.42 0.7
24MM379 SOIL -177um 6564500 319360 12.3 0.92 0.37 0.6
24MM380 SOIL -177um 6564600 319080 14 1 0.26 0.6
24MM381 SOIL -177um 6564600 319120 17.3 1 0.38 0.7
24MM382 SOIL -177um 6564600 319160 15.1 0.87 0.41 0.7
24MM383 SOIL -177um 6564600 319200 14.5 1.34 1.76 0.8
24MM384 SOIL -177um 6564600 319240 16.1 1.42 0.34 0.8
24MM385 SOIL -177um 6564600 319280 11.9 1 0.34 0.7
24MM386 SOIL -177um 6564600 319320 14.4 1.19 0.8 0.8
24MM387 SOIL -177um 6564700 319120 17.6 1.44 0.31 0.7
24MM388 SOIL -177um 6564700 319160 18.3 2.04 0.45 0.9
24MM389 SOIL -177um 6564700 319200 19.8 2.15 0.61 1.1
24MM390 SOIL -177um 6564700 319240 14.9 1.46 0.49 0.9
24MM391 SOIL -177um 6564700 319280 15.7 1.51 0.36 0.8
24MM392 SOIL -177um 6564700 319320 15.5 1.35 0.37 0.9
24MM393 SOIL -177um 6564800 319120 22.3 2.4 0.52 1.1
24MM394 SOIL -177um 6564800 319160 13 1.24 0.39 0.9
24MM395 SOIL -177um 6564800 319200 10.8 1.05 0.51 0.9
24MM396 SOIL -177um 6564800 319240 11.3 1.12 0.58 0.8
24MM397 SOIL -177um 6564800 319280 12.6 1.11 0.44 0.8
24MM398 SOIL -177um 6564800 319320 16.2 1.4 0.41 0.9
24MM399 SOIL -177um 6564900 319160 11.5 0.7 2.08 0.8
24MM400 SOIL -177um 6564900 319200 10.7 0.62 0.44 0.9
24MM401 SOIL -177um 6564900 319240 14.3 1.16 0.74 0.8

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

21

Follow Us

==> picture [130 x 32] intentionally omitted <==

24MM402 SOIL -177um 6564900 319280 18.1 1.1 0.46 1
24MM403 SOIL -177um 6564900 319320 15.2 1 0.4 0.8
24MM404 SOIL -177um 6565300 319360 16.2 1.91 0.41 1.2
24MM405 SOIL -177um 6565300 319400 17.8 1.83 0.93 1
24MM406 SOIL -177um 6565300 319440 18.7 1.83 0.52 1
24MM407 SOIL -177um 6565300 319480 18 1.79 0.89 1
24MM408 SOIL -177um 6565300 319520 20.2 1.96 0.55 1
24MM409 SOIL -177um 6565300 319560 14.3 1.22 0.46 0.8
24MM410 SOIL -177um 6565300 319600 16.5 1.38 0.51 1
24MM411 SOIL -177um 6565300 319640 14.8 1.23 0.65 0.8
24MM412 SOIL -177um 6565400 319400 17.7 1.72 0.99 1.1
24MM413 SOIL -177um 6565400 319440 17.1 1.6 0.41 0.9
24MM414 SOIL -177um 6565400 319480 18.1 1.75 0.43 1
24MM415 SOIL -177um 6565400 319520 16.9 1.58 0.76 0.9
24MM416 SOIL -177um 6565400 319560 17 1.37 0.38 0.7
24MM417 SOIL -177um 6565500 319440 13.5 1.28 0.47 0.8
24MM418 SOIL -177um 6565500 319480 17.3 1.48 0.33 0.8

==> picture [10 x 8] intentionally omitted <==

==> picture [11 x 11] intentionally omitted <==

==> picture [10 x 11] intentionally omitted <==

==> picture [13 x 12] intentionally omitted <==

==> picture [12 x 13] intentionally omitted <==

==> picture [12 x 12] intentionally omitted <==

[email protected] +61 8 6383 7817 futurebatteryminerals.com.au

Future Battery Minerals Ltd Suite 10, 38 Colin St, West Perth WA 6005 ABN 91 148 966 545

ASX: FBM

22

Follow Us