Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ORA BANDA MINING LTD Capital/Financing Update 2017

Aug 7, 2017

65475_rns_2017-08-07_55946874-af9a-4783-ba59-6c44dc091cf9.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT 8 August 2017

DAVYHURST EXPLORATION AND OPERATIONS UPDATE

HIGHLIGHTS

  • 13 drill holes completed at the Riverina gold deposit, within which visible gold has been intersected

  • Assay results pending for both Riverina and Callion

  • Processing plant achieving prolonged uninterrupted production periods, nearing a stable state

Eastern Goldfields Limited (ASX: EGS) ( Eastern Goldfields or the Company ) is pleased to announce an exploration and operations update for the Davyhurst plant and the Riverina and Callion Deposits located within the Davyhurst Mining Hub, approximately 120 kilometres North West of Kalgoorlie.

Diamond drilling continues with 13 drill holes recently completed for 1,680 metres (HQ3/NQ2) over a 530 metre strike length of the Riverina gold deposit. Within the latest drill holes a one metre true width fresh-rock quartz vein has been intersected with visible gold (RVDD16018 from 70 metres downhole or 62m vertical from surface). This drilling is currently evaluating potential open pit mining targets. This is the first time that visible gold has been identified in drill core at Riverina by Eastern Goldfields. This visible gold may suggest that there are quartz lodes in the resource that contain a significant proportion of coarse gold.

ISSUED CAPITAL

Shares: 560.4m Options: 58m Current Share Price: $0.29 Market Capitalisation: $162.5m Cash as at 30/06/2017: $13,000*

*Excluding total debt facilities of $35.0m, see ASX announcement 31 Jan 2017. Drawn to date $15.7m.

The drill core samples are currently being processed and assembled on site and will be dispatched for assaying when ready. There have been a total of 35 holes for 3,830 metres completed of which 16 holes are in the assay laboratory with approximately 1,630 samples due to be received shortly. The remainder of the samples await dispatch from site.

==> picture [382 x 153] intentionally omitted <==

Figure 1: RVDD16018 70m downhole. Visible gold with sphalerite and galena in quartz vein biotite-chlorite host rock.

In addition, at Callion there have been a total of 12 holes completed for 1,096 metres of which 9 holes are in the assay laboratory with approximately 600 samples due to be received shortly.

Executive Chairman Michael Fotios said:

“We are very pleased with the continued drilling success at Riverina. We remain highly encouraged by the results flowing from this deposit. We are also very proud of our operational team who have come together seamlessly to achieve numerous operational improvements seen within the processing plant over the last week. This all bodes well for the future of the Davyhurst Project.

Processing Plant Update

Commissioning works continue with the plant now approaching a stable state. From this point, the operation team expects further stabilisation of the plant before commencing the ramp-up of the through-put rate above the current level of 80t/hr. In the last week, the following operational steps have been achieved:

  • Plant now achieving prolonged uninterrupted production periods at an effective operational rate of 80t/hr;

  • Gold-in-circuit ( GIC ) inventory increasing;

  • Davyhurst team successfully commissioned Anglo American Research Laboratory ( AARL ) elution circuit. The first carbon strip has been completed with gold successfully recovered from the circuit. This has resulted in the first carbon in pulp ( CIP ) and gravity gold pour;

  • Davyhurst team working with Process Logic Control ( PLC ) programmers to optimise the plant functionality, which has resulted in a positive increase in the crushing circuit efficiency that has in turn lead to sustained mill feed rates; and

  • Entire leach circuit now on line and functioning to design specification.

Corporate Update

We refer to recent media speculation regarding protests in Kalgoorlie at Digges & Dealers. The Company has been in constant discussion with these contractors and confirms that the payment of these contractors has occurred or will occur shortly. The Company continues to interact with its contractors in the normal course of commissioning.

Riverina

==> picture [504 x 339] intentionally omitted <==

Figure 2: Riverina Project Location Plan.

==> picture [493 x 699] intentionally omitted <==

Figure 3: Riverina Drill Plan showing drilling with results pending and past results. Previous results see ASX release 25 January 2017.

Callion

==> picture [456 x 568] intentionally omitted <==

Figure 4: Callion Drill Plan showing drilling with results pending and past results. Previous results see ASX release 10 January 2017.

Investor Enquiries

Michael Fotios Jon Snowball Executive Chairman FTI Consulting T: +61 8 6241 1866 T: +61 477 946 068 E : [email protected] E: [email protected]

Forward Looking Statements

Eastern Goldfields Limited has prepared this announcement based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement. To the maximum extent permitted by law, none of Eastern Goldfields Limited, its directors, employees or agents, advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the part of any of them or any other person, for any loss arising from the use of this announcement or its contents or otherwise arising in connection with it. This announcement is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or sale of any security, and neither this announcement nor anything in it shall form the basis of any contract or commitment whatsoever. This announcement may contain forward looking statements that are subject to risk factors associated with gold exploration, mining and production businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates.

Competent Persons Statement

The information in this report that relates to Mineral resources is based on information compiled under the supervision of Mr Andrew Czerw, an employee of Eastern Goldfields Limited, who is Member of the Australian Institute of Mining and Metallurgy (AusIMM). Mr Czerw has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Andrew Czerw consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Table 2: EGS Mineral Resource Statement

PROJECT ('000t)
(g/t Au)
MEASURED
('000t)
(g/t Au)
MEASURED
('000t)
(g/t Au)
INDICATED
('000t)
(g/t Au)
INDICATED
('000t)
(g/t Au)
INFERRED
('000t)
(g/t Au)
INFERRED
('000t)
(g/t Au)
('000oz.)
TOTAL MATERIAL
('000t)
(g/t Au)
('000oz.)
TOTAL MATERIAL
('000t)
(g/t Au)
('000oz.)
TOTAL MATERIAL
GOLDEN EAGLE 0 0.0 345 2.5 311 2.6 656 2.5 54
LIGHTS OF ISRAEL UNDERGROUND 0 0.0 74 4.3 180 4.2 254 4.2 35
MAKAI SHOOT 0 0.0 1,985 2.0 153 1.7 2,138 2.0 136
WAIHI 0 0.0 805 2.4 109 2.4 914 2.4 71
Central Davyhurst Subtotal 0 0.0 3,200 2.2 800 2.6 3,962 2.3 296
LADY GLADYS 0 0.0 1,858 1.9 190 2.4 2,048 1.9 128
RIVERINA AREA 0 0.0 941 2.4 1,644 2.5 2,585 2.5 205
FOREHAND 0 0.0 386 1.7 436 1.9 822 1.8 48
SILVER TONGUE 0 0.0 155 2.7 19 1.3 174 2.5 14
SUNRAYSIA 0 0.0 175 2.1 318 2.0 493 2.0 32
Riverina-Mulline Subtotal 0 0.0 3,515 2.1 2,607 2.3 6,122 2.2 427
SAND KING 0 0.0 1,773 3.3 680 3.7 2,453 3.4 272
MISSOURI 0 0.0 2,022 3.0 409 2.6 2,431 2.9 227
PALMERSTON/CAMPERDOWN 0 0.0 118 2.3 174 2.4 292 2.4 22
BERWICK MOREING 0 0.0 0 0.0 50 2.3 50 2.3 4
BLACK RABBIT 0 0.0 0 0.0 434 3.5 434 3.5 49
THIEL WELL 0 0.0 0 0.0 18 6.0 18 6.0 3
Siberia Subtotal 0 0.0 3,913 3.1 1,765 3.2 5,678 3.1 577
CALLION 0 0.0 86 2.8 83 2.3 169 2.6 14
Callion Subtotal 0 0.0 86 2.8 83 2.3 169 2.6 14
FEDERAL FLAG 32 2.0 112 1.8 238 2.5 382 2.3 28
SALMON GUMS 0 0.0 199 2.8 108 2.9 307 2.8 28
WALHALLA 0 0.0 448 1.8 216 1.4 664 1.7 36
WALHALLA NORTH 0 0.0 94 2.4 13 3.0 107 2.5 9
MT BANJO 0 0.0 109 2.3 126 1.4 235 1.8 14
MACEDON 0 0.0 0 0.0 186 1.8 186 1.8 11
Walhalla Subtotal 32 2.0 962 2.1 887 2.0 1,881 2.1 126
IGUANA 0 0.0 690 2.1 2,032 2.0 2,722 2.0 177
LIZARD 106 4.0 75 3.7 13 2.8 194 3.8 24
Lady Ida Subtotal 106 4.0 765 2.3 2,045 2.0 2,916 2.1 201
Davyhurst Total 138 3.5 12,441 2.5 8,187 2.4 20,728 2.4 1,641
BALDOCK 0 0.0 136 18.6 0 0.0 136 18.6 81
BALDOCK STH 0 0.0 0 0.0 0 0.0 0 0.0 0
METEOR 0 0.0 0 0.0 143 9.3 143 9.3 43
WHINNEN 0 0.0 0 0.0 39 13.3 39 13.3 17
Mount Ida Total 0 0.0 136 18.6 182 10.2 318 13.8 141
Combined Total 138 3.5 12,577 2.7 8,369 2.6 21,046 2.6 1,782
  1. All Resources listed above with the exception of the Missouri and Sand King Resources were prepared and first disclosed under the JORC Code 2004 (refer to ASX release “ Swan Gold Prospectus ”, 13/2/2013) . It has not been updated since to comply with JORC Code 2012 on the basis that the information has not materially changed since it was last reported.

  2. The Missouri and Sand King Mineral Resources has been updated and complies with all relevant aspects of the JORC code 2012.

  3. The above table contains rounding errors.