24 October 2013
Entered strategic marketing agreement with Noble, made several senior level appointments in Marketing, Sourcing and Sales and executed a number of commercial initiatives to support new commercial strategy
| '000 tonnes unless otherwise indicated | Q3 2013 | Q2 2013 | ∆ % | Q1 2013 | 9m 2013 | 9m 2012 |
|---|---|---|---|---|---|---|
| Mining | ||||||
| Own mine zinc in concentrate | 65 | 70 | (7)% | 68 | 203 | 209 |
| Total zinc in concentrate 1 | 70 | 75 | (7)% | 70 | 214 | 230 |
| Gold ('000 troy ounces) | 26.3 | 15.3 | 72% | 9.6 | 51.1 | 66.2 |
| Silver ('000 troy ounces) 2 | 1,178 | 1,269 | (7)% | 1,094 | 3,541 | 4,137 |
| Copper in concentrate | 2.8 | 3.4 | (18)% | 2.8 | 9.1 | 10.7 |
| Metals Processing | ||||||
| Zinc metal | 282 | 256 | 10% | 263 | 801 | 803 |
| Lead metal (Port Pirie) | 41 | 46 | (11)% | 40 | 127 | 113 |
| Market | ||||||
| Average LME zinc price (USD/t) 3 | 1,859 | 1,840 | 1% | 2,033 | 1,910 | 1,946 |
| Average exchange rate (EUR/USD) | 1.32 | 1.31 | 1% | 1.32 | 1.32 | 1.28 |
In the Mining segment Nyrstar's own mines produced approximately 65,000 tonnes of zinc in concentrate in Q3 2013, a 7% decline on the previous quarter. This decrease was driven by operational challenges at Myra Falls and Middle Tennessee mines. The East Tennessee mines continued to perform at a consistently high level, while the Langlois mine increased its production of zinc in concentrate due to the benefits of the optimisation programme put in place during Q2 2013. Nyrstar expects higher production volumes from its mines in Q4 2013, however some challenges are expected to continue within the Mining segment during Q4 2013. Therefore, Nyrstar lowers its full year 2013 zinc in concentrate production guidance to 265,000 – 280,000 tonnes (previously 300,000-340,000 tonnes).
Campo Morado produced approximately 373,000 troy ounces of silver
1 Includes production from Nyrstar operated mines and deliveries under the Talvivaara streaming agreement
2 75% of the silver produced by Campo Morado is subject to a streaming agreement with Silver Wheaton Corporation whereby only USD 3.90/oz is payable. In Q3 2013,
3 Zinc price is average of LME daily cash settlement prices
Gold production in Q3 2013 was significantly up on the previous quarter, mainly due to the planned and previously announced switch to mining higher grade gold ore faces at El Toqui, following its focus on mining zinc/lead ore faces in H1 2013. For this reason, total lead in concentrate production was slightly down in Q3 2013. Copper in concentrate production was impacted by the operational challenges at Campo Morado and Myra Falls, while silver production was down at several mines. In addition after assessing all options in the context of challenged financial performance and a lower precious metal price environment, Management took the decision to put the Coricancha mine on care and maintenance. For this reason and given the level of silver production achieved for the first nine months of 2013 at the other mines, Nyrstar believes it is unlikely that full year 2013 silver guidance will be achieved and therefore lowers guidance to 4.7-4.9 million troy ounces (previously 5.25-5.75 million troy ounces).
The Metals Processing segment delivered a strong Q3 2013 with zinc metal production of approximately 282,000 tonnes, an increase of 10% from Q2 2013, and the highest quarterly production since Q4 2011. Full year 2013 zinc metal guidance of 1.0-1.1 million tonnes is maintained. Production rose at all of the zinc smelters quarter on quarter, with the Auby and Balen/Overpelt smelters delivering the largest improvements, up 30% and 17% respectively, following planned maintenance shuts in Q2 2013. Despite a number of these planned shuts across the Metals Processing segment in H1 2013, zinc metal production for the first nine months of 2013 was in line with the same period in 2012, emphasising the very strong performance in Q3 2013. The Auby smelter also produced a record indium metal in Q3 2013, while lead metal and silver production at Port Pirie were impacted by an unplanned one week shut of the sinter and blast furnace (as stated in Nyrstar's Half Year 2013 results).
Delivering on its commitment to provide an update to the market on the Port Pirie Transformation and Smelting Strategic Review in H2 2013, Nyrstar will host a conference call to to discuss the company's continuing strategic journey including the proposed transformation of its Metals Processing business on 29 October 2013. For further details see the Metals Processing section.
During Q3 2013 the Marketing, Sourcing and Sales (MSS) segment delivered a number of important milestones as part of Nyrstar's new commercial strategy. Nyrstar entered into a strategic offtake and marketing agreement for some of its European commodity grade metal with Noble starting January 2014. Discussions on direct sales, marketing and financing opportunities continue with a number of market participants for remaining European volumes, as Nyrstar believes the best way to market its product is through a multi-channel approach. This could include placing commodity grade zinc metal and other products in offshore markets, a route which was tested during Q3 2013. With regards to the sourcing of raw materials Nyrstar entered tenders for concentrates for the first time and held key contract negotiations with a number of suppliers. To support the implementation of the new strategy Nyrstar has made a number of senior level appointments to MSS to build its capabilities and market insight.
The zinc price continued to trade between USD 1,800/t and USD1,900/t during Q3 2013, with the average price for the quarter in line with Q2 2013, and Nyrstar expects the zinc price to continue to trade in this range during Q4 2013. During Q3 2013 gold and silver prices remained low while acid prices deteriorated across a number of regions. Given the sensitivity of Nyrstar's earnings to changes in those prices, this may impact 2013 results, however metal price hedges put in place in H1 2013 provide some protection against this. Based on current market dynamics, the outlook for both zinc premia and treatment charges appear favourable for smelters and positive momentum seems to be building behind zinc with major mine closures which started in 2013 and will continue in 2014.
Management will discuss this statement in a conference call with the investment community on 24 October 2013 at 9:00am Central European Time. The presentation will be webcast live on the Nyrstar website, www.nyrstar.com, and will also be available in archive. The webcast can be accessed via: http://www.media-server.com/m/p/wh323qqc
Jaideep Thatai Manager Investor Relations T: +41 44 745 8103 M: +41 79 722 3089 [email protected] Sheela Pawar de Groot Group Manager Corporate Affairs T: +41 44 745 8154 M:+41 79 722 6917 [email protected] Geert Lambrechts Manager Corporate External Communications T: +32 14 449 646 M: +32 473 637 892 [email protected]
| '000 tonnes unless otherwise indicated | Q3 2013 | Q2 2013 | ∆ % | Q1 2013 | 9m 2013 | 9m 2012 |
|---|---|---|---|---|---|---|
| Total ore milled | ||||||
| Campo Morado | 172 | 156 | 10% | 57 | 385 | 545 |
| Contonga | 88 | 80 | 10% | 89 | 257 | 264 |
| Coricancha | 3 | 21 | (86)% | 27 | 51 | 74 |
| El Mochito | 208 | 196 | 6% | 190 | 595 | 562 |
| El Toqui | 133 | 133 | - | 143 | 410 | 387 |
| Langlois | 141 | 125 | 13% | 100 | 366 | 386 |
| Myra Falls | 122 | 135 | (10)% | 130 | 387 | 389 |
| East Tennessee | 495 | 501 | (1)% | 507 | 1,504 | 1,345 |
| Middle Tennessee | 357 | 416 | (14)% | 467 | 1,239 | 1,055 |
| Tennessee Mines | 852 | 917 | (7)% | 974 | 2,743 | 2,401 |
| Total | 1,719 | 1,764 | (3)% | 1,709 | 5,193 | 5,007 |
| Zinc mill head grade (%) | ||||||
| Campo Morado | 5.44% | 6.08% | (11)% | 7.35% | 5.98% | 7.09% |
| Contonga | 4.08% | 4.20% | (3)% | 4.35% | 4.21% | 4.51% |
| Coricancha | 3.51% | 1.42% | 147% | 1.94% | 1.81% | 2.02% |
| El Mochito | 3.71% | 3.89% | (5)% | 3.95% | 3.85% | 4.08% |
| El Toqui | 4.42% | 5.41% | (18)% | 6.15% | 5.35% | 4.64% |
| Langlois | 7.42% | 7.47% | (1)% | 9.62% | 8.04% | 8.14% |
| Myra Falls | 4.74% | 6.04% | (22)% | 5.22% | 5.35% | 7.26% |
| East Tennessee | 3.76% | 3.77% | (0)% | 3.72% | 3.75% | 3.38% |
| Middle Tennessee | 3.28% | 3.44% | (5)% | 3.11% | 3.27% | 3.37% |
| Tennessee Mines | 3.56% | 3.62% | (2)% | 3.43% | 3.53% | 3.38% |
| Lead mill head grade (%) | ||||||
| Contonga | 0.20% | 0.15% | 33% | 0.19% | 0.18% | 0.59% |
| Coricancha | 0.62% | 0.28% | 121% | 0.63% | 0.48% | 0.95% |
| El Mochito | 1.87% | 1.94% | (4)% | 1.93% | 1.91% | 2.12% |
| El Toqui | 0.05% | 0.56% | (91)% | 0.98% | 0.54% | 0.36% |
| Myra Falls | 0.49% | 0.49% | - | 0.48% | 0.49% | 0.55% |
| Copper mill head grade (%) | ||||||
| Campo Morado | 0.98% | 1.32% | (26)% | 1.94% | 1.26% | 1.14% |
| Contonga | 1.12% | 1.12% | - | 0.91% | 1.05% | 0.72% |
| Coricancha | 1.15% | 0.51% | 125% | 0.48% | 0.53% | 0.24% |
| Langlois | 0.38% | 0.51% | (25)% | 0.64% | 0.50% | 0.53% |
| Myra Falls | 0.70% | 0.89% | (21)% | 0.90% | 0.83% | 1.03% |
| Gold grade of Ore Milled (g/t) | ||||||
| Campo Morado | 2.46 | 2.15 | 14% | 1.90 | 2.25 | 2.06 |
| Coricancha | 1.69 | 1.73 | (2)% | 3.03 | 2.41 | 3.41 |
| El Toqui | 4.11 | 2.07 | 99% | 1.55 | 2.55 | 3.45 |
| Langlois | 0.11 | 0.13 | (15)% | 0.15 | 0.13 | 0.15 |
| Myra Falls | 1.49 | 1.40 | 6% | 1.20 | 1.36 | 1.29 |
| Silver grade of Ore Milled (g/t) | ||||||
| Campo Morado | 167.48 | 149.62 | 12% | 145.11 | 156.91 | 150.46 |
| Contonga | 33.22 | 32.21 | 3% | 36.34 | 33.98 | 48.45 |
| Coricancha | 178.41 | 78.82 | 126% | 145.69 | 119.64 | 122.56 |
| El Mochito | 68.91 | 81.76 | (16)% | 77.09 | 75.77 | 76.83 |
| El Toqui | 6.84 | 15.92 | (57)% | 14.83 | 12.59 | 9.87 |
| Langlois | 31.60 | 38.28 | (17)% | 51.73 | 39.38 | 42.13 |
| Myra Falls | 54.20 | 51.74 | 5% | 46.11 | 50.63 | 48.49 |
| '000 tonnes unless otherwise indicated | Q3 2013 | Q2 2013 | ∆ % | Q1 2013 | 9m 2013 | 9m 2012 |
|---|---|---|---|---|---|---|
| Zinc recovery (%) | ||||||
| Campo Morado | 77.1% | 76.2% | 1% | 78.2% | 76.9% | 79.7% |
| Contonga | 89.2% | 88.9% | 0% | 89.8% | 89.3% | 89.9% |
| Coricancha | 83.7% | 70.1% | 19% | 73.2% | 74.9% | 80.9% |
| El Mochito | 84.0% | 85.3% | (2)% | 84.0% | 84.4% | 84.2% |
| El Toqui | 81.5% | 85.9% | (5)% | 85.0% | 84.4% | 86.6% |
| Langlois | 94.5% | 92.8% | 2% | 93.1% | 93.5% | 93.5% |
| Myra Falls | 86.3% | 89.2% | (3)% | 88.1% | 88.1% | 88.6% |
| East Tennessee | 94.5% | 94.8% | (0)% | 94.6% | 94.6% | 93.3% |
| Middle Tennessee | 92.8% | 94.3% | (2)% | 94.0% | 93.8% | 94.3% |
| Tennessee Mines | 93.8% | 94.6% | (1)% | 94.3% | 94.2% | 93.7% |
| Lead recovery (%) | ||||||
| Contonga | 54.6% | 58.3% | (6)% | 59.7% | 57.5% | 69.2% |
| Coricancha | 46.6% | 69.2% | (33)% | 60.9% | 64.4% | 77.8% |
| El Mochito | 76.2% | 79.2% | (4)% | 80.4% | 78.7% | 79.3% |
| El Toqui | 0.0% | 51.9% | - | 58.6% | 54.6% | 49.5% |
| Myra Falls | 26.5% | 28.2% | (6)% | 33.1% | 29.2% | 37.4% |
| Copper recovery (%) | ||||||
| Campo Morado | 65.7% | 67.7% | (3)% | 79.9% | 69.8% | 65.0% |
| Contonga | 69.8% | 68.4% | 2% | 61.3% | 67.1% | 55.0% |
| Coricancha | 62.5% | 55.4% | 13% | 50.8% | 54.4% | 45.4% |
| Langlois | 85.6% | 84.1% | 2% | 87.9% | 86.0% | 74.3% |
| Myra Falls | 63.5% | 69.8% | (9)% | 67.8% | 67.5% | 74.9% |
| Gold recovery (%) | ||||||
| Campo Morado | 34.1% | 36.2% | (6)% | 38.0% | 35.4% | 34.7% |
| Coricancha | 33.5% | 38.2% | (12)% | 89.7% | 65.7% | 90.3% |
| El Toqui | 98.6% | 65.2% | 51% | 31.8% | 75.9% | 78.8% |
| Langlois | 91.4% | 83.6% | 9% | 87.9% | 87.6% | 80.8% |
| Myra Falls | 65.4% | 77.0% | (15)% | 65.5% | 70.0% | 67.6% |
| Silver recovery (%) | ||||||
| Campo Morado | 40.3% | 47.1% | (14)% | 54.3% | 44.9% | 50.6% |
| Contonga | 81.9% | 82.9% | (1)% | 78.8% | 80.9% | 79.2% |
| Coricancha | 84.4% | 83.9% | 1% | 87.9% | 83.7% | 95.2% |
| El Mochito | 85.1% | 86.2% | (1)% | 86.7% | 86.1% | 86.5% |
| El Toqui | 84.9% | 67.9% | 25% | 70.6% | 72.1% | 72.8% |
| Langlois | 91.0% | 84.8% | 7% | 88.6% | 88.1% | 76.0% |
| Myra Falls | 78.3% | 80.2% | (2)% | 82.0% | 80.2% | 79.5% |
| Total zinc concentrate | ||||||
| Campo Morado | 15 | 15 | - | 7 | 38 | 64 |
| Contonga Coricancha |
7 0 |
6 0 |
17% - |
7 1 |
20 1 |
21 2 |
| El Mochito El Toqui |
13 10 |
13 13 |
- (23)% |
12 16 |
37 39 |
37 34 |
| Langlois Myra Falls |
18 9 |
16 13 |
13% (31)% |
16 11 |
50 34 |
55 46 |
| East Tennessee | 28 | 28 | - | 28 | 85 | 68 |
| Middle Tennessee | 17 | 21 | (19)% | 21 | 59 | 53 |
| Tennessee Mines | 45 | 50 | (10)% | 50 | 144 | 121 |
| Own Mine Total Talvivaara Stream |
117 7 |
127 7 |
(8)% - |
120 4 |
364 18 |
381 35 |
| Total | 125 | 134 | (7)% | 123 | 382 | 416 |
| Total lead concentrate | ||||||
| Contonga | 0.2 | 0.1 | 100% | 0.2 | 0.5 | 1.8 |
| Coricancha | 0.0 | 0.1 | (100)% | 0.2 | 0.4 | 1.0 |
| El Mochito | 4.7 | 4.6 | 2% | 4.6 | 13.9 | 15.7 |
| El Toqui | - | 0.8 | - | 1.6 | 2.4 | 0.9 |
| Myra Falls | 0.5 | 0.6 | (17)% | 0.6 | 1.7 | 2.3 |
| Total | 5.4 | 6.3 | (14)% | 7.2 | 18.9 | 21.7 |
| '000 tonnes unless otherwise indicated | Q3 2013 | Q2 2013 | ∆ % | Q1 2013 | 9m 2013 | 9m 2012 |
|---|---|---|---|---|---|---|
| Total copper concentrate | ||||||
| Campo Morado | 8.7 | 9.5 | (8)% | 5.1 | 23.2 | 30.0 |
| Contonga | 2.6 | 2.3 | 13% | 1.8 | 6.7 | 4.0 |
| Coricancha | 0.1 | 0.2 | (50)% | 0.3 | 0.6 | 0.3 |
| Langlois | 2.0 | 2.3 | (13)% | 3.0 | 7.3 | 7.6 |
| Myra Falls | 2.4 | 3.5 | (31)% | 3.4 | 9.2 | 12.8 |
| Total | 15.7 | 17.7 | (11)% | 13.5 | 47.0 | 54.7 |
| Zinc in Concentrate | ||||||
| Campo Morado | 7 | 7 | - | 3 | 18 | 31 |
| Contonga | 3 | 3 | - | 3 | 10 | 11 |
| Coricancha | 0 | 0 | - | 0 | 1 | 1 |
| El Mochito | 6 | 7 | (14)% | 6 | 19 | 19 |
| El Toqui | 5 | 6 | (17)% | 7 | 18 | 16 |
| Langlois | 10 | 9 | 11% | 9 | 28 | 29 |
| Myra Falls | 5 | 7 | (29)% | 6 | 18 | 25 |
| East Tennessee | 18 | 18 | - | 18 | 53 | 43 |
| Middle Tennessee | 11 | 13 | (15)% | 14 | 38 | 34 |
| Tennessee Mines | 28 | 31 | (10)% | 31 | 91 | 76 |
| Own Mine Total | 65 | 70 | (7)% | 68 | 203 | 209 |
| Talvivaara Stream | 4 | 5 | (20)% | 2 | 11 | 22 |
| Total | 70 | 75 | (7)% | 70 | 214 | 230 |
| Lead in concentrate | ||||||
| Contonga | 0.1 | 0.1 | - | 0.1 | 0.3 | 1.1 |
| Coricancha | 0.0 | 0.0 | - | 0.1 | 0.2 | 0.5 |
| El Mochito | 3.0 | 3.0 | - | 3.0 | 8.9 | 9.5 |
| El Toqui | - | 0.4 | - | 0.8 | 1.2 | 0.4 |
| Myra Falls | 0.2 | 0.2 | - | 0.2 | 0.6 | 0.8 |
| Total | 3.2 | 3.7 | (14)% | 4.2 | 11.1 | 12.4 |
| Copper in concentrate | ||||||
| Campo Morado | 1.1 | 1.4 | (21)% | 0.9 | 3.4 | 4.0 |
| Contonga | 0.7 | 0.6 | 17% | 0.5 | 1.8 | 1.0 |
| Coricancha | 0.0 | 0.1 | (100)% | 0.1 | 0.1 | 1.0 |
| Langlois | 0.5 | 0.5 | - | 0.6 | 1.6 | 1.5 |
| Myra Falls | 0.5 | 0.8 | (38)% | 0.8 | 2.2 | 3.0 |
| Total | 2.8 | 3.4 | (18)% | 2.8 | 9.1 | 10.7 |
| Gold ('000 troy oz) | ||||||
| Campo Morado | 4.6 | 3.9 | 18% | 1.3 | 9.9 | 12.4 |
| Coricancha | 0.1 | 0.4 | (75)% | 2.5 | 2.6 | 7.4 |
| El Toqui | 17.3 | 5.8 | 198% | 2.4 | 25.5 | 34.0 |
| Langlois | 0.5 | 0.4 | 25% | 0.4 | 1.3 | 1.5 |
| Myra Falls | 3.8 | 4.7 | (19)% | 3.3 | 11.8 | 10.9 |
| Total | 26.3 | 15.3 | 72% | 9.6 | 51.1 | 66.2 |
| Silver ('000 troy oz) | ||||||
| Campo Morado4 | ||||||
| 373 | 353 | 6% | 145 | 871 | 1,329 | |
| Contonga | 77 | 69 | 12% | 81 | 227 | 325 |
| Coricancha El Mochito |
14 392 |
45 445 |
(69)% (12)% |
105 409 |
163 1,246 |
279 1,209 |
| El Toqui | 25 | 46 | (46)% | 48 | 120 | 123 |
| Langlois | 130 | 131 | (1)% | 147 | 408 | 389 |
| Myra Falls | 166 | 180 | (8)% | 158 | 505 | 483 |
| Total | 1,178 | 1,269 | (7)% | 1,094 | 3,541 | 4,137 |
4 75% of the silver produced by Campo Morado is subject to a streaming agreement with Silver Wheaton Corporation whereby only USD 3.90/oz is payable. In Q3 2013, Campo Morado produced approximately 373,000 troy ounces of silver.
Production at the Campo Morado mine was mixed between precious and base metals. Ore milled volumes were up 10% in Q3 2013 due to improved operational processes and modifications in the zinc and copper flotation circuits. Both gold and silver mill head grades also improved in Q3 2013, by 14% and 12% respectively, and therefore production of gold and silver increased by 16% and 8%. However due to limited production headings and lower than expected zinc and copper grades, down 11% and 26% respectively, zinc in concentrate production was flat and copper in concentrate declined by approximately 300 tonnes.
The Contonga mine delivered a solid Q3 2013. The volume of ore milled increased by 10%, with Q2 2013 impacted by a two week period of industrial action (as disclosed in Nyrstar's Half Year 2013 results). The grade profile remained largely unchanged from previous quarters, with mining activities focussed on the low areas of the mine which contain higher copper and lower zinc and silver grades. During Q3 2013 Nyrstar decided to put the Coricancha mine on care and maintenance. As announced in Nyrstar's Half Year 2013 results the mine had switched to a different operating model to treat historic tailings and in the context of the lower precious metal price environment, Management would continually assess the performance of the asset if financial performance did not improve. To preserve cash the decision was therefore taken to stop operations, with the small volumes produced in Q3 2013 related to processing stockpiled ore.
At the El Mochito mine production of zinc and lead in concentrate in Q3 2013 was in-line with Q2 2013, however silver production fell by 12%. A 6% increase in ore milled volumes largely offset a decline in zinc and lead mill head grades, however it could not compensate for a 16% fall in the silver grade. This was due to the depletion of a high silver grade area during Q3 2013. To improve the silver grade, development activity has been accelerated to improve access to a higher grade silver area of the mine for long hole stoping. The El Toqui mine delivered a 198% increase in gold production in Q3 2013, following the planned and previously announced switch to mining higher grade gold ore faces compared to a focus on zinc/lead ore faces in Q2 2013. This can be seen in the 99% increase in the average gold head grade put through the mill in Q3 2013 compared to Q2 2013, and the respective 18% and 91% fall in the zinc and lead grades. Silver production was also impacted as higher silver grades are found in higher zinc grade areas.
The Langlois mine increased zinc in concentrate production in Q3 2013 by 11% on Q2 2013. This was driven by an increase in ore milled, up 13% in Q3 2013, due to the benefits of an optimisation programme put in place during Q2 2013 which has increased the number of available ore faces for production and development. The production of other metals in concentrate was impacted by a fall in mill head grades, resulting from mining in the outer areas of the ore body. At Myra Falls the production of all metals, except lead, declined in Q3 2013 due to operational challenges. The volume of ore milled declined 10% due to a three day site power outage, caused by a rock slide, and a three day unplanned mill outage. Zinc and copper mill head grades declined, by 22% and 21% respectively, compared to Q2 2013 due to increased grade variability in the areas being mined and challenges with accessing a high grade stope, scheduled for mining in September as per the mine plan, but now expected for access in October. Mill recoveries suffered as a consequence of the mill outages and lower than expected copper grade. Nyrstar expects the variability in copper and zinc grades to continue into Q4 2013, and therefore production volumes may continue to be impacted.
The Tennessee Mines produced approximately 28,000 tonnes of zinc in concentrate in Q3 2013, a 10% decline on Q2 2013. East Tennessee mines sustained its high level of operational performance by producing approximately 18,000 tonnes for the third consecutive quarter. Ore milled volumes, average zinc mill head grade and mill recovery were all stable during Q3 2013. At Middle Tennessee mines zinc in concentrate production in Q3 2013 fell by 15% compared to the previous quarter due to a decline in both the volume of ore milled (14%) and zinc grade (5%). This was due to a number of short term issues such as power outages and equipment availability. These issues have since been overcome and in Q4 2013 the site expects to move into higher grade ore zones. Therefore Nyrstar expects Q4 2013 production volumes to recover to levels achieved in Q1 and Q2 2013.
Nyrstar's expects higher zinc in concentrate production volumes from its mines in Q4 2013, however some challenges are expected to continue during Q4 2013, and therefore Nyrstar lowers its full year 2013 zinc in concentrate production to 265,000 – 280,000 tonnes (previously 300,000-340,000 tonnes). In addition, given the volume of silver production in the first nine months of 2013, Nyrstar believes it is unlikely that full year 2013 silver guidance will be achieved and therefore lowers silver guidance to 4.7-4.9 million troy ounces (previously 5.25-5.75 million troy ounces).
Under the Talvivaara zinc streaming agreement approximately 4,000 tonnes of zinc in concentrate were delivered in Q3 2013, a fall of approximately 1,000 tonnes from Q2 2013. Due to the timing of shipments into Antwerp this was less than the 5,645 tonnes of zinc in concentrate Talvivaara produced in Q3 2013 as reported in their Operational Update on 10 October 2013.
| '000 tonnes unless otherwise indicated | Q3 2013 | Q2 2013 | ∆ % | Q1 2013 | 9m 2013 | 9m 2012 |
|---|---|---|---|---|---|---|
| Zinc Metal | ||||||
| Auby | 43 | 33 | 30% | 36 | 112 | 121 |
| Balen/Overpelt | 63 | 54 | 17% | 66 | 183 | 186 |
| Budel | 68 | 67 | 1% | 68 | 203 | 186 |
| Clarksville | 29 | 27 | 7% | 22 | 79 | 83 |
| Hobart | 70 | 67 | 4% | 64 | 202 | 203 |
| Port Pirie | 7 | 8 | (13)% | 7 | 22 | 23 |
| Total | 282 | 256 | 10% | 263 | 801 | 803 |
| Lead Metal | ||||||
| Port Pirie | 41 | 46 | (11)% | 40 | 127 | 113 |
| Other Products | ||||||
| Copper cathode | 1.0 | 1.0 | - | 1.0 | 3.0 | 2.3 |
| Silver ('000 troy ounces) | 4,209 | 4,491 | (6)% | 4,393 | 13,093 | 8,892 |
| Gold ('000 troy ounces) | 19 | 17 | 12% | 18 | 54 | 42 |
| Indium metal (tonnes) | 9 | 8 | 13% | 8 | 25 | 5 |
| Sulphuric acid | 376 | 305 | 23% | 343 | 1,024 | 1,042 |
The Auby smelter produced approximately 43,000 tonnes of zinc metal in Q3 2013, a 30% increase on Q2 2013. This significant increase was due in part to both a planned maintenance shut of the zinc plant in Q2 2013 and also strong operational performance during the third quarter. The site also delivered record quarterly indium metal production of approximately 9 tonnes. The Balen/Overpelt smelter increased its zinc metal production by 17% in Q3 2013, again mainly due to a planned maintenance shut in Q2 2013 impacting prior period output. The Budel smelter delivered another quarter of strong operational performance, due to improvements in the cell house, with zinc metal production of 68,000 tonnes of zinc metal in line with management expectations. Budel's zinc metal production for the first nine months of 2013 is 9% higher than the same period in 2012, highlighting the site's consistently strong performance this year.
The Clarksville smelter delivered a 7% increase in zinc metal production in Q3 2013. This was driven by improved current intensity from on-going operational excellence efforts to monitor equipment effectiveness in the cell house and steady operations from both the roaster and leach plant. Germanium leach product production at Clarksville was unfavourable compared to Q2 2013 as there was less Middle Tennessee concentrate available due to the operational challenges at the mine during the third quarter (as discussed in the Mining section). The Hobart smelter produced approximately 70,000 tonnes in Q3 2013, up 4% on Q2 2013, achieved by strong operational performance throughout the quarter. Hobart's zinc metal production performance in the first nine months of 2013 is in-line with the same period in 2012.
Full year 2013 zinc metal guidance of 1.0-1.1 million tonnes is maintained.
Lead metal production at the Port Pirie smelter was impacted by a one week shut of the sinter and blast furnace, as stated in Nyrstar's Half Year 2013 results. The shut was successfully executed with an approximate 5,000 tonne impact on lead production, slightly less than previously expected. The shut also impacted zinc production, which fell by 11% in Q3 2013, as feed was restricted to the slag fumer resulting from blast furnace downtime. Silver production fell 6% compared to Q2 2013, which benefited from a drawdown in silver containing work in progress inventories, while gold production increased in Q3 2013 by 12% due to a drawdown of gold containing work in progress inventories. Copper production remained steady at approximately 1, 000 tonnes for the quarter.
Delivering on its commitment to provide an update to the market on the Port Pirie Transformation and Smelting Strategic Review in H2 2013, Nyrstar Management will host a conference call with the investment community to discuss the company's continuing strategic journey including the proposed transformation of its Metals Processing business on 29 October 2013 at 11.00am Central European Time. The presentation will be webcast live on the Nyrstar website, www.nyrstar.com, and will also be available in archive. The webcast can be accessed via: http://www.mediaserver.com/m/p/kjn8xgrz
The call can also be accessed using the following dial-in numbers:
| Country | Toll Number |
|---|---|
| UK | +44(0)20 3427 1911 |
| Belgium | +32(0)2 402 3092 |
| France | +33(0)1 76 77 22 22 |
| Germany | +49(0)30 3001 90539 |
| Switzerland | +41(0)22 592 7953 |
| USA | +1 212 444 0895 |
| Canada | +1 416 216 4141 |
| Australia | +61(0)2 8223 9222 |
| The Netherlands | +31(0)20 716 8257 |
If your country is not listed above please dial the international number: +44(0)20 3427 1911.
On 1 October 2013 Nyrstar entered an offtake and strategic marketing agreement with Noble Group ("Noble") to market and sell 200,000 tonnes per annum portion of commodity grade zinc metal (special high grade and continuous galvanising grade) produced at its European smelters. The agreement has a term of 4 years, commencing 1 January 2014, under which Nyrstar will receive market price plus a benchmark premium per tonne of zinc metal, with a profit sharing mechanism for any upside. For Nyrstar, the agreement represents a first step in executing a European zinc metal plan aimed at actively marketing Nyrstar's product to increase optionality in terms of customers, product mix and geography which is expected to deliver improved margins.
The agreement follows a structured process undertaken by Nyrstar to determine the most suitable channel(s) to market and sell commodity grade zinc metal produced at its European smelters. This was triggered by the requirement to end the European component of a Commodity Grade Metal Off-take Agreement with Glencore Xstrata (which will be fully unwound by 31 December 2013) as part of the remedy package agreed by the European Commission in relation to the Glencore merger with Xstrata. During that process Nyrstar determined the best way to market its European commodity grade zinc metal is through a multi-channel approach and therefore continues to discuss direct sales, marketing and financing opportunities with a number of market participants for the remaining 150,000 tonnes (approximately) of commodity grade zinc metal produced in Europe.
Noble also agreed to acquire from Nyrstar's treasury shareholding 1,700,225 common shares in Nyrstar, representing 1% of total shares, for a price of EUR 3.76 per share (a premium of 5% to the 3-day volume weighted average price of Nyrstar shares on 27 September 2013), for a total cash consideration of EUR 6.4 million.
With regards to the sourcing of raw materials Nyrstar entered tenders for concentrates for the first time and was successful in some of the processes it entered. The Sourcing team also held key contract negotiations with a number of suppliers in order to further build and improve its raw material book in the near and long term. Nyrstar also began to place zinc metal in offshore markets to achieve higher margins and will continue to explore these end markets for further marketing and sales opportunities.. To support the implementation of the new strategy, Nyrstar has made a number of senior level appointments to MSS to build its capabilities and market insight.
This release includes forward-looking statements that reflect Nyrstar's intentions, beliefs or current expectations concerning, among other things: Nyrstar's results of operations, financial condition, liquidity, performance, prospects, growth, strategies and the industry in which Nyrstar operates. These forward-looking statements are subject to risks, uncertainties and assumptions and other factors that could cause Nyrstar's actual results of operations, financial condition, liquidity, performance, prospects or opportunities, as well as those of the markets it serves or intends to serve, to differ materially from those expressed in, or suggested by, these forward-looking statements. Nyrstar cautions you that forwardlooking statements are not guarantees of future performance and that its actual results of operations, financial condition and liquidity and the development of the industry in which Nyrstar operates may differ materially from those made in or suggested by the forward-looking statements contained in this news release. In addition, even if Nyrstar's results of operations, financial condition, liquidity and growth and the development of the industry in which Nyrstar operates are consistent with the forward-looking statements contained in this news release, those results or developments may not be indicative of results or developments in future periods. Nyrstar and each of its directors, officers and employees expressly disclaim any obligation or undertaking to review, update or release any update of or revisions to any forward-looking statements in this report or any change in Nyrstar's expectations or any change in events, conditions or circumstances on which these forward-looking statements are based, except as required by applicable law or regulation.
Nyrstar is an integrated mining and metals business, with market leading positions in zinc and lead, and growing positions in other base and precious metals; essential resources that are fuelling the rapid urbanisation and industrialisation of our changing world. Nyrstar has mining, smelting, and other operations located in Europe, the Americas, China and Australia and employs over 7,000 people. Nyrstar is incorporated in Belgium and has its corporate office in Switzerland. Nyrstar is listed on NYSE Euronext Brussels under the symbol NYR. For further information please visit the Nyrstar website, www.nyrstar.com
Jaideep Thatai Manager Investor Relations T: +41 44 745 8103 M: +41 79 722 3089 [email protected] Sheela Pawar de Groot Group Manager Corporate Affairs T: +41 44 745 8154 M:+41 79 722 6917 [email protected] Geert Lambrechts Manager Corporate External Communications T: +32 14 449 646 M: +32 473 637 892 [email protected]
Building tools?
Free accounts include 100 API calls/year for testing.
Have a question? We'll get back to you promptly.