Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

NORONEX LIMITED Capital/Financing Update 2025

Nov 25, 2025

65441_rns_2025-11-25_e253e766-42c5-407e-8590-244c99451a9b.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

26 November 2025

ASX Announcement

==> picture [136 x 100] intentionally omitted <==

Initial Drilling Identifies Potentially Extensive CopperSilver Horizon at Powerline Copper Project

Follow-up drilling currently in progress to evaluate extensions of the prospective D’Kar-NPF contact horizon at the Steenbok Dome

Highlights

  • 7,000m Reverse Circulation (RC) drilling program at the Powerline Copper Project in eastern Namibia is progressing well, with ~3,500m (15 holes) completed to date across the Steenbok and Qembo Domes. Program funded under an earn-in agreement with a wholly owned subsidiary of South32 ( South32 ).

  • Significant zone of copper-silver mineralisation intersected in RC hole 25SBRC001 at the interpreted D’Kar-NPF contact position at the Steenbok (T6) fold closure, within the Steenbok Dome:

  • 25SBRC001 9m @ 0.45% Cu and 43g/t Ag from 294m

  • Structural interpretation and down-hole Optical Televiewer data indicates that hole 25SBRC001 intersected the hinge zone of the anticline, while follow up holes 25SBRC002 and 25SBRC003 remained in steep hangingwall positions and did not encounter the mineralised D’Kar-NPF contact.

  • A follow-up RC hole, at site SBRCE, is planned ~200 metres south-west of hole 25SBRC001 to test for the interpreted extension of the prospective copper-silver horizon.

  • Drilling is currently underway at the northern limb of the Qembo Dome.

  • Initial results validate the targeting strategy and support ongoing exploration across the broader Powerline Project area.


Noronex Limited ( ASX: NRX ) ( Noronex or the Company ) is pleased to report initial assay results from the ongoing 7,000m Reverse Circulation (RC) drilling program at the Powerline Copper Project in eastern Namibia. This program, funded under the earn-in agreement with South32, commenced in September 2025 and is targeting large-scale domal features at the northern edge of the Kalahari

Noronex Limited
ASX: NRX
Suite 1, 295 Rokeby Rd
Subiaco, WA, Australia
ACN: 609 594 005
t: +61 (8) 6555 2950
e: [email protected]
w: noronexlimited.com.au
Board & Management
David Prentice
Chairman
Robert Klug
Non-Executive Director
Victor Rajasooriar
Managing Director & CEO
Piers Lewis
Non-Executive Director
Tony Chisnall
Chief Geologist
Shares on Issue
619,099,499

==> picture [66 x 48] intentionally omitted <==

Copper Belt, interpreted from aeromagnetic data.

This release follows the Company’s announcement dated 19 September 2025, which marked the commencement of drilling across newly granted tenements designed to test the prospective D’KarNPF contact horizon.

Noronex Managing Director and CEO, Victor Rajasooriar, commented:

“The major 7,000m RC program at the Powerline Project is making good progress, with the overall program half way complete and expected to continue through until the first quarter of next year, with a break for Christmas and New Year.

“While still early days, the initial assay results received from 25SBRC001 represent a strong validation of our geological model and targeting approach. Given the size of the domal features we are targeting and the wide-spaced reconnaissance nature of the drilling, hitting a significant zone of mineralisation in the prospective D’Kar-NPF Contact formation in our very first hole is a big win.

“While other initial follow-up holes in the vicinity did not intersect significant mineralisation at the Steenbok Dome, they’ve provided us with critical structural insights that have allowed us to refine our targeting with confidence. We’re excited to follow up on the mineralisation intersected in Hole 1 and continue unlocking the potential of the Powerline Project. Shareholders can look forward to plenty of upcoming news-flow as this major drill program continues to unfold.”

==> picture [439 x 248] intentionally omitted <==

Figure 1: Location of the Steenbok (T6) and Qembo (T2) Domes at Noronex’s Powerline Project, within Exploration Licence EPL 9552, in eastern Namibia. Current, historical and planned drill collar locations are underlain by regional magnetic imagery and historical ground magnetic images.

Assay Results – Steenbok Prospect (T6) and Qembo (T2)

At the Steenbok prospect (T6), RC drill-hole 25SBRC001 successfully intersected the D’Kar-NPF contact and returned encouraging copper and silver values, confirming the mineralised potential of this horizon ( 9m @ 0.45% Cu and 43 g/t Ag from 294m (see Table 1)).

Mineralisation is characterized by fine-grained chalcocite disseminated throughout the host matrix.

2

==> picture [66 x 48] intentionally omitted <==

Interpretation of televiewer (OPTV) bedding data suggests that the dip of the fabric and bedding is shallower deeper down-hole as the drill hole intersects the Steenbok domal closure plunging to the north-east. This supports the interpretation that 25SBRC001 achieved its objective—intersecting the prospective D’Kar-NPF contact horizon near the crest of the anticline.

By contrast, follow-up holes 25SBRC002 and 25SBRC003 remained within the steeply-dipping hanging wall (D’Kar) of the north-western limb of the anticline and did not intersect the contact (host horizon). These outcomes have helped refine the structural model and confirm the steep nature of the northern limb and fold closure position.

==> picture [449 x 79] intentionally omitted <==

----- Start of picture text -----

Depth From Interval
Hole Name Target Easting Northing RL m Dip Azi Depth m Results Cu % Ag g/t
m m
25SBRC001 Steenbok 449001 7617799 1288 -78 184 337 294 9 0.45 43
25SBRC002 Steenbok 448597 7617704 1276 -68 186 300 No significant intercept
25SBRC003 Steenbok 448804 7617749 1271 -77 176 325 No significant intercept
25QBRC004 Qembo 453699 7606601 1274 -77 94 289 No significant intercept
25QBRC005 Qembo 453850 7606650 1260 -74 98 300 No significant intercept
----- End of picture text -----

Table 1: Summary of Assay Results – at Steenbok (T6) and Qembo (T2) (Intervals > 0.3% Cu with 6m internal waste and includes > 0.5 % Cu with 2m internal waste.)

Hole Name Target Easting
Northing
RL m
Dip
Azi
Depth m
Results
Depth From
m
Interval
m
Cu %
Ag g/t
Results
Depth From
m
Interval
m
Cu %
Ag g/t
25SBRC001 Steenbok 449001
7617799
1288
-78
184
337
291
13
0.38
38
25SBRC002 Steenbok 448597
7617704
1276
-68
186
300
No significant intercept
25SBRC003 Steenbok 448804
7617749
1271
-77
176
325
No significant intercept
25QBRC004 Qembo 453699
7606601
1274
-77
94
289
No significant intercept
25QBRC005 Qembo 453850
7606650
1260
-74
98
300
No significant intercept

Table 2: Summary of Assay Results – at Steenbok (T6) and Qembo (T2) (Intervals > 0.2% Cu with 6m internal waste and includes > 0.5 % Cu with 2m internal waste.)

==> picture [449 x 245] intentionally omitted <==

Figure 2: RC drill-hole locations at Steenbok (T6), 25SBRC001 – 25SBRC003. Included is the contact between the overlying D’Kar Formation and underlying NPF interpreted as an ENE plunging anticlinal fold. The NNW limb is steep, hence why holes 25SBRC002 and 25SBRC003 did not reach the mineralised horizon contact. A follow up hole is planned at site SBRCE to test the up-plunge extension of the intercept in 25SBRC001 at the D’Kar-NPF contact.

3

==> picture [66 x 48] intentionally omitted <==

==> picture [413 x 199] intentionally omitted <==

Figure 3: An oblique drill-hole section looking to the NW, with RC hole 25SBRC001 to the left in front, and 25SCRC003, to the right, behind. Significant copper and silver were intersected at the base of the D’Kar Formation, near the apex of the anticlinal fold closure. A hole is planned at site SBRCE, to follow the mineralised contact zone up-plunge, to the WSW of the intercept in 25SBRC001.

Planning is underway for follow-up drilling at Steenbok to step out from 25SBRC001 and test the lateral extent of mineralisation. Additional RC holes have been designed to better constrain the geometry of the highly prospective D’Kar-NPF contact and test other high-priority targets across the project area.

Qembo Dome

At the Qembo (T2) western fold closure, Holes 25QBRC004 and 25QBRC005 were drilled to test the D’Kar-NPF contact along the interpreted crest of a west-south-west plunging anticline. Though the contact zone was intersected, no significant copper mineralisation was returned.

However, subsequent drilling is now testing the northern limb of the Qembo dome, where structural complexity may enhance mineralisation potential. Assay results from some of these holes are expected shortly.

==> picture [401 x 220] intentionally omitted <==

Figure 4: Drill-hole locations for 25QBRC004 and 25QBRC005, reported above at Qembo (T2).

  • ENDS –

4

==> picture [66 x 48] intentionally omitted <==

This ASX announcement has been authorised by the Board of Noronex Limited

For further information, contact the Company at [email protected] or on (08) 6555 2950

Investor inquiries: Media inquiries:
Victor Rajasooriar Nicholas Read
Managing Director & CEO Read Corporate
+61 8 6555 2950 M: 0419 929 046

About Noronex Limited

Noronex is an ASX-listed copper explorer with advanced projects in the Kalahari Copper Belt, spanning Namibia and Botswana, and in Ontario, Canada. Collectively, these projects have seen over 180,000m of historical drilling. The Company currently has a JORC 2012 Resource of 10Mt @ 1.3% Cu at its Witvlei and Dordabis Projects (Namibia) consisting of 2.9 Mt (Indicated) @ 1.39 % Cu and 7.1 Mt (Inferred) @ 1.20%[1] . The Company has a Strategic Alliance Agreement (SAA) with South32, and two Earn-in Agreements providing South32 with the right to acquire 60% of each of Noronex’s HumpbackDamara Project in Namibia and the Cgae Cgae Project in Botswana by funding a combined A$4M in exploration per year for a maximum of five years. Noronex will be the manager of the exploration activities under the Earn-In Agreements and SAA and plans to use modern technology and exploration techniques to generate new targets at the projects and grow the current Resource base.

The Company also has exposure to a Uranium tenement in the centre of Namibia’s hard rock uranium district. The Etango North (EPL 6776) is a joint venture with a local Namibian partner, where Noronex can earn up to an 80% interest on EPL 6776 with Noronex the manager and operator of the JV.

Competent Person Statement – Exploration Results

The information in this report that relates to Exploration Results is based on information compiled by Mr Tony Chisnall who is a Member of the Australasian Institute of Mining & Metallurgy (AusIMM). Mr Chisnall is a geologist employed by Noronex Ltd and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Chisnall consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The Company confirms that it is not aware of any new information or data that materially affects the previously disclosed exploration results referenced in this announcement. Information included in the original market announcements and that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements. Any information contained in this report that relates to Mineral Resources has been extracted from a previously released announcement dated 8/03/2021 (“Announcement”). The Company confirms that it is not aware of any new information or data that materially affects the information included in the Announcement, and that all material assumptions and technical parameters underpinning the estimates in the Announcement continue to apply and have not materially changed.

1 Refer to ASX Announcement dated 8 March 2021.

5

==> picture [66 x 48] intentionally omitted <==

Forward-Looking Statements

This document includes forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Noronex Limited’s planned exploration programs, corporate activities, and any, and all, statements that are not historical facts. When used in this document, words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should" and similar expressions are forward-looking statements. Noronex Limited believes that its forward-looking statements are reasonable; however, forward-looking statements involve risks and uncertainties, and no assurance can be given that actual future results will be consistent with these forward-looking statements. All figures presented in this document are unaudited and this document does not contain any forecasts of profitability or loss.

==> picture [65 x 48] intentionally omitted <==

APPENDIX 1: JORC COMPLIANT EXPLORATION REPORT

The following information is provided in accordance with Table 1 of Appendix 5A of the JORC Code 2012 – Section 1 (Sampling Techniques and Data), Section 2 (Reporting of Exploration Results).

JORC Code 2012 Edition – Table 1

Section 1 - Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
The historical Drilling was completed between 2012 and 2013 and limited information
is available on the nature and quality of the sampling.
All information in regards to the historical Drilling at Powerline is outlined in the
Noronex ASX announcement dated 27 July 2023 (New application lodged in Kalahari
Copper Belt)
RC drilling by Noronex at the Powerline Project were sampled from below ~80m on 1m
intervals from the cyclone of the RC drill rig with two 1-2 kg samples (original and
duplicate) sub-samples collected in calico bags via a cone splitter on the rig.
Samples are tested by pXRF and those over 1000 ppm Cu are assayed in the laboratory
at 1m intervals. Samples below 1000ppm Cu are spear composited to 3m composites
and assayed in the laboratory.
All samples are prepared and analysed at ActLabs for 49 elements
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
All drilling RC samples were weighed, split in a cone splitter on the rig and composited
on site
Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases, more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information.
Reverse Circulation drilling was used to generate 1m samples.
The Kalahari Sands are up to 100m thick over the prospect area and can provide
difficulties in drilling with steel casing being required. No samples are collected prior to
casing.
Oxide mineralisation is noted to ~120m vertical depth.

7

==> picture [65 x 48] intentionally omitted <==

Criteria JORC Code explanation Commentary
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what
method, etc).
Reverse Circulation (RC) drilling is being carried by Hammerstein Drilling Namibia using
‘best practice’ to achieve maximum sample recovery and quality.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and results assessed. Weights were collected from the complete sample collected every metre to manage
recovery, the majority of samples were collected dry.
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
Diligent control was maintained on the rig on sample recovery and all smaller samples
recorded.
Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
No relationship to sample size has been noticed.
Logging Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Samples were logged by qualified geologists and recorded in LogChief software.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.
Logging is quantitively recorded for every metre on oxidation, lithology and
mineralisation that is stored in a MaxGeo Datashed database.
The total length and percentage of the relevant intersections logged. Reported in table in release.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken. No diamond drilling was completed.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
Samples were split by a cone splitter on the cyclone and then composited by spearing
where required. The majority of samples were collected dry.
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
Samples were weighed, fine crushing of entire sample to 70% -2mm, split off 250 and
pulverise split to better than 85% passing 75 microns. Samples were prepared at the
ActLabs laboratory in Windhoek.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Quality control procedures are in place with repeats, blanks inserted in the field.
Measures taken to ensure that the sampling is representative of the in-situ material
collected, including for instance results for field duplicate/second-half sampling.
Quality control procedures are in place with 1 in 20 blanks and standards. Field duplicates
from RC drilling were collected at 1 in 20 frequency
Whether sample sizes are appropriate to the grain size of the material being sampled. No information is available.

8

==> picture [65 x 48] intentionally omitted <==

Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.
Samples are analysed by ActLabs Canada for UT 4-Noronex and overlimit by ME-OG62
49 elements by a 4-acid digestion.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
No drilling data from field-portable pXRF tools are reported.
Magnetic Susceptibility data is captured every metre using a KT-10 Terraplus handheld
MagSus metre and recorded in MagSus_SI_x10¯³
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and
precision have been established.
Blanks and repeats are inserted at 1 in 20 sample intervals.
Field duplicates are inserted at 1 in 20.
Standards from Zambian Sedimentary Copper deposits of appropriate grades are
inserted at 1 in 20.
Verification of
sampling and
i
The verification of significant intersections by either independent or alternative company
personnel.
Sampling is overseen and managed by standard procedures.
assayng The use of twinned holes. No holes have been twinned.
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
Database is verified and managed by RockSolid Australia.
Discuss any adjustment to assay data. No adjustments have been made.
Location of data
points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Hole locations are located using a handheld GPS
Specification of the grid system used. Coordinates are reported in WGS 84 UTM Zone 34S.
Quality and adequacy of topographic control. The Project area has a relatively flat relief, minor collar variations were applied.
Data spacing
and distribution
Data spacing for reporting of Exploration Results. Drillhole spacing is variable. Orientation was varied to cross interpreted sedimentary
dips.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
It is considered that drilling is insufficient to establish continuity of mineralisation and
grade consistent for an Inferred Mineral Resource.
Whether sample compositing has been applied. Samples were composited to 3m if no visible mineralisation was reported.

9

==> picture [65 x 48] intentionally omitted <==

Criteria JORC Code explanation Commentary
Orientation of Whether the orientation of sampling achieves unbiased sampling of possible structures Variable hole orientations give some indication mineralisation is sub-vertical.
data in relation
to geological
and the extent to which this is known, considering the deposit type. OPTV data suggests a 30-50 degree dip of the stratigraphy to the ENE.
structure
If the relationship between the drilling orientation and the orientation of key mineralised True widths are not known at this time
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
Sample security The measures taken to ensure sample security. Samples were delivered direct to the laboratory supervised by geologist.
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. No audits completed.
Criteria JORC Code explanation Commentary
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
Variable hole orientations give some indication mineralisation is sub-vertical.
OPTV data suggests a 30-50 degree dip of the stratigraphy to the ENE.
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
True widths are not known at this time
Sample security The measures taken to ensure sample security. Samples were delivered direct to the laboratory supervised by geologist.
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. No audits completed.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native
title interests, historical sites, wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
The Powerline project consists of EPL_9551_and EPL9552. The licenses were applied for
by Noronex Exploration and Mining Ltd on 3rdof July 2023, granted on the 20thof
January 2025, and are valid until the 19thJanuary 2028.
Noronex Exploration and Mining Ltd hold a 100% legal and beneficial interest.
Environmental Clearance Certificate were issued by the Minister of Environment and
Tourism on 4 in respect of exploration activities which clearance is to be valid for a period
of three years
Approval for the EPL’s and exploration work has been supported by chiefs in the
Traditional Authority.
There are no overriding royalties other than from the state, no special indigenous
interests, historical sites or other registered settings are known in the region of the
reported results.
Exploration done
by other parties
Acknowledgment and appraisal of exploration by other parties. Significant exploration has been completed on the project by EISEB Prospecting and
Mining (Pty) Ltd. A Joint Venture with Antofagasta Minerals was very active over the
project area in 2012-2013.
An Access database with drilling and assay information is available and a number of
reports.

10

==> picture [65 x 48] intentionally omitted <==

Criteria JORC Code explanation Commentary
Geology Deposit type, geological setting and style of mineralisation. The Powerline Project is located within a north easterly trending belt of
Mesoproterozoic sediments, the Kalahari Copper Belt. Stratigraphy displays typical
characteristics of a sedimentary copper system, including a basal sequence of bimodal
volcanics overlain by red-bed sediments, mixed reduced marine siliciclastic and
carbonate rocks.
Copper mineralisation occurs throughout the belt along, and above, the main redox
contact between the Ngwako Pan (NPF) and D’Kar Formations. Mineralisation is largely
epigenetic and primarily related to basin inversion during a prolonged mineralising
event during the Damara (Pan-African) orogeny. Mineralisation is concentrated on
major reactivated structures above basement highs where basinal fluids are
concentrated in reductant traps during basin inversion.
Chalcocite and chalcopyrite are the dominant copper-bearing mineral at the Powerline
Project, with other copper sulphide mineralisation. Chrysocolla and malachite are
observed as the main minerals in the oxide ore in the district.
The mineralisation is stratiform and occurs in a sub-parallel lode that can be modelled
over 4 km’s.
The Damara Duplex on the northern margin of the Copper Belt contains volcanic units
and interpreted gneissic, amphibolite and marble basement of the Damara suture zone.
A number of covered volcanic complexes have been intersected with mafic and felsic
intrusives and extrusives.
Drill hole
Information
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Exploration results when reported are based on a compilation of current drilling and
historical drilling.

11

==> picture [65 x 48] intentionally omitted <==

Criteria JORC Code explanation Commentary
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of high-grade results and longer
lengths of low-grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be clearly
stated.
Intervals reported from Noronex Drilling are reported based on a 0.3 % Cu cut-off and
include up to 6m waste below the cut-off. Results reported are greater than 0.3m%
Copper.
No Copper equivalent intercepts are reported in this release.
Intervals reported from previous work at the T2_T16 projects are reported based on a 0.2
% Cu cut-off and include up to 6m waste below the cut-off. Results reported are greater
than 0.2m% Copper. Silver values are significant and are expected to be recovered in a
copper concentrate as in similar deposits at Motheo, Botswana.
Relationship
between
mineralization
widths and
intercept lengths
These relationships are particularly important in the reporting of Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true width not known’).
Due to the nature of RC drilling and no visual review possible of the drillcore it is not clear
on true thickness downhole.
Mineralisation is closely associated with stratigraphy, the majority of mineralisation is
hosted in a number of green shaley fine grained horizons. Bedding in 25SBRC001 is
moderate and dips to the East-North-East.
Mineralisation is disseminated within the cleavage and in thin quartz-carbonate vein
systems with chalcocite, bornite and chalcopyrite. Veins are also predominantly sub-
vertical.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Powerline Drilling Plan (Steenbok) and sections reported in the body of the report.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
All intervals below transported cover were assayed and reported.
Other
substantive
exploration data
Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
Aeromagnetic and ground magnetic imagery is based on historical surveys.
A drone magnetic survey was flown over the Steenbok domal closure and on various
regional profiles by Ongwe Minerals (Pty) Ltd in July 2025. Lines were flown north-
south at 50m line spacing at 30m flight height with a DJI Matrice 350RTK and a
Geometric MagArrow II magnetic sensor.

12

==> picture [65 x 48] intentionally omitted <==

Criteria JORC Code explanation Commentary
An Optical Borehole Scanner (OPTV) was used to provide a continuous high-resolution
oriented ultrasound image of the borehole wall, which has been used to define
stratigraphic contacts and structural information and orientation.
Further work The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
The current contract is for 7,000m and is underway. Extension to this drilling
programme will be dependent on results.
Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
Diagrams are provided in the report, and future work is discussed to continue exploring
the prospect (Next Steps).

13