Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Newcore Gold Regulatory Filings 2025

Nov 4, 2025

46558_rns_2025-11-04_9c1569c2-52fa-4903-a7d4-4a3da018cd59.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

N

NEWCORE GOLD

NEWS RELEASE

Newcore Gold Drilling Intersects 1.08 g/t Gold over 22.0 Metres and 1.29 g/t Gold over 15.0 Metres, at the Enchi Gold Project, Ghana

Drilling Continues to Highlight the Potential for Resource Growth at Enchi, Intersects Near Surface Gold Mineralization Outside of Current Resources at the Kwakyekrom Gold Deposit

November 4, 2025

TSX-V: NCAU, OTCQX: NCAUF

Vancouver, BC - Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU, OTCQX: NCAUF) is pleased to announce additional drill results from the 45,000-metre drill program underway at the Company's 100% owned Enchi Gold Project ("Enchi" or the "Project") in Ghana. Shallow Reverse Circulation ("RC") drilling at the Kwakyekrom Gold Deposit ("Kwakyekrom") intersected multiple zones of near-surface gold mineralization, including hole KKRC099 which intersected 1.08 grams per tonne gold ("g/t Au") over 22.0 metres ("m") from 112 m, with a higher-grade interval of 2.78 g/t Au over 7.0 m from 126 m. Hole KKRC085A also encountered shallow gold mineralization, intersecting 1.29 g/t Au over 15.0 m from 88 m. Both KKRC099 and KKRC085A targeted areas for potential resource growth and encountered mineralization outside of the current limits of the pit constrained Mineral Resource Estimate at Kwakyekrom. Drilling continues to prove out the continuity of gold mineralization and potential for resource growth at Enchi.

Highlights from Drilling at the Kwakyekrom Gold Deposit at Enchi

  • Drilling at Kwakyekrom included holes that targeted and intersected gold mineralization outside of the current limits of the pit constrained Mineral Resource Estimate, highlighting the potential for future resource growth at Enchi.
  • KKRC099 intersected 1.08 g/t Au over 22.0 m from 112 m, with a higher-grade interval of 2.78 g/t Au over 7.0 m from 126 m.
  • KKRC085A intersected 1.29 g/t Au over 15.0 m from 88 m.

  • Drilling continues to define a series of sub-parallel gold mineralized structures.

  • Gold mineralization was intersected on the northern and southern extents at Kwakyekrom, extending the mineralization both north and south of the current pit constrained Mineral Resource Estimate.

  • All holes intersected gold mineralization, with drilling targeting shallow gold mineralization within the oxide, transition and upper fresh mineral horizons.

The 45,000-metre drill program underway at Enchi is focused on resource growth and infill drilling designed to convert Inferred Resources to Indicated. The drill program is now in its second phase focused on discovery and resource growth, including drilling targeting earlier-stage exploration targets along with drilling focused on defining the resource growth potential at depth and along strike. The completed first phase of drilling focused on the drilling required for resource conversion in advance of commissioning a Pre-Feasibility Study later this year.

Suite 1560 - 200 Burrard Street

Vancouver, British Columbia V6C 3L6

www.newcoregold.com

[email protected]


Luke Alexander, President and CEO of Newcore stated, "The drilling we recently completed at Kwakyekrom continues to highlight the resource growth potential at Enchi, with these results highlighting the opportunity to expand the current deposit at Kwakyekrom both within the near-surface mineralization as well as at depth. This drilling has further defined the continuity of the gold mineralization along the edges of the current pits that constrain the current Mineral Resource Estimate at Kwakyekrom, while also extending the known mineralization to both the north and south. We look forward to continuing to highlight the growth potential that exists at our Enchi Gold Project in Ghana through the drill bit, in tandem with advancing the Project to a Pre-Feasibility Study in H1 2026."

This release reports results for 24 RC holes totalling 3,843 m (KKRC085A to KKRC108) targeting the Kwakyekrom Gold Deposit, with all holes intersecting gold mineralization. A total of 28,940 m in 231 holes have been reported as part of the ongoing 2024 - 2025 drill program at Enchi, with 98.7% of holes intersecting gold mineralization.

Select assay results from the 24 holes of the drill program reported in this release are below:

Table 1 - Enchi Gold Project Drill Highlights

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t)
KKRC099 Kwakyekrom 112.0 134.0 22.0 1.08
including 126.0 133.0 7.0 2.78
KKRC085A Kwakyekrom 88.0 103.0 15.0 1.29
KKRC100 Kwakyekrom 8.0 19.0 11.0 1.39
KKRC088 Kwakyekrom 93.0 103.0 10.0 0.96
KKRC098 Kwakyekrom 25.0 40.0 15.0 0.60
including 33.0 37.0 4.0 1.65
and 214.0 215.0 1.0 6.41
KKRC093 Kwakyekrom 56.0 58.0 2.0 2.05
and 113.0 125.0 12.0 0.57

Notes:
1. See detailed table for complete results;
2. Intervals reported are hole lengths with true width estimated to be 75 - 85%; and
3. Length-weighted averages from uncut assays.

A plan map showing the drill hole locations can be viewed at:
https://newcoregold.com/site/assets/files/5936/2025_11_04-ncau-nr-enchi-plan-map-kwakyekrom.pdf

Cross sections showing drill results and highlights for holes KKRC085A, KKRC086, KKRC093, KKRC098, KKRC099, and KKRC100 can be viewed at:
https://newcoregold.com/site/assets/files/5936/2025_11_04-ncau-crosssections-kwakyekrom.pdf

A complete list of the drill results in this release, including hole details, can be viewed at:
https://newcoregold.com/site/assets/files/5936/2025_11_04-ncau-enchi-2024-2025-drill-results.pdf

Drilling at the Kwakyekrom Gold Deposit

KKRC085A to KKRC108 (24 RC holes totalling 3,843 m) were completed at the Kwakyekrom Gold Deposit, targeting the northern and southern extensions of the mineralized structure.

NEWCORE GOLD


Drilling targeted shallow mineralization with a focus on expanding the deposit and growing the known resource. RC drilling at Kwakyekrom consisted of 50-metre spaced sections with drill holes spaced every 25-metres along the sections. Drilling targeted shallow mineralization, with drill holes reaching a maximum vertical depth of 120 metres. The holes reported in this news release are distributed across 12 separate sections that are spread along a 2-kilometre strike length, and span (1) the northern extension; (2) the northern edge of the resource pit; (3) the southern edge of the resource pit; and (4) the southern extension.

11 RC holes totalling 1,968 m (KKRC085A to KKRC091, KKRC096, KKRC098, KKRC099, KKRC108) were drilled at the northern extension of the Kwakyekrom Gold Deposit. Drilling intersected a series of sub-parallel structures hosting the gold mineralization in this area. KKRC099 intersected 1.08 g/t Au over 22.0 m from 112 m, with a higher-grade interval of 2.78 g/t Au over 7.0 m from 126 m. KKRC085A, located 150 metres north of KKRC099 and the northernmost hole drilled to date at Kwakyekrom as part of the current drill program, intersected 1.29 g/t Au over 15.0 m from 88 m. KKRC088 which tested below the shallow pit that currently constrains the Mineral Resource Estimate at Kwakyekrom extended the gold mineralization to depth intersecting 0.96 g/t Au over 10.0 m from 93 m. KKRC089, drilled 50 metres south of KKRC088, likewise extended the mineralization to depth intersecting 0.47 g/t Au over 18.0 m from 87 m.

6 RC holes totalling 825 m (KKRC092 to KKRC095, KKRC097B, KKRC100) were drilled on the northern edge of the pit that constrains the current Mineral Resource Estimate at Kwakyekrom. This drilling intersected a series of close-spaced gold mineralized structures. KKRC100 intersected 1.39 g/t Au over 11.0 m from 8 m and 0.97 g/t Au over 5.0 m from 109 m. Additional results in this area included KKRC093 with 0.57 g/t Au over 12.0 m from 113 m and 2.05 g/t Au over 2.0 m from 56 m, as well as KKRC092 with 0.84 g/t Au over 6.0 m from 91 m and 0.90 g/t Au over 4.0 m from 58 m.

3 RC holes totalling 438 m (KKRC101 to KKRC103) were drilled on the southern edge of the pit that constrains the current Mineral Resource Estimate at Kwakyekrom. KKRC102 intersected both near-surface and deeper gold mineralized structures with 0.42 g/t Au over 10.0 m from 25 m and 0.29 g/t Au over 20.0 m from 60 m.

4 RC holes totalling 612 m (KKRC104 to KKRC107) were drilled to test the southern extension of the Kwakyekrom Gold Deposit. KKRC104 intersected multiple gold mineralized structures including 0.35 g/t Au over 18.0 m from 67 m and 0.34 g/t Au over 22.0 m from 91 m.

The recently completed drilling at Kwakyekrom continues to confirm continuity along strike and down dip for the principal structures which comprise the Kwakyekrom Gold Deposit. The width and gold grades within these drill results are consistent with prior wider-spaced drilling completed at Kwakyekrom. This drilling also continues to confirm the potential for resource growth at Enchi from drilling on known deposits as well as at earlier-stage targets that have been identified across the district scale property.

2024 - 2025 Enchi Work Program

A 45,000-metre drill program is underway at Enchi, targeting near-surface oxide and shallow fresh mineralization. The primary goal of the first phase of the drill program was infill drilling for resource conversion to improve the confidence level of the existing Mineral Resource

NEWCORE GOLD


Estimate, with most of the first phase of the drill program allocated to the two largest deposits at Enchi, Boin and Sewum. Improving the confidence level of the Mineral Resource Estimate at Enchi is a key component of the development work required to be completed in advance of commissioning a Pre-Feasibility Study for the Project. With the first phase of drilling complete, the second phase of the 2024 - 2025 drill program will focus on outlining resource growth along strike at existing deposits and diamond drilling targeting the higher-grade potential at depth. All deposit areas and pre-resource targets at Enchi remain open along strike and at depth, providing for future resource growth across the district-scale property.

In addition to drilling, development work in support of a Pre-Feasibility Study is on-going at Enchi, including metallurgical testwork, hydrogeological testing, geotechnical work, and environmental work.

Kwakyekrom Gold Deposit

Kwakyekrom is one of the four deposits which comprise the Mineral Resource Estimate at Enchi (Kwakyekrom has an Inferred Mineral Resource of 4.2 million tonnes grading 0.72 g/t Au containing 97,700 ounces). Kwakyekrom is located 15 kilometres southeast of the town of Enchi, with nearby roads and power and further access provided by a series of drill roads. Kwakyekrom is located to the south of Nyam, with the Kwakyekrom structure interpreted to be an extension of the Nyam structure. To date, approximately 40% of the gold-in-soil anomaly at Kwakyekrom is untested by drilling, with the average vertical depth of all holes drilled to date at Kwakyekrom only down to 80 metres.

Drill Hole Locations

Table 2 - Enchi Gold Project Drill Hole Location Details

Hole ID UTM East UTM North Elevation Azimuth ° Dip ° Length (m)
KKRC085A 529000 635363 85 298 -60 180
KKRC086 528942 635392 104 298 -60 122
KKRC087 528929 635332 109 298 -60 150
KKRC088 528945 635255 102 298 -60 174
KKRC089 528968 635307 100 298 -60 228
KKRC090 528899 635167 102 298 -60 240
KKRC091 528796 635102 112 298 -60 120
KKRC092 528633 634835 130 298 -60 126
KKRC093 528695 634878 132 298 -60 125
KKRC094 528762 634990 130 298 -60 102
KKRC095 528771 634927 128 298 -60 168
KKRC096 528816 634982 117 298 -60 180
KKRC097B 528779 634878 116 298 -60 78
KKRC098 528890 635212 101 298 -60 220
KKRC099 528934 635195 104 298 -60 240
KKRC100 528748 634846 126 298 -60 226
KKRC101 528521 634486 102 298 -60 192
KKRC102 528458 634419 115 298 -60 114

NEWCORE GOLD


Hole ID UTM East UTM North Elevation Azimuth ° Dip ° Length (m)
KKRC103 528430 634374 121 298 -60 132
KKRC104 528415 634306 130 298 -60 150
KKRC105 528387 634272 137 298 -60 150
KKRC106 528353 634248 147 298 -60 132
KKRC107 528390 634223 148 298 -60 180
KKRC108 528786 635064 127 298 -60 114

Enchi Gold Project Mineral Resource Estimate

The Enchi Gold Project hosts an Indicated Mineral Resource of 41.7 million tonnes grading 0.55 g/t Au containing 743,500 ounces gold and an Inferred Mineral Resource of 46.6 million tonnes grading 0.65 g/t Au containing 972,000 ounces. Mineral resource estimation practices are in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice Guidelines (November 29, 2019) and follow CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014), that are incorporated by reference into National Instrument 43-101 ("NI 43-101"). The Mineral Resource Estimate is from the technical report titled "NI 43-101 Technical Report, Preliminary Economic Assessment on the Enchi Gold Project" dated June 7, 2024, with an effective date of April 24, 2024, prepared for Newcore by Preetham Nayak, P.Eng., Ryda Peung, P.Eng., and Zunedbhai Shaikh, P.Eng., of Lycopodium Minerals Canada Ltd.; Kerrine Azougarh, P.Eng., of Micon International Limited; and Simon Meadows Smith, P.Eng. / P.Geo., of SEMS Exploration in accordance with NI 43-101, and is available under the Company's profile on SEDAR+ at www.sedarplus.ca. Simon Meadows Smith is an independent qualified person ("QP") as defined by NI 43-101.

Newcore Gold Best Practice

Newcore is committed to best practice standards for all exploration, sampling and drilling activities. Drilling was completed by an independent drilling firm using industry standard RC and Diamond Drill equipment. Analytical quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into the sample strings. Samples are placed in sealed bags and shipped directly to Intertek Labs located in Tarkwa, Ghana for 50 gram gold fire assay.

Qualified Person

Mr. Gregory Smith, P. Geo, Vice President of Exploration at Newcore, is a Qualified Person as defined by NI 43-101, and has reviewed and approved the technical data and information contained in this news release. Mr. Smith has verified the technical and scientific data disclosed herein and has conducted appropriate verification on the underlying data including confirmation of the drillhole data files against the original drillhole logs and assay certificates.

About Newcore Gold Ltd.

Newcore Gold is advancing its Enchi Gold Project located in Ghana, Africa's largest gold producer(1). Newcore Gold offers investors a unique combination of top-tier leadership, who are aligned with shareholders through their 15% equity ownership, and prime district scale exploration opportunities. Enchi's 248 km² land package covers 40 kilometres of Ghana's prolific Bibiani Shear Zone, a gold belt which hosts several multi-million-ounce gold deposits,

NEWCORE GOLD


including the Chirano mine 50 kilometres to the north. Newcore's vision is to build a responsive, creative and powerful gold enterprise that maximizes returns for shareholders.

(1) Source: Production volumes for 2024 as sourced from the World Gold Council.

On Behalf of the Board of Directors of Newcore Gold Ltd.

Luke Alexander
President, CEO & Director

For further information, please contact:

Mal Karwowska | Vice President, Corporate Development and Investor Relations
+1 604 484 4399
[email protected]
www.newcoregold.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release includes statements that contain "forward-looking information" within the meaning of the applicable Canadian securities legislation ("forward-looking statements"). All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussion with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always using phrases such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. In this news release, forward-looking statements relate, among other things, to: statements about the estimation of mineral resources; results of preliminary economic assessments; completion of a pre-feasibility study; results of metallurgical testwork; results of our ongoing drill campaign; results of drilling, magnitude or quality of mineral deposits; anticipated advancement of mineral properties or programs; and future exploration prospects.

These forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business. The assumptions underlying the forward-looking statements are based on information currently available to Newcore. Although the forward-looking statements contained in this news release are based upon what management of Newcore believes, or believed at the time, to be reasonable assumptions, Newcore cannot assure its shareholders that actual results will be consistent with such forward-looking statements, as there may be other factors that cause results not to be as anticipated, estimated or intended. Forward-looking information also involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others: risks related to the speculative nature of Newcore's business; Newcore's formative stage of development; Newcore's financial position; possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of gold and other commodities; fluctuations in currency markets (such as the Canadian dollar to United States dollar exchange rate); change in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, unusual or unexpected geological formations); the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims

NEWCORE GOLD
- 6 -


by local communities; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); and title to properties.

Forward-looking statements contained herein are made as of the date of this news release and Newcore disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.

NEWCORE GOLD
- 7 -


img-0.jpeg

img-1.jpeg

img-2.jpeg

Legend

  • Drill Hole
  • Assays Announced
  • November 4, 2025
  • Previous Drill Holes
  • 200 m

NEWCORE GOLD

2024 - 2025 Drill Program

Enchi Gold Project

Kwakyekrom, Ghana (As of Nov 2025)


img-3.jpeg

100 Elev
KKRC098
KKRC099
surface

0.60 g/t Au over 15 m
incl. 1.65 g/t Au over 4 m

0.49 g/t Au over 1 m
Oxide Zone

0 Elev
0.39 g/t Au over 18 m
incl. 0.89 g/t Au over 5 m

6.41 g/t Au over 1 m
220
1.08 g/t Au over 22 m
incl. 2.78 g/t Au over 7 m

0.21 g/t Au over 1 m
0.20 g/t Au over 1 m

0.23 g/t Au over 34 m
240
0.29 g/t Au over 2 m
0.33 g/t Au over 1 m

LEGEND
Mineralized Zone
Drillhole trace
2023 Resource Pit Shell
(US$1,650/oz Au)

OPEN TO DEPTH

NEWCORE GOLD
2024 - 2025 Drill Program | Enchi Gold Project
Kwakyekrom Deposit - Cross Section (B - B')
KKRC098, KKRC099
Viewing Northeast, November 2025


img-4.jpeg

NEWCORE GOLD

2024 - 2025 Drill Program | Enchi Gold Project

Kwakyekrom Deposit - Cross Section (A - A')

KKRC085A, KKRC086

Viewing Northeast, November 2025


img-5.jpeg

KKRC093

KKRC100

1.39 g/t Au over 11 m

0.46 g/t Au over 1 m

Oxide Zone

0.65 g/t Au over 3 m

0.85 g/t Au over 4 m

2.05 g/t Au over 2 m

0.50 g/t Au over 1 m

0.22 g/t Au over 1 m

0.57 g/t Au over 12 m

125

0 Elev

0.97 g/t Au over 5 m

0.35 g/t Au over 1 m

0.20 g/t Au over 1 m

0.37 g/t Au over 2 m

LEGEND

Mineralized Zone

Drillhole trace

2023 Resource Pit Shell (US$1,650/oz Au)

OPEN TO DEPTH

226

0

50 m

100 m

NEWCORE GOLD

2024 - 2025 Drill Program | Enchi Gold Project

Kwakyekrom Deposit - Cross Section (C - C')

KKRC093, KKRC100

Viewing Northeast, November 2025


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Drill Results Released November 4, 2025

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KKRC085A Kwakyekrom 88.0 103.0 15.0 1.29 529000 635363 85 298 -60 180
and 108.0 109.0 1.0 0.23
and 124.0 132.0 8.0 0.29
KKRC086 Kwakyekrom 27.0 40.0 13.0 0.46 528942 635392 104 298 -60 122
and 43.0 44.0 1.0 0.30
and 46.0 47.0 1.0 0.27
and 55.0 61.0 6.0 0.22
and 69.0 70.0 1.0 0.20
KKRC087 Kwakyekrom 14.0 25.0 11.0 0.29 528929 635332 109 298 -60 150
and 132.0 133.0 1.0 0.29
KKRC088 Kwakyekrom 39.0 41.0 2.0 0.24 528945 635255 102 298 -60 174
and 57.0 61.0 4.0 0.30
and 67.0 68.0 1.0 0.34
and 80.0 83.0 3.0 0.20
and 93.0 103.0 10.0 0.96
and 105.0 106.0 1.0 0.29
and 142.0 145.0 3.0 0.52
KKRC089 Kwakyekrom 67.0 69.0 2.0 0.28 528968 635307 100 298 -60 228
and 79.0 83.0 4.0 0.39
and 87.0 105.0 18.0 0.47
and 114.0 117.0 3.0 0.53
and 120.0 121.0 1.0 0.63
and 126.0 127.0 1.0 0.43
and 132.0 133.0 1.0 0.25
and 138.0 139.0 1.0 1.00
and 144.0 145.0 1.0 0.68
and 148.0 151.0 3.0 0.52
and 164.0 169.0 5.0 0.33
and 178.0 180.0 2.0 0.39

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KKRC090 Kwakyekrom 30.0 31.0 1.0 0.20 528899 635167 102 298 -60 240
and 91.0 96.0 5.0 0.78
and 101.0 102.0 1.0 0.22
and 166.0 167.0 1.0 0.35
and 169.0 170.0 1.0 0.24
KKRC091 Kwakyekrom 1.0 2.0 1.0 0.23 528796 635102 112 298 -60 120
and 36.0 37.0 1.0 0.20
KKRC092 Kwakyekrom 21.0 22.0 1.0 0.45 528633 634835 130 298 -60 126
and 26.0 31.0 5.0 0.39
and 36.0 37.0 1.0 0.79
and 41.0 50.0 9.0 0.49
and 58.0 62.0 4.0 0.90
and 72.0 73.0 1.0 0.22
and 84.0 87.0 3.0 0.39
and 91.0 97.0 6.0 0.84
and 107.0 108.0 1.0 0.21
KKRC093 Kwakyekrom 8.0 11.0 3.0 0.65 528695 634878 132 298 -60 125
and 24.0 28.0 4.0 0.85
and 56.0 58.0 2.0 2.05
and 72.0 73.0 1.0 0.50
and 110.0 111.0 1.0 0.22
and 113.0 125.0 12.0 0.57
KKRC094 Kwakyekrom 92.0 93.0 1.0 0.32 528762 634990 130 298 -60 102
KKRC095 Kwakyekrom 0.0 9.0 9.0 0.54 528771 634927 128 298 -60 168
and 13.0 14.0 1.0 0.48
and 21.0 22.0 1.0 0.27
and 119.0 120.0 1.0 0.60
KKRC096 Kwakyekrom 34.0 36.0 2.0 0.23 528816 634982 117 298 -60 180
and 40.0 41.0 1.0 1.26

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KKRC097B Kwakyekrom 0.0 1.0 1.0 0.22 528779 634878 116 298 -60 78
and 17.0 19.0 2.0 0.28
and 38.0 40.0 2.0 0.20
and 62.0 63.0 1.0 0.21
KKRC098 Kwakyekrom 15.0 16.0 1.0 0.91 528890 635212 101 298 -60 220
and 25.0 40.0 15.0 0.60
including 33.0 37.0 4.0 1.65
and 87.0 88.0 1.0 0.49
and 136.0 154.0 18.0 0.39
including 137.0 142.0 5.0 0.89
and 214.0 215.0 1.0 6.41
KKRC099 Kwakyekrom 19.0 25.0 6.0 0.68 528934 635195 104 298 -60 240
and 30.0 31.0 1.0 0.31
and 35.0 36.0 1.0 1.08
and 112.0 134.0 22.0 1.08
including 126.0 133.0 7.0 2.78
and 170.0 171.0 1.0 0.21
and 182.0 183.0 1.0 0.20
and 191.0 225.0 34.0 0.23
and 234.0 236.0 2.0 0.29
and 239.0 240.0 1.0 0.33
KKRC100 Kwakyekrom 8.0 19.0 11.0 1.39 528748 634846 126 298 -60 226
and 23.0 24.0 1.0 0.46
and 109.0 114.0 5.0 0.97
and 117.0 118.0 1.0 0.35
and 126.0 127.0 1.0 0.20
and 136.0 138.0 2.0 0.37
and 150.0 153.0 3.0 0.44
and 176.0 177.0 1.0 0.44

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KKRC101 Kwakyekrom 16.0 17.0 1.0 0.20 528521 634486 102 298 -60 192
and 36.0 37.0 1.0 0.33
and 43.0 45.0 2.0 0.40
and 63.0 64.0 1.0 0.38
and 73.0 75.0 2.0 0.20
and 108.0 112.0 4.0 0.79
and 116.0 117.0 1.0 0.32
and 136.0 140.0 4.0 0.84
and 180.0 181.0 1.0 1.62
and 186.0 187.0 1.0 1.69
KKRC102 Kwakyekrom 25.0 35.0 10.0 0.42 528458 634419 115 298 -60 114
and 60.0 80.0 20.0 0.29
and 108.0 109.0 1.0 0.24
KKRC103 Kwakyekrom 33.0 36.0 3.0 0.72 528430 634374 121 298 -60 132
and 39.0 40.0 1.0 0.27
and 50.0 51.0 1.0 0.25
and 59.0 60.0 1.0 0.60
and 68.0 74.0 6.0 0.19
and 78.0 83.0 5.0 0.20
and 94.0 99.0 5.0 0.55
and 102.0 103.0 1.0 0.22
and 109.0 110.0 1.0 0.24
and 125.0 126.0 1.0 0.46
KKRC104 Kwakyekrom 30.0 31.0 1.0 0.65 528415 634306 130 298 -60 150
and 42.0 47.0 5.0 0.40
and 51.0 52.0 1.0 0.35
and 55.0 58.0 3.0 0.90
and 67.0 85.0 18.0 0.35
and 91.0 113.0 22.0 0.34
KKRC105 Kwakyekrom 43.0 45.0 2.0 0.32 528387 634272 137 298 -60 150
KKRC106 Kwakyekrom 40.0 52.0 12.0 0.24 528353 634248 147 298 -60 132

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KKRC107 Kwakyekrom 53.0 54.0 1.0 2.46 528390 634223 148 298 -60 180
and 62.0 68.0 6.0 0.85
and 87.0 89.0 2.0 0.29
and 92.0 94.0 2.0 0.31
KKRC108 Kwakyekrom 1.0 10.0 9.0 0.43 528786 635064 127 298 -60 114
and 50.0 52.0 2.0 0.39
and 74.0 80.0 6.0 0.37
  1. Intervals reported are hole lengths with true width estimated to be 75 - 85%.
  2. Length-weighted averages from uncut assays.
  3. All drilling completed by independent contractor.
  4. All drilling samples sealed on site and delivered directly to independent lab Intertek Mineral Limited located in Tarkwa, Ghana for preparation and 50g Fire Assay with AAS finish.
  5. QA/QC procedures include industry standard inclusion of standards, blanks, and duplicates in all sample batches.

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Previously Released Drill Results

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC288 Boin 86.0 87.0 1.0 0.85 519558 634796 132 114 -60 201
and 93.0 98.0 5.0 0.47
and 139.0 201.0 62.0 1.96
including 139.0 164.0 25.0 2.31
including 171.0 199.0 28.0 2.23
KBRC289 Boin 0.0 3.0 3.0 0.17 519608 634766 132 114 -60 151
and 17.0 18.0 1.0 0.25
and 66.0 77.0 11.0 0.65
and 97.0 107.0 10.0 1.46
KBRC290 Boin 33.0 38.0 5.0 0.40 519453 634446 130 114 -60 103
KBRC291 Boin 11.0 17.0 6.0 1.16 519374 634438 132 114 -60 140
and 49.0 50.0 1.0 0.18
and 56.0 63.0 7.0 0.77
and 98.0 100.0 2.0 0.27
and 102.0 103.0 1.0 0.42
and 118.0 119.0 1.0 1.61
and 122.0 139.0 17.0 0.56
KBRC292 Boin 8.0 10.0 2.0 0.30 519415 634419 133 114 -60 110
and 55.0 62.0 7.0 0.50
KBRC293 Boin 10.0 29.0 19.0 0.46 519452 634401 133 114 -60 101
including 10.0 14.0 4.0 1.28
including 23.0 28.0 5.0 0.56
and 33.0 34.0 1.0 0.21
and 43.0 47.0 4.0 0.62

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project
2024 - 2025 Drill Results
Table accompanies news release dated November 4, 2025

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC294 Boin 107.0 113.0 6.0 3.24 519498 634729 125 114 -55 204
including 109.0 110.0 1.0 16.52
and 120.0 121.0 1.0 0.27
and 139.0 141.0 2.0 0.35
and 150.0 204.0 54.0 0.94
including 151.0 158.0 7.0 2.11
including 170.0 181.0 11.0 2.08
KBRC295 Boin 45.0 47.0 2.0 0.34 519533 634699 127 114 -60 157
and 54.0 56.0 2.0 0.31
and 83.0 91.0 8.0 0.19
and 113.0 115.0 2.0 0.30
and 127.0 128.0 1.0 0.97
and 130.0 154.0 24.0 1.25
KBRC296 Boin 31.0 56.0 25.0 1.44 519553 634666 125 114 -60 103
and 67.0 74.0 7.0 2.26
and 90.0 93.0 3.0 0.37
KBRC297 Boin 0.0 7.0 7.0 0.95 519581 634684 127 114 -60 100
and 12.0 26.0 14.0 0.45
and 33.0 34.0 1.0 0.22
and 64.0 68.0 4.0 0.57
KBRC298 Boin 55.0 67.0 12.0 0.43 519301 634381 130 114 -55 220
and 76.0 78.0 2.0 0.24
and 154.0 155.0 1.0 0.24
and 159.0 220.0 61.0 0.53
including 173.0 185.0 12.0 1.07
KBRC299 Boin 1.0 3.0 2.0 0.21 519399 634338 136 114 -60 60
and 16.0 24.0 8.0 0.48
and 32.0 34.0 2.0 0.89

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project
2024 - 2025 Drill Results
Table accompanies news release dated November 4, 2025

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC300 Boin 38.0 41.0 3.0 0.85 519344 634361 135 114 -60 140
and 51.0 52.0 1.0 0.20
and 62.0 68.0 6.0 2.34
and 72.0 74.0 2.0 0.79
and 98.0 102.0 4.0 0.69
and 126.0 128.0 2.0 0.27
KBRC301 Boin 59.0 60.0 1.0 204.27 519281 634351 132 114 -60 193
and 60.0 62.0 2.0 1.46
and 64.0 66.0 2.0 0.22
and 79.0 85.0 6.0 0.22
and 98.0 99.0 1.0 0.33
and 133.0 134.0 1.0 0.51
and 161.0 163.0 2.0 1.77
and 181.0 183.0 2.0 0.19
KBRC302 Boin 0.0 1.0 1.0 0.22 519261 634273 138 114 -60 220
and 39.0 42.0 3.0 0.78
and 111.0 112.0 1.0 0.51
and 116.0 125.0 9.0 0.43
and 130.0 131.0 1.0 0.40
and 139.0 150.0 11.0 0.40
and 185.0 186.0 1.0 0.40
and 199.0 201.0 2.0 0.68
KBRC303A Boin 52.0 54.0 2.0 0.67 519293 634294 130 114 -60 200
and 68.0 70.0 2.0 0.44
and 80.0 82.0 2.0 0.21
and 114.0 145.0 31.0 0.94
and 160.0 181.0 21.0 0.46
and 187.0 189.0 2.0 0.20
and 196.0 197.0 1.0 0.29

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC304 Boin 20.0 24.0 4.0 0.71 519090 634045 134 114 -50 81
and 35.0 36.0 1.0 0.35
and 41.0 59.0 18.0 0.73
KBRC305 Boin 68.0 70.0 2.0 0.21 519248 634321 135 114 -55 252
and 105.0 115.0 10.0 0.61
and 121.0 123.0 2.0 0.43
and 151.0 199.0 48.0 1.01
including 173.0 187.0 14.0 1.86
and 212.0 229.0 17.0 0.86
KBRC306 Boin 190.0 204.0 14.0 0.82 519192 634299 147 114 -55 250
and 236.0 237.0 1.0 0.32
and 242.0 247.0 5.0 1.64
KBRC307A Boin 17.0 25.0 8.0 0.74 519252 634200 139 114 -60 190
and 35.0 36.0 1.0 0.61
and 57.0 66.0 9.0 0.27
and 120.0 148.0 28.0 3.36
including 132.0 143.0 11.0 7.76
and incl. 133.0 135.0 2.0 37.58
and 156.0 190.0 34.0 0.33
KBRC308 Boin 132.0 153.0 21.0 1.04 519205 634212 135 114 -60 222
including 139.0 141.0 2.0 2.66
and 164.0 202.0 38.0 0.50
including 197.0 201.0 4.0 2.03
and 207.0 209.0 2.0 0.49
and 214.0 217.0 3.0 0.51
KBRC309A Boin 63.0 65.0 2.0 0.50 519178 634148 119 114 -60 220
and 110.0 119.0 9.0 0.32
and 126.0 152.0 26.0 0.59
and 171.0 179.0 8.0 0.29
and 183.0 185.0 2.0 0.31

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC310 Boin 16.0 17.0 1.0 0.59 519161 634010 126 114 -60 200
and 39.0 40.0 1.0 0.34
and 97.0 99.0 2.0 0.47
and 101.0 104.0 3.0 0.41
and 108.0 110.0 2.0 0.27
and 116.0 118.0 2.0 0.30
and 191.0 193.0 2.0 0.39
KBRC311 Boin 143.0 146.0 3.0 0.19 519171 634107 127 114 -60 200
and 159.0 161.0 2.0 1.25
KBRC312 Boin 86.0 87.0 1.0 0.28 519119 633968 133 114 -50 210
and 93.0 109.0 16.0 1.04
and 115.0 117.0 2.0 0.30
and 130.0 210.0 80.0 0.54
KBRC313 Boin 127.0 208.0 81.0 1.06 518956 633618 154 0 -90 240
including 132.0 149.0 17.0 2.50
including 184.0 191.0 7.0 2.15
and 215.0 217.0 2.0 0.22
and 229.0 237.0 8.0 0.29
KBRC314 Boin 141.0 143.0 2.0 0.50 518935 633580 156 0 -90 230
and 151.0 154.0 3.0 0.99
and 161.0 223.0 62.0 0.86
including 210.0 219.0 9.0 2.24
KBRC315 Boin 139.0 190.0 51.0 0.58 518914 633556 154 0 -90 240
including 144.0 148.0 4.0 1.71
and 203.0 240.0 37.0 1.32
KBRC316 Boin 100.0 196.0 96.0 0.97 518900 633506 133 0 -90 220
including 163.0 173.0 10.0 2.05
and 200.0 202.0 2.0 0.52
and 217.0 219.0 2.0 0.35

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC317 Boin 88.0 89.0 1.0 0.30 518874 633478 133 0 -90 200
and 109.0 182.0 73.0 0.70
and 192.0 199.0 7.0 1.52
KBRC318 Boin 65.0 72.0 7.0 1.17 518804 633406 137 114 -50 100
KBRC319 Boin 33.0 52.0 19.0 0.94 519535 634589 122 114 -60 78
KBRC320 Boin 57.0 58.0 1.0 0.20 519496 634605 122 114 -60 150
and 85.0 98.0 13.0 0.67
and 108.0 146.0 38.0 0.70
KBRC321 Boin 4.0 17.0 13.0 0.86 518801 633303 132 114 -50 60
and 28.0 29.0 1.0 0.37
KBRC322 Boin 19.0 20.0 1.0 0.24 518741 633324 140 114 -50 166
and 23.0 36.0 13.0 0.86
and 60.0 62.0 2.0 0.38
KBRC323 Boin 0.0 5.0 5.0 0.23 519502 634511 135 114 -60 90
and 14.0 21.0 7.0 0.57
and 35.0 37.0 2.0 0.33
KBRC324 Boin 18.0 20.0 2.0 0.25 519475 634523 133 114 -60 120
and 47.0 49.0 2.0 0.76
and 64.0 120.0 56.0 0.50
KBRC325 Boin 37.0 45.0 8.0 0.84 519657 634877 120 114 -60 180
and 60.0 79.0 19.0 0.54
and 83.0 84.0 1.0 0.20
and 101.0 103.0 2.0 0.23
and 113.0 117.0 4.0 0.67
and 132.0 180.0 48.0 0.43

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC326 Boin 6.0 15.0 9.0 0.64 519708 634856 120 114 -60 144
and 21.0 25.0 4.0 0.38
and 29.0 30.0 1.0 0.58
and 35.0 51.0 16.0 1.03
and 69.0 70.0 1.0 0.26
and 72.0 74.0 2.0 0.22
and 90.0 91.0 1.0 0.29
and 95.0 96.0 1.0 0.31
and 112.0 113.0 1.0 0.22
and 125.0 126.0 1.0 0.30
and 136.0 144.0 8.0 0.33
KBRC327 Boin 76.0 77.0 1.0 0.46 519754 634955 105 114 -60 132
and 81.0 89.0 8.0 0.79
and 96.0 100.0 4.0 0.59
and 110.0 119.0 9.0 0.26
KBRC328 Boin 9.0 72.0 63.0 1.28 519773 634942 110 114 -60 96
and 78.0 96.0 18.0 0.76
KBRC329 Boin No significant results 519786 635002 105 114 -60 60
KBRC330 Boin 46.0 47.0 1.0 0.29 519815 635023 107 114 -60 64
KBRC331 Boin No significant results 520017 635043 120 114 -60 60
KBRC332 Boin 41.0 46.0 5.0 0.41 519948 635072 120 114 -60 72
and 54.0 58.0 4.0 0.64
KBRC333 Boin 45.0 46.0 1.0 0.22 520064 635075 125 114 -60 90
and 71.0 72.0 1.0 0.23
and 80.0 82.0 2.0 0.21
KBRC334 Boin 32.0 34.0 2.0 0.25 520092 635118 127 114 -60 66
KBRC335 Boin 6.0 29.0 23.0 2.18 520035 635135 127 114 -60 66
including 16.0 24.0 8.0 5.58
KBRC336 Boin 30.0 35.0 5.0 0.80 518507 632990 123 114 -50 70

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC337 Boin 12.0 13.0 1.0 0.21 518467 633006 130 114 -50 126
and 79.0 126.0 47.0 1.06
KBRC338 Boin 11.0 18.0 7.0 0.56 518449 632888 124 114 -60 72
and 28.0 40.0 12.0 0.43
KBRC339 Boin 59.0 60.0 1.0 0.27 518421 632912 123 114 -60 120
and 82.0 84.0 2.0 1.31
and 90.0 106.0 16.0 1.06
and 112.0 114.0 2.0 0.37
KBRC340 Boin 14.0 34.0 20.0 0.61 518396 632821 125 114 -60 50
KBRC341 Boin 51.0 120.0 69.0 0.64 518366 632833 125 114 -60 120
KBRC342 Boin 177.0 183.0 6.0 0.50 518885 633671 158 114 -65 233
and 190.0 228.0 38.0 1.74
including 218.0 225.0 7.0 3.67
KBRC343 Boin 69.0 80.0 11.0 0.27 518932 633604 166 114 -60 156
and 95.0 151.0 56.0 0.65
KBRC344 Boin 104.0 176.0 72.0 1.16 518955 633720 154 114 -55 200
including 114.0 124.0 10.0 3.06
and 180.0 181.0 1.0 0.35
and 186.0 189.0 3.0 0.43
and 192.0 195.0 3.0 0.26
and 198.0 200.0 2.0 0.35
KBRC345 Boin 82.0 85.0 3.0 0.29 518983 633747 155 114 -60 174
and 108.0 120.0 12.0 0.73
and 133.0 142.0 9.0 0.79
KBRC346 Boin 98.0 168.0 70.0 0.67 519062 633856 155 114 -62 168
KBRC348 Boin 1.0 11.0 10.0 0.20 519658 634788 148 114 -60 90
and 36.0 43.0 7.0 1.19
and 57.0 67.0 10.0 0.30
KBRC349 Boin 40.0 56.0 16.0 0.65 519689 634837 145 114 -60 90
and 74.0 76.0 2.0 0.34

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC350 Boin 19.0 31.0 12.0 0.26 519656 634848 146 114 -60 144
and 94.0 102.0 8.0 0.63
and 113.0 115.0 2.0 0.74
and 126.0 131.0 5.0 0.25
and 133.0 135.0 2.0 0.21
KBRC351 Boin 21.0 44.0 23.0 0.23 519689 634865 138 114 -60 168
and 54.0 65.0 11.0 0.74
and 74.0 78.0 4.0 0.57
and 92.0 99.0 7.0 0.23
and 108.0 133.0 25.0 0.21
and 144.0 168.0 24.0 0.37
KBRC352 Boin 63.0 64.0 1.0 0.21 519630 634866 147 114 -60 186
and 96.0 152.0 56.0 2.25
including 122.0 137.0 15.0 3.83
and 160.0 186.0 26.0 0.79
KBRC353 Boin 0.0 24.0 24.0 2.15 519651 634761 146 114 -60 80
and 38.0 40.0 2.0 0.30
and 51.0 54.0 3.0 0.53
KBRC354 Boin 18.0 20.0 2.0 1.13 519779 634979 135 114 -55 96
and 31.0 32.0 1.0 0.34
and 34.0 35.0 1.0 0.36
and 63.0 64.0 1.0 0.31
and 69.0 74.0 5.0 0.46
KBRC355 Boin 22.0 23.0 1.0 0.57 519744 634923 127 114 -55 66
and 26.0 55.0 29.0 2.13
KBRC356 Boin 136.0 137.0 1.0 0.29 519482 634747 117 114 -55 204
and 168.0 177.0 9.0 1.20
and 194.0 197.0 3.0 0.64
and 194.0 197.0 3.0 0.64

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project
2024 - 2025 Drill Results
Table accompanies news release dated November 4, 2025

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC347B Boin 31.0 32.0 1.0 0.26 519323 634242 118 114 -65 180
and 42.0 59.0 17.0 0.58
and 90.0 91.0 1.0 0.29
and 134.0 172.0 38.0 1.05
KBRC357 Boin 113.0 121.0 8.0 1.07 519546 634737 145 114 -55 168
and 126.0 150.0 24.0 4.41
including 132.0 142.0 10.0 9.08
and 163.0 164.0 1.0 0.35
KBRC358 Boin 109.0 117.0 8.0 1.25 519586 634795 158 114 -60 186
and 142.0 161.0 19.0 0.47
and 166.0 179.0 13.0 1.05
KBRC359 Boin 11.0 15.0 4.0 0.30 519612 634809 148 114 -60 148
and 28.0 40.0 12.0 0.33
and 77.0 79.0 2.0 0.28
and 86.0 88.0 2.0 0.35
and 110.0 144.0 34.0 0.87
KBRC360 Boin 75.0 127.0 52.0 1.58 519588 634823 145 114 -60 177
including 96.0 112.0 16.0 3.04
and 137.0 139.0 2.0 0.49
and 152.0 153.0 1.0 0.26
and 155.0 177.0 22.0 0.62

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC361 Boin 0.0 1.0 1.0 0.24 519726 634714 117 294 -55 250
and 83.0 84.0 1.0 0.27
and 109.0 110.0 1.0 0.79
and 131.0 134.0 3.0 1.00
and 141.0 142.0 1.0 0.41
and 148.0 149.0 1.0 0.43
and 157.0 170.0 13.0 2.13
and 174.0 175.0 1.0 0.29
and 181.0 182.0 1.0 0.54
and 185.0 191.0 6.0 0.57
and 206.0 213.0 7.0 0.76
and 218.0 219.0 1.0 0.32
and 224.0 237.0 13.0 0.33
KBRC362 Boin 59.0 64.0 5.0 0.78 519197 634054 133 114 -55 210
and 84.0 117.0 33.0 0.25
and 127.0 129.0 2.0 0.66
and 134.0 136.0 2.0 0.23
and 141.0 148.0 7.0 0.41
and 158.0 210.0 52.0 0.66
KBRC363 Boin 102.0 106.0 4.0 0.83 519205 634182 115 114 -60 210
and 120.0 133.0 13.0 1.15
and 137.0 143.0 6.0 0.50
and 160.0 170.0 10.0 0.42
and 189.0 210.0 21.0 0.99
KBRC364 Boin 48.0 49.0 1.0 0.32 519223 634082 125 114 -60 174
and 57.0 58.0 1.0 0.24
and 65.0 66.0 1.0 0.29
and 69.0 70.0 1.0 0.37
and 79.0 80.0 1.0 0.26
KBRC365 Boin 19.0 20.0 1.0 0.43 518844 633393 139 114 -60 84
and 52.0 54.0 2.0 0.34

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KBRC366 Boin 192.0 203.0 11.0 2.01 519241 634342 130 114 -60 255
SWRC171 Sewum 1.0 4.0 3.0 0.21 521265 628718 225 120 -50 78
and 8.0 11.0 3.0 0.19
and 56.0 74.0 18.0 0.60
SWRC172 Sewum 1.0 27.0 26.0 0.61 521293 628770 225 120 -50 70
including 12.0 21.0 9.0 1.09
and 30.0 31.0 1.0 0.29
and 53.0 57.0 4.0 0.33
SWRC173 Sewum 25.0 33.0 8.0 0.49 521320 628836 233 120 -60 60
and 44.0 45.0 1.0 0.22
and 52.0 53.0 1.0 0.36
SWRC174 Sewum 2.0 6.0 4.0 0.25 521304 628813 232 120 -60 60
and 24.0 30.0 6.0 0.23
SWRC175 Sewum 1.0 8.0 7.0 0.50 521491 628830 228 120 -60 60
and 23.0 29.0 6.0 0.25
and 35.0 47.0 12.0 0.45
SWRC176 Sewum 12.0 57.0 45.0 0.30 521475 628780 220 120 -60 72
including 12.0 21.0 9.0 0.51
including 48.0 55.0 7.0 0.49
and 62.0 64.0 2.0 0.89
SWRC177 Sewum 12.0 13.0 1.0 0.18 521446 628754 221 120 -60 72
SWRC178 Sewum 0.0 9.0 9.0 0.78 521482 628875 235 120 -50 80
and 13.0 16.0 3.0 0.57
and 20.0 24.0 4.0 0.53
and 35.0 41.0 6.0 0.34
SWRC179 Sewum 2.0 12.0 10.0 0.32 521450 628801 227 120 -60 84
and 36.0 51.0 15.0 0.46
and 64.0 83.0 19.0 0.35
SWRC180 Sewum 0.0 26.0 26.0 0.66 521321 628958 235 120 -50 80
including 16.0 23.0 7.0 1.46
and 35.0 41.0 6.0 0.19

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC181 Sewum 1.0 9.0 8.0 0.24 521341 629045 240 120 -50 60
and 56.0 57.0 1.0 0.21
SWRC182 Sewum 7.0 8.0 1.0 0.21 521411 629166 235 120 -50 80
and 13.0 14.0 1.0 0.30
and 52.0 62.0 10.0 2.45
including 52.0 55.0 3.0 7.44
and 66.0 68.0 2.0 0.35
SWRC183 Sewum 0.0 2.0 2.0 0.17 521719 629772 234 120 -60 102
and 26.0 27.0 1.0 0.29
and 30.0 32.0 2.0 0.21
and 42.0 43.0 1.0 0.22
and 74.0 77.0 3.0 0.24
and 91.0 92.0 1.0 0.37
and 98.0 100.0 2.0 0.31
SWRC184 Sewum 12.0 14.0 2.0 0.20 521764 629828 233 120 -60 105
and 74.0 80.0 6.0 0.37
SWRC185 Sewum 45.0 47.0 2.0 0.74 521730 629842 234 120 -60 144
and 59.0 62.0 3.0 0.19
and 96.0 97.0 1.0 0.20
and 100.0 108.0 8.0 0.32
and 134.0 136.0 2.0 0.69
SWRC186 Sewum 2.0 5.0 3.0 0.26 521392 629219 235 120 -60 80
SWRC187 Sewum 2.0 4.0 2.0 0.19 521365 629237 230 120 -60 80
SWRC188 Sewum 29.0 31.0 2.0 0.27 521365 629197 220 120 -50 80
and 70.0 71.0 1.0 0.22
SWRC189 Sewum 47.0 50.0 3.0 0.65 521749 629765 222 120 -60 72
and 54.0 57.0 3.0 0.22
SWRC190 Sewum 28.0 29.0 1.0 0.30 521804 629833 216 120 -50 72
and 33.0 35.0 2.0 0.66
and 50.0 51.0 1.0 0.25
SWRC191 Sewum 42.0 44.0 2.0 0.26 521791 629797 220 120 -60 60

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC192 Sewum 10.0 14.0 4.0 0.31 521772 629848 225 120 -50 120
and 59.0 60.0 1.0 0.28
and 64.0 67.0 3.0 0.44
and 78.0 80.0 2.0 0.20
SWRC193 Sewum 2.0 17.0 15.0 0.33 521435 628727 218 120 -60 90
and 25.0 27.0 2.0 0.29
and 47.0 48.0 1.0 0.33
SWRC194 Sewum 1.0 63.0 62.0 1.85 521352 627847 158 120 -50 167
including 13.0 23.0 10.0 8.36
and 74.0 79.0 5.0 0.23
and 99.0 167.0 68.0 0.75
including 102.0 116.0 14.0 1.15
SWRC195 Sewum 0.0 9.0 9.0 0.77 521289 627794 172 120 -50 66
and 20.0 58.0 38.0 0.80
SWRC196 Sewum 21.0 23.0 2.0 0.64 520826 626252 156 120 -55 96
and 63.0 66.0 3.0 2.31
and 78.0 82.0 4.0 0.24
and 90.0 91.0 1.0 0.20
SWRC197 Sewum No significant results 520771 626290 147 120 -55 108
SWRC198 Sewum 25.0 26.0 1.0 0.37 520670 626267 155 120 -55 90
SWRC199 Sewum 53.0 57.0 4.0 0.56 520759 626222 160 120 -55 120
and 72.0 76.0 4.0 1.24
and 97.0 98.0 1.0 0.22
and 102.0 104.0 2.0 0.30
and 108.0 111.0 3.0 0.21
and 115.0 116.0 1.0 0.25
SWRC200 Sewum 20.0 34.0 14.0 0.81 520741 626162 161 120 -55 126
and 81.0 83.0 2.0 0.23
and 91.0 92.0 1.0 0.27
and 107.0 108.0 1.0 1.87
and 118.0 121.0 3.0 1.58

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC201 Sewum 20.0 24.0 4.0 0.56 520704 626103 158 120 -55 102
and 45.0 48.0 3.0 0.38
and 72.0 99.0 27.0 1.07
including 73.0 81.0 8.0 2.82
SWRC202 Sewum 0.0 5.0 5.0 1.65 520648 626033 131 120 -55 78
and 28.0 41.0 13.0 2.39
and 48.0 49.0 1.0 0.23
and 60.0 76.0 16.0 0.39
SWRC203 Sewum 11.0 12.0 1.0 0.20 521761 629918 222 120 -50 108
and 20.0 25.0 5.0 0.76
and 45.0 48.0 3.0 0.32
and 51.0 56.0 5.0 0.39
and 72.0 73.0 1.0 0.25
and 77.0 79.0 2.0 0.29
and 84.0 90.0 6.0 0.42
SWRC204 Sewum 18.0 19.0 1.0 0.24 521330 627665 167 120 -55 132
and 54.0 58.0 4.0 0.29
and 62.0 64.0 2.0 0.22
and 77.0 78.0 1.0 0.23
and 92.0 93.0 1.0 0.41
and 116.0 119.0 3.0 0.22
and 126.0 128.0 2.0 0.21
SWRC205 Sewum 85.0 87.0 2.0 0.24 521297 627683 173 120 -55 168
and 124.0 168.0 44.0 0.38
including 142.0 156.0 14.0 0.81
SWRC206 Sewum 1.0 5.0 4.0 0.61 521365 627644 166 120 -55 120
and 10.0 24.0 14.0 0.66
and 70.0 72.0 2.0 0.23
and 93.0 94.0 1.0 0.26
and 104.0 120.0 16.0 0.51
SWRC207 Sewum 64.0 66.0 2.0 0.23 521412 627878 138 120 -55 84

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC208 Sewum 0.0 17.0 17.0 0.57 521365 627824 148 120 -55 98
and 22.0 46.0 24.0 1.39
including 26.0 30.0 4.0 6.56
and 54.0 59.0 5.0 0.38
and 74.0 79.0 5.0 0.37
and 86.0 88.0 2.0 0.54
SWRC209 Sewum 51.0 53.0 2.0 0.64 521412 627851 139 120 -55 62
SWRC210 Sewum 0.0 11.0 11.0 0.51 521254 627701 174 120 -55 204
and 26.0 27.0 1.0 0.33
and 46.0 50.0 4.0 0.22
and 69.0 81.0 12.0 0.21
and 88.0 100.0 12.0 0.29
and 149.0 153.0 4.0 0.28
and 178.0 193.0 15.0 0.80
SWRC211 Sewum 0.0 37.0 37.0 0.47 521385 627701 174 120 -55 126
and 54.0 69.0 15.0 0.38
SWRC212 Sewum 0.0 81.0 81.0 0.40 521285 627757 172 120 -55 221
and 89.0 90.0 1.0 1.76
and 111.0 120.0 9.0 0.40
and 217.0 221.0 4.0 0.31
SWRC213 Sewum 0.0 7.0 7.0 0.38 521325 627734 173 120 -55 132
and 12.0 32.0 20.0 0.70
and 62.0 130.0 68.0 0.73
SWRC214 Sewum 125.0 137.0 12.0 0.25 521262 627906 150 120 -55 177
and 146.0 156.0 10.0 0.51
and 174.0 175.0 1.0 0.50

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC215 Sewum 0.0 4.0 4.0 0.42 521312 627885 153 120 -55 182
and 7.0 8.0 1.0 0.20
and 31.0 56.0 25.0 0.38
and 61.0 62.0 1.0 0.21
and 95.0 128.0 33.0 0.62
and 132.0 133.0 1.0 0.54
and 138.0 169.0 31.0 0.42
and 174.0 176.0 2.0 2.05
and 180.0 182.0 2.0 0.27
SWRC216 Sewum 7.0 10.0 3.0 0.34 521391 627817 100 120 -55 120
and 33.0 48.0 15.0 0.72
and 60.0 61.0 1.0 0.49
SWRC217 Sewum 1.0 2.0 1.0 1.78 521376 627840 141 120 -55 120
and 19.0 34.0 15.0 1.24
and 90.0 120.0 30.0 1.00
SWRC218 Sewum 20.0 28.0 8.0 0.22 519995 625747 137 120 -55 70
SWRC219 Sewum 1.0 10.0 9.0 0.71 520013 625771 139 120 -55 62
and 16.0 17.0 1.0 0.26
and 25.0 30.0 5.0 0.69
SWRC220 Sewum 13.0 15.0 2.0 0.48 520061 625801 140 120 -55 60
and 26.0 27.0 1.0 0.32
SWRC221 Sewum 1.0 3.0 2.0 0.84 520043 625823 134 120 -55 95
and 51.0 53.0 2.0 0.19
SWRC222 Sewum 0.0 38.0 38.0 0.59 520456 626210 154 120 -55 60
including 4.0 11.0 7.0 1.94
SWRC223 Sewum 18.0 67.0 49.0 0.74 520431 626220 147 120 -55 100
including 42.0 53.0 11.0 1.57
and 84.0 98.0 14.0 0.24

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC224 Sewum 62.0 63.0 1.0 0.52 520673 626116 154 120 -55 153
and 69.0 89.0 20.0 1.24
and 112.0 113.0 1.0 1.24
and 138.0 139.0 1.0 0.67
and 142.0 143.0 1.0 0.30
SWRC225 Sewum 105.0 106.0 1.0 0.23 520646 626141 115 120 -55 198
and 110.0 111.0 1.0 0.49
and 137.0 140.0 3.0 0.29
and 153.0 155.0 2.0 0.23
and 197.0 198.0 1.0 0.38
SWRC226 Sewum 20.0 21.0 1.0 0.24 520707 626184 123 120 -55 168
and 77.0 85.0 8.0 0.65
and 109.0 110.0 1.0 0.30
and 117.0 128.0 11.0 0.47
and 135.0 136.0 1.0 0.24
and 148.0 150.0 2.0 0.39
SWRC227 Sewum 16.0 18.0 2.0 0.77 520846 626317 139 120 -55 120
and 21.0 24.0 3.0 0.75
and 31.0 35.0 4.0 1.59
and 58.0 59.0 1.0 0.49
and 68.0 69.0 1.0 0.41
and 76.0 77.0 1.0 0.34
SWRC228 Sewum 45.0 53.0 8.0 0.38 521672 627929 167 120 -55 66
SWRC229 Sewum 0.0 11.0 11.0 0.34 521689 627951 167 120 -55 114
and 64.0 66.0 2.0 0.28
and 83.0 93.0 10.0 0.65
and 110.0 111.0 1.0 0.26

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project
2024 - 2025 Drill Results
Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC230 Sewum 54.0 60.0 6.0 0.15 521650 627968 169 120 -55 144
and 67.0 68.0 1.0 0.23
and 78.0 84.0 6.0 0.54
and 114.0 124.0 10.0 0.22
and 132.0 133.0 1.0 0.20
SWRC231 Sewum 2.0 6.0 4.0 0.46 521710 627996 144 120 -55 78
and 25.0 26.0 1.0 0.29
SWRC232 Sewum 47.0 54.0 7.0 0.46 521680 628019 144 120 -55 126
and 113.0 120.0 7.0 0.30
SWRC233 Sewum No significant results 520518 625923 107 120 -55 120
SWRC234 Sewum 34.0 35.0 1.0 0.27 520541 625900 125 120 -55 90
and 40.0 41.0 1.0 0.31
and 51.0 54.0 3.0 0.42
and 64.0 75.0 11.0 0.63
and 85.0 86.0 1.0 0.24
SWRC235 Sewum 16.0 17.0 1.0 0.20 520553 625967 97 120 -55 112
and 93.0 94.0 1.0 0.24
and 98.0 99.0 1.0 2.13
SWRC236 Sewum 1.0 15.0 14.0 0.45 521409 628682 194 120 -60 72
and 24.0 28.0 4.0 0.70
and 40.0 69.0 29.0 0.67
SWRC237 Sewum 1.0 10.0 9.0 0.42 521390 628697 194 120 -60 90
and 25.0 52.0 27.0 0.62
including 42.0 49.0 7.0 1.45
and 64.0 90.0 26.0 0.56
including 85.0 90.0 5.0 2.00
SWRC238 Sewum 4.0 29.0 25.0 0.35 521371 628711 194 120 -60 84
and 53.0 63.0 10.0 0.22
and 83.0 84.0 1.0 0.25

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC239 Sewum 0.0 26.0 26.0 0.37 521348 628726 194 120 -60 96
and 44.0 45.0 1.0 0.21
and 60.0 63.0 3.0 0.58
and 71.0 74.0 3.0 0.34
and 91.0 93.0 2.0 0.57
SWRC240 Sewum 2.0 41.0 39.0 0.22 521328 628740 195 120 -60 66
SWRC241 Sewum 3.0 18.0 15.0 0.53 521311 628745 195 120 -60 60
and 34.0 43.0 9.0 0.30
SWRC242 Sewum 1.0 2.0 1.0 0.18 521422 628771 193 120 -60 84
SWRC243 Sewum 5.0 10.0 5.0 0.41 521402 628786 194 120 -60 84
and 63.0 64.0 1.0 0.44
SWRC244 Sewum 1.0 18.0 17.0 0.48 521385 628797 196 120 -60 87
and 36.0 37.0 1.0 0.57
SWRC245 Sewum 2.0 18.0 16.0 0.23 521367 628805 196 120 -60 108
and 24.0 26.0 2.0 0.71
and 31.0 33.0 2.0 0.29
SWRC246 Sewum 0.0 30.0 30.0 0.36 521338 628822 196 120 -60 108
and 54.0 61.0 7.0 0.40
SWRC247 Sewum 2.0 32.0 30.0 0.61 521449 628892 194 120 -60 78
including 3.0 10.0 7.0 1.40
and 44.0 73.0 29.0 0.26
SWRC248 Sewum 4.0 45.0 41.0 0.56 521431 628900 194 120 -60 84
including 9.0 16.0 7.0 1.67
and 67.0 70.0 3.0 0.73
and 82.0 83.0 1.0 0.27
SWRC249 Sewum 0.0 8.0 8.0 0.31 521406 628914 194 120 -60 102
and 15.0 39.0 24.0 0.80
and 46.0 61.0 15.0 0.54
and 78.0 80.0 2.0 0.68
and 92.0 93.0 1.0 0.35

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC250 Sewum 2.0 10.0 8.0 0.22 521384 628932 194 120 -60 102
and 40.0 91.0 51.0 0.38
SWRC251 Sewum 2.0 8.0 6.0 0.23 521361 628944 194 120 -60 108
and 18.0 19.0 1.0 0.30
and 46.0 52.0 6.0 0.21
and 59.0 100.0 41.0 0.51
SWRC252 Sewum 0.0 34.0 34.0 0.39 521477 629081 195 120 -60 60
and 54.0 56.0 2.0 0.52
SWRC253 Sewum 0.0 6.0 6.0 0.31 521456 629095 195 120 -60 80
and 12.0 22.0 10.0 0.22
and 29.0 65.0 36.0 0.34
and 73.0 74.0 1.0 0.33
SWRC254 Sewum 3.0 5.0 2.0 0.21 521434 629114 196 120 -60 98
and 33.0 34.0 1.0 0.45
and 50.0 87.0 37.0 0.51
SWRC255 Sewum 2.0 7.0 5.0 0.29 521411 629121 195 120 -60 120
and 48.0 56.0 8.0 0.43
and 70.0 72.0 2.0 0.42
and 75.0 76.0 1.0 0.38
and 80.0 111.0 31.0 0.31
and 114.0 115.0 1.0 0.37
SWRC256 Sewum 3.0 6.0 3.0 0.24 521385 629136 194 120 -60 138
and 61.0 69.0 8.0 0.21
and 79.0 80.0 1.0 0.26
and 84.0 85.0 1.0 0.48
and 100.0 109.0 9.0 0.22
and 120.0 123.0 3.0 0.32
SWRC257 Sewum 1.0 10.0 9.0 0.27 521362 629147 194 120 -60 64
and 36.0 39.0 3.0 2.79
and 43.0 46.0 3.0 2.06
and 57.0 59.0 2.0 0.26

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC258 Sewum 1.0 34.0 33.0 0.89 521549 629252 197 120 -60 66
and 38.0 39.0 1.0 0.26
and 41.0 43.0 2.0 0.21
and 52.0 56.0 4.0 0.43
SWRC259 Sewum 2.0 42.0 40.0 0.51 521529 629263 202 120 -60 74
and 47.0 53.0 6.0 0.31
and 72.0 73.0 1.0 0.41
SWRC260 Sewum 2.0 6.0 4.0 0.65 521504 629277 195 120 -60 80
and 16.0 18.0 2.0 0.20
and 27.0 68.0 41.0 0.51
including 55.0 61.0 6.0 1.66
SWRC261 Sewum 3.0 5.0 2.0 0.20 521480 629288 195 120 -60 108
and 23.0 24.0 1.0 0.32
and 32.0 36.0 4.0 0.70
and 58.0 60.0 2.0 0.24
and 78.0 96.0 18.0 0.61
SWRC262 Sewum 0.0 7.0 7.0 0.24 521454 629299 194 120 -60 120
and 81.0 84.0 3.0 0.41
and 93.0 101.0 8.0 1.16
and 106.0 107.0 1.0 0.22
SWRC263 Sewum 3.0 5.0 2.0 0.20 521435 629313 194 120 -60 136
and 87.0 90.0 3.0 0.20
and 105.0 106.0 1.0 0.22
and 117.0 124.0 7.0 0.88
SWRC264 Sewum 45.0 46.0 1.0 0.53 521405 629332 193 120 -60 60
SWRC265 Sewum 0.0 12.0 12.0 0.44 521580 629359 198 120 -60 60
and 18.0 39.0 21.0 0.64
SWRC266 Sewum 3.0 8.0 5.0 0.20 521555 629368 198 120 -60 80
and 20.0 26.0 6.0 0.56
and 30.0 36.0 6.0 0.38
and 49.0 60.0 11.0 0.70

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
SWRC267 Sewum 0.0 21.0 21.0 0.40 521534 629380 200 120 -60 100
and 35.0 36.0 1.0 0.33
and 66.0 78.0 12.0 0.78
SWRC268 Sewum 1.0 6.0 5.0 0.29 521509 629393 195 120 -60 120
and 14.0 28.0 14.0 0.52
and 40.0 42.0 2.0 0.23
and 66.0 67.0 1.0 0.34
and 88.0 99.0 11.0 0.28
SWRC269 Sewum 2.0 8.0 6.0 3.98 521492 629402 194 120 -60 60
including 7.0 8.0 1.0 22.62
and 39.0 41.0 2.0 5.50
including 39.0 40.0 1.0 10.53
and 54.0 55.0 1.0 0.93
and 57.0 58.0 1.0 0.20
SWRC270 Sewum 4.0 9.0 5.0 0.50 521469 629414 194 120 -60 60
and 33.0 38.0 5.0 0.38
SWRC271 Sewum 0.0 14.0 14.0 0.46 521601 629348 192 120 -60 60
and 19.0 30.0 11.0 1.10
and 34.0 36.0 2.0 0.45
NBRC108 Nyam 16.0 17.0 1.0 0.28 530218 637234 98 300 -60 108
and 33.0 34.0 1.0 0.91
and 45.0 60.0 15.0 2.50
and 75.0 77.0 2.0 0.96
and 105.0 108.0 3.0 0.42
NBRC109 Nyam 7.0 8.0 1.0 0.78 530243 637218 99 300 -60 138
and 63.0 77.0 14.0 0.37
and 88.0 97.0 9.0 0.93
and 111.0 114.0 3.0 0.97
and 133.0 137.0 4.0 0.43

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
NBRC110 Nyam 36.0 37.0 1.0 0.21 530293 637299 100 300 -60 147
and 52.0 53.0 1.0 0.49
and 97.0 98.0 1.0 0.33
and 104.0 114.0 10.0 3.00
and 126.0 144.0 18.0 0.50
NBRC111 Nyam 9.0 23.0 14.0 0.51 530260 637325 97 300 -60 84
and 28.0 31.0 3.0 0.30
and 36.0 38.0 2.0 0.55
and 45.0 48.0 3.0 0.40
and 53.0 76.0 23.0 0.27
NBRC112 Nyam 48.0 54.0 6.0 0.76 530610 637824 104 300 -60 80
and 62.0 67.0 5.0 0.46
NBRC113 Nyam 86.0 89.0 3.0 0.29 530604 637746 116 300 -60 108
and 100.0 101.0 1.0 0.34
and 105.0 106.0 1.0 0.63
NBRC114 Nyam 78.0 90.0 12.0 1.68 530615 637788 110 300 -60 96
NBRC115 Nyam 48.0 49.0 1.0 0.31 530792 638222 103 300 -60 108
and 57.0 69.0 12.0 0.49
and 84.0 86.0 2.0 0.31
and 97.0 104.0 7.0 0.43
NBRC116 Nyam 41.0 48.0 7.0 1.00 530768 638196 107 300 -60 120
and 56.0 57.0 1.0 0.48
and 61.0 66.0 5.0 0.44
and 86.0 108.0 22.0 0.46
and 117.0 119.0 2.0 0.41
NBRC117 Nyam 6.0 7.0 1.0 0.65 530816 638271 99 300 -60 102
and 38.0 42.0 4.0 0.66
and 47.0 78.0 31.0 0.51
and 95.0 96.0 1.0 0.23

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
NBRC118 Nyam 53.0 72.0 19.0 0.64 530837 638302 99 300 -55 120
and 80.0 85.0 5.0 1.12
and 90.0 92.0 2.0 0.60
NBRC119 Nyam 2.0 8.0 6.0 0.96 530170 637212 96 300 -60 60
and 12.0 19.0 7.0 0.32
and 45.0 53.0 8.0 2.36
NBRC120 Nyam 57.0 58.0 1.0 0.21 530209 637190 95 300 -60 144
and 71.0 72.0 1.0 2.00
and 97.0 101.0 4.0 1.90
and 113.0 120.0 7.0 0.87
and 127.0 129.0 2.0 0.57
KJRC025 Kojina Hill 12.0 14.0 2.0 0.40 529138 637394 98 120 -55 100
and 24.0 26.0 2.0 0.20
and 31.0 32.0 1.0 3.53
and 44.0 45.0 1.0 0.34
and 51.0 53.0 2.0 0.26
and 79.0 80.0 1.0 0.29
and 96.0 97.0 1.0 0.22
KJRC026 Kojina Hill 25.0 26.0 1.0 0.32 528814 637355 105 120 -55 130
and 60.0 62.0 2.0 0.33
and 69.0 106.0 37.0 0.67
including 70.0 90.0 20.0 1.05
KJRC027 Kojina Hill 87.0 89.0 2.0 0.25 528806 637083 186 120 -55 180
KJRC028 Kojina Hill 15.0 17.0 2.0 0.23 528833 636835 173 120 -55 150
and 44.0 46.0 2.0 0.46
and 72.0 77.0 5.0 0.34
KJRC029 Kojina Hill 12.0 14.0 2.0 0.53 528579 636781 118 120 -55 132
and 75.0 76.0 1.0 0.30

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project
2024 - 2025 Drill Results
Table accompanies news release dated November 4, 2025

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KJRC030 Kojina Hill 1.0 8.0 7.0 0.45 528475 636835 126 120 -55 108
and 15.0 26.0 11.0 0.29
and 45.0 49.0 4.0 0.57
and 57.0 59.0 2.0 0.44
and 82.0 83.0 1.0 1.04
KJRC031 Kojina Hill 0.0 1.0 1.0 0.20 528423 636863 117 120 -55 144
and 5.0 7.0 2.0 6.80
and 9.0 10.0 1.0 0.29
and 14.0 16.0 2.0 0.22
and 32.0 33.0 1.0 0.27
and 50.0 58.0 8.0 0.69
and 64.0 68.0 4.0 0.41
and 102.0 103.0 1.0 0.22
and 115.0 136.0 21.0 0.49
KJRC032 Kojina Hill 24.0 25.0 1.0 0.38 528853 637334 108 120 -60 110
and 45.0 49.0 4.0 0.46
and 83.0 94.0 11.0 0.48
and 96.0 97.0 1.0 0.20
and 100.0 110.0 10.0 0.69
KJRC033 Kojina Hill 36.0 37.0 1.0 0.45 528780 637345 110 120 -60 162
and 49.0 52.0 3.0 0.21
and 59.0 60.0 1.0 0.20
and 70.0 74.0 4.0 0.91
and 93.0 102.0 9.0 0.41
and 124.0 126.0 2.0 0.75
and 126.0 127.0 1.0 183.86
and 127.0 134.0 7.0 1.08
and 138.0 148.0 10.0 0.57

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com


Newcore Gold Ltd. | Enchi Gold Project

2024 - 2025 Drill Results

Table accompanies news release dated November 4, 2025

NEWCORE GOLD

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m)
KJRC034 Kojina Hill 0.0 13.0 13.0 3.06 528810 637223 150 300 -60 150
including 2.0 5.0 3.0 8.09
including 9.0 12.0 3.0 4.59
and 27.0 30.0 3.0 0.29
and 116.0 117.0 1.0 1.10
KJRC035 Kojina Hill 12.0 18.0 6.0 0.55 528862 637264 139 300 -60 144
and 41.0 47.0 6.0 0.52
and 56.0 67.0 11.0 0.42
including 61.0 63.0 2.0 1.53
and 70.0 71.0 1.0 0.67
and 74.0 75.0 1.0 0.20
and 80.0 83.0 3.0 0.63
and 106.0 114.0 8.0 0.58
and 121.0 122.0 1.0 0.23
and 140.0 141.0 1.0 0.69
KJRC036 Kojina Hill 0.0 14.0 14.0 0.58 528823 637288 140 300 -60 102
and 24.0 43.0 19.0 0.43
and 100.0 102.0 2.0 0.31
KJRC037 Kojina Hill 13.0 16.0 3.0 0.21 528841 637253 143 300 -60 108
and 20.0 49.0 29.0 0.57
including 21.0 27.0 6.0 1.29
and 84.0 86.0 2.0 0.68
KJRC038 Kojina Hill 181.0 184.0 3.0 0.47 528765 637392 99 120 -60 194
  1. Intervals reported are hole lengths with true width estimated to be 65 - 85%.
  2. Length-weighted averages from uncut assays.
  3. All drilling completed by independent contractor.
  4. All drilling samples sealed on site and delivered directly to independent lab Intertek Mineral Limited located in Tarkwa, Ghana for preparation and 50g Fire Assay with AAS finish.
  5. QA/QC procedures include industry standard inclusion of standards, blanks, and duplicates in all sample batches.

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com