AI assistant
Newcore Gold — Capital/Financing Update 2026
Apr 8, 2026
46558_rns_2026-04-08_79f91c09-9b96-4f6b-9b27-da5c6615075b.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
NEWS RELEASE
==> picture [281 x 46] intentionally omitted <==
Newcore Gold Drilling Intersects 1.59 g/t Gold over 15.5 Metres, Including 3.22 g/t Gold over 6.4 Metres, at the Enchi Gold Project, Ghana
Diamond Drilling at the Sewum Gold Deposit Encounters Wide Zones of Shallow Gold Mineralization
April 8, 2026
TSX-V: NCAU, OTCQX: NCAUF
Vancouver, BC – Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU, OTCQX: NCAUF) is pleased to announce additional drill results from the 60,000-metre drill program underway at the Company’s Enchi Gold Project ("Enchi" or the "Project") in Ghana. Diamond Drilling ("DD") at the Sewum Gold Deposit ("Sewum") encountered wide zones of gold mineralization in the shallow oxide-transition and the upper fresh mineralization, including hole SWDD107 which intersected 1.59 grams per tonne gold ("g/t Au") over 15.5 metres ("m") from 147.5 m, including a higher-grade interval of 3.22 g/t Au over 6.4 m from 152.9 m. Hole SWDD112 also intersected a wide zone of near surface oxidized gold mineralization of 0.69 g/t Au over 41.0 m from 21.5 m, along with a second interval of 1.00 g/t Au over 10.5 m from surface, and a third interval of 0.41 g/t Au over 25.2 m from 102.4 m. This news release reports results for diamond drilling completed at Sewum. Drilling continues to demonstrate the continuity of gold mineralization and potential for resource growth at Enchi.
Highlights from Diamond Drilling at the Sewum Gold Deposit at Enchi
-
Drilling intersected wide zones of gold mineralization above the mineral resource grade and outside the limits of the pit that constrains the Mineral Resource Estimate.
-
Diamond drill hole SWDD107 intersected 1.59 g/t Au over 15.5 m from 147.5 m, with a higher-grade interval of 3.22 g/t Au over 6.4 m from 152.9 m.
-
Hole SWDD108 intersected 0.48 g/t Au over 41.0 m from 141.5 m, with a second interval of 0.82 g/t Au over 18.5 m from 189.5 m including a higher-grade interval of 2.26 g/t Au over 4.5 m from 199.5 m.
-
Drilling targeted shallow mineralization within a vertical depth of 140 metres at the Ridge Zone at Sewum, the northernmost area of the deposit.
-
Hole SWDD112 intersected wide zones of near surface oxidized mineralization including 1.00 g/t Au over 10.5 m from surface and 0.69 g/t Au over 41.0 m from 21.5 m.
-
Hole SWDD113A intersected 0.81 g/t Au over 16.8 m from 75.9 m, with a higher-grade interval of 2.41 g/t Au over 4.4 m from 76.6 m.
-
Drill results not included in most recent Mineral Resource Estimate, with results highlighting potential for future resource growth at Enchi.
-
Sewum is the largest deposit currently identified at Enchi and remains open along strike and at depth.
-
This drilling reached a maximum vertical depth of only 140 metres, representing the deepest intercepts drilled to date at Sewum. Average vertical depth of all holes drilled to date at Sewum is only down to 95 metres.
Suite 1560 - 200 Burrard Street Vancouver, British Columbia V6C 3L6
www.newcoregold.com [email protected]
Greg Smith, VP Exploration of Newcore stated, "We are excited to continue to unlock the future resource growth potential at Enchi through the drill bit. Initial results from diamond drilling completed at Sewum have extended gold mineralization below the pit-constrained mineral resource estimate released in March of this year, while also confirming near-surface lateral continuity in the adjacent sub-parallel structures. Importantly, although this drilling represents the deepest drilling completed to date at Sewum, holes only reached a maximum vertical depth of 140 metres, with the mineralized zone open at depth. The drilling also returned grades exceeding the mineral resource estimate grade both at surface and below the pits. With drilling ongoing and focused on defining the resource growth potential at depth and along strike, we are excited to continue to advance the district scale exploration opportunity at our Enchi Gold Project in Ghana."
This release reports results for 8 DD holes totalling 1,685 m (SWDD107 to SWDD114) targeting the Sewum Gold Deposit, with all holes intersecting gold mineralization. A total of 34,805 m in 256 holes has been reported as part of the ongoing drill program at Enchi, with 98% of holes intersecting gold mineralization.
Select assay results from the 8 holes of the drill program reported in this release are below:
Table 1 - Enchi Gold Project Drill Highlights
| Hole ID | Zone/Deposit | From (m) | To (m) | Length (m) | Au (g/t) |
|---|---|---|---|---|---|
| SWDD107 | Sewum | 147.5 | 163.0 | 15.5 | 1.59 |
| including | 152.9 | 159.3 | 6.4 | 3.22 | |
| SWDD112 | Sewum | 0.0 | 10.5 | 10.5 | 1.00 |
| and | 21.5 | 62.5 | 41.0 | 0.69 | |
| and | 102.4 | 127.6 | 25.2 | 0.41 | |
| SWDD108 | Sewum | 141.5 | 182.5 | 41.0 | 0.48 |
| and | 189.5 | 208.0 | 18.5 | 0.82 | |
| including | 199.5 | 204.0 | 4.5 | 2.26 | |
| SWDD113A | Sewum | 75.9 | 92.7 | 16.8 | 0.81 |
| including | 76.6 | 81.0 | 4.4 | 2.41 | |
| SWDD110 | Sewum | 185.8 | 207.0 | 21.2 | 0.60 |
| SWDD109 | Sewum | 145.95 | 157.0 | 11.05 | 0.93 |
| including | 151.0 | 155.0 | 4.0 | 1.81 |
Notes:
-
See detailed table for complete results;
-
Intervals reported are hole lengths with true width estimated to be 75 - 85%; and
-
Length-weighted averages from uncut assays.
A plan map showing the drill hole locations can be viewed at: https://newcoregold.com/site/assets/files/5960/2026_04_08-ncau-nr-enchi-plan-map-sewum.pdf
A cross section showing drill results and highlights for holes SWDD107 to SWDD109 can be viewed at:
https://newcoregold.com/site/assets/files/5960/2026_04-ncau-crosssection-swdd107-109.pdf
==> picture [100 x 19] intentionally omitted <==
- 2 -
A complete list of the drill results in this release, including hole details, can be viewed at: https://newcoregold.com/site/assets/files/5960/2026_04_08-ncau-enchi-2024-2025-drill-results.pdf
Diamond Drilling at the Sewum Gold Deposit
SWDD107 to SWDD114 (8 DD holes totalling 1,685 m) were completed at Sewum, targeting mineralization within the shallow oxide-transition and the upper fresh mineral horizon at the Ridge Zone, with a goal of expanding the mineralized footprint of the deposit. This drilling reached a maximum vertical depth of 140 metres, representing the deepest intercepts drilled to date at Sewum, with prior drilling completed at Sewum focused on shallow mineralization within the first 100 vertical metres. The holes reported in this news release include six holes testing four sections along a 500 metre strike length on the upper structures and another two holes testing two sections along a 100 metre strike length in the lower structures of the zone.
Three diamond drill holes totalling 733 m (SWDD107 to SWDD109) were drilled on the same section and used to define the dip of the main sub-parallel gold mineralized structures at depth. Hole SWDD107 intersected 1.59 g/t Au over 15.5 m from 147.5 m, including a highergrade interval of 3.22 g/t Au over 6.4 m from 152.9 m. Hole SWDD108 intersected the main structure with 0.48 g/t Au over 41.0 m from 141.5 m, as well as a second mineralized zone that intersected 0.82 g/t Au over 18.5 m from 189.5 m including a higher-grade interval 2.26 g/t Au over 4.5 m from 199.5 m. Hole SWDD109 intersected 0.93 g/t Au over 11.05 m from 145.95 m including a higher-grade interval of 1.81 g/t Au over 4.0 m from 151.0 m.
Two diamond drill holes totalling 312 m (SWDD112 and SWDD113A) tested the western structures near the base of the Ridge Zone and intersected both near-surface oxidized mineralization as well as gold mineralization in the upper fresh mineralization. Hole SWDD112 intersected 0.69 g/t Au over 41.0 m from 21.5 m in the oxide mineralization including a highergrade interval of 1.41 g/t Au over 4.0 m from 46.5 m and 2.08 g/t Au over 3.0 m from 57.5 m. This hole also intersected oxidized mineralization from surface with 1.00 g/t Au over 10.5 m as well as a third deeper zone within the fresh mineralization with 0.41 g/t Au over 25.2 m from 102.4 m. Hole SWDD113A, collared 100 metres to the north, intersected 0.81 g/t Au over 16.8 m from 75.9 m including a higher-grade interval of 2.41 g/t Au over 4.4 m from 76.6 m.
Diamond drill hole SWDD110, totalling 225 m and collared 50 metres north of hole SWDD109, intersected 0.60 g/t Au over 21.2 m from 185.8 m. Hole SWDD111, totalling 155.6 m and collared 50 metres north of hole SWDD114, intersected gold mineralization but was lost before reaching the primary target.
Diamond drilling completed at Sewum continues to confirm continuity along strike and down dip for the principal structures which comprise the Ridge Zone of the Sewum Gold Deposit.
Enchi Work Program
The 60,000 metre drill program underway at Enchi commenced August 2024, targeting nearsurface oxide and transition mineralization along with shallow fresh mineralization. The drill program is in its second phase and is focused on discovery and resource growth, including drilling targeting the potential for resource growth along strike at existing deposits along with diamond drilling targeting the higher-grade potential at depth. The primary goal of the completed first phase of the drill program was Reverse Circulation ("RC") infill drilling for
==> picture [100 x 19] intentionally omitted <==
- 3 -
resource conversion to improve the confidence level of the existing Mineral Resource Estimate, with most of the first phase of the drill program allocated to the two largest deposits at Enchi, Boin and Sewum. All deposit areas and pre-resource targets at Enchi remain open along strike and at depth, providing for future resource growth across the district-scale property.
In addition to drilling, a Pre-Feasibility Study ("PFS") is underway and targeted for completion by the end of June 2026 (see news release dated February 5, 2026), alongside on-going development work in support of project advancement at Enchi which includes metallurgical testwork, hydrogeological testing, geotechnical work, and environmental work.
Sewum Gold Deposit
Sewum is one of the five deposits which comprise the Mineral Resource Estimate at Enchi (Sewum has an Indicated Mineral Resource of 41.2 million tonnes grading 0.43 g/t Au containing 573,000 ounces and an Inferred Mineral Resource of 24.2 million tonnes grading 0.39 g/t Au containing 308,000 ounces). Sewum is located 15 kilometres south of the town of Enchi, with nearby roads and power and further access provided by a series of drill roads. Sewum is outlined on surface by a greater than six-kilometre-long and one-to-two-kilometrewide gold-in-soil anomaly. An airborne geophysical anomaly coincident with the Sewum Gold Deposit defines a series of subparallel and intersecting structures. To date, approximately 45% of the gold-in-soil anomaly at Sewum is untested by drilling, with the average vertical depth of all holes drilled to date at Sewum only down to 95 metres.
Drill Hole Locations
Table 2 - Enchi Gold Project Drill Hole Location Details
| Hole ID | UTM East | UTM North | Elevation |
Azimuth ° | Dip ° | Length (m) |
|---|---|---|---|---|---|---|
| SWDD107 | 521298 | 628974 | 186 | 120 | -60 | 218.4 |
| SWDD108 | 521279 | 628978 | 186 | 120 | -60 | 236.1 |
| SWDD109 | 521249 | 628998 | 184 | 120 | -60 | 278.2 |
| SWDD110 | 521256 | 629035 | 186 | 120 | -60 | 225.0 |
| SWDD111 | 521374 | 629343 | 184 | 120 | -55 | 155.6 |
| SWDD112 | 521021 | 629065 | 132 | 120 | -70 | 185.5 |
| SWDD113A | 521073 | 629138 | 157 | 0 | 90 | 126.1 |
| SWDD114 | 521328 | 629299 | 174 | 120 | -58 | 260.5 |
Enchi Gold Project Mineral Resource Estimate
The Enchi Gold Project hosts an Indicated Mineral Resource of 83.6 million tonnes grading 0.56 g/t Au containing 1,502,000 ounces gold and an Inferred Mineral Resource of 40.1 million tonnes grading 0.49 g/t Au containing 626,000 ounces. Mineral resource estimation practices are in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice Guidelines (November 29, 2019) and follow CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014), that are incorporated by reference into National Instrument 43-101 ("NI 43-101"). The Mineral Resource Estimate was prepared by Ryan Wilson, P. Geo, Matthew Halliday, P. Geo, Schadrac Ibrango, P. Geo of DRA Global Limited who are independent qualified persons ("QP") as defined by NI 43-101. The Mineral Resource Estimate
==> picture [100 x 19] intentionally omitted <==
- 4 -
was announced on March 18, 2026 with a full technical report, which is being prepared in accordance with NI 43-101, to be filed and available under the Company’s SEDAR+ profile at www.sedarplus.ca, and on Newcore’s website, within 45 days of that news release.
Newcore Gold Best Practice
Newcore is committed to best practice standards for all exploration, sampling and drilling activities. Drilling was completed by an independent drilling firm using industry standard RC and Diamond Drill equipment. Analytical quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into the sample strings. Samples are placed in sealed bags and shipped directly to Intertek Labs located in Tarkwa, Ghana for 50 gram gold fire assay.
Qualified Person
Mr. Gregory Smith, P. Geo, Vice President of Exploration at Newcore, is a Qualified Person as defined by NI 43-101, and has reviewed and approved the technical data and information contained in this news release. Mr. Smith has verified the technical and scientific data disclosed herein and has conducted appropriate verification on the underlying data including confirmation of the drillhole data files against the original drillhole logs and assay certificates.
About Newcore Gold Ltd.
Newcore Gold is advancing its Enchi Gold Project located in Ghana, Africa’s largest gold producer[ (1)] . Newcore Gold offers investors a unique combination of top-tier leadership, who are aligned with shareholders through their 13% equity ownership, and prime district scale exploration opportunities. Enchi’s 248 km[2] land package covers 40 kilometres of Ghana’s prolific Bibiani Shear Zone, a gold belt which hosts several multi-million-ounce gold deposits, including the Chirano mine 50 kilometres to the north. Newcore’s vision is to build a responsive, creative and powerful gold enterprise that maximizes returns for shareholders. (1) Source: Production volumes for 2024 as sourced from the World Gold Council.
On Behalf of the Board of Directors of Newcore Gold Ltd.
Luke Alexander President, CEO & Director
For further information, please contact:
Mal Karwowska | Vice President, Corporate Development and Investor Relations +1 604 484 4399
[email protected] www.newcoregold.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
==> picture [100 x 19] intentionally omitted <==
- 5 -
Cautionary Note Regarding Forward-Looking Statements
This news release includes statements that contain "forward-looking information" within the meaning of the applicable Canadian securities legislation ("forward-looking statements"). All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussion with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always using phrases such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. In this news release, forward-looking statements relate, among other things, to: statements about the estimation of mineral resources; realization of mineral resources estimates; filing of a technical report; timing, content and completion of a pre-feasibility study; proposed development plans for the Company; results of metallurgical testwork; results of our ongoing drill campaign; results of drilling, magnitude or quality of mineral deposits; anticipated advancement of mineral properties or programs; and future exploration prospects and growth of mineral properties.
These forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business. The assumptions underlying the forward-looking statements are based on information currently available to Newcore. Although the forward-looking statements contained in this news release are based upon what management of Newcore believes, or believed at the time, to be reasonable assumptions, Newcore cannot assure its shareholders that actual results will be consistent with such forward-looking statements, as there may be other factors that cause results not to be as anticipated, estimated or intended. Forwardlooking information also involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others: risks related to the speculative nature of Newcore’s business; Newcore’s formative stage of development; Newcore’s financial position; possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of gold and other commodities; fluctuations in currency markets (such as the Canadian dollar to United States dollar exchange rate); change in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, unusual or unexpected geological formations); the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); and title to properties.
Forward-looking statements contained herein are made as of the date of this news release and Newcore disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.
==> picture [100 x 19] intentionally omitted <==
- 6 -
==> picture [540 x 720] intentionally omitted <==
----- Start of picture text -----
RIDGE
ZONE
SWDD111
SWDD114
SWDD113A
SWDD110
SWDD112
SWDD109
SWDD108
SWDD107
CHECKERBOARD
HILL
Legend
Drill Hole
Assays Announced
April 8, 2026
Drill Hole
Prior 2024 - 2026
SEWUM
Assays Announced
EXTENSION
Previous Drill Holes
EXTENSION
PARALLEL 1 km
STRUCTURE
Pit Shell
Outline
2024 - 2026 Drill Program
Enchi Gold Project
Sewum, Ghana (As of April 2026)
----- End of picture text -----
==> picture [782 x 598] intentionally omitted <==
----- Start of picture text -----
SWDD107
SWRC249
SWDD109 SWDD108 SWRC180 SWRC251 SWRC250 SWRC248 SWRC247 SWRC178
0.31 g/t Au over 8 m 0.78 g/t Au over 9 m
surface 0.42 g/t Au over 4.4 m 0.48 g/t Au over 8.3 m 0.23 g/t Au over 6 m 0.22 g/t Au over 8 m 0.61 g/t Au over 30 m 0.57 g/t Au over 3 m
incl. 1.40 g/t Au over 7 m
0.23 g/t Au over 8 m 0.66 g/t Au over 26 m 0.30 g/t Au over 1 m
0.43 g/t Au over 2.4 m 0.19 g/t Au over 6 m 0.56 g/t Au over 41 m 0.53 g/t Au over 4 m
incl. 1.46 g/t Au over 7 m 0.80 g/t Au over 24 m
incl. 1.67 g/t Au over 7 m
200 Elev 0.28 g/t Au over 2 m 0.21 g/t Au over 6 m 0.34 g/t Au over 6 m
0.28 g/t Au over 5.1 m 0.54 g/t Au over 15 m
0.73 g/t Au over 3 m
0.61 g/t Au over 8 m
0.26 g/t Au over 29 m
0.51 g/t Au over 41 m
80 0.68 g/t Au over 2 m 78
0.71 g/t Au over 1 m 0.38 g/t Au over 51 m 84 0.27 g/t Au over 1 m
1.40 g/t Au over 2.7 m
0.35 g/t Au over 1 m
0.34 g/t Au over 1.2 m 108
0.48 g/t Au over 41.0 m 102
102
0.24 g/t Au over 1.7 m incl. 1.00 g/t Au over 5.6 m
Oxide Zone 0.40 g/t Au over 6 m
0.47 g/t Au over 1.1 m
0.29 g/t Au over 1 m
100 Elev 0.93 g/t Au over 11.05 m 1.59 g/t Au over 15.5 m
incl. 1.81 g/t Au over 4.0 m
0.33 g/t Au over 2.5 m incl. 3.22 g/t Au over 6.4 m
0.28 g/t Au over 4.0 m
0.22 g/t Au over 2 m
0.59 g/t Au over 1.9 m
0.82 g/t Au over 18.5 m
0.33 g/t Au over 23.8 m incl. 2.26 g/t Au over 4.5 m
incl. 0.97 g/t Au over 2.7 m
218.4
LEGEND
236.1
Mineralized Zone
Drillhole trace
0 Elev 2026 Resource Pit Shell OPEN
(US$3,200/oz Au) TO DEPTH 2024 - 2026 Drill Program | Enchi Gold Project
Sewum Deposit - Cross Section (A - A’)
278.2
0 50 m 100 m SWDD107 - SWDD109
Viewing Northeast, April 2026
----- End of picture text -----
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
Drill Results Released April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Hole Length (m) UTM North Elevation Azimuth ° Dip ° |
|---|---|
| SWDD107 Sewum 0.0 8.3 8.3 0.48 and 48.0 53.1 5.1 0.28 and 60.0 68.0 8.0 0.61 and 90.6 91.6 1.0 0.71 and 127.0 133.0 6.0 0.40 and 144.5 145.5 1.0 0.29 and 147.5 163.0 15.5 1.59 including 152.9 159.3 6.4 3.22 and 180.0 182.0 2.0 0.22 |
521298 628974 186 120 -60 218.4 |
| SWDD108 Sewum 0.0 8.0 8.0 0.23 and 32.3 34.3 2.0 0.28 and 141.5 182.5 41.0 0.48 including 174.0 179.6 5.6 1.00 and 189.5 208.0 18.5 0.82 including 199.5 204.0 4.5 2.26 |
521279 628978 186 120 -60 236.1 |
| SWDD109 Sewum 0.0 4.4 4.4 0.42 and 16.3 18.7 2.4 0.43 and 77.3 80.0 2.7 1.40 and 90.3 91.5 1.2 0.34 and 108.6 110.3 1.7 0.24 and 129.3 130.4 1.1 0.47 and 145.95 157.0 11.05 0.93 including 151.0 155.0 4.0 1.81 and 164.2 166.7 2.5 0.33 and 172.7 176.7 4.0 0.28 and 187.0 188.9 1.9 0.59 and 194.0 217.8 23.8 0.33 including 215.1 217.8 2.7 0.97 |
521249 628998 184 120 -60 278.2 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| SWDD110 Sewum 185.8 207.0 21.2 0.60 including 200.9 204.0 3.1 1.33 including 186.8 189.3 2.4 1.10 and 209.8 216.2 6.4 0.27 |
521256 629035 186 120 -60 225.0 |
| SWDD111 Sewum 0.0 2.0 2.0 0.30 and 32.5 34.5 2.0 0.24 and 60.8 63.5 2.7 0.18 and 150.6 152.6 2.0 0.35 |
521374 629343 184 120 -55 155.6 |
| SWDD112 Sewum 0.0 10.5 10.5 1.00 and 21.5 62.5 41.0 0.69 including 46.5 50.5 4.0 1.41 including 57.5 60.5 3.0 2.08 and 88.8 96.5 7.7 0.59 and 102.4 127.6 25.2 0.41 including 104.3 107.0 2.7 1.39 and 157.5 159.5 2.0 0.23 and 175.0 180.0 5.0 0.81 |
521021 629065 132 120 -70 185.5 |
| SWDD113A Sewum 0.0 12.9 12.9 0.26 and 66.5 68.5 2.0 0.79 and 75.9 92.7 16.8 0.81 including 76.6 81.0 4.4 2.41 and 114.0 115.0 1.0 0.51 |
521073 629138 157 0 90 126.1 |
| SWDD114 Sewum 173.0 180.7 7.7 0.69 |
521328 629299 174 120 -58 260.5 |
-
Intervals reported are hole lengths with true width estimated to be 75 - 85%.
-
Length-weighted averages from uncut assays.
-
All drilling completed by independent contractor.
-
All drilling samples sealed on site and delivered directly to independent lab Intertek Mineral Limited located in Tarkwa, Ghana for preparation and 50g Fire Assay with AAS finish.
-
QA/QC procedures include industry standard inclusion of standards, blanks, and duplicates in all sample batches.
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
Previously Released Drill Results
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Hole Length (m) UTM North Elevation Azimuth ° Dip ° |
|---|---|
| KBRC288 Boin 86.0 87.0 1.0 0.85 and 93.0 98.0 5.0 0.47 and 139.0 201.0 62.0 1.96 including 139.0 164.0 25.0 2.31 including 171.0 199.0 28.0 2.23 |
519558 634796 132 114 -60 201 |
| KBRC289 Boin 0.0 3.0 3.0 0.17 and 17.0 18.0 1.0 0.25 and 66.0 77.0 11.0 0.65 and 97.0 107.0 10.0 1.46 |
519608 634766 132 114 -60 151 |
| KBRC290 Boin 33.0 38.0 5.0 0.40 |
519453 634446 130 114 -60 103 |
| KBRC291 Boin 11.0 17.0 6.0 1.16 and 49.0 50.0 1.0 0.18 and 56.0 63.0 7.0 0.77 and 98.0 100.0 2.0 0.27 and 102.0 103.0 1.0 0.42 and 118.0 119.0 1.0 1.61 and 122.0 139.0 17.0 0.56 |
519374 634438 132 114 -60 140 |
| KBRC292 Boin 8.0 10.0 2.0 0.30 and 55.0 62.0 7.0 0.50 |
519415 634419 133 114 -60 110 |
| KBRC293 Boin 10.0 29.0 19.0 0.46 including 10.0 14.0 4.0 1.28 including 23.0 28.0 5.0 0.56 and 33.0 34.0 1.0 0.21 and 43.0 47.0 4.0 0.62 |
519452 634401 133 114 -60 101 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| KBRC294 Boin 107.0 113.0 6.0 3.24 including 109.0 110.0 1.0 16.52 and 120.0 121.0 1.0 0.27 and 139.0 141.0 2.0 0.35 and 150.0 204.0 54.0 0.94 including 151.0 158.0 7.0 2.11 including 170.0 181.0 11.0 2.08 |
519498 634729 125 114 -55 204 |
| KBRC295 Boin 45.0 47.0 2.0 0.34 and 54.0 56.0 2.0 0.31 and 83.0 91.0 8.0 0.19 and 113.0 115.0 2.0 0.30 and 127.0 128.0 1.0 0.97 and 130.0 154.0 24.0 1.25 |
519533 634699 127 114 -60 157 |
| KBRC296 Boin 31.0 56.0 25.0 1.44 and 67.0 74.0 7.0 2.26 and 90.0 93.0 3.0 0.37 |
519553 634666 125 114 -60 103 |
| KBRC297 Boin 0.0 7.0 7.0 0.95 and 12.0 26.0 14.0 0.45 and 33.0 34.0 1.0 0.22 and 64.0 68.0 4.0 0.57 |
519581 634684 127 114 -60 100 |
| KBRC298 Boin 55.0 67.0 12.0 0.43 and 76.0 78.0 2.0 0.24 and 154.0 155.0 1.0 0.24 and 159.0 220.0 61.0 0.53 including 173.0 185.0 12.0 1.07 |
519301 634381 130 114 -55 220 |
| KBRC299 Boin 1.0 3.0 2.0 0.21 and 16.0 24.0 8.0 0.48 and 32.0 34.0 2.0 0.89 |
519399 634338 136 114 -60 60 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Au (g/t) Hole ID Zone/Deposit From (m) To (m) Length (m) |
UTM East Dip ° Hole Length (m) Azimuth ° UTM North Elevation |
|---|---|
| KBRC300 Boin 38.0 41.0 3.0 0.85 and 51.0 52.0 1.0 0.20 and 62.0 68.0 6.0 2.34 and 72.0 74.0 2.0 0.79 and 98.0 102.0 4.0 0.69 and 126.0 128.0 2.0 0.27 |
519344 634361 135 114 -60 140 |
| KBRC301 Boin 59.0 60.0 1.0 204.27 and 60.0 62.0 2.0 1.46 and 64.0 66.0 2.0 0.22 and 79.0 85.0 6.0 0.22 and 98.0 99.0 1.0 0.33 and 133.0 134.0 1.0 0.51 and 161.0 163.0 2.0 1.77 and 181.0 183.0 2.0 0.19 |
519281 634351 132 114 -60 193 |
| KBRC302 Boin 0.0 1.0 1.0 0.22 and 39.0 42.0 3.0 0.78 and 111.0 112.0 1.0 0.51 and 116.0 125.0 9.0 0.43 and 130.0 131.0 1.0 0.40 and 139.0 150.0 11.0 0.40 and 185.0 186.0 1.0 0.40 and 199.0 201.0 2.0 0.68 |
519261 634273 138 114 -60 220 |
| KBRC303A Boin 52.0 54.0 2.0 0.67 and 68.0 70.0 2.0 0.44 and 80.0 82.0 2.0 0.21 and 114.0 145.0 31.0 0.94 and 160.0 181.0 21.0 0.46 and 187.0 189.0 2.0 0.20 and 196.0 197.0 1.0 0.29 |
519293 634294 130 114 -60 200 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| KBRC304 Boin 20.0 24.0 4.0 0.71 and 35.0 36.0 1.0 0.35 and 41.0 59.0 18.0 0.73 |
519090 634045 134 114 -50 81 |
| KBRC305 Boin 68.0 70.0 2.0 0.21 and 105.0 115.0 10.0 0.61 and 121.0 123.0 2.0 0.43 and 151.0 199.0 48.0 1.01 including 173.0 187.0 14.0 1.86 and 212.0 229.0 17.0 0.86 |
519248 634321 135 114 -55 252 |
| KBRC306 Boin 190.0 204.0 14.0 0.82 and 236.0 237.0 1.0 0.32 and 242.0 247.0 5.0 1.64 |
519192 634299 147 114 -55 250 |
| KBRC307A Boin 17.0 25.0 8.0 0.74 and 35.0 36.0 1.0 0.61 and 57.0 66.0 9.0 0.27 and 120.0 148.0 28.0 3.36 including 132.0 143.0 11.0 7.76 and incl. 133.0 135.0 2.0 37.58 and 156.0 190.0 34.0 0.33 |
519252 634200 139 114 -60 190 |
| KBRC308 Boin 132.0 153.0 21.0 1.04 including 139.0 141.0 2.0 2.66 and 164.0 202.0 38.0 0.50 including 197.0 201.0 4.0 2.03 and 207.0 209.0 2.0 0.49 and 214.0 217.0 3.0 0.51 |
519205 634212 135 114 -60 222 |
| KBRC309A Boin 63.0 65.0 2.0 0.50 and 110.0 119.0 9.0 0.32 and 126.0 152.0 26.0 0.59 and 171.0 179.0 8.0 0.29 and 183.0 185.0 2.0 0.31 |
519178 634148 119 114 -60 220 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Zone/Deposit From (m) To (m) Length (m) Au (g/t) Hole ID |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| KBRC310 Boin 16.0 17.0 1.0 0.59 and 39.0 40.0 1.0 0.34 and 97.0 99.0 2.0 0.47 and 101.0 104.0 3.0 0.41 and 108.0 110.0 2.0 0.27 and 116.0 118.0 2.0 0.30 and 191.0 193.0 2.0 0.39 |
519161 634010 126 114 -60 200 |
| KBRC311 Boin 143.0 146.0 3.0 0.19 and 159.0 161.0 2.0 1.25 |
519171 634107 127 114 -60 200 |
| KBRC312 Boin 86.0 87.0 1.0 0.28 and 93.0 109.0 16.0 1.04 and 115.0 117.0 2.0 0.30 and 130.0 210.0 80.0 0.54 |
519119 633968 133 114 -50 210 |
| KBRC313 Boin 127.0 208.0 81.0 1.06 including 132.0 149.0 17.0 2.50 including 184.0 191.0 7.0 2.15 and 215.0 217.0 2.0 0.22 and 229.0 237.0 8.0 0.29 |
518956 633618 154 0 -90 240 |
| KBRC314 Boin 141.0 143.0 2.0 0.50 and 151.0 154.0 3.0 0.99 and 161.0 223.0 62.0 0.86 including 210.0 219.0 9.0 2.24 |
518935 633580 156 0 -90 230 |
| KBRC315 Boin 139.0 190.0 51.0 0.58 including 144.0 148.0 4.0 1.71 and 203.0 240.0 37.0 1.32 |
518914 633556 154 0 -90 240 |
| KBRC316 Boin 100.0 196.0 96.0 0.97 including 163.0 173.0 10.0 2.05 and 200.0 202.0 2.0 0.52 and 217.0 219.0 2.0 0.35 |
518900 633506 133 0 -90 220 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC317 Boin 88.0 89.0 1.0 0.30 and 109.0 182.0 73.0 0.70 and 192.0 199.0 7.0 1.52 |
518874 633478 133 0 -90 200 |
| KBRC318 Boin 65.0 72.0 7.0 1.17 |
518804 633406 137 114 -50 100 |
| KBRC319 Boin 33.0 52.0 19.0 0.94 |
519535 634589 122 114 -60 78 |
| KBRC320 Boin 57.0 58.0 1.0 0.20 and 85.0 98.0 13.0 0.67 and 108.0 146.0 38.0 0.70 |
519496 634605 122 114 -60 150 |
| KBRC321 Boin 4.0 17.0 13.0 0.86 and 28.0 29.0 1.0 0.37 |
518801 633303 132 114 -50 60 |
| KBRC322 Boin 19.0 20.0 1.0 0.24 and 23.0 36.0 13.0 0.86 and 60.0 62.0 2.0 0.38 |
518741 633324 140 114 -50 166 |
| KBRC323 Boin 0.0 5.0 5.0 0.23 and 14.0 21.0 7.0 0.57 and 35.0 37.0 2.0 0.33 |
519502 634511 135 114 -60 90 |
| KBRC324 Boin 18.0 20.0 2.0 0.25 and 47.0 49.0 2.0 0.76 and 64.0 120.0 56.0 0.50 |
519475 634523 133 114 -60 120 |
| KBRC325 Boin 37.0 45.0 8.0 0.84 and 60.0 79.0 19.0 0.54 and 83.0 84.0 1.0 0.20 and 101.0 103.0 2.0 0.23 and 113.0 117.0 4.0 0.67 and 132.0 180.0 48.0 0.43 |
519657 634877 120 114 -60 180 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| From (m) To (m) Length (m) Au (g/t) Hole ID Zone/Deposit |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC326 Boin 6.0 15.0 9.0 0.64 and 21.0 25.0 4.0 0.38 and 29.0 30.0 1.0 0.58 and 35.0 51.0 16.0 1.03 and 69.0 70.0 1.0 0.26 and 72.0 74.0 2.0 0.22 and 90.0 91.0 1.0 0.29 and 95.0 96.0 1.0 0.31 and 112.0 113.0 1.0 0.22 and 125.0 126.0 1.0 0.30 and 136.0 144.0 8.0 0.33 |
519708 634856 120 114 -60 144 |
| KBRC327 Boin 76.0 77.0 1.0 0.46 and 81.0 89.0 8.0 0.79 and 96.0 100.0 4.0 0.59 and 110.0 119.0 9.0 0.26 |
519754 634955 105 114 -60 132 |
| KBRC328 Boin 9.0 72.0 63.0 1.28 and 78.0 96.0 18.0 0.76 |
519773 634942 110 114 -60 96 |
| KBRC329 Boin No significant results |
519786 635002 105 114 -60 60 |
| KBRC330 Boin 46.0 47.0 1.0 0.29 |
519815 635023 107 114 -60 64 |
| KBRC331 Boin No significant results |
520017 635043 120 114 -60 60 |
| KBRC332 Boin 41.0 46.0 5.0 0.41 and 54.0 58.0 4.0 0.64 |
519948 635072 120 114 -60 72 |
| KBRC333 Boin 45.0 46.0 1.0 0.22 and 71.0 72.0 1.0 0.23 and 80.0 82.0 2.0 0.21 |
520064 635075 125 114 -60 90 |
| KBRC334 Boin 32.0 34.0 2.0 0.25 |
520092 635118 127 114 -60 66 |
| KBRC335 Boin 6.0 29.0 23.0 2.18 including 16.0 24.0 8.0 5.58 |
520035 635135 127 114 -60 66 |
| KBRC336 Boin 30.0 35.0 5.0 0.80 |
518507 632990 123 114 -50 70 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| KBRC337 Boin 12.0 13.0 1.0 0.21 and 79.0 126.0 47.0 1.06 |
518467 633006 130 114 -50 126 |
| KBRC338 Boin 11.0 18.0 7.0 0.56 and 28.0 40.0 12.0 0.43 |
518449 632888 124 114 -60 72 |
| KBRC339 Boin 59.0 60.0 1.0 0.27 and 82.0 84.0 2.0 1.31 and 90.0 106.0 16.0 1.06 and 112.0 114.0 2.0 0.37 |
518421 632912 123 114 -60 120 |
| KBRC340 Boin 14.0 34.0 20.0 0.61 |
518396 632821 125 114 -60 50 |
| KBRC341 Boin 51.0 120.0 69.0 0.64 |
518366 632833 125 114 -60 120 |
| KBRC342 Boin 177.0 183.0 6.0 0.50 and 190.0 228.0 38.0 1.74 including 218.0 225.0 7.0 3.67 |
518885 633671 158 114 -65 233 |
| KBRC343 Boin 69.0 80.0 11.0 0.27 and 95.0 151.0 56.0 0.65 |
518932 633604 166 114 -60 156 |
| KBRC344 Boin 104.0 176.0 72.0 1.16 including 114.0 124.0 10.0 3.06 and 180.0 181.0 1.0 0.35 and 186.0 189.0 3.0 0.43 and 192.0 195.0 3.0 0.26 and 198.0 200.0 2.0 0.35 |
518955 633720 154 114 -55 200 |
| KBRC345 Boin 82.0 85.0 3.0 0.29 and 108.0 120.0 12.0 0.73 and 133.0 142.0 9.0 0.79 |
518983 633747 155 114 -60 174 |
| KBRC346 Boin 98.0 168.0 70.0 0.67 |
519062 633856 155 114 -62 168 |
| KBRC348 Boin 1.0 11.0 10.0 0.20 and 36.0 43.0 7.0 1.19 and 57.0 67.0 10.0 0.30 |
519658 634788 148 114 -60 90 |
| KBRC349 Boin 40.0 56.0 16.0 0.65 and 74.0 76.0 2.0 0.34 |
519689 634837 145 114 -60 90 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Au (g/t) Hole ID Zone/Deposit From (m) To (m) Length (m) |
UTM East UTM North Elevation Dip ° Hole Length (m) Azimuth ° |
|---|---|
| KBRC350 Boin 19.0 31.0 12.0 0.26 and 94.0 102.0 8.0 0.63 and 113.0 115.0 2.0 0.74 and 126.0 131.0 5.0 0.25 and 133.0 135.0 2.0 0.21 |
519656 634848 146 114 -60 144 |
| KBRC351 Boin 21.0 44.0 23.0 0.23 and 54.0 65.0 11.0 0.74 and 74.0 78.0 4.0 0.57 and 92.0 99.0 7.0 0.23 and 108.0 133.0 25.0 0.21 and 144.0 168.0 24.0 0.37 |
519689 634865 138 114 -60 168 |
| KBRC352 Boin 63.0 64.0 1.0 0.21 and 96.0 152.0 56.0 2.25 including 122.0 137.0 15.0 3.83 and 160.0 186.0 26.0 0.79 |
519630 634866 147 114 -60 186 |
| KBRC353 Boin 0.0 24.0 24.0 2.15 and 38.0 40.0 2.0 0.30 and 51.0 54.0 3.0 0.53 |
519651 634761 146 114 -60 80 |
| KBRC354 Boin 18.0 20.0 2.0 1.13 and 31.0 32.0 1.0 0.34 and 34.0 35.0 1.0 0.36 and 63.0 64.0 1.0 0.31 and 69.0 74.0 5.0 0.46 |
519779 634979 135 114 -55 96 |
| KBRC355 Boin 22.0 23.0 1.0 0.57 and 26.0 55.0 29.0 2.13 |
519744 634923 127 114 -55 66 |
| KBRC356 Boin 136.0 137.0 1.0 0.29 and 168.0 177.0 9.0 1.20 and 194.0 197.0 3.0 0.64 and 194.0 197.0 3.0 0.64 |
519482 634747 117 114 -55 204 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Au (g/t) Hole ID Zone/Deposit From (m) To (m) Length (m) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC347B Boin 31.0 32.0 1.0 0.26 and 42.0 59.0 17.0 0.58 and 90.0 91.0 1.0 0.29 and 134.0 172.0 38.0 1.05 |
519323 634242 118 114 -65 180 |
| KBRC357 Boin 113.0 121.0 8.0 1.07 and 126.0 150.0 24.0 4.41 including 132.0 142.0 10.0 9.08 and 163.0 164.0 1.0 0.35 |
519546 634737 145 114 -55 168 |
| KBRC358 Boin 109.0 117.0 8.0 1.25 and 142.0 161.0 19.0 0.47 and 166.0 179.0 13.0 1.05 |
519586 634795 158 114 -60 186 |
| KBRC359 Boin 11.0 15.0 4.0 0.30 and 28.0 40.0 12.0 0.33 and 77.0 79.0 2.0 0.28 and 86.0 88.0 2.0 0.35 and 110.0 144.0 34.0 0.87 |
519612 634809 148 114 -60 148 |
| KBRC360 Boin 75.0 127.0 52.0 1.58 including 96.0 112.0 16.0 3.04 and 137.0 139.0 2.0 0.49 and 152.0 153.0 1.0 0.26 and 155.0 177.0 22.0 0.62 |
519588 634823 145 114 -60 177 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| KBRC361 Boin 0.0 1.0 1.0 0.24 and 83.0 84.0 1.0 0.27 and 109.0 110.0 1.0 0.79 and 131.0 134.0 3.0 1.00 and 141.0 142.0 1.0 0.41 and 148.0 149.0 1.0 0.43 and 157.0 170.0 13.0 2.13 and 174.0 175.0 1.0 0.29 and 181.0 182.0 1.0 0.54 and 185.0 191.0 6.0 0.57 and 206.0 213.0 7.0 0.76 and 218.0 219.0 1.0 0.32 and 224.0 237.0 13.0 0.33 |
519726 634714 117 294 -55 250 |
| KBRC362 Boin 59.0 64.0 5.0 0.78 and 84.0 117.0 33.0 0.25 and 127.0 129.0 2.0 0.66 and 134.0 136.0 2.0 0.23 and 141.0 148.0 7.0 0.41 and 158.0 210.0 52.0 0.66 |
519197 634054 133 114 -55 210 |
| KBRC363 Boin 102.0 106.0 4.0 0.83 and 120.0 133.0 13.0 1.15 and 137.0 143.0 6.0 0.50 and 160.0 170.0 10.0 0.42 and 189.0 210.0 21.0 0.99 |
519205 634182 115 114 -60 210 |
| KBRC364 Boin 48.0 49.0 1.0 0.32 and 57.0 58.0 1.0 0.24 and 65.0 66.0 1.0 0.29 and 69.0 70.0 1.0 0.37 and 79.0 80.0 1.0 0.26 |
519223 634082 125 114 -60 174 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| From (m) To (m) Length (m) Au (g/t) Hole ID Zone/Deposit |
UTM East Azimuth ° UTM North Elevation Dip ° Hole Length (m) |
|---|---|
| KBRC365 Boin 19.0 20.0 1.0 0.43 and 52.0 54.0 2.0 0.34 |
518844 633393 139 114 -60 84 |
| KBRC366 Boin 192.0 203.0 11.0 2.01 |
519241 634342 130 114 -60 255 |
| KBRC367 Boin 8.0 11.0 3.0 0.21 and 21.0 22.0 1.0 0.25 and 82.0 84.0 2.0 2.59 |
519212 635995 117 294 -60 84 |
| KBRC368 Boin 2.0 5.0 3.0 0.71 and 16.0 32.0 16.0 0.78 including 31.0 32.0 1.0 8.17 |
519377 636140 118 294 -60 54 |
| KBRC369 Boin 44.0 62.0 18.0 0.51 including 44.0 46.0 2.0 3.29 and 71.0 74.0 3.0 0.54 and 78.0 79.0 1.0 0.42 |
519415 636122 126 294 -60 100 |
| KBRC370 Boin 14.0 15.0 1.0 0.32 and 24.0 26.0 2.0 0.40 and 43.0 44.0 1.0 1.42 and 51.0 56.0 5.0 0.40 and 62.0 65.0 3.0 3.16 and 68.0 72.0 4.0 0.36 and 76.0 77.0 1.0 1.90 |
519443 636168 122 294 -60 80 |
| KBRC371 Boin 24.0 25.0 1.0 0.91 and 52.0 58.0 6.0 0.89 including 52.0 54.0 2.0 2.37 and 72.0 75.0 3.0 1.12 and 83.0 86.0 3.0 0.64 and 93.0 101.0 8.0 0.35 including 93.0 96.0 3.0 0.72 and 106.0 117.0 11.0 0.31 and 122.0 130.0 8.0 0.47 |
519464 636158 124 294 -60 132 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| From (m) To (m) Length (m) Au (g/t) Hole ID Zone/Deposit |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC372 Boin 11.0 12.0 1.0 0.38 and 14.0 17.0 3.0 1.65 and 32.0 35.0 3.0 0.18 and 45.0 56.0 11.0 0.47 and 71.0 72.0 1.0 0.20 |
519474 636213 124 294 -60 100 |
| KBDD088 Boin 190.0 206.5 16.5 2.03 including 195.0 199.0 4.0 3.90 |
518740 633481 145 114 -55 213.3 |
| KBDD095 Boin 183.0 185.0 2.0 1.04 and 238.4 251.0 12.6 0.51 including 247.8 249.9 2.1 1.37 and 263.0 264.0 1.0 0.99 and 267.0 268.0 1.0 0.63 and 271.0 279.5 8.5 2.34 including 272.0 274.5 2.5 7.50 and 284.5 288.5 4.0 0.31 and 292.5 294.0 1.5 0.22 and 297.0 299.0 2.0 1.00 and 303.0 305.0 2.0 0.28 and 307.0 309.0 2.0 0.37 and 314.6 316.6 2.0 0.36 and 333.3 336.0 2.7 0.19 and 341.0 344.0 3.0 0.25 and 361.0 363.0 2.0 0.39 and 367.0 369.0 2.0 1.24 |
518773 633637 146 114 -60 372.6 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBDD096 Boin 296.0 298.0 2.0 1.33 and 302.0 304.0 2.0 0.52 and 319.2 319.9 0.7 0.96 and 324.0 342.0 18.0 0.68 including 340.1 342.0 1.9 2.42 and 351.0 358.0 7.0 0.97 including 352.0 354.0 2.0 2.60 and 363.0 399.5 36.5 0.69 including 385.0 387.0 2.0 2.34 and 412.0 414.0 2.0 0.83 |
518773 633637 146 114 -75 435.4 |
| KBDD097 Boin 187.0 190.0 3.0 1.57 and 226.0 245.0 19.0 0.62 including 232.0 234.0 2.0 1.67 and 253.0 276.0 23.0 3.54 including 256.0 264.0 8.0 6.92 |
519511 634814 140 114 -60 320.2 |
| KBDD098 Boin 244.0 246.0 2.0 0.58 and 264.0 265.0 1.0 173.75 and 266.0 269.0 3.0 0.18 and 298.3 301.0 2.7 0.36 and 315.0 317.0 2.0 1.03 and 320.7 323.2 2.5 3.00 |
518835 633693 160 114 -65 357.6 |
| KBDD099 Boin 174.4 193.6 19.2 0.44 including 189.6 191.6 2.0 1.42 and 203.0 205.0 2.0 0.66 and 216.0 223.5 7.5 0.32 and 229.3 237.3 8.0 0.42 and 243.0 257.1 14.1 0.78 including 243.0 247.0 4.0 1.86 and 271.6 278.5 6.9 0.39 and 308.3 309.3 1.0 0.99 |
519447 634743 115 114 -55 341.3 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Azimuth ° Dip ° Hole Length (m) Elevation |
|---|---|
| KBDD100 Boin 243.0 245.0 2.0 0.27 and 251.1 254.0 2.9 0.44 and 257.0 262.9 5.9 1.63 and 266.8 269.1 2.3 0.81 and 270.8 274.0 3.2 0.37 and 290.0 292.0 2.0 0.65 and 295.6 301.0 5.4 1.61 and 308.2 310.0 1.8 0.51 and 310.0 311.0 1.0 147.50 and 311.0 313.0 2.0 0.40 |
518742 633544 149 114 -60 321.4 |
| KBDD101 Boin 166.0 174.0 8.0 0.67 including 168.0 170.0 2.0 1.59 and 202.0 218.0 16.0 1.26 including 202.0 209.0 7.0 2.22 and 234.0 235.0 1.0 0.59 |
519591 634889 136 114 -60 311.0 |
| KBDD102 Boin 222.2 232.0 9.8 0.92 and 239.0 243.3 4.3 1.10 and 266.0 274.0 8.0 0.90 and 277.0 280.0 3.0 0.39 and 285.0 310.5 25.5 1.70 and 313.5 320.2 6.7 0.40 and 327.0 344.0 17.0 3.22 and 351.0 353.0 2.0 0.29 |
519207 634347 144 114 -65 366.4 |
| KBDD103 Boin 237.0 238.0 1.0 1.00 and 275.0 276.0 1.0 0.25 and 278.0 279.0 1.0 0.59 |
519619 634957 127 114 -60 280.6 |
| KBDD104 Boin 207.3 210.0 2.7 0.63 and 217.0 228.0 11.0 0.82 including 218.0 223.0 5.0 1.41 and 231.0 235.0 4.0 1.80 and 244.0 246.0 2.0 0.79 |
519190 634263 127 114 -60 309.6 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC171 Sewum 1.0 4.0 3.0 0.21 and 8.0 11.0 3.0 0.19 and 56.0 74.0 18.0 0.60 |
521265 628718 225 120 -50 78 |
| SWRC172 Sewum 1.0 27.0 26.0 0.61 including 12.0 21.0 9.0 1.09 and 30.0 31.0 1.0 0.29 and 53.0 57.0 4.0 0.33 |
521293 628770 225 120 -50 70 |
| SWRC173 Sewum 25.0 33.0 8.0 0.49 and 44.0 45.0 1.0 0.22 and 52.0 53.0 1.0 0.36 |
521320 628836 233 120 -60 60 |
| SWRC174 Sewum 2.0 6.0 4.0 0.25 and 24.0 30.0 6.0 0.23 |
521304 628813 232 120 -60 60 |
| SWRC175 Sewum 1.0 8.0 7.0 0.50 and 23.0 29.0 6.0 0.25 and 35.0 47.0 12.0 0.45 |
521491 628830 228 120 -60 60 |
| SWRC176 Sewum 12.0 57.0 45.0 0.30 including 12.0 21.0 9.0 0.51 including 48.0 55.0 7.0 0.49 and 62.0 64.0 2.0 0.89 |
521475 628780 220 120 -60 72 |
| SWRC177 Sewum 12.0 13.0 1.0 0.18 |
521446 628754 221 120 -60 72 |
| SWRC178 Sewum 0.0 9.0 9.0 0.78 and 13.0 16.0 3.0 0.57 and 20.0 24.0 4.0 0.53 and 35.0 41.0 6.0 0.34 |
521482 628875 235 120 -50 80 |
| SWRC179 Sewum 2.0 12.0 10.0 0.32 and 36.0 51.0 15.0 0.46 and 64.0 83.0 19.0 0.35 |
521450 628801 227 120 -60 84 |
| SWRC180 Sewum 0.0 26.0 26.0 0.66 including 16.0 23.0 7.0 1.46 and 35.0 41.0 6.0 0.19 |
521321 628958 235 120 -50 80 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC181 Sewum 1.0 9.0 8.0 0.24 and 56.0 57.0 1.0 0.21 |
521341 629045 240 120 -50 60 |
| SWRC182 Sewum 7.0 8.0 1.0 0.21 and 13.0 14.0 1.0 0.30 and 52.0 62.0 10.0 2.45 including 52.0 55.0 3.0 7.44 and 66.0 68.0 2.0 0.35 |
521411 629166 235 120 -50 80 |
| SWRC183 Sewum 0.0 2.0 2.0 0.17 and 26.0 27.0 1.0 0.29 and 30.0 32.0 2.0 0.21 and 42.0 43.0 1.0 0.22 and 74.0 77.0 3.0 0.24 and 91.0 92.0 1.0 0.37 and 98.0 100.0 2.0 0.31 |
521719 629772 234 120 -60 102 |
| SWRC184 Sewum 12.0 14.0 2.0 0.20 and 74.0 80.0 6.0 0.37 |
521764 629828 233 120 -60 105 |
| SWRC185 Sewum 45.0 47.0 2.0 0.74 and 59.0 62.0 3.0 0.19 and 96.0 97.0 1.0 0.20 and 100.0 108.0 8.0 0.32 and 134.0 136.0 2.0 0.69 |
521730 629842 234 120 -60 144 |
| SWRC186 Sewum 2.0 5.0 3.0 0.26 |
521392 629219 235 120 -60 80 |
| SWRC187 Sewum 2.0 4.0 2.0 0.19 |
521365 629237 230 120 -60 80 |
| SWRC188 Sewum 29.0 31.0 2.0 0.27 and 70.0 71.0 1.0 0.22 |
521365 629197 220 120 -50 80 |
| SWRC189 Sewum 47.0 50.0 3.0 0.65 and 54.0 57.0 3.0 0.22 |
521749 629765 222 120 -60 72 |
| SWRC190 Sewum 28.0 29.0 1.0 0.30 and 33.0 35.0 2.0 0.66 and 50.0 51.0 1.0 0.25 |
521804 629833 216 120 -50 72 |
| SWRC191 Sewum 42.0 44.0 2.0 0.26 |
521791 629797 220 120 -60 60 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC192 Sewum 10.0 14.0 4.0 0.31 and 59.0 60.0 1.0 0.28 and 64.0 67.0 3.0 0.44 and 78.0 80.0 2.0 0.20 |
521772 629848 225 120 -50 120 |
| SWRC193 Sewum 2.0 17.0 15.0 0.33 and 25.0 27.0 2.0 0.29 and 47.0 48.0 1.0 0.33 |
521435 628727 218 120 -60 90 |
| SWRC194 Sewum 1.0 63.0 62.0 1.85 including 13.0 23.0 10.0 8.36 and 74.0 79.0 5.0 0.23 and 99.0 167.0 68.0 0.75 including 102.0 116.0 14.0 1.15 |
521352 627847 158 120 -50 167 |
| SWRC195 Sewum 0.0 9.0 9.0 0.77 and 20.0 58.0 38.0 0.80 |
521289 627794 172 120 -50 66 |
| SWRC196 Sewum 21.0 23.0 2.0 0.64 and 63.0 66.0 3.0 2.31 and 78.0 82.0 4.0 0.24 and 90.0 91.0 1.0 0.20 |
520826 626252 156 120 -55 96 |
| SWRC197 Sewum No significant results |
520771 626290 147 120 -55 108 |
| SWRC198 Sewum 25.0 26.0 1.0 0.37 |
520670 626267 155 120 -55 90 |
| SWRC199 Sewum 53.0 57.0 4.0 0.56 and 72.0 76.0 4.0 1.24 and 97.0 98.0 1.0 0.22 and 102.0 104.0 2.0 0.30 and 108.0 111.0 3.0 0.21 and 115.0 116.0 1.0 0.25 |
520759 626222 160 120 -55 120 |
| SWRC200 Sewum 20.0 34.0 14.0 0.81 and 81.0 83.0 2.0 0.23 and 91.0 92.0 1.0 0.27 and 107.0 108.0 1.0 1.87 and 118.0 121.0 3.0 1.58 |
520741 626162 161 120 -55 126 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC201 Sewum 20.0 24.0 4.0 0.56 and 45.0 48.0 3.0 0.38 and 72.0 99.0 27.0 1.07 including 73.0 81.0 8.0 2.82 |
520704 626103 158 120 -55 102 |
| SWRC202 Sewum 0.0 5.0 5.0 1.65 and 28.0 41.0 13.0 2.39 and 48.0 49.0 1.0 0.23 and 60.0 76.0 16.0 0.39 |
520648 626033 131 120 -55 78 |
| SWRC203 Sewum 11.0 12.0 1.0 0.20 and 20.0 25.0 5.0 0.76 and 45.0 48.0 3.0 0.32 and 51.0 56.0 5.0 0.39 and 72.0 73.0 1.0 0.25 and 77.0 79.0 2.0 0.29 and 84.0 90.0 6.0 0.42 |
521761 629918 222 120 -50 108 |
| SWRC204 Sewum 18.0 19.0 1.0 0.24 and 54.0 58.0 4.0 0.29 and 62.0 64.0 2.0 0.22 and 77.0 78.0 1.0 0.23 and 92.0 93.0 1.0 0.41 and 116.0 119.0 3.0 0.22 and 126.0 128.0 2.0 0.21 |
521330 627665 167 120 -55 132 |
| SWRC205 Sewum 85.0 87.0 2.0 0.24 and 124.0 168.0 44.0 0.38 including 142.0 156.0 14.0 0.81 |
521297 627683 173 120 -55 168 |
| SWRC206 Sewum 1.0 5.0 4.0 0.61 and 10.0 24.0 14.0 0.66 and 70.0 72.0 2.0 0.23 and 93.0 94.0 1.0 0.26 and 104.0 120.0 16.0 0.51 |
521365 627644 166 120 -55 120 |
| SWRC207 Sewum 64.0 66.0 2.0 0.23 |
521412 627878 138 120 -55 84 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC208 Sewum 0.0 17.0 17.0 0.57 and 22.0 46.0 24.0 1.39 including 26.0 30.0 4.0 6.56 and 54.0 59.0 5.0 0.38 and 74.0 79.0 5.0 0.37 and 86.0 88.0 2.0 0.54 |
521365 627824 148 120 -55 98 |
| SWRC209 Sewum 51.0 53.0 2.0 0.64 |
521412 627851 139 120 -55 62 |
| SWRC210 Sewum 0.0 11.0 11.0 0.51 and 26.0 27.0 1.0 0.33 and 46.0 50.0 4.0 0.22 and 69.0 81.0 12.0 0.21 and 88.0 100.0 12.0 0.29 and 149.0 153.0 4.0 0.28 and 178.0 193.0 15.0 0.80 |
521254 627701 174 120 -55 204 |
| SWRC211 Sewum 0.0 37.0 37.0 0.47 and 54.0 69.0 15.0 0.38 |
521385 627701 174 120 -55 126 |
| SWRC212 Sewum 0.0 81.0 81.0 0.40 and 89.0 90.0 1.0 1.76 and 111.0 120.0 9.0 0.40 and 217.0 221.0 4.0 0.31 |
521285 627757 172 120 -55 221 |
| SWRC213 Sewum 0.0 7.0 7.0 0.38 and 12.0 32.0 20.0 0.70 and 62.0 130.0 68.0 0.73 |
521325 627734 173 120 -55 132 |
| SWRC214 Sewum 125.0 137.0 12.0 0.25 and 146.0 156.0 10.0 0.51 and 174.0 175.0 1.0 0.50 |
521262 627906 150 120 -55 177 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC215 Sewum 0.0 4.0 4.0 0.42 and 7.0 8.0 1.0 0.20 and 31.0 56.0 25.0 0.38 and 61.0 62.0 1.0 0.21 and 95.0 128.0 33.0 0.62 and 132.0 133.0 1.0 0.54 and 138.0 169.0 31.0 0.42 and 174.0 176.0 2.0 2.05 and 180.0 182.0 2.0 0.27 |
521312 627885 153 120 -55 182 |
| SWRC216 Sewum 7.0 10.0 3.0 0.34 and 33.0 48.0 15.0 0.72 and 60.0 61.0 1.0 0.49 |
521391 627817 100 120 -55 120 |
| SWRC217 Sewum 1.0 2.0 1.0 1.78 and 19.0 34.0 15.0 1.24 and 90.0 120.0 30.0 1.00 |
521376 627840 141 120 -55 120 |
| SWRC218 Sewum 20.0 28.0 8.0 0.22 |
519995 625747 137 120 -55 70 |
| SWRC219 Sewum 1.0 10.0 9.0 0.71 and 16.0 17.0 1.0 0.26 and 25.0 30.0 5.0 0.69 |
520013 625771 139 120 -55 62 |
| SWRC220 Sewum 13.0 15.0 2.0 0.48 and 26.0 27.0 1.0 0.32 |
520061 625801 140 120 -55 60 |
| SWRC221 Sewum 1.0 3.0 2.0 0.84 and 51.0 53.0 2.0 0.19 |
520043 625823 134 120 -55 95 |
| SWRC222 Sewum 0.0 38.0 38.0 0.59 including 4.0 11.0 7.0 1.94 |
520456 626210 154 120 -55 60 |
| SWRC223 Sewum 18.0 67.0 49.0 0.74 including 42.0 53.0 11.0 1.57 and 84.0 98.0 14.0 0.24 |
520431 626220 147 120 -55 100 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC224 Sewum 62.0 63.0 1.0 0.52 and 69.0 89.0 20.0 1.24 and 112.0 113.0 1.0 1.24 and 138.0 139.0 1.0 0.67 and 142.0 143.0 1.0 0.30 |
520673 626116 154 120 -55 153 |
| SWRC225 Sewum 105.0 106.0 1.0 0.23 and 110.0 111.0 1.0 0.49 and 137.0 140.0 3.0 0.29 and 153.0 155.0 2.0 0.23 and 197.0 198.0 1.0 0.38 |
520646 626141 115 120 -55 198 |
| SWRC226 Sewum 20.0 21.0 1.0 0.24 and 77.0 85.0 8.0 0.65 and 109.0 110.0 1.0 0.30 and 117.0 128.0 11.0 0.47 and 135.0 136.0 1.0 0.24 and 148.0 150.0 2.0 0.39 |
520707 626184 123 120 -55 168 |
| SWRC227 Sewum 16.0 18.0 2.0 0.77 and 21.0 24.0 3.0 0.75 and 31.0 35.0 4.0 1.59 and 58.0 59.0 1.0 0.49 and 68.0 69.0 1.0 0.41 and 76.0 77.0 1.0 0.34 |
520846 626317 139 120 -55 120 |
| SWRC228 Sewum 45.0 53.0 8.0 0.38 |
521672 627929 167 120 -55 66 |
| SWRC229 Sewum 0.0 11.0 11.0 0.34 and 64.0 66.0 2.0 0.28 and 83.0 93.0 10.0 0.65 and 110.0 111.0 1.0 0.26 |
521689 627951 167 120 -55 114 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC230 Sewum 54.0 60.0 6.0 0.15 and 67.0 68.0 1.0 0.23 and 78.0 84.0 6.0 0.54 and 114.0 124.0 10.0 0.22 and 132.0 133.0 1.0 0.20 |
521650 627968 169 120 -55 144 |
| SWRC231 Sewum 2.0 6.0 4.0 0.46 and 25.0 26.0 1.0 0.29 |
521710 627996 144 120 -55 78 |
| SWRC232 Sewum 47.0 54.0 7.0 0.46 and 113.0 120.0 7.0 0.30 |
521680 628019 144 120 -55 126 |
| SWRC233 Sewum No significant results |
520518 625923 107 120 -55 120 |
| SWRC234 Sewum 34.0 35.0 1.0 0.27 and 40.0 41.0 1.0 0.31 and 51.0 54.0 3.0 0.42 and 64.0 75.0 11.0 0.63 and 85.0 86.0 1.0 0.24 |
520541 625900 125 120 -55 90 |
| SWRC235 Sewum 16.0 17.0 1.0 0.20 and 93.0 94.0 1.0 0.24 and 98.0 99.0 1.0 2.13 |
520553 625967 97 120 -55 112 |
| SWRC236 Sewum 1.0 15.0 14.0 0.45 and 24.0 28.0 4.0 0.70 and 40.0 69.0 29.0 0.67 |
521409 628682 194 120 -60 72 |
| SWRC237 Sewum 1.0 10.0 9.0 0.42 and 25.0 52.0 27.0 0.62 including 42.0 49.0 7.0 1.45 and 64.0 90.0 26.0 0.56 including 85.0 90.0 5.0 2.00 |
521390 628697 194 120 -60 90 |
| SWRC238 Sewum 4.0 29.0 25.0 0.35 and 53.0 63.0 10.0 0.22 and 83.0 84.0 1.0 0.25 |
521371 628711 194 120 -60 84 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC239 Sewum 0.0 26.0 26.0 0.37 and 44.0 45.0 1.0 0.21 and 60.0 63.0 3.0 0.58 and 71.0 74.0 3.0 0.34 and 91.0 93.0 2.0 0.57 |
521348 628726 194 120 -60 96 |
| SWRC240 Sewum 2.0 41.0 39.0 0.22 |
521328 628740 195 120 -60 66 |
| SWRC241 Sewum 3.0 18.0 15.0 0.53 and 34.0 43.0 9.0 0.30 |
521311 628745 195 120 -60 60 |
| SWRC242 Sewum 1.0 2.0 1.0 0.18 |
521422 628771 193 120 -60 84 |
| SWRC243 Sewum 5.0 10.0 5.0 0.41 and 63.0 64.0 1.0 0.44 |
521402 628786 194 120 -60 84 |
| SWRC244 Sewum 1.0 18.0 17.0 0.48 and 36.0 37.0 1.0 0.57 |
521385 628797 196 120 -60 87 |
| SWRC245 Sewum 2.0 18.0 16.0 0.23 and 24.0 26.0 2.0 0.71 and 31.0 33.0 2.0 0.29 |
521367 628805 196 120 -60 108 |
| SWRC246 Sewum 0.0 30.0 30.0 0.36 and 54.0 61.0 7.0 0.40 |
521338 628822 196 120 -60 108 |
| SWRC247 Sewum 2.0 32.0 30.0 0.61 including 3.0 10.0 7.0 1.40 and 44.0 73.0 29.0 0.26 |
521449 628892 194 120 -60 78 |
| SWRC248 Sewum 4.0 45.0 41.0 0.56 including 9.0 16.0 7.0 1.67 and 67.0 70.0 3.0 0.73 and 82.0 83.0 1.0 0.27 |
521431 628900 194 120 -60 84 |
| SWRC249 Sewum 0.0 8.0 8.0 0.31 and 15.0 39.0 24.0 0.80 and 46.0 61.0 15.0 0.54 and 78.0 80.0 2.0 0.68 and 92.0 93.0 1.0 0.35 |
521406 628914 194 120 -60 102 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC250 Sewum 2.0 10.0 8.0 0.22 and 40.0 91.0 51.0 0.38 |
521384 628932 194 120 -60 102 |
| SWRC251 Sewum 2.0 8.0 6.0 0.23 and 18.0 19.0 1.0 0.30 and 46.0 52.0 6.0 0.21 and 59.0 100.0 41.0 0.51 |
521361 628944 194 120 -60 108 |
| SWRC252 Sewum 0.0 34.0 34.0 0.39 and 54.0 56.0 2.0 0.52 |
521477 629081 195 120 -60 60 |
| SWRC253 Sewum 0.0 6.0 6.0 0.31 and 12.0 22.0 10.0 0.22 and 29.0 65.0 36.0 0.34 and 73.0 74.0 1.0 0.33 |
521456 629095 195 120 -60 80 |
| SWRC254 Sewum 3.0 5.0 2.0 0.21 and 33.0 34.0 1.0 0.45 and 50.0 87.0 37.0 0.51 |
521434 629114 196 120 -60 98 |
| SWRC255 Sewum 2.0 7.0 5.0 0.29 and 48.0 56.0 8.0 0.43 and 70.0 72.0 2.0 0.42 and 75.0 76.0 1.0 0.38 and 80.0 111.0 31.0 0.31 and 114.0 115.0 1.0 0.37 |
521411 629121 195 120 -60 120 |
| SWRC256 Sewum 3.0 6.0 3.0 0.24 and 61.0 69.0 8.0 0.21 and 79.0 80.0 1.0 0.26 and 84.0 85.0 1.0 0.48 and 100.0 109.0 9.0 0.22 and 120.0 123.0 3.0 0.32 |
521385 629136 194 120 -60 138 |
| SWRC257 Sewum 1.0 10.0 9.0 0.27 and 36.0 39.0 3.0 2.79 and 43.0 46.0 3.0 2.06 and 57.0 59.0 2.0 0.26 |
521362 629147 194 120 -60 64 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC258 Sewum 1.0 34.0 33.0 0.89 and 38.0 39.0 1.0 0.26 and 41.0 43.0 2.0 0.21 and 52.0 56.0 4.0 0.43 |
521549 629252 197 120 -60 66 |
| SWRC259 Sewum 2.0 42.0 40.0 0.51 and 47.0 53.0 6.0 0.31 and 72.0 73.0 1.0 0.41 |
521529 629263 202 120 -60 74 |
| SWRC260 Sewum 2.0 6.0 4.0 0.65 and 16.0 18.0 2.0 0.20 and 27.0 68.0 41.0 0.51 including 55.0 61.0 6.0 1.66 |
521504 629277 195 120 -60 80 |
| SWRC261 Sewum 3.0 5.0 2.0 0.20 and 23.0 24.0 1.0 0.32 and 32.0 36.0 4.0 0.70 and 58.0 60.0 2.0 0.24 and 78.0 96.0 18.0 0.61 |
521480 629288 195 120 -60 108 |
| SWRC262 Sewum 0.0 7.0 7.0 0.24 and 81.0 84.0 3.0 0.41 and 93.0 101.0 8.0 1.16 and 106.0 107.0 1.0 0.22 |
521454 629299 194 120 -60 120 |
| SWRC263 Sewum 3.0 5.0 2.0 0.20 and 87.0 90.0 3.0 0.20 and 105.0 106.0 1.0 0.22 and 117.0 124.0 7.0 0.88 |
521435 629313 194 120 -60 136 |
| SWRC264 Sewum 45.0 46.0 1.0 0.53 |
521405 629332 193 120 -60 60 |
| SWRC265 Sewum 0.0 12.0 12.0 0.44 and 18.0 39.0 21.0 0.64 |
521580 629359 198 120 -60 60 |
| SWRC266 Sewum 3.0 8.0 5.0 0.20 and 20.0 26.0 6.0 0.56 and 30.0 36.0 6.0 0.38 and 49.0 60.0 11.0 0.70 |
521555 629368 198 120 -60 80 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC267 Sewum 0.0 21.0 21.0 0.40 and 35.0 36.0 1.0 0.33 and 66.0 78.0 12.0 0.78 |
521534 629380 200 120 -60 100 |
| SWRC268 Sewum 1.0 6.0 5.0 0.29 and 14.0 28.0 14.0 0.52 and 40.0 42.0 2.0 0.23 and 66.0 67.0 1.0 0.34 and 88.0 99.0 11.0 0.28 |
521509 629393 195 120 -60 120 |
| SWRC269 Sewum 2.0 8.0 6.0 3.98 including 7.0 8.0 1.0 22.62 and 39.0 41.0 2.0 5.50 including 39.0 40.0 1.0 10.53 and 54.0 55.0 1.0 0.93 and 57.0 58.0 1.0 0.20 |
521492 629402 194 120 -60 60 |
| SWRC270 Sewum 4.0 9.0 5.0 0.50 and 33.0 38.0 5.0 0.38 |
521469 629414 194 120 -60 60 |
| SWRC271 Sewum 0.0 14.0 14.0 0.46 and 19.0 30.0 11.0 1.10 and 34.0 36.0 2.0 0.45 |
521601 629348 192 120 -60 60 |
| NBRC108 Nyam 16.0 17.0 1.0 0.28 and 33.0 34.0 1.0 0.91 and 45.0 60.0 15.0 2.50 and 75.0 77.0 2.0 0.96 and 105.0 108.0 3.0 0.42 |
530218 637234 98 300 -60 108 |
| NBRC109 Nyam 7.0 8.0 1.0 0.78 and 63.0 77.0 14.0 0.37 and 88.0 97.0 9.0 0.93 and 111.0 114.0 3.0 0.97 and 133.0 137.0 4.0 0.43 |
530243 637218 99 300 -60 138 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| NBRC110 Nyam 36.0 37.0 1.0 0.21 and 52.0 53.0 1.0 0.49 and 97.0 98.0 1.0 0.33 and 104.0 114.0 10.0 3.00 and 126.0 144.0 18.0 0.50 |
530293 637299 100 300 -60 147 |
| NBRC111 Nyam 9.0 23.0 14.0 0.51 and 28.0 31.0 3.0 0.30 and 36.0 38.0 2.0 0.55 and 45.0 48.0 3.0 0.40 and 53.0 76.0 23.0 0.27 |
530260 637325 97 300 -60 84 |
| NBRC112 Nyam 48.0 54.0 6.0 0.76 and 62.0 67.0 5.0 0.46 |
530610 637824 104 300 -60 80 |
| NBRC113 Nyam 86.0 89.0 3.0 0.29 and 100.0 101.0 1.0 0.34 and 105.0 106.0 1.0 0.63 |
530604 637746 116 300 -60 108 |
| NBRC114 Nyam 78.0 90.0 12.0 1.68 |
530615 637788 110 300 -60 96 |
| NBRC115 Nyam 48.0 49.0 1.0 0.31 and 57.0 69.0 12.0 0.49 and 84.0 86.0 2.0 0.31 and 97.0 104.0 7.0 0.43 |
530792 638222 103 300 -60 108 |
| NBRC116 Nyam 41.0 48.0 7.0 1.00 and 56.0 57.0 1.0 0.48 and 61.0 66.0 5.0 0.44 and 86.0 108.0 22.0 0.46 and 117.0 119.0 2.0 0.41 |
530768 638196 107 300 -60 120 |
| NBRC117 Nyam 6.0 7.0 1.0 0.65 and 38.0 42.0 4.0 0.66 and 47.0 78.0 31.0 0.51 and 95.0 96.0 1.0 0.23 |
530816 638271 99 300 -60 102 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
K K K K |
|---|---|---|
| NBRC118 Nyam 53.0 72.0 19.0 0.64 and 80.0 85.0 5.0 1.12 and 90.0 92.0 2.0 0.60 |
530837 638302 99 300 -55 120 |
|
| NBRC119 Nyam 2.0 8.0 6.0 0.96 and 12.0 19.0 7.0 0.32 and 45.0 53.0 8.0 2.36 |
530170 637212 96 300 -60 60 |
|
| NBRC120 Nyam 57.0 58.0 1.0 0.21 and 71.0 72.0 1.0 2.00 and 97.0 101.0 4.0 1.90 and 113.0 120.0 7.0 0.87 and 127.0 129.0 2.0 0.57 |
530209 637190 95 300 -60 144 |
|
| KKRC085A Kwakyekrom 88.0 103.0 15.0 1.29 and 108.0 109.0 1.0 0.23 and 124.0 132.0 8.0 0.29 |
529000 635363 85 298 -60 180 |
|
| KKRC086 Kwakyekrom 27.0 40.0 13.0 0.46 and 43.0 44.0 1.0 0.30 and 46.0 47.0 1.0 0.27 and 55.0 61.0 6.0 0.22 and 69.0 70.0 1.0 0.20 |
528942 635392 104 298 -60 122 |
|
| KKRC087 Kwakyekrom 14.0 25.0 11.0 0.29 and 132.0 133.0 1.0 0.29 |
528929 635332 109 298 -60 150 |
|
| KKRC088 Kwakyekrom 39.0 41.0 2.0 0.24 and 57.0 61.0 4.0 0.30 and 67.0 68.0 1.0 0.34 and 80.0 83.0 3.0 0.20 and 93.0 103.0 10.0 0.96 and 105.0 106.0 1.0 0.29 and 142.0 145.0 3.0 0.52 |
528945 635255 102 298 -60 174 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
K K K K |
|---|---|---|
| KKRC089 Kwakyekrom 67.0 69.0 2.0 0.28 and 79.0 83.0 4.0 0.39 and 87.0 105.0 18.0 0.47 and 114.0 117.0 3.0 0.53 and 120.0 121.0 1.0 0.63 and 126.0 127.0 1.0 0.43 and 132.0 133.0 1.0 0.25 and 138.0 139.0 1.0 1.00 and 144.0 145.0 1.0 0.68 and 148.0 151.0 3.0 0.52 and 164.0 169.0 5.0 0.33 and 178.0 180.0 2.0 0.39 |
528968 635307 100 298 -60 228 |
|
| KKRC090 Kwakyekrom 30.0 31.0 1.0 0.20 and 91.0 96.0 5.0 0.78 and 101.0 102.0 1.0 0.22 and 166.0 167.0 1.0 0.35 and 169.0 170.0 1.0 0.24 |
528899 635167 102 298 -60 240 |
|
| KKRC091 Kwakyekrom 1.0 2.0 1.0 0.23 and 36.0 37.0 1.0 0.20 |
528796 635102 112 298 -60 120 |
|
| KKRC092 Kwakyekrom 21.0 22.0 1.0 0.45 and 26.0 31.0 5.0 0.39 and 36.0 37.0 1.0 0.79 and 41.0 50.0 9.0 0.49 and 58.0 62.0 4.0 0.90 and 72.0 73.0 1.0 0.22 and 84.0 87.0 3.0 0.39 and 91.0 97.0 6.0 0.84 and 107.0 108.0 1.0 0.21 |
528633 634835 130 298 -60 126 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
K K K K K K |
|---|---|---|
| KKRC093 Kwakyekrom 8.0 11.0 3.0 0.65 and 24.0 28.0 4.0 0.85 and 56.0 58.0 2.0 2.05 and 72.0 73.0 1.0 0.50 and 110.0 111.0 1.0 0.22 and 113.0 125.0 12.0 0.57 |
528695 634878 132 298 -60 125 |
|
| KKRC094 Kwakyekrom 92.0 93.0 1.0 0.32 |
528762 634990 130 298 -60 102 |
|
| KKRC095 Kwakyekrom 0.0 9.0 9.0 0.54 and 13.0 14.0 1.0 0.48 and 21.0 22.0 1.0 0.27 and 119.0 120.0 1.0 0.60 |
528771 634927 128 298 -60 168 |
|
| KKRC096 Kwakyekrom 34.0 36.0 2.0 0.23 and 40.0 41.0 1.0 1.26 |
528816 634982 117 298 -60 180 |
|
| KKRC097B Kwakyekrom 0.0 1.0 1.0 0.22 and 17.0 19.0 2.0 0.28 and 38.0 40.0 2.0 0.20 and 62.0 63.0 1.0 0.21 |
528779 634878 116 298 -60 78 |
|
| KKRC098 Kwakyekrom 15.0 16.0 1.0 0.91 and 25.0 40.0 15.0 0.60 including 33.0 37.0 4.0 1.65 and 87.0 88.0 1.0 0.49 and 136.0 154.0 18.0 0.39 including 137.0 142.0 5.0 0.89 and 214.0 215.0 1.0 6.41 |
528890 635212 101 298 -60 220 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
K K K K |
|---|---|---|
| KKRC099 Kwakyekrom 19.0 25.0 6.0 0.68 and 30.0 31.0 1.0 0.31 and 35.0 36.0 1.0 1.08 and 112.0 134.0 22.0 1.08 including 126.0 133.0 7.0 2.78 and 170.0 171.0 1.0 0.21 and 182.0 183.0 1.0 0.20 and 191.0 225.0 34.0 0.23 and 234.0 236.0 2.0 0.29 and 239.0 240.0 1.0 0.33 |
528934 635195 104 298 -60 240 |
|
| KKRC100 Kwakyekrom 8.0 19.0 11.0 1.39 and 23.0 24.0 1.0 0.46 and 109.0 114.0 5.0 0.97 and 117.0 118.0 1.0 0.35 and 126.0 127.0 1.0 0.20 and 136.0 138.0 2.0 0.37 and 150.0 153.0 3.0 0.44 and 176.0 177.0 1.0 0.44 |
528748 634846 126 298 -60 226 |
|
| KKRC101 Kwakyekrom 16.0 17.0 1.0 0.20 and 36.0 37.0 1.0 0.33 and 43.0 45.0 2.0 0.40 and 63.0 64.0 1.0 0.38 and 73.0 75.0 2.0 0.20 and 108.0 112.0 4.0 0.79 and 116.0 117.0 1.0 0.32 and 136.0 140.0 4.0 0.84 and 180.0 181.0 1.0 1.62 and 186.0 187.0 1.0 1.69 |
528521 634486 102 298 -60 192 |
|
| KKRC102 Kwakyekrom 25.0 35.0 10.0 0.42 and 60.0 80.0 20.0 0.29 and 108.0 109.0 1.0 0.24 |
528458 634419 115 298 -60 114 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
K K K K K K |
|---|---|---|
| KKRC103 Kwakyekrom 33.0 36.0 3.0 0.72 and 39.0 40.0 1.0 0.27 and 50.0 51.0 1.0 0.25 and 59.0 60.0 1.0 0.60 and 68.0 74.0 6.0 0.19 and 78.0 83.0 5.0 0.20 and 94.0 99.0 5.0 0.55 and 102.0 103.0 1.0 0.22 and 109.0 110.0 1.0 0.24 and 125.0 126.0 1.0 0.46 |
528430 634374 121 298 -60 132 |
|
| KKRC104 Kwakyekrom 30.0 31.0 1.0 0.65 and 42.0 47.0 5.0 0.40 and 51.0 52.0 1.0 0.35 and 55.0 58.0 3.0 0.90 and 67.0 85.0 18.0 0.35 and 91.0 113.0 22.0 0.34 |
528415 634306 130 298 -60 150 |
|
| KKRC105 Kwakyekrom 43.0 45.0 2.0 0.32 |
528387 634272 137 298 -60 150 |
|
| KKRC106 Kwakyekrom 40.0 52.0 12.0 0.24 |
528353 634248 147 298 -60 132 |
|
| KKRC107 Kwakyekrom 53.0 54.0 1.0 2.46 and 62.0 68.0 6.0 0.85 and 87.0 89.0 2.0 0.29 and 92.0 94.0 2.0 0.31 |
528390 634223 148 298 -60 180 |
|
| KKRC108 Kwakyekrom 1.0 10.0 9.0 0.43 and 50.0 52.0 2.0 0.39 and 74.0 80.0 6.0 0.37 |
528786 635064 127 298 -60 114 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| KJRC025 Kojina Hill 12.0 14.0 2.0 0.40 and 24.0 26.0 2.0 0.20 and 31.0 32.0 1.0 3.53 and 44.0 45.0 1.0 0.34 and 51.0 53.0 2.0 0.26 and 79.0 80.0 1.0 0.29 and 96.0 97.0 1.0 0.22 |
529138 637394 98 120 -55 100 |
| KJRC026 Kojina Hill 25.0 26.0 1.0 0.32 and 60.0 62.0 2.0 0.33 and 69.0 106.0 37.0 0.67 including 70.0 90.0 20.0 1.05 |
528814 637355 105 120 -55 130 |
| KJRC027 Kojina Hill 87.0 89.0 2.0 0.25 |
528806 637083 186 120 -55 180 |
| KJRC028 Kojina Hill 15.0 17.0 2.0 0.23 and 44.0 46.0 2.0 0.46 and 72.0 77.0 5.0 0.34 |
528833 636835 173 120 -55 150 |
| KJRC029 Kojina Hill 12.0 14.0 2.0 0.53 and 75.0 76.0 1.0 0.30 |
528579 636781 118 120 -55 132 |
| KJRC030 Kojina Hill 1.0 8.0 7.0 0.45 and 15.0 26.0 11.0 0.29 and 45.0 49.0 4.0 0.57 and 57.0 59.0 2.0 0.44 and 82.0 83.0 1.0 1.04 |
528475 636835 126 120 -55 108 |
| KJRC031 Kojina Hill 0.0 1.0 1.0 0.20 and 5.0 7.0 2.0 6.80 and 9.0 10.0 1.0 0.29 and 14.0 16.0 2.0 0.22 and 32.0 33.0 1.0 0.27 and 50.0 58.0 8.0 0.69 and 64.0 68.0 4.0 0.41 and 102.0 103.0 1.0 0.22 and 115.0 136.0 21.0 0.49 |
528423 636863 117 120 -55 144 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KJRC032 Kojina Hill 24.0 25.0 1.0 0.38 and 45.0 49.0 4.0 0.46 and 83.0 94.0 11.0 0.48 and 96.0 97.0 1.0 0.20 and 100.0 110.0 10.0 0.69 |
528853 637334 108 120 -60 110 |
| KJRC033 Kojina Hill 36.0 37.0 1.0 0.45 and 49.0 52.0 3.0 0.21 and 59.0 60.0 1.0 0.20 and 70.0 74.0 4.0 0.91 and 93.0 102.0 9.0 0.41 and 124.0 126.0 2.0 0.75 and 126.0 127.0 1.0 183.86 and 127.0 134.0 7.0 1.08 and 138.0 148.0 10.0 0.57 |
528780 637345 110 120 -60 162 |
| KJRC034 Kojina Hill 0.0 13.0 13.0 3.06 including 2.0 5.0 3.0 8.09 including 9.0 12.0 3.0 4.59 and 27.0 30.0 3.0 0.29 and 116.0 117.0 1.0 1.10 |
528810 637223 150 300 -60 150 |
| KJRC035 Kojina Hill 12.0 18.0 6.0 0.55 and 41.0 47.0 6.0 0.52 and 56.0 67.0 11.0 0.42 including 61.0 63.0 2.0 1.53 and 70.0 71.0 1.0 0.67 and 74.0 75.0 1.0 0.20 and 80.0 83.0 3.0 0.63 and 106.0 114.0 8.0 0.58 and 121.0 122.0 1.0 0.23 and 140.0 141.0 1.0 0.69 |
528862 637264 139 300 -60 144 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2024 - 2026 Drill Results
==> picture [177 x 32] intentionally omitted <==
Table accompanies news release dated April 8, 2026
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KJRC036 Kojina Hill 0.0 14.0 14.0 0.58 and 24.0 43.0 19.0 0.43 and 100.0 102.0 2.0 0.31 |
528823 637288 140 300 -60 102 |
| KJRC037 Kojina Hill 13.0 16.0 3.0 0.21 and 20.0 49.0 29.0 0.57 including 21.0 27.0 6.0 1.29 and 84.0 86.0 2.0 0.68 |
528841 637253 143 300 -60 108 |
| KJRC038 Kojina Hill 181.0 184.0 3.0 0.47 |
528765 637392 99 120 -60 194 |
-
Intervals reported are hole lengths with true width estimated to be 65 - 85%.
-
Length-weighted averages from uncut assays.
-
All drilling completed by independent contractor.
-
All drilling samples sealed on site and delivered directly to independent lab Intertek Mineral Limited located in Tarkwa, Ghana for preparation and 50g Fire Assay with AAS finish.
-
QA/QC procedures include industry standard inclusion of standards, blanks, and duplicates in all sample batches.
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com