Newcore Gold Capital/Financing Update 2022

Dec 15, 2022

46558_rns_2022-12-15_0dcfcb8d-8c8b-4295-b2aa-8ee14f705319.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

NEWS RELEASE

==> picture [281 x 46] intentionally omitted <==

Newcore Gold Provides an Update on Work Programs and Exploration Activities Underway at the Enchi Gold Project, Ghana

Mineral Resource Update to be Released in January 2023; Trenching Proving Out the Potential for Discovery and Future Resource Growth Across the Project

December 15, 2022

TSX-V: NCAU, OTCQX: NCAUF

Vancouver, BC – Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU, OTCQX: NCAUF) is pleased to provide an update on work programs and exploration activities underway at the Company’s 100% owned Enchi Gold Project ("Enchi" or the "Project") in Ghana. Current activities focused on de-risking and advancement of the Project include:

  • (i) Completion of an updated Mineral Resource Estimate to be released in January 2023;

  • (ii) Diamond drilling underway at the Nyam Gold Deposit at Enchi, following up on highgrade results from prior drilling of the upper sulphide mineralization;

  • (iii) Trenching on several kilometre-scale gold anomalies to continue to advance early-stage targets across the Project towards the drill testing stage;

  • (iv) Continued metallurgical testwork, including testing of sulphide mineralization;

  • (v) Completion of an updated environmental and social baseline study in H1 2023.

Highlights from Work Programs and Exploration Underway at Enchi

  • Mineral Resource Update Underway with Completion in January 2023, incorporating results from a portion of the 90,000 metre drill program completed in mid-2022. From this drilling approximately 20,000 metres was included in the 2021 Mineral Resource Estimate; approximately 40,000 metres was focused on resource expansion and is anticipated to be included in the update; the remaining metres focused on earlier stage targets that highlight the future resource growth potential at Enchi and will be incorporated into future mineral resource updates. Completion of an updated Mineral Resource Estimate is scheduled for January 2023 as the Company’s resource consultant completes incorporation of all new drilling data and recently completed drone topographic surveys. It is anticipated that incorporating the recently completed drone survey will upgrade a portion of the Mineral Resource Estimate into the Indicated category, further de-risking the Project.

  • Newcore is funded to complete the current work program at Enchi (commenced October 2022) with $5 million in cash and short-term investments at the end of Q3 2022.

  • Drilling Underway Targeting High-Grade Potential at Enchi. Diamond drilling underway at the Nyam Gold Deposit is following-up on high-grade mineralization identified in the upper portions of the sulphide mineralization, continuing to define the potential for high-grade underground mineralization at Enchi. Results anticipated Q1 2023.

  • Trenching Intersected Mineralization at Early-Stage Targets, providing additional drill targets for discovery. First pass trenching of kilometre-scale gold-in-soil anomalies encountered strong results in oxidized mineralization with 0.73 grams per tonne gold ("g/t Au") over 22.0 metres ("m") at the Nkwanta Target and 0.65 g/t Au over 24.0 m at the Agyeikrom Target.

  • Metallurgical Testwork and Updated Baseline Environmental and Social Study underway as part of broader activities at Enchi designed to continue to advance and de-risk the Project.

Suite 1560 - 200 Burrard Street Vancouver, British Columbia V6C 3L6

www.newcoregold.com [email protected]

Luke Alexander, President and CEO of Newcore stated, "We continue to be active on numerous fronts advancing and de-risking the Enchi Gold Project. An updated Mineral Resource Estimate, incorporating the significant amount of drilling completed in 2021 and 2022, is targeted for completion in January 2023. We are also thrilled to be back drilling at Enchi with the first phase of this drill program targeting the higher-grade potential of the sulphide mineralization that we first encountered in 2021. Testing the high-grade and depth potential of the sulphide mineralization is a priority as part of defining the potential for gold mineralization at Enchi on the same scale and magnitude as the significant gold deposits along the Sefwi-Bibiani gold belt."

Greg Smith, VP Exploration of Newcore stated, "The extensive trenching program completed in 2021 and 2022 has defined multiple gold mineralized structures in a series of kilometrescale gold-in-soil anomalies. This sets the stage for future first pass drilling on additional early stage targets at Enchi with an objective of proving out the potential for additional new discoveries across the Project. Simultaneously additional work underway, consisting of further metallurgical testing, a baseline environmental study and a drone topographic survey, are important steps in continuing to de-risk and advance the Project for future economic studies."

Mineral Resource Update to be Completed January 2023

An updated Mineral Resource Estimate is underway, incorporating results from the 90,000 metre drill program completed in mid-2022. Of the 92,583 metres of drilling completed in 2021 and 2022, the current Mineral Resource Estimate (completed June 2021) incorporated only 20,195 metres of drilling. Of the remaining 72,388 metres the Company anticipates that approximately 40,000 metres will be additive to the resource at Enchi given those metres focused on testing existing deposit areas along strike and at depth. The remaining metres targeted earlier stage targets highlighting the potential for future resource growth at Enchi as Newcore continues to prove out the multi-million-ounce potential of the 216 km[2] district scale property. Completion of the updated Mineral Resource Estimate is scheduled for January 2023 as the Company’s consultant completes incorporation of all new drilling data and recently completed drone topographic surveys. It is anticipated that incorporating the recently completed drone survey will upgrade a portion of the Mineral Resource Estimate into the Indicated category, further de-risking the Project.

Diamond Drilling Targeting High-Grade Sulphide Mineralization

Diamond drilling is underway testing the Nyam Gold Deposit at Enchi, following-up on highgrade intercepts intersected in the upper portions of the sulphide mineralization. A series of holes are planned to test the down dip and lateral extensions to the high-grade gold mineralization. To date, the deposit has only been tested to a maximum vertical depth of 300 metres and remains open to depth.

Table 1 - Enchi Gold Project High Grade Drill Highlights

Hole ID Zone/Deposit From(m) To(m) Length(m) Au(g/t)
NBRC045 Nyam 179.0 219.0 40.0 1.57
including 185.0 194.0 9.0 5.40
NBDD048 Nyam 236.0 249.0 13.0 4.51
including 237.5 245.2 7.7 7.40

==> picture [100 x 19] intentionally omitted <==

  • 2 -
Hole ID Zone/Deposit From(m) To(m) Length(m) Au(g/t)
NBRC047 Nyam 222.0 247.0 25.0 1.94
including 227.0 234.0 7.0 5.78
NBDD052 Nyam 321.0 336.0 15.0 3.21
including 322.0 330.0 8.0 5.57
NBRC073 Nyam 74.0 131.0 57.0 0.78
including 94.0 103.0 9.0 1.34
NBRC092 Nyam 38.0 62.0 24.0 1.79
including 51.0 55.0 4.0 4.14

Notes:

  1. See detailed table for complete results

  2. Intervals reported are hole lengths with true width estimated to be 75 - 85%

  3. Length-weighted averages from uncut assays

A long section showing deeper drill results at Nyam can be viewed at:

https://newcoregold.com/site/assets/files/5784/2022_09-ncau-longsection-nyam-l.pdf

This is the first priority area to be drilled as part of the planned 5,000 metres of drilling announced September 8, 2022 which will include both diamond and Reverse Circulation ("RC") drilling. Diamond drilling will focus on continuing to define the higher-grade sulphide mineralization at depth with a goal of delineating the potential for high-grade underground resources at Enchi. RC drilling will target near-surface oxide and shallow sulphide mineralization with a goal of outlining additional resource growth along strike and depth at all deposit areas as well as at new discoveries made as part of the 90,000 metre drill program completed mid-2022.

Trenching on Several Kilometre-Scale Gold-in-Soil Anomalies

Exploration work at Enchi includes trenching to continue to define the near-surface, multimillion-ounce potential of the Project. Trenching completed in 2021 and 2022 focused on a number of high-priority gold targets that are defined by kilometre-scale gold-in-soil anomalies located across the 216 km[2] Project. Trenching intersected high-priority gold mineralization with similar grades and widths to prior trench results associated with the current resource zones. Since 2021, Newcore has completed 62 trenches total 11,037 metres with a total of 49 trenches encountering gold bearing structures of which 37 encountered multiple gold mineralized zones. This exploration work continues to define additional drill targets which will be prioritized for further exploration work.

Table 2 - Enchi Gold Project Trenching Results Highlights

Hole ID Zone From (m) To (m) Length (m) Au (g/t)
KJTR008B Kojina Hill 240.0 246.0 6.0 4.59
KJCH004 Kojina Hill 0.0 9.0 9.0 2.01
KJTR001 Kojina Hill 48.0 78.0 30.0 0.58
NKTR0013A Nkwanta 38.0 60.0 22.0 0.73
including 46.0 52.0 6.0 2.45
AGTR002B Agyeikrom 98.0 122.0 24.0 0.65

==> picture [100 x 19] intentionally omitted <==

  • 3 -
Hole ID Zone From (m) To (m) Length (m) Au (g/t)
KKSTR003 Kwakyekrom 174.0 182.0 8.0 1.90
KJTR002 Kojina Hill 106.0 110.0 4.0 1.04
and 234.0 276.0 42.0 0.24
and 308.0 326.0 18.0 0.71
KKSTR001 Kwakyekrom 82.0 126.0 44.0 0.25
AGTR005 Agyeikrom 174.0 202.0 28.0 0.36
NKTR0014 Nkwanta 80.0 136.0 56.0 0.14
NKTR010 Nkwanta 48.0 66.0 18.0 0.37
KJTR005 Kojina Hill 76.0 100.0 24.0 0.26
NKTR026 Nkwanta 108.0 118.0 10.0 0.58
AGTR004 Agyeikrom 98.0 108.0 10.0 0.51
NKTR003 Nkwanta 68.0 76.0 8.0 0.61

Notes:

  1. See detailed table for complete results

  2. Intervals reported are trench lengths with true width estimated to be 75 - 85%

  3. Length-weighted averages from uncut assays

A complete list of the results from trenching completed in 2021 and 2022 can be viewed at: https://newcoregold.com/site/assets/files/5798/2022_12-ncau-enchi-2021-2022-trench-results-l.pdf

A plan map with highlights from trenching completed in 2021 and 2022 can be viewed at: https://newcoregold.com/site/assets/files/5798/2022_12-ncau-nr-enchi-plan-map-trenching-l.pdf

A property map showing the location of deposits and targets at Enchi can be viewed at: https://newcoregold.com/site/assets/files/5784/2022_09-ncau-nr-enchi-property-target-map-l.pdf

The exploration work includes first pass trenching on the Agyeikrom Target which is located in the north-central portion of the Enchi Gold Project. The gold-in-soil anomaly at Agyeikrom extends 4.5 kms by 2.0 kms with no previous trenching or drilling completed. A total of eight trenches (1,852 m) tested 1.2 kms of strike length with results including 0.65 g/t Au over 24.0 m and a second interval of 0.20 g/t Au over 4.3 m, 0.36 g/t Au over 28.0 m and a second interval of 0.57 g/t Au over 4.0 m, 0.51 g/t Au over 10.0 m, and 0.48 g/t Au over 4.0 m.

At the Nkwanta Target trenching has defined a series of gold mineralized structures within one of the strongest gold-in-soil anomalies on the Project which stretches for 2.5 kms by 1.5 kms. A total of 30 trenches (5,610 m) tested multiple structures with results including 0.73 g/t Au over 22.0 m including 2.45 g/t Au over 6.0 m, 0.14 g/t Au over 56.0 m, 0.37 g/t Au over 18.0 m, 0.58 g/t Au over 10.0 m, 0.61 g/t Au over 8.0 m, and 0.78 g/t Au over 6.0 m.

At the Kojina Hill Target trenching consisted of 15 trenches (2,168 m) with step-out trenching of the previously drilled area extending the defined gold mineralization more than 500 metres north and south of the prior drilling. Trench KJTR008B, located 300 metres to the south of previous work intersected eight gold mineralized structures highlighted by 4.59 g/t Au over 6.0 m. Trench KJCH004, located 100 metres to the east on a subparallel structure intersected 2.01 g/t Au over 9.0 m. Trench KJTR001, located 500 metres to the south of previous work and

==> picture [100 x 19] intentionally omitted <==

  • 4 -

on the southern limited of the currently tested area, intersected multiple gold mineralized structures with results including 0.58 g/t Au over 30.0 m, 0.40 g/t Au over 12.0 m, and 0.28 g/t Au over 12.0 m. Additional trenches intercepted 0.71 g/t Au over 18.0 m, 0.24 g/t Au over 42.0 m, 0.26 g/t Au over 24.0 m, and 1.04 g/t Au over 4.0 m.

Trenching work on the southern extension of the Kwakyekrom Gold Deposit has extended the defined gold mineralization in preparation of additional drilling to be completed in 2023. The trenching consisted of a total of nine trenches (1,407 m) with results including 1.90 g/t Au over 8.0 m, 0.25 g/t Au over 44.0 m, 0.25 g/t Au over 12.0 m, 0.23 g/t Au over 6.0 m, and 0.22 g/t Au over 6.0 m.

Health, safety, and the environment are prioritized throughout the trenching process and all trenches are backfilled and reclaimed once sampling and mapping are completed.

Metallurgical Testwork

The Company continues to de-risk the Project through metallurgical testwork designed to optimize and improve the understanding of processing options available for Enchi.

Diamond drill core samples were collected and delivered to the laboratory at the University of Technology and Mining located in Tarkwa, Ghana. The metallurgical work underway is comprised of optimization column tests following-up on recent positive recoveries from a series of column tests on oxide and transitional material from the Sewum and Boin Deposits completed at Intertek laboratories. The recent tests continued to have excellent recoveries with an average gold recovery of 92.4% and showed low reagent consumptions (see news release dated October 12, 2022). The optimization tests will focus on further defining the optimal reagent level with a goal to lower potential processing costs while maintaining high recoveries.

In addition to the column testwork, a bench-scale, bulk, sample metallurgical test work program will be completed. The program will process 20 tonnes of representative mineralized material using the optimized reagent levels as determined by the results of the on-going column tests.

Sample selection is also under way for metallurgical testing of sulphide mineralization which will be initiated in 2022 and completed in 2023.

Baseline Environmental and Social Study

The Company has contracted a qualified independent engineering firm to complete an updated Baseline Environmental and Social Study building on the work completed previously in 2015. The study includes compilation of social baseline data, collection of physical environmental baseline data, engagement with relevant stakeholders, and gathering of relevant supplementary data, as well as recommendations for next steps. Specific field work will include surface water quality and use, ground water quality testing, climate, air quality and noise, geology, soil sampling and analysis, terrestrial ecological survey including flora and fauna, and aquatic biology/biodiversity assessment. The socio-economic baseline survey will include interviews with key informants, focus group discussions, general surveys, and stakeholder engagement and consultations. This is an important step in further advancing and de-risking the Enchi Gold Project towards a future production decision.

==> picture [100 x 19] intentionally omitted <==

  • 5 -

Enchi Gold Project Mineral Resource Estimate

The Enchi Gold Project hosts a pit constrained Inferred Mineral Resource of 70.4 million tonnes grading 0.62 g/t Au containing 1.41 million ounces gold (see Newcore news release dated June 8, 2021). Mineral resource estimation practices are in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice Guidelines (November 29, 2019) and follow CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014), that are incorporated by reference into National Instrument 43-101 ("NI 43-101"). The Mineral Resource Estimate was prepared by independent qualified person Todd McCracken, P. Geo. of BBA E&C Inc. The technical report, titled "Preliminary Economic Assessment for the Enchi Gold Project, Enchi, Ghana" has an effective date of June 8, 2021, and is available under the Company’s profile on SEDAR at www.sedar.com.

Enchi Drill Program

A 5,000 metre discovery and resource expansion drill program, following up on the success achieved to date from drilling at Enchi, commenced in Q4 2022. Diamond drilling will focus on continuing to define the higher-grade sulphide mineralization at depth with a goal of delineating the potential for high-grade underground resources at Enchi. RC drilling will target near-surface oxide and shallow sulphide mineralization with a goal of outlining additional resource growth along strike and depth at all deposit areas. RC drilling will also be planned to follow-up on discoveries made as part of the recently completed 90,000 metre drill program. Additional exploration work is also on-going, including metallurgical testwork and trenching of high-priority surface anomalies.

A 90,000 metre discovery and resource expansion drill program (commenced in August 2020) was completed at Enchi in Q2 2022. The program included both RC and diamond drilling and included the first deeper drilling on the Project. Newcore’s multi-pronged exploration approach delivered on the goals set out at the start of drilling: (i) successfully outlined potential resource growth along strike at all four existing deposits (Sewum, Boin, Nyam, Kwakyekrom); (ii) encountered strong results at previously drilled zones that are outside of the resource area (Kojina Hill and Eradi); (iii) drilling intersected high-grade at depth which has outlined the potential for underground resources; and (iv) identified new discoveries from successful first pass drilling on early stage kilometre-scale gold-in-soil anomalous targets (Sewum South, Tokosea). The total planned drill program consisted of 575 holes representing 92,583 metres.

Trench Locations

Table 3 - Enchi Gold Project Trench Location Details

Hole ID Target UTM East UTM North Elevation Length(m)
NKTR001 Nkwanta 526248 631596 146 390.0
NKTR002A Nkwanta 526175 632142 181 147.0
NKTR002B Nkwanta 526277 632061 133 225.5
NKTR003 Nkwanta 526435 632891 135 291.0
NKTR004 Nkwanta 525800 632411 113 181.0
NKTR005 Nkwanta 526019 632730 119 176.0
NKTR006 Nkwanta 526307 632528 111 210.4
NKTR007 Nkwanta 525503 631369 132 133.0
NKTR008 Nkwanta 525855 631868 123 308.7

==> picture [100 x 19] intentionally omitted <==

  • 6 -
Hole ID Target UTM East UTM North Elevation Length(m)
NKTR009 Nkwanta 526256 631469 154 99.0
NKTR010 Nkwanta 526395 631362 148 192.6
NKTR011 Nkwanta 526361 631586 130 77.3
NKTR012 Nkwanta 526733 634852 114 211.5
NKTR0013A Nkwanta 526054 634348 130 101.4
NKTR0013B Nkwanta 526177 634260 118 56.5
NKTR0014 Nkwanta 526275 634452 135 153.8
NKTR015 Nkwanta 525892 634235 102 108.0
NKTR016 Nkwanta 526386 633654 125 106.4
NKTR017 Nkwanta 526212 633527 110 141.4
NKTR018A Nkwanta 525852 633300 113 52.0
NKTR018B Nkwanta 525935 633237 88 208.0
NKTR019 Nkwanta 525852 633006 95 89.0
NKTR020 Nkwanta 525838 632859 128 160.5
NKTR021 Nkwanta 525695 632691 131 134.0
NKTR022 Nkwanta 527039 635074 115 133.2
NKTR023 Nkwanta 524764 636462 159 231.0
NKTR024 Nkwanta 524705 636728 110 212.5
NKTR025 Nkwanta 524718 635983 214 389.0
NKTR026 Nkwanta 525058 635021 106 371.8
NKTR027 Nkwanta 524928 634880 105 318.5
AGTR001 Agyeikrom 531693 644706 134 549.3
AGTR002A Agyeikrom 533253 644078 142 149.0
AGTR002B Agyeikrom 533397 643983 102 198.3
AGTR003 Agyeikrom 533578 644336 124 317.6
AGTR004 Agyeikrom 534032 644376 122 159.0
AGTR005 Agyeikrom 534356 644739 128 226.0
AGTR006 Agyeikrom 532061 644683 147 202.6
ADCH001 Agyeikrom 533422 643878 114 50.0
KJTR001 Kojina Hill 528391 636864 121 306.6
KJTR002 Kojina Hill 528624 637182 127 502.0
KJCH001 Kojina Hill 528531 636894 131 26.0
KJTR003 Kojina Hill 528733 637553 89 87.3
KJTR004 Kojina Hill 528638 637627 86 84.0
KJTR005 Kojina Hill 529088 637413 87 199.4
KJTR006A Kojina Hill 529537 638023 78 108.7
KJTR006B Kojina Hill 529649 637954 79 40.0
KJTR007 Kojina Hill 528594 637455 111 103.9
KJTR008A Kojina Hill 528502 637061 107 196.2
KJTR008B Kojina Hill 528653 636920 119 315.3
KJTR009 Kojina Hill 529324 637649 113 155.9
KJCH002 Kojina Hill 529211 637235 88 24.0
KJCH003 Kojina Hill 529201 637221 92 4.0
KJCH004 Kojina Hill 529187 637224 87 15.0
KKSTR001 Kwakyekrom
528011
634259 126 189.6
KKSTR002 Kwakyekrom
528022
633756 120 260.0
KKSTR003 Kwakyekrom
527873
633367 125 208.0

==> picture [100 x 19] intentionally omitted <==

  • 7 -
Hole ID Target UTM East UTM North Elevation Length(m)
KKSTR004 Kwakyekrom
527667
633009 115 103.0
KKSTR005 Kwakyekrom
527866
632881 110 210.8
KKSTR006 Kwakyekrom
527729
632544 119 134.0
KKSTR007A Kwakyekrom
526976
633012 112 31.0
KKSTR007B Kwakyekrom
527063
632949 111 54.6
KKSTR008 Kwakyekrom
527299
633326 98 216.0

Newcore Gold Best Practice

Newcore is committed to best practice standards for all exploration, sampling and drilling activities. Drilling was completed by an independent drilling firm using industry standard RC and Diamond Drill equipment. Analytical quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into the sample strings. Samples are placed in sealed bags and shipped directly to Intertek Labs located in Tarkwa, Ghana for 50 gram gold fire assay.

Qualified Person

Mr. Gregory Smith, P. Geo, Vice President of Exploration at Newcore, is a Qualified Person as defined by NI 43-101, and has reviewed and approved the technical data and information contained in this news release. Mr. Smith has verified the technical and scientific data disclosed herein and has conducted appropriate verification on the underlying data including confirmation of the drillhole data files against the original drillhole logs and assay certificates.

About Newcore Gold Ltd.

Newcore Gold is advancing its Enchi Gold Project located in Ghana, Africa’s largest gold producer[ (1)] . The Project currently hosts an Inferred Mineral Resource of 1.41 million ounces of gold at 0.62 g/t[ (2)] . Newcore Gold offers investors a unique combination of top-tier leadership, who are aligned with shareholders through their 24% equity ownership, and prime district scale exploration opportunities. Enchi’s 216 km[2] land package covers 40 kilometres of Ghana’s prolific Bibiani Shear Zone, a gold belt which hosts several 5 million-ounce gold deposits, including the Chirano mine 50 kilometers to the north. Newcore’s vision is to build a responsive, creative and powerful gold enterprise that maximizes returns for shareholders.

On Behalf of the Board of Directors of Newcore Gold Ltd.

Luke Alexander President, CEO & Director

For further information, please contact:

Mal Karwowska | Vice President, Corporate Development and Investor Relations +1 604 484 4399

[email protected] www.newcoregold.com

==> picture [100 x 19] intentionally omitted <==

  • 8 -

  • (1) Source: Production volumes for 2021 as sourced from the World Gold Council

  • (2) Notes for Inferred Mineral Resource Estimate:

  • CIM definition standards were followed for the resource estimate.

  • The 2021 resource models used ordinary kriging (OK) grade estimation within a three-dimensional block model with mineralized zones defined by wireframed solids and constrained by pits shell for Sewum, Boin and Nyam. Kwakyekrom used Inverse Distance squared (ID2).

  • A base cut-off grade of 0.2 g/t Au was used with a capping of gold grades varied by deposit and zone.

  • A US$1,650/ounce gold price, open pit with heap leach operation was used to determine the cut-off grade of 0.2 g/t Au. Mining costs of US$1.40 for oxides, US$2.10 for transition, and US$2.60 for fresh rock per mined tonne and G&A and milling costs of US$6.83/milled tonne. The Inferred Mineral Resource Estimate is pit constrained.

  • Metallurgical recoveries have been applied to four individual deposits and in each case three material types (oxide, transition, and fresh rock) with average recoveries of 77% for Sewum, 79% for Boin, 60% for Nyam and 72% for Kwakyekrom.

  • A density of 2.20 g/cm[3] for oxide, 2.45 g/cm[3] for transition, and 2.70 g/cm[3] for fresh rock was applied.

  • Optimization pit slope angles varied based on the rock types.

  • Mineral Resources that are not mineral reserves do not have economic viability. Numbers may not add due to rounding.

  • These numbers are from the technical report titled "Preliminary Economic Assessment for the Enchi Gold Project, Enchi, Ghana", with an effective date of June 8, 2021, prepared for Newcore Gold by BBA E&C Inc. in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects and is available under Newcore’s SEDAR profile at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release includes statements that contain "forward-looking information" within the meaning of the applicable Canadian securities legislation ("forward-looking statements"). All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussion with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always using phrases such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. In this news release, forward-looking statements relate, among other things, to: statements about the estimation of mineral resources; results of our drill campaign, results of our exploration work including trench results, results of metallurgical testwork, magnitude or quality of mineral deposits; anticipated advancement of mineral properties or programs; and future exploration prospects.

These forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business. The assumptions underlying the forward-looking statements are based on information currently available to Newcore. Although the forward-looking statements contained in this news release are based upon what management of Newcore believes, or believed at the time, to be reasonable assumptions, Newcore cannot assure its shareholders that actual results will be consistent with such forward-looking statements, as there may be other factors that cause results not to be as anticipated, estimated or intended. Forwardlooking information also involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others: risks related to the speculative nature of the Company’s business; the Company’s formative stage of development; the Company’s financial position; possible

==> picture [100 x 19] intentionally omitted <==

  • 9 -

variations in mineralization, grade or recovery rates; actual results of current exploration activities; fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of gold and other commodities; fluctuations in currency markets (such as the Canadian dollar to United States dollar exchange rate); change in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, unusual or unexpected geological formations); the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); and title to properties.

Forward-looking statements contained herein are made as of the date of this news release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.

==> picture [100 x 19] intentionally omitted <==

  • 10 -

==> picture [540 x 720] intentionally omitted <==

----- Start of picture text -----

AGTR005: 28m at 0.36 g/t Au &
AGTR006: 6m at
4m at 0.57 g/t Au
0.38 g/t Au
AGTR002A: 4m at
0.48 g/t Au AGTR004: 10m at
0.51 g/t Au
AGYEIKROM
AGTR002B: 24m at
0.65 g/t Au
KOJINA HILL NYAM
KJTR005: 24m at 0.26 g/t Au
KJCH004: 9m at 2.01 g/t Au
KJTR002: 18m at 0.71 g/t Au &
42m at 0.24 g/t Au &
4m at 1.04 g/t Au
KJTR008B: 6m at 4.59 g/t Au
KJTR001: 30m at 0.58 g/t Au &
12m at 0.40 g/t Au &
12m at 0.28 g/t Au
NKTR026: 10m at NKTR014: 56m at 0.14 g/t Au
& 12m at 0.22 g/t Au
0.58 g/t Au
KWAKYEKROM
NKTR0013A: 22m at 0.73 g/t Au
incl. 6m at 2.45 g/t Au KKSTR001: 44m at 0.25 g/t Au Legend
NKTR0013B: 6m at 0.78 g/t Au
Trench
KKSTR008: 12m at 0.25 g/t Au Completed in 2021 - 2022
KKSTR003: 8m at 1.90 g/t Au
NKWANTA
Trench Highlight
NKTR003: 8m at 0.61 g/t Au
NKTR008: 18m at 0.16 g/t Au
NKTR002B: 6m at 0.66 g/t Au 5 km
NKTR001: 10m at 0.27 g/t Au & 2m at 0.94 g/t Au
NKTR007: 2m at 1.01 g/t Au
NKTR010: 18m at
TOKOSEA 0.37 g/t Au
2021-2022 Trench Program | Enchi Gold Project
Ghana (As of December 2022)
----- End of picture text -----

Newcore Gold Ltd. | Enchi Gold Project 2021 & 2022 Trenching Results

==> picture [177 x 33] intentionally omitted <==

Table accompanies news release dated December 15, 2022

Trenching Results Released December 15, 2022

Trench ID
Target
From (m)
To (m)
Length (m)
Au (g/t)
UTM
East
UTM
North
Elevation
Trench
Length (m)
AGTR001
Agyeikrom
304.0
306.0
2.0
0.27
and
362.0
365.0
3.0
0.19
531693
644706
134
549.3
AGTR002A
Agyeikrom
26.0
30.0
4.0
0.48
and
38.0
40.0
2.0
0.13
and
84.0
88.0
4.0
0.28
and
102.0
104.0
2.0
0.26
533253
644078
142
149.0
AGTR002B
Agyeikrom
28.0
32.0
4.0
0.19
and
98.0
122.0
24.0
0.65
and
140.0
142.0
2.0
0.11
and
146.0
150.0
4.0
0.18
and
162.0
164.0
2.0
0.16
and
194.0
198.3
4.3
0.20
533397
643983
102
198.3
AGTR003
Agyeikrom
4.0
6.0
2.0
0.18
and
14.0
18.0
4.0
0.29
and
112.0
114.0
2.0
0.86
and
182.0
184.0
2.0
0.64
and
214.0
216.0
2.0
0.35
and
220.0
222.0
2.0
0.17
and
236.0
238.0
2.0
0.11
533578
644336
124
317.6
AGTR004
Agyeikrom
98.0
108.0
10.0
0.51
534032
644376
122
159.0
AGTR005
Agyeikrom
40.0
42.0
2.0
0.16
and
50.0
52.0
2.0
0.29
and
104.0
106.0
2.0
0.75
and
116.0
122.0
6.0
0.25
and
128.0
132.0
4.0
0.57
and
154.0
156.0
2.0
0.34
and
174.0
202.0
28.0
0.36
534356
644739
128
226.0

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com

Newcore Gold Ltd. | Enchi Gold Project

2021 & 2022 Trenching Results

==> picture [177 x 33] intentionally omitted <==

Table accompanies news release dated December 15, 2022

Trench ID
Target
From (m)
To (m)
Length (m)
Au (g/t)
UTM
East
UTM
North
Elevation
Trench
Length (m)
AGTR006
Agyeikrom
2.0
8.0
6.0
0.38
532061
644683
147
202.6
ADCH001
Agyeikrom
18.0
22.0
4.0
0.15
and
26.0
28.0
2.0
0.21
533422
643878
114
50.0
KJCH001
Kojina Hill
2.0
24.0
22.0
0.13
528531
636894
131
26.0
KJCH002
Kojina Hill
no significant results
529211
637235
88
24.0
KJCH003
Kojina Hill
no significant results
529201
637221
92
4.0
KJCH004
Kojina Hill
0.0
9.0
9.0
2.01
529187
637224
87
15.0
KJTR001
Kojina Hill
48.0
78.0
30.0
0.58
and
92.0
98.0
6.0
0.27
and
110.0
122.0
12.0
0.40
and
126.0
128.0
2.0
0.11
and
134.0
136.0
2.0
0.11
and
166.0
170.0
4.0
0.12
and
178.0
180.0
2.0
0.14
and
188.0
190.0
2.0
0.12
and
192.0
194.0
2.0
0.11
and
212.0
216.0
4.0
0.15
and
222.0
234.0
12.0
0.28
and
254.0
256.0
2.0
0.11
and
276.0
278.0
2.0
0.29
528391
636864
121
306.6

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com

Newcore Gold Ltd. | Enchi Gold Project 2021 & 2022 Trenching Results

==> picture [177 x 33] intentionally omitted <==

Table accompanies news release dated December 15, 2022

Trench ID
Target
From (m)
To (m)
Length (m)
Au (g/t)
UTM
East
Trench
Length (m)
UTM
North
Elevation
KJTR002
Kojina Hill
10.0
22.0
12.0
0.11
and
84.0
86.0
2.0
0.37
and
92.0
94.0
2.0
0.15
and
106.0
110.0
4.0
1.04
and
132.0
136.0
4.0
0.25
and
234.0
276.0
42.0
0.24
and
308.0
326.0
18.0
0.71
and
470.0
472.0
2.0
0.12
and
482.0
484.0
2.0
0.11
and
500.0
502.0
2.0
0.11
528624
637182
127
502.0
KJTR003
Kojina Hill
no significant results
528733
637553
89
87.3
KJTR004
Kojina Hill
48.0
50.0
2.0
0.16
528638
637627
86
84.0
KJTR005
Kojina Hill
66.0
68.0
2.0
0.62
and
76.0
100.0
24.0
0.26
and
124.0
126.0
2.0
0.81
and
182.0
184.0
2.0
0.19
529088
637413
87
199.4
KJTR006A
Kojina Hill
no significant results
529537
638023
78
108.7
KJTR006B
Kojina Hill
no significant results
529649
637954
79
40.0
KJTR007
Kojina Hill
70.6
72.0
1.4
0.18
528594
637455
111
103.9
KJTR008A
Kojina Hill
42.0
50.0
8.0
0.21
and
116.0
118.0
2.0
0.42
528502
637061
107
196.2
KJTR008B
Kojina Hill
60.0
62.0
2.0
0.16
and
68.0
70.0
2.0
0.33
and
102.0
104.0
2.0
0.40
and
150.0
154.0
4.0
0.12
and
222.0
224.0
2.0
0.11
and
240.0
246.0
6.0
4.59
and
254.0
256.0
2.0
0.18
and
298.0
306.0
8.0
0.14
528653
636920
119
315.3

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com

Newcore Gold Ltd. | Enchi Gold Project 2021 & 2022 Trenching Results

==> picture [177 x 33] intentionally omitted <==

Table accompanies news release dated December 15, 2022

Trench ID
Target
From (m)
To (m)
Length (m)
Au (g/t)
UTM
East
UTM
North
Elevation
Trench
Length (m)
KJTR009
Kojina Hill
136.0
140.0
4.0
0.12
529324
637649
113
155.9
KKSTR001
Kwakyekrom
64.0
66.0
2.0
0.14
and
82.0
126.0
44.0
0.25
and
140.0
142.0
2.0
0.24
and
146.0
152.0
6.0
0.23
and
160.0
162.0
2.0
0.11
528011
634259
126
189.6
KKSTR002
Kwakyekrom
14.0
16.0
2.0
0.20
and
170.0
172.0
2.0
0.12
and
198.0
200.0
2.0
0.64
and
206.0
208.0
2.0
0.13
528022
633756
120
260.0
KKSTR003
Kwakyekrom
18.0
20.0
2.0
0.20
and
112.0
114.0
2.0
0.63
and
122.0
124.0
2.0
0.24
and
174.0
182.0
8.0
1.90
527873
633367
125
208.0
KKSTR004
Kwakyekrom
52.0
58.0
6.0
0.22
527667
633009
115
103.0
KKSTR005
Kwakyekrom
no significant results
527866
632881
110
210.8
KKSTR006
Kwakyekrom
62.0
64.0
2.0
0.52
and
98.0
100.0
2.0
0.11
527729
632544
119
134.0
KKSTR007A
Kwakyekrom
18.0
20.0
2.0
0.31
526976
633012
112
31.0
KKSTR007B
Kwakyekrom
no significant results
527063
632949
111
54.6
KKSTR008
Kwakyekrom
170.0
182.0
12.0
0.25
527299
633326
98
216.0
NKTR001
Nkwanta
2.0
4.0
2.0
0.18
and
132.0
142.0
10.0
0.27
and
144.0
152.0
8.0
0.10
and
158.0
160.0
2.0
0.14
526248
631596
146
390.0
NKTR002A
Nkwanta
46.0
48.0
2.0
0.19
and
62.0
64.0
2.0
0.14
and
132.0
134.0
2.0
0.15
526175
632142
181
147.0

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com

Newcore Gold Ltd. | Enchi Gold Project 2021 & 2022 Trenching Results

==> picture [177 x 33] intentionally omitted <==

Table accompanies news release dated December 15, 2022

Au (g/t)
From (m)
To (m)
Length (m)
Trench ID
Target
UTM
East
UTM
North
Elevation
Trench
Length (m)
NKTR002B
Nkwanta
100.0
102.0
2.0
0.11
and
140.0
146.0
6.0
0.66
and
160.0
162.0
2.0
0.94
526277
632061
133
225.5
NKTR003
Nkwanta
6.0
8.0
2.0
0.31
and
28.0
30.0
2.0
0.32
and
68.0
76.0
8.0
0.61
and
98.0
100.0
2.0
0.21
and
106.0
108.0
2.0
0.39
and
222.0
224.0
2.0
0.36
and
280.0
282.0
2.0
0.25
526435
632891
135
291.0
NKTR004
Nkwanta
no significant results
525800
632411
113
181.0
NKTR005
Nkwanta
152.0
154.0
2.0
0.46
526019
632730
119
176.0
NKTR006
Nkwanta
162.0
164.0
2.0
0.11
and
194.0
198.0
4.0
0.27
526307
632528
111
210.4
NKTR007
Nkwanta
112.0
114.0
2.0
0.36
and
128.0
130.0
2.0
1.01
525503
631369
132
133.0
NKTR008
Nkwanta
16.0
18.0
2.0
0.14
and
48.0
50.0
2.0
0.19
and
138.0
140.0
2.0
0.16
and
148.0
166.0
18.0
0.16
525855
631868
123
308.7
NKTR009
Nkwanta
6.0
12.0
6.0
0.12
and
52.0
54.0
2.0
0.19
and
94.0
96.0
2.0
0.22
526256
631469
154
99.0

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com

Newcore Gold Ltd. | Enchi Gold Project 2021 & 2022 Trenching Results

==> picture [177 x 33] intentionally omitted <==

Table accompanies news release dated December 15, 2022

Trench ID
Target
From (m)
To (m)
Length (m)
Au (g/t)
UTM
East
UTM
North
Elevation
Trench
Length (m)
NKTR010
Nkwanta
32.0
34.0
2.0
0.12
and
48.0
66.0
18.0
0.37
and
78.0
80.0
2.0
0.15
and
104.0
108.0
4.0
0.18
and
116.0
118.0
2.0
0.13
and
122.0
124.0
2.0
0.14
and
140.0
144.0
4.0
0.16
526395
631362
148
192.6
NKTR011
Nkwanta
2.0
4.0
2.0
0.11
and
14.0
16.0
2.0
0.12
and
44.0
46.0
2.0
0.12
and
50.0
52.0
2.0
0.41
526361
631586
130
77.3
NKTR012
Nkwanta
96.0
98.0
2.0
0.19
and
102.0
104.0
2.0
0.48
and
164.0
166.0
2.0
0.15
526733
634852
114
211.5
NKTR0013A
Nkwanta
2.0
8.0
6.0
0.48
and
38.0
60.0
22.0
0.73
including
46.0
52.0
6.0
2.45
526054
634348
130
101.4
NKTR0013B
Nkwanta
20.0
22.0
2.0
0.73
and
36.0
38.0
2.0
0.16
and
46.0
52.0
6.0
0.78
526177
634260
118
56.5
NKTR0014
Nkwanta
0.0
12.0
12.0
0.22
and
26.0
28.0
2.0
0.11
and
80.0
136.0
56.0
0.14
and
144.0
146.0
2.0
0.11
526275
634452
135
153.8
NKTR015
Nkwanta
66.0
68.0
2.0
0.23
and
76.0
78.0
2.0
0.40
525892
634235
102
108.0
NKTR016
Nkwanta
100.0
102.0
2.0
0.14
526386
633654
125
106.4
NKTR017
Nkwanta
no significant results
526212
633527
110
141.4
NKTR018A
Nkwanta
no significant results
525852
633300
113
52.0

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com

Newcore Gold Ltd. | Enchi Gold Project 2021 & 2022 Trenching Results

==> picture [177 x 33] intentionally omitted <==

Table accompanies news release dated December 15, 2022

Au (g/t)
Trench ID
Target
From (m)
To (m)
Length (m)
UTM
East
UTM
North
Elevation
Trench
Length (m)
NKTR018B
Nkwanta
110.0
112.0
2.0
0.34
and
136.0
138.0
2.0
0.70
525935
633237
88
208.0
NKTR019
Nkwanta
no significant results
525852
633006
95
89.0
NKTR020
Nkwanta
50.0
52.0
2.0
0.20
and
58.0
62.0
4.0
0.26
and
72.0
74.0
2.0
0.40
and
106.0
108.0
2.0
0.21
525838
632859
128
160.5
NKTR021
Nkwanta
22.0
24.0
2.0
0.17
and
58.0
66.0
8.0
0.25
525695
632691
131
134.0
NKTR022
Nkwanta
6.0
8.0
2.0
0.11
and
62.0
64.0
2.0
0.15
and
92.0
94.0
2.0
0.13
527039
635074
115
133.2
NKTR023
Nkwanta
no significant results
524764
636462
159
231.0
NKTR024
Nkwanta
no significant results
524705
636728
110
212.5
NKTR025
Nkwanta
46.0
48.0
2.0
0.1
and
68.0
72.0
4.0
0.2
and
76.0
78.0
2.0
0.1
and
88.0
94.0
6.0
0.2
524718
635983
214
389.0
NKTR026
Nkwanta
68.0
70.0
2.0
0.11
and
108.0
118.0
10.0
0.58
and
192.0
194.0
2.0
0.34
and
272.0
274.0
2.0
0.38
525058
635021
106
371.8
NKTR027
Nkwanta
28.0
30.0
2.0
0.46
and
50.0
64.0
14.0
0.19
and
80.0
82.0
2.0
0.32
and
198.0
200.0
2.0
0.35
524928
634880
105
318.5
  1. Intervals reported are trench lengths with true width estimated to be 75 - 85%.

  2. Length-weighted averages from uncut assays.

  3. All trench samples sealed on site and delivered directly to independent lab Intertek Mineral Limited located in Tarkwa, Ghana for preparation and 50g Fire Assay with AAS finish.

  4. QA/QC procedures include industry standard inclusion of standards, blanks, and duplicates in all sample batches.

TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com