AI assistant
Newcore Gold — Capital/Financing Update 2022
Jul 27, 2022
46558_rns_2022-07-27_a8ac358b-0daa-4f17-8f04-5191d42f7ea9.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [281 x 46] intentionally omitted <==
NEWS RELEASE
Newcore Gold Completes 90,000 Metre Drill Program, Significantly Expanding the Mineralized Footprint at the Enchi Gold Project, Ghana
High-Grade Encountered in Sulphides at Depth, Footprint of Oxide Mineralization Expanded at all Resource Areas, Three Greenfield Discoveries Made on the Project
July 27, 2022
TSX-V: NCAU, OTCQX: NCAUF
Vancouver, BC – Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU, OTCQX: NCAUF) is pleased to announce final drill results and the completion of a successful 90,000 metre drill program at the Company’s 100% owned Enchi Gold Project ("Enchi" or the
"Project") in Ghana. Newcore’s multi-pronged exploration approach delivered on its goals:
-
(i) Successfully outlined the potential resource growth along strike at all four deposits (Sewum, Boin, Nyam, Kwakyekrom);
-
(ii) Encountered strong results at previously drilled zones outside of the resource area (Kojina Hill, Eradi);
-
(iii) Intersected high-grade gold at depth, outlining the potential to delineate underground resources; and
-
(iv) Identified new discoveries from successful first pass drilling on early-stage targets (Sewum South, Tokosea, Sewum Ext. Parallel Structure).
The largest drill program to ever be completed on the Project was successful in highlighting the district scale potential across the 216 km[2] property and the strong potential to delineate additional resources at Enchi. Results from the drill program will be incorporated into an updated Mineral Resource Estimate expected to be completed by the end of 2022. Newcore is now planning the next phase of discovery and resource expansion drilling at Enchi.
Highlights from the 2020 - 2022 Drill Program at Enchi
-
Largest drill program to ever be completed at Enchi (92,583 metres) with results highlighting the potential for significant resource growth across the Project.
-
All deposits and targets remain open along strike and at depth, with drill results highlighting the potential for resource growth in both shallow oxides and at depth.
-
Drilling intersected the highest-grade gold interval to date, outside the limits of the pit-constrained mineral resource area.
-
RC hole KBRC250 at Boin intersected 95.16 g/t Au over 2.0 m from 109 m.
-
Deepest Drilling to Date Completed on the Project, Intersected High-Grade Mineralization in the Sulphides.
-
Drilling at Nyam defined two northerly plunging high-grade zones down to a depth of 300 metres which remain open for further expansion. Results include hole NBDD048 which intersected 4.51 g/t Au over 13.0 m from 236 m.
-
Three New Discoveries from First Pass Drilling on New Structures.
-
Drilling on a parallel structure at Sewum Extension, located 200 metres east of the Sewum Deposit, intersected 1.98 g/t Au over 25.0 m from 3.0 m in hole SWRC164.
-
Shallow drilling on two of the largest untested anomalies at Enchi, Sewum South and Tokosea, showcased the potential for additional resource areas across the property.
Suite 1560 - 200 Burrard Street Vancouver, British Columbia V6C 3L6
www.newcoregold.com [email protected]
Luke Alexander, President and CEO of Newcore stated, "Since we relaunched Newcore in mid2020, we have not only retained strong alignment with shareholders through management and director’s 24% equity interest, but we have also built out a very strong institutional shareholder base that currently owns approximately 40% of the equity, we have completed two resource updates and a Preliminary Economic Assessment, and we have now also completed the largest drill program ever on the Project. Our multi-pronged exploration approach delivered on the objectives we set at the start. We outlined near surface resource expansion potential along strike at all four of our existing deposits, we achieved strong results from drilling at previously drilled areas, we encountered high-grade intercepts at depth which outlined the potential for delineating underground resources, and we made three new greenfield discoveries. We have only just scratched the surface of the gold potential at Enchi. We look forward to continuing to unlock the value of Enchi through exploration and the drill bit, with a next phase drill program currently being planned for later this summer."
Greg Smith, VP Exploration of Newcore stated, "This drill program has significantly advanced our geological understanding of the potential size and scale at Enchi. Results from this largestever drill program on the Project highlight the potential to define gold mineralization on the same scale and magnitude as the significant gold deposits along the Sefwi-Bibiani Gold Belt. The success we have had with drilling, in both oxide and sulphide mineralization, highlights the potential for Enchi to develop into a much larger project through additional exploration. We are excited to be on a path to unlocking that potential."
Final Drill Results From the 90,000 Metre Drill Program and On-Going Exploration
Final drill results from the 2020 - 2022 drill program included Reverse Circulation ("RC") drilling targeting oxide mineralization within the southern extension of the Boin Gold Deposit, as well as diamond drilling ("DD") targeting deeper mineralization at all resource areas. All holes intersected gold mineralization, with results including 1.16 grams per tonne gold ("g/t Au") over 20.0 metres ("m") from 221 m in the sulphides, including 4.92 g/t Au over 1.8 m from 221 m at Boin.
Additional exploration work is on-going, including metallurgical testwork and trenching of high-priority surface anomalies in advance of a next phase drill program anticipated to commence in late Q3 2022.
Summary of Achievements from the 2020 – 2022 Drill Program
The drill program consisted of 575 holes representing 92,583 metres. The current Mineral Resource Estimate (completed June 2021) incorporated 20,195 metres of this drilling. Select highlighted assay results from the drill program are below:
Table 1 - Enchi Gold Project Drill Highlights (2020 - 2022 Drill Program)
| Hole ID | Zone/Deposit | From (m) | To (m) | Length (m) | Au (g/t) |
|---|---|---|---|---|---|
| KBRC250 | Boin | 109.0 | 111.0 | 2.0 | 95.16 |
| KBRC276 | Boin | 113.0 | 216.0 | 103.0 | 1.00 |
| KBDD064 | Boin | 121.0 | 195.0 | 74.0 | 1.28 |
| SWRC093 | Sewum | 61.0 | 164.0 | 103.0 | 0.82 |
| KBRC141 | Boin | 48.0 | 95.0 | 47.0 | 1.67 |
==> picture [100 x 19] intentionally omitted <==
- 2 -
| Hole ID | Zone/Deposit | From (m) | To (m) | Length (m) | Au (g/t) |
|---|---|---|---|---|---|
| NBRC075 | Nyam | 0.0 | 35.0 | 35.0 | 2.04 |
| NBRC045 | Nyam | 179.0 | 219.0 | 40.0 | 1.57 |
| NBRC017 | Nyam | 8.0 | 53.0 | 45.0 | 1.38 |
| KBRC236 | Boin | 55.0 | 124.0 | 69.0 | 0.90 |
| NBDD048 | Nyam | 236.0 | 249.0 | 13.0 | 4.51 |
| KBRC185 | Boin | 137.0 | 204.0 | 67.0 | 0.85 |
| SWRC164 | Sewum Ext. | 3.0 | 28.0 | 25.0 | 1.98 |
| SWRC076 | Sewum | 104.0 | 120.0 | 16.0 | 3.04 |
| SWRC076 | Sewum | 39.0 | 88.0 | 49.0 | 0.91 |
| NBRC047 | Nyam | 222.0 | 247.0 | 25.0 | 1.94 |
| NBRC047 | Nyam | 227.0 | 234.0 | 7.0 | 5.78 |
| SWRC107 | Sewum | 4.0 | 81.0 | 77.0 | 0.63 |
| TORC045 | Tokosea | 30.0 | 57.0 | 27.0 | 1.80 |
| SWRC082 | Sewum | 36.0 | 60.0 | 24.0 | 2.02 |
| NBDD052 | Nyam | 321.0 | 336.0 | 15.0 | 3.21 |
| KJRC022 | Kojina Hill | 61.0 | 120.0 | 59.0 | 0.79 |
| KBRC159 | Boin | 178.0 | 240.0 | 62.0 | 0.73 |
| NBRC073 | Nyam | 74.0 | 131.0 | 57.0 | 0.78 |
| SWRC083 | Sewum | 86.0 | 108.0 | 22.0 | 1.97 |
| SWRC073 | Sewum | 0.0 | 28.0 | 28.0 | 1.52 |
| NBRC092 | Nyam | 38.0 | 62.0 | 24.0 | 1.79 |
| NBRC076 | Nyam | 1.0 | 51.0 | 50.0 | 0.85 |
| KKRC041 | Kwakyekrom | 0.0 | 53.0 | 53.0 | 0.79 |
Notes:
-
See detailed table for complete results
-
Intervals reported are hole lengths with true width estimated to be 75 - 85%
-
Length-weighted averages from uncut assays
Plan maps showing the drill hole locations can be viewed at:
https://newcoregold.com/site/assets/files/5776/2022_07-ncau-nr-enchi-plan-maps-l.pdf
A cross section showing drill results and highlights for hole KBDD067 and KBDD075 can be viewed at:
https://newcoregold.com/site/assets/files/5776/2022_07-ncau-crosssection-kbdd067-l.pdf
A complete list of the 2020 – 2022 drill results, including hole details, can be viewed at: https://newcoregold.com/site/assets/files/5776/2022_07-ncau-enchi-2020-2022-drill-results-l.pdf
==> picture [100 x 19] intentionally omitted <==
- 3 -
Sewum - Drilling Expanded Mineralization and Intersected New Structures
Drilling expanded the known mineralized footprint at the Sewum Gold Deposit, intersecting new structures and widespread gold mineralization. Hole SWRC093 intersected a wide zone of mineralization of 0.82 g/t Au over 103.0 m from 61 m, extending the footprint of known mineralization at Sewum to the north of the pit-constrained mineral resource area. Hole SWRC076 drilled on the edge of the pit-constrained mineral resource area intersected 3.04 g/t Au over 16.0 m from 104 m with a second zone of 0.91 g/t Au over 49.0 m from 39 m. Hole SWRC107 intersected a wide zone of oxide mineralization returning 0.63 g/t Au over 77.0 m from 4 m. Hole SWRC082 drilled on the southern extent of the pit-constrained mineral resource area intersected near surface oxide mineralization of 2.02 g/t Au over 24.0 m from 36 m.
As part of the drill program, a total of 89 holes representing 16,552 metres were drilled at Sewum. Drilling expanded the drill tested strike extent by 25% to 3.0 kms, with the current pit constrained mineral resource defined across a strike extent of 2.4 kms. Gold mineralization is open along strike and down dip.
Sewum is the largest of the four deposits which comprise the pit constrained Inferred Mineral Resource Estimate at Enchi, hosting approximately 51% of the currently defined resource (41.0 million tonnes grading 0.55 g/t Au containing 725,200 ounces). Sewum is located 15 kilometres southeast of the town of Enchi, with nearby roads and power and further access provided by a series of drill roads. Sewum is outlined on surface by a six-kilometre-long and one-to-two-kilometre-wide gold in soil anomaly. An airborne geophysical anomaly coincident with the Sewum Deposit defines a series of sub parallel and intersecting structures. To date, approximately 50% of the gold-in-soil anomaly is untested by drilling.
Boin - Drilling Intersected the Highest-Grade Gold Interval to Date
Drilling at Boin intersected the highest-grade gold interval to date on the Project with RC hole KBRC250 intersecting 95.16 g/t Au over 2.0 m from 109 m, with a second structure of 13.22 g/t Au over 1.0 m from 120 m (true widths unknown). Drilling also expanded the known mineralized footprint at Boin both to the north and south of the pit-constrained mineral resource area. Wide-spaced exploration drilling extended gold mineralization 400 metres to the north and 1.5 km to the south of the current limits of the pit constrained resource. Additional drilling encountered wide zones of gold mineralization including hole KBRC276 with 1.00 g/t Au over 103.0 m from 113 m and hole KBDD064 with 1.28 g/t Au over 74.0 m from 121 m. RC drilling expanded the near surface oxide mineralization with wide gold intercepts including hole KBRC141 intersecting 1.67 g/t Au over 47.0 m from 48 m and hole KBRC236 intersecting 0.90 g/t Au over 69.0 m from 55 m.
As part of the drill program, a total of 172 holes representing 28,274 metres were drilled at Boin. Drilling has expanded the drill tested strike extent by 50% to 4.2 kms, with the current pit constrained mineral resource defined across a strike extent of 2.8 kms. Gold mineralization is open along strike and down dip.
Boin is one of the primary deposits which comprise the pit constrained Inferred Mineral Resource Estimate at Enchi, with Boin hosting approximately 36% of the currently defined resource (21.8 million tonnes grading 0.72 g/t Au containing 504,800 ounces). Boin is located 10 kilometres south of the town of Enchi, with nearby roads and power and further access provided by a series of drill roads. Boin is outlined on surface by a greater than six-kilometrelong by up to one-kilometre-wide gold in soil anomaly. An airborne geophysical anomaly coincident with the Boin structure extends for a further two kilometres north and four
==> picture [100 x 19] intentionally omitted <==
- 4 -
kilometres south beyond the limits of current drilling. To date, approximately 50% of the goldin-soil anomaly is untested by drilling.
Nyam – Deepest Drilling Completed to Date, High-Grade Intersected in Sulphides at Depth
Drilling at the Nyam Gold Deposit included the deepest drilling completed to date on the Project, with high-grade mineralization encountered in the sulphides. Drilling has defined two northerly plunging high-grade zones down to a depth of 300 metres which remain open for further expansion. Hole NBDD052 intersected a high-grade gold mineralized structure grading 5.57 g/t Au over 8.0 m from 322 m, within a broader zone of 3.21 g/t Au over 15.0 m from 321 m. Hole NBDD048 intersected 4.51 g/t Au over 13.0 m from 236 m and hole NBRC047 intersected 1.94 g/t Au over 25.0 m from 222 m. Drilling has also expanded the near surface oxide mineralization with hole NBRC075 intersecting 2.04 g/t Au over 35.0 m from surface and hole NBRC017 intersecting 1.38 g/t Au over 45.0 m from 8 m.
As part of the drill program, a total of 104 holes representing 18,087 metres were drilled at Nyam. Drilling has expanded the drill tested strike extent by 40% to 2.0 kms, with the current pit constrained mineral resource defined across a strike extent of 1.4 kms. Gold mineralization is open along strike and down dip.
Nyam is one of the four deposits which comprise the pit constrained Inferred Mineral Resource Estimate at Enchi (4.9 million tonnes grading 0.82 g/t Au containing 129,000 ounces). Nyam is located 15 kilometres east of the town of Enchi, with nearby roads and power and further access provided by a series of drill roads. An airborne geophysical anomaly coincident with the Nyam Gold Deposit shows a complex series of linear high conductivity trends, reflective of the multiple sub-parallel gold-bearing structures. To date, approximately 30% of the gold-insoil anomaly is untested by drilling.
Kwakyekrom – Newest Resource Area at Enchi
Drilling completed as part of the 2020 – 2022 drill program led to an initial resource being defined at Kwakyekrom as part of the Mineral Resource Estimate announced in June 2021. Drilling at Kwakyekrom also included the best interval drilled to date at the zone, hole KKRC041 encountered 0.79 g/t Au over 53.0 m from surface.
As part of the drill program, a total of 70 holes representing 11,434 metres were drilled at Kwakyekrom. Drilling has expanded the drill tested strike extent by 120% to 1.1 kms, with the current pit constrained mineral resource defined across a strike extent of 500 m. Gold mineralization is open along strike and down dip.
Kwakyekrom is one of the four deposits which comprise the pit constrained Inferred Mineral Resource Estimate at Enchi (2.7 million tonnes grading 0.64 g/t Au containing 55,600 ounces), with an initial resource defined at Kwakyekrom as part of the updated Mineral Resource Estimate announced in June 2021. Kwakyekrom is located 15 kilometres southeast of the town of Enchi, with nearby roads and power and further access provided by a series of drill roads. The Kwakyekrom structure is interpreted to be an extension of the Nyam structure and is located south of Nyam. To date, approximately 40% of the gold-in-soil anomaly is untested by drilling.
==> picture [100 x 19] intentionally omitted <==
- 5 -
Sewum South, Tokosea, Sewum Ext. Parallel Zone – Three New Greenfield Discoveries
Three new discoveries were made at Enchi as a result of first pass drill testing on earlier-stage targets. Inaugural RC drilling on two of the largest anomalies identified on the property, Sewum South and Tokosea, intersected shallow oxide gold mineralization demonstrating the potential to delineate additional resource areas across the 216 km[2] property.
-
Sewum South is the largest gold-in-soil anomaly on the Project with a dimension of sixkilometres-by-two-kilometres and is located on the southern end of the property. Mineralization is interpreted to be related to several sub-parallel and intersecting structural trends defined by the geophysical signatures with similarities to the Sewum Deposit. Drilling intersected multiple gold mineralized zones, with hole SWRC130 encountering 0.95 g/t Au over 15.0 m from 25 m, including 2.31 g/t Au over 5.0 m from 25 m and a second zone of 1.50 g/t Au over 4.0 m from 14 m. As part of the 2020 - 2022 drill program, 29 holes totalling 3,120 metres were completed.
-
Tokosea a large anomalous area located in the central portion of the Enchi Gold Project and is one of the largest anomalous areas with gold-in-soil and associated geophysical anomalies. Hole TORC045 intersected multiple zones of mineralization throughout the drill hole. Near surface, the hole intersected 1.80 g/t Au over 27.0 m from 30 m, including 4.13 g/t Au over 3.0 m from 31 m, 3.41 g/t Au over 3.0 m from 38 m, and 3.76 g/t Au over 3.0 m from 47 m. Tokosea is outlined on surface by a six-kilometre-long and two-to-threekilometre-wide gold-in-soil anomaly, of which wide spaced and shallow drilling tested targets within a four-kilometre-by-two-kilometre area. As part of the 2020 - 2022 drill program, 82 holes totalling 10,238 metres were completed.
-
Sewum Ext. Parallel Zone was an undrilled target at Sewum, a series of sub-parallel structures defined by gold-in-soil and trench anomalies located approximately 200 metres east of the main Sewum structure. These new sub-parallel structures have now been tested for over 400 metres of strike length and are open to both the north and south. Hole SWRC152 tested shallow oxide mineralization and intersected 5.84 g/t Au over 6.0 m from 2 m, including 26.82 g/t Au over 1.0 m from 2 m. As part of the 2020 - 2022 drill program, 10 holes totalling 1,086 metres were completed.
As part of the drill program, a total of 121 holes representing 14,444 metres were drilled on these earlier stage targets. These targets represent new areas for longer-term potential resource growth at Enchi. All of these areas are within close proximity of the infrastructure outlined in the June 2021 Preliminary Economic Assessment.
Other Targets with No Defined Mineral Resource
- Eradi is a previously drilled target at Enchi, located on the northern end of the property, where diamond drilling in 2021 tested approximately 1.2 kilometres of strike length, with all holes intersecting gold mineralization. Hole ERDD020, completed on the northern portion of the target, intersected multiple gold mineralized zones within the oxides including a wide zone with high-grade core structures which encountered 0.89 g/t Au over 47.8 m from 41.2 m, including 6.44 g/t Au over 2.5 m from 41.2 m and 2.14 g/t Au over 5.8 m from 54.2 m. Eradi has now been tested at wide spacings over a strike length of 1.6 kilometres and remains open along strike and to depth. As part of the 2020 - 2022 drill program, 14 holes totalling 2,189.5 metres were completed.
==> picture [100 x 19] intentionally omitted <==
-
6 -
-
Kojina Hill is an advanced target on the property that is outlined on surface by a twokilometre-long by one-kilometre-wide gold-in-soil anomaly. It is related to a structure subparallel to the Nyam Shear Zone and located 1.5 kilometres west of the Nyam Deposit. As part of the 2020 - 2022 drill program, 14 holes totalling 2,588 metres were completed. The Company is currently testing the strike extent of the Kojina Hill anomaly through completion of a manual trenching program.
Final Drill Results From the 90,000 Metre Drill Program
Remaining results from the 2020 - 2022 drill program included RC drilling targeting oxide mineralization within the southern extension of the Boin Gold Deposit, as well as diamond drilling completed at all resource areas. This release reports final results from the drill program: 3 DD holes totalling 1,061.7 m (SWDD081 to SWDD083) at Sewum, 10 DD holes totalling 2,631.4 m (KBDD067 to KBDD076) targeting Boin, 7 RC holes totalling 932 m (KBRC281 to KBRC287) targeting the southern extension at Boin, 3 DD holes totalling 946.9 m (NBDD057 to NBDD059) at Nyam, and 2 DD holes totalling 640.3 m (KKDD002, KKDD003) at Kwakyekrom. All holes intersected gold mineralization.
Diamond drilling at Boin included hole KBDD075, drilled in the central portion of the structure, intersected several gold mineralized zones including 1.16 g/t Au over 20.0 m from 221 m with higher-grade core structures of 4.92 g/t Au over 1.8 m from 221 m, 1.99 g/t Au over 3.8 m from 227.2 m, and 2.03 g/t Au over 2.5 m from 236 m. Hole KBDD067, collared 50 metres west of KBDD075 on the same section, intersected 1.07 g/t Au over 15.0 m from 250 m, including 2.28 g/t Au over 5.0 m from 251 m, as well as 5.14 g/t Au over 2.8 m from 185.2 m, 1.75 g/t Au over 5.7 m from 33.3 m, and 1.35 g/t Au over 3.0 m from 90 m. Hole KBDD076, collared 100 metres south of KBDD075, intersected 3.42 g/t Au over 2.8 m from 257 m, and 1.00 g/t Au over 2.2 m from 199 m. Hole KBDD068, collared 800 metres north of KBDD075, intersected multiple gold mineralized structures including 1.11 g/t Au over 1.3 m from 241.5 m and 2.01 g/t Au over 1.0 m from 278 m.
Shallow drilling on the southern extension at Boin consisted of seven RC holes all of which intersected gold mineralization within the near-surface oxidized zone and upper portions of the sulphides. Hole KBRC284 intersected multiple mineralized zones with 1.07 g/t Au over 5.0 m from 18 m and 0.57 g/t Au over 8.0 m from 50 m. Hole KBRC281 intersected multiple structures including 1.43 g/t Au over 3.0 m from 108 m and 0.60 g/t Au over 7.0 m from 3 m.
Drilling at Nyam included three additional deeper diamond drill holes, each of which intersected multiple gold mineralized zones. Hole NBDD057 intersected 1.07 g/t Au over 12.0 m from 181 m including 1.96 g/t Au over 3.0 m from 184 m. Hole NBDD058, drilled 50 metres south of NBDD057, intersected 0.90 g/t Au over 12.2 m from 221.2 m including 2.64 g/t Au over 1.4 m from 222.8 m and 2.10 g/t Au over 1.8 m from 231.6 m. Hole NBDD059, drilled 75 metres north of NBDD057, intersected 0.59 g/t Au over 13.0 m from 277 m, including 1.13 g/t Au over 2.2 m from 286.8 m.
Enchi Gold Project Mineral Resource Estimate
The Enchi Gold Project hosts a pit constrained Inferred Mineral Resource of 70.4 million tonnes grading 0.62 g/t Au containing 1.41 million ounces gold (see Newcore news release dated June 8, 2021). Mineral resource estimation practices are in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice Guidelines (November 29, 2019) and follow CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014),
==> picture [100 x 19] intentionally omitted <==
- 7 -
that are incorporated by reference into National Instrument 43-101 ("NI 43-101"). The Mineral Resource Estimate was prepared by independent qualified person Todd McCracken, P. Geo. of BBA E&C Inc. The technical report, titled "Preliminary Economic Assessment for the Enchi Gold Project, Enchi, Ghana" has an effective date of June 8, 2021, and is available under the Company’s profile on SEDAR at www.sedar.com.
2020 - 2022 Enchi Drilling Program
A 90,000 metre discovery and resource expansion drill program (commenced in August 2020) was completed at Enchi in Q2 2022. The program included both RC and diamond drilling and included the first deeper drilling on the Project. Newcore’s multi-pronged exploration approach delivered on the goals set out at the start of drilling: (i) successfully outlined potential resource growth along strike at all four existing deposits (Sewum, Boin, Nyam, Kwakyekrom); (ii) encountered strong results at previously drilled zones that are outside of the resource area (Kojina Hill and Eradi); (iii) drilling intersected high-grade at depth which has outlined the potential for underground resources; and (iv) identified new discoveries from successful first pass drilling on early stage kilometre-scale gold-in-soil anomalous targets (Sewum South, Tokosea). The total planned drill program consisted of 575 holes representing 92,583 metres.
Drill Hole Locations (Previously Unreleased Drill Results Only)
Table 2 - Enchi Gold Project Drill Hole Location Details
| Hole ID | UTM East | UTM North | Elevation |
Azimuth ° | Dip ° | Length(m) |
|---|---|---|---|---|---|---|
| KBRC281 | 517320 | 631388 | 118 | 114 | -50 | 150 |
| KBRC282 | 517438 | 631445 | 109 | 114 | -50 | 102 |
| KBRC283 | 517404 | 631458 | 115 | 114 | -50 | 150 |
| KBRC284 | 517449 | 631542 | 112 | 114 | -50 | 156 |
| KBRC285 | 517457 | 631714 | 131 | 114 | -50 | 170 |
| KBRC286 | 517603 | 631796 | 145 | 114 | -50 | 102 |
| KBRC287 | 517700 | 631963 | 121 | 114 | -50 | 102 |
| KBDD067 | 519130 | 634081 | 142 | 120 | -52 | 300.4 |
| KBDD068 | 519473 | 634792 | 121 | 120 | -52 | 339.5 |
| KBDD069 | 520258 | 635635 | 116 | 120 | -55 | 318.5 |
| KBDD070 | 519303 | 634424 | 138 | 114 | -60 | 235.4 |
| KBDD071 | 520261 | 635352 | 119 | 114 | -55 | 199.4 |
| KBDD072 | 520201 | 635384 | 118 | 114 | -58 | 310.4 |
| KBDD073A | 520330 | 635316 | 110 | 0 | -90 | 274.0 |
| KBDD074 | 518910 | 633615 | 168 | 114 | -60 | 121.5 |
| KBDD075 | 519168 | 634041 | 123 | 114 | -60 | 257.1 |
| KBDD076 | 519109 | 633975 | 144 | 114 | -60 | 275.2 |
| NBDD057 | 530644 | 637797 | 92 | 300 | -60 | 312.5 |
| NBDD058 | 530629 | 637755 | 96 | 300 | -60 | 299.2 |
| NBDD059 | 530730 | 637844 | 102 | 300 | -62 | 335.2 |
| SWDD081 | 521232 | 629138 | 189 | 120 | -60 | 395.3 |
| SWDD082 | 521256 | 628074 | 134 | 120 | -53 | 364.7 |
| SWDD083 | 521259 | 629336 | 144 | 120 | -60 | 301.7 |
| KKDD002 | 528642 | 634568 | 103 | 298 | -63 | 315.6 |
| KKDD003 | 528707 | 634630 | 106 | 298 | -65 | 324.7 |
==> picture [100 x 19] intentionally omitted <==
- 8 -
Newcore Gold Best Practice
Newcore is committed to best practice standards for all exploration, sampling and drilling activities. Drilling was completed by an independent drilling firm using industry standard RC and Diamond Drill equipment. Analytical quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into the sample strings. Samples are placed in sealed bags and shipped directly to Intertek Labs located in Tarkwa, Ghana for 50 gram gold fire assay.
Qualified Person
Mr. Gregory Smith, P. Geo, Vice President of Exploration at Newcore, is a Qualified Person as defined by NI 43-101, and has reviewed and approved the technical data and information contained in this news release. Mr. Smith has verified the technical and scientific data disclosed herein and has conducted appropriate verification on the underlying data including confirmation of the drillhole data files against the original drillhole logs and assay certificates.
About Newcore Gold Ltd.
Newcore Gold is advancing its Enchi Gold Project located in Ghana, Africa’s largest gold producer[ (1)] . The Project currently hosts an Inferred Mineral Resource of 1.41 million ounces of gold at 0.62 g/t[ (2)] . Newcore Gold offers investors a unique combination of top-tier leadership, who are aligned with shareholders through their 24% equity ownership, and prime district scale exploration opportunities. Enchi’s 216 km[2] land package covers 40 kilometres of Ghana’s prolific Bibiani Shear Zone, a gold belt which hosts several 5 million-ounce gold deposits, including Kinross’ Chirano mine 50 kilometers to the north. Newcore’s vision is to build a responsive, creative and powerful gold enterprise that maximizes returns for shareholders.
On Behalf of the Board of Directors of Newcore Gold Ltd.
Luke Alexander
President, CEO & Director
For further information, please contact:
Mal Karwowska | Vice President, Corporate Development and Investor Relations +1 604 484 4399
[email protected] www.newcoregold.com
-
(1) Source: Production volumes for 2020 as sourced from the World Gold Council
-
(2) Notes for Inferred Mineral Resource Estimate:
-
CIM definition standards were followed for the resource estimate.
-
The 2021 resource models used ordinary kriging (OK) grade estimation within a three-dimensional block model with mineralized zones defined by wireframed solids and constrained by pits shell for Sewum, Boin and Nyam. Kwakyekrom used Inverse Distance squared (ID2).
-
A base cut-off grade of 0.2 g/t Au was used with a capping of gold grades varied by deposit and zone.
-
A US$1,650/ounce gold price, open pit with heap leach operation was used to determine the cut-off grade of 0.2 g/t Au. Mining costs of US$1.40 for oxides, US$2.10 for transition, and US$2.60 for fresh rock per mined tonne and G&A and milling costs of US$6.83/milled tonne. The Inferred Mineral Resource Estimate is pit constrained.
==> picture [100 x 19] intentionally omitted <==
-
9 -
-
Metallurgical recoveries have been applied to four individual deposits and in each case three material types (oxide, transition, and fresh rock) with average recoveries of 77% for Sewum, 79% for Boin, 60% for Nyam and 72% for Kwakyekrom.
-
A density of 2.20 g/cm[3] for oxide, 2.45 g/cm[3] for transition, and 2.70 g/cm[3] for fresh rock was applied.
-
Optimization pit slope angles varied based on the rock types.
-
Mineral Resources that are not mineral reserves do not have economic viability. Numbers may not add due to rounding.
-
These numbers are from the technical report titled "Preliminary Economic Assessment for the Enchi Gold Project, Enchi, Ghana", with an effective date of June 8, 2021, prepared for Newcore Gold by BBA E&C Inc. in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects and is available under Newcore’s SEDAR profile at www.sedar.com.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Statements
This news release includes statements that contain "forward-looking information" within the meaning of the applicable Canadian securities legislation ("forward-looking statements"). All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussion with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always using phrases such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. In this news release, forward-looking statements relate, among other things, to: statements about the estimation of mineral resources; results of our drill campaign, magnitude or quality of mineral deposits; anticipated advancement of mineral properties or programs; and future exploration prospects.
These forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business. The assumptions underlying the forward-looking statements are based on information currently available to Newcore. Although the forward-looking statements contained in this news release are based upon what management of Newcore believes, or believed at the time, to be reasonable assumptions, Newcore cannot assure its shareholders that actual results will be consistent with such forward-looking statements, as there may be other factors that cause results not to be as anticipated, estimated or intended. Forwardlooking information also involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others: risks related to the speculative nature of the Company’s business; the Company’s formative stage of development; the Company’s financial position; possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of gold and other commodities; fluctuations in currency markets (such as the Canadian dollar to United States dollar exchange rate); change in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, unusual or unexpected geological formations); the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); and title to properties.
==> picture [100 x 19] intentionally omitted <==
- 10 -
Forward-looking statements contained herein are made as of the date of this news release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.
==> picture [100 x 19] intentionally omitted <==
- 11 -
==> picture [540 x 720] intentionally omitted <==
----- Start of picture text -----
KBRC197
KBRC198
KBRC196
KBRC195
KBRC194
KBRC192 KBRC193
KBRC183
KBRC252 KBRC1916600
KBDD069 KBRC181KBRC180 KBRC179 KBRC243
KBRC251 KBRC182
KBDD065 6400
KBRC177 KBRC146
SECTORNORTH KBDD072 KBRC276KBRC189KBRC241 KBRC2406200KBRC242KBRC147
KBRC238 KBRC239
KBRC173 KBRC275
KBRC274 KBRC2486000
KBRC170 KBRC237 KBDD073A
KBRC174KBRC171KBRC235 KBRC232KBRC245 KBDD071
KBRC169 KBRC2335800
KBRC166 KBRC187KBRC234
KBRC168 KBRC165
KBRC167 5600
KBRC186 KBRC164
KBDD068
KBRC273 KBRC163 5400
KBRC185
5200
KBDD070 5000
KBRC152
KBRC151
4800
KBDD064 KBRC153KBRC143
KBDD075KBDD067 KBRC1444600 Pit Shell
KBDD076
KBRC154
4400 Outline
KBDD063AKBDD063 KBRC2534200
CENTRAL KBDD074 KBRC141 KBRC1404100
SECTOR KBDD066KBRC155 4000
KBRC155A
3900
3800
3700
KBRC142B
KBRC142 3600
KBDD062 KBRC139 3500
KBDD061A KBRC156A 3400
KBRC158KBRC159 KBRC157B 3300
KBRC138 KBRC138A
KBRC161 3200 Legend
KBRC280
KBRC279 KBRC160 3100
KBRC278 KBRC244 3000
KBRC277 KBRC229KBRC228KBRC162 2900 Drill Hole
KBRC231
KBRC203 KBRC230 2800 Assays Announced
KBRC202 2700 July 27, 2022
2600
KBRC206
KBRC205 KBRC204
KBRC209 KBRC208 2400 Drill Hole
KBRC255 KBRC207 Prior 2020 - 2021 Assays Not in
KBRC262KBRC227 KBRC226KBRC254 2200 Mineral Resource Estimate
KBRC264KBRC256KBRC257KBRC258 KBRC259KBRC263KBRC260 KBRC287 KBRC262 20002100 Drill Hole
KBRC267 KBRC224 1900
KBRC285 KBRC272KBRC266 KBRC222KBRC265KBRC223 KBRC286 KBRC225 17001800 Mineral Resource Estimate2020 Assay Included in
KBRC269KBRC268KBRC271 KBRC270 KBRC283KBRC284 14001500 1600 Previous Drill Holes
KBRC281 KBRC282 1300 SECTORSOUTH 2 km
2020-2022 Drill Program | Enchi Gold Project
Boin, Ghana (As of July 2022)
----- End of picture text -----
==> picture [540 x 720] intentionally omitted <==
----- Start of picture text -----
SEWUM
RIDGE
SWDD083
SWRC070 SWRC069
SWRC068
SWDD081
SWRC071
SWDD079A
SWRC072
SWDD075 SWRC086
SWRC085
SWRC088 SWRC087
SWDD074 SWRC090
SWRC089
SWDD073
SWRC099 SWRC091
SWRC092 SWDD082 SWRC093SWRC108
SEWUM SWDD071BSWRC093 SWRC113 SWRC105SWRC112
SWDD070A SWRC109
CHECKERBOARD HILL SWRC094 SWRC106SWRC110
SWRC095 SWRC107
SWDD072 SWRC111
SWRC096 SWRC076SWRC077
SWRC097 Pit Shell
Outline
SWRC139
SWRC138
SWRC137
SWRC140
SWRC156
SWRC158
SWRC157
SWRC124 SWRC104
SWRC125 SWDD076
SWRC126SWRC127 SEWUM SWRC081SWRC080SWRC079SWRC075 [SWRC100] SWDD077 SWRC145SWRC147SWRC154SWRC153SWRC155 Legend
SWRC132 SWRC133 EXT. SWRC165SWRC166SWDD078 SWRC169SWRC074SWRC073SWRC143SWRC151SWRC152SWRC150SWRC149 Drill Hole
SWDD080 SWRC164 SWRC170 Assays Announced
SWRC078 SWRC162 SWRC168SWRC167 July 27, 2022
SWRC163
SWRC128SWRC129 SWRC130SWRC131 SWRC102SWRC103 Drill Hole
SWRC141A SWRC136
SWRC142 SWRC135 Prior 2020 - 2021 Assays Not in
SWRC134 Mineral Resource Estimate
SWRC121 Drill Hole
SWRC122 2020 Assay Included in
Mineral Resource Estimate
SWRC123 SWRC120
SEWUM SWRC119 1 km Previous Drill Holes
SOUTH
SWRC115
SWRC114
SWRC116
SWRC118
SWRC117 2020-2022 Drill Program | Enchi Gold Project
Sewum, Ghana (As of July 2022)
----- End of picture text -----
==> picture [540 x 720] intentionally omitted <==
----- Start of picture text -----
NBRC036 NBRC037
NBRC038
NBRC039 NBRC040
NBRC041
NBRC042A
NBRC043
Pit Shell
Outline
NBRC098
NBRC099
NBRC103
NBRC101
NBRC100 NBRC102 NBRC035
NBRC104
NBRC097 NBRC019
NBRC034
NBRC033
NBRC096 [NBRC105]
NBRC023
NBRC094 NBRC044
NBRC092 NBRC095
NBRC093
NBRC089
NBRC090
NBRC086 NBRC091
NBRC085
NBRC083 NBRC087
NBRC088
NBRC107 NBRC084
NBRC082
NBRC081
NBRC106 NBDD059
NBRC077NBRC078 NBRC080 NBDD058NBDD057
NBRC079 NBDD052
NBRC076 NBRC020NBRC046 Legend
NBRC047
NBDD053
NBRC021
NBRC075 NBDD050
NBRC048 NBRC022 NBRC045 NBDD054 Drill Hole
NBRC049 NBDD049 Assays Announced
NBRC073 NBRC032
NBRC072 NBRC074 July 27, 2022
NBRC050
NBRC051 Drill Hole
NBRC071
NBRC069 Prior 2020 - 2021 Assays Not in
NBRC052 Mineral Resource Estimate
NBRC053
NBRC054
NBRC055 NBRC067
NBRC018 NBRC068 NBDD055 Drill Hole
NBRC027 NBRC017NBRC024 NBDD056 2020 Assay Included in
NBRC016 NBRC025 Mineral Resource Estimate
NBRC031
NBRC026 NBDD048
NBRC028NBRC029 Previous Drill Holes
NBRC030
NBDD051
NBRC056
NBRC070
NBRC059B 500 metres
NBRC057
NBRC058
NBRC060 2020-2022 Drill Program | Enchi Gold Project
Nyam, Ghana (As of July 2022)
----- End of picture text -----
==> picture [540 x 720] intentionally omitted <==
----- Start of picture text -----
KKRC066
KKRC084
KKRC067
KKRC084
KKRC073
KKRC074
KKRC069
KKRC070
KKRC071
KKRC072
KKRC075
KKRC076
KKRC077
KKRC078
KKRC079
KKRC080
KKRC081
KKRC082
KKRC039 KKRC083
KKRC040
KKRC037 KKRC017A KKRC058
KKRC036 KKRC018 KKRC038
KKRC019 KKRC059
KKRC020 KKRC031
KKRC050KKRC029KKRC021KKRC032 KKRC061CKKRC026KKRC030KKRC060 Legend
KKRC043 KKRC027 KKRC052
KKRC022 KKRC053
KKRC035 KKRC028
KKRC023KKRC034 KKRC056KKRC057 KKDD003 KKRC051 Drill Hole
KKRC025KKRC024 KKRC055 KKDD002 Assays Announced
KKRC033 July 27, 2022
KKRC042 KKRC054
KKRC041 KKRC048
KKRC049 Pit Shell Drill Hole
KKRC046KKRC047 Outline Prior 2020 - 2021 Assays Not in
Mineral Resource Estimate
KKRC044
KKRC045
Drill Hole
KKRC062KKRC063 2020 Assay Included in
Mineral Resource Estimate
Previous Drill Holes
500 metres
KKRC064
KKRC065
2020-2022 Drill Program | Enchi Gold Project
Kwakyekrom, Ghana (As of July 2022)
----- End of picture text -----
==> picture [766 x 599] intentionally omitted <==
----- Start of picture text -----
KBRC044
KBDD075
KBDD067 KBDDH049 KBDDH051
KBRC043
KBDDH044
KBRC086
KBRC085
KBRC042
0.20 g/t Au over 1.8 m
surface
0.69 g/t Au over 8 m
0.60 g/t Au over 16 m 0.89 g/t Au over 4 m
1.75 g/t Au over 5.7 m 0.53 g/t Au over 7 m 100 Elev
0.73 g/t Au over 22 m 0.34 g/t Au over 3 m
0.25 g/t Au over 2 m Oxide Zone
0.31 g/t Au over 3 m
0.26 g/t Au over 2.0 m
2.92 g/t Au over 6 m 0.47 g/t Au over 2 m
0.75 g/t Au over 2 m
0.51 g/t Au over 3 m
1.35 g/t Au over 3 m
84
0.26 g/t Au over 15 m
50 Elev
0.47 g/t Au over 2.5 m
0.52 g/t Au over 2.0 m
120
0.83 g/t Au over 1.8 m
120 101.1 120
0.50 g/t Au over 1.8 m
150 0.98 g/t Au over 60 m
0.31 g/t Au over 1.0 m
0 Elev
5.14 g/t Au over 2.8 m 0.28 g/t Au over 1.4 m 155
0.44 g/t Au over 20 m
1.16 g/t Au over 20 m
0.58 g/t Au over 1.9 m
incl. 4.92 g/t Au over 1.8 m, 1.99 g/t Au over 3.8 m, 2.03 g/t Au over 2.5 m
0 50 100 m
0.77 g/t Au over 7.0 m -50 Elev
LEGEND
1.07 g/t Au over 15 m
Mineralized Zone incl. 2.28 g/t Au over 5 m 257.1 2020-2022 Drill Program | Enchi Gold Project
Drillhole trace
2021 Resource Pit Shell TO DEPTHOPEN 0.52 g/t Au over 2.2 m Boin Deposit - Cross Sec�on (A - A’)-100 Elev
KBDD067, KBDD075
(US$1,650/oz Au)
Viewing Northeast, July 2022
----- End of picture text -----
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
Drill Results Released July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Hole Length (m) UTM North Elevation Azimuth ° Dip ° |
|---|---|
| KBDD067 Boin 33.3 39.0 5.7 1.75 and 48.0 50.0 2.0 0.25 and 90.0 93.0 3.0 1.35 and 106.0 108.5 2.5 0.47 and 115.2 117.0 1.8 0.83 and 185.2 188.0 2.8 5.14 and 208.5 210.4 1.9 0.58 and 216.0 223.0 7.0 0.77 and 250.0 265.0 15.0 1.07 including 251.0 256.0 5.0 2.28 and 273.0 275.2 2.2 0.52 |
519130 634081 142 120 -52 300.4 |
| KBDD068 Boin 211.0 217.0 6.0 0.56 and 234.9 242.8 7.9 0.00 including 241.5 242.8 1.3 1.11 and 276.0 283.0 7.0 0.67 including 278.0 279.0 1.0 2.01 |
519473 634792 121 120 -52 339.5 |
| KBDD069 Boin 277.0 278.0 1.0 0.97 and 304.0 308.0 4.0 0.42 |
520258 635635 116 120 -55 318.5 |
| KBDD070 Boin 197.0 202.8 5.8 0.32 and 221.2 224.5 3.3 0.32 and 232.4 233.3 0.9 0.59 |
519303 634424 138 114 -60 235.4 |
| KBDD071 Boin 26.0 28.0 2.0 0.58 and 74.0 80.0 2.0 0.25 and 83.5 90.0 2.0 0.27 |
520261 635352 119 114 -55 199.4 |
| KBDD072 Boin 77.0 79.6 2.6 0.49 and 204.0 206.0 2.0 0.72 and 287.3 288.2 0.9 0.31 |
520201 635384 118 114 -58 310.4 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Elevation Azimuth ° Dip ° Hole Length (m) UTM North |
|---|---|
| KBDD073A Boin 0.0 10.0 10.0 0.26 including 0.0 1.2 1.2 1.04 and 167.3 170.0 2.7 0.25 and 182.4 183.6 1.2 3.33 and 204.4 206.0 1.6 0.52 |
520330 635316 110 0 -90 274 |
| KBDD074 Boin hole lost and not sampled |
518910 633615 168 114 -60 121.5 |
| KBDD075 Boin 9.8 11.6 1.8 0.20 and 65.0 67.0 2.0 0.26 and 114.0 116.0 2.0 0.52 and 139.7 141.5 1.8 0.50 and 158.0 159.0 1.0 0.31 and 162.8 164.2 1.4 0.28 and 221.0 241.0 20.0 1.16 including 221.0 222.8 1.8 4.92 including 227.2 231.0 3.8 1.99 including 236.0 238.5 2.5 2.03 |
519168 634041 123 114 -60 257.1 |
| KBDD076 Boin 16.0 17.0 1.0 0.30 and 19.0 19.7 0.7 0.26 and 146.2 147.0 0.8 0.31 and 179.0 179.5 0.5 0.40 and 199.0 201.2 2.2 1.00 and 219.0 220.0 1.0 0.65 and 257.0 261.0 2.8 3.42 and 268.0 268.8 0.8 0.24 |
519109 633975 144 114 -60 275.2 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC281 Boin 3.0 10.0 7.0 0.60 and 24.0 27.0 3.0 0.42 and 68.0 70.0 2.0 0.27 and 79.0 81.0 2.0 0.22 and 108.0 111.0 3.0 1.43 and 124.0 127.0 3.0 0.29 |
517320 631388 118 114 -50 150 |
| KBRC282 Boin 33.0 34.0 1.0 0.35 and 63.0 64.0 1.0 0.40 |
517438 631445 109 114 -50 102 |
| KBRC283 Boin 23.0 32.0 9.0 0.64 and 54.0 59.0 5.0 0.73 and 65.0 66.0 1.0 0.43 and 73.0 119.0 46.0 0.22 including 80.0 82.0 2.0 0.52 including 103.0 105.0 2.0 0.42 |
517404 631458 115 114 -50 150 |
| KBRC284 Boin 9.0 11.0 2.0 0.26 and 18.0 23.0 5.0 1.07 and 50.0 58.0 8.0 0.57 and 66.0 68.0 2.0 0.66 and 104.0 120.0 16.0 0.23 and 135.0 155.0 20.0 0.31 |
517449 631542 112 114 -50 156 |
| KBRC285 Boin 30.0 31.0 1.0 1.09 and 115.0 124.0 9.0 0.32 including 115.0 118.0 3.0 0.60 and 144.0 145.0 1.0 0.32 |
517457 631714 131 114 -50 170 |
| KBRC286 Boin 44.0 45.0 1.0 0.22 and 59.0 60.0 1.0 0.31 |
517603 631796 145 114 -50 102 |
| KBRC287 Boin 21.0 22.0 1.0 0.22 and 83.0 84.0 1.0 0.89 |
517700 631963 121 114 -50 102 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| NBDD057 Nyam 109.0 119.0 10.0 0.54 and 181.0 193.0 12.0 1.07 including 184.0 187.0 3.0 1.96 and 226.8 229.0 2.2 0.46 and 234.6 242.0 7.4 0.58 and 270.0 273.0 3.0 0.50 and 283.3 285.0 1.7 0.33 |
530644 637797 92 300 -60 312.5 |
| NBDD058 Nyam 23.5 24.4 0.9 0.38 and 116.7 118.0 1.3 0.28 and 126.0 127.0 1.0 0.37 and 130.0 131.1 1.1 1.26 and 191.0 192.0 1.0 0.75 and 199.0 201.2 2.2 0.37 and 221.2 233.4 12.2 0.90 including 222.8 224.2 1.4 2.64 including 231.6 233.4 1.8 2.10 and 238.7 240.6 1.9 0.43 and 245.0 248.0 3.0 0.71 and 258.0 266.0 8.0 0.30 |
530629 637755 96 300 -60 299.2 |
| NBDD059 Nyam 189.2 190.2 1.0 0.80 and 270.2 273.0 2.8 0.67 and 277.0 290.0 13.0 0.59 including 286.8 289.0 2.2 1.13 |
530730 637844 102 300 -62 335.2 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Hole Length (m) UTM North Elevation Azimuth ° Dip ° |
|---|---|
| SWDD081 Sewum 0.0 3.0 3.0 0.47 and 57.3 58.3 1.0 0.43 and 118.0 119.0 1.0 0.31 and 150.0 151.0 1.0 0.35 and 218.0 224.0 6.0 0.57 and 254.0 256.0 2.0 0.33 and 261.0 262.0 1.0 0.39 and 324.2 325.0 0.8 1.42 |
521232 629138 189 120 -60 395.3 |
| SWDD082 Sewum 53.0 54.2 1.2 0.46 and 57.7 58.3 0.6 0.62 and 132.2 133.0 0.8 0.27 and 145.0 146.0 1.0 0.29 and 152.4 153.0 0.6 0.33 and 155.0 157.0 2.0 0.86 and 197.0 198.5 1.5 0.24 and 234.0 235.0 1.0 0.35 and 263.8 265.7 1.9 0.32 and 266.7 268.1 1.4 0.41 and 272.0 275.0 3.0 0.24 |
521256 628074 134 120 -53 364.7 |
| SWDD083 Sewum 53.1 55.2 2.1 0.84 and 97.0 98.0 1.0 0.31 and 167.2 168.0 0.8 0.43 and 193.7 209.0 15.3 0.43 |
521259 629336 144 120 -60 301.7 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Hole Length (m) UTM North Elevation Azimuth ° Dip ° |
|---|---|
| KKDD002 Kwakyekrom 30.0 31.0 1.0 0.88 and 135.0 136.0 1.0 0.57 and 152.0 155.0 3.0 0.35 and 170.0 183.0 13.0 0.28 and 188.0 191.0 3.0 0.67 and 230.0 231.0 1.0 0.31 and 244.0 245.8 1.8 0.33 |
528642 634568 103 298 -63 315.6 |
| KKDD003 Kwakyekrom 188.0 232.0 44.0 0.20 including 188.0 192.0 4.0 0.44 including 199.0 201.0 2.0 0.44 including 210.6 212.3 2.0 0.35 including 216.0 229.0 13.0 0.31 and 288.0 289.0 1.0 0.30 and 314.0 315.0 1.0 0.46 |
528707 634630 106 298 -65 324.7 |
-
Intervals reported are hole lengths with true width estimated to be 75 - 85%.
-
Length-weighted averages from uncut assays.
-
All drilling completed by independent contractor.
-
All drilling samples sealed on site and delivered directly to independent lab Intertek Mineral Limited located in Tarkwa, Ghana for preparation and 50g Fire Assay with AAS finish.
-
QA/QC procedures include industry standard inclusion of standards, blanks, and duplicates in all sample batches.
[SEE NEXT PAGE FOR PREVIOUSLY RELEASED RESULTS]
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
Previously Released Drill Results
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Hole Length (m) UTM North Elevation Azimuth ° Dip ° |
|---|---|
| KBRC138 Boin 92.0 96.0 4.0 1.05 |
518408 632972 147 114 -60 97 |
| KBRC138A Boin 133.0 135.0 2.0 0.57 and 146.0 148.0 2.0 0.65 |
518405 632976 147 114 -60 216 |
| KBRC139 Boin 1.0 17.0 16.0 0.69 |
518700 633234 130 120 -60 80 |
| KBRC140 Boin 4.0 7.0 3.0 0.31 and 13.0 14.0 1.0 0.44 |
519121 633708 155 120 -60 80 |
| KBRC141 Boin 10.0 21.0 11.0 0.34 and 48.0 95.0 47.0 1.67 including 49.0 58.0 9.0 2.96 and incl. 75.0 85.0 10.0 3.63 |
519018 633704 156 114 -50 120 |
| KBRC142 Boin 1.0 4.0 3.0 0.27 and 131.0 150.0 19.0 0.43 including 131.0 142.0 11.0 0.60 |
518558 633239 129 114 -50 156 |
| KBRC142B Boin 121.0 130.0 9.0 0.30 |
518573 633233 137 114 -50 238 |
| KBRC143 Boin 3.0 17.0 14.0 0.56 |
519395 634172 120 114 -60 108 |
| KBRC144 Boin 146.0 148.0 2.0 0.51 |
519378 634178 120 120 -60 150 |
| KBRC145 Boin 48.0 55.0 7.0 0.54 |
520325 635410 117 120 -60 150 |
| KBRC146 Boin 7.0 10.0 3.0 0.24 and 30.0 62.0 32.0 0.92 including 42.0 54.0 12.0 1.78 and incl. 59.0 61.0 2.0 0.52 |
520456 635619 124 114 -50 100 |
| KBRC147 Boin 50.0 59.0 9.0 0.52 |
520424 635582 124 114 -50 102 |
| KBRC148 Boin 56.0 58.0 2.0 0.69 and 75.0 77.0 2.0 0.30 |
520391 635546 122 114 -50 108 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| From (m) To (m) Length (m) Au (g/t) Hole ID Zone/Deposit |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| KBRC149 Boin 38.0 41.0 3.0 0.36 |
520378 635496 120 114 -50 100 |
| KBRC150 Boin 59.0 94.0 35.0 0.57 including 65.0 91.0 26.0 0.70 and 130.0 135.0 5.0 0.59 and 141.0 148.0 7.0 0.42 |
520335 635517 125 114 -65 148 |
| KBRC150A Boin 72.0 74.0 2.0 0.59 and 87.0 108.0 21.0 1.19 and 136.0 139.0 3.0 1.01 and 145.0 162.0 17.0 0.44 |
520338 635514 122 114 -65 174 |
| KBRC151 Boin 9.0 20.0 11.0 2.30 and 62.0 65.0 3.0 0.63 and 136.0 144.0 8.0 0.55 |
519349 634402 131 120 -60 156 |
| KBRC152 Boin 73.0 74.0 1.0 1.20 and 209.0 213.0 4.0 1.56 and 234.0 235.0 1.0 2.55 |
519292 634429 117 120 -60 258 |
| KBRC153 Boin 7.0 11.0 4.0 0.68 and 28.0 33.0 5.0 0.42 and 42.0 60.0 18.0 1.21 and 67.0 71.0 4.0 1.40 and 110.0 114.0 4.0 0.82 and 155.0 158.0 3.0 0.33 and 191.0 194.0 3.0 0.39 |
519317 634201 122 120 -60 258 |
| KBRC154 Boin 88.0 95.0 7.0 0.61 and 149.0 152.0 3.0 0.27 |
519086 633928 157 120 -60 178 |
| KBRC155 Boin 85.0 89.0 4.0 0.22 and 103.0 105.0 2.0 0.89 and 118.0 134.0 16.0 0.57 |
518896 633582 155 120 -60 138 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| To (m) Length (m) Hole ID Zone/Deposit From (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| KBRC155A Boin 95.0 97.0 2.0 0.68 and 110.0 113.0 3.0 0.64 and 127.0 135.0 8.0 0.37 |
518900 633578 163 120 -60 204 |
| KBRC156A Boin 156.0 174.0 18.0 0.69 and 187.0 191.0 4.0 1.20 |
518480 633164 130 114 -55 270 |
| KBRC157B Boin 150.0 162.0 12.0 0.70 |
518457 633065 128 114 -65 180 |
| KBRC158 Boin 77.0 91.0 14.0 1.41 |
518379 632992 126 114 -60 260 |
| KBRC159 Boin 178.0 240.0 62.0 0.73 including 187.0 206.0 19.0 1.76 and incl. 199.0 206.0 7.0 3.18 |
518423 633075 127 114 -65 240 |
| KBRC160 Boin no significant results |
518358 632778 124 114 -60 120 |
| KBRC161 Boin 124.0 126.0 2.0 0.37 and 144.0 151.0 7.0 0.36 and 163.0 166.0 3.0 0.31 |
518330 632898 128 114 -55 200 |
| KBRC162 Boin 65.0 69.0 4.0 0.53 and 88.0 91.0 3.0 0.68 and 101.0 107.0 6.0 1.67 |
518321 632793 120 114 -60 156 |
| KBRC163 Boin 11.0 14.0 3.0 0.34 and 27.0 54.0 27.0 1.27 |
519678 634811 141 114 -60 102 |
| KBRC164 Boin 19.0 25.0 6.0 1.23 and 102.0 114.0 12.0 0.69 and 128.0 132.0 4.0 0.47 |
519649 634822 164 114 -60 144 |
| KBRC165 Boin 78.0 80.0 2.0 0.41 |
519895 635045 120 114 -60 102 |
| KBRC166 Boin no significant results |
519886 635049 126 114 -60 140 |
| KBRC167 Boin no significant results |
519836 634974 123 114 -60 120 |
| KBRC168 Boin 1.0 6.0 5.0 0.56 |
519816 634986 121 114 -60 140 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| KBRC169 Boin 55.0 69.0 14.0 1.41 including 62.0 68.0 6.0 2.86 and 84.0 86.0 2.0 0.53 and 90.0 92.0 2.0 0.53 and 125.0 131.0 6.0 0.31 |
519973 635110 128 114 -60 138 |
| KBRC170 Boin 45.0 49.0 4.0 0.31 and 70.0 72.0 2.0 0.49 |
520050 635185 141 114 -60 156 |
| KBRC171 Boin 77.0 78.0 1.0 1.07 and 119.0 129.0 10.0 0.44 |
520030 635195 129 114 -60 150 |
| KBRC172 Boin 2.0 5.0 3.0 0.27 and 78.0 84.0 6.0 0.57 and 128.0 138.0 10.0 0.92 |
520131 635252 125 114 -60 150 |
| KBRC173 Boin 20.0 22.0 2.0 0.28 and 85.0 87.0 2.0 0.76 and 154.0 158.0 4.0 0.32 and 166.0 179.0 13.0 0.30 |
520105 635265 126 114 -60 186 |
| KBRC174 Boin 91.0 93.0 2.0 0.41 and 153.0 154.0 1.0 0.76 |
519957 635121 130 114 -60 162 |
| KBRC175 Boin 67.0 89.0 22.0 0.65 |
520291 635396 119 114 -60 150 |
| KBRC176 Boin 70.0 77.0 7.0 0.39 and 95.0 105.0 10.0 0.64 and 130.0 140.0 10.0 0.44 |
520369 635575 130 114 -60 182 |
| KBRC177 Boin 81.0 84.0 2.0 0.47 and 108.0 109.0 1.0 0.46 and 116.0 120.0 4.0 0.81 and 204.0 206.0 2.0 1.39 |
520320 635523 123 114 -65 228 |
| KBRC178 Boin 134.0 140.0 6.0 0.57 147.0 149.0 2.0 0.90 |
520297 635532 117 114 -65 220 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Zone/Deposit Hole ID Au (g/t) Length (m) To (m) From (m) |
UTM East Hole Length (m) Dip ° Azimuth ° Elevation UTM North |
|---|---|
| KBRC179 Boin 92.0 97.0 5.0 0.56 |
520436 635631 133 114 -50 150 |
| KBRC180 Boin 108.0 110.0 2.0 0.33 and 126.0 129.0 3.0 0.47 |
520415 635637 134 114 -55 170 |
| KBRC181 Boin 127.0 138.0 11.0 0.45 and 142.0 145.0 3.0 0.29 and 155.0 162.0 7.0 1.05 |
520393 635648 138 114 -60 216 |
| KBRC182 Boin 64.0 68.0 4.0 0.35 and 78.0 82.0 4.0 0.68 and 87.0 91.0 4.0 0.70 |
520570 635717 137 114 -60 108 |
| KBRC183 Boin 93.0 96.0 3.0 0.49 and 105.0 121.0 16.0 0.30 |
520544 635724 131 114 -60 144 |
| KBRC184 Boin 86.0 88.0 2.0 0.44 and 102.0 111.0 9.0 0.82 and 125.0 128.0 3.0 0.45 and 145.0 166.0 21.0 0.94 |
520234 635422 114 114 -60 216 |
| KBRC185 Boin 114.0 116.0 2.0 1.42 and 137.0 204.0 67.0 0.85 including 137.0 146.0 9.0 2.95 |
530284 634768 135 114 -50 204 |
| KBRC186 Boin 102.0 103.0 1.0 0.30 and 138.0 142.0 4.0 0.54 and 166.0 169.0 3.0 0.32 |
530262 634841 146 114 -60 200 |
| KBRC187 Boin 0.0 1.0 1.0 0.56 and 7.0 9.0 2.0 0.30 and 22.0 24.0 2.0 1.19 and 102.0 106.0 4.0 0.40 |
530200 635099 137 114 -60 132 |
| KBRC188 Boin 6.0 30.0 24.0 0.85 and 46.0 51.0 5.0 0.50 |
530122 635241 129 114 -60 150 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| KBRC189 Boin 86.0 88.0 2.0 0.37 and 92.0 94.0 2.0 0.51 and 101.0 103.0 2.0 0.57 and 121.0 123.0 2.0 0.41 and 126.0 127.0 1.0 0.78 and 140.0 142.0 2.0 0.37 and 148.0 150.0 2.0 0.48 |
530142 635433 111 114 -60 200 |
| KBRC190 Boin 103.0 111.0 8.0 0.61 and 119.0 155.0 36.0 1.14 including 124.0 142.0 18.0 1.72 |
530180 635591 128 114 -60 200 |
| KBRC191 Boin 1.0 3.0 2.0 0.48 |
530297 635707 129 114 -60 100 |
| KBRC192 Boin 116.0 118.0 2.0 0.36 and 124.0 125.0 1.0 0.30 |
530507 635817 145 114 -60 150 |
| KBRC193 Boin no significant results |
530909 635870 125 114 -50 100 |
| KBRC194 Boin 4.0 6.0 2.0 0.31 and 12.0 13.0 1.0 0.50 and 17.0 19.0 2.0 0.46 and 25.0 26.0 1.0 0.36 and 102.0 103.0 1.0 0.86 |
530760 635882 119 114 -60 160 |
| KBRC195 Boin 111.0 113.0 2.0 0.31 and 145.0 146.0 1.0 0.37 and 163.0 164.0 1.0 0.58 |
530910 635894 124 114 -70 208 |
| KBRC196 Boin no significant results |
531135 635948 114 114 -50 100 |
| KBRC197 Bon 21.0 23.0 2.0 0.54 and 28.0 29.0 1.0 0.32 |
531161 635960 108 114 -60 150 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Zone/Deposit Hole ID Au (g/t) Length (m) To (m) From (m) |
UTM East Hole Length (m) Dip ° Azimuth ° Elevation UTM North |
|---|---|
| KBRC198 Boin 4.0 8.0 4.0 0.39 and 29.0 32.0 3.0 0.43 and 36.0 40.0 4.0 0.34 and 97.0 99.0 2.0 0.39 and 193.0 194.0 1.0 0.35 |
531190 635967 107 114 -70 204 |
| KBRC199 Boin 41.0 46.0 5.0 0.41 |
531096 636032 112 114 -50 108 |
| KBRC200 Boin 59.0 62.0 3.0 0.67 |
531120 636055 113 114 -70 200 |
| KBRC201 Boin 84.0 86.0 2.0 0.26 |
520881 636042 111 114 -60 180 |
| KBRC202 Boin 7.0 8.0 1.0 0.32 |
518142 632540 136 114 -60 102 |
| KBRC203 Boin 59.0 61.0 2.0 0.29 and 130.0 133.0 3.0 0.32 |
518113 632554 129 114 -60 150 |
| KBRC204 Boin 51.0 53.0 2.0 0.26 |
518036 632382 121 114 -60 102 |
| KBRC205 Boin 12.0 27.0 15.0 0.53 including 13.0 16.0 3.0 1.81 and 30.0 33.0 3.0 0.31 and 80.0 82.0 2.0 0.48 |
517993 632397 131 114 -60 132 |
| KBRC206 Boin 67.0 69.0 2.0 2.31 |
517951 632416 125 114 -60 168 |
| KBRC207 Boin 12.0 14.0 2.0 0.32 and 44.0 46.0 2.0 0.40 |
517815 632238 120 114 -60 108 |
| KBRC208 Boin 51.0 53.0 2.0 0.30 and 78.0 80.0 2.0 0.21 and 88.0 89.0 1.0 0.33 |
517778 632254 115 114 -60 105 |
| KBRC209 Boin 87.0 90.0 3.0 0.19 |
517741 632271 115 114 -60 156 |
| KBRC210A Boin no significant results |
522086 637066 98 114 -60 109 |
| KBRC211 Boin no significant results |
522026 637096 101 114 -60 150 |
| KBRC212 Boin no significant results |
521954 637125 99 114 -60 200 |
| KBRC213 Boin no significant results |
521852 636897 105 114 -60 108 |
| KBRC214 Boin no significant results |
521774 636929 100 114 -60 156 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| KBRC215 Boin 89.0 90.0 1.0 0.21 |
521707 636961 104 114 -60 213 |
| KBRC216 Boin no significant results |
521425 636580 116 114 -60 108 |
| KBRC217 Boin no significant results |
521370 636604 108 114 -60 150 |
| KBRC218 Boin no significant results |
521309 636633 100 114 -60 200 |
| KBRC219 Boin no significant results |
521141 636272 107 114 -60 100 |
| KBRC220 Boin 114.0 116.0 2.0 0.28 |
521096 636295 107 114 -60 150 |
| KBRC221 Boin no significant results |
521053 636315 107 114 -60 216 |
| KBRC222 Boin 23.0 26.0 3.0 0.40 and 34.0 41.0 7.0 0.45 and 48.0 53.0 5.0 0.33 and 59.0 61.0 2.0 0.67 |
517464 631646 136 114 -60 120 |
| KBRC223 Boin 75.0 79.0 4.0 0.29 |
517535 631739 140 114 -60 132 |
| KBRC224 Boin 3.0 4.0 1.0 0.94 and 41.0 42.0 1.0 1.16 |
517608 631888 113 114 -60 100 |
| KBRC225 Boin 23.0 25.0 2.0 1.51 and 38.0 40.0 2.0 0.31 and 70.0 109.0 39.0 0.67 including 95.0 103.0 8.0 1.60 |
517571 631888 118 114 -60 100 |
| KBRC226 Boin 91.0 92.0 1.0 0.63 |
517690 632085 122 114 -60 100 |
| KBRC227 Boin 84.0 86.0 2.0 0.37 and 95.0 104.0 9.0 0.35 including 95.0 97.0 2.0 0.69 |
517653 632106 116 114 -60 150 |
| KBRC228 Boin 36.0 38.0 2.0 0.33 and 50.0 51.0 1.0 0.40 and 78.0 84.0 6.0 0.29 |
518290 632705 125 114 -60 100 |
| KBRC229 Boin 118.0 133.0 15.0 0.73 |
518240 632729 127 114 -60 150 |
| KBRC230 Boin no significant results |
518218 632621 126 114 -60 107 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC231 Boin 52.0 54.0 2.0 0.33 and 56.0 57.0 1.0 0.32 and 103.0 104.0 1.0 0.33 |
518175 632636 120 114 -60 150 |
| KBRC232 Boin 8.0 12.0 4.0 0.36 |
520142 635142 138 114 -60 84 |
| KBRC233 Boin 21.0 27.0 6.0 0.29 and 39.0 43.0 4.0 3.50 and 63.0 64.0 1.0 0.45 and 67.0 68.0 1.0 0.31 |
520119 635156 135 114 -60 126 |
| KBRC234 Boin 64.0 71.0 7.0 1.25 |
520035 635082 121 114 -60 114 |
| KBRC235 Boin 40.0 43.0 3.0 1.45 and 55.0 59.0 4.0 1.29 and 91.0 92.0 1.0 0.46 and 103.0 107.0 4.0 0.39 and 123.0 125.0 2.0 0.34 |
520092 635164 134 114 -60 136 |
| KBRC236 Boin 13.0 18.0 5.0 1.24 and 55.0 124.0 69.0 0.90 including 61.0 73.0 12.0 2.06 |
520187 635223 125 114 -60 126 |
| KBRC237 Boin 24.0 26.0 2.0 0.59 and 52.0 56.0 4.0 0.46 |
520246 635295 118 114 -60 100 |
| KBRC238 Boin 44.0 45.0 1.0 0.46 and 118.0 120.0 2.0 0.41 |
520218 635313 112 114 -60 150 |
| KBRC239 Boin 6.0 7.0 1.0 0.37 and 91.0 92.0 1.0 0.71 |
520333 635374 114 114 -60 100 |
| KBRC240 Boin 48.0 51.0 3.0 0.69 and 57.0 59.0 2.0 0.28 and 72.0 73.0 1.0 0.63 |
520334 635433 110 114 -60 100 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC241 Boin 18.0 26.0 8.0 0.45 and 34.0 43.0 9.0 1.75 and 62.0 65.0 3.0 1.36 and 76.0 112.0 36.0 1.02 including 95.0 102.0 7.0 2.58 |
520300 635447 129 114 -60 150 |
| KBRC242 Boin 6.0 8.0 2.0 0.57 |
520443 635548 121 114 -60 100 |
| KBRC243 Boin no significant results |
520612 635700 129 114 -60 100 |
| KBRC244 Boin 0.0 1.0 1.0 0.48 and 4.0 11.0 7.0 0.68 |
518380 632770 126 114 -60 102 |
| KBRC245 Boin 126.0 132.0 6.0 0.56 |
520161 635179 94 114 -55 132 |
| KBRC246 Boin 2.0 12.0 10.0 0.74 |
520216 635206 116 114 -50 108 |
| KBRC247 Boin 9.0 16.0 7.0 0.45 and 70.0 74.0 4.0 0.50 and 102.0 105.0 3.0 0.56 |
520187 635223 123 114 -65 186 |
| KBRC248 Boin 1.0 6.0 5.0 0.45 and 29.0 31.0 2.0 0.25 |
520285 635280 115 114 -55 156 |
| KBRC249 Boin 1.0 3.0 2.0 0.32 and 14.0 15.0 1.0 0.31 |
520309 635327 113 114 -55 132 |
| KBRC250 Boin 54.0 59.0 5.0 0.28 and 79.0 81.0 2.0 0.30 and 109.0 111.0 2.0 95.16 and 111.0 116.0 5.0 0.93 and 120.0 121.0 1.0 13.22 and 121.0 127.0 6.0 0.21 |
520273 635345 119 114 -55 138 |
| KBRC251 Boin 182.0 187.0 5.0 0.20 |
520302 635603 130 114 -60 240 |
| KBRC252 Boin 134.0 135.0 1.0 1.86 |
520512 635737 144 114 -60 207 |
| KBRC253 Boin 17.0 19.0 2.0 0.33 and 24.0 31.0 7.0 0.99 |
519153 633798 114 114 -60 114 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC254 Boin 57.0 59.0 2.0 0.30 |
517736 632173 112 114 -50 102 |
| KBRC255 Boin 143.0 145.0 2.0 0.39 |
517700 632187 113 114 -50 152 |
| KBRC256 Boin 39.0 47.0 8.0 0.68 and 51.0 53.0 2.0 0.27 and 63.0 76.0 13.0 0.48 and 118.0 119.0 1.0 0.36 and 126.0 139.0 13.0 0.21 |
517597 631947 124 114 -55 150 |
| KBRC257 Boin 42.0 44.0 2.0 0.43 and 52.0 81.0 29.0 0.50 and 188.0 201.0 13.0 0.45 |
517565 631962 114 114 -55 201 |
| KBRC258 Boin 49.0 52.0 3.0 0.86 and 62.0 65.0 3.0 0.50 and 85.0 91.0 6.0 0.78 and 107.0 114.0 7.0 0.27 and 139.0 143.0 4.0 0.39 |
517585 632005 112 114 -50 150 |
| KBRC259 Boin 56.0 62.0 6.0 0.46 |
517742 632065 113 114 -50 124 |
| KBRC260 Boin 39.0 41.0 2.0 0.35 and 49.0 62.0 13.0 0.78 |
517663 631979 110 114 -55 90 |
| KBRC261 Boin 101.0 103.0 2.0 0.31 |
517742 632065 113 114 -50 156 |
| KBRC262 Boin no significant results |
517617 632116 104 114 -50 198 |
| KBRC263 Boin 22.0 25.0 3.0 0.31 and 45.0 46.0 1.0 0.51 |
517653 631932 113 114 -55 108 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC264 Boin 33.0 42.0 9.0 0.50 and 63.0 64.0 1.0 0.53 and 72.0 102.0 30.0 0.39 and 142.0 144.0 2.0 0.32 and 160.0 169.0 9.0 0.32 and 177.0 230.0 53.0 0.51 including 187.0 196.0 9.0 1.17 and 234.0 236.0 2.0 0.43 |
517530 631895 119 114 -50 236 |
| KBRC265 Boin 3.0 5.0 2.0 0.32 and 23.0 24.0 1.0 0.88 and 44.0 48.0 4.0 0.36 and 69.0 78.0 9.0 1.55 including 70.0 72.0 2.0 4.75 |
517569 631819 132 114 -50 108 |
| KBRC266 Boin 14.0 22.0 8.0 1.12 and 92.0 94.0 2.0 0.56 |
517530 631833 131 114 -50 156 |
| KBRC267 Boin 45.0 49.0 4.0 0.30 and 95.0 102.0 7.0 1.78 |
517490 631848 125 114 -55 186 |
| KBRC268 Boin 45.0 46.0 1.0 0.84 and 60.0 85.0 25.0 0.79 and 94.0 96.0 2.0 0.29 and 108.0 121.0 13.0 0.54 |
517365 631470 110 114 -50 126 |
| KBRC269 Boin 128.0 130.0 2.0 0.50 |
517338 631490 109 114 -50 152 |
| KBRC270 Boin 48.0 53.0 5.0 0.50 and 78.0 80.0 2.0 0.41 and 92.0 112.0 20.0 0.44 |
517413 631559 108 114 -50 120 |
| KBDD061A Boin 236.0 236.7 0.7 1.38 |
518372 633108 122 114 -65 360.9 |
| KBDD062 Boin 303.0 304.1 1.1 0.24 |
518423 633182 127 114 -62 320.8 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Hole Length (m) UTM North Elevation Azimuth ° Dip ° |
|---|---|
| KBDD063A Boin 207.5 210.0 2.5 0.30 and 218.5 225.8 7.3 0.45 and 243.0 244.2 1.2 1.09 and 248.0 249.8 1.8 0.63 |
518891 633759 155 114 -60 249.8 |
| KBRD063 Boin 198.4 201.3 2.9 0.69 and 208.9 221.9 13.0 0.13 and 252.3 254.4 2.1 2.72 and 297.8 301.0 3.2 0.72 |
518891 633759 155 114 -60 315.4 |
| KBDD064 Boin 107.3 109.0 1.7 1.19 and 121.0 195.0 74.0 1.28 including 122.0 128.4 6.4 2.65 including 136.0 137.4 1.4 9.93 including 149.3 155.4 6.1 2.24 including 170.6 177.0 6.4 4.04 including 189.0 193.0 4.0 2.41 |
519239 634235 130 114 -60 351.7 |
| KBDD065 Boin 276.3 277.0 0.7 1.32 and 296.0 297.8 1.8 6.14 and 310.0 313.0 3.0 0.56 |
520215 635573 109 114 -57 330.3 |
| KBDD066 Boin 222.0 247.0 25.0 1.08 including 222.0 224.0 2.0 4.31 including 232.9 237.5 4.6 2.06 and 257.4 279.0 21.6 0.63 including 259.0 260.8 1.8 2.04 including 267.0 270.0 3.0 1.84 |
518777 633586 146 114 -57 300.6 |
| KBRC271 Boin 10.0 12.0 2.0 0.34 and 18.0 25.0 7.0 1.22 and 77.0 110.0 33.0 0.47 and 119.0 122.0 3.0 0.30 |
517381 631566 110 114 -50 162 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KBRC272 Boin 90.0 94.0 4.0 0.40 and 102.0 109.0 7.0 0.75 |
517432 631655 126 114 -50 162 |
| KBRC273 Boin 152.0 155.0 3.0 1.63 and 166.0 175.0 9.0 1.67 and 183.0 192.0 9.0 1.57 and 232.0 233.0 1.0 0.70 |
519489 634780 132 114 -50 278 |
| KBRC274 Boin 12.0 13.0 1.0 0.41 and 32.0 40.0 8.0 0.41 and 60.0 63.0 3.0 0.82 and 84.0 85.0 1.0 0.39 |
520124 635198 127 114 -55 200 |
| KBRC275 Boin 16.0 19.0 3.0 0.39 and 45.0 46.0 1.0 0.31 and 80.0 82.0 2.0 0.32 |
520245 635365 116 114 -55 156 |
| KBRC276 Boin 27.0 67.0 40.0 0.63 including 44.0 46.0 2.0 3.42 and 69.0 70.0 1.0 0.65 and 80.0 83.0 3.0 0.35 and 91.0 103.0 12.0 0.64 including 91.0 95.0 4.0 1.12 and 113.0 216.0 103.0 1.00 including 121.0 126.0 5.0 4.16 including 132.0 133.0 1.0 2.91 including 198.0 214.0 16.0 1.67 |
520217 635377 120 114 -55 216 |
| KBRC277 Boin 159.0 162.0 3.0 1.00 |
518205 632743 131 114 -60 216 |
| KBRC278 Boin 117.0 132.0 15.0 1.49 including 123.0 129.0 6.0 2.44 |
518259 632764 129 114 -55 156 |
| KBRC279 Boin 152.0 160.0 8.0 0.68 and 171.0 174.0 3.0 0.45 |
518229 632779 127 114 -55 205 |
| KBRC280 Boin 140.0 141.0 1.0 0.29 |
518288 632806 122 114 -60 222 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC068 Sewum 3.0 5.0 2.0 0.28 and 23.0 31.0 8.0 0.30 and 39.0 42.0 3.0 0.35 and 46.0 62.0 16.0 0.54 including 51.0 57.0 6.0 0.93 and 74.0 76.0 2.0 1.03 |
521494 629230 193 120 -70 100 |
| SWRC069 Sewum 39.0 41.0 2.0 0.30 and 50.0 59.0 9.0 0.55 and 63.0 70.0 7.0 0.47 and 98.0 114.0 16.0 1.20 |
521442 629252 198 120 -70 125 |
| SWRC070 Sewum 43.0 45.0 2.0 1.41 and 141.0 148.0 7.0 0.98 |
521392 629273 193 120 -70 180 |
| SWRC071 Sewum 3.0 16.0 13.0 0.45 and 38.0 43.0 5.0 0.46 and 95.0 100.0 5.0 0.55 |
521347 628986 193 120 -55 100 |
| SWRC072 Sewum 3.0 22.0 19.0 0.67 and 46.0 84.0 38.0 0.42 |
521408 628860 199 120 -60 150 |
| SWRC073 Sewum 0.0 28.0 28.0 1.52 including 15.0 25.0 10.0 3.58 and 36.0 42.0 6.0 1.21 |
520472 626241 119 130 -50 100 |
| SWRC074 Sewum 7.0 38.0 31.0 0.84 including 8.0 17.0 9.0 1.47 and 48.0 60.0 12.0 0.71 and 92.0 94.0 2.0 0.36 |
520416 626193 105 130 -50 100 |
| SWRC075 Sewum 169.0 177.0 8.0 0.56 |
520355 626219 102 130 -60 220 |
| SWRC076 Sewum 1.0 12.0 11.0 0.48 and 39.0 88.0 49.0 0.91 and 104.0 120.0 16.0 3.04 |
521308 627853 118 120 -50 120 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC077 Sewum 29.0 35.0 6.0 0.49 and 54.0 56.0 2.0 0.36 and 68.0 83.0 15.0 0.76 and 89.0 92.0 3.0 0.62 and 117.0 119.0 2.0 0.40 and 126.0 131.0 5.0 0.40 and 138.0 140.0 2.0 0.28 and 151.0 153.0 2.0 0.35 and 163.0 165.0 2.0 0.40 |
521268 627871 112 120 -50 180 |
| SWRC078 Sewum no significant results |
520197 626036 83 120 -60 270 |
| SWRC079 Sewum 207.0 209.0 2.0 0.37 and 260.0 262.0 2.0 1.78 and 278.0 284.0 6.0 0.98 |
520334 626242 104 120 -60 294 |
| SWRC080 Sewum 149.0 159.0 10.0 1.35 and 166.0 168.0 2.0 0.49 |
520405 626279 113 120 -60 204 |
| SWRC081 Sewum no significant results |
520380 626293 104 120 -60 250 |
| SWRC082 Sewum 36.0 60.0 24.0 2.02 and 96.0 111.0 15.0 0.40 and 222.0 224.0 2.0 0.55 |
520483 626291 115 120 -50 246 |
| SWRC083 Sewum 86.0 108.0 22.0 1.97 and 140.0 141.0 1.0 0.83 |
520459 626301 124 120 -60 252 |
| SWRC084 Sewum 115.0 134.0 19.0 1.41 |
520472 626357 114 120 -60 250 |
| SWRC085 Sewum 4.0 12.0 8.0 0.43 and 42.0 44.0 2.0 0.36 and 63.0 64.0 1.0 0.31 |
521395 628651 191 120 -50 100 |
| SWRC086 Sewum 131.0 133.0 2.0 0.46 |
521353 628672 198 120 -50 150 |
| SWRC087 Sewum 0.0 1.0 1.0 0.66 and 84.0 86.0 2.0 0.48 |
521415 628352 145 120 -50 120 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC088 Sewum 7.0 18.0 11.0 0.32 and 34.0 36.0 2.0 0.29 and 56.0 63.0 7.0 0.35 |
521366 628375 145 120 -50 180 |
| SWRC089 Sewum 12.0 13.0 1.0 0.33 and 43.0 45.0 2.0 0.31 and 47.0 49.0 2.0 0.30 and 60.0 62.0 2.0 0.38 |
521412 628244 127 120 -50 102 |
| SWRC090 Sewum 0.0 1.0 1.0 0.52 and 66.0 68.0 2.0 0.29 and 114.0 116.0 2.0 0.46 and 119.0 121.0 2.0 0.73 |
521370 628269 137 120 -50 156 |
| SWRC091 Sewum 4.0 5.0 1.0 0.32 and 60.0 61.0 1.0 0.30 and 81.0 82.0 1.0 0.40 and 95.0 99.0 4.0 0.81 |
521371 628158 107 120 -50 100 |
| SWRC092 Sewum 90.0 91.0 1.0 0.71 and 140.0 148.0 8.0 0.37 and 196.0 198.0 2.0 0.43 |
521270 627986 106 120 -50 220 |
| SWRC093 Sewum 8.0 11.0 3.0 1.48 and 32.0 49.0 17.0 0.60 and 61.0 164.0 103.0 0.82 |
521364 627948 102 120 -50 168 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| SWRC094 Sewum 86.0 88.0 2.0 0.33 and 91.0 94.0 3.0 0.32 and 108.0 111.0 3.0 1.19 and 115.0 131.0 16.0 1.26 and 147.0 150.0 3.0 0.55 and 158.0 164.0 6.0 1.51 and 175.0 183.0 8.0 2.35 and 187.0 195.0 8.0 0.71 and 246.0 252.0 6.0 0.37 |
521225 627895 113 120 -50 254 |
| SWRC095 Sewum 27.0 28.0 1.0 0.95 and 122.0 124.0 2.0 1.63 and 181.0 195.0 14.0 0.53 and 233.0 238.0 5.0 1.16 |
521155 627863 119 120 -50 242 |
| SWRC096 Sewum 0.0 1.0 1.0 2.44 and 66.0 67.0 1.0 1.56 and 83.0 84.0 1.0 0.54 and 92.0 108.0 16.0 0.69 and 136.0 138.0 2.0 0.40 and 143.0 192.0 49.0 0.32 |
521165 627779 105 120 -50 200 |
| SWRC097 Sewum 2.0 3.0 1.0 0.31 and 22.0 23.0 1.0 0.36 and 155.0 156.0 1.0 0.62 |
521164 627439 106 120 -50 180 |
| SWRC098 Sewum 7.0 12.0 5.0 0.29 and 59.0 60.0 1.0 0.66 |
521375 628065 100 120 -50 150 |
| SWRC099 Sewum 9.0 10.0 1.0 0.42 94.0 96.0 2.0 0.21 118.0 130.0 12.0 0.73 136.0 138.0 2.0 0.29 |
521332 628166 110 120 -50 150 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC100 Sewum 116.0 122.0 6.0 0.60 and 144.0 158.0 14.0 0.74 and 189.0 190.0 1.0 1.06 and 195.0 196.0 1.0 0.41 |
520433 626319 116 120 -60 252 |
| SWRC101 Sewum 154.0 171.0 17.0 0.62 |
520451 626371 112 120 -60 220 |
| SWRC102 Sewum 35.0 36.0 1.0 0.32 |
520332 626142 93 120 -60 200 |
| SWRC103 Sewum 19.0 20.0 1.0 0.34 and 63.0 72.0 9.0 0.77 and 78.0 79.0 1.0 0.30 and 83.0 87.0 4.0 0.47 |
520348 626128 98 120 -50 174 |
| SWRC104 Sewum 26.0 27.0 1.0 0.95 and 126.0 127.0 1.0 0.43 and 146.0 150.0 4.0 0.92 and 215.0 216.0 1.0 0.70 |
520571 626500 93 120 -60 264 |
| SWRC105 Sewum 7.0 9.0 2.0 0.28 and 84.0 85.0 1.0 0.65 and 99.0 101.0 2.0 0.33 |
521415 628026 106 120 -50 274 |
| SWRC106 Sewum no significant results |
521448 627900 104 120 -50 234 |
| SWRC107 Sewum 4.0 81.0 77.0 0.63 including 4.0 40.0 36.0 0.72 and incl. 28.0 37.0 9.0 1.82 including 48.0 80.0 32.0 0.70 and incl. 53.0 67.0 14.0 1.22 and 139.0 186.0 47.0 0.39 |
521408 627918 102 120 -50 186 |
| SWRC108 Sewum 78.0 79.0 1.0 0.31 and 139.0 143.0 4.0 0.42 |
521444 628077 114 120 -50 300 |
| SWRC109 Sewum 116.0 117.0 1.0 0.24 and 154.0 155.0 1.0 0.23 |
521438 627962 104 120 -50 262 |
| SWRC110 Sewum no significant results |
521480 627942 105 120 -50 222 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| SWRC111 Sewum 5.0 11.0 6.0 0.25 and 63.0 76.0 13.0 0.22 and 90.0 92.0 2.0 0.49 and 108.0 109.0 1.0 0.42 and 112.0 113.0 1.0 0.37 and 115.0 124.0 9.0 0.66 and 175.0 176.0 1.0 0.36 and 180.0 181.0 1.0 0.40 and 214.0 215.0 1.0 0.31 and 248.0 254.0 6.0 0.28 and 262.0 263.0 1.0 0.38 and 287.0 298.0 11.0 0.23 |
521341 627895 108 120 -50 300 |
| SWRC112 Sewum 32.0 33.0 1.0 0.38 and 51.0 57.0 6.0 0.44 and 116.0 117.0 1.0 0.46 and 149.0 150.0 1.0 0.45 and 185.0 186.0 1.0 0.30 and 213.0 216.0 3.0 0.29 |
521464 628007 107 120 -50 276 |
| SWRC113 Sewum 46.0 48.0 2.0 0.61 and 61.0 65.0 4.0 0.33 and 84.0 86.0 2.0 0.32 and 164.0 166.0 2.0 0.29 and 207.0 208.0 1.0 0.50 and 220.0 283.0 63.0 0.24 including 231.0 233.0 2.0 0.49 including 255.0 257.0 2.0 0.42 including 271.0 283.0 12.0 0.39 |
521387 627988 98 120 -50 283 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| SWDD070A Sewum 131.4 131.8 0.4 2.48 and 212.4 213.0 0.6 0.42 and 243.0 244.0 1.0 0.38 and 285.5 298.2 12.7 0.17 |
521129 627940 118 120 -57 320.4 |
| SWDD071B Sewum 77.5 79.0 1.5 0.63 and 104.0 118.0 14.0 2.33 including 110.0 117.0 7.0 4.08 and incl. 116.0 117.0 1.0 20.54 and 123.0 127.0 4.0 0.67 and 149.0 151.0 2.0 0.93 and 162.0 166.1 4.1 0.33 and 171.0 172.0 1.0 0.31 and 242.0 244.0 2.0 0.30 and 277.6 291.0 13.4 0.40 |
521312 627963 100 120 -55 374.5 |
| SWDD072 Sewum 134.0 135.4 1.4 0.23 and 184.3 186.2 1.9 0.27 and 221.3 228.0 6.7 0.79 |
521119 627799 111 120 -55 259.8 |
| SWDD073 Sewum 159.0 164.1 5.1 0.75 and 168.0 180.8 12.8 0.34 and 195.5 202.0 6.5 1.61 and 220.2 223.7 3.5 0.78 and 231.2 237.3 6.1 0.56 including 231.2 233.0 1.8 1.24 and 257.2 258.0 0.8 0.42 and 273.3 284.5 11.2 0.63 including 283.0 284.5 1.5 2.38 and 294.0 297.0 3.0 0.57 and 303.0 307.0 4.0 0.31 and 319.7 327.0 7.3 0.64 |
521264 628205 131 120 -55 350.1 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWDD074 Sewum 6.0 9.0 3.0 0.26 and 57.2 60.4 3.2 0.42 and 107.0 108.0 1.0 0.30 and 114.0 115.0 1.0 1.01 and 149.4 150.0 0.6 0.65 and 236.1 237.4 1.3 0.28 |
521313 628290 143 120 -55 329.2 |
| SWDD075 Sewum 2.0 18.0 16.0 0.58 and 101.0 108.3 7.3 0.31 and 125.0 125.9 0.9 1.75 and 344.3 345.0 0.7 1.05 and 350.0 365.6 15.6 0.98 including 359.0 365.6 6.6 2.00 |
521303 628694 195 120 -52 389.3 |
| SWDD076 Sewum 130.0 146.0 16.0 0.54 including 131.0 132.0 1.0 1.64 and 160.0 161.0 1.0 0.49 |
520522 626435 107 120 -55 275.1 |
| SWDD077 Sewum 148.0 149.0 1.0 0.53 and 224.0 233.0 9.0 1.23 including 227.0 230.1 3.1 1.98 and 243.0 245.0 2.0 0.45 and 253.3 255.0 1.7 0.74 and 289.2 290.1 0.9 0.32 |
520396 626389 102 120 -55 302.1 |
| SWDD078 Sewum 250.0 250.8 0.8 0.63 and 324.0 331.0 7.0 0.39 |
520300 626255 99 120 -60 371.4 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| SWDD079A Sewum 39.4 56.0 16.6 0.20 and 62.2 72.0 9.8 0.21 and 75.8 79.0 3.2 0.38 and 120.0 132.0 12.0 0.33 and 173.6 187.0 13.4 0.52 and 191.9 195.0 3.1 0.56 and 209.9 212.0 2.1 0.37 and 220.2 221.0 0.8 0.37 and 307.0 310.0 3.0 0.28 and 313.0 314.0 1.0 0.47 and 404.0 405.0 1.0 0.34 |
521289 628910 174 120 -60 404.6 |
| SWDD080 Sewum 214.0 215.0 1.0 0.52 and 247.1 249.0 1.9 0.42 |
520308 626179 87 120 -70 282.2 |
| SWRC143 Sewum Ext. 5.0 19.0 14.0 1.49 and 26.0 27.0 1.0 0.87 |
520505 626275 122 120 -55 50 |
| SWRC144 Sewum Ext. 81.0 94.0 13.0 1.72 |
520501 626343 118 120 -60 120 |
| SWRC145 Sewum Ext. 8.0 34.0 26.0 0.41 |
520569 626355 113 120 -55 70 |
| SWRC146 Sewum Ext. 47.0 51.0 4.0 0.38 and 62.0 64.0 2.0 1.32 |
520550 626367 120 120 -55 100 |
| SWRC147 Sewum Ext. 6.0 20.0 14.0 0.45 |
520615 626387 108 120 -55 40 |
| SWRC148 Sewum Ext. 66.0 68.0 2.0 1.37 and 84.0 86.0 2.0 0.36 |
520576 626411 105 120 -65 110 |
| SWRC149 Sewum Ext. 2 47.0 49.0 2.0 0.29 |
520996 626322 98 120 -50 100 |
| SWRC150 Sewum Ext. 2 5.0 7.0 2.0 0.55 |
520893 626162 97 120 -50 102 |
| SWRC151 Sewum Ext. 2 16.0 17.0 1.0 0.53 and 29.0 39.0 10.0 1.10 and 72.0 92.0 20.0 0.67 including 79.0 84.0 5.0 1.23 |
520775 626215 130 120 -50 102 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC152 Sewum Ext. 2 2.0 8.0 6.0 5.84 including 2.0 3.0 1.0 26.82 |
520831 626189 189 120 -50 100 |
| SWRC153 Sewum Ext. 2 0.0 3.0 3.0 0.69 and 11.0 14.0 3.0 0.60 |
520845 626392 110 120 -50 108 |
| SWRC154 Sewum Ext. 2 no significant results |
520779 626420 117 120 -50 114 |
| SWRC155 Sewum Ext. 2 49.0 50.0 1.0 0.51 and 111.0 120.0 9.0 0.41 and 124.0 126.0 2.0 0.43 |
520915 626351 94 120 -50 130 |
| SWRC156 Sewum Ext. no significant results |
520654 626422 98 120 -55 50 |
| SWRC157 Sewum Ext. 96.0 98.0 2.0 0.65 |
520589 626463 89 120 -55 120 |
| SWRC158 Sewum Ext. 28.0 30.0 2.0 1.30 |
520623 626437 87 120 -55 100 |
| SWRC159 Sewum Ext. 95.0 102.0 7.0 1.06 |
520522 626383 113 120 -55 140 |
| SWRC160 Sewum Ext. 123.0 141.0 18.0 2.14 including 124.0 128.0 4.0 3.01 and incl. 129.0 136.0 7.0 2.87 |
520491 626397 117 120 -55 160 |
| SWRC161 Sewum Ext. no significant results |
520491 626397 117 120 -60 40 |
| SWRC162 Sewum Ext. 0.0 2.0 2.0 0.26 and 29.0 33.0 4.0 0.37 |
520393 626096 96 120 -60 50 |
| SWRC163 Sewum Ext. 0.0 24.0 24.0 0.39 including 4.0 10.0 6.0 0.80 |
520381 626103 97 120 -60 70 |
| SWRC164 Sewum Ext. 3.0 28.0 25.0 1.98 and 35.0 37.0 2.0 0.64 and 48.0 70.0 22.0 0.58 |
520402 626147 92 120 -60 70 |
| SWRC165 Sewum Ext. 24.0 26.0 2.0 0.46 and 73.0 91.0 18.0 1.31 including 83.0 85.0 2.0 8.28 |
520374 626160 92 120 -60 100 |
| SWRC166 Sewum Ext. 117.0 120.0 3.0 2.36 and 126.0 132.0 6.0 0.29 |
520355 626174 93 120 -55 140 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC167 Sewum Ext. 2 46.0 47.0 1.0 0.54 and 73.0 74.0 1.0 0.40 |
520717 626011 95 120 -50 100 |
| SWRC168 Sewum Ext. 2 4.0 8.0 4.0 0.48 and 35.0 47.0 12.0 0.85 and 72.0 85.0 13.0 0.70 and 91.0 100.0 9.0 0.49 |
520655 626046 101 120 -50 100 |
| SWRC169 Sewum Ext. 1.0 9.0 8.0 0.50 and 15.0 29.0 14.0 0.83 including 24.0 27.0 3.0 2.50 and 36.0 37.0 1.0 0.30 |
520441 626176 107 120 -55 85 |
| SWRC170 Sewum Ext. 2 96.0 100.0 4.0 0.30 and 122.0 124.0 2.0 0.72 |
520633 626060 101 120 -55 130 |
| NBRC016 Nyam 23.0 29.0 6.0 1.03 and 50.0 54.0 4.0 0.40 and 68.0 86.0 18.0 0.63 and 97.0 100.0 3.0 0.48 and 109.0 112.0 3.0 0.55 |
530221 637264 81 300 -60 130 |
| NBRC017 Nyam 8.0 53.0 45.0 1.38 including 8.0 30.0 22.0 0.74 and incl. 47.0 53.0 6.0 6.25 and 64.0 66.0 2.0 1.88 and 83.0 93.0 10.0 0.41 and 102.0 107.0 5.0 0.54 and 135.0 137.0 2.0 0.34 |
530241 637278 69 300 -60 150 |
| NBRC018 Nyam 10.0 12.0 2.0 0.25 and 36.0 42.0 6.0 0.32 |
530180 637314 76 300 -60 84 |
| NBRC019 Nyam 80.0 82.0 2.0 0.35 and 91.0 108.0 17.0 1.20 |
530845 638277 81 300 -60 156 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| NBRC020 Nyam 51.0 60.0 9.0 1.14 and 73.0 102.0 29.0 0.94 and 110.0 120.0 10.0 1.18 and 139.0 143.0 4.0 0.41 |
530506 637714 86 300 -60 150 |
| NBRC021 Nyam 15.0 17.0 2.0 0.33 and 32.0 34.0 2.0 0.73 and 50.0 54.0 4.0 1.56 and 63.0 84.0 21.0 1.42 and 90.0 96.0 6.0 1.26 and 102.0 105.0 3.0 0.36 and 109.0 119.0 10.0 0.52 and 126.0 129.0 3.0 0.65 |
530474 637679 93 300 -60 130 |
| NBRC022 Nyam 8.0 10.0 2.0 1.96 and 70.0 90.0 20.0 1.72 and 116.0 119.0 3.0 0.36 |
530435 637610 102 300 -60 150 |
| NBRC023 Nyam 49.0 51.0 2.0 0.19 |
530712 638187 98 300 -60 80 |
| NBRC024 Nyam 22.0 26.0 4.0 0.67 and 41.0 42.0 1.0 0.89 and 57.0 84.0 27.0 1.34 and 93.0 102.0 9.0 3.45 and 113.0 120.0 7.0 0.47 and 137.0 146.0 9.0 0.38 |
530262 637265 78 300 -60 156 |
| NBRC025 Nyam 33.0 35.0 2.0 0.51 and 72.0 73.0 1.0 0.41 and 92.0 124.0 32.0 0.84 and 136.0 139.0 3.0 0.51 and 151.0 162.0 11.0 0.55 |
530284 637253 78 300 -60 174 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| NBRC026 Nyam 64.0 66.0 2.0 0.36 and 79.0 91.0 12.0 0.42 and 96.0 98.0 2.0 0.86 and 105.0 109.0 4.0 2.39 and 116.0 117.0 1.0 0.65 and 125.0 127.0 2.0 1.00 and 145.0 148.0 3.0 0.57 and 170.0 173.0 3.0 0.41 and 177.0 179.0 2.0 0.34 |
530262 637240 75 300 -60 204 |
| NBRC027 Nyam 3.0 9.0 6.0 2.83 and 39.0 55.0 16.0 0.48 and 60.0 62.0 2.0 0.36 |
530200 637284 74 300 -60 110 |
| NBRC028 Nyam 32.0 36.0 4.0 0.46 and 60.0 74.0 14.0 0.49 |
530122 637161 76 300 -60 132 |
| NBRC029 Nyam 10.0 11.0 1.0 1.15 and 59.0 61.0 2.0 0.82 and 87.0 89.0 2.0 0.53 |
530142 637152 78 300 -60 150 |
| NBRC030 Nyam 69.0 85.0 16.0 1.17 and 102.0 104.0 2.0 0.53 and 110.0 115.0 5.0 1.48 and 150.0 155.0 5.0 0.34 and 158.0 160.0 2.0 0.32 |
530180 637146 77 300 -60 180 |
| NBRC031 Nyam 28.0 29.0 1.0 0.49 and 104.0 106.0 2.0 0.32 and 124.0 148.0 24.0 0.31 and 158.0 164.0 6.0 1.48 and 177.0 188.0 11.0 1.28 |
530297 637242 80 300 -60 210 |
| NBRC032 Nyam 170.0 226.0 56.0 0.40 |
530507 637573 72 300 -60 258 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| NBRC033 Nyam 151.0 153.0 2.0 0.57 and 201.0 214.0 13.0 1.00 and 233.0 235.0 2.0 0.32 |
530909 638234 97 300 -60 264 |
| NBRC034 Nyam 0.0 14.0 14.0 0.59 |
530760 638239 100 300 -60 156 |
| NBRC035 Nyam 130.0 132.0 2.0 0.57 and 135.0 137.0 2.0 0.54 and 142.0 144.0 2.0 0.78 |
530910 638345 84 300 -60 156 |
| NBRC036 Nyam 7.0 9.0 2.0 0.75 and 87.0 88.0 1.0 0.38 |
531135 638959 70 300 -60 102 |
| NBRC037 Nyam 6.0 7.0 1.0 0.34 and 20.0 21.0 1.0 0.69 and 68.0 77.0 9.0 0.46 and 81.0 83.0 2.0 0.48 |
531161 638947 79 300 -60 156 |
| NBRC038 Nyam 109.0 112.0 3.0 0.52 and 122.0 126.0 4.0 0.42 and 130.0 132.0 2.0 0.33 |
531190 638936 68 300 -60 204 |
| NBRC039 Nyam 7.0 29.0 22.0 0.50 |
531096 638870 72 300 -60 114 |
| NBRC040 Nyam 52.0 70.0 18.0 0.30 and 76.0 83.0 7.0 1.05 |
531120 638857 75 300 -60 156 |
| NBRC041 Nyam 111.0 131.0 20.0 0.39 |
531147 638847 74 300 -60 201 |
| NBRC042A Nyam 9.0 15.0 6.0 0.40 and 24.0 37.0 13.0 0.62 |
531054 638780 83 300 -60 102 |
| NBRC043 Nyam 104.0 124.0 20.0 0.31 |
531099 638758 76 300 -60 180 |
| NBRC044 Nyam 8.0 10.0 2.0 0.98 and 17.0 20.0 3.0 0.53 and 41.0 67.0 26.0 1.17 |
530696 638123 132 300 -60 162 |
| NBRC045 Nyam 165.0 174.0 9.0 0.81 and 179.0 219.0 40.0 1.57 including 185.0 194.0 9.0 5.40 |
530544 637644 115 300 -60 252 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| NBRC046 Nyam 116.0 119.0 3.0 0.52 and 124.0 147.0 23.0 0.60 |
530527 637695 104 300 -60 186 |
| NBRC047 Nyam 182.0 205.0 23.0 0.48 and 212.0 216.0 4.0 0.40 and 222.0 247.0 25.0 1.94 including 227.0 234.0 7.0 5.78 |
530572 637672 112 300 -60 247 |
| NBRC048 Nyam 79.0 85.0 6.0 0.33 and 95.0 101.0 6.0 0.31 and 104.0 114.0 10.0 0.30 |
530333 637622 101 300 -60 114 |
| NBRC049 Nyam 7.0 10.0 3.0 0.39 and 13.0 14.0 1.0 0.37 |
530360 637607 102 300 -60 134 |
| NBRC050 Nyam 11.0 13.0 2.0 1.23 and 23.0 27.0 4.0 1.03 and 35.0 45.0 10.0 0.67 and 50.0 53.0 3.0 0.35 |
530339 637516 96 300 -60 120 |
| NBRC051 Nyam 15.0 16.0 1.0 0.30 and 28.0 31.0 3.0 0.99 and 38.0 47.0 9.0 0.69 and 57.0 65.0 8.0 0.51 |
530325 637479 93 300 -60 126 |
| NBRC052 Nyam 4.0 7.0 3.0 1.28 and 17.0 22.0 5.0 0.31 and 24.0 26.0 2.0 0.34 and 38.0 40.0 2.0 0.34 and 67.0 69.0 2.0 1.97 |
530267 637402 87 300 -60 115 |
| NBRC053 Nyam 9.0 11.0 2.0 0.86 and 42.0 44.0 2.0 0.32 and 48.0 57.0 9.0 1.32 and 100.0 107.0 7.0 0.33 |
530292 637376 79 300 -60 155 |
| NBRC054 Nyam no significant results |
530206 637384 72 300 -60 115 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| NBRC055 Nyam 12.0 21.0 9.0 0.38 and 102.0 103.0 1.0 1.04 |
530229 637372 78 300 -60 144 |
| NBRC056 Nyam no significant results |
530086 637145 80 300 -60 153 |
| NBRC057 Nyam 102.0 103.0 1.0 0.31 |
530012 637064 77 300 -60 150 |
| NBRC058 Nyam 17.0 19.0 2.0 1.11 and 94.0 95.0 2.0 0.29 and 106.0 108.0 2.0 0.68 |
530119 637014 75 300 -60 162 |
| NBRC059B Nyam 97.0 106.0 10.0 1.60 |
530177 637089 73 300 -60 150 |
| NBRC060 Nyam 7.0 8.0 1.0 0.74 and 84.0 85.0 1.0 0.22 |
529938 636854 84 300 -60 174 |
| NBRC061 Nyam no significant results |
529759 636735 106 300 -60 156 |
| NBRC062 Nyam 60.0 61.0 1.0 0.26 and 75.0 76.0 1.0 0.52 |
529834 636686 99 300 -60 162 |
| NBRC063 Nyam no significant results |
529657 636560 114 300 -60 150 |
| NBRC064 Nyam 58.0 59.0 1.0 0.49 |
529735 636517 113 300 -60 150 |
| NBRC065 Nyam no significant results |
529555 636386 117 300 -60 156 |
| NBRC066 Nyam 89.0 104.0 15.0 0.52 |
529631 636341 94 300 -60 153 |
| NBRC067 Nyam 49.0 50.0 1.0 0.36 and 87.0 89.0 2.0 0.35 and 111.0 113.0 2.0 0.43 and 129.0 130.0 1.0 1.14 and 147.0 184.0 37.0 0.54 including 159.0 164.0 5.0 1.69 |
530332 637356 79 300 -60 184 |
| NBRC068 Nyam 48.0 49.0 1.0 1.03 and 104.0 105.0 1.0 0.34 and 121.0 122.0 1.0 1.66 and 153.0 154.0 1.0 0.35 and 201.0 203.0 2.0 0.93 and 234.0 238.0 4.0 0.62 |
530363 637340 85 300 -60 252 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| NBRC069 Nyam 16.0 25.0 9.0 0.60 and 33.0 38.0 5.0 0.58 and 56.0 58.0 2.0 0.41 |
530308 637454 89 300 -60 144 |
| NBRC070 Nyam 79.0 80.0 1.0 1.11 and 148.0 149.0 1.0 0.52 and 181.0 183.0 2.0 0.58 and 195.0 199.0 4.0 1.02 and 231.0 234.0 3.0 0.75 |
530251 637110 81 300 -50 240 |
| NBRC071 Nyam 60.0 65.0 5.0 0.44 and 92.0 93.0 1.0 1.53 and 101.0 118.0 17.0 0.72 |
530354 637456 93 300 -50 135 |
| NBRC072 Nyam 59.0 61.0 2.0 0.58 and 76.0 78.0 2.0 0.46 and 85.0 105.0 20.0 0.58 and 127.0 129.0 2.0 0.62 |
530402 637545 95 300 -60 140 |
| NBRC073 Nyam 26.0 27.0 1.0 0.40 and 74.0 131.0 57.0 0.78 including 94.0 103.0 9.0 1.34 |
530425 637572 98 300 -60 142 |
| NBRC074 Nyam 125.0 131.0 6.0 0.45 and 141.0 147.0 6.0 0.55 and 163.0 178.0 15.0 0.55 including 157.0 159.0 2.0 0.99 and 192.0 194.0 2.0 1.42 |
530457 637552 94 300 -60 197 |
| NBRC075 Nyam 0.0 35.0 35.0 2.04 including 8.0 16.0 8.0 4.89 and incl. 9.0 11.0 2.0 9.60 and 108.0 110.0 2.0 0.27 |
530404 637629 99 300 -60 144 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| NBRC076 Nyam 1.0 51.0 50.0 0.85 including 1.0 14.0 13.0 1.18 and incl. 31.0 39.0 8.0 2.10 |
530442 637701 96 300 -60 120 |
| NBRC077 Nyam 52.0 60.0 8.0 0.51 and 69.0 98.0 29.0 1.13 and 119.0 126.0 7.0 0.49 and 141.0 145.0 4.0 0.39 |
530488 637722 83 300 -60 183 |
| NBRC078 Nyam 27.0 30.0 3.0 0.57 and 36.0 115.0 79.0 0.53 |
530501 637751 85 300 -55 144 |
| NBRC079 Nyam 92.0 119.0 27.0 0.89 including 104.0 109.0 5.0 2.19 and 132.0 142.0 10.0 0.45 |
530538 637730 93 300 -55 160 |
| NBRC080 Nyam 62.0 68.0 6.0 0.51 and 81.0 83.0 2.0 0.41 and 91.0 94.0 3.0 4.63 and 106.0 111.0 5.0 0.96 and 124.0 132.0 8.0 0.70 |
530536 637767 87 300 -60 180 |
| NBRC081 Nyam 33.0 43.0 10.0 0.99 and 94.0 101.0 7.0 0.46 and 120.0 130.0 10.0 1.68 |
530615 637853 83 300 -50 144 |
| NBRC082 Nyam 0.0 12.0 12.0 0.34 and 75.0 83.0 8.0 0.52 and 93.0 108.0 15.0 1.18 including 93.0 97.0 4.0 2.41 |
530599 637880 88 300 -60 162 |
| NBRC083 Nyam 71.0 72.0 1.0 0.32 |
530548 637941 84 300 -60 100 |
| NBRC084 Nyam 92.0 102.0 10.0 0.93 and 108.0 120.0 12.0 0.89 |
530634 637896 88 300 -50 126 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| NBRC085 Nyam 0.0 18.0 18.0 1.26 including 11.0 13.0 2.0 6.46 and 82.0 85.0 3.0 0.60 |
530572 637961 89 300 -60 120 |
| NBRC086 Nyam 10.0 12.0 2.0 0.32 and 17.0 36.0 19.0 1.24 and 101.0 102.0 1.0 0.45 and 115.0 117.0 2.0 0.37 and 121.0 128.0 7.0 0.42 |
530597 637974 89 300 -60 130 |
| NBRC087 Nyam 1.0 4.0 3.0 0.51 and 71.0 79.0 8.0 0.52 and 84.0 103.0 19.0 2.14 including 92.0 94.0 2.0 4.14 |
530632 637952 95 300 -60 120 |
| NBRC088 Nyam 57.0 85.0 28.0 0.88 and 80.0 82.0 2.0 5.09 |
530616 637935 95 300 -60 110 |
| NBRC089 Nyam 0.0 5.0 5.0 1.86 and 37.0 39.0 2.0 0.76 and 44.0 53.0 9.0 0.92 and 60.0 62.0 2.0 0.88 |
530631 637994 103 300 -60 152 |
| NBRC090 Nyam 17.0 18.0 1.0 0.41 and 23.0 24.0 1.0 0.36 and 32.0 35.0 3.0 1.53 and 78.0 109.0 31.0 0.77 including 102.0 103.0 1.0 4.92 including 107.0 108.0 1.0 5.19 and 115.0 116.0 1.0 0.30 and 156.0 158.0 2.0 0.34 |
530663 638009 110 300 -60 160 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| From (m) To (m) Length (m) Au (g/t) Hole ID Zone/Deposit |
UTM East Azimuth ° UTM North Elevation Dip ° Hole Length (m) |
|---|---|
| NBRC091 Nyam 84.0 86.0 2.0 0.38 and 91.0 103.0 12.0 1.02 and 134.0 139.0 5.0 0.54 and 147.0 150.0 3.0 0.61 |
530704 637995 106 300 -60 204 |
| NBRC092 Nyam 9.0 13.0 4.0 0.61 and 38.0 62.0 24.0 1.79 including 51.0 55.0 4.0 4.14 |
530670 638079 139 300 -60 129 |
| NBRC093 Nyam 40.0 41.0 1.0 0.33 and 49.0 59.0 10.0 0.24 and 79.0 127.0 48.0 0.43 including 79.0 91.0 12.0 0.89 and incl. 84.0 88.0 4.0 1.79 including 95.0 107.0 12.0 0.54 and incl. 99.0 102.0 3.0 1.32 and 113.0 114.0 1.0 0.35 and 132.0 133.0 1.0 0.51 |
530683 638040 130 300 -60 183 |
| NBRC094 Nyam 0.0 2.0 2.0 0.30 and 14.0 28.0 14.0 0.68 |
530669 638118 137 300 -63 132 |
| NBRC095 Nyam 61.0 75.0 14.0 0.72 including 70.0 74.0 4.0 1.42 and 105.0 125.0 20.0 0.90 including 111.0 114.0 3.0 2.38 and 134.0 136.0 2.0 1.99 |
530726 638099 90 300 -60 138 |
| NBRC096 Nyam no significant results |
530681 638193 109 300 -60 130 |
| NBRC097 Nyam 10.0 35.0 25.0 0.87 including 20.0 24.0 4.0 2.59 |
530805 638296 84 300 -60 82 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| From (m) To (m) Length (m) Au (g/t) Hole ID Zone/Deposit |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| NBRC098 Nyam 15.0 19.0 4.0 0.88 and 28.0 30.0 2.0 0.58 and 44.0 46.0 2.0 0.45 and 52.0 54.0 2.0 0.56 |
530925 638536 136 300 -60 126 |
| NBRC099 Nyam 13.0 35.0 22.0 0.34 and 46.0 48.0 2.0 0.43 and 80.0 84.0 4.0 0.44 and 110.0 112.0 2.0 0.25 including 121.0 123.0 2.0 0.29 |
530901 638474 112 300 -60 130 |
| NBRC100 Nyam 2.0 6.0 4.0 0.83 and 16.0 28.0 12.0 0.77 |
530813 638335 78 300 -60 120 |
| NBRC101 Nyam 2.0 3.0 1.0 0.58 and 6.0 11.0 5.0 0.36 and 73.0 75.0 2.0 0.43 |
530817 638367 100 300 -60 83 |
| NBRC102 Nyam 32.0 46.0 14.0 0.24 and 52.0 57.0 5.0 0.40 and 75.0 77.0 2.0 0.42 |
530848 638350 89 300 -60 120 |
| NBRC103 Nyam 11.0 23.0 12.0 0.89 and 43.0 44.0 1.0 0.34 |
530854 638384 85 300 -60 126 |
| NBRC104 Nyam 78.0 98.0 20.0 0.84 and 108.0 119.0 11.0 0.87 |
530849 638314 87 300 -60 120 |
| NBRC105 Nyam 0.0 11.0 11.0 0.63 and 22.0 41.0 19.0 0.38 and 90.0 96.0 6.0 0.40 |
530737 638212 89 300 -60 132 |
| NBRC106 Nyam 3.0 4.0 1.0 1.88 and 41.0 45.0 4.0 0.50 and 67.0 78.0 11.0 1.08 |
530548 637825 77 300 -60 138 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| NBRC107 Nyam 8.0 12.0 4.0 0.52 and 20.0 22.0 2.0 0.54 and 30.0 34.0 4.0 0.63 |
530547 637889 78 300 -60 66 |
| NBDD048 Nyam 82.0 84.0 2.0 0.53 and 182.0 183.0 1.0 0.84 and 207.0 208.0 1.0 0.81 and 212.0 213.0 1.0 0.30 and 227.0 229.0 2.0 0.37 and 236.0 249.0 13.0 4.51 including 237.5 245.2 7.7 7.40 and 269.0 271.0 2.0 1.24 and 295.7 299.0 3.3 0.69 |
530341 637217 96 300 -60 319.2 |
| NBDD049 Nyam 114.0 115.0 1.0 0.72 and 121.2 122.7 1.5 1.42 and 255.5 258.7 3.5 0.90 and 307.0 310.0 3.0 0.27 and 323.0 342.0 19.0 0.37 including 327.0 335.0 8.0 0.54 and 361.0 364.0 3.0 0.67 |
530629 637594 99 300 -62 382.3 |
| NBDD050 Nyam 116.0 117.5 1.5 0.35 and 159.0 160.5 1.5 0.30 and 183.3 186.0 2.7 0.33 and 211.0 213.0 2.0 0.81 and 277.0 281.7 4.7 0.26 and 293.0 300.0 7.0 0.45 and 320.0 321.0 1.0 0.41 and 332.5 333.6 1.5 0.57 |
530617 637648 107 300 -63 337.3 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| NBDD051 Nyam 45.8 46.4 0.6 0.33 and 65.0 66.8 1.8 0.82 and 90.0 91.0 1.0 0.49 and 105.0 107.1 2.1 0.23 and 240.0 242.2 2.2 0.34 and 245.0 247.6 2.6 0.42 and 254.0 266.0 12.0 0.65 and 274.0 276.0 2.0 4.57 and 305.0 306.8 1.8 1.81 |
530286 637133 75 300 -63 360.7 |
| NBDD052 Nyam 207.0 212.0 5.0 1.47 and 280.0 297.0 17.0 0.31 and 321.0 336.0 15.0 3.21 including 322.0 330.0 8.0 5.57 |
530677 637738 105 300 -63 393.7 |
| NBDD053 Nyam 172.0 174.0 2.0 0.82 and 253.0 254.0 1.0 0.74 and 258.0 275.0 17.0 0.50 and 291.2 300.1 8.9 1.54 including 291.2 293.0 1.8 3.78 including 297.0 298.0 1.0 4.20 and 311.4 314.6 3.2 0.58 and 326.6 337.2 10.6 0.37 |
530628 637680 109 300 -63 382.4 |
| NBDD054 Nyam 167.0 170.0 3.0 1.77 and 373.4 374.5 1.1 1.38 and 390.0 397.0 30.0 0.34 and 423.9 431.0 7.1 0.98 including 428.4 429.0 0.6 3.52 |
530672 637613 118 300 -63 466.7 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Dip ° Hole Length (m) UTM North Elevation Azimuth ° |
|---|---|
| NBDD055 Nyam 211.0 213.0 2.0 0.29 248.8 250.0 1.2 1.17 263.0 265.0 2.0 0.74 268.0 270.0 2.0 0.32 276.0 284.0 8.0 1.57 279.0 281.2 2.2 2.64 |
530401 637334 92 300 -63 337.4 |
| NBDD056 Nyam 100.0 102.3 2.3 1.49 248.7 273.5 24.8 1.62 248.7 257.7 9.0 3.17 278.0 291.0 13.0 0.67 303.4 305.3 1.9 0.46 |
530364 637280 95 300 -63 331.4 |
| NKRC001 Nkwanta no significant results |
525094 633089 101 300 -55 100 |
| KKRC017A Kwakyekrom 45.0 48.0 3.0 0.52 and 69.0 70.0 1.0 1.17 and 89.0 120.0 31.0 0.46 including 107.0 120.0 13.0 0.72 |
528698 634833 127 298 -60 150 |
| KKRC018 Kwakyekrom 35.0 39.0 4.0 0.29 and 86.0 92.0 6.0 0.80 and 99.0 110.0 11.0 2.35 |
528658 634784 129 298 -60 120 |
| KKRC019 Kwakyekrom 4.0 7.0 3.0 0.36 and 58.0 78.0 20.0 0.36 including 59.0 63.0 4.0 0.50 and incl. 70.0 76.0 6.0 0.64 and 88.0 92.0 4.0 0.38 and 102.0 104.0 2.0 0.50 |
528611 634738 128 298 -60 120 |
| KKRC020 Kwakyekrom 26.0 28.0 2.0 0.79 and 44.0 47.0 3.0 0.43 and 60.0 75.0 15.0 0.48 and 79.0 83.0 4.0 1.04 |
528598 634714 133 298 -60 110 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KKRC021 Kwakyekrom 52.0 69.0 17.0 0.57 and 97.0 104.0 7.0 0.94 |
528592 634693 132 298 -60 114 |
| KKRC022 Kwakyekrom 41.0 67.0 26.0 0.51 including 59.0 66.0 5.0 1.59 and 101.0 104.0 3.0 0.57 |
528555 634617 124 298 -60 114 |
| KKRC023 Kwakyekrom 34.0 40.0 6.0 4.71 and 60.0 66.0 6.0 0.34 |
528542 634595 117 298 -60 122 |
| KKRC024 Kwakyekrom 35.0 38.0 3.0 0.77 and 59.0 74.0 15.0 0.44 and 104.0 113.0 9.0 0.23 |
528550 634557 104 298 -60 130 |
| KKRC025 Kwakyekrom 0.0 18.0 18.0 0.45 including 13.0 17.0 4.0 1.00 and 23.0 29.0 6.0 0.57 and 69.0 77.0 8.0 0.21 and 89.0 100.0 11.0 0.63 |
528502 634580 103 298 -60 100 |
| KKRC026 Kwakyekrom 20.0 24.0 4.0 1.32 and 70.0 73.0 3.0 0.44 and 80.0 94.0 14.0 1.69 and 120.0 121.0 1.0 0.44 and 126.0 128.0 2.0 0.63 and 138.0 141.0 3.0 0.31 |
528614 634705 128 298 -60 162 |
| KKRC027 Kwakyekrom 1.0 3.0 2.0 0.29 and 49.0 51.0 2.0 0.42 and 78.0 81.0 3.0 0.39 and 84.0 101.0 17.0 0.91 |
528611 634689 128 298 -60 168 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KKRC028 Kwakyekrom 111.0 137.0 26.0 1.43 including 115.0 124.0 9.0 3.31 and 149.0 157.0 8.0 0.34 and 162.0 167.0 5.0 0.69 and 176.0 180.0 4.0 0.39 |
528632 634668 126 298 -60 213 |
| KKRC029 Kwakyekrom 21.0 45.0 24.0 0.89 and 54.0 56.0 2.0 0.41 and 116.0 118.0 2.0 0.35 and 123.0 125.0 2.0 0.43 |
528574 634699 133 298 -60 126 |
| KKRC030 Kwakyekrom 65.0 66.0 1.0 0.42 and 68.0 69.0 1.0 0.46 and 109.0 127.0 18.0 0.97 and 145.0 147.0 2.0 0.43 |
528653 634733 127 298 -60 180 |
| KKRC031 Kwakyekrom 30.0 32.0 2.0 0.78 and 114.0 124.0 10.0 2.97 and 162.0 168.0 6.0 0.88 and 181.0 184.0 3.0 0.36 |
528682 634774 131 298 -60 186 |
| KKRC032 Kwakyekrom 14.0 24.0 10.0 0.32 and 56.0 63.0 7.0 0.40 |
528570 634723 134 298 -60 114 |
| KKRC033 Kwakyekrom 26.0 28.0 2.0 0.33 and 47.0 49.0 2.0 0.41 and 69.0 75.0 6.0 1.19 |
528569 634584 109 298 -60 126 |
| KKRC034 Kwakyekrom 14.0 46.0 32.0 0.68 and 67.0 74.0 7.0 0.58 and 90.0 95.0 5.0 0.34 |
528517 634607 124 298 -60 102 |
| KKRC035 Kwakyekrom 0.0 7.0 7.0 0.46 and 17.0 25.0 8.0 0.82 and 39.0 41.0 2.0 0.30 |
528532 634631 125 298 -60 108 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KKRC036 Kwakyekrom 19.0 22.0 3.0 0.49 and 28.0 31.0 3.0 0.41 and 54.0 61.0 7.0 1.95 and 93.0 114.0 21.0 0.41 |
528625 634796 130 298 -60 114 |
| KKRC037 Kwakyekrom 44.0 46.0 2.0 0.35 and 88.0 92.0 4.0 0.49 and 105.0 107.0 2.0 4.12 |
528661 634846 126 298 -60 110 |
| KKRC038 Kwakyekrom 36.0 29.0 3.0 0.38 and 97.0 111.0 14.0 0.35 and 126.0 128.0 2.0 0.37 and 131.0 143.0 12.0 0.83 and 153.0 170.0 17.0 1.44 |
528738 634809 128 298 -60 200 |
| KKRC039 Kwakyekrom 28.0 38.0 10.0 0.31 |
528692 634909 129 298 -60 129 |
| KKRC040 Kwakyekrom 12.0 39.0 27.0 0.34 and 95.0 99.0 4.0 0.29 and 107.0 109.0 2.0 1.29 and 116.0 120.0 4.0 0.47 |
528741 634889 127 298 -60 162 |
| KKRC041 Kwakyekrom 0.0 53.0 53.0 0.79 and 70.0 84.0 14.0 0.45 |
528466 634474 104 298 -60 120 |
| KKRC042 Kwakyekrom 0.0 2.0 2.0 0.33 and 38.0 39.0 1.0 0.50 and 48.0 50.0 2.0 0.35 and 56.0 62.0 6.0 0.47 |
528440 634487 108 298 -60 100 |
| KKRC043 Kwakyekrom 73.0 83.0 10.0 1.51 and 89.0 92.0 3.0 1.16 and 138.0 140.0 2.0 0.90 |
528580 634606 123 298 -60 144 |
| KKRC044 Kwakyekrom 14.0 22.0 8.0 0.49 |
528362 634281 143 298 -60 114 |
| KKRC045 Kwakyekrom 80.0 87.0 7.0 1.03 |
528409 634257 142 298 -60 162 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KKRC046 Kwakyekrom 55.0 79.0 24.0 0.50 including 58.0 72.0 14.0 0.61 |
528407 634372 123 298 -60 96 |
| KKRC047 Kwakyekrom 74.0 76.0 2.0 0.33 and 88.0 96.0 8.0 0.41 |
528454 634348 124 298 -60 138 |
| KKRC048 Kwakyekrom 24.0 26.0 2.0 0.46 and 58.0 73.0 15.0 1.29 and 111.0 122.0 11.0 1.86 and 144.0 147.0 3.0 0.69 |
528499 634456 106 298 -60 150 |
| KKRC049 Kwakyekrom 60.0 67.0 7.0 0.34 and 117.0 120.0 3.0 0.91 and 197.0 200.0 3.0 0.40 and 208.0 213.0 5.0 2.33 |
528539 634435 109 298 -60 213 |
| KKRC050 Kwakyekrom 0.0 3.0 3.0 0.37 and 25.0 28.0 3.0 0.32 and 36.0 56.0 20.0 0.55 and 97.0 118.0 21.0 0.46 including 97.0 108.0 11.0 0.71 |
528572 634653 131 298 -60 132 |
| KKRC051 Kwakyekrom 148.0 198.0 50.0 0.61 including 164.0 173.0 9.0 1.36 and 210.0 212.0 2.0 0.44 and 225.0 227.0 2.0 1.02 and 241.0 244.0 3.0 0.63 |
528656 634656 119 298 -60 246 |
| KKRC052 Kwakyekrom 54.0 55.0 1.0 0.64 and 75.0 76.0 1.0 0.52 and 112.0 132.0 20.0 1.19 including 113.0 118.0 5.0 2.75 |
528640 634698 122 298 -60 192 |
| KKRC053 Kwakyekrom 145.0 149.0 4.0 0.90 and 172.0 190.0 18.0 0.75 and 210.0 212.0 2.0 0.38 |
528667 634679 120 298 -60 240 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KKRC054 Kwakyekrom 98.0 109.0 11.0 0.58 |
528602 634632 128 298 -60 156 |
| KKRC055 Kwakyekrom 8.0 12.0 4.0 1.21 and 98.0 99.0 1.0 0.70 and 108.0 121.0 13.0 0.94 and 162.0 163.0 1.0 0.54 |
528590 634565 106 298 -60 168 |
| KKRC056 Kwakyekrom 81.0 88.0 7.0 0.23 and 105.0 106.0 1.0 0.45 and 110.0 125.0 15.0 0.96 including 110.0 119.0 9.0 1.46 and 129.0 130.0 1.0 0.35 and 134.0 141.0 7.0 0.23 and 160.0 189.0 29.0 0.94 including 170.0 176.0 6.0 2.65 |
528600 634591 114 298 -60 189 |
| KKRC057 Kwakyekrom 90.0 91.0 1.0 0.31 and 119.0 121.0 2.0 0.31 and 131.0 148.0 17.0 0.25 and 192.0 194.0 2.0 0.29 |
528636 634623 120 298 -60 202 |
| KKRC058 Kwakyekrom 70.0 72.0 2.0 0.53 and 78.0 80.0 2.0 0.28 including 85.0 87.0 2.0 0.45 and 91.0 92.0 1.0 0.32 and 105.0 106.0 1.0 0.56 and 146.0 147.0 1.0 0.33 and 171.0 174.0 3.0 1.47 and 179.0 181.0 2.0 0.28 and 194.0 195.0 1.0 0.39 and 230.0 232.0 2.0 0.64 |
528812 634852 113 298 -60 267 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KKRC059 Kwakyekrom 148.0 151.0 3.0 1.13 and 169.0 171.0 2.0 0.50 and 177.0 184.0 7.0 0.63 and 217.0 218.0 1.0 1.63 |
528776 634792 118 298 -60 276 |
| KKRC060 Kwakyekrom 148.0 156.0 8.0 0.66 and 168.0 177.0 9.0 0.71 and 189.0 190.0 1.0 1.41 |
528710 634749 127 298 -60 234 |
| KKRC061C Kwakyekrom 154.0 156.0 2.0 0.45 |
528696 634718 117 298 -60 210 |
| KKRC062 Kwakyekrom no significant results |
528326 634188 167 298 -60 107 |
| KKRC063 Kwakyekrom 86.0 89.0 3.0 0.44 and 123.0 124.0 1.0 0.51 and 154.0 155.0 1.0 0.78 |
528364 634167 169 298 -60 186 |
| KKRC064 Kwakyekrom 84.0 85.0 1.0 0.61 and 114.0 123.0 9.0 0.50 |
528384 633885 129 298 -60 144 |
| KKRC065 Kwakyekrom 94.0 105.0 11.0 0.90 and 141.0 144.0 3.0 0.64 |
528409 633870 123 298 -60 200 |
| KKRC066 Kwakyekrom no significant results |
529459 636214 80 298 -60 138 |
| KKRC067 Kwakyekrom 35.0 36.0 1.0 0.20 |
529362 636053 110 298 -60 152 |
| KKRC068 Kwakyekrom 81.0 83.0 2.0 0.22 |
529534 636175 93 298 -60 144 |
| KKRC069 Kwakyekrom no significant results |
529156 635702 113 298 -60 150 |
| KKRC070 Kwakyekrom 31.0 32.0 1.0 0.46 and 128.0 132.0 4.0 0.37 and 141.0 144.0 3.0 1.54 |
529236 635656 109 298 -60 160 |
| KKRC071 Kwakyekrom 32.0 33.0 1.0 0.24 and 64.0 65.0 1.0 0.53 |
529055 635525 90 298 -60 162 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KKRC072 Kwakyekrom 3.0 8.0 5.0 0.21 and 12.0 15.0 3.0 0.23 and 22.0 23.0 1.0 0.27 and 29.0 30.0 1.0 0.36 and 92.0 93.0 1.0 2.70 and 155.0 156.0 1.0 0.31 |
529126 635490 96 298 -60 166 |
| KKRC073 Kwakyekrom no significant results |
529260 635869 96 298 -60 156 |
| KKRC074 Kwakyekrom 91.0 94.0 3.0 0.41 |
529331 635828 88 298 -60 162 |
| KKRC075 Kwakyekrom 53.0 60.0 7.0 2.31 and 79.0 82.0 3.0 0.22 and 105.0 108.0 3.0 0.33 |
528961 635355 100 298 -60 150 |
| KKRC076 Kwakyekrom 46.0 47.0 1.0 0.21 and 119.0 132.0 13.0 1.14 and 156.0 157.0 1.0 0.75 and 174.0 178.0 4.0 0.50 and 185.0 186.0 1.0 0.45 and 189.0 191.0 2.0 2.29 |
529022 635319 97 298 -60 200 |
| KKRC077 Kwakyekrom 23.0 29.0 6.0 0.52 and 153.0 154.0 1.0 0.30 |
528913 635267 112 298 -60 162 |
| KKRC078 Kwakyekrom 63.0 78.0 15.0 0.28 including 72.0 74.0 2.0 1.23 and 136.0 138.0 2.0 0.71 and 161.0 184.0 23.0 0.56 including 172.0 174.0 2.0 1.79 |
528983 635231 97 298 -60 192 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| KKRC079 Kwakyekrom 104.0 106.0 2.0 0.23 and 147.0 152.0 5.0 0.67 and 155.0 157.0 2.0 0.60 and 160.0 166.0 6.0 0.73 and 182.0 184.0 2.0 0.72 and 198.0 203.0 5.0 1.84 and 208.0 210.0 2.0 2.61 |
528950 635137 90 298 -60 210 |
| KKRC080 Kwakyekrom 6.0 7.0 1.0 0.30 and 40.0 43.0 3.0 1.67 and 50.0 51.0 1.0 0.53 and 81.0 110.0 29.0 0.99 and 122.0 123.0 1.0 0.32 and 129.0 132.0 3.0 0.54 and 145.0 147.0 2.0 0.25 |
528825 635093 94 298 -60 162 |
| KKRC081 Kwakyekrom 104.0 105.0 1.0 0.24 |
528901 635052 98 298 -60 156 |
| KKRC082 Kwakyekrom 39.0 49.0 10.0 0.36 and 57.0 59.0 2.0 0.43 and 62.0 64.0 2.0 0.45 and 116.0 117.0 1.0 0.88 |
528840 634942 102 298 -60 150 |
| KKRC083 Kwakyekrom 53.0 62.0 9.0 0.77 and 166.0 169.0 3.0 0.39 |
528894 634916 98 298 -60 188 |
| KKRC084 Kwakyekrom 80.0 84.0 4.0 0.71 |
529438 635997 87 298 -60 168 |
| KJRC011 Kojina Hill no significant results |
528887 637281 110 300 -65 170 |
| KJRC012 Kojina Hill 218.0 222.0 4.0 1.34 and 229.0 230.0 1.0 0.83 |
528887 637281 110 300 -75 252 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| KJRC013 Kojina Hill 6.0 13.0 7.0 0.33 and 83.0 113.0 30.0 0.39 including 83.0 91.0 8.0 0.51 and incl. 94.0 99.0 5.0 0.56 and incl. 109.0 113.0 4.0 0.57 |
528897 637243 123 300 -60 170 |
| KJRC014 Kojina Hill 57.0 60.0 3.0 0.37 and 209.0 212.0 3.0 0.37 |
528897 637243 123 300 -75 288 |
| KJRC015 Kojina Hill 126.0 127.0 1.0 0.40 and 139.0 140.0 1.0 0.42 |
528867 637240 130 300 -60 192 |
| KJRC016 Kojina Hill 174.0 175.0 1.0 0.31 and 208.0 209.0 1.0 0.30 and 244.0 246.0 2.0 0.33 |
528871 637239 127 300 -75 252 |
| KJRC017 Kojina Hill 108.0 112.0 4.0 0.86 and 119.0 122.0 3.0 0.28 and 125.0 145.0 20.0 1.09 including 125.0 129.0 4.0 2.52 and 155.0 156.0 1.0 0.47 |
528838 637203 149 300 -65 162 |
| KJRC018 Kojina Hill 48.0 50.0 2.0 0.30 and 98.0 102.0 4.0 0.68 |
528860 637219 141 300 -65 150 |
| KJRC019 Kojina Hill 81.0 89.0 8.0 0.50 and 121.0 122.0 1.0 0.60 |
528871 637239 129 270 -70 282 |
| KJRC020 Kojina Hill 67.0 69.0 2.0 0.44 |
528805 637400 97 120 -55 90 |
| KJRC021 Kojina Hill no significant results |
528774 637413 88 120 -55 132 |
| KJRC022 Kojina Hill 2.0 3.0 1.0 0.62 and 44.0 49.0 5.0 1.68 and 61.0 120.0 59.0 0.79 including 80.0 90.0 10.0 3.03 |
528789 637334 113 120 -55 120 |
| KJRC023 Kojina Hill no significant results |
528766 637358 64 120 -55 168 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| KJRC024 Kojina Hill 86.0 100.0 14.0 0.87 and 117.0 132.0 15.0 1.44 |
528786 637377 107 120 -55 160 |
| ERDD011 Eradi 118.7 120.0 1.3 0.36 and 148.7 150.0 1.3 0.73 and 166.0 169.0 3.0 0.28 |
539579 650489 165 130 -60 179.2 |
| ERDD012 Eradi 25.0 26.0 1.0 0.35 |
539818 650767 211 130 -60 79.7 |
| ERDD012A Eradi 77.0 78.0 1.0 0.95 and 172.7 173.5 0.8 0.31 and 192.0 193.0 1.0 0.39 and 256.0 257.0 1.0 0.36 |
539823 650758 212 130 -60 260.2 |
| ERDD013 Eradi 19.6 26.0 6.4 0.35 |
539765 650539 161 130 -60 81.1 |
| ERDD014 Eradi 102.5 103.7 1.2 0.48 |
539860 650741 216 130 -60 182.2 |
| ERDD015 Eradi 9.7 14.3 4.6 0.87 and 65.8 72.9 7.1 0.61 and 105.6 107.8 2.2 0.93 |
539729 650573 163 130 -60 158.2 |
| ERDD016 Eradi 6.8 8.6 1.8 0.48 and 34.0 34.7 0.7 0.57 |
539878 650616 197 130 -60 102.2 |
| ERDD017 Eradi 7.2 8.6 1.4 0.49 and 75.7 77.4 1.7 0.95 and 79.7 81.0 1.3 0.27 and 99.7 100.7 1.0 0.38 |
539848 650644 203 130 -60 102 |
| ERDD018 Eradi 10.2 10.8 0.6 0.39 and 34.6 35.7 1.1 0.77 |
540021 650784 193 130 -60 152.2 |
| ERDD019 Eradi 25.0 29.0 4.0 0.44 and 75.9 77.3 1.4 0.76 |
540284 651078 127 130 -60 173.1 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| ERDD020 Eradi 10.0 11.0 1.0 0.31 and 15.2 19.7 4.5 0.43 and 41.2 89.0 47.8 0.89 including 41.2 43.7 2.5 6.44 and incl. 54.2 60.0 5.8 2.14 and 92.8 93.8 1.0 2.45 |
540466 651192 178 130 -60 158.2 |
| ERDD021 Eradi 75.2 79.2 4.0 0.56 and 124.0 125.0 1.0 1.61 and 198.3 204.0 3.5 0.41 |
540551 651237 186 130 -60 224 |
| ERDD022 Eradi 80.0 82.0 2.0 0.95 and 88.0 89.5 1.5 0.53 and 91.0 92.0 1.0 0.34 and 152.0 154.0 2.0 0.56 and 168.0 169.0 1.0 0.47 |
540356 651175 159 130 -60 185.2 |
| ERDD023 Eradi 77.4 84.0 6.6 0.60 and 126.0 127.0 1.0 0.31 |
540304 651188 113 130 -60 152 |
| TORC001 Tokosea 3.0 7.0 4.0 0.21 and 26.0 27.0 1.0 0.35 and 67.0 69.0 2.0 0.22 and 76.0 78.0 2.0 0.33 and 80.0 82.0 2.0 0.36 and 87.0 89.0 2.0 0.30 |
522718 629843 117 120 -50 96 |
| TORC002 Tokosea 5.0 7.0 2.0 0.20 |
522659 629877 127 120 -50 100 |
| TORC003 Tokosea 2.0 4.0 2.0 0.58 and 38.0 49.0 11.0 0.81 including 44.0 46.0 2.0 2.73 |
522604 629911 144 120 -50 100 |
| TORC004 Tokosea no significant results |
522562 629719 123 120 -50 100 |
| TORC005 Tokosea no significant results |
522499 629747 126 120 -50 100 |
| TORC006 Tokosea 35.0 36.0 1.0 0.21 |
522342 629817 126 120 -50 102 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| TORC007 Tokosea 32.0 33.0 1.0 0.40 and 36.0 67.0 31.0 0.36 including 37.0 45.0 8.0 0.67 and 77.0 79.0 2.0 0.40 and 87.0 113.0 26.0 0.34 |
522290 629847 120 120 -50 114 |
| TORC008 Tokosea 12.0 13.0 1.0 0.45 and 22.0 23.0 1.0 0.29 and 25.0 26.0 1.0 0.52 and 33.0 51.0 18.0 0.34 including 43.0 46.0 3.0 0.79 and 71.0 72.0 1.0 0.66 and 79.0 80.0 1.0 0.80 |
522436 629991 129 120 -50 102 |
| TORC009 Tokosea 1.0 9.0 8.0 0.41 and 50.0 61.0 11.0 0.23 and 71.0 72.0 1.0 1.01 and 111.0 112.0 1.0 0.36 and 117.0 120.0 3.0 0.44 |
522369 630029 119 120 -50 126 |
| TORC010 Tokosea 9.0 13.0 4.0 0.20 and 17.0 21.0 4.0 0.34 and 38.0 59.0 21.0 0.30 including 55.0 56.0 1.0 1.44 and 71.0 78.0 7.0 0.35 |
522776 629274 117 120 -50 100 |
| TORC011 Tokosea 20.0 29.0 9.0 0.20 and 51.0 57.0 6.0 0.34 and 71.0 74.0 3.0 0.57 |
522732 629213 107 120 -50 114 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| TORC012 Tokosea 4.0 31.0 27.0 0.51 including 23.0 28.0 5.0 1.92 and 43.0 44.0 1.0 0.40 and 104.0 107.0 3.0 0.42 and 112.0 115.0 3.0 0.36 and 125.0 131.0 6.0 1.73 including 125.0 127.0 2.0 4.35 |
522650 629254 134 120 -50 132 |
| TORC013 Tokosea 31.0 37.0 6.0 0.38 including 33.0 34.0 1.0 1.51 and 70.0 71.0 1.0 0.46 and 88.0 90.0 2.0 0.45 and 103.0 108.0 5.0 0.73 |
522866 629373 120 120 -50 130 |
| TORC014 Tokosea 19.0 20.0 1.0 0.30 and 29.0 31.0 2.0 0.38 and 42.0 44.0 2.0 0.53 and 52.0 56.0 4.0 0.30 and 75.0 76.0 1.0 0.46 and 104.0 106.0 2.0 0.31 |
522992 629514 147 120 -50 114 |
| TORC015 Tokosea 96.0 97.0 1.0 0.29 |
522795 629414 118 120 -50 102 |
| TORC016 Tokosea 26.0 27.0 1.0 1.83 and 43.0 54.0 11.0 0.84 including 53.0 54.0 1.0 6.81 and 61.0 67.0 6.0 0.39 |
523092 629680 120 120 -50 100 |
| TORC017 Tokosea 51.0 52.0 1.0 0.33 and 61.0 62.0 1.0 0.38 |
522648 628835 122 120 -50 120 |
| TORC018 Tokosea 4.0 5.0 1.0 0.85 |
522502 628681 111 120 -50 102 |
| TORC019 Tokosea 26.0 29.0 3.0 0.67 and 84.0 91.0 7.0 0.87 |
522423 628718 121 120 -50 102 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| TORC020 Tokosea 74.0 86.0 12.0 0.90 including 76.0 78.0 2.0 4.55 and 127.0 129.0 2.0 0.93 |
522566 628880 157 120 -50 138 |
| TORC021 Tokosea 55.0 57.0 2.0 0.51 and 72.0 77.0 5.0 1.30 including 74.0 75.0 1.0 4.17 |
522477 628821 137 120 -50 108 |
| TORC022 Tokosea no significant results |
523036 629482 161 120 -50 108 |
| TORC023 Tokosea 89.0 90.0 1.0 0.47 and 96.0 98.0 2.0 0.36 and 108.0 109.0 1.0 0.32 |
523241 630315 134 120 -50 114 |
| TORC024 Tokosea 2.0 9.0 7.0 0.22 and 17.0 26.0 9.0 0.21 and 29.0 39.0 10.0 0.20 |
523838 630705 136 120 -50 108 |
| TORC025 Tokosea 3.0 6.0 3.0 1.15 and 69.0 70.0 1.0 0.31 and 74.0 83.0 9.0 3.52 including 77.0 81.0 4.0 7.36 and 90.0 91.0 1.0 0.33 |
523959 630632 141 120 -50 108 |
| TORC026 Tokosea 12.0 14.0 2.0 0.41 and 18.0 19.0 1.0 0.50 and 43.0 54.0 11.0 0.52 including 45.0 46.0 1.0 2.88 and 87.0 89.0 2.0 1.36 and 91.0 92.0 1.0 0.29 and 104.0 105.0 1.0 0.26 |
523893 630671 133 120 -50 108 |
| TORC027 Tokosea 41.0 44.0 3.0 0.24 and 48.0 53.0 5.0 0.76 and 97.0 98.0 1.0 0.29 |
523937 630780 142 120 -50 114 |
| TORC028 Tokosea 7.0 10.0 3.0 0.49 |
524067 630710 134 120 -50 120 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| TORC029 Tokosea 14.0 16.0 2.0 0.55 and 55.0 59.0 4.0 0.36 |
524018 630724 136 120 -50 102 |
| TORC030 Tokosea 1.0 4.0 3.0 0.30 and 32.0 33.0 1.0 0.52 and 76.0 77.0 1.0 0.34 |
523788 630451 112 120 -50 170 |
| TORC031 Tokosea 0.0 4.0 4.0 1.73 and 26.0 30.0 4.0 1.31 and 55.0 57.0 2.0 0.71 and 97.0 115.0 18.0 0.83 including 107.0 112.0 5.0 1.89 |
523744 630489 131 120 -50 120 |
| TORC032 Tokosea 105.0 110.0 5.0 3.36 and 131.0 148.0 17.0 1.67 including 131.0 132.0 1.0 18.17 |
523676 630518 135 120 -50 156 |
| TORC033 Tokosea 1.0 7.0 6.0 0.82 and 25.0 29.0 4.0 0.65 and 90.0 91.0 1.0 0.46 |
523685 630319 114 120 -50 124 |
| TORC034A Tokosea 5.0 20.0 15.0 0.60 including 17.0 18.0 1.0 3.13 and 35.0 36.0 1.0 1.40 |
523640 630345 114 120 -50 160 |
| TORC035 Tokosea 9.0 15.0 6.0 0.30 and 90.0 91.0 1.0 0.48 |
524244 631301 142 120 -50 130 |
| TORC036 Tokosea 7.0 8.0 1.0 0.27 and 93.0 97.0 4.0 0.37 and 133.0 138.0 5.0 0.32 and 147.0 150.0 3.0 0.92 and 155.0 157.0 2.0 0.47 |
524182 631335 153 120 -50 162 |
| TORC037 Tokosea 5.0 6.0 1.0 0.28 and 43.0 44.0 1.0 0.22 |
524518 631332 134 120 -50 137 |
| TORC038 Tokosea 0.0 1.0 1.0 0.21 |
524425 631204 151 120 -50 126 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| TORC039 Tokosea 5.0 16.0 11.0 0.23 and 33.0 34.0 1.0 0.27 and 53.0 54.0 1.0 0.28 and 94.0 95.0 1.0 0.28 |
524357 631237 163 120 -50 156 |
| TORC040 Tokosea 1.0 2.0 1.0 0.24 and 20.0 21.0 1.0 0.28 and 40.0 41.0 1.0 0.28 and 109.0 111.0 2.0 0.80 |
524319 631321 173 120 -50 138 |
| TORC041 Tokosea 35.0 36.0 1.0 0.60 and 57.0 58.0 1.0 0.32 and 67.0 68.0 1.0 1.02 |
524457 631372 157 120 -50 136 |
| TORC042 Tokosea 5.0 6.0 1.0 0.31 and 72.0 73.0 1.0 0.23 |
524401 631414 167 120 -50 126 |
| TORC043 Tokosea 18.0 20.0 2.0 0.79 and 84.0 85.0 1.0 2.12 |
524342 631447 162 120 -50 102 |
| TORC044 Tokosea 14.0 24.0 10.0 0.43 and 49.0 50.0 1.0 0.31 and 66.0 72.0 6.0 0.21 |
524288 631486 174 120 -50 108 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| TORC045 Tokosea 0.0 12.0 12.0 0.33 and 19.0 20.0 1.0 0.50 and 30.0 57.0 27.0 1.80 including 31.0 34.0 3.0 4.13 including 38.0 41.0 3.0 3.41 including 47.0 50.0 3.0 3.76 and 78.0 86.0 8.0 0.58 and 90.0 91.0 1.0 0.36 and 96.0 98.0 2.0 0.28 and 102.0 103.0 1.0 0.62 and 108.0 109.0 1.0 0.39 and 114.0 115.0 1.0 0.28 and 120.0 121.0 1.0 0.26 and 134.0 149.0 15.0 0.93 including 140.0 143.0 3.0 3.22 |
523739 630276 112 120 -50 150 |
| TORC046 Tokosea 3.0 5.0 2.0 0.53 and 61.0 62.0 1.0 0.27 and 161.0 173.0 12.0 0.62 including 164.0 165.0 1.0 6.27 |
523492 630405 123 120 -50 180 |
| TORC047 Tokosea 0.0 10.0 10.0 1.20 including 1.0 3.0 2.0 4.26 and 26.0 30.0 4.0 0.99 and 66.0 68.0 2.0 0.25 and 85.0 86.0 1.0 0.46 and 110.0 112.0 2.0 0.32 and 121.0 123.0 2.0 0.37 and 126.0 127.0 1.0 0.30 |
523130 630115 136 120 -50 138 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| TORC048 Tokosea 0.0 32.0 32.0 0.40 including 8.0 10.0 2.0 0.59 including 27.0 30.0 3.0 2.10 and 38.0 42.0 4.0 0.40 and 63.0 64.0 1.0 0.33 and 73.0 76.0 3.0 0.53 and 87.0 95.0 8.0 0.74 |
523153 630362 122 120 -50 100 |
| TORC049 Tokosea no significant results |
522211 628391 118 120 -50 120 |
| TORC050 Tokosea no significant results |
522156 628419 130 120 -50 144 |
| TORC051 Tokosea 35.0 36.0 1.0 0.46 |
522349 628119 142 120 -50 120 |
| TORC052 Tokosea 39.0 40.0 1.0 0.62 and 47.0 49.0 2.0 0.26 |
522310 628139 143 120 -50 114 |
| TORC053 Tokosea no significant results |
522241 628175 122 120 -50 108 |
| TORC054 Tokosea no significant results |
522179 628204 112 120 -50 126 |
| TORC055 Tokosea no significant results |
522195 628547 105 120 -50 102 |
| TORC056 Tokosea no significant results |
522183 628619 112 120 -50 100 |
| TORC057 Tokosea 42.0 55.0 13.0 1.29 and 106.0 138.0 32.0 0.48 including 108.0 115.0 7.0 1.06 |
629167 522608 130 120 -50 150 |
| TORC058 Tokosea 102.0 103.0 1.0 0.23 |
629278 522608 136 120 -50 114 |
| TORC059 Tokosea no significant results |
629325 522691 135 120 -50 156 |
| TORC060 Tokosea 6.0 7.0 1.0 0.37 and 30.0 31.0 1.0 0.38 and 89.0 90.0 1.0 0.23 |
630004 522974 137 120 -50 150 |
| TORC061 Tokosea no significant results |
630092 523016 140 120 -50 150 |
| TORC062 Tokosea 0.0 1.0 1.0 0.25 and 18.0 21.0 3.0 0.27 and 23.0 25.0 2.0 0.33 and 38.0 39.0 1.0 0.35 |
630143 523088 137 120 -50 150 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| TORC063 Tokosea 10.0 18.0 8.0 1.34 |
630275 523132 122 120 -50 123 |
| TORC064 Tokosea no significant results |
630395 523112 121 120 -50 174 |
| TORC065 Tokosea 15.0 19.0 4.0 0.29 and 24.0 43.0 19.0 0.31 and 57.0 61.0 4.0 0.81 and 145.0 147.0 2.0 1.32 |
630458 523197 114 120 -50 150 |
| TORC066 Tokosea 75.0 77.0 2.0 0.61 |
630324 523852 132 120 -50 132 |
| TORC067 Tokosea 28.0 30.0 2.0 1.08 |
630374 523781 108 120 -50 156 |
| TORC068 Tokosea no significant results |
630263 523800 121 120 -50 132 |
| TORC069 Tokosea 2.0 4.0 2.0 0.54 including 1.0 6.0 5.0 0.31 and 36.0 38.0 2.0 0.24 and 51.0 53.0 2.0 0.30 and 60.0 61.0 1.0 0.33 and 66.0 67.0 1.0 0.48 and 85.0 86.0 1.0 0.27 and 97.0 98.0 1.0 1.21 and 108.0 109.0 1.0 1.88 and 179.0 181.0 2.0 0.28 |
630285 523722 116 120 -57 207 |
| TORC070 Tokosea 28.0 36.0 8.0 1.73 and 78.0 80.0 2.0 1.62 |
630530 523911 138 120 -50 132 |
| TORC071 Tokosea 54.0 56.0 2.0 0.61 and 61.0 64.0 3.0 0.53 and 90.0 96.0 6.0 0.55 and 114.0 116.0 2.0 0.33 and 125.0 126.0 1.0 1.34 and 133.0 134.0 1.0 0.36 |
630592 523798 122 120 -50 150 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| TORC072A Tokosea 53.0 67.0 14.0 0.24 and 78.0 80.0 2.0 0.41 and 87.0 90.0 3.0 0.29 and 96.0 97.0 1.0 0.43 and 101.0 106.0 5.0 0.28 and 114.0 115.0 1.0 0.46 and 133.0 134.0 1.0 0.50 and 140.0 143.0 3.0 0.35 |
630428 523681 121 120 -50 162 |
| TORC073 Tokosea no significant results |
630713 523823 135 120 -55 96 |
| TORC074 Tokosea 32.0 34.0 2.0 0.74 and 57.0 63.0 6.0 0.43 and 81.0 85.0 4.0 0.49 |
630648 523929 136 120 -50 150 |
| TORC075 Tokosea 1.0 3.0 2.0 0.31 |
630615 523999 150 120 -50 78 |
| TORC076 Tokosea 128.0 129.0 1.0 0.80 and 132.0 133.0 1.0 0.76 |
630575 524062 172 300 -50 150 |
| TORC077 Tokosea 71.0 78.0 7.0 2.11 |
630236 523812 118 300 -50 102 |
| TORC078 Tokosea 1.0 2.0 1.0 0.84 and 22.0 25.0 3.0 0.60 |
630351 523177 130 300 -55 48 |
| TORC079 Tokosea no significant results |
630360 523153 116 120 -70 54 |
| TORC080 Tokosea 10.0 11.0 1.0 0.25 and 84.0 113.0 29.0 0.35 including 85.0 91.0 6.0 0.53 |
630324 523225 136 300 -50 120 |
| TORC081 Tokosea 7.0 8.0 1.0 0.26 and 96.0 99.0 3.0 1.01 and 119.0 120.0 1.0 0.82 and 158.0 168.0 10.0 1.64 |
630190 523670 131 120 -50 171 |
| TORC082 Tokosea 66.0 67.0 1.0 0.35 |
630107 523757 118 300 -70 144 |
| SWRC114 Sewum South 54.0 57.0 3.0 0.40 and 107.0 110.0 3.0 0.30 |
518581 624633 105 114 -55 114 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project 2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East Azimuth ° Dip ° Hole Length (m) UTM North Elevation |
|---|---|
| SWRC115 Sewum South 61.0 64.0 3.0 0.97 |
518542 624660 112 114 -55 120 |
| SWRC116 Sewum South no significant results |
518887 624432 81 114 -55 102 |
| SWRC117 Sewum South 20.0 26.0 6.0 0.75 |
518414 624361 110 114 -55 102 |
| SWRC118 Sewum South 9.0 14.0 5.0 0.35 and 20.0 22.0 2.0 0.32 and 33.0 50.0 17.0 0.31 including 35.0 38.0 3.0 0.63 and 72.0 74.0 2.0 0.34 and 78.0 80.0 2.0 0.48 and 106.0 107.0 1.0 0.40 |
518336 624390 108 114 -55 114 |
| SWRC119 Sewum South 97.0 98.0 1.0 0.82 |
519546 625004 87 114 -55 100 |
| SWRC120 Sewum South no significant results |
519485 625030 88 114 -55 102 |
| SWRC121 Sewum South 54.0 78.0 24.0 0.53 including 54.0 57.0 3.0 1.09 including 69.0 71.0 2.0 1.61 |
518704 625382 141 114 -55 108 |
| SWRC122 Sewum South 21.0 23.0 2.0 0.40 |
518905 625299 101 114 -55 100 |
| SWRC123 Sewum South 29.0 30.0 1.0 0.22 |
519390 625078 87 114 -55 102 |
| SWRC124 Sewum South 41.0 43.0 2.0 0.81 |
518975 626583 208 114 -55 102 |
| SWRC125 Sewum South 86.0 92.0 6.0 0.45 |
519047 626547 198 114 -55 100 |
| SWRC126 Sewum South 21.0 22.0 1.0 0.31 and 29.0 31.0 2.0 0.81 and 47.0 48.0 1.0 0.36 and 56.0 61.0 5.0 0.26 and 66.0 68.0 2.0 0.64 |
519141 626508 137 114 -55 102 |
| SWRC127 Sewum South 20.0 21.0 1.0 0.40 |
519245 626465 108 114 -55 114 |
| SWRC128 Sewum South 80.0 81.0 1.0 0.26 and 111.0 112.0 1.0 0.22 |
518657 625888 211 114 -55 120 |
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com
Newcore Gold Ltd. | Enchi Gold Project
2020 - 2022 Drill Results
==> picture [176 x 33] intentionally omitted <==
Table accompanies news release dated July 27, 2022
| Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t) |
UTM East UTM North Elevation Azimuth ° Dip ° Hole Length (m) |
|---|---|
| SWRC129 Sewum South 19.0 35.0 16.0 0.51 including 19.0 21.0 2.0 1.64 including 30.0 33.0 3.0 0.94 and 48.0 50.0 2.0 0.48 |
518726 625859 178 114 -55 100 |
| SWRC130 Sewum South 14.0 18.0 4.0 1.50 and 25.0 40.0 15.0 0.95 including 25.0 30.0 5.0 2.31 |
518791 625819 145 114 -55 102 |
| SWRC131 Sewum South 42.0 50.0 8.0 1.57 |
518836 625800 134 294 -50 100 |
| SWRC132 Sewum South 11.0 12.0 1.0 0.32 |
518918 626183 167 114 -55 100 |
| SWRC133 Sewum South 14.0 24.0 10.0 0.76 including 22.0 23.0 1.0 3.94 and 35.0 38.0 3.0 0.30 |
518991 626151 120 114 -55 100 |
| SWRC134 Sewum South 26.0 27.0 1.0 0.30 |
519146 625649 132 294 -50 102 |
| SWRC135 Sewum South 11.0 12.0 1.0 0.19 |
519082 625670 120 294 -50 102 |
| SWRC136 Sewum South 16.0 17.0 1.0 0.47 |
519063 625680 123 114 -55 102 |
| SWRC137 Sewum South 46.0 47.0 1.0 0.37 |
520106 626951 109 114 -50 102 |
| SWRC138 Sewum South 2.0 3.0 1.0 0.2 and 67.0 68.0 1.0 0.3 |
520028 626992 111 114 -50 100 |
| SWRC139 Sewum South no significant results |
519963 627038 101 114 -50 108 |
| SWRC140 Sewum South 17.0 18.0 1.0 0.18 and 95.0 96.0 1.0 0.42 |
519324 626827 130 114 -55 100 |
| SWRC141A Sewum South 60.0 62.0 2.0 0.39 |
518947 625742 193 114 -50 200 |
| SWRC142 Sewum South 30.0 31.0 1.0 0.26 |
518986 625727 162 114 -55 100 |
-
Intervals reported are hole lengths with true width estimated to be 75 - 85%.
-
Length-weighted averages from uncut assays.
-
All drilling completed by independent contractor.
-
All drilling samples sealed on site and delivered directly to independent lab Intertek Mineral Limited located in Tarkwa, Ghana for preparation and 50g Fire Assay with AAS finish.
-
QA/QC procedures include industry standard inclusion of standards, blanks, and duplicates in all sample batches.
TSX-V: NCAU | OTCQX: NCAUF | www.newcoregold.com