Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Nesco Ltd AGM Information 2020

Aug 14, 2020

60999_rns_2020-08-14_257cb643-da68-482b-81b3-d4dea3cc1007.pdf

AGM Information

Open in viewer

Opens in your device viewer

NESCO LIMITED Nesco Center Goregaon (East) Mumbai 400063

T +9122 6645 0123 F +9122 6645 0101 E [email protected] Ww www.nesco.in

14 August 2020

Department of Corporate Services 5th Floor, Exchange Plaza, 25" Floor, Phiroze Jeejeebhoy Towers, Bandra Kurla Complex, Dalal Street, Bandra (East), Mumbai - 400 001. Mumbai - 400 051.

BSE Limited National Stock Exchange of India Limited

Ref : 505355 Ref : NESCO

Sub: Presentation made at the 61%* Annual General Meeting

Dear Sir,

Enclosed herewith is the Presentation made by the Vice Chairman and Managing Director of the Company at the 61st Annual General Meeting held on 14 August 2020.

Request you to take the same on your records.

Thanking you

Yours faithfully,

For Nesco Limited

Jinal J. Shah Company Secretary and Compliance Officer

Encl : As above

Nesco Limited

Nesco Center, Western Express Highway, Goregaon (East), Mumbai 400063 Maharahstra, India

CIN L17100MH1946PLC004886

Disclaimer

This presentation and the accompanying slides (the "Presentation"), which have been prepared by Nesco Limited (the "Company"), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe for any securities, and shall not form the basis or be relied on in connection with any contract or binding commitment whatsoever. No offering of securities of the Company will be made except by means of a statutory offering document containing detailed information about the Company. This Presentation has been prepared by the Company based on information and data which the Company considers reliable, but the Company makes no representation or warranty, express or implied, whatsoever, and no reliance shall be placed on, the truth, accuracy, completeness, fairness and reasonableness of the contents of this Presentation. This Presentation may not be all inclusive and may not contain all of the information that you may consider material. Any liability in respect of the contents of, or any omission from, this Presentation is expressly excluded. This Presentation may contain forward-looking statements based on reasonable beliefs and assumptions of the management of the Company, which are expressed in good faith. Such statements involve uncertainties and other factors which may cause the actual results, financial condition, performance or achievements of the Company or industry results, to differ materially from the results, financial condition, performance or achievements expressed or implied by such statements. By their nature, forward-looking statements inherently involve risks and uncertainties because they relate to events and depend on circumstances that may or may not occur in the future. Such statements are not guarantee of future performance and actual results may differ from those specified in such statements as a result of various such factors and assumptions. No assurance is being provided that the assumptions underlying such forward-looking statements are free from errors.

Tower 03

Tower 04

Particulars Unit Existing Proposed Total
Tower 03 Tower 04 Tower 02
Area - Office Space & Related Sq. Ft. 6,65,000 12,00,000 26,80,000 45,45,000
Area - Licensed / Contracted Sq. Ft. 6,65,000 9,15,000 15,80,000
Capex - Cost of Construction Rs. Crores 140.00 400.00 950.00 1,490.00
Capex - MCGM Charges Rs. Crores 10.00 170.00 500.00 680.00
Capex - Total Rs. Crores 150.00 570.00 1,450.00 2,170.00
Annual Revenue (100% Occupancy) Rs. Crores 115.00 200.00 500.00
Revenue Yield Rs. psf/pm 145.00 150.00 160.00
Area - Hotel Sq. Ft. 3,40,000
Capex - Cost of Construction Rs. Crores 250.00
Capex - MCGM Charges Rs. Crores 100.00
Capex - Total Rs. Crores 350.00
Annual Revenue (70% Occupancy) Rs. Crores 100.00

Proposed Tower 02

Proposed Tower 02

  • Designed by Singapore based Architect firm
  • 26,80,000 Sq. Ft. office space
  • Floor plates ranging from 25,000 Sq. Ft. to 120,000 Sq. Ft. with options for horizontal and vertical exclusivity experience
  • Proposed Platinum LEED Certified
  • Direct Connectivity to Metro Station

Proposed Tower 02

  • Integrated 4 Star Business Hotel 300 keys, F&B and Banquet areas
  • Business Centre
  • Over 120,000 Sq. Ft. Open Space for Circulation and F&B on Plinth
  • Parking for over 3,000 vehicles
  • Landscape at multiple levels of building

Capacity

Facility Area(Sq. Ft)
Hall 01 2,10,000
Hall 02 80,000
Hall 03 1,20,000
Hall 04 1,15,000
Hall 05 47,500
Area - Existing 5,72,500
Area - Proposed in FY2021 1,50,000
  • Airconditioned Halls
  • Ground Level
  • Currently has been serving the city residents as large covid care facility.
  • Depending on the improvement of the Covid situation, we hope to have some exhibitions/events to resume in Q4

Proposed New Hall

Proposed Hall Floor Plan

  • Free Hall with 14 meter clear height
  • (Exhibitions, Musical Events, Sporting Events, Corporate Programs and more
  • structure with RCC

Covid Care Centre / MCGM

Hygiene Teams

The Root

Grande

  • Prefunction area • Ample parking space

Restaurants

  • Multiple restaurants • Food Court Outlets • Serving variety of cuisines

Community

  • Manufacturing located in Gujarat at Karamsad and Vishnoli
  • Fully integrated capability to manufacture Equipments, Spares and Abrasives • Surface Preparation Equipments,
  • Painting Systems, Dust Collectors

Shot Peening machine with Robotic Pick & Place

Large machines for Indian Railways CNC shot peening for clutch plates