CORPORATE DIRECTORY IFC
CHAIRMAN'S LETTER 02
REVIEW OF OPERATIONS 04
DIRECTORS' REPORT 14
AUDITOR'S INDEPENDENCE DECLARATION 28
INDEPENDENT AUDITOR'S REPORT 29
DIRECTORS' DECLARATION 31
CONSOLIDATED STATEMENT OF
COMPREHENSIVE INCOME
33
CONSOLIDATED STATEMENT
OF FINANCIAL POSITION
34
CONSOLIDATED STATEMENT
OF CHANGES IN EQUITY
35
CONSOLIDATED STATEMENT
OF CASH FLOWS
36
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 37
CORPORATE GOVERNANCE STATEMENT 85
ADDITIONAL SECURITIES EXCHANGE
INFORMATION
98

Letter From The Chairman

Dear Shareholder,

The past year has been one of great change for Reed Resources, with the company focused on bringing its 100% owned Meekatharra Gold Project (MGP) into production by the end of 2012. Reed acquired MGP in July 2011 and after completing a Bankable Feasibility Study (BFS) in February 2012, a decision to mine was made by the board, subject to equity and debt funding being secured. The company successfully completed a \$40 million capital raising through a fully underwritten entitlement offer to shareholders in May 2012 and recently announced it had engaged Credit Suisse to provide a \$19 million debt facility for working capital purposes.

Work on refurbishment and the upgrade of the Meekatharra plant and infrastructure is progressing on budget and on schedule. Reed made the decision to undertake a certain portion of the refurbishment work in-house and this had led to cost savings over amounts initially forecast in the BFS.

As MGP moves towards production, staffing levels have increased in line with the increase in activity. While the labour market has been tight, Reed has been fortunate enough to secure an experienced team of key personnel who will help ensure the success of the mine over the coming years. As part of this process the company appointed Luke Tonkin as managing director and CEO. Luke brings a wealth of relevant experience to Reed, including many years developing and operating mines in Western Australia.

With continuing global economic uncertainty, governments around the world have taken measures to ease monetary policy in order to boost activity and employment. Against this backdrop, the outlook for gold is strong. Reed is in a position to take advantage of gains in gold price to achieve delivery prices above those outlined in the BFS. This will provide the company with a comfortable margin over its forecast cost of production. The substantial working capital generated through production of the 134,000oz of gold in Stage 1 will strengthen the balance sheet and enable increased production levels as we exploit and expand the 618,000oz Stage 2 gold reserve.

Assessment of the Barrambie Titanium and Vanadium Project and the Mount Marion Lithium Project continued during the year. Considerable work was undertaken to identify and evaluate the optimal way to ensure long-term cost competitiveness and maximise the enterprise values of the projects.

The Barrambie Titanium and Vanadium project is on the cusp of a technological breakthrough from a proprietary hydrometallurgical process developed in Canada. The results from laboratory scale test work undertaken to date have been positive and in line with results being reported by a number of companies trialling similar technology on hardrock titanium deposits. A larger-scale continuous program of test work is scheduled for later this year, based on recent encouraging test results.

With Reed's primary strategy being the development and commissioning of MGP, investor focus on the Mount Marion Lithium project has decreased. This is not to say the project doesn't have considerable potential and value. The recent \$740 million acquisition of Western Australian producer Talison Lithium by Rockwood Holdings highlights the strong outlook for the lithium battery business throughout the world.

It is my opinion that Reed shares are trading at a substantial discount to other mining companies with comparative levels of reserves and resources. However, I feel a positive re-rating will occur at the end of the year when gold production at Meekatharra commences.

I reverted to non-executive chairman from 1 July and Christopher Reed moved to the position of executive director with responsibility for our lithium, titanium and vanadium projects. I would like to take this opportunity to sincerely thank retiring directors Ian Junk and Peter Collins for their many years of dedicated commitment as members of Reed Resources' board of directors.

In closing, I thank all our directors and staff for an excellent contribution in this exciting stage of our company's development and to our shareholders for their continued involvement and support of the company.

David Reed CHAIRMAN, REED RESOURCES LIMITED

MEEKATHARRA GOLD PROJECT

(Reed 100%)

Reed Resources' Meekatharra Gold Project is situated in Western Australia's prolific Meekatharra – Wydgee Greenstone Belt which is host to a number of multimillion ounce deposits, which include Mt Magnet (8 Moz) and Tuckabiana (1 Moz).

Reed has managed to acquire one of the most fertile contiguous packages of land in this greenstone belt. It has a strike of 110km, covers approximately 1,000 square kilometres and has produced in excess of 4.5 Moz of gold during the course of its history.

Strategically located in the centre of the project area is Reed's 3 million tonne per annum Bluebird CIL processing plant. Co-located at Bluebird are support infrastructures including administration offices, workshops, laboratories, power station and a 190 room accommodation village, all of which have a replacement cost in excess of \$100 million.

Project Strategy

Reed is taking a strategic and disciplined 3 stage approach to the exploitation of Meekatharra's 752,000oz Reserve and 3.6 Moz Resources base (inclusive of Reserves) with the aim of delivering sustainable production of 100 to 150 thousand ounces of gold per year at a cost of less than \$1,000 per ounce over 10 years.

Stage 1 will focus on the Yaloginda region which has produced 1.5 Moz to date. In the first 19 months 134,000 ounces will be produced from four low risk open pits - Bluebird, Batavia, Whagamata and Surprise, all within 6.5km of the Bluebird CIL plant.

Stage 2 will exploit the remaining 618,000 ounces of Reserves, and will see the focus expand from open pit to open pit and higher grade underground production at Paddy's Flat to the north and Reedys to the south, in addition to ongoing operations at Yaloginda.

Paddys Flat has produced approximately 2 Moz of gold and hosts multiple open pit and underground ore sources.

Initially large scale bulk lower grade open pit ore will be sourced from the Prohibition and Mickey Doolan pits whilst higher grade underground ore will be produced from the Prohibition, Vivian, Consol's, Fatts and Mudlode ore-bodies.

Reed is confident that significant potential exists to add ounces per vertical metre in the Eastern ore zones, given the existing exploration drill hole orientation and spacing is unlikely to have adequately tested very high grade gold spur veins and quartz lodes (resulting from steeply dipping cross-structures). Also, significant Resources are located near currently defined Reserves.

The Reedy tenement group is located at the southern end of the tenement package, approximately 65km from the Bluebird plant and has produced approximately 1 Moz of gold and constitutes one of the main gold camps in the Murchison Goldfields.

Mineralisation along the 15km long Reedy Shear Zone has long been recognised as economically important. Ore will be mined from existing open pit Reserves which include

Jack Ryan, Callisto and Rand, whilst exploration will target extensions to known deposits, additional open pit Resources and defining underground Reserves below South Emu, Triton, Rand and Jack Ryan.

Stage 3 of Reed's strategy will be executed concurrently with Stages 1 & 2, and will utilise the latest targeting and exploration techniques to convert as many of the remaining 2.8 Moz of Resources to Reserves, whilst also defining additional Resources and Reserves.

Since Reed Resources acquired the Meekatharra Gold Project in January 2011 the Mineral Resource Inventory has been increased by 1.2 Moz or 50% to a total of 3.6 Moz of gold and the Reserves have increased by 78% from 422,000 oz to 752,000 oz (as at June 30th, 2012).

Stage 1 – Meekatharra Gold Operations Recommencement

The Stage 1 Meekatharra Gold Operations Feasibility Study was completed as scheduled and budgeted during the year. Subsequently Reed committed to mine Stage 1 subject to equity and debt financing.

Reed completed a Rights Issue raising approximately \$40 million before costs with funds being employed to upgrade and refurbish plant, equipment and infrastructure that forms part of Stage 1 of the Meekatharra project strategy. Reed also signed an engagement letter with Credit Suisse on 26 September 2012 for a term loan facility for \$19 million and the provision of a hedging facility. The Credit Suisse offer is subject to finalisation of documentation and due diligence.

Stage 1 will produce of 2.4 Mt @ 1.9 g/t Au recovering approximately 134,000 oz over 19 months from the Bluebird, Whangamata, Batavia and Surprise open pits, all located within a six kilometre radius of the Bluebird CIL plant at Yaloginda.

Multiple Resources and Reserves exist within the Yaloginda area and are being investigated as possible ore sources for an extension to the Stage 1 operations.

Aggregate funding required for Stage 1 until positive net cash flow is achieved is estimated at A\$45 million.

Net cash flow generated during the 19 months of Stage 1 milling is estimated at A\$66 million (applying a A\$1,520 price floor). Reed is expecting to adopt a Participating Forward structure for price protection, essentially selling some production as forward delivery contracts over this period and purchasing put options for the balance. The proposed hedge structure mitigates risk resulting from unexpected gold price decline whilst retaining some exposure to higher gold prices.

Accommodation Village

The accommodation supplier, APB, commenced earthworks on site during the latter half of the year in preparation for the installation of 80 new accommodation units and a dry mess facility, effectively extending the existing Bluebird accommodation village. Both refurbishment and upgrade of the village is scheduled to be completed by October.

Current capacity of the existing village is 110 personnel which will increase to 190 when upgrade works are completed.

OPERATING INPUTS
Ore Milled 2.4 Mt
Feed Head Grade 1.88 g/t
Recovery 94%
OPERATING OUTPUTS
Recovered ounces 134,000
Revenue @ A\$1,520 / oz \$205 million
Cash available for debt servicing \$66 million
Net Cash Inflows \$45 million
FUNDING
Capex -\$24.0 million
Owners cost including mining -\$11.4 million
Equity Contribution \$35.4 million
Working capital -\$ 8.0 million
Debt Facility \$19.0 million

Project Work Packages and Delivery

The capital works package for the Stage 1 of the Meekatharra Gold Project is estimated at \$24 million and comprises replacement of the primary crusher, mill refurbishment, upgrade and refurbishment of the accommodation village, and minor capital works.

Primary Crusher

A new Metso C125 primary crusher arrived on site during the year and GR Engineering is scheduled to complete the installation of the new heavy duty crusher by mid-November 2012.

Mill Refurbishment

Refurbishment of the Bluebird CIL processing facility progressed as scheduled during the year with ~65% of total planned project refurbishment activities completed at 30 June 2012 with the remaining works to be completed by mid-November 2012. Refurbishment of the facility has progressed as budgeted.

Other Site Activities:

Power Station

During the year Pacific Energy (KPS) Pty Ltd was awarded the contract for the provision of power "over-the-fence" under a Build-Own-Operate (BOO) agreement. The existing diesel power generators were removed from site and the new power generating facility is scheduled to be installed and operational by the end of November 2012.

Mining Contract

All open pit ore sources for Stage 1 will be mined by an open pit mining contractor.

The award of the mining contract and subsequent mobilisation is subject to finalising key conditions precedent to drawdown of the debt facility. Mining contractor mobilisation is scheduled in October.

People

Key operational staff for the Meekatharra Gold Project have been appointed and further operational staff are being

Review of Operations

engaged and will commence site duties as project activity increases and preparation for mine operations intensifies.

Project Timeline

The commencement of Stage 1 mining and consequently ore processing is subject to Reed's access to debt finance covering Meekatharra Gold Project's working capital expenditure requirements. The primary condition precedent to full draw down of the facility is Department of Mines and Petroleum ('DMP') mining approval for Stage 1 open pits Batavia and Whangamata with Surprise and the 86,200 ounce Bluebird open pits already approved. Reed is working with the DMP, and particularly the Environmental Division of the DMP to progress Mining Proposals as efficiently as practicable. Material mining approvals allowing access to debt draw down are anticipated to be received over the coming weeks with mining scheduled to commence in October.

BARRAMBIE IRON-TITANIUM-VANADIUM PROJECT

(Reed 100%)

Since May 2010 Reed has been in discussions with China Non-Ferrous Metal Industry's Foreign Engineering and Construction Co. Ltd ('NFC') and West Australian based engineering and Construction Company Arccon (WA) Pty Ltd, relating to an engineering procurement and construction contract ('EPC') and project financing.

The Company received a final, fixed price EPC quote for Barrambie in early August 2011 indicating a potential capital cost saving of approximately \$100 million with Direct Construction Costs and EPCM Fee's reduced from \$539 million to \$439 million.

However, in light of ongoing weak market conditions for vanadium (US\$6.50/lb V2O5, Metals Bulletin 13/7/12) the parties have made the decision to cease further formal discussions. Barrambie remains one of the world's highest grade vanadium deposits with a Probable Ore Reserve of 39.7 Mt at 0.82% V2O5.

In the December 2011 quarter Reed commenced a concept study level evaluation of the production of a titanium rich concentrate from the Eastern Band of the Barrambie Fe-Ti-V deposit. Initially the study evaluated the recovery of titanium and iron units via the production and export of a titanomagnetite concentrate, the study has now been expanded to evaluate recovery of Fe-Ti-V units via a proprietary hydrometallurgical route. A number of companies globally are trialling variants of this technology on hard rock titanium deposits and reporting very high recoveries (+90%) of each metal (Fe-Ti-V) into pure products.

Barrambie's Eastern Band is currently the second highest grade hard rock titanium deposit globally (behind Rio Tinto's Lac Tio mine in Canada) (Mineral Resource Estimate (2005) of 48Mt @ 22% TiO2).

Initial laboratory scale test work has been conducted on Eastern Band magnetic concentrates generated during the 2007-09 DFS. A mini-plant (150kg) test work program is planned, pending the receipt of successful laboratory scale test results. A new resource estimate will be released pending determination of an appropriate cut-off grade for titanium, and supported by test work recoveries.

The Public Environmental Review Document (PER) was recommended for approval subsequent to the end of the financial year.

MOUNT MARION LITHIUM PROJECT

(Reed Resources 70%, Mineral Resources Limited earning 30%)

During the year Reed together with partner Mineral Resources Ltd ('Mineral Resources') continued to advance the Mount Marion Lithium Project ('Mount Marion').

Mount Marion has a designed capacity of 200,000 tpa of 6% Li2O chemical grade spodumene concentrate, 60,000 tpa of muscovite mica and 30 tpa tantalite concentrate.

Mine Development Update

Reed is working with Mineral Resources to establish the most effective production profile and optimal timing for the commencement of operations in light of the prevailing industry, economic and financial market conditions. All project approvals have been received.

During the year the partners met with potential marketers of lithium and mica products as part of its continuing evaluation. The world's largest spodumene producer has announced that effective from 1 July 2012 it was raising prices a further 10% and in addition to a 15% increase in the first half of 2012, however they have now commissioned an expansion from 400,000 to 740,000t. The partners believe this has the potential to elicit a response from the large South American brine producers as both are targeting the largest market in the world, China.

Project development is fully funded by Mineral Resources.

Mineral Resource Estimate

The Mount Marion deposit consists of a series of shallow westerly dipping, parallel sheets of spodumenebearing pegmatite within mafic-ultramafic volcanic rocks. The pegmatite sheets are over 20 metres in thickness and have been drill tested to a depth of ~100 metres below surface.

An updated Mineral Resource estimate was undertaken by Hellman and Schofield and reported to the market on 22 July 2011. Total resources now stand at 14.9Mt at 1.3% Li2O for 201,000 tonnes of contained lithium oxide (Li2O), representing a 38% increase over the previous estimate of 146,000 tonnes of contained Li2O.

Lithium Down-Streaming Strategy

The integration or conversion of lithium spodumenes into lithium battery materials like lithium carbonate and lithium hydroxide maximises the revenue and margins derived from the sale of product. To this end Reed completed a PFS examining the construction of a 17,000 tpa lithium carbonate facility and is working with the Malaysian Industrial Development Authority on its application for Pioneer Status/Investment Tax Allowance. Reed is also evaluating the production of a high purity lithium hydroxide product, a potentially higher margin feedstock preferred by some lithium battery makers.

Reed is continuing strategic discussions with third parties in relation to a partial sale of the spodumene concentrate operations and/or joint ventures for lithium carbonate production. It should be stressed that discussions remain preliminary and there can be no assurance that a binding proposal will emerge.

Reed continues to work with Mineral Resources reviewing the most appropriate method for the Project's special purpose vehicle to become an independently financed, industrial minerals company.

COMET VALE PROJECT

(100% Reed)

Sand Queen Gold Mine

The Sand Queen mine remains on care and maintenance and there was no production during the year.

A sale process for the Comet Vale project run during the June quarter did not generate a binding offer sufficiently attractive to Reed. Discussions are continuing with other interested parties in relation to partial or full sale alternatives. The project has combined underground and open-pitable resources of 850Kt @ 7.66g/t Au for 209,000 oz.

MT FINNERTY PROJECT

The Mt Finnerty Project, located about 65 km east of Koolyanobbing, is currently being explored for iron ore in joint venture with Cliffs Natural Resources ('Cliffs') and nickel mineralisation, partly in joint venture with Barranco Resources NL ('Barranco').

All iron exploration is conducted by Cliffs Asia Pacific Iron Ore Pty Ltd ('Cliffs'), targeting banded iron formations along the central spine of the greenstone belt.

Nickel exploration has focussed on the western flank of the greenstone belt which is most prospective for massive nickel sulphide mineralisation.

Iron Ore Joint Venture (Reed 20%, Cliffs 80%)

The first stage of a resource definition drilling program was undertaken during the December 2010 quarter with a total of 25 RC holes completed. Drill assay results confirmed a low grade iron ore occurrence with potential for gold. A magnetite exploration review was completed during the current financial year.

Nickel Exploration (Barranco 100%, Reed Option to Acquire 100%)

During the year an auger geochemical sampling survey was conducted, which confirmed strongly anomalous Ni-Cu-Pt-Pd values coincident with the contact of the western ultramafic unit with a hornfelsed basalt footwall.

A wide-spaced RC program drilled in the 2011 September Quarter intersected non-nickeliferous disseminated sulphides in a number of the drill holes, with elevated copper and PGE values at the contact positions in addition to the high MgO tenor of the ultramafics. All of these features are favourable indicators for nickel sulphides.

Nimbus Silver-Zinc Project (Reed 1% Zinc Royalty)

On 25 July 2011 the Company announced the sale of its subsidiary Kalgoorlie Ore Treatment Company Pty Ltd ("KOTC"), which holds the Nimbus processing plant and associated assets, to Macphersons Reward Gold Limited (ASX code: MRP), pursuant to a binding memorandum of understanding ("MOU"). Consideration for the sale consisted of \$4.5 million (\$3.4 million cash and \$1.6 million in MRP ordinary shares). The Company will retain a 1% Net Smelter Royalty on zinc production from KOTC's two mining leases.

MRP also agreed to process up to 70,000 tonnes per annum of gold ore from Reed Resource's Comet Vale Gold Project for up to 4 years from commencement of the first milling campaign.

Review of Operations

REED RESOURCES LTD – MINERAL RESOURCE STATEMENT

Meekatharra Category Tonnes (Mt) Au (g/t) Au (koz)
Meekatharra North Indicated 1.2 1.8 66.0
Inferred 0.2 1.6 9.0
Nannine Indicated 0.6 1.6 31.0
Inferred 0.2 1.6 13.0
Paddy's Flat Indicated 25.2 1.6 1,281.0
Inferred 13.4 1.6 670.0
Yaloginda Indicated 10.1 1.7 564.0
Inferred 6.2 1.7 347.0
Reedys Indicated 2.7 3.1 276.0
Inferred 4.0 2.7 338.0
TOTAL Indicated 39.8 1.7 2,217.0
Inferred 24.1 1.8 1,377.0
TOTAL 63.9 1.8 3,594.0
Comet Vale Category Tonnes (Mt) Au (g/t) Au (koz)
Comet Vale Indicated 0.41 7.2 96.9
Inferred 0.43 8.1 112.6
Total 0.85 7.6 209.5
Mt Marion Category Tonnes (Mt) Li2O (%) Li2O (kt)
1, 2, 2W, 4, 5, 6 Measured 2.0 1.45 29.2
Indicated 4.8 1.39 66.3
Inferred 8.1 1.30 105.1
Total 14.9 1.35 200.7
Barrambie Category Tonnes (Mt) V2O5 (%) TiO2 (%)
Barrambie Indicated 49.2 0.82 17.3
Inferred 16.0 0.81 17.2
Total 65.2 0.82 17.3

REED RESOURCES LTD – ORE RESERVE STATEMENT

Project Category Tonnes (Mt) Au (g/t) Au (koz)
Bluebird Probable 1.39 1.9 86.2
Prohibition Probable 1.11 2.7 96.0
Mickey Doolan Probable 3.31 1.1 121.7
Maid Marion Probable 0.2 1.4 8.6
South Junction Probable 0.1 1.5 4.5
Surprise Probable 0.1 3.0 13.0
Batavia Probable 0.2 2.4 14.0
Whangamata Probable 0.3 1.4 11.9
GNH Probable 0.9 1.3 35.6
Aladdin Probable 0.4 1.7 21.4
Jack Ryan Probable 0.2 3.1 21.8
Callisto Probable 0.1 3.1 7.2
Rand Probable 0.1 2.4 7.6
South Emu Probable 0.1 4.7 13.9
TOTT Probable 0.5 1.8 29.4
Sub-total (Open Pit) Probable 9.01 1.7 492.9
Prohibition Probable 1.3 2.4 104.1
Vivian/Consols Probable 0.3 7.7 63.6
Fatts/Mudlode Probable 0.4 4.7 57.2
South Emu Probable 0.2 4.3 34.2
Sub-total (Underground) Probable 2.2 3.6 259.1
Total Probable 11.2 2.1 752.0
Barrambie Category Tonnes (Mt) V2O5 (%) TiO2 (%)
Barrambie Probable 39.7 0.82 15.7
Total 39.7 0.82 15.7

Notes:

  1. Resources and Reserves comply with the JORC Code.

  2. Resources are inclusive of Reserves.

Review of Operations

COMPETENT PERSONS STATEMENTS

Meekatharra and Comet Vale Gold Projects

Geological aspects of this report that relate to exploration results for the company's Meekatharra and Comet Vale gold projects have been compiled by Mr Craig Fawcett (MAIMM), a full time employee of Reed Resources Ltd. Mr Fawcett has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which is being reported on to qualify as a Competent Person as defined in the Code for Reporting of Mineral Resources and Ore Reserves (2004). Mr Fawcett consents to the inclusion in this report of the matters in the form and context in which it appears.

Barrambie and Mount Marion Projects

Geological aspects of this report that relate to exploration results for the company's Barrambie and Mount Marion projects have been compiled by Dr Bryan Smith (MAIG and MAIMM), a consultant to Reed Resources Ltd. Dr Smith has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which is being reported on to qualify as a Competent Person as defined in the Code for Reporting of Mineral Resources and Ore Reserves (2004). Dr Smith consents to the inclusion in the report of the matters in the form and context in which it appears.

CORPORATE

Equity raising

In May 2012 the Company successfully completed an underwritten, non-renounceable entitlement offer raising approximately \$40 million before costs. These funds are being utilised by the Company to fund development of Reed's 100% owned Meekatharra Gold Project and for general working capital purposes. Details of the company's Meekatharra Gold Project can be found above.

Debt funding

Subsequent to the balance date the company received an offer for a \$19M debt facility and a hedging facility from Credit Suisse to fund the development of the company's 100% owned Meekatharra Gold Project. On 26 September 2012 the Company accepted the offer from Credit Suisse, the offer being subject to due diligence and final documentation. The Credit Suisse facility replaces a previous offer for a \$23M facility from another lender made during the year. The Credit Suisse facility was selected on the basis that it provides the company with greater flexibility with respect to commencing operations at the company's Meekatharra Gold Project and future funding requirements. This information is also disclosed in subsequent events note 33.

The company is currently seeking additional funding in order to undertake its forecast activities over the coming financial year. Further details in relation to the company's funding activities can be found under the going concern heading in note 1 to the consolidated financial statements.

Management changes

During the reporting period the company's board of directors and its executive management team were restructured with the following changes occurring during the year:

  • Mr David Reed transitioned from an executive chairman position to non-executive position on 1 July 2012.
  • Mr Luke Tonkin commenced with the company as managing director and chief executive officer on 14 May 2012.
  • Mr Chris Reed transitioned from managing director to executive director on the commencement of Mr. Tonkin's employment.
  • Mr Ian Junk ceased being a director on 28 June 2012.
  • Mr David Lim commenced as Chief Financial Officer on 11 April 2012.

Directors' Report

The directors of Reed Resources Ltd submit their report for the financial year ended 30 June 2012.

The names and particulars of the directors of the company during or since the end of the financial year are:

Current Directors

Name Particulars

David J. Reed OAM Non-Executive Chairman

Mr Reed is an accountant with over 40 years' experience in stock broking and corporate management. From 1985 to 1997 Mr Reed was chairman of stock-broking firm Eyres Reed Ltd until its sale to CIBC World Markets in 1997 at which time he became Chairman of CIBC Australia, a position he held until 2003. Mr Reed has extensive public company experience having served as chairman of several ASX listed mineral exploration companies. Mr Reed is a former chairman of the fund raising committee for the Australian Prospectors and Miners Hall of Fame and secretary of the Amalgamated Prospectors and Leaseholders Association and was a co-founder of the Diggers and Dealers Forum in Kalgoorlie. Mr Reed received an Order of Australia Medal in 2002 for his service to the community.

Mr David Reed is Fellow of CPA Australia.

Appointed: 20 December 2001

Special responsibilities: Member of the Nomination and Remuneration Committee

Directorships of other listed companies: Nil

Luke Tonkin Managing Director

Mr Tonkin, a mining engineer, joined Reed Resources Ltd as Managing Director on 14 May 2012. Mr Tonkin has extensive experience within the resource industry with a range of commodities including gold, nickel, tantalum, tin, lithium and iron ore. Prior to joining Reed Resources Mr Tonkin was Managing director of Mount Gibson Iron Ltd and has held senior management roles with some of Australia's largest mining operations including WMC's Kambalda Nickel operations, St Ives Gold operations, Leinster Nickel operations and Sons of Gwalia. Mr Tonkin has extensive experience with implementing large-scale investment, divestment, transition and integration strategies

Mr Tonkin holds a Bachelor of Engineering from the West Australian School of Mines and is a member of AusIMM and the Australian Institute of Company Directors.

Appointed: 14 May 2012

Special responsibilities: Nil

Directorships of other listed companies: Managing Director Mt Gibson Iron Ltd 25 October 2005 to 16 December 2011.

Christopher J. Reed Executive Director

Mr Reed is an accountant with over 20 years of experience in the resource industry including more than 10 years in corporate administration and management. Mr Reed served as Managing Director of Reed Resources Ltd from September 2007 until May 2012 at which time he assumed the role executive director. Mr Reed is the current serving Vice-president of the Association of Mining and Exploration Companies.

Mr Reed holds a Bachelor of Commerce from the University of Notre Dame and a Graduate Certificate in Mineral Economics from the WA School of Mines. He is a member of the AusIMM and CPA Australia.

Appointed: 20 December 2001

Special responsibilities: Nil

Directorships of other listed companies: Nil

Steven Cole Non-Executive Director

Mr Cole is a lawyer with over 35 years of professional consultancy and commercial experience. Mr Cole has extensive experience in the management of ASX listed companies, statutory, and proprietary and NFP organisations covering the industrial, financial, educational, professional services, health and resources sectors.

Mr Cole holds a Bachelor of laws (hons) and is a Fellow of the Australian Institute of Company Directors.

Appointed: 24 July 2008

Special responsibilities: Deputy Chairman, Chairman of the Nomination and Remuneration and Audit and Risk Management Committees

Directorships of other listed companies: Chairman of Emerson Stewart Group Limited (31 March 2008 to 16 October 2011)

Peter L.F. Collins Non-Executive Director

Dr Peter Collins is a geologist with over 35 years of experience in the resource industry, government and academia. He currently holds a senior lecturing position in economic geology at Curtin University, Perth. Dr Collins has extensive experience in the investigation of and exploration for a variety of minerals include gold, base metals, ferrous metals, tin-tungsten and was responsible for discovery of the Sand George gold deposit at Comet Vale, WA.

Mr Collins holds a Bachelor of Science (Hons) and a PhD in geology from the University of Tasmania and is a member of the Australian Institute of Geoscientists.

Appointed: 20 December 2001

Special responsibilities: Member of the Nomination and Remuneration and Audit and Risk Management Committees

Directorships of other listed companies: Nil

Directors' Report

Current Directors (continued)

Name Particulars

Vanessa Guthrie Non-Executive Director

Dr Guthrie has more than 20 years of experience in the Australian resources sector, working in a number of areas in the resources sector including mining, refining, smelting and gas production. Dr Guthrie has previously held positions in corporate administration as well as holding the position of Mine Manager at Australia's largest bauxite operation. She has worked for organisations such as Woodside Energy Ltd, Alcoa World Alumina Australia, WMC Resources, RGC Limited, Goldfields Limited, Pasminco Ltd and Toro Energy.

Dr Guthrie holds a Bachelor of Science with Honors II (I) (Geology), a Doctor of Philosophy (Geology), Diploma in Natural Resources, Diploma in Business Management and Diploma in Commercial and Resources Law. Dr Guthrie is also member of AusIMM and the Australian Institute of Company Directors.

Appointed: 17 June 2011

Special responsibilities: Member of the Audit and Risk Management Committee

Directorships of other listed companies: Nil

Former Directors

Ian C. Junk Non-Executive Director Mr Junk is a mining engineer with considerable experience in narrow vein underground mining and project development having managed several private mining companies during his career. He has been a national finalist in the Ernst & Young Entrepreneur of the Year and received a Goldfields Business of the Year Award. Mr Junk graduated with a Bachelor of Engineering with honours from the WA School of Mines and is a Member of the AusIMM. Term of Office: 1 December 2003 to 28 June 2012 Special responsibilities: Member of the Nomination and Remuneration and Audit

and Risk Management Committees

Directorships of other listed companies: Nil

Company Secretaries

Jason Carone Company Secretary (Joint) and Financial Controller

Mr Carone is a Chartered Accountant with over 15 years' experience in accounting and company administration in Australia and South East Asia.

Mr Carone holds a Bachelor of Commerce in Accounting and Business Law from Curtin University, WA and is a member of the Institute of Chartered Accountants.

Appointed: 4 March 2009

Darren Wates Company Secretary (Joint) and Legal Counsel

Mr Wates joined Reed Resources in December 2010 as Commercial Legal Counsel and in April 2011 was appointed Joint Company Secretary. Mr Wates has over 10 years' experience in corporate and commercial law in Western Australia, having worked in the Perth office of a national law firm and more recently in senior consultancy at a specialist corporate, commercial and resources law firm.

Mr Wates holds a Bachelor of Laws and a Bachelor of Commerce from Murdoch University, and a Graduate Diploma in Applied Finance and Investment from the Financial Services Institute of Australasia.

Appointed: 6 April 2011

Review of operations

The consolidated loss after income tax for the year attributable to members of Reed Resources Ltd ("Reed Resources", "Company" and "Consolidated Entity") was \$30,983,345 (2011: \$3,353,586) after an impairment loss of \$23.5 million (2011: \$0.74 million). Details of the impairment loss are included in note 14. A detailed review of the company's operations during the financial year can be found on pages 4 to 10 of this Annual Financial Report.

Changes in state of affairs

During the financial year the consolidated entity completed a Bankable Feasibility Study on the Meekatharra Gold Project and commenced development of project. Other than these activities there have not been any other significant changes in the affairs of the company from the previous year.

Principal activities

The consolidated entity's principal activities during the period consisted of mineral exploration and the development of the company's Meekatharra Gold Project located in the Murchison region of Western Australia.

Events subsequent to balance date

Subsequent to the end of the financial year the company engaged Credit Suisse to provide a corporate debt financing for \$19 million. Pursuant to this agreement Credit Suisse will provide the company with a senior debt facility for \$19 million dollars and a hedging facility. Funds from this facility will be used by the company to fund the development of the Meekatharra Gold Project. Formal documentation for the facility, based on a binding term sheet, is expected to be completed by the end of October 2012.

On 19 September a contract for put options over 70,000oz of gold expired. As the options were out-of-the-money at expiration the Group recognised a loss of \$3.048 million on the transaction. Refer to subsequent events note 33 for additional details.

Future developments

As detailed above the consolidated entity commenced development of its Meekatharra Gold Project with operations scheduled to commence in the 2012/13 financial year. The company continues to undertake exploration and evaluation studies on its non-producing projects with the aim of maximising shareholder value through either development or sale. The company is unable to comment on any additional likely developments or future results as this is likely to prejudice the Consolidated Entity.

Please refer to the Going Concern Assumption Note in Note 2 of the notes to the consolidated financial statements.

Environmental regulations

As required by section 299(f) of the Corporations Act the company states that it has performed all of its environmental obligations in accordance with applicable environmental regulations.

Directors' Report

Dividends

No dividends were paid, recommended or declared during the reporting period.

Indemnification of officers and auditors

During the financial year the company paid a premium in respect of a contract insuring the directors and officers of the company and of any related body corporate against a liability incurred as a director or officer, to the extent permitted by the Corporations Act 2001. The contract of insurance prohibits disclosure of the nature of the liability and the amount of the premium.

The company has not otherwise, during or since the financial year, except to the extent permitted by law, indemnified or agreed to indemnify an officer or auditor of the company or of any related body corporate against a liability incurred as such an officer or auditor.

Unissued shares under option

The following table sets out the unissued ordinary shares of the company, Reed Resources Ltd, which are under option at the date of this report.

Options series Number Grant date Expiry
Date
Exercise
Price
\$
Fair
Value
at grant
date
\$
Vesting Date
Issued 14 September 2007 300,000 14/09/2007 31/12/2012 0.834 0.22 Pursuant to ESOP
Issued 28 November 2007 1,500,000 28/11/2007 31/12/2012 0.834 0.22 At date of grant
Issued 15 September 2008 600,000 15/09/2008 30/06/2013 1.184 0.13 Pursuant to ESOP
Issued 25 November 2008 1,250,000 25/11/2008 30/06/2013 1.184 0.03 At date of grant
Issued 26 July 2010 750,000 19/07/2010 01/07/2013 0.984 0.18 50% 12/04/2011
50% 12/04/2012
Issued 27 August 2010 2,250,000 20/08/2010 01/07/2013 0.984 0.12 Pursuant to ESOP
Issued 7 September 2009 1,600,000 31/08/2009 31/12/2013 0.784 0.08 Pursuant to ESOP*
Issued 9 December 2009 850,000 26/11/2009 31/12/2013 0.784 0.24 Pursuant to ESOP
Issued 8 April 2011 500,000 08/04/2011 01/07/2014 0.984 0.12 50% 06/12/2011
50% 06/06/2012
9,600,000

The holders of these options do not have the right, by virtue of the option, to participate in any share issue, other than through the exercise of their option, or interest payment.

Service conditions only relate to options issued under the Company's Employee Share Option Plan 2007 ("ESOP") in that 50% of the options vest 12 months following issue with the balance vesting 18 months following issue. In addition, in the event that an employee leaves, the options lapse 3 months following the date of cessation of employment. The options marked with an asterix (*) include 900,000 options with additional vesting conditions (one third 11 September 2010, one third 30 June 2011 and one third 30 June 2012).

No shares of the Company were issued during or since the end of the financial year as a result of the exercise of an option over the unissued shares of the company.

Directors' meetings

The following table sets out the number of directors' meetings (including meetings of committees of directors) held during the financial year and the number of meetings attended by each director (while they were a director or committee member). During the financial year, 17 board meetings, 3 nomination and remuneration committee meetings and 4 audit and risk committee meetings were held.

Board of Directors Nomination &
Remuneration
Committee
Audit Committee
Directors Held Attended Held Attended Held Attended
S. Cole 17 17 3 3 4 4
P. Collins 17 16 3 3 4 3
V. Guthrie (1) 17 17 n/a n/a 4 3
I. Junk 17 15 3 3 4 4
C. Reed 17 17 n/a n/a n/a n/a
D. Reed (2) 17 15 n/a n/a n/a n/a
L. Tonkin 4 4 n/a n/a n/a n/a

(1) V. Guthrie became a member of the Audit Committee on 17 June 2011 and a member of the Nominations and Remuneration Committee on 23 August 2012.

(2) D. Reed became a member the Nominations and Remuneration and Audit Committees on 23 August 2012.

Directors' shareholdings

The following table sets out each director's relevant interest in shares, debentures, and rights or options in shares or debentures of the company or a related body corporate as at the date of this report:

Fully paid
Ordinary
Shares
Number
Share
Options
Number
Performance
Rights
Number
S. Cole 75,068 600,000 -
P. Collins 285,705 450,000 -
V. Guthrie - - -
C. Reed 1,109,202 1,600,000 2,154,184
D. Reed 26,977,338 - -
L. Tonkin 833,000 - 4,247,390

Proceedings on behalf of the company

No person has applied for leave of Court to bring proceedings on behalf of the Company or intervene in any proceedings to which the Company is a party for the purpose of taking responsibility on behalf of the Company for all or part of those proceedings. The Company was not a party to any such proceedings during the year.

Directors' Report

Remuneration Report (audited)

Key Management Personnel

The following persons were deemed to be Key Management Personnel (KMP) during or since the end of the financial year for the purpose of Section 300A of the Corporations Act 2001 and unless otherwise stated were KMP for the entire reporting period.

Non-executive directors

  • Steven Cole non-executive director/deputy chairman
  • Peter Collins non-executive director
  • Vanessa Guthrie non-executive director
  • Ian Junk non-executive director (ceased being a director on 28 June 2012)
  • David Reed non-executive chairman (executive chairman to 30 June 2012)

Executive directors

  • Luke Tonkin managing director (commenced 14 May 2012)
  • Christopher Reed executive director (managing director to 13 May 2012)

Other executives

  • Jason Carone financial controller and joint company secretary
  • Craig Fawcett general manager gold
  • David Lim chief financial officer (commenced 11 April 2012)
  • Darren Wates legal counsel and joint company secretary

Remuneration policy for key management personnel

Non-executive directors

The board's policy is to remunerate non-executive directors at market rates for comparable companies for time, commitment and responsibilities. The nomination and remuneration committee on behalf of the board determines payments to the non-executive directors and reviews their remuneration annually, based on market practice, duties and accountability. Independent external advice is sought when required. The maximum aggregate amount of fees that can be paid to non-executive directors is \$400,000 as approved by shareholders at the General Meeting on 15 November 2011. Fees for non-executive directors are not linked to the performance of the economic entity. However, to align directors' interests with shareholder interests, the directors are encouraged to hold shares in the Company and non-executive directors have formerly received options in order to secure their services.

General

The Group's remuneration policy for KMP is to provide a fixed remuneration component and performance based components. The board believes that this remuneration policy is appropriate given the size of the company and the activities which it undertakes and is appropriate in aligning KMP objectives with shareholder and business objectives.

The remuneration policy for the employees is developed by the Nomination and Remuneration Committee taking into account market conditions and comparable salary levels for companies of a similar size and operating in similar sectors. The Company operates in the mineral exploration and development sector with the majority of its funds allocated to specific exploration programs and new business development activities. Due to the nature of the company's business activities the board has determined that issuing executives with securities in Reed Resources as a key component of the incentive portion of their remuneration packages to be an effective method in both retaining valued staff and aligning their goals with that of shareholders. The board considers that each executive's experience will greatly assist the company advance its current projects to the next stage of development and to identify new projects. As such, the board believes that the number of incentive securities granted to executives is commensurate to their value to the company.

The Company adopted a Performance Rights Plan (PRP) for its staff, including the KMP, in July 2011. The board believes that the PRP will assist the Company in remunerating and providing ongoing incentives to employees of the Company.

The rules of the PRP enable the Company to issue performance rights to eligible personnel subject to performance and vesting conditions determined by the Company. Each performance right entitles the holder, for nil cash consideration, to one fully paid ordinary share in the Company for every performance right offered, if the applicable performance and vesting conditions set for that holder are satisfied.

During the financial year a total of 10,000 performance rights were offered to and accepted by KMP.

Due to the uncertain nature of the company's business activities, that is mineral exploration, the board has determined that it is appropriate that KMP are issued with Performance Rights which provide the KMP with shares in Reed Resources. Other than service-based vesting conditions, there are no additional performance criteria on the incentive securities granted to executives.

All remuneration provided to KMP in the form of share based payments are valued at cost to the Company and expensed on a pro rata basis over the vesting period of the relevant security.

To date the Company's principal activities have been the exploration for minerals and the ongoing evaluation of these projects to determine if they can be brought into production or sold for value. As the Company does not currently hold any operating projects which generated income the board does not consider current or prior year earnings when assessing remuneration of key management personnel.

As a result of the Company's exploration and business development activities, the board anticipates that it will retain future earnings (if any) and other cash resources for the operation and development of its business. Accordingly, the Company does not currently have a policy with respect to the payment of dividends, and as a result the remuneration policy does not take into account the level of dividends or other distribution to shareholders (e.g. return of capital). In addition, the board does not directly base remuneration levels on the Company's share price or movement in the share price over time. However, as noted above a number of KMP have received incentive options and performance rights, the value of which is dependent on the company's share price. To date remuneration packages for executive KMPs contain the following key elements:

  • a) Fixed Base Salary salary, superannuation and non-monetary benefits;
  • b) Short term incentives cash bonus incentives applied to a maximum percentage of Fixed Base Salary and structured against relative satisfaction (at the reasonable discretion of the Board) of certain corporate and personally related key performance indicators of the executive.
  • c) Long term incentives the grant of Performance Rights in the Company, with value capped to a maximum percentage of Fixed Base Salary, vesting progressively on an annualised basis while the executive remains engaged, with the degree of vesting structured relatively against the company's relative Total Shareholder Return (TSR) performance against a comparator group of companies.

The committee's remuneration policies are designed to align executive's remuneration with shareholders' interests and to retain appropriately qualified executive talent for the benefit of the Company. The main principles of the policies are that:

  • • shareholder interests and employee interests are aligned;
  • • the Company is able to attract, develop and retain superior talent; and
  • • the integrity of the Company's reward program is maintained.

Directors' Report

Remuneration policy for key management personnel (continued)

Relationship between the remuneration policy and company performance

The tables below set out summary information about the consolidated entity's earnings and movements in shareholder wealth for the five years to June 2012:

30 June 2012
\$
30 June 2011
\$
30 June 2010
\$
30 June 2009
\$
30 June 2008
\$
Revenue - 347,821 2,883,931 3,593,481 1,972,498
Net loss before tax (30,983,345) (4,738,594) (3,484,481) (3,629,760) (4,439,216)
Net loss after tax (30,983,345) (3,353,586) (2,666,815) (2,468,834) (3,179,303)
Share price at start of year 0.50 0.60 0.24 1.03 0.46
Share price at end of year 0.205 0.50 0.60 0.24 1.03
Market capitalisation at
year end (undiluted)
94,853,822 131,118,600 106,362,881 33,036,000 139,513,500
Basic loss per share (0.0966) (0.0150) (0.0161) (0.0180) (0.0283)
Diluted loss per share (0.1061) (0.0150) (0.0161) (0.0180) (0.0283)
Dividends Paid Nil Nil Nil Nil Nil

Key management personnel remuneration

The key management personnel received the following amounts as compensation for their services as directors and executives of the Company and/or the Group during the year:

Short-term employee benefits Post em
ployment
benefits
Share
based
payment
2012 Salary &
fees
\$
Bonus
\$
Non
monetary
\$
Other
\$
Super
annua
tion
\$
Termi
nation
benefits
\$
Options
and
rights
\$
Total
\$
% Con
sisting of
options
Non-executive directors
S. Cole 71,101 - - - 6,399 - - 77,500 -
P. Collins 52,752 - - - 4,748 - - 57,500 -
V. Guthrie 52,752 - - - 4,748 - - 57,500 -
I. Junk 52,752 - - - 4,748 - - 57,500 -
229,357 - - - 20,643 - - 250,000
Executive directors
C. Reed(1) 455,585 70,000 - - 35,092 - 62,815 623,492 10.07
D. Reed(2) 151,376 22,936 - - 15,688 - 31,407 221,407 14.19
L. Tonkin(3) 82,140 - - - - - - 82,140 -
689,101 92,936 - - 50,780 - 94,222 927,039
Other executives
J. Carone 180,000 - - - 16,200 - 29,560 225,760 13.09
C. Fawcett 260,000 30,000 10,699 - 26,100 - 31,200 357,999 8.72
D. Lim(4) 55,087 - - - 4,958 - - 60,045 -
D. Wates 210,000 - - - 18,900 - 48,459 277,359 17.47
705,087 30,000 10,699 - 66,158 - 109,219 921,163
Total 1,623,545 122,936 10,699 - 137,581 - 203,441 2,098,202

(1) C. Reed's salary includes an amount of \$ 65,677 for long service paid out during the financial year.

(2) D. Reed was Executive Chairman until 30 June 2012. On 1 July 2012 D. Reed became a non-executive director.

(3) L. Tonkin commenced employment on 14 May 2012.

(4) D. Lim commenced employment on 11 April 2012.

In reference to (3) above, subject to shareholder approval Mr L Tonkin is entitled to receive a sign-on award of 883,000 shares and 1,667,000 performance rights vesting in equal annual tranches until 30 June 2014. This was approved by shareholders at the Company's Extraordinary General Meeting held on 12 July 2012.

Short-term employee benefits Post em
ployment
benefits
Share
based
payment
2011 Salary &
fees
\$
Bonus
\$
Non
monetary
\$
Other
\$
Super
annua
tion
\$
Termi
nation
benefits
\$
Options
and
rights
\$
Total
\$
Consist
ing of
options
%
Non-executive directors
S. Cole 50,000 - - - 4,500 - 39,312 93,812 41.90
P. Collins 40,000 - - - 3,600 - 19,656 63,256 31.07
V. Guthrie 2,051 - - - 185 - - 2,236 -
I. Junk 40,000 - - - 3,600 - 19,656 63,256 31.07
132,051 - - - 11,885 - 78,624 222,560
Executive directors
C. Reed 250,000 - - - 22,500 - 400,220 672,720 59.49
D. Reed 125,000 - - - 11,250 - 200,110 336,360 59.49
375,000 - - - 33,750 - 600,330 1,009,080
Other executives
J. Carone 145,301 30,000 4,011 - 16,200 - 76,554 272,066 28.14
C. Fawcett 205,000 - - - 18,450 - 106,426 329,876 32.26
D. Wates 113,978 - - - 10,258 - 16,644 140,880 11.81
464,279 30,000 4,011 - 44,908 - 199,624 742,822
Total 971,330 30,000 4,011 - 90,543 - 878,578 1,974,462

Directors' Report

Remuneration policy for key management personnel (continued)

Service agreements - performance based remuneration

The KMP of the Company, other than non-executive directors, are employed under Service Agreements. A summary of performance conditions for relevant KMP are detailed below:

Position: Financial Controller/ Company Secretary (Joint)

Term: No defined term

Incentive based remuneration

Short Term Incentive

Each financial year during the term of his Service Agreement the board, at its sole discretion, may award the KMP a cash bonus of up to 25% of the KMP's annual Salary Package (currently \$228,900 inclusive of superannuation). The basis for the calculating the STI will be a range of criteria including both the KMP's personal performance and the company financial performance/position and share price.

Long Term Incentive

Each financial year during the term of his Service Agreement the KMP is entitled to receive up to 25% of their annual Salary Package (currently \$228,900 inclusive of superannuation) as Performance Rights granted under the company's Performance Rights Plan, subject to satisfaction of the following criteria.

Criteria

The KMP's entitlement to Performance Rights under the incentive scheme is based on Total Shareholder Return (TSR) over the calculation period (1 year) and will be calculated as follows:

    1. If the Company's TSR is below the 45th percentile of the Comparator Group of companies no performance rights will vest.
    1. If the Company' TSR ranks between the 45th and 50th percentile, for each percentile over the 45th percentile 10% of the Performance Rights will vest.
    1. For each 1% ranking above the 51st percentile an additional 2% of the Performance rights will vest, with 100% vesting above the 76th percentile.

Performance rights granted to the KMP have a vesting period of 2 years from the end of the financial year in which they are granted and will lapse on the KMP ceasing to be an employee of the company prior to the vesting date.

Name: Mr C. Fawcett

Position: General Manager - Gold

Term: Termination date of 13 March 2015

Incentive based remuneration

Mr Fawcett is entitled to cash bonuses on the satisfaction of the following corporate/financial milestones:

  • 1 \$50,000 on the successful commissioning of the Bluebird plant to produce 100,000oz per annum.
    1. \$50,000 payable on production of 100,000oz of gold bullion from the Bluebird plant.
    1. \$50,000 payable on production of 200,000oz of gold bullion from the Bluebird plant.

Mr Fawcett is entitled to performance rights in accordance with the Company's Performance Rights Plan as set out below:

    1. 150,000 performance rights vest on the first anniversary of the KMP's employment.
    1. 150,000 performance rights vest on the second anniversary of the KMP's employment.
    1. 150,000 performance rights vest on the third anniversary of the KMP's employment.
Name: Mr D. Lim
Position: Chief Financial Officer
Term: Termination date of 16 April 2015

Incentive based remuneration

Mr Lim is entitled to cash bonuses on the satisfaction of the following corporate/financial milestones:

    1. \$30,000 on the financial close of debt funding for the Meekatharra Gold Project, payable on the successful commissioning of the Project.
    1. \$50,000 on certain key corporate/financial milestones relating to the development of the Meekatharra Gold Project and Barrambie Project.
    1. \$70,000 on completion of a change of control/liquidity event with respect to the Mount Marion Lithium Project.

Mr Lim is entitled to performance rights in accordance with the Company's Performance Rights Plan as set out below:

    1. 100,000 performance rights vest on the first anniversary of the KMP's employment.
    1. 150,000 performance rights vest on the second anniversary of the KMP's employment.
    1. 250,000 performance rights vest on the third anniversary of the KMP's employment.

These rights were granted subsequent to the end of the financial year.

Name: Mr C. Reed

Position: Executive Director

Term: Termination date of 30 June 2015

Incentive based remuneration

Short Term Incentive

Each financial year during the term of his Service Agreement the board, at its sole discretion, my award the KMP a cash bonus of up to 33% of the KMP's annual Salary Package (currently \$446,900 inclusive of superannuation). The basis for the calculating the STI will be a range of criteria including both the KMP's personal performance and the company financial performance/position and share price.

Long Term Incentive

Each financial year during the term of his Service Agreement the KMP is entitled to receive up to 50% of their annual Salary Package (currently \$446,900 inclusive of superannuation) as Performance Rights granted under the company's Performance Rights Plan, subject to satisfaction of the following criteria, and shareholder approval.

Criteria

The KMP's entitlement to the Performance Rights under the incentive scheme is based on Total Shareholder Return (TSR) over the calculation period (1 year) and will be calculated as follows:

    1. If the Company's TSR is below the 45th percentile of the Comparator Group of companies no performance rights will vest.
    1. If the Company' TSR ranks between the 45th and 50th percentile, for each percentile over the 45th percentile 10% of the Performance Rights will vest.
    1. For each 1% ranking above the 51st percentile an additional 2% of the Performance rights will vest, with 100% vesting above the 76th percentile.

Directors' Report

Remuneration policy for key management personnel (continued)

Service agreements - performance based remuneration

Performance rights granted to the KMP vest on the grant date and lapse on the KMP ceasing to be an employee of the company prior to the vesting date.

Name: Mr L. Tonkin

Position: Managing Director and Chief Executive Officer

Term: Termination date of 30 June 2015

Incentive based remuneration

Short Term Incentive

Each financial year during the term of his Service Agreement the board, at its sole discretion, my award the KMP a cash bonus of up to 50% of the KMP's annual Salary Package (currently \$599,500 inclusive of superannuation). The basis for the calculating the STI will be a range of criteria including both the KMP's personal performance and the company financial performance/position and share price.

Long Term Incentive

Each financial year during the term of his Service Agreement the KMP is entitled to receive up to 83.33% of their annual Salary Package (currently \$599,500 inclusive of superannuation) as Performance Rights granted under the company's Performance Rights Plan, subject to satisfaction of the following criteria, and shareholder approval.

Criteria

The KMP's entitlement to the Performance Rights under the incentive scheme is based on Total Shareholder Return (TSR) over the vesting period (1 year) and will be calculated as follows:

    1. If the Company's TSR is below the 45th percentile of the Comparator Group of companies no performance rights will vest.
    1. If the Company' TSR ranks between the 45th and 50th percentile, for each percentile over the 45th percentile 10% of the Performance Rights will vest.
    1. For each 1% ranking above the 51st percentile an additional 2% of the Performance rights will vest, with 100% vesting above the 76th percentile.

Performance rights granted to the KMP vest on the grant date and lapse on the KMP ceasing to be an employee of the company prior to the vesting date.

  • Name: Mr D. Wates
  • Position: Legal Counsel/ Company Secretary (Joint)

Term: No defined term

Incentive based remuneration

Short Term Incentive

Each financial year during the term of his Service Agreement the board, at its sole discretion, my award the KMP a cash bonus of up to 25% of the KMP's annual Salary Package (currently \$272,500 inclusive of superannuation). The basis for the calculating the STI will be a range of criteria including both the KMP's personal performance and the company financial performance/position and share price.

Long Term Incentive

Each financial year during the term of his Service Agreement the KMP is entitled to receive up to 25% of their annual Salary Package (currently \$272,500 inclusive of superannuation) as Performance Rights granted under the company's Performance Rights Plan, subject to satisfaction of the following criteria.

Criteria

The KMP's entitlement to the Performance Rights under the incentive scheme is based on Total Shareholder Return (TSR) over the calculation period (1 year) and will be calculated as follows:

    1. If the Company's TSR is below the 45th percentile of the Comparator Group of companies no performance rights will vest.
    1. If the Company' TSR ranks between the 45th and 50th percentile, for each percentile over the 45th percentile 10% of the Performance Rights will vest.
    1. For each 1% ranking above the 51th percentile an additional 2% of the Performance rights will vest, with 100% vesting above the 76th percentile.

Performance rights granted to the KMP have a vesting period of 2 years from the end of the financial year in which they are granted and will lapse on the KMP ceasing to be an employee of the company prior to the vesting date.

The Company provides the KMP with performance based incentives in order to incentivise KMP to pursue strategies that are aligned with the overall business strategy and the interests of the shareholders. Where deemed appropriate the Company has set specific Key Performance Indicators as performance criteria for staff that have a direct role/responsibility in achieving a specific outcome. To ensure that KMP are also incentivised to pursue longer term strategies that increase shareholder wealth a portion of the KMP's remuneration is linked to a "comparative TSR model" which links the level of the KMP remuneration to the Company's performance against a group of comparable ASX listed entities, using Total Shareholder Return as the basis of comparison. KMP are also issued with Performance Rights with service conditions as vesting criteria which assist the company retain staff as well as aligning the interests of the KMP with shareholders. The Company has deemed the issue of service based Performance rights as an appropriate form of remuneration due the uncertain nature of the company's business, that is, mineral exploration and the fact that the company does not yet have any operating projects.

For the purpose of determining the KMP's entitlement to Performance Right under the comparative TSR model detailed above, the Company has selected a range of gold focused ASX listed companies as the comparator group.

List of comparator group of companies:

• Doray Minerals Ltd (ASX: DRM) • Silver Lake (ASX: SLR)
• Evolution Mining (ASX: EVN) • Tanami Gold Ltd (ASX: TAM)
• Focus Minerals Ltd (ASX: FML) • Unity Mining Ltd (ASX: UML)

• Regis Resources Ltd (ASX: RRL) • Ramelius Resources (ASX: RMS)

  • Gold Road Resources Ltd ( ASX: GOR) St Barbara Ltd (ASX: SBM)
  • Northern Star Resources Ltd (ASX: NST) Millenium Minerals Ltd (ASX: MOY)
  • The company has selected the above group of companies as the comparator group for the following reasons:
    1. Represent a broad cross section of resource companies with respect to market capitalisation, resource base and phase of development.
    1. Primarily focused on gold exploration and production in Western Australia.

Directors' Report

Performance Rights granted to key management personnel

The following tables summarises information relevant to the current financial year in relation to the grant of performance rights to KMP as part of their remuneration.

Name Grant date No. granted No. vested Fair value at
grant date
Earliest
exercise date
Consideration
payable on
exercise
Executives:
D.Wates 1 August 2011 10,000 9,151 3,564 1 August 2012 Nil
Total 10,000 - 3,564
Name Grant date Fair value
of rights at
grant date
\$
Vested during
the financial
year
%
Forfeited/
lapsed during
the financial
year
%
Ordinary
shares issued
on exercise of
rights
\$
Executives:
D. Wates 1 August 2011 3,564 91.51 - -
Total 3,564 91.51 - -

The performance rights granted entitle the grantee to one fully paid ordinary share in Reed Resources Ltd for nil consideration on satisfaction of the vesting criteria. KMP must satisfy a service period equal to the vesting period in order to exercise the performance rights.

Share options granted to key management personnel

No share options were issued to KMP during the financial year as part of their remuneration.

Non-audit services

Details of the amounts paid or payable to the auditor for the audit and non-audit services during the year are as follows:

2012
\$
2011
\$
Auditor (Deloitte Touche Tohmatsu)
Audit fees 94,716 70,495
Non-audit fees - 30,381
94,716 100,876

The directors are satisfied that the provision of non-audit services, during the year, by the auditor (or by another person or firm on the auditor's behalf) is compatible with the general standard of independence for auditors imposed by the Corporations Act 2001.

The directors' are satisfied that the non-audit services provided did not compromise the external auditor's independence for the following reasons:

  • • all non-audit services are reviewed and approved by the directors' prior to commencement to ensure they do not adversely affect the integrity and objectivity of the auditor; and
  • • the nature of the services provided do not compromise the general principles relating to auditor independence as set out in the Institute of Chartered Accountants in Australia and CPA Australia's Professional Statement F1: Professional Independence.

Auditor's independence declaration

The auditor's independence declaration is included on page 28 of the Annual Financial Report.

Signed in accordance with a resolution of directors made pursuant to s.298(2) of the Corporations Act 2001. On behalf of the Directors,

Luke Tonkin Managing Director West Perth, WA 28 September 2012

Auditor's Independence Declaration

for the year ended 30 June 2012

Independent Auditor's Report

for the year ended 30 June 2012

Independent Auditor's Report

for the year ended 30 June 2012

The directors declare that:

  • (a) in the directors' opinion, there are reasonable grounds to believe that the company will be able to pay its debts as and when they become due and payable;
  • (b) the attached financial statements are in compliance with International Financial Reporting Standards as stated in note 2 to the financial statements;
  • (c) in the directors' opinion, the attached financial statements and notes thereto are in accordance with the Corporations Act 2001, including compliance with accounting standards and giving a true and fair view of the financial position and performance of the consolidated entity; and
  • (d) the directors have been given the declarations required by s.295A of the Corporations Act 2001.

Signed in accordance with a resolution of the directors made pursuant to s.295(5) of the Corporations Act 2001.

On behalf of the Directors

Luke Tonkin Managing Director 28 September 2012

Consolidated Statement of Comprehensive Income

for the year ended 30 June 2012

Note 2012
\$
2011
\$
Continuing operations
Revenue from sale of goods 5 - 347,821
Cost of sales before amortisation 5 - (53,633)
Gross profit before amortisation - 294,188
Amortisation expense 14 - (230,775)
Gross profit - 63,413
Other income 5 1,016,951 941,209
Loss on sale of equity instruments (301,874) -
(Loss)/gain on sale of property, plant and equipment (319,221) 164,364
Loss on revaluation of financial asset held at fair value (380,384) -
Employee expenses 5 (3,421,582) (3,021,365)
Occupancy expenses (548,136) (254,519)
Administration expenses (2,800,716) (2,095,203)
Finance costs 5 (1,089,208) (8,527)
Other expenses (35,026) (221,195)
Impairment of non-current assets 14 (20,340,077) (74,356)
Loss before income tax (28,219,273) (4,506,179)
Income tax benefit 6 - 1,321,233
Loss for the period from continuing operations (28,219,273) (3,184,946)
Discontinued operations
Loss for the period from discontinued
operations, net of tax 8 (2,764,072) (168,640)
Loss for the period (30,983,345) (3,353,586)
Other comprehensive income - -
Total comprehensive income for the period (30,983,345) (3,353,586)
Loss attributable to:
Owners of the Company 22 (30,983,345) (3,353,586)
Total comprehensive income attributable to:
Owners of the Company (30,983,345) (3,353,586)
Loss per share
From continuing operations:
Basic and diluted (cents per share)
From continuing and discontinued operations:
23 (9.66) (1.43)
Basic and diluted (cents per share) 23 (10.61) (1.50)

The consolidated statement of comprehensive income should be read in conjunction with the accompanying notes.

Consolidated Statement of Financial Position

for the year ended 30 June 2012

Note 2012
\$
2011
\$
Current assets
Cash and cash equivalents 34 (a) 25,612,420 13,824,448
Trade and other receivables 11 1,289,308 1,118,288
Other financial assets 12 (a) 6,123,499 28,431,001
Inventories 13 1,143,810 51,405
Current tax assets 6 - 286,923
34,169,037 43,712,065
Assets classified as held for sale 7 6,168,749 4,269,580
Total current assets 40,337,786 47,981,645
Non-current assets
Exploration, evaluation and
development expenditure
14 38,509,686 41,701,430
Other financial assets 12 (b) 11,746,111 11,560,634
Property, plant and equipment 15 22,701,973 1,304,158
Deferred tax assets 6 7,387,199 7,320,136
Total non-current assets 80,344,969 61,886,358
Total assets 120,682,755 109,868,003
Current liabilities
Trade and other payables 16 3,276,386 873,745
Other financial liabilities 17 3,015,205 9,400,000
Borrowings 19 47,668 -
Provisions 18 1,269,871 1,074,568
7,609,130 11,348,313
Liabilities directly associated
with held for sale assets
7 228,245 27,320
Total current liabilities 7,837,375 11,375,633
Non-current liabilities
Provisions 18 7,461,708 698,511
Total non-current liabilities 7,461,708 698,511
Total liabilities 15,299,083 12,074,144
Net assets 105,383,672 97,793,859
Equity
Issued capital 20 148,058,577 109,790,915
Accumulated losses 22 (47,698,088) (16,714,743)
Reserves 21 5,023,183 4,717,687
Total equity 105,383,672 97,793,859

This consolidated statement of financial position should be read in conjunction with the accompanying notes.

Consolidated Statement of Changes in Equity

for the year ended 30 June 2012

Issued
Capital
\$
Share based
payments
reserve
\$
Accumulated
losses
\$
Total
attributable
to equity
holders of the
entity
\$
Balance at 01/07/10 63,773,894 3,672,455 (13,361,157) 54,085,192
Loss for the period - - (3,353,586) (3,353,586)
Total comprehensive loss for the period - - (3,353,586) (3,353,586)
Recognition of share-based payments - 1,045,232 - 1,045,232
Issue of share capital 48,164,951 - - 48,164,951
Share issue costs, net of tax (2,147,930) - - (2,147,930)
Balance at 30/06/11 109,790,915 4,717,687 (16,714,743) 97,793,859
Loss for the period - - (30,983,345) (30,983,345)
Total comprehensive loss for the period - - (30,983,345) (30,983,345)
Recognition of share-based payments - 305,496 - 305,496
Issue of share capital 40,844,464 - - 40,844,464
Share issue costs, net of tax (2,576,802) - - (2,576,802)
Balance at 30/06/12 148,058,577 5,023,183 (47,698,088) 105,383,672

This consolidated statement of changes in equity should be read in conjunction with the accompanying notes.

Consolidated Statement of Cash Flows

for the year ended 30 June 2012

Note 2012
\$
2011
\$
Cash flows from operating activities
Receipts from customers - 367,821
Payments to suppliers and employees (6,305,893) (4,278,762)
Interest received 487,371 1,012,799
Interest and other finance costs paid (66,521) -
Tax refunds 512,292 413,720
Net cash used in operating activities 34(c) (5,372,751) (2,484,422)
Cash flows from investing activities
Exploration and development costs paid (11,199,655) (7,382,394)
Payment for financial assets (3,746,331) (21,275,001)
Proceeds from sale of financial assets 1,313,260 -
Payment for property, plant & equipment (8,976,006) (816,093)
Proceeds from sale of property, plant & equipment 115,000 232,000
Net proceeds from sale of subsidiary 27(b) 3,012,883 100,000
Net cash used in investing activities (19,480,849) (29,141,488)
Cash flows from financing activities
Proceeds from issues of shares 39,591,790 47,499,951
Payment for share issue costs (2,576,778) (3,068,471)
Amounts advanced to related parties (1,420,286) -
Amounts received from related parties 1,260,026 -
Repayment of borrowings (238,338) -
Net cash provided by financing activities 36,616,414 44,431,480
Net increase in cash and cash equivalents 11,762,814 12,805,570
Cash and cash equivalents at the beginning of the Financial Year 13,882,948 1,285,378
Transfer to other financial assets - (208,000)
Cash and cash equivalents at the end of the financial year 34(a) 25,645,762 13,882,948

This consolidated statement of cash flows should be read in conjunction with the accompanying notes.

Index to Notes to the Consolidated Financial Statements

Note Contents
1 General information
2 Significant accounting policies
3 Critical accounting judgments and key sources of estimation uncertainty
4 Parent entity disclosure
5 Loss for the year
6 Income taxes
7 Assets classified as held for sale
8 Discontinued operations
9 Key management personnel compensation
10 Share based payments
11 Trade and other receivables
12 Other financial assets
13 Inventories
14 Exploration, evaluation and development expenditure
15 Property, plant and equipment
16 Trade and other payables
17 Other financial liabilities
18 Provisions
19 Borrowings
20 Issued capital
21 Reserves
22 Accumulated losses
23 Loss per share
24 Commitments for expenditure
25 Contingent liabilities
26 Leases
27 Disposal of subsidiary
28 Acquisition of assets
29 Jointly controlled operations and assets
30 Subsidiaries
31 Segment information
32 Related party disclosures
33 Subsequent events
34 Notes to the cash flow statement
35 Financial instruments

Notes to the Consolidated Financial Statements

1. General information

Reed Resources Ltd is a for-profit public company, incorporated and domiciled in Australia, listed on the Australian Securities Exchange.

Registered office and principal place of business

Level 1, 672 Murray St, West Perth WA 6005

2. Significant accounting policies

Statement of compliance

The financial report is a general purpose financial report which has been prepared in accordance with the Corporations Act 2001, Accounting Standards and Interpretations, and complies with other requirements of the law. The financial statements comprise the consolidated financial statements of the Group. For the purpose of preparing the financial statements the consolidated entity is a for-profit entity.

Accounting Standards include Australian Accounting Standards. Compliance with Australian Accounting Standards ensures that the financial statements and notes of the company and the Group comply with International Financial Reporting Standards ('IFRS').

The financial statements were authorised for issue by the directors on 28 September 2012.

Basis of preparation

The accounting policies adopted are consistent with those adopted and disclosed in the Company's 2011 Annual Financial Report for the Financial Year Ended 30 June 2011 except for the impact of the Standards and Interpretations described below. These accounting policies are consistent with Australian Accounting Standards and with International Financial Reporting Standards.

The Group has adopted all of the new and revised Standards and Interpretations issued by the Australian Accounting Standards Boards ('AASB') that are relevant to its operations and effective for the current reporting period beginning 1 July 2011.

The financial report has been prepared on the basis of historical cost except for the revaluation of certain non-financial assets and financial instruments. Cost is based on the fair values of the consideration given in exchange for assets. All amounts are presented in Australian dollars, unless otherwise noted.

Going concern assumption

The financial report for Reed Resources Ltd has been prepared on the going concern basis which contemplates the continuity of normal business activity and the realisation of assets and the settlement of liabilities in the normal course of business.

The Consolidated Entity has incurred a net loss after tax of \$30,983,345 (including \$23,558,139 of impairment charges) (2011: Loss \$3,353,586) and experienced net cash outflows from operating and investing activities of \$24,853,600 (2011: \$31,625,910) for the year ended 30 June 2012.

During this same period the Company raised \$37,015,012 (2011: \$44,431,480) through capital raisings which have primarily been used to develop the Company's projects through the acquisition and development of the Meekatharra Gold Project and continued exploration and evaluation of its non-gold projects.

On 26 September 2012 Reed Resources Ltd executed a binding term sheet with Credit Suisse. Pursuant to this term sheet Credit Suisse will provide the company with a senior debt facility for \$19 million and a hedging facility. These facilities are subject to final documentation and due diligence which are expected to be finalised by the end of October 2012.

At present management has identified a shortfall in the funds required to execute Stage 1 of the Meekatharra Gold Project. The Company is actively engaged in raising additional funds to cover this shortfall which is also a condition precedent to the availability of the Credit Suisse debt facility.

The Directors have reviewed the Company's and Consolidated Entity's overall position and outlook in respect of the matters identified above and are of the opinion that the use of the going concern basis remains appropriate given the following:

  • (i) The Directors have reviewed the quantum and timing of expenditure required to execute the Company's business strategy and the funds required in order for it to prudently commit to certain key contracts associated with its Meekatharra Gold Project. Should the Company be unable raise the funds required to execute tasks in the forecast timeframes, management will be required to implement a revised strategy of reduced activity and expenditure until such time as funds become available.
  • (ii) The Directors have identified non-core assets, as disclosed in Note 7 to the financial report, which are intended to be disposed of, with completion expected to occur within 12 months from the date of signing this report.

At the date of this report the Company is at an advanced stage in its endeavours to raise the required funding and while there is no assurance that the steps taken, and to be taken, will be successful, the Directors are confident in the Company's ability to raise the necessary additional funds in order to continue to develop the Meekatharra Gold Project.

Should the Company be unable to secure additional funding a material uncertainty would exist as to whether the Company and Consolidated Entity will be able to continue as going concerns at planned levels of activity and therefore whether they will realise their assets and extinguish their liabilities in the normal course of business and at the amounts stated in the financial report.

The financial report does not include any adjustments relating to the recoverability and classification of recorded asset amounts or, to the amounts and classification of liabilities that might be necessary should the Company and Consolidated Entity not continue as going concerns.

Standards and interpretations adopted in the current year

The Company has adopted all of the new and revised Standards and Interpretations issued by the Australian Accounting Standards Board that are relevant to their operations and are effective for the current financial reporting period beginning 1 July 2011.

The following new and revised Standards and Interpretations have been adopted in the current period:

  • • AASB 124 'Related Party Disclosures' (revised December 2009) and AASB 2009-12 'Amendments to Australian Accounting Standards'
  • • AASB 1054 'Australian Additional Disclosures'
  • • AASB 2010-4 'Further Amendments to Australian Accounting Standards arising from the Annual Improvements Project'
  • • AASB 2010-5 'Amendments to Australian Accounting Standards'
  • • AASB 2010-6 'Amendments to Australian Accounting Standards Disclosures on Transfers of Financial Assets'

The impact of the adoption of these Standards and Interpretations did not have a material impact on the Company.

2. Significant accounting policies (continued)

Statement of compliance (continued)

Standards and interpretations issued not yet effective

At the date of authorisation of the financial statements, the following Australian Accounting Standards and Interpretations have recently been issued or amended but are not yet effective and have not been adopted by the Company for the year ended 30 June 2012:

Standard Effective
for annual
reporting
periods
beginning
on or after
Expected to
be initially
applied
in the
financial
year ending
• AASB 9 'Financial Instruments' (December 2009), AASB 2009-11
'Amendments to Australian Accounting Standards arising from AASB 9' 1 January 2013 30 June 2014
• AASB 10 'Consolidated Financial Statements' 1 January 2013 30 June 2014
• AASB 11 'Joint Arrangements' 1 January 2013 30 June 2014
• AASB 12 'Disclosure of Interests in Other Entities' 1 January 2013 30 June 2014
• AASB 127 'Separate Financial Statements' (2011) 1 January 2013 30 June 2014
• AASB 128 'Investments in Associates and Joint Ventures' (2011) 1 January 2013 30 June 2014
• AASB 13 'Fair Value Measurement' and AASB 2011-8 'Amendments
to Australian Accounting Standards arising from AASB 13'
1 January 2013 30 June 2014
• AASB 119 'Employee Benefits' (2011) and AASB 2011-10 'Amendments
to Australian Accounting Standards arising from AASB 119 (2011)'
1 January 2013 30 June 2014
• AASB 2010-8 'Amendments to Australian Accounting
Standards – Deferred Tax: Recovery of Underlying Assets'
1 January 2012 30 June 2013
• AASB 2011-4 'Amendments to Australian Accounting Standards to
Remove Individual Key Management Personnel Disclosure Requirements'
1 July 2013 30 June 2014
• AASB 2011-7 'Amendments to Australian Accounting Standards
arising from the Consolidation and Joint Arrangements Standards'
1 January 2013 30 June 2014
• AASB 2011-9 'Amendments to Australian Accounting Standards
– Presentation of Items of Other Comprehensive Income'
1 July 2012 30 June 2013
• AASB 2012-2 'Amendments to Australian Accounting Standards
– Disclosures – Offsetting Financial Assets and Financial Liabilities'
1 January 2013 30 June 2014
• AASB 2012-3 'Amendments to Australian Accounting Standards
– Offsetting Financial Assets and Financial Liabilities'
1 January 2014 30 June 2015
• AASB 2012-5 'Amendments to Australian Accounting Standards
arising from Annual Improvements 2009-2011 Cycle'
1 January 2013 30 June 2014
• AASB 2012-6 'Amendments to Australian Accounting Standards
-Mandatory Effective Date of AASB 9 and Transition Disclosures'
1 January 2013 30 June 2014

At the date of authorisation of the financial statements the following IASB Standards and IFRIC Interpretations were also in issue but not yet effective, although Australian equivalent Standards and interpretations have not yet been issued and have not been adopted by the Company for the year ended 30 June 2012. The impact of these recently issued or amended standards and interpretations have not been determined by the Company.

Standard/Interpretation Effective
for annual
reporting
periods
beginning
on or after
Expected to
be initially
applied
in the
financial
year ending
• Offsetting Financial Assets and Financial Liabilities (Amendments to IAS 32) 1 January 2014 30 June 2015
• Disclosures – Offsetting Financial Assets and
Financial Liabilities (Amendments to IFRS 7)
1 January 2013 30 June 2014
• Mandatory Effective Date of IFRS 9 and Transition
Disclosures (Amendments to IFRS 9 and IFRS 7)
1 January 2015 30 June 2016
• Annual Improvements 2009-2011 cycle 1 January 2013 30 June 2014

Critical accounting judgments and key sources of estimation uncertainty

In the application of the Group's accounting policies, management is required to make judgments, estimates and assumptions about carrying values of assets and liabilities that are not readily apparent from other sources. The estimates and associated assumptions are based on historical experience and other factors that are considered to be relevant. Actual results may differ from these estimates.

The estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognised in the period in which the estimate is revised if the revision affects only that period, or in the period of the revision and future periods if the revision affects both current and future periods. Refer to Note 3 for a discussion of critical judgments in applying the entity's accounting policies, and key sources of estimation uncertainty.

The following significant accounting policies have been adopted in the preparation and presentation of the financial report:

(a) Cash and cash equivalents

Cash comprises cash on hand and demand deposits. Cash equivalents are short-term, highly liquid investments that are readily convertible to known amounts of cash and which are subject to an insignificant risk of changes in value.

(b) Employee benefits

A liability is recognised for benefits accruing to employees in respect of wages and salaries, annual leave, long service leave, and sick leave when it is probable that settlement will be required and they are capable of being measured reliably.

Liabilities recognised in respect of employee benefits expected to be settled within 12 months, are measured at their nominal values using the remuneration rate expected to apply at the time of settlement.

Liabilities recognised in respect of employee benefits which are not expected to be settled within 12 months are measured as the present value of the estimated future cash outflows to be made by the consolidated entity in respect of services provided by employees up to reporting date.

Contributions to defined contribution superannuation plans are expensed when incurred.

(c) Financial instruments issued by the company

Debt and equity instruments

Debt and equity instruments are classified as either liabilities or as equity in accordance with the substance of the contractual arrangement.

Financial liabilities

Financial liabilities are classified as either financial liabilities 'at fair value through profit or loss' or other financial liabilities.

2. Significant accounting policies (continued)

(c) Financial instruments issued by the company

Financial liabilities at fair value through profit or loss

Financial liabilities are classified as at fair value through profit or loss where the financial liability is either held for trading or it is designated as at fair value through profit or loss.

A financial liability is held for trading if:

  • It has been incurred principally for the purpose of repurchasing in the near future; or
  • It is a part of an identified portfolio of financial instruments that the Group manages together and has a recent actual pattern of short-term profit-taking; or
  • It is a derivative that is not designated and effective as a hedging instrument.

A financial liability other than a financial liability held for trading is designated as at fair value through profit or loss upon initial recognition if:

  • such designation eliminates or significantly reduces a measurement or recognition inconsistency that would otherwise arise; or
  • the financial liability forms part of a group of financial assets or financial liabilities or both, which is managed and its performance evaluated on a fair value basis, in accordance with the Group's documented risk management or investment strategy, and information about the grouping is provided internally on that basis; or
  • it forms part of a contract containing one or more embedded derivatives, and AASB 139 'Financial Instruments: Recognition and Measurement' permits the entire combined contract (asset or liability) to be designated as at fair value through profit or loss.

Financial liabilities at fair value through profit or loss are stated at fair value, with any resultant gain or loss recognised in profit or loss. The net gain or loss recognised in profit or loss incorporates any interest paid on the financial liability. Fair value is determined in the manner described in Note 2 (o).

Other financial liabilities

Other financial liabilities, including borrowings, are initially measured at fair value, net of transaction costs. Other financial liabilities are subsequently measured at amortised cost using the effective interest method, with interest expense recognised on an effective yield basis. The effective interest method is a method of calculating the amortised cost of a financial liability and of allocating interest expense over the relevant period. The effective interest rate is the rate that exactly discounts estimated future cash payments through the expected life of the financial liability, or, where appropriate, a shorter period.

Transaction costs on the issue of equity instruments

Transaction costs arising on the issue of equity instruments are recognised directly in equity as a reduction of the proceeds of the equity instruments to which the costs relate. Transaction costs are the costs that are incurred directly in connection with the issue of those equity instruments and which would not have been incurred had those instruments not been issued.

Interest and dividends

Interest and dividends are classified as expenses or as distributions of profit consistent with the balance sheet classification of the related debt or equity instruments or component parts of compound instruments.

(d) Goods and service tax

Revenues, expenses and assets are recognised net of the amount of goods and services tax (GST), except:

  • i) where the amount of GST incurred is recoverable from the taxation authority, it is recognised as part of the cost of acquisition of an asset or as part of an item of expense; or
  • ii) for receivables and payables which are recognised inclusive of GST.

The net amount of GST recoverable from, or payable to, the taxation authority is included as part of receivables or payables.

Cash flows are included in the cash flow statement on a gross basis. The GST component of cash flows arising from investing and financing activities which is recoverable from, or payable to, the taxation authority is classified as operating cash flows.

(e) Non-current assets held for sale

Non-current assets and their disposal groups are classified as held for sale if their carrying amount will be recovered principally through a sale transaction rather than continuing use. This condition is regarded as met only when the sale is highly probable and the non-current asset (or disposal group) is available for immediate sale in its present condition. Management must be committed to the sale which should be expected to qualify for recognition as a completed sale within one year from the date of classification.

When the Group is committed to a sale plan involving loss of control of a subsidiary, all of the assets and liabilities of that subsidiary are classified as held for sale when the criteria described above are met, regardless of whether the Group will retain a non-controlling interest in its former subsidiary after the sale. Non-current assets (and disposal groups) classified as held for sale are measured at the lower of their previous carrying amount and fair value less cost to sell.

(f) Impairment of assets

At each reporting date, the consolidated entity reviews the varying amounts of its tangible and intangible assets to determine whether there is any indication that those assets have suffered an impairment loss. If any such indication exists, the recoverable amount of the asset is estimated in order to determine the extent of the impairment loss (if any). Where the asset does not generate cash flows that are independent from other assets, the consolidated entity estimates the recoverable amount of the cash-generating unit to which the asset belongs.

Recoverable amount is the higher of fair value less costs to sell and value in use. In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset for which the estimates of future cash flows have not been adjusted.

If the recoverable amount of an asset (or cash-generating unit) is estimated to be less than its carrying amount, the varying amount of the asset (cash-generating unit) is reduced to its recoverable amount. An impairment loss is recognised in profit or loss immediately.

Where an impairment loss subsequently reverses, the varying amount of the asset (cash-generating unit) is increased to the revised estimate of its recoverable amount, but only to the extent that the increased varying amount does not exceed the varying amount that would have been determined had no impairment loss been recognised for the asset (cashgenerating unit) in prior years. A reversal of an impairment loss is recognised in profit or loss immediately.

2. Significant accounting policies (continued)

(g) Income tax

Current tax

Current tax is calculated by reference to the amount of income taxes payable or recoverable in respect of the taxable profit or tax loss for the period. It is calculated using tax rates and tax laws that have been enacted or substantively enacted by reporting date. Current tax for current and prior periods is recognised as a liability (or asset) to the extent that it is unpaid (or refundable).

Deferred tax

Deferred tax is accounted for using the comprehensive balance sheet liability method in respect of temporary differences arising from differences between the varying amount of assets and liabilities in the financial statements and the corresponding tax base of those items.

In principle, deferred tax liabilities are recognised for all taxable temporary differences. Deferred tax assets are recognised to the extent that it is probable that sufficient taxable amounts will be available against which deductible temporary differences or unused tax losses and tax offsets can be utilised. However, deferred tax assets and liabilities are not recognised if the temporary differences giving rise to them arise from the initial recognition of assets and liabilities (other than as a result of a business combination) which affects neither taxable income nor accounting profit. Furthermore, a deferred tax liability is not recognised in relation to taxable temporary differences arising from goodwill.

Deferred tax liabilities are recognised for taxable temporary differences arising on investments in subsidiaries, branches, associates and joint ventures except where the consolidated entity is able to control the reversal of the temporary differences and it is probable that the temporary differences will not reverse in the foreseeable future. Deferred tax assets arising from deductible temporary differences associated with these investments and interests are only recognised to the extent that it is probable that there will be sufficient taxable profits against which to utilise the benefits of the temporary differences and they are expected to reverse in the foreseeable future.

Deferred tax assets and liabilities are measured at the tax rates that are expected to apply to the period(s) when the asset and liability giving rise to them are realised or settled, based on tax rates (and tax laws) that have been enacted or substantively enacted by reporting date. The measurement of deferred tax liabilities and assets reflects the tax consequences that would follow from the manner in which the consolidated entity expects, at the reporting date, to recover or settle the carrying amount of its assets and liabilities.

Deferred tax assets and liabilities are offset when they relate to income taxes levied by the same taxation authority and the Company/consolidated entity intends to settle its current tax assets and liabilities on a net basis.

Current and deferred tax for the period

Current and deferred tax is recognised as an expense or income in the income statement, except when it relates to items credited or debited directly to equity, in which case the deferred tax is also recognised directly in equity, or where it arises from the initial accounting for a business combination, in which case it is taken into account in the determination of goodwill or excess.

Tax consolidation

The Company and all its wholly-owned Australian resident entities are part of a tax-consolidated group under Australian taxation law. Reed Resources Ltd is the head entity in the tax-consolidated group. Income tax expense/benefit, deferred tax liabilities and deferred tax assets arising from temporary differences of the members of the tax consolidated group are recognised in the separate financial statements of the members of the tax consolidated group using a 'group allocation' approach based on the allocation specified in the tax funding arrangement.

The tax funding arrangement requires a notional current and deferred tax calculation for each entity as if it were a taxpayer in its own right, except that unrealised profits, distributions made and received and capital gains and losses and similar items arising on transactions within the tax consolidated group are treated as having no consequence. Current tax liabilities and assets and deferred tax assets arising from unused tax losses and tax credits of the members of the tax consolidated group are recognised by the Company (as head entity in the tax consolidated group).

Due to the existence of a tax funding arrangement between the entities in the tax consolidated group, amounts are recognised as payable to or receivable by the Company and each member of the group in relation to the tax contribution amounts paid or payable between the parent and the other members of the tax consolidated group in accordance with the arrangement.

Where the tax contribution amount recognised by each member of the tax consolidated group for a particular period is different to the aggregate of the current tax liability or asset and any deferred tax asset arising from the unused tax losses and tax credits in respect of that period, the difference is recognised as a contribution from, or distribution to, equity participants.

(h) Exploration and evaluation expenditure

Exploration and evaluation expenditures in relation to separate areas of interest are capitalised in the year in which they are incurred and are carried at cost less accumulated impairment losses where the following conditions are satisfied;

  • i) the rights to tenure of the area of interest are current; and
  • ii) at least one of the following conditions is also met:
  • the exploration and evaluation expenditures are expected to be recouped through successful development and exploration of the area of interest, or alternatively, by its sale; or
  • exploration and evaluation activities in the area of interest have not at the reporting date reached a stage which permits a reasonable assessment of the existence or otherwise of economically recoverable reserves, and active and significant operations in, or in relation to, the area of interest are continuing.

Capitalised exploration costs for each area of interest (considered to be the cash generating unit) are reviewed each reporting date to test whether an indication of impairment exists. If any such indication exists, the recoverable amount of the capitalised exploration costs is estimated to determine the extent of the impairment loss (if any). The recoverable amount for capitalised exploration costs has been determined as the fair value less costs to sell by reference to an active market. Where an impairment loss subsequently reverses, the carrying amount of the asset is increased to the revised estimate of its recoverable amount, but only to the extent that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been recognised for the asset in previous years.

Where a decision is made to proceed with development, accumulated expenditure is tested for impairment and transferred to capitalised development and then amortised over the life of the reserves associated with the area of interest once mining operations have commenced.

Development expenditure

Development expenditure is recognised at cost less any impairment losses. Where commercial production in an area of interest has commenced, the associated costs are amortised over the life of the reserves associated with the area of interest. Changes in factors such as estimates of proved and probable reserves that effect unit-of-production calculations are dealt with on a prospective basis.

Provision for restoration and rehabilitation

A provision for restoration and rehabilitation is recognised when there is a present obligation as a result of development, production, transportation or storage activities undertaken, it is probable that an outflow of economic benefits will be required to settle the obligation, and the amount of the provision can be measured reliably. The estimated future obligations include the costs of restoring the affected areas.

The provision for future restoration costs is the best estimate of the present value of the expenditure required to settle the restoration obligation at the reporting date. Future restoration costs are reviewed annually and any changes in the estimate are reflected in the present value of the restoration provision at each reporting date.

2. Significant accounting policies (continued)

(h) Exploration and evaluation expenditure (continued)

Provision for restoration and rehabilitation (continued)

The initial estimate of the restoration and rehabilitation provision relating to development is capitalised into the cost of the related asset and depreciated over the estimated remaining life of the asset on a straight line basis. Changes in the estimate of the provision for restoration and rehabilitation are treated in the same manner, except that the unwinding of the effect of discounting on the provision is recognised as a finance cost rather than being capitalised into the cost of the related asset.

(i) Payables

Trade payables and other accounts payable are recognised when the consolidated entity becomes obliged to make future payments resulting from the purchase of goods and services.

(j) Principles of consolidation

The consolidated financial statements are prepared by combining the financial statements of all the entities that comprise the consolidated entity, being the Company (the parent entity) and its subsidiaries as defined in Accounting Standard AASB 127 'Consolidated and Separate Financial Statements'. A list of subsidiaries appears in Note 30 to the financial statements. Consistent accounting policies are employed in the preparation and presentation of the consolidated financial statements.

On acquisition, the assets, liabilities and contingent liabilities of a subsidiary are measured at their fair values at the date of acquisition. Any excess of the cost of acquisition over the fair values of the identifiable net assets acquired is recognised as goodwill. If, after reassessment, the fair values of the identifiable net assets acquired exceeds the cost of acquisition, the excess is credited to profit and loss in the period of acquisition. The consolidated financial statements include the information and results of each subsidiary from the date on which the Company obtains control and until such time as the Company ceases to control such entity. In preparing the consolidated financial statements, all inter-company balances and transactions, and unrealised profits arising within the consolidated entity are eliminated in full.

(k) Property, plant and equipment

Plant and equipment is stated at cost less accumulated depreciation and impairment. Cost includes expenditure that is directly attributable to the acquisition of the item. In the event that settlement of all or part of the purchase consideration is deferred, costs are determined by discounting the amounts payable in the future to their present value as at the date of acquisition.

Depreciation is calculated on a diminishing value basis so as to write off the net cost or other re-valued amount of each asset over its expected useful life to its estimated residual value. The estimated useful lives, residual values and depreciation method are reviewed at the end of each annual reporting period with the effect of any changes recognised on a prospective basis.

The following estimated useful lives are used in the calculation of depreciation:

Furniture & Fittings 5-20 years
Plant and Equipment 2-10 years
Buildings 10-20 years

An item of property, plant and equipment is derecognised upon disposal when no future economic benefits are expected to arise from the continued use of the asset. Any gain or loss arising on the disposal or retirement of an item of property, plant and equipment is determined as the difference between the sales proceeds and the carrying amount of the asset and is recognised in profit and loss.

(l) Provisions

Provisions are recognised when the consolidated entity has a present obligation, the future sacrifice of economic benefits is probable, and the amount of the provision can be measured reliably.

The amount recognised as a provision is the best estimate of the consideration required to settle the present obligation at reporting date, taking into account the risks and uncertainties surrounding the obligation. Where a provision is measured using the cash flows estimated to settle the present obligation, its carrying amount is the present value of those cash flows. When some or all of the economic benefits required to settle a provision are expected to be recovered from a third party, the receivable is recognised as an asset if it is virtually certain that recovery will be received and the amount of the receivable can be measured reliably.

(m) Revenue recognition

Revenue is measured at the fair value of the consideration received or receivable.

Sale of goods

Revenue from the sale of goods is recognised when the consolidated entity has transferred to the buyer the significant risks and rewards of ownership of the goods.

Dividend and interest revenue

Dividend revenue from investments is recognised when the shareholder's right to receive the payment has been established. Interest revenue is recognised on a time proportionate basis that takes into account the effective yield on the financial asset.

(n) Joint ventures

Jointly controlled assets and operations

Interests in jointly controlled assets and operations are reported in the financial statements by including the consolidated entity's share of assets employed in the joint ventures, the share of liabilities incurred in relation to the joint ventures and the share of any expenses incurred in relation to the joint ventures in their respective classification categories.

(o) Share-based payments

Equity-settled share-based payments granted after 7 November 2002 that vest on or after 1 January 2005, are measured at fair value at the date of grant. Fair value is measured by use of Black Scholes model.

The fair value determined at the grant date of the equity-settled share-based payments is expensed on a straight-line basis over the vesting period, based on the consolidated entity's estimate of shares that will eventually vest.

(p) Financial assets

Subsequent to initial recognition, investments in subsidiaries are measured at cost in the Company's financial statements. Other financial assets are classified into the following specified categories: financial assets 'at fair value through profit or loss', 'held-to-maturity investments', 'available-for-sale' financial assets, and 'loans and receivables'. The classification depends on the nature and purpose of the financial assets and is determined at the time of initial recognition. All of the Company's and group financial assets are classified as loans and receivables.

Loans and receivables

Trade receivables, loans, and other receivables that have fixed or determinable payments that are not quoted in an active market are classified as 'loans and receivables'. Loans and receivables are measured at amortised cost using the effective interest method less impairment.

Interest income is recognised by applying the effective interest rate.

2. Significant accounting policies (continued)

(p) Financial assets (continued)

Impairment of financial assets

Financial assets, other than those at fair value through profit or loss, are assessed for indicators of impairment at each balance sheet date. Financial assets are impaired where there is objective evidence that as a result of one or more events that occurred after the initial recognition of the financial asset the estimated future cash flows of the investment have been impacted. For financial assets carried at amortised cost, the amount of the impairment is the difference between the asset's carrying amount and the present value of estimated future cash flows, discounted at the original effective interest rate.

The carrying amount of the financial asset is reduced by the impairment loss directly for all financial assets with the exception of trade receivables where the carrying amount is reduced through the use of an allowance account. When a trade receivable is uncollectible, it is written off against the allowance account. Subsequent recoveries of amounts previously written off are credited against the allowance account. Changes in the carrying amount of the allowance account are recognised in profit or loss.

With the exception of available-for-sale equity instruments, if, in a subsequent period, the amount of the impairment loss decreases and the decrease can be related objectively to an event occurring after the impairment was recognised, the previously recognised impairment loss is reversed through profit or loss to the extent the carrying amount of the investment at the date the impairment is reversed does not exceed what the amortised cost would have been had the impairment not been recognised. In the case of available-for-sale equity instruments, the reversal is recognised directly in equity.

(q) Leased assets

Leases are classified as finance leases when the terms of the lease transfer substantially all the risks and rewards incidental to ownership of the leased asset to the lessee. All other leases are classified as operating leases.

Assets held under finance leases are initially recognised at their fair value or, if lower, at amounts equal to the present value of the minimum lease payments, each determined at the inception of the lease. The corresponding liability to the Lessor is included in the balance sheet as a finance lease obligation.

Lease payments are apportioned between finance charges and reduction of the lease obligation so as to achieve a constant rate of interest on the remaining balance of the liability. Finance charges are charged directly against income, unless they are directly attributable to qualifying assets, in which case they are capitalised in accordance with the Group's general policy on borrowing costs.

Contingent rentals are recognised as expenses in the periods in which they are incurred. Finance leased assets are amortised on a straight line basis over the estimated useful life of the asset.

Operating lease payments are recognised as an expense on a straight-line basis over the least term, except where another systematic basis is more representative of the time pattern in which economic benefits from the leased asset are consumed. Contingent rentals arising under operating leases are recognised as an expense in the period in which they incurred.

(r) Inventories

Work in progress and finished goods inventories are measured at the lower of cost and net realisable value. Costs are assigned on a weighted average basis and comprise all costs of purchase, costs of conversion and any other costs incurred in bringing inventories to their present location and condition. Costs of conversion include costs relating directly to production in addition to an apportionment of fixed and variable production overhead expenses, and include costs such as depreciation and amortisation. Net realisable value is the estimated selling price in the ordinary course of business less estimated costs of completion and any estimated selling costs. Consumable stores inventory are measured at the cost of acquisition.

3. Critical accounting judgments and key sources of estimation uncertainty

In the application of the Group's accounting policies, which are described in Note 2, management is required to make judgments, estimates and assumptions about carrying values of assets and liabilities that are not readily apparent from other sources. The estimates and associated assumptions are based on historical experience and various other factors that are believed to be reasonable under the circumstance, the results of which form the basis of making the judgments. Actual results may differ from these estimates. The estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognised in the period in which the estimate is revised if the revision affects only that period, or in the period of the revision and future periods if the revision affects both current and future periods.

3.1 Critical judgments in applying the entity's accounting policies

The following are the critical judgments that management has made in the process of applying the Group's accounting policies and that have the most significant effect on the amounts recognised in the financial statements.

(a) Recovery of capitalised exploration evaluation and development expenditure

The Group capitalises exploration, evaluation and development expenditure incurred on ongoing projects. The recoverability of this capitalised exploration expenditure is entirely dependent upon returns from the successful development of mining operations or from surpluses from the sale of the projects or the subsidiary companies that control the projects. At the point that it is determined that any capitalised exploration expenditure is definitely not recoverable, it is written off.

(b) Share-based payments

Equity-settled share-based payments granted are measured at fair value at the date of grant. The fair value of share options is measured by use of the Black Scholes model and requires substantial judgement. Management has made its best estimate for the effects of non-transferability, exercise restrictions (including the probability of meeting market conditions attached to the option), and behavioural considerations.

The fair value of performance rights issued during the period was made with reference to the parent entity's closing share price on the date of grant. Management has been required to estimate the probability that the employee will meet the performance criteria determined by the Board and that the employee will remain with the Company.

(c) Rehabilitation provision

The Group is required to perform a detailed assessment of its provision for rehabilitation at each reporting date. Significant estimates and assumptions are made in determining the provision for mine rehabilitation as there are numerous factors that will affect the ultimate amount payable. These factors include estimates of the extent and costs of rehabilitation activities, technological changes, regulatory changes, cost increases and changes in discount rates. These uncertainties may result in future actual expenditure differing from the amounts currently provided. The provision at reporting date represents management's best estimate of the present value of the future rehabilitation costs required. This estimate is completed with the assistance of external consultants having substantial expertise in the area of mine rehabilitation.

3. Critical accounting judgments and key sources of estimation uncertainty (continued)

3.2 Key areas of estimation uncertainty

The following are key assumptions concerning the future, or other key sources of estimation uncertainty at the balance sheet date, that have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year.

(a) Capitalised development and evaluation assets

Certain assumptions are required to be made in order to assess the recoverability of long-lived assets. Key assumptions include the future price of gold, future cash flows, an estimated discount rate and estimates of recoverable gold ounces. In addition, cash flows are projected over the life of mine, which is based on indicated ore resources. Estimates of ore are dependent on various assumptions. Changes in these estimates could materially impact on ore reserves, and could therefore affect estimates of future cash flows used in the assessment of recoverable amount. The carrying amount of development and evaluation assets which is included in the consolidated statement of financial position at 30 June 2012 is \$38.5 million (2011: \$41.7 million) after an impairment loss of \$23.5 million was recognised during 2012 (2011: \$0.74 million). Details of the impairment loss are included in note 14.

The Company estimates its mineral resources based on information compiled by Competent Persons (as defined in the JORC code). In estimating the remaining life of the mine for the purpose of amortisation and depreciation calculations, due regard is given, not only to the amount of remaining recoverable gold ounces, but also to limitations which could arise from the potential for changes in technology, demand, and other issues which are inherently difficult to estimate over a lengthy timeframe.

Where a change is estimated recoverable gold ounces contained in indicated resources is made, depreciation and amortisation is accounted for prospectively.

The determination of indicated resources and remaining mine life affects the carrying of value of a number of the Consolidated Entity's assets and liabilities including deferred mining costs and the provision for rehabilitation.

(b) Value of deferred tax assets

Deferred income tax assets, including those arising from un-utilised tax losses, require management to assess the likelihood that the Group will generate sufficient taxable earnings in future periods, in order to utilise recognised deferred income tax assets. Assumptions about the generation of future taxable profits depend on management's estimates of future cash flows. These estimates of future taxable income are based on forecast cash flows from operations (which are impacted by production and sales volumes, commodity prices, reserves, operating costs, closure and rehabilitation costs, capital expenditure, dividends and other capital management transactions) and judgement about the application of existing tax laws in Australia. To the extent that future cash flows and taxable income differ significantly from estimates, the ability of the Group to realise the net deferred income tax assets recorded at the reporting date could be impacted.

In addition, future changes in tax laws in Australia could limit the ability of the Group to obtain tax deductions in future periods.

The carrying amount of deferred tax assets which is included in the consolidated statement of financial position at 30 June 2012 is \$7.4 million (2011: \$7.3 million).

4. Parent entity disclosure

2012
\$
2011
\$
Financial Position
Assets
Current assets 21,247,430 13,990,521
Non-current assets 92,593,595 86,153,807
Total assets 113,841,025 100,144,328
Liabilities
Current liabilities 659,344 759,911
Non-current liabilities 19,919 8,570
Total liabilities 679,263 768,481
Equity
Issued capital 148,058,577 109,790,915
Retained earnings (39,919,998) (15,132,755)
Reserves
Share based payments 5,023,183 4,717,687
Total equity 113,161,762 99,375,847
Financial Performance
Loss for the year (24,787,243) (3,205,240)
Other comprehensive income - -
Total comprehensive income (24,787,243) (3,205,240)
Guarantees entered into on behalf of subsidiaries (i) 8,700,000 8,771,634
Contingent liabilities
Contingent liability arising from interest in joint ventures (ii) (80,000) (80,000)
Contingent liability arising from MoU (iii) - (234,490)
(80,000) (314,490)
Commitments for exploration, evaluation and development (iv) - (433,310)

(i) Barrambie Gas Pty Ltd, a wholly owned subsidiary of the Company, is party to a gas transmission agreement with DBNGP (WA) Transmission Pty Ltd for the Barrambie Project. As part of this agreement the parent entity was required to procure term deposits of \$8.7 million from its bankers as security. Refer to Note 12(b) for details.

(ii) As part of the Mt Finnerty Project joint venture agreement with Cliffs Asia Pacific Iron Ore Pty Ltd ("Cliffs"), the Company agreed to provide an indemnity in respect of performance bonds provided to the Dtepartment of Mines and Petroleum by Cliffs. Refer to Note 25 for details.

(iii) In the prior year the Company had entered into a memorandum of understanding (MoU) for the development of the Barrambie Project. The agreement has terminated in the current period and there are no outstanding contingent liabilities at 30 June 2012. Refer to note 25 for details.

(iv) The Company had been committed to certain exploration and evaluation expenditure by virtue of contracts entered into by its wholly owned subsidiary GMK Exploration Pty Ltd for the Meekatharra Gold Project. These obligations were settled in the current period and are reflected in the financial statements.

Notes to the Consolidated Financial Statements

5. Loss for the year

2012
\$
2011
\$
(a) Income
Income from operations consisted of the following items:
Revenue from the sale of goods - 347,821
Other income:
Interest revenue 790,813 883,974
Statutory refunds and grants 221,777 24,481
Other 4,361 32,754
1,016,951 941,209
(b) Loss before Income Tax
Loss before income tax has been arrived at after charging the following expenses:
Finance costs:
Borrowing costs (449,566) -
Facility fees (80,025) -
Unwinding of provision for rehabilitation (544,412) (8,523)
Other (15,205) (4)
(1,089,208) (8,527)
Cost of goods sold - (284,408)
Impairment of non-current assets (i) (20,340,077) (74,356)
Depreciation of non-current assets (223,542) (243,507)
(Loss)/gain on sale of plant and equipment (319,221) 164,364
Loss on financial asset held at fair value (ii) (380,384) -
Loss on sale of equity instruments (iii) (301,874) -
Employee benefits expense:
Equity settled share-based payments (305,496) (1,045,232)
Defined contribution plans (208,207) (142,512)
Other employee benefits (2,907,879) (1,833,621)
(3,421,582) (3,021,365)

(i) Impairment expense relates to the exploration, evaluation and development assets for continuing operations (\$20,340,077). The impairment expense of discontinued operations (\$3,218,062) is shown at note 8. Refer to note 14 for further details of the impairment of these assets.

(ii) The Company purchased put options for 70,000 oz of gold with a view to underpinning the hedging program for the company's Meekatharra Gold Project. These options expired unexercised on 19 September 2012. The loss represents the movement in fair value up to 30 June 2012. Refer to note 12(a) for additional information on the option purchase.

(iii) The Company recorded a loss on disposal of fully paid ordinary shares acquired as part consideration for disposal of its subsidiary Kalgoorlie Ore Treatment Pty Ltd. Refer to note 27 for details of the disposal.

6. Income taxes continuing operations

2012
\$
2011
\$
Continuing operations
(a) Income tax recognised in profit or loss
Tax income comprises:
Current tax income - 286,923
Deferred tax income relating to the origination and reversal of temporary differences - 1,034,310
Total tax income - 1,321,233
The prima facie income tax expense on pre-tax accounting profit from continuing
operations reconciles to the income tax expense in the financial statements as
follows:
Loss from continuing operations (28,219,273) (4,506,179)
Income tax calculated at 30% 8,465,782 1,351,854
Effect of expenses that are not deductible in determining taxable profit (1,173,572) (88,006)
Effect of research and development tax off-set - 57,385
Current tax benefit not recognised during the period (7,292,210) -
- 1,321,233

The tax rate used in the above reconciliation is the corporate tax rate of 30% payable by Australian corporate entities on taxable income under Australian tax law. There has been no change in the corporate tax rate during the reporting period.

For tax disclosures on discontinued operations refer to note 8.

(b) Deferred tax assets not brought to account

On income account:
Carry forward tax losses 7,900,936 -
Other (214,294) -
7,686,642 -
On capital account
Share issue costs 217,862 -
7,904,504 -

Notes to the Consolidated Financial Statements

6. Income taxes (continued)

2012
\$
2011
\$
(c) Deferred tax balances are presented in
the statement of financial position as follows:
Continuing Operations
Deferred tax assets 16,186,273 16,521,047
Deferred tax liabilities (8,799,074) (9,200,911)
7,387,199 7,320,136
Classified as assets held for sale
Directly associated with assets held for sale 9,383 76,446
Total recognised deferred tax balances 7,396,582 7,396,582

Deferred tax assets have been recognised based upon the directors assessment of future probable taxable income arising from the development or sale of the Company's assets. Where the directors believe that there may be some uncertainty regarding the generation of adequate taxable income to utilise deferred tax assets of the company the deferred tax asset is not recognised in the statement of financial position until the directors assess otherwise.

(d) Current tax balance

Current tax assets comprise:

Tax refund receivable - 286,923
- 286,923

Taxable and deductible temporary differences arise from the following:

Consolidated
2012 Opening
Balance
\$
Charged to
Equity
\$
Charged to
Income
\$
Closing
Balance
\$
Gross deferred tax liabilities:
Capitalised expenditure (9,200,911) - - (9,200,911)
Gross deferred tax assets:
Unclaimed share issue costs 1,132,102 - - 1,132,102
Unclaimed borrowing costs - - - -
Unclaimed impairment of put options - - - -
Accrued expenses 71,654 - - 71,654
Tax loss - revenue 15,393,737 - - 15,393,737
16,597,493 - - 16,597,493
7,396,582 - - 7,396,582
Consolidated
2011 Opening
Balance
\$
Charged to
Equity
\$
Charged to
Income
\$
Closing
Balance
\$
Gross deferred tax liabilities:
Capitalised expenditure (7,686,297) - (1,514,614) (9,200,911)
Gross deferred tax assets:
Unclaimed share issue costs 624,074 920,541 (412,513) 1,132,102
Accrued expenses 38,522 - 33,132 71,654
Tax loss - revenue 12,401,657 - 2,992,080 15,393,737
13,064,253 920,541 2,612,699 16,597,493
5,377,956 920,541 1,098,085 7,396,582

Tax consolidation

Relevance of tax consolidation to the consolidated entity

The Company and its wholly-owned Australian resident entities have formed a tax-consolidated group and are therefore taxed as a single entity. The head entity within the tax-consolidated group is Reed Resources Ltd. The members of the tax-consolidated group are identified at note 30.

Nature of tax funding arrangements and tax sharing agreements

Entities within the tax-consolidated group have entered into a tax funding arrangement and a tax sharing agreement with the head entity. Under the terms of the tax funding arrangement, Reed Resources Ltd and each of the entities in the tax consolidation group has agreed to pay a tax equivalent payment to or from the head entity, based on the current tax liability or current tax assets of the entity. Such amounts are reflected in amounts receivable from or payable to other entities in the tax consolidated group. The tax sharing agreement entered into between the members of the taxconsolidated group provides for the determination of the allocation of income tax liabilities between the entities should the head entity default on its payment obligations or if an entity should leave the tax-consolidated group. The effect of the tax sharing agreement is that each member's tax liability for tax payable by the tax-consolidated group is limited to the amount payable to the head entity under the tax funding arrangement.

7. Assets classified as held for sale

2012
\$
2011
\$
Assets classified as held for sale (i), (ii) 6,168,749 4,269,580
Liabilities directly associated with assets classified as held for sale (i), (ii) 228,245 27,320

(i) In January 2012 the Board decided the Comet Vale Gold Project did not form part of the Company's core assets, and that it should be actively marketed for sale. Despite having received several offers to purchase the project, the Company believed these did not adequately reflect its value. Consequently a renewed marketing strategy has been undertaken with a view to disposing of the assets within the next 12 months.

(ii) Comparatives represent the assets and liabilities associated with the Nimbus Gold Project disposed of during the current period. Refer to note 27 for details.

Notes to the Consolidated Financial Statements

7. Assets classified as held for sale (continued)

2012
\$
2011
\$
Classified as held for sale
Cash and cash equivalents 33,342 58,500
Trade and other receivables 1,409 22,623
Exploration, evaluation and development expenditure 6,021,849 280,605
Other financial assets 64,683 228,000
Property, plant & equipment 38,083 3,603,406
Deferred tax assets 9,383 76,446
Assets classified as held for sale 6,168,749 4,269,580
Trade and other payables (3,014) (22,357)
Provisions (225,231) (4,963)
Liabilities directly associated with assets classified as held for sale (228,245) (27,320)
Net assets classified as held for sale 5,940,504 4,242,260

8. Discontinued operations

(i) Disposal of interest in Kalgoorlie Ore Treatment Company Pty Ltd

On 8 September 2011 the Group disposed of Kalgoorlie Ore Treatment Company Pty Ltd, which held the Nimbus Gold Project situated near Kalgoorlie, Western Australia. The proceeds on disposal included \$3.4 million cash consideration and \$1.6 million worth of MacPhersons Reward Gold Ltd (ASX: MRP) fully paid ordinary shares. The ordinary shares acquired were subsequently disposed of during the period. Details of the assets and liabilities disposed of, and the calculation of the gain on disposal are disclosed in note 27.

(ii) Plan to dispose of the Comet Vale Gold Project

The Comet Vale Gold Project, situated near Kalgoorlie, Western Australia, has been actively marketed for sale during the period. Subsequent to the acquisition of the Meekatharra Gold Project it was decided the comparatively small scale of the Comet Vale Project rendered it a non-core asset.

(iii) Analysis of loss for the year from discontinued operations

The combined results of the discontinued operations included in the consolidated statement of comprehensive income are set out below. The comparative loss from discontinued operations has been re-presented to include those operations classified as discontinued in the current year.

2012
\$
2011
\$
Loss for the year
Interest income 2,013 9,853
Impairment of non-current assets (3,218,062) -
Expenses (116,585) (242,268)
Loss before income tax (3,332,634) (232,415)
Attributable income tax benefit recognised - 63,775
(3,332,634) (168,640)
Gain on disposal of operation 568,562 -
Loss for the year from discontinued operations (2,764,072) (168,640)

9. Key management personnel compensation

Details of key management personnel compensation are provided on pages 18-26 of the Directors' Report.

10. Share based payments

Employee and executive share option plan

Reed Resources Ltd has an ownership based remuneration scheme for executives and employees (excluding directors). In accordance with the provisions of the scheme, as approved by shareholders at the Company's AGM on 26 November 2007. No share options were issued during the financial year ended 30 June 2012.

The following share-based payment arrangements to employees were in existence during the period:

Options series Number Grant date Expiry date Exercise price
\$
Fair Value at
grant date
\$
Issued 14 September 2007 300,000 14/09/2007 31/12/2012 0.85 0.22
Issued 28 November 2007 1,500,000 28/11/2007 31/12/2012 0.85 0.22
Issued 9 December 2009 4,500,000 26/11/2009 30/06/2012 0.80 0.17
Issued 6 December 2010 4,000,000 25/11/2010 01/07/2012 1.00 0.08
Issued 15 September 2008 600,000 15/09/2008 30/06/2013 1.20 0.13
Issued 25 November 2008 1,250,000 25/11/2008 30/06/2013 1.20 0.03
Issued 26 July 2010 750,000 19/07/2010 01/07/2013 1.00 0.18
Issued 27 August 2010 2,400,000 20/08/2010 01/07/2013 1.00 0.12
Issued 7 September 2009 1,600,000 01/09/2009 31/12/2013 0.80 0.08
Issued 9 December 2009 850,000 26/11/2009 31/12/2013 0.80 0.24
Issued 8 April 2011 500,000 07/04/2011 01/07/2014 1.00 0.12
18,250,000

10. Share based payments (continued)

Inputs into the model
Option series Grant date
share price
\$
Exercise price
\$
Expected
volatility
%
Option life
Years
Risk-free
interest rate
%
14 September 2007 0.61 0.85 63 5 6.27
28 November 2007 0.61 0.85 63 5 6.27
15 September 2008 0.57 1.20 64 5 6.53
25 November 2008 0.28 1.20 69 5 6.53
7 September 2009 0.37 0.80 73 4 3.95
9 December 2009 0.65 0.80 73 3 3.95
26 July 2010 0.595 1.00 64 3 4.70
27 August 2010 0.48 1.00 64 3 4.70
6 December 2010 0.53 1.00 64 2 4.70
8 April 2011 0.63 1.00 64 3 5.00

The following reconciles the outstanding share options granted under the executive and employee share option plan at the beginning and end of the financial year:

2012 2011
Options
No.
Weighted
average
exercise price
\$
Options
No.
Weighted
average
exercise price
\$
Balance at beginning of the financial year 18,250,000 0.93 13,300,000 0.85
Granted during the financial year as
compensation
- - 7,650,000 1.00
Exercised during the financial year (i) - - - -
Lapsed during the financial year (ii) (4,650,000) 0.81 (2,700,000) 0.75
Balance at the end of the financial year (iii) 13,600,000 0.97 18,250,000 0.93

(i) Exercised during the financial year

There were no share options exercised during the year (2011: Nil).

(ii) Lapsed during the financial year

There were 4,650,000 share options that lapsed during the financial year (2011: 2,700,000).

(iii) Balance at the end of the financial year

The share options outstanding at the end of the financial year had a weighted average exercise price of \$0.97 (2011: \$0.93), and a weighted average remaining contractual life of 281 days (2011: 578 days).

No share options were issued during the financial year ended 30 June 2012.

There were 285,000 performance rights issued to employees on 1 August 2011 that resulted in the issue of 77,500 ordinary shares in the Company on 1 August 2012 following satisfaction of the applicable vesting and performance criteria. The fair value of performance rights issued was determined by the closing share price on date of issue, applied to a probability factor reflecting the likelihood that both the service period would be satisfied and the Board would assess an employee's performance as meeting the required standard.

The total expense recognised for the period arising from share-based payment transactions and accounted for as equity-settled share-based payment transactions is \$305,496 (2011: \$1,045,232).

11. Trade and other receivables

2012
\$
2011
\$
Current trade and other receivables
Trade receivables (i) 68,798 889,370
Other receivables (ii) 508,705 31,538
Prepayments 226,636 56,832
Goods and services tax recoverable 485,169 140,548
1,289,308 1,118,288

(i) The average settlement terms are 30 days and all amounts are considered recoverable.

(ii) Includes an amount of \$160,260 receivable from Mr C Reed (executive director). During the period the Company provided a loan to Mr Reed of \$150,000 at a commercial rate of interest that is adjusted in line with the official interest rate set by the Reserve Bank of Australia. Additional amounts of \$10,260 were paid on behalf of Mr C Reed and are due to be repaid by 31 December 2012. Refer to note 32 for further information.

12. Other financial assets

2012
\$
2011
\$
(a) Current
Option fee (i) 3,088,116 -
Restricted term deposit (ii) 3,035,072 -
Meekatharra Gold Project deposit (iii) - 28,431,001
Other 311 -
6,123,499 28,431,001

(i) During the year the Group via its wholly owned subsidiary GMK Exploration Pty Ltd, entered into a transaction with Barclays Bank to purchase put options over 70,000 oz of gold. The put options give the Company the right but not the obligation to sell gold at a price of \$1,560 per ounce on the 19th of September 2012. Refer to subsequent events note 33 for a description of the expiration of this contract and financial impact on the Group.

(ii) The amount represents security for a deferred premium payable to Barclays Bank under the purchase of put options detailed in (i) above. As part of the above transaction with Barclays Bank, a portion of the premium payable for the put options is deferred until the maturity date of 19 September 2012. GMK Exploration Pty Ltd is required to deposit funds with Barclays Bank to settle deferred premium payment obligation.

(iii) The Group entered into an agreement to purchase the Meekatharra Gold Project assets during the previous financial period via its wholly owned subsidiary GMK Exploration Pty Ltd. As part of this agreement the Company was required to pay a deposit on the acquisition cost. The transaction settled on 1 July 2011. Refer to note 28 for details of the assets acquired.

Notes to the Consolidated Financial Statements

12. Other financial assets (continued)

2012
\$
2011
\$
(b) Non-current
Barrambie Gas term deposit (i) 8,700,000 8,700,000
Other bond term deposits (ii) 2,803,352 2,860,634
Option premiums (iii) 147,759 -
Rental bond term deposit 95,000 -
11,746,111 11,560,634

(i) Barrambie Gas Pty Ltd (Barrambie), a wholly owned subsidiary of the Company, is party to a gas transmission agreement with DBNGP (WA) Transmission Pty Ltd in relation to the Barrambie Project. As part of the agreement the Company is required to procure a term deposit from its bankers in the amount of \$8.7 million as security for Barrambie's contractual obligations. The value of the security represented the present value of the Company's commitment under the agreement. The gas transmission and the Group's commitment commenced on 1 July 2010. Whilst the Group is not utilising this transmission capacity, it may enter into agreements to on-sell this capacity.

(ii) Cash restrictions exist on a term deposit with a total value of \$2,803,352 relating to environmental performance bonds issued by the Macquarie Bank Ltd in favour of the Minister for State Development. The deposit acts as security for the bonds. The performance bonds relate specifically to environmental obligations at the Meekatharra Gold Project site.

(iii) Comprised of several options held by the Group relating to the Mount Marion Lithium Project, Meekatharra Gold Project and Mount Finnerty-Barranco Project. Payments have been made to secure options furthering the interests of the Group in these areas.

13. Inventories

2012
\$
2011
\$
Consumable stores 1,143,810 51,405

Consumable stores are mainly comprised of items acquired as part of the Meekatharra Gold Project purchase. The transaction settled on 1 July 2011, details of assets acquired can be found at note 28. During the year the company undertook development work at the Meekatharra Gold Project which included the upgrade of the processing plant and associated camp infrastructure. All inventories used in relation the development activities have been capitalised as part of the capital work in process. No inventories were recognised as an expense during the financial year (2011: \$265,597).

14. Exploration, evaluation and development expenditure

Consolidated
Capitalised
development
\$
Capitalised
exploration
\$
Total
\$
Gross carrying amount
Balance at 1 July 2010 10,489,277 31,899,316 42,388,593
Additions 1,238,337 5,010,031 6,248,368
Transferred to development 1,113,637 (1,113,637) -
Reclassified as held for sale (i) (280,605) - (280,605)
Transferred from intangible assets 200,000 100,000 300,000
Balance at 1 July 2011 12,760,646 35,895,710 48,656,356
Additions 330,022 20,661,898 20,991,920
Reclassified as held for sale (i) (10,972,432) (2,056,282) (13,028,714)
Rehabilitation asset - 6,400,101 6,400,101
Balance at 30 June 2012 2,118,236 60,901,427 63,019,663
Accumulated amortisation and impairment
Balance at 1 July 2010
Amortisation expense
3,745,108
-
3,113,614
-
6,858,722
-
Impairment losses charged to profit - 74,356 74,356
Depreciation of rehabilitation asset 21,848 - 21,848
Reclassified as held for sale (i) - - -
Balance at 1 July 2011 3,766,956 3,187,970 6,954,926
Amortisation expense (ii) - 981,930 981,930
Impairment losses charged to profit (iii) 2,495,657 21,062,482 23,558,139
Depreciation of rehabilitation asset (iv) 21,848 - 21,848
Reclassified as held for sale (i) (6,284,461) (722,405) (7,006,866)
Balance at 30 June 2012 - 24,509,977 24,509,977

Net book value

As at 30 June 2011 8,993,690 32,707,740 41,701,430
As at 30 June 2012 2,118,236 36,391,450 38,509,686

The recovery of exploration expenditure carried forward is dependent upon the discovery of commercially viable mineral and other natural resource deposits, their development and exploration, or alternatively their sale.

(i) The assets and associated liabilities of the Comet Vale Gold Project are held for sale in the current period. The prior year balances relate to the Nimbus Gold Project. Refer to note 7 for details.

(ii) There was no active mining carried out at the Comet Vale Gold Mine for the year. Consequently no additional amortisation has been charged to the development asset.

14. Exploration, evaluation and development expenditure (continued)

(iii) The Group performed a detailed review of the recoverable amount of all projects due to continued weakness in commodity prices. Total impairment charges of \$23.55 million (2011: \$0.074 million) were recognised in respect of exploration, evaluation and development assets, with write-downs on expired or lapsed tenements comprising \$136,774 of this total amount. The impairment expense relating to continuing operations was \$20,340,077 (note 5) whilst impairment to discontinued operations totalled \$3,218,062 and related to the write-down of the Comet Vale Gold Project which is classified as held for sale in the current period (note 8). The major element of the impairment was a charge of \$18.43 million relating to the Barrambie Project. The triggers for the impairment test were primarily the effect of delays to the anticipated development of the project due to continued weakness in the vanadium commodity price. The recoverable amount used in assessing all of the impairment charges is fair value less costs to sell.

(iv) The rehabilitation asset comprises part of the Comet Vale Gold Project which is classified as held for sale in the current period (refer to note 7). Depreciation of the asset is included in the loss from discontinued operations at note 8.

15. Property, plant and equipment

Consolidated
Land &
buildings
at cost
\$
Office
equipment,
furniture &
fittings at
cost
\$
Plant and
equipment
at cost
\$
Capital
work in
progress(i)
\$
Total
\$
Gross carrying amount
Balance at 1 July 2010 27,900 212,952 1,687,525 2,896,452 4,824,829
Additions - 69,635 39,541 695,672 804,848
Disposals - - (70,641) - (70,641)
Reclassified as held for sale (ii) - (4,268) (9,170) (3,592,124) (3,605,562)
Balance at 1 July 2011 27,900 278,319 1,647,255 - 1,953,474
Additions (iii) 3,491,834 323,524 13,376,508 4,967,938 22,159,804
Disposals - - (437,412) - (437,412)
Reclassified as held for sale (ii) (27,900) - (88,246) - (116,146)
Balance at 30 June 2012 3,491,834 601,843 14,498,105 4,967,938 23,559,720
Accumulated depreciation
Balance at 1 July 2010 8,750 146,319 263,586 - 418,655
Disposals - - (3,005) - (3,005)
Reclassified as held for sale (ii) - (800) (1,356) - (2,156)
Depreciation expense 1,128 29,109 205,585 - 235,822
Balance at 1 July 2011 9,878 174,628 464,810 - 649,316
Disposals - - (4,422) - (4,422)
Reclassified as held for sale (ii) (10,959) - (67,104) - (78,063)
Depreciation expense 1,081 65,641 224,194 - 290,916
Balance at 30 June 2012 - 240,269 617,478 - 857,747

As at 30 June 2011 18,022 103,691 1,182,445 - 1,304,158 As at 30 June 2012 3,491,834 361,574 13,880,627 4,967,938 22,701,973

Net book value

  • (i) Capital work in progress in the current year is comprised of refurbishment expenditure incurred on the Meekatharra Gold Project's processing plant and associated assets. The program of work commenced in February 2012 following completion of a bankable feasibility study for the project.
  • (ii) The assets and associated liabilities of the Comet Vale Gold Project are held for sale in the current period. Prior period balances relate to the Nimbus Gold Project that was subsequently disposed of in the current period. Refer to note 7 for details.
  • (iii) Substantial additions are due to the Meekatharra Gold Project purchase price allocation to their respective assets. The purchase transaction settled on 1 July 2011. Refer to note 28 for details of the assets acquired.

16. Trade and other payables

2012
\$
2011
\$
Trade payables 2,021,889 434,089
Accrued expenses 720,849 299,145
Other (i) 533,648 140,511
3,276,386 873,745

The average credit period on purchases is 30 days. No interest is charged on the trade payables. The Group has financial risk management policies in place to ensure that all payables are paid within the credit timeframe.

(i) The other payable's balance for the current period is predominantly comprised of payroll related liabilities.

17. Other financial liabilities

2012
\$
2011
\$
Financial liabilities held at amortised cost – Meekatharra Gold Project (i) - 8,000,000
Other (i) - 1,300,000
Deferred revenue (ii) - 100,000
Deferred consideration payable (iii) 3,015,205 -
3,015,205 9,400,000

(i) Amounts associated with the final consideration payable to acquire the Meekatharra Gold Project via its wholly owned subsidiary GMK Exploration Pty Ltd. The transaction settled on 1 July 2011.

(ii) Deferred consideration received in the prior period relates to the sale of wholly owned subsidiary Kalgoorlie Ore Treatment Company Pty Ltd. The revenue was recognised at settlement on 8 September 2011.

(iii) Deferred payment for the purchase of put options to acquire 70,000 oz of gold. The payment is due on 19 September 2012. Refer to note 12 for additional information.

Notes to the Consolidated Financial Statements

18. Provisions

2012
\$
2011
\$
Current
Annual leave 245,764 85,384
Long service leave 12,784 85,328
Other (a) 1,011,323 903,856
1,269,871 1,074,568
Non-current
Long service leave 22,062 8,570
Other (a) 7,439,646 689,941
7,461,708 698,511
8,731,579 1,773,079

(a) Detail of movement in other provisions

2012 Provision
for rehabil
itation (i)
\$
Onerous
contracts (ii)
\$
Total
\$
Balance at 1 July 2011 206,191 1,387,606 1,593,797
Additional provisions recognised 5,730,645 - 5,730,645
Reductions arising from payments/other sacrifices of
future economic benefits
- (918,749) (918,749)
Additions/(reductions) resulting from
re-measurement or settlement without cost
669,457 1,020,378 1,689,835
Unwinding of discount and effect of
changes in the discount rate
563,450 17,222 580,672
Reclassified as held for sale (225,231) - (225,231)
Balance at 30 June 2012 6,944,512 1,506,457 8,450,969
Comprised of:
Current provision - 1,011,323 1,011,323
Non-current provision 6,944,512 495,134 7,439,646
6,944,512 1,506,457 8,450,969

(i) Represents an estimate of the present value of the future rehabilitation costs required for the Meekatharra Gold Project area.

(ii) The onerous contract relates to a contract entered into by Barrambie Gas Pty Ltd, a wholly owned subsidiary of the Company, for the Company's Barrambie Project. The contract is with DBNGP (WA) Transmission Pty Ltd for gas transmission that commenced on 1 July 2010. The provision in the accounts represents the present value of 18 months of gas transmission obligations under the contract for gas transmission not expected to be utilised or on sold.

2011 Provision
for rehabil
itation
\$
Onerous
contracts
\$
Total
\$
Balance at 1 July 2011 188,761 1,837,498 2,026,259
Additional provisions recognised - - -
Reductions arising from payments/other
sacrifices of future economic benefits
- (991,024) (991,024)
Additions/(reductions) resulting from
re-measurement or settlement without cost
- 513,133 513,133
Unwinding of discount and effect of changes in the discount rate 17,430 27,999 45,429
Reclassified as held for sale - - -
Balance at 30 June 2011 206,191 1,387,606 1,593,797
Comprised of:
Current provision - 903,856 903,856
Non-current provision 206,191 483,750 689,941
206,191 1,387,606 1,593,797

19. Borrowings

2012
\$
2011
\$
Unsecured – at amortised cost
Insurance premium funding 47,668 -

During the period the Company entered into a financing arrangement for the payment of its annual insurance premiums. This allows the Company to better manage cash outflows by paying the premiums evenly over a 12-month period.

20. Issued capital

2012
\$
2011
\$
462,701,573 fully paid ordinary shares (2011: 262,237,201) 148,058,577 109,790,915

Changes to the then Corporations Law abolished the authorised capital and par value concept in relation to share capital from 1 July 1998. Therefore, the Company does not have a limited amount of authorised capital and issued shares do not have a par value.

20. Issued capital (continued)

2012 2011
No. \$ No. \$
Fully paid ordinary shares
Balance at beginning of financial year 262,237,201 109,790,915 177,271,768 63,773,894
Issue of shares for cash 197,959,072 39,591,790 83,965,433 47,499,951
Share issue costs - (2,576,778) - (3,068,471)
Income tax on items taken directly to equity - - - 920,541
Issue of shares as part consideration for
acquisition of the Meekatharra Gold Project
2,505,300 1,252,650 - -
Issue of shares to consultant - - 1,000,000 665,000
Balance at the end of the financial year 462,701,573 148,058,577 262,237,201 109,790,915

Fully paid ordinary shares carry one vote per share and carry the right to dividends.

Share options

In accordance with the provisions of the employee share option plan or as approved by shareholders, at 30 June 2012, employees and directors held options over 13,600,000 ordinary shares (13,600,000 of which are vested) in aggregate, 4,000,000 expiring 01/07/2012, 1,800,000 expiring 31/12/2012, 1,850,000 expiring 30/06/2013, 3,000,000 expiring 01/07/2013, 2,450,000 expiring 31/12/2013 and the remaining 500,000 expiring on 01/07/2014.

Share options carry no rights to dividends and no voting rights. Further details of the executive share option plan are contained in Note 10 to the financial statements.

21. Reserves

The equity-settled benefits reserve arises on the grant of share options for the provision of services by consultants and to executives and employees under the employee share option plan or as approved by shareholders. Share options may also be granted to suppliers. Additional reserve amounts have arisen from the issue of performance rights to several employees. Amounts are transferred out of the reserve and into issued capital when the options are exercised or when the performance rights are fully vested. Further information about share-based payments to employees is provided in Note 10 to the financial statements.

2012
\$
2011
\$
Share based payments reserve:
Balance at the beginning of the financial year 4,717,687 3,672,455
Share-based payments 305,496 1,045,232
Balance at the end of the financial year 5,023,183 4,717,687

22. Accumulated losses

2012
\$
2011
\$
Accumulated losses:
Balance at the beginning of the financial year (16,714,743) (13,361,157)
Net loss attributable to members of the Company (30,983,345) (3,353,586)
Balance at the end of the financial year (47,698,088) (16,714,743)

23. Loss per share

2012
Cents per
share
2011
Cents per
share
Basic and diluted loss per share:
Continuing operations (9.66) (1.43)
Continuing and discontinued operations (10.61) (1.50)

Basic loss per share

The loss and weighted average number of ordinary shares used in the calculation of basic loss per share are as follows:

2012
\$
2011
\$
Loss (a)
Continuing operations (28,219,273) (3,184,946)
Continuing and discontinued operations (30,983,345) (3,353,586)
2012
No
2011
No
Weighted average number of ordinary shares for the purpose of basic loss per share 292,137,998 223,344,318

(a) Loss used in the calculation of loss per share reconciles to net loss in the income statement.

23. Loss per share (continued)

Diluted loss per share

The loss and weighted average number of ordinary shares used in the calculation of diluted loss per share are as follows:

2012
\$
2011
\$
Loss (a)
Continuing operations (28,219,273) (3,184,946)
Continuing and discontinued operations (30,983,345) (3,353,586)
2012
No
2011
No
Weighted average number of ordinary shares for the purpose of diluted loss per share 292,137,998 223,344,318

(a) Loss used in the calculation of diluted loss per share reconciles to net loss in the income statement.

All potential ordinary shares are not dilutive and are therefore excluded in the weighted average number of ordinary shares for the purposes of diluted loss per share.

24. Commitments for expenditure

(a) Exploration and evaluation expenditure commitments

As referred to in Note 12 (b) to the accounts, Barrambie Gas Pty Ltd, a wholly owned subsidiary of the Company, previously entered into a gas transmission agreement with DBNGP (WA) Transmission Pty Ltd for the Barrambie Project. As part of the agreement the Company was required to procure a term deposit in the amount of \$8.7 million from its bankers as security, which represented the present value of the Company's commitment under the agreement. The gas transmission agreement and the Company's commitment commenced on 1 July 2010.

(b) Capital expenditure commitments

GMK Exploration entered into an irrevocable agreement to purchase mobile plant equipment for the Meekatharra Gold Project during the period. The value of this commitment at the end of the period is \$185,000.

(c) Lease commitments

Non-cancellable operating lease commitments are disclosed in Note 26 to the financial statements. There are no finance lease commitments at reporting date.

25. Contingent liabilities

2012
\$
2011
\$
Arising from interests in joint ventures (i) 80,000 80,000
Barrambie Project (ii) - 234,490
Contingent liabilities at year-end 80,000 314,490

(i) In consideration of Cliffs agreeing to provide performance bonds totalling \$80,000 for the benefit of the Company to the Department of Mines and Petroleum in relation to four Mount Finnerty Project tenements, the Company agrees to unconditionally indemnify Cliffs in respect of any claims made against Cliffs in respect of the performance bonds where such claims arise out of the Company's activities on those four tenements that are outside the scope of the joint venture and irrespective of whether such activities are undertaken by the Company alone or by a third party with the Company's consent.

(ii) The Company was party to a Memorandum of Understanding (MoU) with Arccon (WA) Pty Ltd and China Non-Ferrous Industry's Foreign Engineering and Construction Company Ltd for the development of the Barrambie Vanadium Project. However due to ongoing weak market conditions for vanadium the MoU terminated during the current period. Consequently the contingent liability did not eventuate and has been extinguished.

26. Leases

Finance leases:

Leasing arrangements

The Company had no finance leases for the current or prior period.

Operating leases:

Leasing arrangements

Operating leases relate to the lease of several commercial premises with original lease terms of between 1 and 2 years. The lease agreement for the Company's registered head office provides the option to extend for a further two years from October 2013. There is additional provision for the annual increase in lease payments at the greater of CPI and a fixed rate. For all other leases the future tenancy is deemed to continue on a periodic (casual) basis and any escalation to be negotiated. The consolidated entity does not have an option to purchase the leased assets at the expiry of the leases.

2012
\$
2011
\$
Payments recognised as an expense
Minimum lease payments 264,807 226,575
Contingent rentals - -
Sub-lease payments received - -
264,807 226,575
Non-cancellable operating lease commitments
Not longer than 1 year 282,038 334,846
Longer than 1 year and not longer than 5 years 41,748 256,340
Longer than 5 years - -
323,786 591,186

Notes to the Consolidated Financial Statements

27. Disposal of subsidiary

On 8 September 2011 the Group disposed of Kalgoorlie Ore Treatment Company Pty Ltd which held the Nimbus Gold Project situated near Kalgoorlie, Western Australia.

2012
\$
2011
\$
(a) Analysis of assets and liabilities over which control was lost
Current assets
Cash and cash equivalents 111 -
Other receivables 10,780 -
Non-current assets
Exploration, evaluation and
development expenditure
332,964 -
Property, plant and equipment 3,687,874 -
Other financial assets 228,000 -
Deferred tax assets - -
Current liabilities
Payables (107,408) -
Net assets disposed of 4,152,321 -
(b) Gain on disposal of subsidiary
Net assets disposed of 4,152,321 -
Gain on disposal 568,562 -
Total consideration 4,720,883 -
Consideration satisfied by
Fully paid ordinary shares 1,608,000 -
Cash (i) 3,499,680 -
Total consideration 5,107,680 -
Disposal costs (386,797) -
4,720,883 -
Total cash received (i) 3,399,680 -
Disposal costs paid (386,797) -
Net cash inflow arising on disposal 3,012,883 -

(i) Deferred cash consideration received in the prior reporting period and recognised as income at settlement on 8 September 2011.

The gain on disposal is included in the loss for the year from discontinued operations in the statement of comprehensive income. Refer to note 8 for details of discontinued operations.

28. Acquisition of assets

On 1 July 2011 the Group acquired the assets of the Meekatharra Gold Project. The transaction was not considered a business combination as the assets acquired did not meet the definition of a business as defined in the Australian Accounting Standards. The fair values of the net assets acquired at the date of the acquisition and the consideration paid are as follows:

2012
\$
Consumables 1,092,406
Property, plant & equipment 17,010,000
Exploration tenements 10,313,360
Rehabilitation asset 5,730,645
Rehabilitation liability (5,730,645)
Value of net assets acquired 28,415,766
Equity consideration 1,252,650
Cash consideration (i) 25,000,000
Stamp duty 1,400,498
Directly attributable costs 762,618
Total consideration 28,415,766

(i) The total cash consideration was paid in instalments including \$17 million paid in the prior period. The final payment made on 1 July 2011 for acquisition of the Meekatharra Gold Project included a cash component of \$8 million. This payment is disclosed as a cash outflow from investing activities in the consolidated cash flow statement and is allocated across the assets acquired on a pro-rata basis; property, plant and equipment, exploration assets and inventory consumables.

29. Jointly controlled operations and assets

Interest
Name of operation Principal activity 2012
%
2011
%
Mt Finnerty Iron Ore Project Iron Ore Exploration 20 20

The consolidated entity's interest in assets employed in the above jointly controlled operations and assets is detailed below.

The amounts are included in the financial statements and consolidated financial statements under their respective asset categories:

2012
\$
2011
\$
Non-current assets
Exploration expenditure 1,968,510 1,960,090
Total non-current assets 1,968,510 1,960,090
Total assets 1,968,510 1,960,090

Notes to the Consolidated Financial Statements

30. Subsidiaries

Ownership interest
Name of entity Country of incorporation 2012
%
2011
%
Parent entity
Reed Resources Ltd Australia - -
Subsidiaries
Mount Finnerty Pty Ltd Australia 100 100
Barrambie Gas Pty Ltd Australia 100 100
Australian Vanadium Corporation (Holdings) Pty Ltd Australia 100 100
Australian Vanadium Exploration Pty Ltd Australia 100 100
Kalgoorlie Ore Treatment Company Pty Limited (i) Australia - 100
Reed Industrial Minerals Pty Ltd (ii) Australia 100 100
Reed Exploration Pty Ltd Australia 100 100
Reed Advanced Materials Pty Ltd Australia 100 100
GMK Exploration Pty Ltd Australia 100 100
GMK Administration Pty Ltd Australia 100 100
Gold Mines of Kalgoorlie Ltd Australia 100 100
Sand Queen Gold Mines Pty Ltd Australia 100 100
Australian Vanadium Corporation (Investments) Pty Ltd Australia 100 100

All of these companies are members of a tax consolidated group. Reed Resources Ltd is the head entity of the tax consolidated group.

(i) Kalgoorlie Ore Treatment Company Pty Ltd was disposed of during the period. Refer to note 27 for details.

(ii) Mineral Resources Ltd is earning a 30% equity interest in Reed Industrial Minerals Pty Ltd.

31. Segment information

Basis for segmentation

AASB 8 Operating Segments requires the presentation of information based on the components of the entity that management regularly reviews for its operational decision making. This review process is carried out by the Chief Operating Decision Maker (CODM) for the purpose of allocating resources and assessing the performance of each segment. The amounts reported for each operating segment is the same measure reviewed by the CODM in allocating resources and assessing performance of that segment.

For management purposes the Group operates under three reportable operating segments comprised of the Company's gold, vanadium and 'other segments'. Gold and vanadium operating segments are separately identified given they possess different competitive and operating risks, and meet the quantitative criteria as set out in the AASB 8. The 'other segments' category is the aggregation of all remaining operating segments given sufficient reportable operating segments have been identified.

Reportable operating segments Gold
\$
Vanadium
\$
Other
\$
Unallocated
\$
Total
\$
Revenue from external customers - - - - -
Cost of sales before amortisation - - - - -
Gross profit before amortisation - - - - -
Amortisation expense - - - - -
Gross profit - - - - -
Other income 97,949 - 90,451 828,551 1,016,951
Impairment (1,802,613) (18,428,566) (108,898) - (20,340,077)
Depreciation and amortisation (171,159) - - (52,383) (223,542)
Total revenue 97,949 - 90,451 828,551 1,016,951
Total expense (4,313,804) (18,436,412) (181,222) (6,304,786) (29,236,224)
Loss before tax (4,215,855) (18,436,412) (90,771) (5,476,235) (28,219,273)
Discontinued operations
Total revenue 2,013 - - - 2,013
Total expenses (3,334,647) - - - (3,334,647)
Gain on disposal of subsidiary 568,562 - - - 568,562
Loss before tax (2,764,072) - - - (2,764,072)
Consolidated loss before tax (6,979,927) (18,436,412) (90,771) (5,476,235) (30,983,345)

For the year ended 30 June 2012

31. Segment information (continued)

As at 30 June 2012

Reportable operating segments Gold
\$
Vanadium
Other
\$
\$
Unallocated
\$
Total
\$
Increase/(decrease) in
non-current assets
12,250,889 (16,246,697) 847,950 211,880 (2,935,978)
Reclassified as held for sale 1,017,202 - - - 1,017,202
Consolidated increase/(decrease)
in non-current assets
13,268,091 (16,246,697) 847,950 211,880 (1,918,776)
Total segment assets 60,982,179 19,646,928 5,956,015 27,928,884 114,514,006
Assets classified as held for sale 6,168,749 - - - 6,168,749
Consolidated total assets 67,150,928 19,646,928 5,956,015 27,928,884 120,682,755

For the year ended 30 June 2011

Reportable operating segments Gold
\$
Vanadium
\$
Other
\$
Unallocated
\$
Total
\$
Revenue from external customers 347,821 - - - 347,821
Cost of sales before amortisation (53,633) - - - (53,633)
Gross profit before amortisation 294,188 - - - 294,188
Amortisation expense (230,775) - - - (230,775)
Gross profit/(loss) 63,413 - - - 63,413
Revenue – other 174,218 113 22,454 918,641 1,115,426
Impairment - - (74,356) - (74,356)
Depreciation and amortisation (229,270) - - (28,400) (257,670)
Total revenue 522,039 113 22,454 918,641 1,463,247
Total expense (1,102,230) (10,792) (249,700) (4,839,119) (6,201,841)
Loss before tax (580,191) (10,679) (227,246) (3,920,478) (4,738,594)

As at 30 June 2011

Reportable operating segments Gold
\$
Vanadium
\$
Other
\$
Unallocated
\$
Total
\$
Increase/(decrease) in
non-current assets
34,877,582 2,786,570 937,916 1,522,352 40,124,420
Reclassified as held for sale (1,200,664) - - - (1,200,664)
Consolidated increase/(decrease) in
non-current assets
33,676,918 2,786,570 937,916 1,522,352 38,923,756
Total segment assets 43,836,940 35,546,586 5,882,651 20,332,246 105,598,423
Assets classified as held for sale 4,269,580 - - - 4,269,580
Consolidated total assets 48,106,520 35,546,586 5,882,651 20,332,246 109,868,003

Information about major customers

Revenue from external customers includes gold ore sales to a third party of nil (2011: \$0.3 million).

Geographical information

The Group operates in a single geographical area being Western Australia (country of domicile).

Notes to the Consolidated Financial Statements

32. Related party disclosures

(a) Equity interests in related parties

Equity interest in subsidiaries

Details of the percentage of ordinary sharets held in subsidiaries are disclosed in Note 30 to the financial statements.

(b) Key management personnel remuneration

Details of Key Management Personnel Remuneration are disclosed in pages 18-26 of the Directors Report.

(c) Key management personnel equity holdings

Fully paid ordinary shares of Reed Resources Ltd

2012 Balance at
01/07/11
No.
Balance on
appoint
ment
No.
Received on
exercise of
options
No.
Net other
change
No.
Balance at
30/06/12
No.
Balance held
nominally
No.
Non-executive directors
S. Cole 42,896 - - 32,172 75,068 -
P. Collins 285,705 - - - 285,705 -
I. Junk (i) 781,102 - - (781,102) - -
Executive directors
C. Reed 2,909,202 - - (1,800,000) 1,109,202 -
D. Reed (ii) 21,776,113 - - 5,201,225 26,977,338 -
L.Tonkin (iii) - - - 833,000 833,000 -
Other executives
J. Carone 147,388 - - 25,112 172,500 -
C. Fawcett - - - - - -
D. Lim - - - 80,000 80,000 -
D. Wates 151,121 - - - 151,121 -
Total 26,093,527 - - 3,590,407 29,683,934 -

(i) Mr I Junk ceased being a director on 28 June 2012.

(ii) Mr D Reed became a non-executive director on 1 July 2012.

(iii) Mr L Tonkin commenced as managing director and chief executive officer on 14 May 2012. Upon appointment and subject to shareholder approval Mr Tonkin is entitled to a sign-on award of 833,000 shares. Refer to the directors' report for further discussion on this matter.

32. Related party disclosures

2011 Balance at
01/07/10
No.
Balance on
appoint
ment
No.
Received on
exercise of
options
No.
Net other
change
No.
Balance at
30/06/11
No.
Balance held
nominally
No.
Non-executive directors
S. Cole 17,034 - - 25,862 42,896 -
P. Collins 285,705 - - - 285,705 -
I. Junk 781,102 - - - 781,102 -
Executive directors
C. Reed 2,909,202 - - - 2,909,202 -
D. Reed 21,750,251 - - 25,862 21,776,113 -

Other executives

Total 25,882,062 142,500 - 68,965 26,093,527 -
D. Wates - 142,500 - 8,621 151,121 -
C. Fawcett - - - - - -
J. Carone 138,768 - - 8,620 147,388 -

Share options of Reed Resources Ltd

2012 Balance at
01/07/11
No.
Granted as
remunera
tion
No.
Exercised/
(lapsed)
No.
Balance at
30/06/12
No.
Balance
vested at
30/06/12
No.
Vested but
not exer
cisable
No.
Vested and
exercis
able
No.
Options
vested
during
year
No.
D.Reed 2,500,000 - (1,500,000) 1,000,000 1,000,000 - 1,000,000 1,250,000
C. Reed 6,600,000 - (3,000,000) 3,600,000 4,600,000 - 4,600,000 2,500,000
P.Collins 700,000 - - 700,000 700,000 - 700,000 -
I. Junk 700,000 - - 700,000 700,000 - 700,000 -
S. Cole 1,100,000 - - 1,100,000 1,100,000 - 1,100,000 -
J. Carone 1,800,000 - - 1,800,000 1,800,000 - 1,800,000 900,000
C. Fawcett 750,000 - - 750,000 750,000 - 750,000 375,000
D. Wates 500,000 - - 500,000 500,000 - 500,000 500,000
Others 3,600,000 - (150,000) 3,450,000 2,450,000 - 2,450,000 825,000
Total 18,250,000 - (4,650,000) 13,600,000 13,600,000 - 13,600,000 6,350,000

32. Related party disclosures (continued)

(c) Key management personnel equity holdings (continued)

Share options of Reed Resources Ltd (continued)

2011 Balance at
01/07/10
No.
Granted as
remunera
tion
No.
Exercised/
(lapsed)
No.
Balance at
30/06/11
No.
Balance
vested at
30/06/11
No.
Vested but
not exer
cisable
No.
Vested and
exercis
able
No.
Options
vested
during
year
No.
D.Reed 1,500,000 1,000,000 - 2,500,000 1,250,000 - 1,250,000 1,250,000
C. Reed 5,600,000 2,000,000 (1,000,000) 6,600,000 5,100,000 - 5,100,000 2,500,000
P.Collins 950,000 250,000 (500,000) 700,000 1,200,000 - 1,200,000 250,000
I. Junk 950,000 250,000 (500,000) 700,000 1,200,000 - 1,200,000 250,000
S. Cole 600,000 500,000 - 1,100,000 1,100,000 - 1,100,000 500,000
J. Carone 1,200,000 600,000 - 1,800,000 900,000 - 900,000 600,000
C. Fawcett - 750,000 - 750,000 375,000 - 375,000 375,000
D. Wates - 500,000 - 500,000 - - - -
Others 2,500,000 1,800,000 (700,000) 3,600,000 2,500,000 - 2,500,000 1,050,000
Total 13,300,000 7,650,000 (2,700,000) 18,250,000 13,625,000 - 13,625,000 6,775,000

All share options have been issued in accordance with the provisions of the employee share option plan or as approved by shareholders. No options were issued during the current period.

Executive performance rights of Reed Resources Ltd

In the current period the Company granted 10,000 performance rights to Mr D Wates as remuneration. At the reporting date 9,153 performance rights had vested. There were no performance rights issued to executives in the prior period.

Further details of the executive share option plan and of share options and performance rights granted are contained in pages 18-26 of the Directors Report and note 10 to the financial statements.

(d) Other transactions with key management personnel

The loss from operations includes the following items of revenue and expense that resulted from transactions other than compensation, loans or equity holdings, with Key Management Personnel or their related parties:

2012
\$
2011
\$
Interest income 8,464 -
Total recognised as income 8,464 -
Service fees and charges (18,950) (61,709)
Rent (84,843) (187,421)
Interest and fees expense (i) (11,473) -
Consulting fees - (12,538)
Royalties - (18,701)
Total recognised as expenses (115,266) (280,369)

(i) Interest of \$8,586 and fees of \$2,887 were charged on the loan provided by Mr D Reed. Details are provided in part (e) of this note.

(e) Transactions with other related parties

Other related parties include:

  • The parent entity;
  • Associates;
  • Joint ventures in which the entity is a venturer;
  • Subsidiaries;
  • Key Management Personnel of Reed Resources Ltd;
  • Former Key Management Personnel; and
  • Other related parties.

Transactions involving the parent entity

The Directors elected for wholly-owned Australian entities within the Group to be taxed as a single entity from 1 July 2003.

The parent entity has loaned funds to subsidiaries. The loans totalled \$61,923,451 at 30 June 2012 (2011: \$36,596,819). These loans are repayable on demand and interest free.

No other transactions occurred during the financial year between entities in the wholly owned Group.

Transactions involving other related parties

Reed Resources Ltd has entered into arrangements with Trucking Nominees Pty Ltd, a Company associated with Mr D Reed, for the provision of offices and office equipment in West Perth and Kalgoorlie at cost plus 5%. The total amount for the year was \$103,793 (2011: \$249,130), being rent, service fees and minor property outgoings including rates. These agreements came to an end on 31 August 2011. In addition, Mr D Reed has personally provided short-term loans totalling \$1,260,025 (at a market rate of interest) to Reed Resources Ltd in the current period to fund working capital whilst the Company undertook a capital raising in April-May 2012. Interest and associated fees charged on the loan for the year totalled \$11,473 (2011: Nil). The loan was fully repaid as at reporting date.

During the period the Board resolved to provide a loan to Mr C Reed in the amount of \$150,000 at a commercial interest rate of 7.2%. The interest rate is subsequently adjusted in line with changes to the official cash rate announced by the Reserve Bank of Australia (RBA) from time to time. The facility is an interest only loan until March 2013 when it reverts to repayments of principal and interest and will be fully repaid by July 2014. Loan interest charged for the period totalled \$8,464. Additional amounts of \$10,260 were paid on behalf of Mr C Reed and are due to be repaid in the near future.

Mr P Collins has provided geological consulting services to the Company on an ad-hoc basis. However no services were provided by Mr P Collins in the current period (2011: \$12,538).

Reed Resources Ltd has a royalty agreement with MTAB Pty Ltd, a Company controlled by Mr D Reed, related to production on the Comet Vale Gold Project. There was no production during the year and consequently there were no royalty payments for the period (2011: \$18,701).

The above amounts were paid for services rendered in the ordinary course of business and on normal commercial terms and conditions.

Existing agreements involving other related parties

As disclosed in the Company's prospectus dated 24 June 2002, the Company has contracted to pay royalty payments from the Mount Finnerty Project properties to a company controlled by Mr C Reed. To date mining has not been undertaken on these properties and accordingly no royalty payments have been paid to Mr C Reed.

32. Related party disclosures (continued)

(f) Controlling entities

The parent entity in the group is Reed Resources Ltd a company incorporated in Australia.

33. Subsequent events

Subsequent to the end of the financial year the company engaged Credit Suisse to provide a corporate debt financing for \$19 million. Pursuant to this agreement Credit Suisse will provide the Company with a senior debt facility for \$19 million dollars and a hedging facility. Funds from this facility will be used by the Company to fund the development of the Meekatharra Gold Project. Formal documentation for the facility, based on a binding term sheet, is expected to be completed by the end of October 2012.

During the year the Group via its wholly owned subsidiary GMK Exploration Pty Ltd, entered into a transaction with Barclays Bank to purchase put options over 70,000 oz of gold. The put option contract expired on 19 September 2012 at which time a deferred option premium of \$3.048 million became due and payable. As the contract expired out-of-money the impact on the company's financial performance was a loss of \$3.048 million.

34. Notes to the cash flow statement

a) Reconciliation of cash and cash equivalents

For the purposes of the cash flow statement, cash and cash equivalents includes cash on hand and in banks and investments in money market instruments, net of outstanding bank overdrafts. Cash and cash equivalents at the end of the financial year as shown in the Cash Flow Statement is reconciled to the related items in the statement of financial position as follows:

2012
\$
2011
\$
Cash and cash equivalents 25,612,420 13,824,448
Cash and cash equivalents included in assets classified held for sale (i) 33,342 58,500
25,645,762 13,882,948

(i) Associated with the Comet Vale Gold Project which is currently being marketed for sale. Prior period balance relates to Kalgoorlie Ore Treatment Pty Ltd. Refer to note 7 for additional information.

(b) Funds not available for use

Restrictions exist on several term deposits with a total value of \$14,698,107. All term deposits are classified as financial assets except for \$64,683 that is now classified as assets held for sale.

One term deposit relates to an unconditional performance bond issued by the National Australia Bank in favour of the Minister for State Development and DBNGP (WA) Transmission Pty Ltd. A separate term deposit of \$8,700,000 is restricted in its use to ensure it serves as security for the bond.

There are two term deposits totalling \$2,868,035 that serve as security for environmental performance bonds required for the Comet Vale and Meekatharra Gold Project sites. Refer to note 7 for additional information on the financial asset classified as held for sale, and note 12 for discussion of all other financial assets.

During the year the Company via wholly owned subsidiary GMK Exploration Pty Ltd entered into a transaction with Barclays Bank to purchase put options over 70,000 oz of gold. The Company has placed \$3,035,072 on deposit as security for the deferred portion of the option premium. Refer to note 12 for additional information.

The Company has \$95,000 on deposit as security for a rental bond relating to its leased business premises.

(c) Reconciliation of loss for the period to net cash flows from operating activities

2012
\$
2011
\$
Loss for the period (30,983,345) (3,353,586)
Gain/(loss) on sale of non-current assets 319,221 (164,364)
Gain on disposal of discontinued operations (568,562) -
Loss on disposal of equity instruments 301,874 -
Loss on revaluation of other financial assets
designated at fair value through profit and loss
380,384 -
Depreciation and amortization of non-current assets 249,929 488,445
Equity settled share-based payment 305,496 1,045,232
Impairment of non-current assets 23,558,139 74,356
(Increase) / decrease in current tax asset 286,923 126,797
Increase in deferred tax asset - (1,098,086)
(Increase) / decrease in assets:
Current receivables (239,546) 481,936
(Increase) / decrease in liabilities:
Current payables 221,144 (191,539)
Other non-cash expenses 795,592 206,387
Net Cash used in operating activities (5,372,751) (2,384,422)

(d) Non cash financing and investing activities

On 1 July 2011 the Company issued 2,505,300 fully paid ordinary shares at \$0.50 per share as part consideration for settlement of the Meekatharra Gold Project acquisition.

35. Financial instruments

(a) Financial risk management objectives

The consolidated entity does not enter into or trade financial instruments, including derivative financial instruments, for speculative purposes.

(b) Significant accounting policies

Details of the significant accounting policies and methods adopted, including the criteria for recognition, the basis of measurement and the basis on which income and expenses are recognised, in respect of each class of financial asset, financial liability and equity instrument are disclosed in Note 2 to the financial statements.

The following tables detail the exposure to interest rate risk:

Weighted Maturity Dates
2012 average
effective
interest
rate
%
Variable
interest
rate
\$
Less than
1 Year
\$
1-5 Years
\$
More than
5 Years
\$
Non
interest
bearing
\$
Total
\$
Financial assets:
Cash and cash
equivalents (i)
2.72 - 25,644,252 - - 1,510 25,645,762
Barrambie Gas
term deposit (ii)
5.30 - 8,700,000 - - - 8,700,000
Bond term
deposits (ii)
3.54 - 2,963,035 - - - 2,963,035
Trade and other
receivables (iii)
- - - - - 1,292,126 1,292,126
Fair value-profit
and loss (iv)
- - - - - 3,088,116 3,088,116
Other (v) 3.25 - 3,035,072 - - - 3,035,072

Financial liabilities:

Trade payables (iii) - - - - - 3,279,400 3,279,400
Other financial
liabilities (vi) 5.00 - 3,015,205 - - - 3,015,205

(i) Includes cash and bank balances of \$33,342 in a disposal group held for sale. Refer to note 7 for more information.

(ii) The balances represents two term deposits that are restricted in their use and are classified in the current reporting period other financial assets in addition to another deposit with a total value of \$64,683 that is classified as a held for sale asset. Refer to Note 7 for further details on assets held for sale. Additional information on all other term deposits is provided at note 12 and note 34 (b). The financial assets have contractual maturities of less than one year, however they are classified as non-current in the statement of financial position as they will be rolled-over for greater than twelve months as security for the matters discussed in the aforementioned notes.

(iii) Includes receivables of \$1,409 and trade creditors of \$3,014 classified as held for sale and disclosed at note 7.

(iv) Represents the fair value of put options acquired from Barclays Bank. Refer to note 12 (a) for details.

(v) Term deposit to secure the purchase of put options from Barclays Bank. Refer to note 12 (a) for details.

(vi) Deferred option premium for the purchase of put options from Barclays Bank. Refer to note 17 for details.

Maturity Dates
2011 Weighted
average
effective
interest
rate
%
Variable
interest
rate
\$
Less than
1 Year
\$
1-5 Years
\$
More than
5 Years
\$
Non
interest
bearing
\$
Total
\$
Financial assets:
Cash and cash
equivalents (i)
3.15 - 13,862,514 - - 20,434 13,882,948
Barrambie Gas
term deposit (ii)
5.50 - 8,700,000 - - - 8,700,000
Bond term
deposits (ii)
5.46 - 3,088,634 - - - 3,088,634
Trade and other
receivables (iii)
- - - - - 1,140,911 1,140,911
Meekatharra Gold
Project deposits (iv)
- - - - - 28,431,001 28,431,001
Financial
liabilities:
Trade payables (iii) - - - - - 896,102 896,102
Other financial
liabilities (v)
- - - - - 9,400,000 9,400,000

(i) Includes held for sale assets of \$58,500 as disclosed in note 7.

(ii) The balances represent term deposits that are restricted in their use and are classified as other financial assets except for term deposits with a total value of \$228,000 that are classified as held for sale assets and shown at note 7.

(iii) Includes receivables of \$22,623 and trade creditors of \$22,357 classified as held for sale and disclosed at note 7.

(iv) Comprised of acquisition costs and purchase price consideration paid or accrued for prior to settlement on 1 July 2011 and classified as other financial assets.

(v) Includes \$9.3 million purchase price consideration that was paid for the Meekatharra Gold Project at settlement on 1 July 2011.

35. Financial instruments (continued)

(c) Credit risk management

Credit risk refers to the risk that a counterparty will default on its contractual obligations resulting in financial loss to the consolidated entity. The consolidated entity has adopted a policy of only dealing with credit-worthy counterparties and obtaining sufficient collateral where appropriate, as a means of mitigating the risk of financial loss from defaults. The consolidated entity exposure and the credit ratings of its counterparties are continuously monitored and the aggregate value of transactions concluded is spread amongst approved counterparties.

The consolidated entity does not have any significant credit risk exposure to any single counterparty or any group of counterparties having similar characteristics. The credit risk on liquid funds is limited because the counterparties are banks with high credit-ratings assigned by international credit-rating agencies.

(d) Liquidity risk management

Ultimate responsibility for liquidity risk management rests with the Board of Directors, who have built an appropriate liquidity risk management framework for the management of the Group's short, medium and long-term funding and liquidity management requirements. The Group manages liquidity risk by maintaining

adequate reserves, banking facilities and reserve borrowing facilities by continuously monitoring forecast and actual cash flows and matching the maturity profiles of financial assets and liabilities.

(e) Fair value

The carrying amount of financial assets and financial liabilities recorded in the financial statements approximates their respective net fair values, other than intercompany loans from the Company to its subsidiaries determined in accordance with the accounting policies disclosed in Note 2 to the financial statements.

(f) Commodity price risk

The Group is exposed to gold and other commodity price risk. These commodity prices can be volatile and are influenced by factors beyond the Group's control. During the year the Group via its wholly owned subsidiary GMK Exploration Pty Ltd, entered into a transaction with Barclays Bank to purchase put options over 70,000 oz of gold. The put options give the Company the right but not the obligation to sell gold at a price of \$1,560 per ounce on the 19th of September 2012. Refer to subsequent events note 33 for a description of the expiration of this contract and financial impact on the Group.

(g) Capital management

The Board's policy is to maintain a strong capital base so as to maintain investor, creditor and market confidence and to sustain future development of the business. Given the stage of development of the Group, the Board's objective is to minimise debt and to raise funds as required through the issue of new shares. There were no changes in the Group's approach to capital management during the year. The Group is not subject to externally imposed capital requirements.

Corporate Governance Statement

The Board of directors of Reed Resources Ltd (the "Company") is responsible for the corporate governance of the Company, for setting corporate direction, defining policies and monitoring the business of the Company, to ensure the best interests of the Company are promoted and shareholder value is delivered.

This corporate governance statement outlines the key principles and practices of the Company which in the terms of the Company's Corporate Governance Charter ("Charter"), define the Company's system of governance.

The Company is committed to implementing sound standards of corporate governance. In determining what those standards should involve, the Company has had regard to the ASX Corporate Governance Council's Corporate Governance Principles and Recommendations 2nd Edition with 2010 amendments ("Recommendations").

A copy of the Recommendations and the Company's Charter has been placed on the Company's website in the operations, corporate policies section www.reedresources.com/corporate.php.

PRINCIPLE 1: LAY SOLID FOUNDATIONS FOR MANAGEMENT AND OVERSIGHT

Recommendation 1.1 – Establish and disclose the functions reserved to the board and those delegated to senior executives.

The functions and responsibilities of the Board compared with those delegated to management are reflective of the Recommendations.

The Board is responsible for guiding and monitoring the Company on behalf of shareholders by whom they are elected and to whom they are accountable. The Board's primary responsibility is to oversee the development of strategies for the Company, setting and reviewing the Company's strategic objectives and monitoring the performance of the Company against those objectives.

The overall goals of the corporate governance process are to:

  • deliver corporate and operational performance against objectives set;
  • drive shareholder value;
  • assure a prudential and ethical base to the Company's conduct and activities; and
  • ensure compliance with the Company's legal and regulatory obligations.

Consistent with these goals, the Board assumes the following responsibilities:

  • developing initiatives for profit and asset growth;
  • reviewing the corporate, commercial and financial performance of the Company on a regular basis;
  • acting on behalf of, and being accountable to, the Company's shareholders;
  • identifying business risks and implementing actions to manage those risks; and
  • developing and effecting management and corporate systems to assure quality sound corporate performance.

The Board has delegated authority for the operations and administration of the Company to the Chief Executive Officer. He is responsible for overseeing the overall efficient and effective operation of the exploration and mining related activities of the company, and for bringing material and other relevant matters to the attention of the Board in an accurate and timely manner.

Recommendation 1.2 – Disclose the process for evaluating the performance of senior executives.

The Nominations and Remuneration Committee is charged in the terms of the Charter with periodic review of the job description and performance of the CEO according to agreed performance parameters.

PRINCIPLE 1: LAY SOLID FOUNDATIONS FOR MANAGEMENT AND OVERSIGHT (continued)

In September 2011 the Company undertook its periodic evaluation and review of the Board. This was a self-evaluation facilitated and coordinated by the Chairman of the Nominations and Remuneration Committee. The evaluation comprised of:

  1. areas of potential Board engagement;

    1. overall level of Board engagement;
    1. questions for Managing Director evaluation;
  2. Director and Committee performance evaluation including Board evaluation, Board committee evaluation, and director personal reflections.

The outcomes of the evaluation were reported to the Board in November 2011 and agreed outcomes actioned thereafter. A further review will take place in the latter part of 2012.

Other senior executives were the subject of informal evaluations against both individual performance and overall business measures. These evaluations were undertaken by the CEO progressively and periodically, in consultation with the Nomination and Remuneration Committee and the Board.

Outcomes arising from these evaluations included identifying skill improvement needs, re-description of positions of employment, remuneration reviews and in some cases remedial action.

The Charter contains a section formally setting out the Company's Board and Management Performance Enhancement Policy.

Recommendation 1.3 – Provide the information in the guide to reporting on Recommendations.

The Company is not aware of any departure from Recommendations 1.1 or 1.2. Performance evaluations for senior executives have taken place in the reporting period in accordance with the process disclosed.

PRINCIPLE 2: STRUCTURE THE BOARD TO ADD VALUE

Recommendation 2.1 – A majority of the Board should be independent directors.

The Board respects "independence" as critical to effective governance. The Board defines this to mean "independence of thought and decision making", and is satisfied that its Board composition meets these requirements.

For the majority of the year the Board comprised:

  • 4 non-executive independent directors (Steven Cole, Peter Collins*, Ian Junk and Vanessa Guthrie); and
  • 2 executive directors (David John Reed and Chris Reed).
  • Due to consulting work undertaken in prior years by Peter Collins for the Company, Peter might not satisfy the technical indicia of "independence" proposed in the Recommendations.

On 14 May 2012 Mr Luke Tonkin joined the Board as Managing Director as the Company prepares to bring its flagship Meekatharra Gold Project into production. Chris Reed remained as Executive Director with a specific focus on the business development of the Company's non-gold assets. Mr Tonkin's appointment followed a Board initiated skills assessment of its needs and further expanded the Company's management and operations experience to support the Meekatharra Gold Project's development.

In addition, on 28 June 2012 long standing director Mr Ian Junk retired from the Board to allow him more time to focus on his other increasingly demanding executive commitments. Mr Junk was appointed to the Board in November 2003. On 30 June 2012 David John Reed stepped down from his executive role and continued as a non-executive director and Chairman.

Recommendation 2.2 – The chairperson should be an independent director.

The chairperson (David John Reed) was an executive director until 30 June 2012 and substantial shareholder of the company and as such does not pass the criteria of independence as outlined in the Recommendations. Effective 1 July 2012, Mr David Reed stepped back to a Non-Executive Chairman Role whilst continuing to maintain an active involvement with the Company.

Recommendation 2.3 –The roles of chairperson and chief executive officer should not be exercised by the same individual.

The roles of the Chairperson and the Chief Executive Officer were not exercised by the same individual.

Recommendation 2.4 – The Board should establish a nomination committee.

The Board has a Nomination and Remuneration Committee.

Recommendation 2.5 – Disclose the process for evaluating the performance of the Board, its committees and individual directors.

The Nominations and Remuneration Committee is charged in the terms of the Charter with Board and Board Committee membership, succession planning and performance evaluation, as well as Board member induction, education and development.

The Company has adopted policies and procedures in the Charter concerning the evaluation and development of its directors, executives and Board committee. Procedures include an induction protocol and a performance management system for the Board and its directors. Each Board committee also formally reports to the Board annually on its operations in the context of its remit.

The evaluation process adopted includes a self-assessment questionnaire of each Board and Committee member, facilitated by the Chair of the Nomination and Remuneration Committee including a follow up qualitative interview and analysis, as well as a reporting process to each Director, the Nomination and Remuneration Committee and the Board. The questionnaire and interview focuses on individual, committee and overall Board performance and commentary.

The Company's Board and Management Performance Enhancement Policy also is incorporated in the Charter.

Recommendation 2.6 – Provide the information indicated in Guide to reporting on Principle 2.

Contained in the Directors' Report section of this Annual Report are details of:

  • the skills, experience and expertise relevant to the position of director held by each Director in office at the date of this Annual Report;
  • the term of office held by each Director in office at the date of this Annual Report.

The terms of office, and their status as executive/nonexecutive/independent, for each director for the year ending 30 June 2012 were as follows:

David Reed executive Chairman - 1 July 2011 to 30 June 2012 (continuing
as Non-executive Chairman from 1 July 2012)
Luke Tonkin Chief executive Officer and Managing Director - 14 May 2012 to 30 June 2012 (cont.)
Christopher Reed Chief executive Officer and Managing Director – 1 July 2011 to 13 May 2012
executive Director - 14 May 2012 to 30 June 2012 (cont.)
Steven Cole non-executive/independent – 1 July 2011 to 30 June 2012 (cont.)
Peter Collins non-executive/independent - 1 July 2011 to 30 June 2012 (cont.)
Vanessa Guthrie non-executive/independent – 1 July 2011 to 30 June 2012 (cont.)
Ian Junk non-executive/independent – 1 July 2011 to 28 June 2012

PRINCIPLE 2: STRUCTURE THE BOARD TO ADD VALUE (continued)

Recommendation 2.6 – Provide the information indicated in Guide to reporting on Principle 2 (continued).

The Company has adopted the definition of "independence" as set out in the response to Recommendation 2.1 above, in the above analysis.

The Company's Charter empowers a director to take independent professional advice at the expense of the Company.

With respect to the mix of skills and diversity that the Board is looking to achieve in its membership, the Board undertakes a skills matrix analysis of desired skills relevant to the Company's projects and operations in comparison to the skills and experience of its Directors. The Board undertakes periodic evaluation and performance review processes. The Company has adopted a diversity policy – refer recommendation 3.3 below. Based on these principles the Board identifies its Director succession requirements.

Members of the Board's Nominations and Remuneration Committee, and their attendance at meetings of that committee, were as follows (a total of 2 meetings were held):

Director* Number of Mtgs
Eligible to Attend
Number of Mtgs
Attended
Steven Cole (Chairman) 3 3
Peter Lionel Fleury Collins 3 3
Ian Courtney Junk (until 28 June 2012) 3 3

* David John Reed and Dr Vanessa Guthrie were appointed to the Nominations and Remuneration Committee on 23 August 2012

In accordance with the process for Board, Board Committee and director evaluation as described in the Charter such an evaluation and review has been considered and was undertaken in September 2011 and has been scheduled to be repeated in the latter part of 2012.

The Company departed from the Recommendations in that:

  • (a) the Company adopts a varied definition of "independence" than in the Recommendations; and
  • (b) the chairperson held an executive role until 30 June 2012 and is not an independent director.

In explanation of the reasons for these departures the Company advises:

  • • it is satisfied with the level of independence of thought and decision making being contributed by all its nonexecutive directors;
  • • through the appointment of Steven Cole, an independent nonexecutive director with recognised corporate governance skills, as Deputy Chairman, extra governance oversight is brought to bear to Board proceedings notwithstanding the Chairman was executive;

PRINCIPLE 3: PROMOTE ETHICAL AND RESPONSIBLE DECISION MAKING

Recommendation 3.1: Establish a code of conduct and disclose the code, or a summary as to:

  • 3.1.1 the practices necessary to maintain confidence in the company's integrity;
  • 3.1.2 the practices necessary to take into account legal obligations and reasonable expectations of stakeholders;

3.1.3 the responsibility and accountability of individuals for reporting and investigating reports of unethical practices.

The Company has established a formal code of conduct in the Charter to guide the Directors, the CEO, the CFO (or equivalent) and other key executives with respect to the practices necessary to maintain confidence in the Company's integrity, the practices necessary to take into account legal obligations and reasonable expectations of stakeholders, and the responsibility and accountability of individuals for reporting and investigating reports of unethical practices.

The Company's policy concerning trading in Company securities by Directors, officers and employees is set out in the Charter which has been placed on the Company's website. This policy was updated on 21 December 2010 to comply with Listing Rule 12.9 which came into effect on 1 January 2011.

Recommendation 3.2: Companies should establish a policy concerning diversity and disclose the policy or a summary of that policy.

The Company has developed and adopted a diversity policy, which has been placed on the Company's website.

Recommendation 3.3: Companies should disclose the measurable objectives for achieving gender diversity

The Board and executive established the following strategies, initiatives and programs:

3.3.1 Phase 1 – Strategies

  • (a) The development and adoption of the Policy.
  • (b) The Group's governance charter embodying the Policy within its terms.
  • (c) The assignment of responsibility for the Policy and its administration, monitoring and review.

3.3.2 Phase 2 – Initiatives and Programs

(a) At Board / Board Committee level:

  • (i) Review the Board / Director selection and evaluation processes to ensure that:
  • (A) diversity is embedded as a relevant attribute;
  • (B) any skill / gap analysis matrix utilised includes due regard for the attribute of Diversity; and
  • (C) a clear statement exists as to the mix of skills and diversity that the Board is looking to achieve in membership of the Board
  • (ii) When addressing Board succession planning, ensure that:
  • (A) the Policy is respected;
  • (B) efforts are made to identify prospective appointees who have Diversity attributes;
  • (C) efforts are made for any short list of prospective appointees to include at least one male and at least one female candidate.
  • (iii) When setting performance and remuneration KPI's for achievement by the CEO and the senior executive team under their employment contracts, ensure that the following are comprised within such KPI's:
  • (A) the development of strategies, initiatives and programs towards the Principle; and
  • (B) attainment of measureable objectives towards the Principle, including gender diversity.

PRINCIPLE 3: PROMOTE ETHICAL AND RESPONSIBLE DECISION MAKING (continued)

Recommendation 3.1: Establish a code of conduct and disclose the code, or a summary as to: (continued)

3.3.2 Phase 2 – Initiatives and Programs (continued)

(b) At executive and Management Level

  • (i) Review the Group's HR policies and processes to ensure that:
  • (A) they are "inclusive" in nature and responsive to the Policy;
  • (B) they do not expressly or implicitly operate in a manner contrary to the Policy;
  • (C) equal opportunity status applies to all positions within the Group, except where there is legitimate cause in the best interests of the Group and its personnel, to warrant otherwise; and
  • (D) any incidents of exception referred to in paragraph (C) are reported to the Company Secretary for verification (and on-referral as appropriate) having regard to the Policy.
  • (ii) Review the Group's physical environments and cultural practices to ensure that:
  • (A) they are "inclusive" in nature and responsive to the Policy;
  • (B) they do not expressly or implicitly operate in a manner contrary to the Policy.
  • (iii) Generally ensure in the Group's recruitment practices that:
  • (A) the Policy is respected;
  • (B) efforts are made for any short list of prospective appointees to include at least one male and at least one female candidate.

(c) Generally – Development Programs

  • (i) The Group commits to the career development of those of its personnel who aspire to develop their skills and abilities to take on more senior and responsible roles within the Group.
  • (ii) A standing program will be developed by management, with provisional budgetary funding approved from time to time by the Board, to achieve this objective.
  • (iii) A particular aim of this initiative is to improve the internal succession 'pipeline' of personnel, especially gender diverse personnel, towards more senior and responsible roles within the Group.
Strategies By When Status (√ indicates objective, target
and KPI met)
3.3.1 (a) 31 October 2010
3.3.1 (b) 31 December 2010
3.3.1 (c) 31 December 2010
Initiatives / Program
3.3.2 (a)(i)(A) 31 March 2011
3.3.2 (a)(i)(B) 31 March 2011
3.3.2 (a)(i)(C) 31 March 2011
3.3.2 (a)(ii) Ongoing
3.3.2 (a)(iii) 30 June 2011 and ongoing outstanding
3.3.2 (b)(i) 31 March 2011
3.3.2 (b)(ii) 30 June 2011
3.3.2 (b)(iii) Ongoing
3.3.2 (c)(i) Ongoing
3.3.2 (c)(ii) 30 June 2011
Specific Gender Diversity Target
(1) At Board Level
At least one of the next 2 Board
appointments desirably should be
female with appropriate skills and
attributes.
(1) When it is appropriate to expand or
refresh the Board.
√ Dr Vanessa Guthrie joined the Board
on 17 June 2011.
(2) At executive level (2) When it is appropriate to expand or
At least one of the next 2 executive
appointments desirably should be
female with appropriate skills and
attributes.
refresh the executive team.
(3) Generally (3) Annually by 30 June each year. √ As at 30 June 2012 the group had
Subject to the qualifying note under
the Strategic, Initiatives, Programs –
Measurable Objectives, Targets and
KPI's, of the policy, not less than
33% of new appointments should be
male and not less than 33% of new
appointments should be female.
made 51 appointments, 6 female
and 45 male. The differential in
the number of female appointees
against the target is on account of the
exception in the qualifying note under
item 2 (c) of the policy.

3.3.3 Measurable objectives, targets and KPI's (refer paragraph 3 of Policy)

The proportion of:-

  • women on the Board is 16.67%
  • women in senior executive positions is 0%
  • women employees in the group is 15%

Copies of the Company's current Board Members Code of Conduct and Group Code of Conduct/Values and the Company's Share Trading Policy and Diversity Policy are publicly available on the Company's website.

Corporate Governance Statement

PRINCIPLE 4: SAFEGUARD INTEGRITY IN FINANCIAL REPORTING

Recommendation 4.1: The Board should establish an Audit Committee.

The Board has had a combined Audit and Risk Management Committee for the entire reporting period.

Recommendation 4.2: Structure the Audit Committee so that it consists of:

  • only nonexecutive directors
  • a majority of independent directors
  • an independent Chairperson, who is not chairperson of the Board;
  • at least three members.

The Company's Audit and Risk Management Committee has at least 3 members all being nonexecutive directors (Steven Cole, Peter Collins, Ian Junk and Vanessa Guthrie), all of whom, including the Chairman (Steven Cole), are independent. Ian Junk retired as a director on 28 June 2012. From 23 August 2012 David John Reed was also appointed to the Audit and Risk Committee.

Recommendation 4.3: The Audit Committee should have a formal charter.

The Company's Audit and Risk Management Committee has a formal charter as set out in the Charter.

Recommendation 4.4: Provide the information indicated in Guide to reporting on Principle 4.

Members of the Board's Audit and Risk Management Committee, and their attendance at meetings of that Committee were as follows (a total of 4 meetings were held):

Director* Number of Mtgs
Eligible to Attend
Number of Mtgs
Attended
Steven Cole (Chairman) 4 4
Peter Lionel Fleury Collins 4 3
Ian Courtney Junk (until 28 June 2012) 4 4
Vanessa Guthrie 4 3

The qualifications of the Directors on the Audit and Risk Management Committee appear in the Directors' Report section of this Annual Report.

The Company is not aware of any departures from the Recommendations under Principle 4.

The Company's Audit and Risk Management Committee charter and information on procedures for the selection and appointment of the external auditor, and for the rotation of external audit engagement partners, are all set out in the Charter which is publicly available on the Company's website.

PRINCIPLE 5: MAKE TIMELY AND BALANCED DISCLOSURE

Recommendation 5.1: Establish written policies designed to ensure compliance with ASX Listing Rule disclosure requirements and to ensure accountability at a senior executive level for that compliance and disclose those policies or a summary of them.

The Company has established written policies and procedures designed to ensure compliance with ASX Listing Rule disclosure requirements and to ensure accountability at senior executive level for the compliance.

Recommendation 5.2: Provide the information indicated in Guide to reporting on Principle 5.

The Company is not aware of any departure from Recommendations 5.1 or 5.2.

The Company's current written policies and procedures on ASX Listing Rule disclosure requirements are all set out under the heading "Release of Price Sensitive Information Policy" in the Charter which is publicly available on the Company's website.

PRINCIPLE 6: RESPECT THE RIGHTS OF SHAREHOLDERS

Recommendation 6.1: Design and disclose a communications policy for promoting effective communication with shareholders and encouraging their participation at general meetings.

The Charter contains a section formally setting out the Company's communications strategy with its stakeholders including the effective use of electronic communications.

Recommendation 6.2: Provide the information indicated in Guide to reporting on Principle 6.

Details of how the Company will communicate with its shareholders publicly is set out under the heading "Communications with Stakeholders" which is publicly available on the Company's website.

The Company is not aware of any departure from Recommendations 6.1 or 6.2.

PRINCIPLE 7: RECOGNISE AND MANAGE RISK

Recommendation 7.1: Companies should establish policies for the oversight and management of material business risks and disclose a summary of those policies.

The Charter includes a formal policy on risk oversight and management. The Board also has established the Audit and Risk Management Committee of the Board.

The Board and executive through interactive workshop sessions have implemented a system for identifying, assessing, monitoring and managing material risks throughout the organisation, including internal compliance and control systems, and procedures based on AS/NZ ISO 31000:2009. The Company with the assistance of professional consultants undertook a Formal Business Risk Review in January 2012.

Details of the Company's policy on these matters and any amendments in due course are set out under the heading "Risk Management Policy" in the Charter which is publicly available on the Company's website.

Recommendation 7.2: The Board to require management to design and implement the risk management and internal control system to manage the Company's material business risks, and report to it on whether those risks are being managed effectively. Board to disclose that management has reported to it as to the effectiveness of the Company's management of its material business risks.

An Audit and Risk Management Committee has been established as set out in the Charter with preliminary responsibility for establishment and maintaining effective risk management and internal control systems.

The Board, including through the Audit and Risk Management Committee has required management to progress matters and report to it in the terms of this Recommendation.

Further, the Board discloses that management has reported to it as to the effectiveness of the Company's management of its material business risks, including the risk treatment actions taken to date to minimise the risks.

PRINCIPLE 7: RECOGNISE AND MANAGE RISK (continued)

Recommendation 7.3: Board to disclose whether it has received assurance from the CEO (or equivalent) and the CFO (or equivalent) that the declaration provided in accordance with S.295A of the Corporations Act is founded on a sound system of risk management and internal control and that the system is operating effectively in all material respects in relation to financial reporting risks.

The Company's CEO and CFO (or equivalent) provided the Board assurance in compliance with this Recommendation that the declaration provided in accordance with S.295A of the Corporations Act was founded on a sound system of risk management and internal control and that system was operating effectively in all material respects in relation to financial reporting risks.

Recommendation 7.4: Provide the information indicated in Guide to reporting on Principle 7.

The Company is not aware of any departure from Recommendations 7.1, 7.2 or 7.3.

A summary of the Company's policies on risk oversight and management of material business risks is publicly available under the heading "Risk Management Policy" in the Charter on the Company's website.

PRINCIPLE 8: REMUNERATE FAIRLY AND RESPONSIBLY

Recommendation 8.1: The Board should establish a remuneration committee.

The Board has established a combined Nomination and Remuneration Committee. Refer reporting on Recommendation 2.6 above.

The remit and responsibilities of the Nominations and Remuneration Committee in respect of remuneration are set out in the Charter.

Recommendation 8.2: Clearly distinguish the structure of non-executive directors' remuneration from that of executive directors and senior executives.

The structure of non-executive remuneration is clearly distinguishable from that of executive directors and senior executives.

The Board's policy for determining the nature and amount of remuneration for Board members and senior executives of the economic entity was as follows:

  • Executives were to receive a remuneration package consisting of:
  • Fixed Base Salary (based on factors such as skills, experience, value to the Company and length of service), superannuation and non- monetary benefits, as appropriate.
  • Short term incentives in the form of a cash bonus incentive, applied to a maximum percentage of the base salary and structured against relative satisfaction (at the reasonable discretion of the Board) of certain corporate and personally related key performance indicators of the executive.
  • Long term incentives the grant of Performance Rights in the Company, with value capped to a maximum percentage of Fixed Base Salary, vesting progressively on an annualised basis while the executive remains engaged, with the degree of vesting structured relatively against the company's relative Total Shareholder Return (TSR) performance against a comparator group of companies

The Nomination and Remuneration Committee (on reference from, and in consultation with, the CEO) reviews executive packages from time to time by reference to the economic entity's performance, executive performance and comparable information from industry benchmarks.

  • The maximum remuneration of nonexecutive directors is the subject of Shareholder resolution in accordance with the Company's Constitution, the Corporations Act and the ASX Listing rules, as applicable. The apportionment of non-executive director remuneration within that maximum is made by the Board having regard to the inputs and value to the Company of the respective contributions by each nonexecutive director. The Board may also award additional remuneration to nonexecutive directors called upon to perform extra services or make special exertions on behalf of the Company. No additional remuneration was awarded for the year ended 30 June 2012. Details of these are set out in the Remuneration Report within the Directors' Report.
  • Greater details of the remuneration arrangements for Directors, Officers and senior executives are contained in the Remuneration Report comprised in the Directors' Report forming part of this Annual Report.

Recommendation 8.3: Provide the information indicated in guide to reporting on Principle 8

Remuneration Committee (names of members and attendance at meetings)

Refer to the response to Recommendation 2.6 above concerning the Company's Nomination and Remuneration Committee.

Non-Executive Director Retirement Benefits

Non-executive directors are entitled to statutory superannuation. There are no other schemes for retirement benefits for nonexecutive directors.

Information Publicly Available

The Charter contains a section formally setting out the charter of the Company's Nominations and Remuneration Committee. Details are publicly available on the Company's website.

EXECUTIVE SUMMARY OF COMPLIANCE WITH RECOMMENDATIONS
Recommendation # Compliant Non-Compliant If not, why not?
1 - N/A
2 - Partial Refer response to
Recommendation
2.6 above.
3 - N/A
4 - N/A
5 - N/A
6 - N/A
7 - N/A
8 - N/A

As at 30 September 2012

The shareholder information set out below was applicable as at 31 August 2012.

Distribution of ordinary shares:

Analysis of number of equity security holders by size of holding:

Range Total holders Units % of Issued Capital
1 – 1,000 368 124,368 0.03
1,001 – 5,000 806 2,534,132 0.55
5,001 – 10,000 745 6,141,581 1.32
10,001 – 100,000 1907 68,682,092 14.80
100,001 – 9,999,999,999 423 386,629,900 83.31
Rounding -0.01
Total 4,249 464,112,073 100.00
Unmarketable Parcels 634 577,706 0.12

Top 20 holders of ordinary shares:

Rank Name Units % of Units
1. J P MORGAN NOMINEES AUSTRALIA LIMITED 80,537,592 17.35
2. NATIONAL NOMINEES LIMITED 26,876,631 5.79
3. PERSHING AUSTRALIA NOMINEES PTY LTD BLUE OCEAN EQUITIES A/C> 24,000,000 5.17
4. HSBC CUSTODY NOMINEES (AUSTRALIA) LTD 21,507,709 4.63
5. TRUCKING NOMINEES PTY LTD 14,115,034 3.04
6. AMP LIFE LIMITED 12,005,550 2.59
7. MELAID HOLDINGS PTY LTD 11,662,046 2.51
8. MR KENNETH JOSEPH HALL 10,000,000 2.15
9. MR DAVID JOHN REED 8,052,768 1.74
10. BNP PARIBAS NOMS PTY LTD 5,525,672 1.19
11. ADVANCE CONCEPT HOLDINGS PTY LTD 5,000,000 1.08
12. TERAN NOMINEES PTY LTD 4,109,310 0.89
13. J P MORGAN NOMINEES AUSTRALIA LIMITED 3,783,847 0.82
14. BOND STREET CUSTODIANS LIMITED 3,372,559 0.73
15. CITICORP NOMINEES PTY LTD 3,371,182 0.73
16. LINFOOT ONE SUPER PTY LTD 3,160,250 0.68
17. BNP PARIBAS NOMS PTY LTD 2,961,617 0.64
18. ABN AMRO CLEARING SYDNEY NOMINEES PTY LTD 2,672,745 0.58
19. COROM PTY LTD 2,527,034 0.54
20. MRS JUDITH MARY REED 2,487,226 0.54

Substantial Holders

Substantial holders in the Company are set out below:

Ordinary Shares Number Held Percentage
M&G Investment Management Limited 67,000,000 14.48%
D J Reed 26,997,338 6.12%
Metals X Limited 24,000,000 5.17%
SG Hiscock & Company Limited 23,247,105 5.01%

Unlisted Options

The number of unlisted options with an exercise price of 85 cents maturing on 31 December 2012 over fully paid ordinary shares is 1,800,000 options and the number of holders of options is 5.

The number of unlisted options with an exercise price of \$1.20 maturing on 30 June 2013 over fully paid ordinary shares is 1,850,000 options and the number of holders of options is 8.

The number of unlisted options with an exercise price of \$1.00 maturing on 1 July 2013 over fully paid ordinary shares is 3,000,000 options and the number of holders of options is 8.

The number of unlisted options with an exercise price of 80 cents maturing on 31 December 2013 over fully paid ordinary shares is 2,450,000 options and the number of holders of options is 8.

The number of unlisted options with an exercise price of \$1.00 maturing on 1 July 2014 over fully paid ordinary shares is 500,000 options and the number of holders of options is 1.

Voting Rights

The voting rights attaching to ordinary shares are set out below:

On a show of hands every member present at a meeting in person or by proxy shall have one vote and upon a poll each share shall have one vote.

The unlisted Option Holders may attend and speak at general meetings of the Company, however, they do not have an entitlement to vote upon the business before the meeting either by show of hands or by poll.

Other

The name of the Company's Joint Company Secretaries are Mr Darren Wates and Mr Jason Carone.

The address of the principal registered office in Australia is:

Level 1, 672 Murray Street, West Perth, Western Australia 6005.

Telephone: (08) 9322 1182

Facsimile: (08) 9321 0556

Website: www.reedresources.com

Registers of Securities are held at the following addresses:

Level 1, 672 Murray Street, West Perth, Western Australia 6005.

Quotation has been granted for all ordinary shares of the Company on all Member Exchanges of the Australian Stock Exchange Limited.

Additional Stock Exchange Information

as at 28 September 2012

MEEKATHARRA PROJECT

Aladdin-Caledonia-Three Sisters-Bailey Island
M51/0012 M51/0031 M51/0033 M51/0062 M51/0096 M51/0203
M51/0320 M51/0321 M51/0793 M51/0794 M51/0795 M51/0819
M51/0820
Bluebird / South Junction
M51/0132 M51/0393 M51/0491 M51/0539
Bluebird-Yaloginda
L51/0043 M51/0027 M51/0028 M51/0035 M51/0091 M51/0161
M51/0180 M51/0187 M51/0190 M51/0209 M51/0211 M51/0280
M51/0281 M51/0325 M51/0385 M51/0386 M51/0409 M51/0418
M51/0419 M51/0433 M51/0441 M51/0471 M51/0485 M51/0489
M51/0500 M51/0502 M51/0516 M51/0528 M51/0560 M51/0561
M51/0679 M51/0738 M51/0805 P51/1606 P51/1607 P51/1723
P51/1732 P51/1750 P51/1755 P51/1760 P51/1820 P51/1904
P51/1907 P51/1908 P51/1909 P51/1910 P51/1992 P51/2185
P51/2189 M51/0557(a) M51/0586(a) M51/0587(a) M51/0613(a) M51/0811(a)
M51/0628(a) M51/0640(a) M51/0677(a) M51/0678(a) M51/0680(a) M51/0871(a)
M51/0718(a) M51/0737(a)
Burnakura
M51/0422 M51/0423 M51/0424 M51/0468 M51/0469
Chunderloo/Wanganui
L51/0082 M51/0079 M51/0637(a) M51/0638(a) M51/0639(a)
Highway
M51/0256 M51/0257 M51/0503
Kurara East
E51/0814 L51/0030 L51/0051 M51/0235 M51/0381 M51/0454
M51/0455 M51/0456 P51/2037 P51/2038 P51/2039 P51/2040
M51/0675(a)
M51/0825(a)
M51/0746(a) M51/0781(a) M51/0806(a) M51/0807(a) M51/0824(a)

MEEKATHARRA PROJECT

M51/0783(a)

L51/0056
M51/0438
L51/0067
M51/0199
M51/0200
M51/0521
M51/0437
P51/1801
M51/0439
M51/0440
M51/0504
P51/1859
P51/1764
P51/1861
P51/1808
P51/1809
P51/1836
P51/1867
P51/1860
P51/1871
P51/1862
P51/1863
P51/1865
P51/1879
P51/1869
P51/1881
P51/1875
P51/1876
P51/1878
P51/1885
P51/1880
P51/1887
P51/1882
P51/1883
P51/1884
P51/1891
P51/1886
P51/1893
P51/1888
P51/1889
P51/1890
M51/0667(a)
P51/1892
M51/0669(a)
P51/1894
M51/653(a)
M51/0654(a)
M51/0673(a)
M51/0668(a)
M51/0688(a)
M51/0670(a)
M51/0671(a)
M51/0672(a)
Nannine
G51/0009
L51/0018
L51/0033
L51/0034
L51/0079
M51/0006
M51/0051
M51/0053
M51/0075
M51/0334
M51/0374
M51/0447
M51/0462
M51/0463
M51/0472
M51/0482
M51/0486
M51/0496
M51/0523
M51/0524
P51/1581
P51/1582
P51/1583
P51/1628
P51/1637
P51/1638
P51/1639
P51/1640
P51/1641
P51/1642
P51/1646
P51/1647
P51/1648
P51/1649
P51/1650
P51/1656
P51/1657
P51/1658
P51/1788
P51/1789
P51/1795
P51/1796
P51/1797
P51/1798
P51/1799
P51/1818
P51/1822
P51/1823
P51/1824
P51/1825
P51/1990
P51/2024
P51/2036
P51/2056
P51/2057
P51/2058
P51/2059
P51/2061
P51/2062
M51/0568(a)
M51/0569(a)
M51/0570(a)
M51/0571(a)
M51/0572(a)
M51/0573(a)
M51/0575(a)
M51/0576(a)
M51/0581(a)
M51/0582(a)
M51/0644(a)
M51/0645(a)
M51/0652(a)
M51/0666(a)
M51/0674(a)
M51/0740(a)
M51/0758(a)
M51/0780(a)
M51/0782(a)
Meekatharra

Additional Stock Exchange Information

as at 28 September 2012

MEEKATHARRA PROJECT (continued)

Norie
E51/1496 M51/0039 M51/0477 M51/0492 M51/0493 M51/0494 M51/0495
M51/0501 M51/0525 M51/0526 P51/1717 P51/1718 P51/1719 P51/2082
P51/1720 P51/1721 P51/1991 P51/2081 M51/0584(a) M51/0784(a)
Polelle
E51/0259 E51/0615 E51/1484 L51/0035 M51/0427 M51/0459 M51/0465
M51/0484 M51/0605 M51/0611 M51/0612 M51/0643 M51/0717 M51/0802(a)
M51/0797 M51/0803 P51/1925 P51/2327 M51/0483(a) M51/0801(a) M51/0834(a)
M51/0796(a) M51/0798(a) M51/0799(a) M51/0800(a) M51/0823(a) M51/0830(a)
M51/0809(a) M51/0810(a) M51/0822(a)
Reedys
E20/0189 E20/0440 E20/0489 E51/1487 G51/0013 G51/0014 G51/0015
G51/0017 G51/0026 L20/0008 L20/0010 L51/0029 L51/0031
M20/0012 M20/0045 M20/0068 M20/0069 M20/0077 M20/0212
M20/0214 M20/0219 M20/0443 M20/0444 M20/0445 M20/0496
M51/0092 M51/0233 M51/0649 M20/0420(a) M20/0421(a)
M20/0437(a) M20/0438(a) M20/0476(a) M20/0477(a) M51/0778(a)
SE Meekatharra
L51/0041 L51/0055 L51/0071 L51/0072 L51/0073 L51/0077 P51/2326
M51/0445 M51/0446 M51/0487 M51/0488 M51/0490 P51/1987 M51/0741(a)
M51/0849(a)
Stakewell
L20/0017
South Quinns
E20/0690
Tough Go
L20/0018 M20/0073 M51/0254 M51/0762
Turn Of The Tide
E51/0348 L51/0078 L51/0081 M20/0070 M20/0071 M20/0107 M20/0249
M20/0309 M51/0236 M51/0237 M51/0757(a) M51/0788(a)

BARRAMBIE PROJECT

E57/769 E57/770 E57/819 M57/173 G57/5 G57/6 G57/7
G57/8 L57/29 L57/30 L20/49 L20/55

COMET VALE

E29/603 E29/727 E29/762 M29/035 M29/052 M29/085 M29/185
M29/186 M29/197 M29/198 M29/199 M29/200 M29/201 M29/232
M29/233 M29/235 M29/321 E29/787 L29/67

MOUNT FINNERTY

E15/836 E15/1123 E15/1172 E16/260 E16/261 E16/272 E16/308
E16/341 E16/305* E16/330* E16/375 E16/376 E16/378 E16/380
E16/384** M15/978 M15/1371 M15/1752 M15/1785 M15/1787 M16/506
M16/507 M16/511 M16/522 P15/4445 L15/309 P15/4818 P15/4819

MOUNT MARION

E15/1190 E15/1191 M15/999 M15/1000 L15/315 L15/316 L15/317
L15/321

(a)- mining tenement applications

* - registered holder is Barranco Resources NL, Reed Resources Ltd has option to purchase 100%

** - registered holder is Cliffs Asia Pacific Iron Ore Pty Ltd, Reed Resources Ltd has 20% interest in iron ore rights.

This page has been left intentionally blank.

This page has been left intentionally blank.

This page has been left intentionally blank.