8 November 2017

==> picture [165 x 190] intentionally omitted <==

BARRAMBIE TITANIUM PROJECT - UPDATE

HIGHLIGHTS

  • Final assays received for recent metallurgical drilling campaign.

  • Significant high-grade intercepts returned from recent metallurgical drilling includes:

  • 71.0 metres at 34.1% TiO2 and 0.86% V2O5, from surface to end of hole

  • 71.0 metres at 33.1% TiO2 and 0.69% V2O5, from surface to end of hole

  • 71.0 metres at 32.4% TiO2 and 0.82% V2O5, from surface to end of hole

  • 71.0 metres at 32.1% TiO2 and 0.72% V2O5, from surface to end of hole

  • 71.0 metres at 32.3% TiO2 and 0.75% V2O5, from surface to end of hole

  • 71.0 metres at 31.9% TiO2 and 0.59 % V2O5, from surface to end of hole

  • Beneficiation test work to prepare feed for piloting of Neomet Process nearing completion.

  • Core has arrived in China for evaluation by a Chinese titanium processor.

  • Mining Proposal lodged to cover extraction of bulk sample (~50kt) as part of the evaluation of the production of Direct Shipping Ore.

  • Former Iluka and Talison executive, Mr Paul Wallwork appointed General Manager – Marketing and Product Development.

  • POW lodged for resource development drilling to follow-up significant intercepts at Virginia Hills prospect including:

  • 19 metres at 16.4% TiO2 and 0.41% V2O5, from 9m down hole

  • 19 metres at 17.7% TiO2 and 0.42 % V2O5, from 52m down hole

Further to the announcement on the 11[th] September, Neometals Ltd (ASX: NMT) (“Neometals”) is pleased to provide an update on results from recent drilling at its Barrambie Titanium Deposit, one of the world’s highest-grade titanium deposits.

Drilling Results

During the July quarter, twenty (20) holes were drilled within the TiO2 starter pit area for the purpose of collecting samples for metallurgical testwork. Results announced previously related only to the top 40 metres of each hole, corresponding to the planned depth of the initial starter pits.

==> picture [49 x 49] intentionally omitted <==

==> picture [205 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

Results for the remainder of the core have now been received and all results are reported in Table 1, below.

low.
Target Drill Hole
Number
Easting
Northing
Co-ordinates GDA 94
dip
Azimuth
Depth
from
to
width
TiO2 %
V2O5 %
sample
(m)
(m)
(m)
Barrambie BDDH050
BDDH051
BDDH052
BDDH053
BDDH054
BDDH055
BDDH056
BDDH057
BDDH058
BDDH059
BDDH060
BDDH061
BDDH062
BDDH063
BDDH064
BDDH065
BDDH066
BDDH067
BDDH068
BDDH069
710200
6962100
710138
6962189
710111
6962247
710064
6962308
710056
6962383
710050
6962473
710047
6962530
710043
6962586
710028
6962692
709075
6965106
709028
6965172
708988
6965210
708933
6965291
708965
6965426
708906
6965506
708874
6965545
708850
6965587
708816
6965626
708773
6965663
708714
6965740
-85
240
71
-85
60
71
-90
000
71
-90
000
71
-90
000
71
-80
240
71
-90
000
71
-85
60
71
-85
60
71
-85
240
71
-90
000
71
-85
60
71
-80
240
71
-70
240
71
-85
60
71
-90
000
71
-85
240
71
-80
240
71
-80
240
71
-70
60
64.8
0.0
71.0
71.0
22.9
0.57
Qtr PQ core
0.0
71.0
71.0
25.9
0.58
Qtr PQ core
0.0
71.0
71.0
18.6
0.42
Qtr PQ core
0.0
71.0
71.0
32.1
0.72
Qtr PQ core
0.0
71.0
71.0
17.8
0.51
Qtr PQ core
0.0
71.0
71.0
22.2
0.66
Qtr PQ core
0.0
71.0
71.0
27.4
0.67
Qtr PQ core
0.0
71.0
71.0
24.3
0.56
Qtr PQ core
0.0
71.0
71.0
24.4
0.59
Qtr PQ core
0.0
71.0
71.0
34.1
0.86
Qtr PQ core
0.0
71.0
71.0
27.9
0.58
Qtr PQ core
0.0
71.0
71.0
32.3
0.75
Qtr PQ core
0.0
71.0
71.0
22.5
0.62
Qtr PQ core
0.0
71.0
71.0
14.4
0.57
Qtr PQ core
0.0
71.0
71.0
32.4
0.82
Qtr PQ core
0.0
71.0
71.0
10.8
0.39
Qtr PQ core
0.0
71.0
71.0
31.9
0.59
Qtr PQ core
0.0
71.0
71.0
23.5
0.52
Qtr PQ core
0.0
71.0
71.0
33.1
0.69
Qtr PQ core
0.0
64.8
64.8
26.0
0.55
Qtr PQcore

Table 1: Drilling and Assay Details - Barrambie Metallurgical Drilling

Holes were drilled using diamond drilling techniques producing PQ core samples, which were then geologically logged on site, and shipped to Perth for cutting and quarter core sampling. Sampling was conducted on 1m intervals downhole, whilst geological logging was completed in sufficient detail to support reporting of Exploration Results. Logging was both qualitative and quantitative; full descriptions were recorded on standard logging forms of lithology, alteration, and oxidation as well as percentage estimates of alteration minerals, and veining. Sample preparation and analysis was conducted by Intertek. Whole rock analysis of a standard iron ore suite was conducted by lithium borate fusion and ICP finish.

Beneficiation and Pilot Hydrometallurgical Test work

The beneficiation (variability) test work will be completed this month and the majority of the concentrates will be freighted to the Company’s laboratory in Montreal for the scheduled pilot plant testing of the Neomet Process in Canada. The Company plans to commence pilot testing in the June Quarter 2018 after the Lithium-ion Battery Recycling pilot campaign, which will be commissioned in December.

Evaluation of Direct Shipping Ore (DSO) Operation and Mining Proposal

The Company is evaluating the fast-track start-up of Barrambie as a DSO operation (in parallel with concentration of the ore into a titaniferous magnetite concentrate in China). The Company has delivered a representative sample of Barrambie ore from the planned starter pits to China for evaluation by a titanium processor. If the customer performance tests of the ore are positive and logistic studies show it is viable, the Company will negotiate the sale of ore, on terms that recognise the contained value in the ore, to selected processors in the titanium supply chain.

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

A draft Mining Proposal for Small Operation (MPSO) has been lodged to cover extraction of a bulk sample of up to 50,000t.

==> picture [463 x 322] intentionally omitted <==

Figure 1 : Barrambie Project Plan

Appointment of General Manager – Marketing and Product Development

During October former Iluka and Talison executive, Mr Paul Wallwork, was appointed to the role of General Manager - Marketing and Product Development. Mr Wallwork has nearly 30 years of experience working in the chemicals and minerals industries, primarily in technical sales, international marketing and management roles. Most recently, in the role of Trading Manager at Iluka Resources, Mr Wallwork was responsible for various mineral trading activities including the export sale of iron and heavy mineral concentrates, third-party mineral processing arrangements and the development of new markets for by-products. During several previous years of employment with Iluka he was Marketing Manager for Europe and then Asia. In the five-year period from 2008 to 2013 Mr Wallwork held the roles of Marketing Manager and General Manager Marketing at Talison with responsibility for export sales of tantalum, tin and lithium minerals.

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

Virginia Hills Resource Extension Drilling

During the September Quarter, Neometals successfully completed an exploratory drilling programme of a single line of 7 RC holes at the Virginia Hills prospect located approximately 5 kilometres to the west of Barrambie (refer to announcement 11 September for drilling details and full results).

==> picture [407 x 527] intentionally omitted <==

Figure 1 : Barrambie Project Geology showing location of recent drilling at Barrambie and Virginia Hills

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

The Virginia Hills prospect is interpreted to be a repetition or folded limb of the Barrambie mineralisation and has been delineated by geophysics over approximately 10 kilometres strike length. These recent holes are the first holes drilled at the prospect to date and intersected disseminated and massive titanomagnetite layers similar to that occurring at Barrambie. Signficant intercepts included 19 metres at 16.4% TiO2 and 0.41% V2O5 and 19 metres at 17.7% TiO2 and 0.42 % V2O5 (see announcement 11 September for further drill details).

A Program of Work (POW) has been lodged for a RC drill campaign of 30 RC holes to further delineate and assess the potential of this prospective new zone of mineralisation.

ENDS

For further information, please contact:

Chris Reed

Managing Director Neometals Ltd T: +61 8 9322 1182 E: [email protected]

Media

Michael Weir / Cameron Gilenko Citadel MAGNUS T: +61 8 6160 4900

COMPETENT PERSONS STATEMENT

The information in this market announcement is extracted from the reports entitled Barrambie Resource Estimate December 2013, and Barrambie Prefeasibility Study August 2015 and announced 6 December 2013 and 25 August 2015.

Neometals Limited confirms it is not aware of any new information or data that materially affects the information in the original market announcements relating to Barrambie mineral resources and pre-feasibility study, that all material assumptions and technical parameters underpinning the Barrambie mineral resource estimate continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.

The information in this announcement that relates to Exploration Targets and Exploration Results is based on information compiled by Clay Gordon, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and Australia Institute of Geoscientists. Mr Gordon is employed by Advance Geological Consulting Pty Ltd, an independent consultant to Neometals Limited. Mr Gordon has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Gordon consents to the inclusion in this announcement of the matters based on information in the form and context in which it appears.

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

APPENDIX A: SUPPORTING INFORMATION

==> picture [256 x 241] intentionally omitted <==

Figure 3 : Barrambie Titanium Project – location plan

JORC Mineral Resources

Barrambie Titanium Project has Mineral Resources of 47.2 million tonnes at 22% TiO2 (total Indicated and Inferred) (announcement ASX:RDR 6 December 2013).

Category
JORC
2012
Tonnage
(Mt)
TiO2
(%)
V2O5
(%)
Fe2O3
(%)
Al2O3
(%)
SiO2
(%)
Indicated 34.7 22.25 0.64 46.77 9.48 14.95
Inferred 12.5 21.99 0.58 46.51 9.32 15.40
Total 47.2 22.18 0.63 46.70 9.44 15.07

Table 2: Barrambie Titanium Project – Mineral Resources (above 15% TiO2 block cut off)

The ferrovanadium titanium (Ti-V-Fe) deposit occurs within the Archaean Barrambie Greenstone Belt, a narrow, NNW-SSE trending greenstone belt in the northern Yilgarn Craton. The linear greenstone belt is about 60 km long and attains a maximum width of about 4 km. The Barrambie Sill extends over a distance of at least 25 km approximately half of which is covered by Neometal’s tenements where is varies in width from 500 m to 1700 m.

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

The sill is comprised of anorthositic magnetite-bearing gabbros that intrude a sequence of metasediments, banded iron formation, metabasalts and metamorphosed felsic volcanics of the Barrambie Greenstone Belt. The metasediment unit forms the hanging-wall to the layered sill complex.

Ti-V-Fe mineralisation occurs as bands of cumulate aggregations of vanadiferous magnetite (martite)-ilmenite (leucoxene) in massive and disseminated layers and lenses. Titanium rich horizons tend to be focussed in the relatively wider band on the eastern margin of the Sill.

==> picture [469 x 496] intentionally omitted <==

Figure 4: Barrambie Geology, location of starter pits and recent metallurgical drill holes.

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

==> picture [395 x 260] intentionally omitted <==

Figure 5: Barrambie deposit geology

==> picture [395 x 243] intentionally omitted <==

Figure 6: Cross Section 12600N within starter pit showing recent metallurgical core hole

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

==> picture [421 x 258] intentionally omitted <==

Figure 7: Cross Section 12100N within starter pit showing recent metallurgical core hole

==> picture [421 x 258] intentionally omitted <==

Figure 8: Cross Section 12100N within starter pit showing recent metallurgical core hole

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

==> picture [415 x 255] intentionally omitted <==

Figure 8: Maiden drill traverse at Virginia Hills

JORC Table 1, Section 1, Sampling Techniques, and Data

Criteria **Commentary **
Sampling techniques Metallurgical drilling comprises 20 PQ core holes. Core was ¼ cut for
assayingin 1metre lengths.
Drilling techniques Metallurgical drilling was conducted by PQ coring technique.
Drill sample recovery A qualitative logging code was used to record recovery for the
recent RC and DD drilling. Recovery of samples is considered to be
good.
Logging Geological logging of core and rock chips was carried out recording
lithology, major minerals, oxidation, colour, texture, mineralisation,
water and recovery. The logging was carried out in sufficient detail
to meet the requirements of resource estimation and mining
studies.
Sub-sampling techniques
and sample preparation
All samples were dried, crushed to approximately 2mm, split and
pulverised.
Quality of assay data and
laboratorytests
No field QAQC data was conducted by Neometals. Intertek Genalysis
conducted their own internalQAQC,with no issues beingreported.

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

Verification of sampling and
assaying
Data was recorded in the field on paper logs and transferred to
individual .xls files prior to merging with project database. No twin
holes were drilled and no verification of significant intersections by
independent laboratories has been undertaken.
Location of data points Drill collar and azimuth were pegged in the field using GDA94 system
byindependent surveyors.
Data spacing and distribution Metallurgical holes were spaced at 50m intervals along the strike of
the Barrambie TiO2deposit.
Orientation of data in
relation to geological
structure
Metallurgical holes were drilled within plane of the Barrambie
mineralisation.
Sample security Samples were stored onsite and transported to the laboratory on a
regular basis byNeometals employees.
Audits or reviews No audits or reviews of sampling techniques and data have been
conducted.

JORC Table 1, Section 2, Reporting of Exploration Results

Criteria **Commentary **
Mineral tenement and land
tenure status
The Barrambie mineralisation is within 100% owned granted mining
lease M57/173 in the Eastern Murchison Goldfields. No known
impediments exist to operate in the area.
Exploration done by other
parties
No relevant exploration has been completed by other parties to
acknowledge or appraise at this time.
Geology The ferrovanadium titanium (Ti-V-Fe) deposit occurs within the
Archaean Barrambie Greenstone Belt, which is a narrow, NNW-SSE
trending greenstone belt in the northern Yilgarn Craton. The linear
greenstone belt is about 60 km long and attains a maximum width
of about 4 km. It is flanked by banded gneiss and granitoids. The
mineralisation is hosted within a large layered, mafic intrusive
complex (the Barrambie Igneous Complex), which has intruded into
and is conformable with the general trend of the enclosing
Greenstone Belt. From aeromagnetic data and regional geological
mapping, it appears that this layered sill complex extends over a
distance of at least 25 km into tenements to the north and south of
M57/173. The layered sill varies in width from 500 m to 1700 m.
The sill is comprised of anorthositic magnetite-bearing gabbros that
intrude a sequence of metasediments, banded iron formation,
metabasalts and metamorphosed felsic volcanics of the Barrambie
Greenstone Belt. The metasediment unit forms the hanging-wall to
the layered sill complex.

==> picture [204 x 58] intentionally omitted <==

==> picture [86 x 70] intentionally omitted <==

Exposure is poor due to deep weathering, masking by laterite,
widespread cover of transported regolith (wind-blown and water-
borne sandy and silty clay), laterite scree and colluvium. Where
remnant laterite profiles occur on low hills, there is ferricrete
capping over a strongly weathered material that extends down to
depths of 70 m.
Ti-V-Fe mineralisation occurs as bands of cumulate aggregations of
vanadiferous magnetite (martite)-ilmenite (leucoxene) in massive
and disseminated layers and lenses.
Within the tenement the layered deposit has been divided into five
sections established at major fault offsets. Cross faults have
displacements that range from a few metres to 400 m. The water
table occurs at about 35 m below the surface (when measured
where the laterite profile has been stripped).
Drill hole Information See Tables and Figures in body of announcement.
Data aggregation methods For the metallurgical drilling within the Barrambie high grade
deposit,all assays for the hole assayed have been aggregated.
Relationship between
mineralisation widths and
intercept lengths
Metallurgical holes were drilled entirely within the plane of the ore
hence do not reflect true width of the orebody.
Diagrams See body of announcement for Project geology, drill hole locations,
schematicgeologyand drill cross sections.
Balanced reporting All results have been reported.
Other substantive
exploration data
See ASX announcements 11 September 2017 and 6 December 2013
for further information regardingthe Barrambie deposit.
Further work Further exploration work is planned and discussed in this
announcement.