AI assistant
NEOMETALS LTD — Investor Presentation 2020
Dec 21, 2020
65430_rns_2020-12-21_9584611f-11bd-4651-9855-7f74f12e85a7.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [557 x 92] intentionally omitted <==
----- Start of picture text -----
22 December 2020
----- End of picture text -----
BARRAMBIE FLOWSHEET BREAKTHROUGH
HIGHLIGHTS
-
Conventional reduction roasting and magnetic separation of gravity concentrates generates ilmenite for titanium pigment and a vanadium-rich magnetite for specialty steel production at high recoveries
-
Large scale concentrate products meet commercial specifications for both ilmenite and magnetite products
-
High quality ilmenite suitable for both chloride and sulphate pigment production, maximising marketability
-
Samples of gravity concentrates in transit to IMUMR in China for flowsheet validation and generation of
concentrates to advance potential offtake discussions
- Commenced early contractor engagement for a mining and gravity concentrate operation on site.
Innovative project development company, Neometals Ltd (ASX: NMT) (“ Neometals ” or “ the Company ”), is pleased to announce excellent results from beneficiation test-work which has generated further concentrate samples for scale up validation work in China.
The largest-scale test work program was conducted on three bulk samples (20 tonnes) of Barrambie Eastern band (high titanium zone) mineralised material which generated 11 tonnes of heavy mineral concentrate (containing titanium, vanadium and iron) from traditional gravity spirals used by the mineral sands industry. Low-temperature reduction roasting and subsequent magnetic separation produced a high-quality ilmenite (> 52 % TiO2 content) at high recoveries (> 87% TiO2 recovery) and mass yield of 60%, and a marketable magnetite by-product concentrate (with grades equivalent to 58.7% Fe and 1.58% V2O5).
Historically, Neometals has evaluated the production of either vanadium or titanium in isolation using different flowsheets. Vanadium and titanium are industrial minerals which require significant proof of value-in-use when negotiating with potential offtakers. The Barrambie development strategy seeks to realise value from both the titanium and vanadium in the deposit via the generation of clean multi-metal concentrates from an initial capital-light mining and beneficiation operation for export to endusers. The reductive roast-magnetic separation work is a breakthrough for the Company as we can with confidence produce two separate products that achieved market ready specifications, with high mass pulls towards the potential higher value ilmenite product.
Neometals’ Chinese partner, IMUMR*, is due to take delivery of a 1 tonne sample of the mixed concentrate material to allow replication of the Neometals reductive roast results and further downstream processing of the products. Validation of Australian test-work results using Chinese laboratories is standard practice in China and will support ongoing product offtake dialogues.
Neometals’ Managing Director Chris Reed commented:
“These test work results are a breakthrough in simplifying the development concept for Barrambie. Proving that a simple gravity concentrate can be roasted and separated into two high quality concentrates is a significant step forward in realising our goal of developing Barrambie with strong partners. We are attracting strong interest from potential off-take partners and we look forward to continuing to work with IMUMR on advancing the project.”
Institute of Multipurpose Utilization of Mineral Resources Chinese Academy of Geological Sciences (“ IMUMR* ”). MOU was executed 4th October 2019 ( see Neometals ASX announcement titled “Development Agreement for Barrambie” defining a co-funded evaluation pathway towards a 50:50 joint venture to develop Barrambie.
[email protected] neometals.com.au
Locked Bag 8 T: +61 8 9322 1182 West Perth WA 6872 F: +61 8 9321 0556
ACN 099 116 361 Level 1, 1292 Hay Street West Perth WA 6005
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
Background
Barrambie is the most advanced, undeveloped hard-rock titanium Mineral Resource in Australia, located adjacent to existing transport infrastructure giving access to open user port facilities (see image below). Barrambie has a granted Mining Proposal for a 1.2 Mtpa mining operation and Ministerial Approval for construction of a processing plant with a throughput of 3.2Mtpa.
==> picture [497 x 281] intentionally omitted <==
Figure 1 - Location of Barrambie Project
Test-work technical details
The Barrambie mineralisation contains high-grade ilmenite intergrown with a vanadium-bearing magnetite (iron) and, as demonstrated, the Neometals planned process flowsheet can produce a superior concentrate with high recoveries. The Barrambie development strategy revolves around extracting value from both the titanium and vanadium in the deposit. The highlevel schematic flowsheet for this processing option involving mining, gravity beneficiation, reductive calcination and magnetic beneficiation into an ilmenite (TiO2 concentrate) and an Fe-V concentrate is shown in Figure 2.
Beneficiation test work, including scaled up beneficiation on three bulk samples (20 tonnes of mineralised feed) of Barrambie Eastern mineralised material have found both gravity and magnetic beneficiation options work exceptionally well to produce a high-grade mixed concentrate. A gravity circuit based on spirals was found to give a slightly improved grade for TiO2 and V2O5 grades and an improved recovery for TiO2 to the concentrate. Overall mass pull to concentrate was typically around 58% with recoveries of TiO2 and V2O5 to gravity concentrate of around 77% and 63% respectively
Bench scale reductive calcination test work has previously been shown to produce a material susceptible to magnetic fractionation, enabling the production of a TiO2-rich concentrate and an iron-vanadium concentrate. Recent confirmatory test work has been performed at larger scale (22 kg) using syngas as the reductant in a fluidized bed contactor for reductive calcination and magnetic separation processing stages. Encouragingly mass pull and value metal deportment to product concentrate streams are improved over earlier test work outcomes. The flowsheet and overall mass pull to each fraction along with the elemental composition of these streams is depicted in Figure 3.
2
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
==> picture [392 x 301] intentionally omitted <==
Figure 2 - Schematic of potential flowsheet
The combined non-magnetic streams produce an ilmenite (TiO2 concentrate) with 52.02% TiO2, 0.40% V2O5 , 46.95% Fe2O3, 1.00% Al2O3 and 1.99% SiO2. The recovery of titanium to the TiO2 concentrate is over 87% from concentrate feed. Due to the quality of the Barrambie ore and the deportment of other impurities these are low in both the TiO2 and Fe-V concentrates (See Table 1). Similarly, the Fe-V concentrate produced with this flowsheet has both a high vanadium grade (1.58% V2O5) and high iron grade (84.20% Fe2O3), The recovery of iron and vanadium to the Fe-V concentrate are 49% and 67% respectively from concentrate feed.
Table 1: Chemical composition data for Barrambie Concentrate, Ilmenite and Fe-V Concentrate
==> picture [450 x 213] intentionally omitted <==
----- Start of picture text -----
Composition Barrambie Eastern Gravity Reduced Gravity TiO2 Concentrate Fe-V Concentrate
Mineralisation Concentrate Concentrate Feed
TiO2 (%) 27.80 36.09 37.98 52.02 13.00
V2O5 (%) 0.72 0.78 0.82 0.40 1.58
Fe2O3 (%) 47.18 57.28 60.30 46.95 84.20
Al2O3 (%) 8.70 1.23 1.30 1.00 1.79
SiO2 (%) 12.00 2.10 2.21 1.99 2.54
CaO (%) 0.15 0.06 0.06 0.05 0.07
MgO (%) 0.44 0.14 0.15 0.17 0.12
MnO (%) 0.21 0.29 0.31 0.42 0.12
K2O (%) 0.01 0.01 0.01 0.01 0.01
Nb2O5 (%) < 0.01 < 0.01 < 0.01 < 0.01 < 0.01
P2O5 (%) 0.01 0.01 0.01 < 0.01 0.02
SO3 (%) 0.01 0.01 0.01 0.01 < 0.01
Th (ppm) < 10 < 10 < 10 < 10 < 10
U (ppm) < 10 < 10 < 10 < 10 < 10
----- End of picture text -----
3
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
==> picture [492 x 193] intentionally omitted <==
==> picture [492 x 193] intentionally omitted <==
Figure 3 - Low Temperature Reductive Calcination and Beneficiation Flowsheet and Mass Balance and Stream Composition
Next Steps
Given the extensive geological, metallurgical and evaluation study data on Barrambie and management preference for capitallight build-own-operate-transfer arrangements, it is progressing discussions with specialist mining and processing contractors under an early contractor involvement model. In parallel management is progressing discussions with potential offtake parties for both the ilmenite and magnetite products in China.
Authorised on behalf of Neometals by Christopher Reed, Managing Director
ENDS
For further information, please contact:
Chris Reed
Managing Director Neometals Ltd E: [email protected] T: +61 8 9322 1182
Jeremy Mcmanus
General Manager - Commercial and IR Neometals Ltd E: [email protected]
4
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
==> picture [525 x 20] intentionally omitted <==
About Neometals Ltd
Neometals innovatively develops opportunities in minerals and advanced materials essential for a sustainable future. With a focus on the energy storage megatrend, the strategy focuses on de-risking and developing long life projects with strong partners and integrating down the value chain to increase margins and return value to shareholders.
Neometals has four core projects with large partners that span the battery value chain:
Recycling and Resource Recovery:
-
Lithium-ion Battery Recycling – a proprietary process for recovering cobalt and other valuable materials from spent and scrap lithium batteries. Pilot plant testing completed with plans well advanced to conduct demonstration scale trials with 50:50 JV partner SMS group, working towards a development decision in early 2022; and
-
Vanadium Recovery – sole funding the evaluation of a potential 50:50 joint venture with Critical Metals Ltd to recover vanadium from processing by-products (“Slag”) from leading Scandinavian Steel maker SSAB. Underpinned by a 10-year Slag supply agreement, a decision to develop sustainable European production of high-purity vanadium pentoxide is targeted for December 2022.
Downstream Advanced Materials:
- Lithium Refinery Project – evaluating the development of India’s first lithium refinery to supply the battery cathode industry with potential 50:50 JV partner Manikaran Power, underpinned by a binding life-of-mine annual offtake option for 57,000 tonnes per annum of Mt Marion 6% spodumene concentrate, working towards a development decision in 2022.
Upstream Industrial Minerals:
- Barrambie Titanium and Vanadium Project - one of the world's highest-grade hard-rock titanium-vanadium deposits, working towards a development decision in mid-2021 with potential 50:50 JV partner IMUMR.
COMPETENT PERSONS ATTRIBUTION
Exploration and Sampling
The information in this report that relates to Exploration Results is based on, and fairly represents, information and supporting documentation compiled by Mr Gregory Hudson, who is a member of the Australian Institute of Geoscientists. Mr Hudson is a full-time employee of Neometals Ltd and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity he is undertaking, to qualify as a Competent Person as defined in the December 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Hudson has consented to the inclusion of the matters in this report based on his information in the form and context in which it appears.
Metallurgy
The information in this report that relates to metallurgical test work results is based on, and fairly represents, information compiled and / or reviewed by Dr David Robinson, who is a Member of The Australasian Institute of Mining and Metallurgy. Dr Robinson is a full-time employee of Neometals Ltd and has sufficient experience relevant to the activity which he is undertaking, to qualify as a Competent Person as defined in the December 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr Robinson has consented to the inclusion in the report of the matters based on his information in the form and context in which it appears.
COMPLIANCE STATEMENT
The information in this report that relates to Mineral Resource Estimates Barrambie Titanium Project are extracted from the ASX Announcement entitled “Updated Barrambie Mineral Resource Estimate” lodged 17 April 2018. The Company confirms that it is not aware of any new information or data that materially affects the information included on the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified form the original market announcement.
5
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
JORC Table 1, Section 1, Sampling Techniques, and Data
==> picture [487 x 625] intentionally omitted <==
----- Start of picture text -----
Criteria Commentary
Sampling techniques Drilling to collect material for metallurgical bulk samples from both the eastern
and central zones comprised 88 reverse circulation (RC) holes for 6,337 metres. Of
this drilling 255 samples from 15 holes were combined to make the 7 tonnes bulk
sample used in the beneficiation bench scale work.
All drillholes were sampled at 1 metre intervals. Drill chips from each metre drilled
were collected in a rig-mounted cyclone, then passed through a cone splitter to
create:
1. a sub-sample of ~3 to 4kg in weight and,
2. a “reject sample” of remaining material which was typically between 20 and
30kg.
Drilling techniques Metallurgical drilling was conducted by reverse circulation (RC) technique using a
Schramm rig with booster and auxiliary. A face sampling hammer with a bit size if 5.25
inches (133mm) was used.
Drill sample recovery A qualitative logging code was used to record recovery for the recent RC drilling.
Overall, recovery of samples is considered to be good to very good.
Logging Geological logging of rock chips was carried out recording lithology, major
minerals, oxidation, colour, texture, mineralisation, moisture and recovery. A
Terraplus (model KT-10) hand-held magnetic susceptibility meter was used with a
reading taken for each metre drilled. The logging was carried out in sufficient
detail to meet the requirements of a Mineral Resource estimation and mining
studies.
Sub-sampling techniques All sub-samples were weighed on receipt and dried. Samples greater than 3kg were split.
and sample preparation All samples were then pulverised to 75um, from which an aliquot was taken for assay.
Quality of assay data and From the collection of samples through to the assessment of laboratory results best
laboratory tests practice QAQC protocols and standards were followed.
An array of Certified reference material (CRMs) suitable for Vanadium-Titanium-Iron
deposits were inserted by NMT or contract geologists at a rate greater than 1 per 50
samples basis.
Field duplicate samples were taken at the rig and submitted blind to the lab. All duplicate
results show very good correlation.
ALS conducted internal QAQC including the use of CRM’s and repeat and duplicate
samples. There have not been any non-compliance issues.
Verification of sampling and Geological and sampling data was recorded in the field directly onto computers in
assaying excel software. Each drillhole was reviewed and saved as individual .xls files prior
to being sent to an external database management contractor for merging with
project database. No twin holes were drilled. A round robin analysis with samples
of known grade sent to an alternate lab was conducted with results confirming
accuracy of the original assays.
Location of data points Planned drill collar locations were pegged in the field using handheld GPS by
Neometals staff. Drill collars from the January and February 2019 program
(MSC001 to MSC076) were surveyed used RTK Differential GPS by and
independent surveyor to within 1 cm accuracy. Drill collars from the August 2019
program (MSC077 to MSC088) only have handheld GPS location (5m accuracy). All
grid references refer to the GDA94 system. Barrambie is in Zone 50.
Data spacing and distribution Metallurgical holes were drilled in 5 “prospect” locations along the 11 km length
of the deposit. At these areas drill holes were spaced at 30m intervals in lines
across the strike, with drill lines nominally 100 metres apart. In some locations infill
lines at 50 metres were drilled.
----- End of picture text -----
6
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
==> picture [487 x 154] intentionally omitted <==
----- Start of picture text -----
Orientation of data in Holes were drilled across strike to achieve sampling with the best representation
relation to geological of the known mineralised zone.
structure
Sample security Assay samples were moved from site to Meekatharra by Neometals employees,
and then transported to the commercial laboratory in Perth using a transport
company. A consignment note system was used for the chain of custody.
The bulk sample material was collected on site with each individual metre held in
green plastic mining bags put into 44-gallon drums by Neometals employees. The
drums were then secured to pallets and transported using a transport contractor
to the commercial laboratory in Perth where the metallurgical test work was
carried out.
Audits or reviews No audits or reviews of sampling techniques and data have been conducted.
----- End of picture text -----
7
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
JORC Table 1, Section 2, Reporting of Exploration Results
==> picture [487 x 598] intentionally omitted <==
----- Start of picture text -----
Criteria Commentary
Mineral tenement and land The Barrambie Mineral Resource subject to this metallurgical testwork is from the
tenure status granted mining lease M57/173-I located between Sandstone and Meekatharra in
the Eastern Murchison Goldfields of Western Australia. The mining lease and all
mineral rights are held by Australian Titanium Pty Ltd, a 100% owned subsidiary of
Neometals Ltd. No known impediments exist to operate in the area.
Exploration done by other No relevant exploration has been completed by other parties to acknowledge or
parties appraise at this time.
Geology The ferrovanadium titanium (Ti-V-Fe) deposit occurs within the Archaean
Barrambie Greenstone Belt, which is a narrow, NNW-SSE trending greenstone belt
in the northern Yilgarn Craton. The linear greenstone belt is about 60 km long and
attains a maximum width of about 4 km. It is flanked by banded gneiss and
granitoids. The mineralisation is hosted within a large layered, mafic intrusive
complex (the Barrambie Igneous Complex), which has intruded into and is
conformable with the general trend of the enclosing Greenstone Belt. From
aeromagnetic data and regional geological mapping, it appears that this layered
sill complex extends over a distance of at least 25 km into tenements to the north
and south of M57/173. The layered sill varies in width from 500 m to 1700 m.
The sill is comprised of anorthositic magnetite-bearing gabbros that intrude a
sequence of metasediments, banded iron formation, metabasalts and
metamorphosed felsic volcanics of the Barrambie Greenstone Belt. The
metasediment unit forms the hanging-wall to the layered sill complex.
Exposure is poor due to deep weathering, masking by laterite, widespread cover
of transported regolith (wind-blown and water-borne sandy and silty clay), laterite
scree and colluvium. Where remnant laterite profiles occur on low hills, there is
ferricrete capping over a strongly weathered material that extends down to depths
of 70 m.
Ti-V-Fe mineralisation occurs as bands of cumulate aggregations of vanadiferous
magnetite (martite)-ilmenite (leucoxene) in massive and disseminated layers and
lenses.
Within the tenement the layered deposit has been divided into five sections established
at major fault offsets. Cross faults have displacements that range from a few metres to
400 m. The water table occurs at about 35 m below the surface (when measured where
the laterite profile has been stripped).
Drill hole Information Tables with drill hole ID’s, locations, dip and azimuths are located in Appendix 1.
Data aggregation methods For the metallurgical drilling within the Barrambie high grade deposit, all assay
results from the sub-samples of the drilling were assessed. From this the bulk
sample was made by compositing the reject samples from allocated drillhole
metres for the hole assayed have been aggregated.
Relationship between The Barrambie mineralised system is at a near vertical orientation, with a
mineralisation widths and moderate north easterly dip. To best intersect the mineralisation drilling was at -
intercept lengths 60 to -75 [o] to the south west (typically Azimuth of 240). Due to the steep
orientation of the deposit there will still be some exaggeration of mineralised
intercept widths.
----- End of picture text -----
8
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
==> picture [487 x 91] intentionally omitted <==
----- Start of picture text -----
Diagrams Diagrams with plans and a cross section of the location of the RC Holes drilled for
the metallurgical testing is, if notin the body of the report, included in Appendix 2. The
drillholes from which samples used in the bulk sample have been identified in Appendix 1
Balanced reporting All results have been reported.
Other substantive See ASX announcements 17 [th] April 2018, 8 [th] November 2017, 11 September 2017
exploration data and 6 December 2013 for further information regarding the Barrambie deposit.
Further work Further metallurgical work is planned and discussed in this announcement.
----- End of picture text -----
APPENDIX 1.
Drill holes used in the Barrambie Metallurgical testwork bulk sample
==> picture [421 x 234] intentionally omitted <==
----- Start of picture text -----
HOLE_ID Area ORIG_EAST ORIG_NORTH ORIG_RL MAX_DEPTH Azimuth Dip
MSC012 Area 2 709,453.5 6,964,608.6 541.7 83 246 -76.2
MSC018 Area 2 709,420.2 6,964,674.3 539.3 101 246 -85.1
MSC023 Area 3 708,436.0 6,966,879.0 523.4 113 243 -61.4
MSC027 Area 3 708,394.9 6,966,913.0 522.6 83 242 -61.1
MSC028 Area 3 708,407.7 6,966,920.1 522.7 125 244 -75.7
MSC031 Area 3 708,355.4 6,966,947.9 522.1 95 242 -60.4
MSC037 Area 3 708,356.1 6,967,007.1 522.0 89 242 -61.2
MSC044 Area 4 706,496.1 6,969,255.3 518.1 137 241 -75.2
MSC049 Area 4 706,418.0 6,969,328.9 515.1 59 243 -66.0
MSC057 Area 5 705,803.6 6,970,100.0 516.5 59 53 -60.7
MSC061 Area 1 710,045.9 6,962,615.0 524.3 71 244 -71.5
MSC065 Area 1 710,033.5 6,962,668.1 524.4 125 243 -76.4
MSC073 Area 1 710,035.2 6,962,869.6 526.7 96 249 -75.6
MSC074 Area 3 708,412.2 6,966,893.7 523.0 102 243 -61.5
MSC075 Area 3 708,423.7 6,966,899.8 523.1 144 245 -74.0
----- End of picture text -----
All coordinates are in MGA94_50
9
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
APPENDIX 2.
Plans and sections of the Barrambie Project showing the source locations of the bulk sample material
==> picture [413 x 388] intentionally omitted <==
==> picture [413 x 195] intentionally omitted <==
Figure 4 - Plan of the Barrambie Mineral Resources and Mining Lease showing the 5 areas where drilling was conducted to collect material for the metallurgical bulk sample
10
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
==> picture [432 x 406] intentionally omitted <==
==> picture [432 x 203] intentionally omitted <==
Figure 5 - Plan of Area 3 showing historic (prefix BRD) and recent (prefix MSC) drill collar and drill traces
11
neometals.com.au
==> picture [561 x 61] intentionally omitted <==
----- Start of picture text -----
22 December 2020 – BARRAMBIE FLOWSHEET BREAKTHROUGH
----- End of picture text -----
==> picture [492 x 349] intentionally omitted <==
Figure 6 - Cross section with 2 of the RC holes and TiO2 grades in Area 3 from which the collected material was used in the metallurgical bulk sample.
12 neometals.com.au