NEOMETALS LTD Investor Presentation 2015

May 25, 2015

65430_rns_2015-05-25_f877bc01-eda4-4687-946b-3b813ed4255f.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [720 x 114] intentionally omitted <==

==> picture [378 x 142] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

==> picture [106 x 26] intentionally omitted <==

1

2

Summary information: This document has been prepared by Neometals Ltd (“Neometals” or “the Company”) to provide summary information about the Company and its associated entities and their activities current as at the date of this document. The information contained in this document is of general background and does not purport to be complete. It should be read in conjunction with Neometals’ other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange, which are available at www.asx.com.au.

Forward-looking information: This document includes certain statements, opinions, projections, forecasts and other forward-looking information which, while considered reasonable by Neometals, are inherently subject to significant uncertainties and contingencies. Many known and unknown factors could cause actual events or results to differ materially from estimated or anticipated events or results included in this document. Recipients of this document are cautioned that forward-looking statements are not guarantees of future performance – they must make their own independent investigations, consideration and evaluation of the opportunity to invest in the Company. By accepting this document, recipients agree that if they proceed further with their investigations, consideration or evaluation of the opportunity to invest in the Company, they will make and rely solely upon their own investigations and enquiries and will not in any way rely upon this document.

Any statements, opinions, projections, forecasts and other forward-looking information contained in this document do not constitute any commitments, representations or warranties by Neometals and its associated entities, directors, agents and employees, including any undertaking to update any such information. Except as required by law, and only to the extent so required, directors, agents and employees of Neometals shall in no way be liable to any person or body for any loss, claim, demand, damages, costs or expenses of whatsoever nature arising in any way out of, or in connection with, the information contained in this document.

Financial data: All figures in this document are in Australian dollars (AUD) unless stated otherwise.

Not financial product advice: This document is for information purposes only and is not financial product or investment advice, nor a recommendation to acquire securities in Neometals. It has been prepared without taking into account the objectives, financial situation or needs of individuals. Before making any investment decision, prospective investors should consider the appropriateness of the information having regard to their own objectives, financial situation and needs and seek legal and taxation advice appropriate to their jurisdiction.

Investment risk: An investment in securities in Neometals is subject to investment and other known and unknown risks, some of which are beyond the control of Neometals. The Company does not guarantee any particular rate of return or the performance of Neometals. Investors should have regard to the risk factors outlined in this document.

Competent Persons Statement:

The information in this document that relates to “Barrambie Scoping Study Results”, “Mt Marion test work results”, “Barrambie Mineral Resource Estimates”, “Mt Marion Mineral Resource Estimates” and Mt Marion – Successful Semi-Pilot Plant Results is extracted from ASX Releases set out below. The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX Releases set out below, and in the case of estimates of mineral resources, that all material assumptions and technical parameters underpinning the estimates in those ASX Releases continue to apply and have not materially changed.

==> picture [315 x 58] intentionally omitted <==

The Company confirms that all the material assumptions underpinning the production target and the forecast financial information derived from the production targets in the Barrambie Scoping Study and Mt Marion Pre-feasiblity Study continue to apply and have not materially changed.

==> picture [112 x 29] intentionally omitted <==

==> picture [47 x 26] intentionally omitted <==

----- Start of picture text -----

+ =
----- End of picture text -----

==> picture [30 x 26] intentionally omitted <==

2

3

Develop low-cost operations with strong partners

Quality captive resources

Attractive commodities with strong, long-term fundamentals

Focus on low-cost processing technologies for long-term profitability

Leverage strategic partnerships to better manage financial and operating risk

Strong governance

Lean board and management team

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

3

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Corporate Details
----- End of picture text -----

==> picture [649 x 287] intentionally omitted <==

----- Start of picture text -----

ASX Code: NMT OTC: NMTUYPrice (AU cents) ASX Code: NMT OTC: RDRUY
12
Last close ( 12 Dec 2014 ) $ 0.036 Last close (19 May 2015) $0.09
10
8
Shares on issue 6 M 499.4 Shares on issue 502 M
4
2
Cas 0 h (30 Sept 2014) $m 11.7 Cash (31 Mar 2015) $9 M
Incl Restricted Term Deposit $m 6.2 Incl Restricted Term Deposit $6.1 M
Market capitalisation $m 19 Market capitalisation $45 M
----- End of picture text -----

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

4

==> picture [720 x 114] intentionally omitted <==

==> picture [103 x 105] intentionally omitted <==

==> picture [20 x 17] intentionally omitted <==

----- Start of picture text -----

+
----- End of picture text -----

==> picture [104 x 105] intentionally omitted <==

=

==> picture [104 x 105] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

5

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Lithium Fundamentals
----- End of picture text -----

==> picture [581 x 335] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

6

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Lithium Fundamentals
----- End of picture text -----

==> picture [500 x 338] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

7

==> picture [721 x 39] intentionally omitted <==

==> picture [721 x 38] intentionally omitted <==

----- Start of picture text -----

Lithium Fundamentals
----- End of picture text -----

==> picture [721 x 39] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 20] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 20] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 20] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 20] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 20] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 19] intentionally omitted <==

==> picture [662 x 20] intentionally omitted <==

==> picture [662 x 18] intentionally omitted <==

==> picture [359 x 12] intentionally omitted <==

----- Start of picture text -----

50% Hard rock 50% Brine
----- End of picture text -----

==> picture [113 x 30] intentionally omitted <==

+ =

==> picture [30 x 27] intentionally omitted <==

8

==> picture [77 x 78] intentionally omitted <==

Mt Marion Lithium Project 70% Neometals

30% and Operator Mineral Resources Ltd (ASX:MIN)

==> picture [326 x 295] intentionally omitted <==

==> picture [644 x 9] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

==> picture [30 x 26] intentionally omitted <==

+ =

9

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

High Quality Resource
----- End of picture text -----

3[rd]

Highest ranked undeveloped hard-rock deposit globally

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

10

Sources: SignumBOX, Issue 8, February 2014

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Project Strategy
----- End of picture text -----

==> picture [598 x 285] intentionally omitted <==

----- Start of picture text -----

Produce Lithium Value add into
Integrated Lithium
Mineral Lithium Battery Producer
Concentrates Materials (LiOH)
with partner MIN with Partners
=
+
FULLY FUNDED
FULLY
PERMITTED
----- End of picture text -----

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

11

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

High Quality Partner
----- End of picture text -----

==> picture [173 x 93] intentionally omitted <==

  • Australia’s largest contract minerals processor

  • • Will provide complete mine-to-port solution

  • • Construct and operate plant on Build-OwnOperate basis

  • • No upfront capital cost to NMT

==> picture [112 x 29] intentionally omitted <==

==> picture [47 x 26] intentionally omitted <==

----- Start of picture text -----

+ =
----- End of picture text -----

==> picture [30 x 26] intentionally omitted <==

12

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Flythrough
----- End of picture text -----

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

13

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Secured additional Lithium Rights (blue) and
Infrastructure purchase (green) from MLX
----- End of picture text -----

==> picture [564 x 351] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

14

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Commercialisation Plan
----- End of picture text -----

==> picture [614 x 220] intentionally omitted <==

----- Start of picture text -----

Final
Final
Obtain Investment
Downstream Investment
Take-or-Pay Decision –
Partner Decision –
Offtake Concentrate
Agreement LiOH
2015 Operation
Operation
----- End of picture text -----

PROGRESS

  • Negotiations progressing with offtake partners

  • Completion of offtake deal will allow for FID and production within 12 months

==> picture [112 x 29] intentionally omitted <==

==> picture [47 x 26] intentionally omitted <==

----- Start of picture text -----

+ =
----- End of picture text -----

==> picture [30 x 26] intentionally omitted <==

15

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Own low-cost Patented Technology
----- End of picture text -----

==> picture [622 x 358] intentionally omitted <==

----- Start of picture text -----

Competitors
Input Price
US$5,000/t
x 1 t
Final Final
Lithium Lithium
Product Chlorination Product
Carbonate Carbonate Caustic-
LiOH Spodumene Purification LiOH
Technical Battery isation
Battery Electrolysis Battery
Grade Grade
Grade Grade
Cost Cost
US$5,700/t US$3,900/t
----- End of picture text -----

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

16

Sources: SQM (Brine Flowsheet) and Neometals internal analysis including 2012 Pre-feasibility Study. All prices are FOB Basis.

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Own low-cost Patented Technology
----- End of picture text -----

==> picture [568 x 330] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

17

==> picture [77 x 78] intentionally omitted <==

Barrambie Titanium Project 100% Neometals

==> picture [325 x 295] intentionally omitted <==

==> picture [644 x 9] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

==> picture [30 x 26] intentionally omitted <==

+ =

18

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Titanium Fundamentals
----- End of picture text -----

==> picture [542 x 339] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

19

Sources: Company Reports

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

High Quality Resource
----- End of picture text -----

==> picture [607 x 318] intentionally omitted <==

----- Start of picture text -----

1
2
3
+150Mt 47Mt @
@34% TiO2 22% TiO2 18%
Lac Tio Barrambie Tellnes
----- End of picture text -----*

*** Mineral Resource Estimate (JORC2012) on page 29**

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

Sources: Company Reports

20

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Project Strategy
----- End of picture text -----

Mine, Concentrate Produce Titanium Integrated Titanium and Truck Pigment with Producer Titanium Industry Partner Concentrate = +

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

21

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Licenced low-cost Technology
----- End of picture text -----

==> picture [645 x 408] intentionally omitted <==

----- Start of picture text -----

Competitors
Input Price
US$1,000/t
X1.2t
Final Final
Chlorination Product ROM Chlorination Product
Rutile
& Purification Fine Ore & Purification Fine
Pigment Pigment
Cost Cost
US$2,100 - US$1,214/t
2,300/t
 Step 1: Proof of concept
 High purity 99.9% TiO2
 Mini-pilot scale testing in Canada
+ =
----- End of picture text -----

22

Sources: SQM (Brine Flowsheet) and Neometals internal analysis including 2012 Pre-feasibility Study. All prices are FOB Basis.

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Licenced low-cost Technology
----- End of picture text -----

==> picture [472 x 343] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

23

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Commercialisation Plan
----- End of picture text -----

==> picture [614 x 219] intentionally omitted <==

----- Start of picture text -----

Pilot Scale
Complete Beneficiation Definitive Final
Pre-feasibility & Hydromet Feasibility Investment
Study Test work Study Decision
1H 2015 2015/16 2016/17
----- End of picture text -----

==> picture [276 x 30] intentionally omitted <==

----- Start of picture text -----

Attract JV Partner
----- End of picture text -----

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

24

25

Investment Proposition

==> picture [644 x 9] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

25

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Lithium : Near term mining opportunity
----- End of picture text -----

Fully funded, fully permitted

==> picture [657 x 352] intentionally omitted <==

----- Start of picture text -----


03
02
01
Great resource Firm offtake Consider
+
=
Strong partner agreements Final Investment
Strong market Decision
+ =
----- End of picture text -----

26

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Titanium : A growth story for 2015
----- End of picture text -----

==> picture [658 x 300] intentionally omitted <==

----- Start of picture text -----


03
02
01
Obtain
Demonstrate + Demonstrate Strong
+
Technical Economic Partners
Feasibility Viability to Commercialise
----- End of picture text -----

==> picture [112 x 29] intentionally omitted <==

==> picture [47 x 26] intentionally omitted <==

----- Start of picture text -----

+ =
----- End of picture text -----

==> picture [30 x 26] intentionally omitted <==

27

Thank you www.neometals.com.au

==> picture [644 x 9] intentionally omitted <==

==> picture [112 x 29] intentionally omitted <==

==> picture [30 x 26] intentionally omitted <==

+ =

28

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Mineral Resource Estimates
for the Mt Marion Lithium deposit, as at July 2011, for a block cut-off grade of 0.3% Li2O
----- End of picture text -----

Project Area Material type Measured Measured Measured Indicated Indicated Indicated Inferred Inferred Inferred Total Total Total
Tonnes Li~~2~~O% Fe~~2~~O~~3~~% Tonnes Li~~2~~O% Fe~~2~~O~~3~~% Tonnes Li~~2~~O% Fe~~2~~O~~3~~% Tonnes Li~~2~~O% Fe~~2~~O~~3~~%
Area1 Oxide 60,000 1.19 0.67 144,000 1.26 0.82 179,000 1.2 1.0 383,000 1.2 0.9
Transitional 658,000 1.44 0.79 727,000 1.41 1.14 353,000 1.3 1.4 1,739,000 1.4 1.1
Fresh 666,000 1.54 0.98 1,051,000 1.41 1.31 1,379,000 1.3 1.4 3,096,000 1.4 1.3
Subtotal 1,384,000 1.48 0.88 1,923,000 1.40 1.21 1,911,000 1.3 1.4 5,218,000 1.4 1.2
Area2 Oxide - 0.00 0.00 - 1.64 1.19 18,000 1.3 1.1 18,000 1.3 1.1
Transitional - 0.00 0.00 19,000 1.42 1.50 215,000 1.3 1.4 234,000 1.3 1.4
Fresh 64,000 1.31 1.41 385,000 1.35 1.59 833,000 1.3 1.5 1,281,000 1.3 1.5
Subtotal 64,000 1.31 1.41 404,000 1.35 1.59 1,065,000 1.3 1.5 1,532,000 1.3 1.5
Area2W Oxide - 0.00 0.00 6,000 0.90 0.92 33,000 0.9 1.0 39,000 0.9 1.0
Transitional 2,000 1.23 1.19 56,000 1.09 1.11 210,000 1.1 1.1 268,000 1.1 1.1
Fresh 433,000 1.38 0.97 1,554,000 1.39 1.12 2,669,000 1.3 1.1 4,655,000 1.3 1.1
Subtotal 435,000 1.38 0.97 1,616,000 1.38 1.12 2,911,000 1.3 1.1 4,963,000 1.3 1.1
Area4 Oxide - 0.00 0.00 - 0.00 0.00 4,000 0.8 1.6 4,000 0.8 1.6
Transitional 17,000 1.31 1.43 182,000 1.22 1.35 251,000 1.1 1.5 450,000 1.1 1.4
Fresh 28,000 1.47 1.26 223,000 1.32 1.34 397,000 1.3 1.3 648,000 1.3 1.3
Subtotal 45,000 1.41 1.33 405,000 1.28 1.34 652,000 1.2 1.4 1,102,000 1.2 1.3
Area5 Oxide - 0.00 0.00 - 0.00 0.00 22,000 1.1 2.2 22,000 1.1 2.2
Transitional - 0.00 0.00 2,000 1.41 1.82 102,000 1.3 2.4 104,000 1.3 2.4
Fresh - 0.00 0.00 9,000 1.44 2.24 216,000 1.3 2.2 226,000 1.3 2.2
Subtotal - 0.00 0.00 11,000 1.43 2.17 340,000 1.3 2.3 351,000 1.3 2.3
Area6 Oxide - 0.00 0.00 2,000 1.57 1.36 55,000 1.6 1.7 58,000 1.6 1.7
Transitional 16,000 1.57 1.12 208,000 1.53 1.24 663,000 1.4 1.4 887,000 1.4 1.3
Fresh 71,000 1.59 0.98 200,000 1.54 1.15 485,000 1.5 1.2 756,000 1.5 1.1
Subtotal 87,000 1.59 1.01 411,000 1.54 1.20 1,203,000 1.5 1.3 1,701,000 1.5 1.3
Project Total 2,015,000
1.45
0.93 4,769,000
1.39
1.22 8,082,000 1.3 1.3 14,866,000
1.30
1.2

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

29

NOTE : Figures may not sum due to rounding. Significant figures do not imply an added level of precision.

==> picture [720 x 114] intentionally omitted <==

----- Start of picture text -----

Mineral Resource Estimates
for the Barrambie Ti-V deposit, as at September 2013, for a block cut-off grade of 15% TiO2
----- End of picture text -----


Classification
Zone Oxidation MTonnes Density
(t/m3)
TiO2
(%)
V2O5
(%)
Fe2O3
(%)
Al2O3
(%)
SiO2
(%)
Indicated Eastern Oxide 18.7 2.82 23.29 0.59 42.93 10.70 16.36
Transition 8.7 3.52 23.11 0.61 50.80 7.34 12.99
Fresh 2.4 3.85 21.77 0.56 52.90 5.99 12.84
Sub-total 29.8 3.10 23.11 0.60 46.02 9.35 15.10
Central Oxide 3.5 2.95 16.84 0.92 49.82 11.06 14.91
Transition 1.3 3.50 17.39 0.89 54.76 8.49 12.15
Fresh 0.1 4.04 15.59 0.88 59.93 7.22 10.96
Sub-total 4.9 3.12 16.95 0.91 51.40 10.28 14.08
Total 34.7 3.11 22.25 0.64 46.77 9.48 14.95
Inferred Eastern Oxide 2.6 2.71 20.88 0.48 40.00 12.20 19.42
Transition 3.3 3.29 23.04 0.59 47.51 8.62 14.45
Fresh 5.5 3.71 22.82 0.57 47.50 8.39 14.57
Sub-total 11.4 3.36 22.44 0.55 45.78 9.33 15.65
Central Oxide 0.1 3.07 16.64 0.98 53.63 9.96 13.33
Transition 0.4 3.47 18.36 0.86 54.15 8.79 12.43
Fresh 0.7 3.86 17.30 0.91 53.48 9.44 13.17
Sub-total 1.2 3.64 17.55 0.90 53.71 9.30 12.96
Total 12.5 3.38 21.99 0.58 46.51 9.32 15.40
Grand Total 47.2 3.18 22.18 0.63 46.70 9.44 15.07

==> picture [112 x 29] intentionally omitted <==

+ =

==> picture [30 x 26] intentionally omitted <==

30

NOTE : Figures may not sum due to rounding. Significant figures do not imply an added level of precision.