26 March 2020
----- End of picture text -----

MT EDWARDS NICKEL – DRILL RESULTS FROM CASSINI-WANNAWAY TREND

HIGHLIGHTS

  • Assay results from air core drilling across prospects south of the Widgiemooltha Dome included 7 metres @ 0.63% nickel including 1 metre @ 1.09%

  • Mineralised intercept less than 250 meters along strike from Mincor Resources’ Cassini North prospect

  • Numerous anomalous nickel results within an ultramafic komatiite host rock at Double Eagle prospect, including 13 metres @ 0.46% nickel and 20 metres @ 0.36% nickel

  • Exploration to continue at Double Eagle prospect located south of Mincor Resources’ historic Wannaway mine

Project developer Neometals Ltd ( ASX: NMT ) ( “Neometals” or “the Company” ) is pleased to announce assay results from a recent air core ( “AC” ) drilling program at its Mt Edwards Project. Drilling and sampling programs were carried out during November and December 2019 across five mining tenements located south of the Widgiemooltha Dome. The drill program comprised 93 drill holes for 3,262 metres (refer to Table 1) and was designed to test numerous nickel targets to confirm bedrock geology and identify the basal contact of the komatiite flows with the underlying basalt.

Table 1 - The number of holes and meterage for each prospect and mining tenement

Prospect Mining Tenement(s) AC holes Meterage
E15/1553 E15/1553 13 705
Double Eagle,Baldrick M15/45,M15/46,M15/77 61 1,728
Percy M15/79 19 829

In the past 12 months Neometals has undertaken a targeted exploration campaign at Mt Edwards, methodically validating and improving the drill-hole database, and in turn re-interpreting the geology and the Mineral Resources. Exploration success is seeing the definition of high-grade nickel sulphide amongst the existing Mineral Resources. This drilling follows an encouraging eight-hole reverse circulation program at the recently acquired Exploration Licence E15/1553 in November 2019 (for full details refer to ASX announcement entitled “High-grade massive nickel sulphide at Mt Edwards” released on 31 January 2020) .

The first of two specific areas drilled was at exploration licence ‘E15/1553’, located directly along strike from the Mincor Resources NL’s ( “Mincor” ) Cassini North prospect, where 13 AC holes targeted stratigraphic locations and some historical geophysics conductors. Results included 1 metre @ 1.09% nickel from 49 metres downhole in ultramafic rock near the southern boundary of the tenement.

The second area covered four mining leases on which the Double Eagle, Baldrick and Percy prospects are located. Highly anomalous nickel grades (>0.3% Ni) at the Percy and Double Eagle prospects have been identified in numerous komatiite flows. Both Percy and Double Eagle prospects occur ~10 kilometres south and along strike from Mincor’s historic Wannaway Nickel Mine, which has similar interpreted geology.

The results support the likelihood of significant nickel sulphide mineralisation in the area. The grade encountered along strike from Mincor’s Cassini North endorses the results from the RC program announced in January 2020. The proximity of third party nickel sulphide drilling success is also encouraging with ‘E15/1553’ being situated approximately 250 meters directly along strike from Mincor’s Cassini North prospect, and near Mincor’s Cassini Mineral Resource (1.254Mt @ 4.0% nickel).

Neometals considers that the results warrant follow-up drilling and EM geophysical surveys to further investigate these targets. Additional exploration is planned at the earliest opportunity subject to the constraints on movements of equipment and people imposed by Government’s coronavirus pandemic response.

Locked Bag 8 West Perth WA 6872

ACN 099 116 361 Level 1, 1292 Hay Street West Perth WA 6005

T: +61 8 9322 1182 F: +61 8 9321 0556

[email protected]

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

Background

The Mt Edwards Nickel Project is centred around the small township of Widgiemooltha, located 90 kilometres south of Kalgoorlie in Western Australia. The project consists of 45 granted and pending mining tenements located over 50 kilometres of strike length across and north of the Widgiemooltha Dome (refer to Figure 1). The Widgiemooltha Dome is a world class nickel sulphide camp with several historical nickel mines.

==> picture [363 x 512] intentionally omitted <==

Figure 1Mining tenements of the Mt Edwards Project with the location of Percy, Baldrick and Double Eagle highlighted in tenements M15/45, M15/46, M15/77, and M15/79 (red diagonal stripes). Also highlighted is the recently acquired tenement E15/1553 (blue diagonal stripes) north of Mincor’s Cassini Mineral Resource (for full details refer to ASX announcement entitled “Additional Nickel Mineral Resource at Mt Edwards” released on 13 November 2019)

2

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

In November and December 2019 an AC drill program was conducted across the Double Eagle, Baldrick and Percy nickel prospects in the southwestern corner of the project, and at a prospective area on the recently acquired Exploration Licence E15/1553. Exploration took place on five mining tenements, M15/45, M15/46, M15/77, M15/79 and E15/1553 located ~20km south of the community of Widgiemooltha.

Significant Assay Results and Geological Interpretation – E15/1553

Results of the AC program included a significant intercept of 1 metre interval at 1.09% Nickel, from 49 metres downhole in hole MEAC108, as shown in Table 2 below.

Table 2 - Significant intercepts encountered during the air core drilling program

Hole ID Interval
(metres)
Ni % Cu
(ppm)
Co
(ppm)
Depth From
(metres)
Depth To
(metres)
Tenement Total depth
(metres)
MEAC108 1 1.09 276 278 49 50 E15/1553 66

Note: Significant intercepts are contiguous samples with assay results greater than 0.3% nickel, with an average grade greater than 1% nickel.

Drilling at E15/1553 focused on identifying the ultramafic – mafic boundary north of, and along strike from, Mincor’s Cassini North prospect. Two previous RC drill holes completed in the area in November 2019 had shown encouraging mineralisation, and a flat lying ultramafic – mafic contact.

AC drill hole MEAC108 intercepted significant nickel mineralisation with 7 metres @ 0.63% nickel from 47 metres downhole depth within an ultramafic rock. This included 1 metre @ 1.09% nickel located at 49 metres downhole depth. There was also a mineralised interval at the end of drill hole MEAC109 at 92 meters downhole depth. This further supports prior evidence of nickel sulphide mineralisation in the area and strengthens the interpretation of a flat lying contact as previously identified by RC holes MERC100 and MERC101 (Figures 2 and 3).

==> picture [468 x 332] intentionally omitted <==

Figure 2Cross-section looking north-west showing air core holes MEAC107-109 and MEAC025-026 with MERC100-101 from a previous RC drilling program. Anomalous nickel (>0.3% Ni) and significant intercepts are highlighted on the drill strings including 7 metres @ 0.63% nickel in MEAC108 and 1 metre @ 0.3% nickel in MEAC109

3

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

==> picture [405 x 572] intentionally omitted <==

Figure 3 - Plan view of the interpreted geology at the southern end of the acquired Exploration Licence E15/1553 along strike from the Mincor owned Cassini North prospect and Cassini Mineral Resource. Recent AC and RC drill collars and traces completed by Neometals on E15/1553 are shown in black, with an interpretation of Mincor’s Cassini drilling shown in grey. The latest drilling results for Cassini North from Mincor (refer to Mincor ASX announcement entitled “Exploration Update” released on 18 March 2020) include results of drill hole MDD342 which is less than 250 metres along strike from the Neometals Exploration Licence boundary. The geology interpretation shown here is from Kambalda Nickel Operations from the 1980’s. Due to the alluvial cover geology is projected from depth (~80 metres) and not indicative of surface material. Neometals’ future drilling and geophysics will validate the interpretation and re-define the ultramafic-basalt contacts on E15/1553.

4

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

Assay Results and Geological Interpretation – Percy and Double Eagle

The drilling at the Double Eagle, Baldrick and Percy nickel prospects was designed to target conductive units situated in interpreted ultramafic lithologies, supported by litho-geochemical signatures from recent and historic soil sampling, and historic drill hole assays. The mineralised intercepts at Double Eagle and Percy occur in komatiite flows that trend south along strike from Mincor’s historic Wannaway Nickel Mine, which produced 30,683 nickel tonnes from 1984 until 2008.

==> picture [391 x 554] intentionally omitted <==

Figure 4 - Image showing the collar locations of the recent AC drill holes coloured by maximum nickel grade on Mt Edwards’ southern package of tenements. Interpreted location of prospective ultramafic rock are shown in purple, along with nickel prospects Percy, Baldrick and Double Eagle and Mincor’s Cassini and Wannaway Mineral Resources. Striped aqua polygons show areas of planned Moving Loop Electromagnetic surveys

5

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

Drill holes MEAC041-044 and MEAC046 at Double Eagle express highly anomalous amounts of nickel (>0.3%) in a thick sequence of ultramafic rock with interpreted disseminated-style nickel sulphides.

Drill holes MEAC070-071 at Double Eagle show nickel anomalism near the ultramafic-mafic contact within the ultramafic unit. This matches up with anomalism shown in historic drill holes ~175 metres to the north and ~260 metres to the south, along the ultramafic-mafic contact.

Across all the areas drilled the interpretation of the ultramafic – mafic boundaries have now been improved using the data collected which will aid future exploration.

==> picture [371 x 525] intentionally omitted <==

Figure 5 - Plan of the interpreted geology at the Double Eagle prospect with recent AC drill collars and traces. There is some anomalism on the boundaries of three Mining Leases M15/45, 47 & M15/77. Drill holes MEAC041-044 and MEAC046, and MEAC070-071 at Double Eagle express anomalous amounts of nickel (>0.3%). There is also low-level anomalism in historic holes MER100 to MER102 along strike to the north

6

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

Table 3 - Mineralised intercepts encountered during the November-December 2019 AC drill program at Mt Edwards

Hole ID Prospect From
(metres)
To
(metres)
Interval
(metres)
Ni
%
Cu
**ppm **
As
**ppm **
Cr
**ppm **
Fe2O3
%
MgO
%
S
%
MEAC041 Double
Eagle
16 19 3 0.38 81 BDL 2944 17.54 12.03 0.03
MEAC042 29 39 10 0.31 167 BDL 5350 22.63 5.26 0.08
MEAC043 40 42 2 0.40 189 BDL 3974 23.38 15.79 0.07
MEAC044 16 17 1 0.31 252 BDL 4181 23.09 6.94 0.04
MEAC044 20 23 3 0.34 115 BDL 5000 19.69 14.91 0.04
MEAC046 5 7 2 0.49 14 BDL 1024 11.56 11.24 0.03
MEAC046 16 24 8 0.36 46 10 2991 16.12 11.84 0.04
MEAC046 26 27 1 0.31 21 BDL 1970 12.57 15.42 0.05
MEAC063 49 53 4 0.52 124 BDL 4617 18.27 10.60 0.72
MEAC070 6 19 13 0.46 83 BDL 3572 17.95 11.96 0.03
MEAC070 21 23 2 0.31 51 31 3098 16.15 14.00 0.03
MEAC071 4 24 20 0.36 62 BDL 3754 15.54 14.53 0.03
MEAC095 Percy 24 28 4 0.33 44 BDL 2743 13.99 20.34 0.02
MEAC099 17 28 11 0.39 65 44 3117 15.12 16.85 0.01
MEAC099 31 32 1 0.32 94 100 2178 11.51 22.84 0.02
MEAC101 20 25 5 0.33 103 BDL 4557 22.97 7.60 0.05
MEAC101 27 30 3 0.32 66 BDL 3478 15.27 21.63 0.02
MEAC108 E15/1553 47 54 7 0.63 303 84 2704 13.44 15.27 0.54
incl. 49 50 1 1.09 276 108 4156 10.51 10.36 0.94
MEAC109 92 93 1 0.30 39 101 1777 9.40 29.27 0.87

Note: Mineralised intercepts are contiguous samples with assay results greater than 0.3% nickel, with an average grade greater than 0.3% nickel. Several 1 metre internal dilution (less than 0.3% nickel) may be included in the intercept. BDL: Below detection limit (<10 ppm for As)

Table 4 - Collar and survey information for the key drill holes in the November-December 2019 AC drill program

Hole ID Depth Easting Northing Dip Azimuth Collar RL Tenement Prospect
MEAC041 31 364432 6495582 -59 67 301 M15/77 Double Eagle
MEAC042 52 364351 6495541 -59 65 301 M15/77 Double Eagle
MEAC043 47 364200 6495459 -59 64 307 M15/46 Double Eagle
MEAC044 36 364115 6495406 -59 63 305 M15/46 Double Eagle
MEAC046 27 363943 6495306 -60 60 310 M15/46 Double Eagle
MEAC063 59 363057 6495804 -60 65 321 M15/46 Double Eagle
MEAC070 27 362610 6495591 -60 65 318 M15/46 Double Eagle
MEAC071 42 362538 6495559 -59 67 317 M15/46 Double Eagle
MEAC095 32 367095 6489033 -60 245 310 M15/79 Percy
MEAC099 49 367110 6488429 -59 246 319 M15/79 Percy
MEAC101 60 367264 6488482 -59 246 318 M15/79 Percy
MEAC108 66 368974 6492621 -60 47 297 E15/1553 E15/1553
MEAC109 94 369072 6492732 -60 36 294 E15/1553 E15/1553

Note: MGA94 51S coordinate system. Collar location, dip and azimuth measurements at surface were recorded by the rig geologist using handheld GPS and a sighter compass. Some downhole surveys were recorded by a Reflex gyro

Future Exploration and Mineral Resource expansion work at Mt Edwards Nickel Project

A multi-phase follow-up exploration program is planned to specifically target the expected mineralised extension along strike from Mincor’s Cassini North prospect. This will involve drilling programs using AC, RC and potentially diamond core methods. Moving Loop Electromagnetic ( “MLEM” ) and Down Hole Electromagnetic ( “DHEM” ) surveying will also be undertaken.

7

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

MLEM programs will be completed on selected areas over the Percy, Baldrick and Double Eagle prospects in the southern Widgiemooltha dome. MLEM surveys are also planned over the Lake Eaton prospect. These surveys will help refine the locations of EM conductors that are known to host nickel sulphide deposits. Further drilling of these refined targets are expected to follow the survey results. Due to the success of previous Neometals DHEM surveys, another DHEM program will be performed using historic holes at the Zabel deposit at the northern area of the Mt Edwards project to identify further targets at that location.

A Mineral Resource expansion drilling program is planned for the Gillett deposit at the Widgie South Trend following on from positive results during September 2019 ( for full details refer to ASX announcement entitled “Mt Edwards Nickel - Drill Results From Widgie South Trend” released on 11 December 2019 ) extending the known strike length at Gillett by at least 220 metres. An updated Mineral Resource estimate is planned for Gillett, 132N and Armstrong deposits in coming months to complement ongoing mining studies. Mine planning and process engineering models apply a consensus view of predicted nickel market pricing to meet the expected Electric Vehicle demand.

Note: Future exploration is being planned per the above however specifics on timing will be subject to the constraints on movements of equipment and people imposed by the coronavirus pandemic.

Competent Person Attribution

The information in this report that relates to Exploration Results is based on information compiled by Gregory Hudson, who is a member of the Australian Institute of Geoscientists. Gregory Hudson is a full time employee of Neometals Ltd and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration and the activity being undertaken, to qualify as a Competent Person as defined in the December 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Gregory Hudson has consented to the inclusion of the matters in this report based on his information in the form and context in which it appears.

Compliance Statement

The information relating to previous RC drilling in this announcement is extracted from the ASX Announcements listed below, which are also available on the Company’s website at www.neometals.com.au:

31/01/2020 High-grade massive nickel sulphide at Mt Edwards
11/12/2019 Mt Edwards Nickel – Drill Results From Widgie South Trend
13/11/2019 Additional Nickel Mineral Resource At Mt Edwards

The Company confirms that it is not aware of any new information and data that materially affects the information included in the original market announcements and, in the case of the estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.

ENDS

Authorised on behalf of Neometals by Christopher Reed, Managing Director

For further information, please contact:

Chris Reed Managing Director Neometals Ltd T: +61 8 9322 1182 E: [email protected]

Jeremy Mcmanus General Manager - Commercial and IR Neometals Ltd T: +61 8 9322 1182 E: [email protected]

8

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

About Neometals Ltd

Neometals innovatively develops opportunities in minerals and advanced materials essential for a sustainable future. With a focus on the energy storage megatrend, the strategy focuses on de-risking and developing long life projects with strong partners and integrating down the value chain to increase margins and return value to shareholders.

Neometals has three core projects:

  • Lithium-ion Battery Recycling – a proprietary process for recovering cobalt and other valuable materials from spent and scrap lithium batteries. Pilot plant testing currently underway with plans established to conduct demonstration scale trials with potential JV partner SMS Group;

  • Barrambie Titanium and Vanadium Project - one of the world's highest-grade hard-rock titanium-vanadium deposits, working towards a development decision in mid-2021 with potential JV partner IMUMR; and

  • Lithium Refinery Project – progressing plans for a lithium refinery development to supply lithium hydroxide to the battery cathode industry with potential JV partner Manikaran Power, underpinned by a binding life-of-mine annual offtake option for 57,000 tonnes per annum of Mt Marion 6% spodumene concentrate.

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.

Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.

Aspects of the determination of mineralisation that
are Material to the Public Report.

In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
All new data collected from the Mt Edwards nickel
exploration project discussed in this report is in relation to
an air core drilling and sampling program completed during
November and December 2019, unless stated otherwise.
Samples were acquired at one metre intervals from a chute
beneath a cyclone on the drill rig. Sample size was then
reduced through either a cone or riffle sample splitter. A
sample was captured in pre‐numbered calico bags, with
typical masses ranging between 1 and 3kg. The remainder
of the sample (the reject) was placed in sample (spoil) piles
onto the cleared ground near the edge of the drill pad.
Samples assessed as prospective for nickel mineralisation
were assayed at single metre sample intervals. Zones
where the geology is considered less prospective were
assayed at nominal 4 metre length composite samples
using a scoop to collect from the sample piles.
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
The drill rig is a custom built RAB / AC Model KD150. Drill
rods are 3 metres long with a hole diameter of 85mm using
a blade drill bit, or a hammer in harder rock, to retrieve the
sample. Holes were drilled at a nominal dip of ‐60o,
excluding two vertical holes, with varying azimuth angles in
order to orthogonally intercept the favourable geological
contact zones.
Drill sample
recovery

Method of recording and assessing core and chip
sample recoveries and results assessed.

Measures taken to maximise sample recovery and
ensure representative nature of the samples.

Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
The geologist recorded when sample recovery was poor
and when the samples were wet. Samples with excess
water were sampled directly from spoil piles, and not put
through a splitter into calico bags.
Minor sample loss was recognised while sampling the first
metre of some drill holes due to the very fine grain size of
the surface and near‐surface material.
No relationship between sample recovery and grade has
been recognised.

9

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

Criteria JORC Code explanation Commentary
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.

Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.

The total length and percentage of the relevant
intersections logged.
All drill holes have been geologically logged for lithology
and mineralisation. All samples were logged in the field at
the time of drilling and sampling (both quantitatively and
qualitatively where viable), with spoil material and sieved
rock chips assessed.
All 3,262 metres from the drill program were chipped and
logged on site.
It is not planned for the air core results to be used to
support Mineral Resource estimations.
Sub-
sampling
techniques
and sample
preparation

If core, whether cut or sawn and whether quarter,
half or all core taken.

If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.

For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.

Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain
size of the material being sampled.
Samples sent to the lab are either:
1 metre original samples, which are truly the 1 to 3kg sub‐
samples of the sample material extracted and captured
from each metre through the drilling process.
Composite samples, usually scoops of material from spoil
piles for 4 metres or less, were also collected into calico
bags totally 1 to 3kg.
These samples (1 metre and composite) were received by
the lab, sorted and recorded. Individual samples were
weighed as received and then dried in a gas oven for up to
12 hours at 105C.
Any samples >3 kg’s were riffle split 50:50 and excess
discarded. All samples were then pulverised in a LM5
pulveriser for 5 minutes to achieve 85% passing 75um. 1:50
grind checks were performed to verify passing was
achieved.
A 300g split was taken at the bowl upon completion of the
grind and sent to the next facility for assay. The remainder
of the sample (now pulverised) was bagged and retained
until further notice. For each submitted sample, the
remaining sample (material) less the aliquot used for
analysis has been retained, with the majority retained and
returned to the original calico bag and a nominal 300g
portion split into a pulp packet for future reference.
Individual samples have been assayed for a suite of 33
elements including nickel related analytes as per the
laboratory’s procedure for a 4‐acid digestion followed by
Optical Emission Spectral analysis. Internal sample quality
control analysis was then conducted on each sample and
on the batch by the laboratory.
Results have been reported to Neometals in csv, pdf and
azeva formats.
Quality of
assay data
and
laboratory
tests

The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.

Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) andprecision have been established.
Duplicates were collected in the field as per a QAQC
procedure.
The laboratory also conducted internal QAQC, including
standards, duplicates and repeats. .
Verification
of sampling
and
assaying

The verification of significant intersections by either
independent or alternative company personnel.

The use of twinned holes.
Assay results are provided by the laboratory to Neometals
in csv, pdf and azeva formats, and then validated and
entered into the database managed by an external
contractor.

10

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

Criteria JORC Code explanation Commentary

Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.

Discuss any adjustment to assay data.
Backups of the database are stored both in and out of
office.
Assay, Sample ID and logging data are matched and
validated using filters in the drill database. The data is
further visually validated by Neometals geologists and
database staff.
Location of
data points
Location of
data points
cont.

Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.
A handheld GPS (Garmin GPSmap76 model) was used to
determine the drill hole collar locations during the drill
program with a ±8 metres coordinate accuracy.
MGA94 51S is the grid system used in this program.
Downhole survey using Reflex gyro survey equipment was
conducted for select holes deeper than 30m during the
program at the request of the Company. The survey was
carried out by the drill contractor.
Data
spacing and
distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.

Whether sample compositing has been applied.
All drill holes were sampled at 1 metre intervals down hole.
Select sample compositing has been applied in the field at
4 metre intervals as determined by the geologist.
Drill lines and spacing were based on numerous,
widespread targets over three prospect areas.
Drilling was more targeted than at a uniform spacing
between drill holes and drill lines.
Orientation
of data in
relation to
geological
structure

Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.

If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
At the Mt. Edwards‐Kambalda region, nickel sulphide
mineralisation is located on the favourable geological
contact zones between ultramafic rock units and
metabasalt rock units. All but two drill holes were planned
at ꟷ60odip angles, the other two were vertical, with
varying azimuth angles used in order to orthogonally
intercept the favourable geological contact zones.
Geological information (including structural) from both
historical geological mapping as well as current geological
mapping were used during the planning of these drill holes.
Geophysics and geochemical results from a recent
Neometals soil sampling campaign were also used to plan
targets.
Sample
security

The measures taken to ensure sample security.
Samples were collected and transported personally by
Neometals and/or geological consultant staff to a
reputable commercial laboratory in Kalgoorlie.
Sample security was not considered a significant risk to the
project. No specific measures were taken by Neometals to
ensure sample security beyond the normal chain of custody
for a sample submission.
Audits or
reviews

The results of any audits or reviews of sampling
techniques and data.
A thorough review of the exploration program was
undertaken prior to the drill program by Neometals
Geology management.
Regular reviews and site visits were made during the
conduct of drill program.
Contract geologists were based on site prior to, during and
on completion of the drill and sample program to ensure
proper quality control as per the modern mining industry
standards.

11 neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.

The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Work was carried out on mining tenements M15/45,
M15/46, M15/77, M15/79 and E15/1553.
These make up the southern portion of Neometals’
tenement package around the Widgiemooltha Dome.
The four mining leases are held by another company,
Mincor Resources, however Neometals holds the nickel
mineral rights.
Neometals is the beneficial owner of all mineral rights for
the Exploration Licence E15/1553.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by
other parties.
Neometals has held an interest in the areas since June
2018, hence all prior work has been conducted by other
parties.
The ground has a long history of exploration and mining
and has been explored for nickel since the 1960s, initially
by Western Mining Corporation. Numerous companies
have taken varying interests in the project area since this
time.
Historical exploration results and data quality have been
considered during the planning stage of drill locations for
this exploration program.
Geology
Deposit type, geological setting and style of
mineralisation.
The geology in this area typically comprises of sub‐
vertically dipping multiple sequences of ultramafic rock,
metabasalt rock units and intermittent meta‐sedimentary
units.
Contact zones between ultramafic rock and metabasalt
are considered as favourable zones for nickel
mineralisation. Geochemical analysis, including the Mg:Ni
ratios, suggests komatiite channels have been intersected
in this program.
Drill hole
Information

A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.

If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent Person
should clearly explain why this is the case
93 air core drill holes have been completed during the
exploration program across five tenements for a total of
3,262 metres. The drill and sample programs were
conducted in November and December 2019. All drill
holes were drilled at a nominal ꟷ60odip (with two
vertical holes) at varying azimuth angles.
Relevant drill hole information has been tabled in the
report including hole ID, drill type, drill collar location,
elevation, drilled depth, azimuth, dip and respective
tenement number.
Data
aggregation
methods

In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
Samples assessed as prospective for nickel mineralisation
were assayed at single metre sample intervals, while
zones where the geology were considered less

12

neometals.com.au

==> picture [595 x 63] intentionally omitted <==

----- Start of picture text -----

26 March 2020 – MT EDWARDS NICKEL DRILL RESULTS FROM AIR CORE PROGRAM
----- End of picture text -----

Criteria JORC Code explanation Commentary
stated.

Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths of
low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.

The assumptions used for any reporting of metal
equivalent values should be clearly stated.
prospective were assayed at a nominal 4 metre length
composite sample.
Significant intercepts in this report and defined as
contiguous 1m sample intervals with assay results greater
than 0.3% nickel, with an average grade greater than 1%
nickel. Up to 1 metre internal dilution (less than 0.3%
nickel) may be included in the intercept.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in
the reporting of Exploration Results.

If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.

If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (eg ‘down hole length, true width not
_known’). _
Nickel mineralisation is hosted in the ultramafic rock unit
close to the metabasalt contact zones. In some occasions
nickel mineralisation has been recorded in the
metabasalt units.
All drilling is angled to best intercept the favourable
contact zones between ultramafic rock and metabasalt
rock units to best as possible test true widths of
mineralisation.
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional
views.
A map of the current nickel exploration program
locations and tenements relative to the total Mt Edwards
project is shown in the report.
Balanced
reporting

Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
Current understanding is based on a single phase of
drilling conducted by Neometals, and a small RC program
conducted in November 2019. This was combined with
historical mapping, drilling and sampling conducted by
previous owners of the tenement. While results are
encouraging, Neometals wish to conduct further
exploration across the project area to gain an improved
understanding of the economic potential of the nickel
mineralisation at Mt Edwards.
Other
substantive
exploration
data

Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
No further exploration data has been collected at
this stage.
Further work
The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
Further air core drilling is planned to further define
current nickel targets and test new targets identified
from the drilling program mentioned in this report.
RC and DD programs are also planned for 2020 at
Neometals’ Mt. Edwards Nickel Project.

13

neometals.com.au