NEOMETALS LTD Capital/Financing Update 2009

Apr 27, 2009

65430_rns_2009-04-27_1baeb6ee-883f-43e8-a486-ca893e605c6c.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Reed Resources Ltd

ABN 89 099 116 631

97 Outram Street West Perth WA 6005 Tel: + 61 8 9322 1182 Fax: + 61 8 9321 0556

28 APRIL 2009

OPTION SECURED ON STRATEGIC PROCESSING PLANT

Highlights

  • Option secured over 250,000 tpa precious metal processing plant

  • Resource optimization and reserve calculations underway enable fast track evaluation of open pit operations (100% RDR)

  • Combined, shallow (<50m) measured and indicated resources at Comet Vale of 192,000 tonnes at 2.6 g/t Au for 16,200 ounces of gold

  • Potential removal of milling risk/production limits from current processing/oresale arrangements

Reed Resources Ltd (ASX: RDR) (“Reed”) is pleased to advise it has entered into a binding letter agreement with Polymetals Group Pty Ltd (“PGPL”) giving Reed an exclusive option to acquire the Nimbus Silver Project and Processing Plant, 15km southeast of Kalgoorlie. Reed and PGPL intend to enter into a more detailed option agreement shortly, on terms not different in substance from those outlined in the binding letter agreement.

Summary of Key Terms regarding Nimbus Project

  • A$50K option fee payable to PGPL;

  • Option exercisable by Reed on or before 31 August 2009; and

  • A$2.25M cash payable by Reed on exercise of option.

An independent valuation in 2008 valued the plant and associated equipment at a replacement value (not installed) of A$7M. Reed is aware that such mills are extremely difficult to locate in the existing market and represents significant value to the Company.

Benefits of Acquisition

Acquisition of a processing plant will enable Reed to further develop its strategy of increasing its level of profitable gold production, from its share of the high-grade Sand Queen Production Joint Venture (Table 1) and in its own right through the exploitation of shallow gold resources (Figure 1; Table 2), in unweathered rock, amenable to low-cost open pit mining and processing through a Merrill-Crowe gold recovery circuit, currently owned by PGPL and installed at Nimbus.

The Comet Vale gold ores are highly amenable to gravity recovery followed by leaching, and the Nimbus plant, which includes a yet to be installed gravity circuit, will enable both open pit and underground ores to be processed at their optimal conditions.

The Nimbus Project comprises two granted mining leases (M26/490, M26/598). PGPL commenced mining in early 2004 and produced approximately 3M oz of silver from two open pits before ceasing mining operations in late 2006. The processing plant (Figures 2, 3 and 4) was placed on care and maintenance in late 2007. There is significant base metal exploration upside and in-situ high-grade silver mineralization beneath the current pit floors.

==> picture [594 x 76] intentionally omitted <==

Forward Work Program

Technical and environmental due diligence on the Nimbus Project and processing plant will be undertaken by Reed prior to exercising the option. Reed will complete an operational feasibility review to definitively establish the quantum and grade of Comet Vale open pit ore reserves and detail the scope and timetable of site operations to commence open pit mining and refurbishment of the mill. Pit optimisation and reserve calculations are being undertaken on the Sand Prince West and Princess Grace resources. Previous optimisation studies indicated that a large proportion of the resources could be economically mined.

Chris Reed Managing Director Tel: 08 9322 1182

Geological aspects of this report that relate to Exploration Results have been compiled by Dr Bryan Smith (MAIG), a consultant to Reed Resources Ltd. Dr Smith has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which is being reported on to qualify as a Competent Person as defined in the Code for Reporting of Mineral Resources and Ore Reserves. Dr Smith consents to the inclusion in the report of the matters in the form and context in which it appears.

Although Reed remains optimistic about the potential of the Nimbus tenements, any reference to the terms “ore” and “high-grade” in this report is conceptual in nature. Use of the term “grade(s)” is not intended to represent the grade of a resource.

==> picture [171 x 145] intentionally omitted <==

Reed Resources is a diversified mining and exploration Company based in Western Australia, with modest gold production the Company is expanding and diversifying our production base. Reed Resources has three main projects all in Western Australia.

Comet Vale – High-grade underground gold mine in JV with Kingsrose Mining Limited. Nickel Laterite JV with Heron Resources NL.

Barrambie – Completing Definitive Feasibility Study on Ferrovanadium operation.

Mt.Finnerty – Iron Ore JV with Cliffs Natural Resources. Nickel JV with Western Areas NL

==> picture [179 x 262] intentionally omitted <==

==> picture [250 x 260] intentionally omitted <==

Figure 1. Tenement plan of Comet Vale Project (left) and location of near surface gold resources at Sand Prince West and Princess Grace deposits that are potentially suitable for open pit mining, and nearby infrastructure within Mining Lease M29/52 (right).

==> picture [455 x 219] intentionally omitted <==

Figure 2. Ball mill and leaching tanks at Nimbus processing plant (photo courtesy: Polymetals Group Pty Ltd).

==> picture [461 x 326] intentionally omitted <==

Figure 3. Location of tenement s (M26/490, M26/598) and Nimbus Silver Project and processing plant about 15 km east of Kalgoorlie (image courtesy: Polymetals Group Pty Ltd).

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 12] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

==> picture [410 x 11] intentionally omitted <==

Figure 4. Processing plant, surface instrastructure and open pits at Nimbus project, within Mining Leases 26/490 and 26/598 (image courtesy: Polymetals Group Pty Ltd).

Table 1 . Mineral Resource estimates for the Sand Queen mine, Comet Vale project (at a cut-off grade of 5 g/t Au) previously released to ASX 2 December 2008.

Resource Category Tonnes Gradeg/t Au Contained goldounces
Indicated 329,000 9.2 97,100
Inferred 332,000 8.0 85,500
Total 661,000 8.6 182,600

All tonnage, grade and ounce values have been rounded down to three significant figures; slight errors may occur due to rounding of values.

Table 2 Mineral Resource estimates (this announcement) for potential open pit mining of gold deposits at Sand Prince West, Princess Grace and Coonega prospects (previously released to ASX 23 November 2006 and 24 July 2007).

Resource Category Tonnes Gradeg/t Au Contained goldounces
Princess Grace(1 g/t Au lower cut, no upper cut required)
Indicated 93,000 2.8 8,400
Inferred 13,000 1.6 600
Total 106,000 2.7 9,000
Coonega(1 g/t Au lower cut, 12 g/t Au upper cut)
Inferred 106,000 2.2 7,500
Total 106,000 2.2 7,500
Sand Prince West(1 g/t Au lower cut, no upper cut required)
Measured 53,000 2.7 4,600
Indicated 46,000 2.2 3,200
Inferred 21,900 2.1 1,500
Total 121,000 2.4 9,300
Combined Resources(1 g/t Au lower cut)
Measured 53,000 2.7 4,600
Indicated 139,000 2.6 11,600
Inferred 141,000 2.1 9,600
Total 333,000 2.4 25,800

All tonnage, grade and ounce values have been rounded down to three significant figures; slight errors may occur due to rounding of values.