MKANGO RESOURCES LTD.
MANAGEMENT’S DISCUSSION AND ANALYSIS
For the year ended December 31, 2019
Page 1 Mkango Resources Ltd
This Management’s Discussion and Analysis (“ MD&A ”) provides a review of the operational performance of Mkango Resources Ltd. (“ Mkango ”, or the “ Company ”). The report was prepared in accordance with the requirements of National Instrument 51-102, Continuous Disclosure Obligations, and it should be read in conjunction with the audited consolidated financial statements for the year ended December 31, 2019. The Financial Statements and the accompanying notes have been prepared in accordance with International Financial Reporting Standards (“ IFRS ”) and are prepared in United States dollars unless otherwise stated. This document is dated April 28, 2020.
The Board of Directors of the Company have reviewed and approved the information contained in this MD&A and the Financial Statements.
Readers are cautioned that this MD&A contains certain forward-looking statements. Please see the section concerning “Forward Looking Statements” below.
Additional information relating to the Company can be found on the Canadian System for Electronic Document Analysis and Retrieval (“ SEDAR ”) at www.sedar.com. The Company is listed on the TSX Venture Exchange (the “ TSX-V ”) and holds an additional listing on the AIM Market of the London Stock Exchange (“ AIM ”) under the symbol MKA.
FORWARD LOOKING STATEMENTS
Certain disclosures set forth in this MD&A may constitute forward-looking statements concerning anticipated development of the Company’s operations in future periods. Any statements contained herein that are not statements of historical fact may be deemed to be forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as “anticipate”, “believes”, “budget”, “continue”, “could”, “estimate”, “forecast”, “intends”, “may”, “plan”, “predicts”, “projects”, should”, “will” and other similar expressions. All estimates and statements that describe the Company’s future, goals, or objectives, including management’s assessment of future plans and operations, including statements regarding exploration results and budgets, mineral resource estimates, work programs, capital expenditures, timelines, strategic plans, market price of commodities or other statements that are not statement of fact may constitute forward-looking information under securities laws. Forwardlooking information is based on reasonable assumptions that have been made by the Company as at the date of such information but, by their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond the Company’s control, including the impact of general economic and political conditions, industry conditions, volatility of commodity prices, currency fluctuations, accuracy of drilling and other exploration results, realization of mineral resource estimates, environmental risks, changes in environmental, tax and royalty legislation or other government regulation, the speculative nature of strategic metal exploration and development including the risks of contests over title to properties, the risks associated with obtaining necessary licences or permits, including and not limited to approval of any future mining licence applications and exploration licence extensions, operating or technical difficulties in connection with development activities; personnel relations, competition from other industry participants, the lack of availability of qualified personnel or management, availability of drilling equipment and access, stock market volatility and the ability to access sufficient capital from internal and external sources. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to the price of rare earth elements (“ REEs ” or “ rare earths ”); the demand for REEs; the ability to carry on exploration and development activities; the timely receipt of any required approvals; the ability to obtain qualified personnel, equipment and services in a timely and cost-efficient manner; the ability to operate in a safe, efficient and effective manner; and the regulatory framework including and not limited to licence approvals, social and environmental matters, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Mkango’s actual results, performance or achievement could differ materially from those expressed in, or implied by, these forward-looking statements. Mkango disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.
Page 2 Mkango Resources Ltd
COMPANY OVERVIEW
Mkango is an exploration and development company focused on rare earths and associated minerals with properties in the Republic of Malawi, Africa, specifically the Songwe Hill rare earths project (“ Songwe Hill ”) within the Phalombe exploration licence (the “ Phalombe Licence ”). Mkango is also pursuing mineral exploration opportunities with three additional properties in the Republic of Malawi, Africa: the Thambani exploration licence (“ Thambani Licence ”), the Chimimbe Hill exploration licence (“ Chimimbe Licence ”) and the Mchinji exploration license (“Mchinji Licence” ).
The Company’s core strategy is to advance the Songwe Hill project through the feasibility and development phases, whilst in parallel advancing complementary downstream opportunities in the rare earths supply chain through Maginito Limited (“ Maginito ”), both in partnership with Talaxis Limited (“Talaxis”) , a wholly owned subsidiary of Noble Group Limited (“Noble”) . The current work programme for Songwe Hill is focused on completing a feasibility study (the “ Feasibility Study ”), the initial phases of which included a major diamond drilling programme and publication of an updated mineral resource estimate, in addition to metallurgical optimisation and work in relation to the ongoing Environmental Social Health Impact Assessment (“ ESHIA ”) and Corporate Social Responsibility program.
Corporate Structure
The Company is incorporated in the province of British Columbia, Canada. The Company’s registered office is Suite 2900, 550 Burrard Street, Vancouver, British Columbia, Canada, V6C 0A3.
==> picture [298 x 170] intentionally omitted <==
----- Start of picture text -----
Mkango Resources Ltd.
(Canada)
Lancaster Exploration (BVI)
51% Ownership
Maginito Limited (BVI)
75.5% Ownership
MKA Exploration Limited
Lancaster Exploration Limited (BVI) 100% Ownership
(Malawi)
100% Ownership
MKA Exploration Limited
(Malawi) 100% Ownership
----- End of picture text -----
The Phalombe Licence, the Thambani Licence and the Chimimbe Licence are held by Lancaster Exploration Limited (“ Lancaster BVI ”), a company which was incorporated under the laws of the British Virgin Islands (“ BVI ”) on August 3, 2007. Lancaster BVI is 51% owned by Mkango and 49% owned by Talaxis. 100% of the Thambani Licence and the Chimimbe Licence are held in trust for Mkango.
Lancaster Exploration Limited (“ Lancaster Malawi ”) was incorporated on May 19, 2011, under the laws of Malawi. Lancaster Malawi is a wholly owned subsidiary of Lancaster BVI and as such, includes a non-controlling interest representing 49% of Lancaster Malawi’s assets and liabilities that are owned by Talaxis.
MKA Exploration Limited (“ MKA Exploration ”) was incorporated under the laws of BVI on July 25, 2018 and under the laws of Malawi (“ MKA Exploration Malawi ”) on May 6, 2019. Both companies are 100% owned by Mkango. The Mchinji License is held by MKA Exploration.
Maginito Limited (“ Maginito ”) was incorporated under the laws of the BVI on January 3, 2018. Maginito is 75.5% owned by Mkango and 24.5% owned by Talaxis. Maginito is focused on downstream opportunities relating to the rare earths supply chain, in particular neodymium alloy powders, magnet and other technologies geared to accelerating growth in the electric vehicle market. This includes a collaboration previously entered into with Metalysis Limited (“ Metalysis ”), discussed below, and its investment in HyProMag Limited (“HyProMag”).
Page 3 Mkango Resources Ltd
Accounting Treatment
The Consolidated Financial Statements include 100% of the assets and liabilities related to Lancaster BVI and include a non-controlling interest, representing 49% of Lancaster BVI’s assets and liabilities that were owned by Talaxis as at December 31, 2019. The non-controlling interest excludes the Thambani Licence and the ChimimbeLicence, 100% of which are held in trust for Mkango, and the Mchinji Licence which is 100% owned by MKA Exploration Limited. The consolidated financial statements include 100% of the assets and liabilities related to Maginito and include a noncontrolling interest representing 24.5% of Maginito’s assets and liabilities attributable to Talaxis. Accounting policies are applied consistently throughout all consolidated entities.
OVERALL PERFORMANCE AND OUTLOOK
The Company is focused on advancing the Songwe Hill project, in addition to its other projects in Malawi, and on downstream opportunities relating to the rare earths supply chain. Highlights for the year ended December 31, 2019, include:
-
The announcement, on February 4, 2019, of an updated mineral resource estimate for Songwe Hill: 8 Mt grading 1.50% TREO in the Measured category, 12.2 Mt grading 1.35% TREO in the Indicated category and 27.5 Mt grading 1.33% TREO in the Inferred category, applying a base case cut-off grade of 1.0% TREO. This represented a 60% increase in Measured and Indicated tonnage and the first measured resource for the project. The Measured Mineral Resource Estimate comprises 42% of the combined Measured and Indicated Mineral Resource Estimate, indicating a substantial increase in geological confidence to support the completion of the Feasibility Study.
-
The filing of an updated NI 43-101 Technical Report for the Songwe Hill Rare Earths Project resource update on March 21,2019.
-
The receipt, on March 28, 2019, in accordance with the terms of the Talaxis Agreement, described more fully below, of £7 million ($9.2 million) from Talaxis for a further 29% interest in Lancaster BVI, which enables Mkango to advance its Songwe Hill project through the feasibility phase against the backdrop of increasing demand for rare earths used in electric vehicles, direct drive wind turbines and other green technologies.
-
The appointment of SENET, a DRA Global company, as lead engineer and project manager for completion of the Feasibility Study. SENET has longstanding experience in project management and in providing detailed multidiscipline engineering, procurement, logistics management, and construction services to the mining, mineral processing, infrastructure and materials handling industries. It has extensive project and construction experience throughout Africa and boasts the largest and most advanced hydrometallurgical process engineering team on the continent.
-
The shipment of a 60 tonne bulk sample to Australia in preparation for metallurgical pilot test work. Potential pilot facilities have been reviewed and a tender process has been completed for selection of a flotation pilot facility.
-
The commencement of an exploration programme in the Thambani Licence focused on further definition of uranium, tantalum and niobium mineralisation in the licence area. In parallel, Mkango continues to evaluate partnership opportunities for the project.
-
The receipt of the grant of the Mchinji License in Mchinji district, central Malawi, which has potential for rutile, nickel-cobalt, gold, base metals, and graphite.
SUBSEQUENT EVENTS
On January 10, 2020, the Company announced that its subsidiary Maginito had completed the acquisition of an initial 25% interest in HyProMag Limited, a company focused on rare earth magnet recycling. Maginito has invested an initial £300,000 for a 25% interest in HyProMag and has an option to invest a further £1 million to increase its interest up to 49%.
Subsequent to year-end, there was a global outbreak of COVID-19 (coronavirus), which has had a significant impact on businesses through the restrictions put in place by the governments of countries, including those in which the Company operates, regarding travel, business operations and isolation/quarantine orders.
Whilst the Feasibility Study is continuing with work underway in Australia, South Africa and the UK, the Company believes it is inevitable that some work streams will be impacted, however the degree of impact is currently uncertain.
Page 4 Mkango Resources Ltd
Following a review of the various ongoing work streams, the Company is now targeting completion of the Feasibility Study in the second half of 2021, in line with an anticipated more stable market environment and favourable backdrop to advance project development. We note, however, that extended periods of COVID-19 disruption may further impact this timing.
Operations at HyProMag are continuing where possible, in line with current UK government guidelines. At this time, the extent of the impact the COVID-19 outbreak may have on HyProMag is unknown, as this will depend on future developments that are highly uncertain and cannot be predicted with confidence. These uncertainties arise from the inability to predict the ultimate geographic spread of the disease, and the duration of the outbreak, including the duration of travel restrictions, business closures or disruptions, and quarantine/isolation measures that are currently, or may be put, in place by countries to fight the virus.
DISCUSSION OF OPERATIONS
Mkango holds a 51% interest in Lancaster BVI, which holds a 100% interest in three exclusive prospecting licences in southern Malawi, the Phalombe Licence, the Thambani Licence and the Chimimbe Licence. 100% of the Thambani Licence and Chimimbe Licence are held in trust for Mkango. Mkango holds a 100% interest in MKA Exploration Limited BVI which holds a 100% interest in the Mchinji License Pursuant to the definitive agreements. Talaxis has agreed to fund the Feasibility Study for the development of Songwe Hill, the main exploration target within the Phalombe Licence, and has an option to fund the development of the project.
| License | Project | For the year ended December 31, 2019 2018 |
|---|---|---|
| Phalombe | Songwe Hill project Mineral extraction development Government fees ESHIA(1) Drilling programme(2) Technical studies Consulting fees Grant refund Malawi office and campexpenses |
$519,109 $588,549 17,226 36,023 161,960 342,238 35,907 2,571,917 546,732 - 249,260 181,175 (115,113) - 164,133 812,959 |
| Thambani Chimimbe Mchinji Other |
Exploration programme Project costs Project costs |
115,442 2,782 7,979 3,416 16,454 - 2,660 - |
| Total Malawiproject expenditures | 1,721,749 4,539,059 |
|
| Research and development | Maginito | 25,750 410,173 |
| Total mineral exploration and research and development expenses |
$1,747,499 $4,949,232 |
(1) Environmental Social Health Impact Assessment and Corporate Social Responsibility expenditures.
(2) The Company completed a major diamond drilling programme at Songwe Hill during 2018.
Exploration and evaluation expenditures are recognized in the consolidated statement of comprehensive loss as mineral exploration expenditures pending determination of technical feasibility and commercial viability.
SONGWE HILL
Background
The Phalombe Licence covers an area of 849.1 square kilometers (" sq km ") in southeast Malawi, within which Songwe Hill is the main development target and features carbonatite hosted rare earth mineralization. Songwe Hill was subject to historic exploration programs during the late 1980s. Lancaster BVI was awarded the licence by the Malawi
Page 5 Mkango Resources Ltd
Government on January 21, 2010 and subsequently renewed it, with the most recent renewal on January 21, 2019 being for a further 2 years to January 21, 2021.
The geological units of significance with respect to rare earth mineralization in the Phalombe Licence are intrusions and lavas of the Jurassic/Cretaceous Chilwa Alkaline Province, in which carbonatites are widely present. In addition to the large carbonatitic intrusion at Songwe Hill, numerous smaller carbonatites occur throughout the Province and include dykes, sheets, and volcanic systems such as Nkalonje, which also occurs within the Phalombe Licence area.
Exploration
Mkango has been exploring and evaluating the Songwe Hill rare earth deposit since January 2010. Following confirmation of the previously investigated enriched zones, exploration focused on identifying the nature and extent of the rare earth mineralized carbonatites and related rocks. Mkango’s early exploration activities consisted of lithogeochemical sampling, soil sampling, channel sampling, geological mapping, ground magnetic, density and radiometric surveys, and petrographic/mineralogical analyses.
In particular, detailed geological mapping of Songwe Hill was carried out in 2010 and 2011. The mapping demonstrated that carbonatite outcrops existed over a significantly larger area than had previously been recognized. Mapping further achieved a more precise delineation of the distribution of the main rock types. The mapping broadened the surface area of known rare earth mineralization significantly beyond the areas identified in previous exploration and identified new areas of rare earth enriched carbonatite.
The results of these activities confirmed the rare earth enrichment initially identified by historical exploration and suggested that the mineralized carbonatites were more widespread than originally identified. Mkango embarked on diamond drilling campaigns in 2011 (“ Phase 1 ”), 2011–2012 (“ Phase 2 ”) and 2018 (“ Phase 3 ”). Mkango also produced a bulk sample after the Phase 3 drilling in 2018.
The Phase 1 programme was successful in confirming the presence of rare earth mineralization first outlined by historical exploration. Eleven of the 13 holes intersected significant zones of rare earth mineralization. Having confirmed the presence of the mineralization, the Phase 1 drilling was expanded to areas not previously tested and demonstrated the extension of rare earth mineralization both laterally and vertically.
The Phase 2 drilling focused on expanding the area of known mineralization, infilling between existing holes and testing the mineralization at depth. All drill holes intersected rare earth mineralization and the maximum depth at which rare earth mineralization was encountered was 350 metres (“ m ”) below the surface of the hill.
The original resource estimate based on the Phase 1 and Phase 2 drilling programs enabled a maiden resource of 13.2 million tonnes (“ Mt ”) grading 1.62% total rare earth oxides (“ TREO ”) in the Indicated category and 18.6mt grading 1.38% TREO in the Inferred category which was announced on October 10, 2012. The Indicated resource estimate formed the basis for a Pre-Feasibility Study completed in 2014, which was subsequently updated in 2015.
Talaxis Agreement
In March 2017, Mkango announced a transaction with Talaxis, whereby Talaxis invested £500,000 in Mkango by means of a placing. The placing closed in October 2017, which resulted in Talaxis’ ownership of 12.5% in Mkango’s outstanding common shares (“ Shares ”). In addition, Talaxis owns warrants, which could, if exercised, take its ownership to 18.1% of Mkango’s Shares. Talaxis has agreed that it will not exercise warrants if this causes Talaxis to own more than 20% of the Company’s outstanding Shares. In November of 2017, Mkango announced a further transaction with Talaxis (the “ Talaxis Agreement ”), whereby Talaxis agreed to make investments totalling £12 million ($16 million) in Lancaster BVI to fund a Feasibility Study for Songwe Hill, with an option to fund project development, and a further investment totalling £2 million ($2.8 million) in Maginito (described more fully below) to further advance Mkango’s downstream strategy.
On January 24, 2018, in accordance with the terms of the Talaxis Agreement, Talaxis invested an initial £5 million ($7 million) for a 20% interest in Lancaster BVI and a further £1 million ($1.3 million) for a 24.5% interest in Maginito.
On May 18, 2018, Mkango signed the Songwe Hill Joint Venture Agreement, the Talaxis Investment Agreement and the Cooperation Deed (the “ Definitive Agreements ”) in relation to the Talaxis Agreement.
Page 6 Mkango Resources Ltd
On March 28, 2019, in accordance with the terms of the Definitive Agreements, Talaxis invested £7 million ($9.0 million) for a further 29% interest in Lancaster BVI.
Following completion of the Feasibility Study, Talaxis has been granted an option to acquire an additional 26% interest in Lancaster BVI by arranging funding for project development, including funding the equity component thereof. If Talaxis exercises its option, Mkango will retain a 25% interest in Lancaster BVI, which will be free carried to production.
Feasibility Study
Following the receipt of £5 million ($7 million) by Lancaster BVI on January 24, 2018, pursuant to the transaction with Talaxis, Mkango commenced the Feasibility Study, the initial phases of which comprised an extensive diamond drilling programme, metallurgical optimisation and work in relation to the ongoing ESHIA.
On June 4, 2018, Mkango announced commencement of the major Phase 3 diamond drilling programme at Songwe Hill. The programme was completed in early September 2018 and comprised 91 drill holes totalling 10,900 m of infill, step-out and geotechnical drilling, the latter for the purposes of mine design.
In five press releases between August 21, 2018 and December 3, 2018 (www.sedar.com), Mkango announced the results of all 91 drill holes which, together with a schematic geological map illustrating the location of the drill hole collars and estimated drill hole traces, are available on the Company’s website (www.mkango.ca).
Approximately 60% of the Phase 3 drill holes were infill holes aimed at better defining the geology and geometry of the mineralized body, to facilitate a better understanding of the geological characteristics and setting of the mineralization, and to refine the geological model as a prelude to re-defining the Mineral Resource. All infill holes intersected significant widths of mineralized carbonatite and breccia. Modelling of the lithologies based on geochemistry confirms that the core of the deposit is a uniformly mineralized carbonatite intrusive with steep sides.
Approximately 30% of the Phase 3 drill holes were step-out holes, aimed at expanding the known Mineral Resource by identifying or better delineating mineralization that is outside the volume of the previously defined Mineral Resource. Most of these holes contained mineralized intersections although not all reached their targeted depths. These holes have resulted in expansion of the estimated Mineral Resources by identifying new areas of mineralized carbonatite beyond the limits of the previous exploration programs.
Oriented core was recovered from 16 of the holes to provide geotechnical information within the Mineral Resource for future mine design.
Forty-nine of the drill holes intersected significant zones of rare earths mineralisation grading above 1% total TREO.
Selected Drill Results:
| PX056 | 114.8 m grading 1.6% TREO(60.7 – 175.5 m) including30.0 m grading 2.0% TREO(135.0 – 165.0 m). Inclined hole (60 degrees west). |
|---|---|
| PX059 | 63.0 m1grading 1.7% TREO(6.0 – 69.0 m), including23.0 m2grading 2.3% TREO(7.0 – 30.0 m), and15.4 m grading 1.6% TREO(128.0 – 143.4 m). Inclined hole (60 degrees west). |
| PX073 | 67.1 m grading 1.6% TREO(8.8 – 75.9 m) including25.2 m grading 2.0% TREO(45.0 – 70.2 m). Inclined hole (60 degrees west). |
| PX076 | 40.2 m grading 1.8% TREO(60.4 – 100.7 m) including20.0 m grading 2.4% TREO(60.4 – 80.4 m). Inclined hole (60 degrees west). |
| PX077 | 51.9 m3grading 1.7% TREO(26.2 – 78.0 m). Inclined hole (60 degrees west). |
| PX081 | 53.3m4grading 2.2% TREO(3.7 – 57.0 m) including26.8 m grading 3.1% TREO(3.7 – 30.5 m). Inclined hole (60 degrees east). |
| PX086 | 73.3 m grading 1.9% TREO(21.5 – 94.8 m). Inclined hole (60 degrees west). |
| PX087 | 74.4 m5grading 2.1% TREO (16.2 – 90.6 m). Inclined hole (60 degrees west). |
| PX090 | 25.7 m6grading 3.9% TREO(39.5 – 65.2 m). Inclined hole (60 degrees west). |
| PX092 | 74.9 m grading 1.9% TREO(10.1 – 84.9 m) and51.9 m grading 1.5% TREO(97.6 – 149.5 m EoH). Inclined hole (60 degrees south). |
Page 7 Mkango Resources Ltd
| PX093 | 83.9 m grading 1.9% TREO(1.5 – 85.4 m) including18.0 m grading 3.0% TREO(21.0 – 39.0 m). Inclined hole (60 degrees west). |
|---|---|
| PX098 | 65.0 m7grading 1.7% TREO(1.1 – 66.0 m) and13.1 m grading 1.2% TREO(115.0 – 128.1 m). Inclined hole (60 degrees south). |
| PX103 | 165.2 m grading 1.6% TREO(2.6 – 167.8 m). Inclined hole (60 degrees east). |
| PX107 | 91.3 m8grading 1.3% TREO(23.0 – 114.2 m) including32.2 m9grading 1.9% TREO(82.0 – 114.2 m). Inclined hole (60 degrees east). |
| PX108 | 45.8 m grading 1.4% TREO(8.2 – 54.0 m) and57.3 m grading 1.7% TREO(76.9 – 134.2 m). Inclined hole (60 degrees east). |
| PX109 | 53.0 m grading 2.1% TREO(22.0 – 75.0 m) including22.0 m grading 3.0% TREO(24.0 – 46.0 m). Inclined hole(60 degrees east). |
| PX113 | 51.1 m10grading 2.2% TREO(4.7 – 55.8 m). Inclined hole (50 degrees north). |
| PX112 | 100.9 m grading 3.3% TREO(5.9 – 106.8 m EoH) including20.5 m grading 4.2% TREO(5.9 – 26.4 m) and 22.2 m grading 4.1% TREO (36.0 – 58.2 m). Inclined hole (60 degrees south). |
| PX125 | 104.5 m grading 1.5% TREO (3.5 – 108.0 m) including 51.5 m grading 1.9% TREO (3.5 – 55.0 m). Inclined hole (60 degrees south). |
1 Includes two cavities totaling 5.9m not sampled. 2 Includes a 2.5m cavity not sampled. 3 Includes a 2.7m cavity not sampled. 4 Includes a 3.8m cavity not sampled.[5] Includes a 2.7m cavity not sampled.[6] Includes a 6.3m cavity not sampled. Due to the size of the cavity, the significance of this intersection is uncertain. 5 Includes a 2.3m cavity not sampled. 6 Includes two cavities totaling 2.3m not sampled. 7 Includes a 0.9m cavity not sampled. 8 Includes two cavities totaling 10.0m not sampled.[9] Includes a 0.9m cavity not sampled.[10] Includes two cavities totaling 10.0m not sampled. Due to the size of the cavities, the significance of this intersection is uncertain. TREO: total rare earth oxides based on total La2O3, Ce2O3, Pr2O3, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb2O3, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3. These intersections are reported as down hole widths and do not necessarily represent true thicknesses and attitude of the mineralized zones, the estimation of which will require further refining of the geological model.
Drill holes PX072, PX073, PX078, PX079, PX080, PX083, PX084, PX085, PX088, PX089, PX090, PX091, PX093, PX094, PX095, PX109, PX114, PX118, PX119, PX120, PX121, PX122, PX123 and PX124 were step-out holes focused on testing north and north-west extensions of the mineralisation. Of these 24 drill holes, 19 intersected broad zones of mineralisation. The mineralised intersection in PX113 indicates the extension of the higher grade carbonatite zone located in the north-east as indicated on the accompanying geological map on the Company’s website, to the north under cover. Drill holes PX038, PX039, PX040 and PX041 were step-out drill holes, focused on testing extensions of mineralisation to the south. The intersections in PX039 and PX040 further indicate that mineralisation may extend to the south. The remaining drill holes were focused on infill zones in the previous exploration/resource area defined by drill holes PX001 to PX035. Intersections of broad zones of mineralisation, as opposed to narrow veins or dykes, continue to support the concept of a bulk tonnage, open pit mining operation with low mining costs.
The full set of the above results and breakdown of TREO values can be found in Appendix A of this report.
Laboratory assay data was used to produce a 3D model based on geochemical coding that is reflective of the main mineralization, and that is objective, repeatable, and provides a consistent and meaningful illustration of the distribution of rare earth mineralization in the context of the geological setting.
The principal geochemical discriminators of the lithological variation were found to be aluminium, silicon, potassium, and calcium. Calcium was used as the final indicator, which gave a good separation with the same accuracy and resolution as if all four discriminators had been used.
The geological model constructed from the geochemistry provides a good framework within which to interpret the geology of the deposit. This is a heterogeneous geological environment that is not easily interpreted from lithological observations of drill hole core and outcrop samples alone. The model provides an estimate of the shape and extent of the carbonatite and is considered a useful tool to describe the shape of the main ore body. The model was also applied to validate the indicator approach that was used to estimate the carbonatite proportion in each cell of the resource block model.
On February 4, 2019, Mkango announced an updated mineral resource estimate for Songwe Hill: 8 Mt grading 1.50% TREO in the Measured category, 12.2 Mt grading 1.35% TREO in the Indicated category and 27.5 Mt grading 1.33% TREO in the Inferred category, applying a base case cut-off grade of 1.0% TREO.
Page 8 Mkango Resources Ltd
The updated base case Mineral Resource Estimate equates to a 60% increase in the Measured and Indicated Resource tonnage and a 48% increase in the Inferred Resource tonnage versus the base case 2012 Mineral Resource Estimate, which formed the basis for the 2015 Pre-Feasibility study. The Mineral Resource is open at depth. The combined Measured and Indicated Mineral Resource Estimate, totalling 21 Mt grading 1.41% TREO, will form the basis of the updated mine plan for the ongoing feasibility study, which will evaluate a bulk tonnage, open pit mining operation focused on broad zones of near surface and outcropping rare earths mineralisation. The updated resource supersedes the 2012 Mineral Resource Estimate, and therefore renders the mining and economic information in the 2015 PreFeasibility study obsolete. Updated mining and economic information will be generated as part of the ongoing Feasibility Study based on the new resource.
The Measured Mineral Resource Estimate comprises 42% of the combined Measured and Indicated Mineral Resource Estimate, indicating a substantial increase in geological confidence to support the completion of the Feasibility Study.
The majority of the previously delineated near surface Inferred Mineral Resource Estimate has been upgraded to either the Measured or Indicated categories, achieving a key objective of the 2018 drill programme. Approximately 95% of the Measured and Indicated Mineral Resource Blocks are at a depth of less than 160 m below the surface of the hill, indicating that the majority will be accessible by open pit mining.
Scientific and technical information in relation to these results and related disclosure, including sampling, analytical, and test data underlying the information, has been approved and verified by Dr. Scott Swinden of Swinden Geoscience Consultants Ltd, who is a "Qualified Person" in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects.
Sample preparation and analytical work for the drilling and channel sampling programmes are being provided by Intertek-Genalysis Laboratories (Perth, Australia) employing ICP-MS techniques suitable for rare earth analyses and following strict internal Quality Assurance/Quality Control (“ QAQC ”) procedures inserting duplicates, blanks and standards. Internal Laboratory QAQC was also completed to include blanks, standards and duplicates.
In terms of other aspects of the Feasibility Study, Mkango shipped a 60 tonne bulk sample to Australia and the bulk sample is currently being prepared ready for future metallurgical pilot test work. Potential pilot facilities have been reviewed and a tender process has been completed for selection of a flotation pilot facility. Metallurgical optimisation is underway at laboratories in Australia. The work programme was scaled up following receipt of the Talaxis funding and is focused on flotation and hydrometallurgy.
The ESHIA is underway and is being completed in accordance with World Bank Standards and Equator Principles.
Following a review of the various ongoing work streams, the Company is now targeting completion of the Feasibility Study in the second half of 2021, in line with an anticipated more stable market environment and favourable backdrop to advance project development. Other targets in the Phalombe Licence
On August 9, 2016, Mkango announced the results of an airborne geophysical survey (the “ Survey ”) covering approximately two thirds of the Phalombe Licence. The Survey was part of a $25 million World Bank funded nationwide airborne geophysical programme. The airborne radiometric survey highlights a number of exploration targets within the Phalombe Licence. Songwe Hill was not covered by the Survey.
Apart from Songwe Hill, there are two other identified hypabyssal systems in the Phalombe Licence, namely Nkalonje and Namangale. In both cases, the Survey indicates strong thorium radiometric anomalies coincident with the intrusive rocks, which, similar to Songwe Hill, are expressed as steep hills rising above the surrounding plain. Thorium radiometrics are known as a highly effective tool for rare earths exploration and the carbonatite at Songwe Hill is also characterized by a thorium radiometric anomaly, identified through previous geophysical surveys. Unlike Songwe Hill, the Nkalonje and Namangale hypabyssal systems do not feature large areas of outcropping carbonatite, the host rock for rare earths at Songwe Hill. However, both contain outcrops of carbonatite veins and dykes suggesting that there is potential for identifying a carbonatite body below surface. Other prospects within the Phalombe Licence include the Mantrap and Knoll prospects.
A map showing the thorium radiometric anomalies superimposed on a topographic map, indicating local infrastructure, and the locations of Nkalonje and Namangale can be accessed via the following link: http://www.mkango.ca/i/maps/Results-of-Airborne-Radiometric-Survey-(Th)-on-Topo-Aug.jpg.
Page 9 Mkango Resources Ltd
In 2016, Songwe Hill and the Nkalonje, Mantrap and Knoll prospects were visited by a large delegation of international and Malawian geology and geophysics experts in connection with the €5.4 million HiTech AlkCarb research program led by the Camborne School of Mines, the University of Exeter and funded under the European Union's Horizon 2020 Research and Innovation program in which the Company (through Lancaster BVI) is an industry partner. The scope of the research project encompasses building exploration expertise in hi-tech raw materials as well as improving and developing interpretation of geophysical and down hole data. Of particular relevance to Mkango is the opportunity to better understand the potential for large but unexposed mineralised bodies of carbonatite (the host rock for rare earth mineralisation) on either a prospect or regional scale.
Based on work to date, the highest priority of such targets within the Phalombe Licence is the abovementioned Nkalonje hypabyssal system, where outcrop is largely fenite (altered country rock) with occasional carbonatite but where there may also be potential for underlying and larger zones of mineralised carbonatite.
Mkango retains, through its holding in Lancaster BVI, a 51% interest in the Phalombe Licence.
THAMBANI, MWANZA DISTRICT
Background
Lancaster BVI was granted the Thambani Licence by the Malawi Minister of Natural Resources, Energy and Environment on September 10, 2010 in respect of an area, which was originally 468 sq km in Thambani, Mwanza District, Malawi. Exploration has identified a number of areas with potential for uranium (“U”), tantalum (“Ta”), niobium (“Nb”), zircon (“Zr”) and mineral corundum.
The licence was originally issued by the Malawi Government on a three-year basis and was subsequently renewed on September 10, 2015 for an additional two-year term when the Company requested a reduction in the licence area to the current 136.9 sq km. The licence was renewed for a further 2 years to September 10, 2019 and was subsequently renewed for an additional 2 years to September 10 2021.
The exploration activities conducted during 2011 and 2012 included acquisition of Landsat7 and ASTER satellite imagery for the licence area, systematic ground radiometric surveys to confirm and detail previously-known airborne anomalies, reconnaissance geological mapping and litho-geochemical sampling programs. The work has identified a number of potential uranium targets over the Thambani Massif, which is mainly composed of nepheline syenite gneiss, forming two prominent ridges known as Thambani East Ridge and West Ridge. Historical airborne radiometric surveys and ground radiometric survey programs carried out by Mkango have revealed two distinct uranium anomalies occurring along the two ridges. A strong uranium anomaly, measuring approximately 3 km by 1.5 km, occurs along the length of the Thambani East Ridge with a north-south trend and a second uranium anomaly, measuring approximately 1.5 km by 0.4 km along the western foot of the West Ridge possibly coincident with the contact between the nepheline syenite body and the biotite-hornblende gneisses to the west.
Initial results from follow up reconnaissance geochemical sampling conducted in 2013 returned locally anomalous uranium values, ranging up to 1,545 ppm U3O8, on both Thambani East Ridge and West Ridge. During the year ended December 31, 2014, the Company continued to progress the geological exploration studies on the Thambani project area, data analysis and geological modeling.
Mkango completed a trenching program across the Thambani Massif primarily focused on two sites of historical uranium exploration, known as the Chikoleka and Little Ngona targets. An initial set of nine trenches, selected on the basis of anomalous ground radiometric results, have been re-examined and geochemically sampled across profiles from soil/overburden into bedrock.
The first set of assay results of 142 soil and rock chip samples returned variably anomalous U, Nb and Ta values in most trenches, ranging up to 4.70 % U3O88, 3.25 % Nb2O5 in soil and up to 0.42 % U3O8, 0.78 % Nb2O5 and 972 ppm Ta2O5 in rock chips, notably higher than results from the 2013 reconnaissance surface geochemical sampling program. Results associated with the 10 best U3O8 assays are summarized in the table below.
Preliminary mineralogical studies carried out on six rock samples from the Little Ngona River and Chikoleka targets, using Scanning Electron Microscopy (“SEM”) at the Natural History Museum (NHM) London, indicate that pyrochlore group minerals, mainly betafite, are the principal carriers of U, Nb and Ta for these samples.
Page 10 Mkango Resources Ltd
Assays from the 10 highest- U3O8 samples from the Thambani trenching program
| Trench No. |
Profile | Sample No |
From (m) |
To (m) |
Rock type | U308 Ppm |
Nb2O5 ppm |
Ta2O5 ppm |
|---|---|---|---|---|---|---|---|---|
| C3 | A | U3622 | 0.5 | 1 | Soil | 47,094 | 32,462 | 45 |
| C3 | A | U3623 | 1 | 1.5 | Soil | 1,057 | 735 | 59 |
| T11 | C | U3508 | 0.5 | 1 | Decomposed Feldspathic | 4,231 | 7,805 | 743 |
| T11 | C | U3509 | 1 | 1.5 | Decomposed Feldspathic | 2,539 | 6,619 | 911 |
| T11 | B | U3505 | 0.5 | 1 | Decomposed Feldspathic | 2,369 | 5,424 | 972 |
| T15 | A | U3554 | 1 | 1.5 | Feldspathic rock | 1,657 | 4,346 | 67 |
| T15 | A | U3553 | 0.5 | 1 | Feldspathic rock |
1,616 | 3,754 | 431 |
| T15 | E | U3565 | 0.5 | 1 | Feldspathic rock |
1,553 | 3,525 | 41 |
| T14 | D | U3549 | 1.5 | 2 | Feldspathic rock |
1,432 | 3,034 | 434 |
| T19 | C | U3604 | 1 | 1.5 | Feldspathic rock |
1,367 | 5,525 | 675 |
Airborne Geophysical Survey
On July 12, 2016, Mkango announced results of an airborne geophysical survey covering approximately two thirds of its Thambani Licence. As with the Phalombe Licence, the survey was part of a $25 million World Bank funded nationwide airborne geophysical programme flown at 250 metre spacings.
The airborne survey confirms the presence of the previously identified uranium radiometric anomaly referred to above along the western flank of the Thambani East Ridge. The Little Ngona prospect, which previously yielded very encouraging uranium, niobium and tantalum values from geochemical sampling, is located at the northern end of this anomaly.
Further discrete uranium anomalies orientated approximately east-west, is located to the south of these anomalies and has yet to be investigated in detail. The previously identified uranium radiometric anomalies on the West Ridge and Chikoleka prospect in the north-west of the licence area, which also yielded very encouraging results from previous geochemical sampling, were not covered by this Survey.
A map showing the uranium radiometric anomalies superimposed on a topographic map, indicating local infrastructure, and a digital elevation model can be accessed via the following link: http://www.mkango.ca/i/maps/Results_of_Airborne_radiometric_survey_on_topo_U_July.jpg
The airborne survey also highlighted a number of magnetic anomalies not previously identified, including a 2.3 kilometer (“ km ”) linear magnetic high anomaly along the Thambani East Ridge, a further 1 km by 0.5 km magnetic high anomaly located to the north along the Thambani East Ridge, a magnetic low anomaly approximately co-incident with the abovementioned east–west orientated uranium anomaly and anomalies in a number of other locations. These areas require further investigation to determine the significance of the magnetic anomalies and whether they are related to mineralisation or geological features.
A map showing the magnetic anomalies superimposed on a topographic map, indicating local infrastructure, and a digital elevation model can be accessed via the following link: http://www.mkango.ca/i/maps/Results_of_Airborne_magnetic_survey_on_topo_July_2016.jpg
During 2019, Mkango commenced a subsequent exploration programme focused on further definition of uranium, tantalum and niobium mineralisation in the licence area. Results were as follows:
Assay results from 128 rock samples collected during the 2019 exploration programme returned uranium, tantalum and niobium values ranging up to 0.74% U3O8, 0.41% Ta2O5 and 3.24% Nb2O5. Of the total, 43 graded above 500ppm U3O8, of which 13 graded above 1,000ppm U3O8; all but one of these 43 samples were in-situ rock samples. Results associated with the ten best U3O8 assays are summarised in the table below, nine of which are grab samples from outcrop (prefixed G-) and one a hand-auger sample of highly weathered rock in a trench (prefixed T-).
The objective of the programme was to identify new areas of outcropping mineralisation through further geological reconnaissance and sampling, guided by handheld spectrometer. Sampling was focussed on the uranium anomalies identified by previous airborne and ground radiometric surveys, including areas where previous sampling gave encouraging results. The aims of the sampling were to better delineate the mineralised zones and to localise future
Page 11 Mkango Resources Ltd
drill sites to test the downdip extension of surface mineralisation. Field observations and sampling results suggest that mineralisation occurs in zones that are conformable with gneissic banding.
Assays from the 10 highest grade U3O8 samples from the 2019 Thambani sampling programme
| Sample ID. | U3O8ppm | Ta2O5ppm | Nb2O5ppm |
|---|---|---|---|
| T0567 G1902 G1951 G1928 G1962 G1938 G1903 G1929 G1946 G1961 |
7,369 2,755 2,254 2,028 1,880 1,483 1,409 1,333 1,275 1,239 |
3,849 4,057 2,152 2,450 1,561 29 2,305 1,886 855 1,698 |
12,933 32,401 14,713 17,516 8.634 305 19,451 14,764 3,126 12,823 |
The 2019 sampling programme was focused on radiometric uranium anomalies associated with the Thambani Massif, a body of nepheline-bearing syenite gneiss which dominates the north-eastern part of the licence. Previous work has shown the uranium anomalies to be associated with niobium and tantalum mineralisation.
Two suites of samples were collected: 1) in-situ grab samples from outcrop; and 2) extremely friable, highly weathered rock from trenches that were manually excavated to approximately 10 metres (“m”) long, 1.5m wide and 2m deep, and oriented west to east across the regional strike of the gneissic foliation. Grab samples are selective and are not necessarily representative of the mineralisation on the property.
A location map and sampling maps can be found at https://mkango.ca/projects/thambani
A total of 58 surface grab samples were collected, 54 of which were from outcrop associated with the prominent radiometric anomaly along the western slope of the East Ridge, and four from outcrop in the Supe River.
Ten trenches were excavated by hand over radiometric anomalies. Three of these (the Western Trenches) were spaced 25m apart, immediately adjacent to a pit where the highest grades were encountered in 2017. The seven other trenches were excavated over radiometric anomalies at widely separated locations on the lower slope of the East Ridge. In all of the trenches, highly weathered nepheline syenite gneiss was encountered below a bouldery soil horizon approximately 0.5m thick. The westward dip of the banded gneiss observed in outcrop on the ridges was recognisable in the trenches despite strong weathering.
In the Western Trenches, 70 samples were collected, 61 of which were horizontal channel samples of 2m length collected along each wall in all of the three trenches. Five similar samples were collected in one trench at the foot of the East Ridge.
Assays summarised in the table below show that grades in the fresh rock tended to be higher, suggesting extensive secondary remobilisation of the elements of interest.
Page 12 Mkango Resources Ltd
Summary of assay results (grades in ppm) from the 2019 Thambani sampling programme
| Rockgrab samples | Rockgrab samples | Rockgrab samples | Trench samples | |||
|---|---|---|---|---|---|---|
| U3O8 | Ta2O5 | Nb2O5 | U3O8 | Ta2O5 | Nb2O5 | |
| Average | 777 | 761 | 5,267 | 221 | 161 | 881 |
| Median | 659 | 542 | 3,340 | 93 | 87 | 654 |
| Minimum | 6 | 7 | 63 | 14 | 15 | 222 |
| Maximum | 2,755 | 4,057 | 32,401 | 7,369 | 3,849 | 12,933 |
This programme provides new information on the nature, disposition and grade ranges of mineralisation in the Thambani Massif. Sampling of mainly fresh samples on the East Ridge indicates that the U-Ta-Nb mineralisation occurs within the gneissic bands, and surface observations indicate that it may occur in conformable zones. This provides a target for shallow drilling on the down-dip extension of the surface showings.
Mkango is currently evaluating strategic options for Thambani, including opportunities for joint venture and other potential avenues to create value.
Mkango currently retains a 100% interest in the Thambani Licence.
CHIMIMBE HILLS, MCHINJI DISTRICT
On November 14, 2017, Lancaster BVI was granted the Chimimbe Licence by the Malawi Minister of Natural Resources, Energy and Environment in respect of an area of 98.48 sq km around Chimimbe Hill, Mchinji district, Malawi. Exploration has identified a number of areas with potential for laterite and saprolite hosted nickel, cobalt, chrome, rutile, gold & base metals and other mineralization.
The Chimimbe Licence runs for a period of three years and is renewable for further periods of two years thereafter if the terms and conditions of the licence have been met.
Mkango is evaluating the Chimimbe Hill deposit in the context of geophysical data produced by the recent World Bank airborne geophysical survey of Malawi, recent infrastructure developments in the region, potential synergies with Songwe Hill and the Thambani uranium-tantalum-niobium project, options relating to sulphuric acid and/or alternative reagents supply and potential by-products, as well as opportunities to produce nickel and cobalt products for the battery electric vehicle market. The licence is also being explored for gold, rutile and base metals
Mkango retains a 100% interest in the Chimimbe Licence.
MCHINJI, MCHINJI DISTRICT
On July 4, 2019, MKA Exploration BVI was granted the Mchinji Licence by the Malawi Minister of Natural Resources, Energy and Environment in respect of an area of 868.69 sq km in the Mchinji district, Malawi, which is adjacent to licences with known mineral potential including the Company's Chimimbe Hill nickel-cobalt licence to the south.
The Mchinji Licence runs for a three-year term, after which it can be renewed twice for a further two-year period with a 50% reduction in the licence area required with each renewal.
Mkango is evaluating the Mchinji deposit in the context of geophysical data produced by the recent World Bank airborne geophysical survey of Malawi completed in 2016. Exploration is focusing on rutile, gold, base metals, nickelcobalt and graphite.
Mkango retains a 100% interest in the Mchinji Licence.
MAGINITO
Maginito was incorporated on January 3, 2018 in the BVI and is focused on downstream opportunities in the rare earths supply chain, in particular rare earth alloy, magnet and other technologies geared to accelerating growth in the electric vehicle market.
Page 13 Mkango Resources Ltd
Metalysis Agreement and Maginito Joint Venture
In March 2017, Mkango entered into a Memorandum of Understanding (" MOU ") with Metalysis to jointly research, develop and commercialise novel rare earth metal alloys for use in permanent magnets. In September 2017, Mkango and Metalysis signed a joint venture principles and exclusivity agreement (the “ Metalysis Agreement ”) for the development of advanced alloys using neodymium or praseodymium with other elements for use in permanent magnets. This included joint venture principles for a joint venture (the “ Metalysis Joint Venture ”) to commercialise intellectual property rights for the production of neodymium or praseodymium alloy powders. Under the Metalysis Agreement, Maginito will hold an 85% interest in the Metalysis Joint Venture and Metalysis will receive a 15% free carried interest.
On January 24, 2018, Talaxis invested £1 million ($1.3 million) in Maginito to acquire a 24.5% interest in Maginito to fund the research and development programme with Metalysis and other complementary downstream opportunities in the rare earths supply chain, including the proposed investment in HyProMag announced on September 23, 2019 (see subsequent events below for developments after the year end). Payment of an additional £1 million was conditional on completion of a definitive Investment Agreement in respect of Maginito and successful completion of the second phase of the research and development programme with Metalysis, upon which Talaxis would hold a 49% interest in Maginito.
On June 6, 2019, the Company announced that it had been notified by Metalysis that Metalysis had entered administration (receivership). On July 5, 2019, it was reported in the media that Power Resources Group (“PRG”) was purchasing Metalysis. The Company is in contact with PRG to determine if there is a mutually beneficial way forward for the collaboration. However, there is no guarantee that a new agreement, superceding the Metalysis Joint Venture, can be arranged. The Company is also discussing with Talaxis restructuring the agreement in relation to the additional £1m investment into Maginito.
On September 23, 2019, the Company announced that Maginito had signed an investment term sheet and one year exclusivity agreement with HyProMag Limited, a private company focused on rare earth magnet recycling. Consistent with Maginito's strategy, the rationale for the transaction includes potential synergies, such as blending of primary production originating from Songwe Hill with recycled production from HyProMag, as well as enhanced marketing flexibility and access to downstream markets for rare earth permanent magnets, which are critical materials for electric vehicles, wind turbines, consumer electronics and other technology applications.
HyProMag has licenced a patented process for extracting and demagnetising neodymium iron boron (“NdFeB”) alloy powders from magnets embedded in scrap and redundant equipment named HPMS (Hydrogen Processing of Magnet Scrap, the “Technology”). This was originally developed within the Magnetic Materials Group (“MMG”) at the University of Birmingham (“UoB”).
On January 10, 2020 the Company announced that Maginito had completed the acquisition of an initial 25% interest in HyProMag. Maginito has invested an initial £300,000 for a 25% interest in HyProMag, with an option to invest a further £1 million to increase its interest up to 49% and the first right to supply any primary rare earth raw materials for blending with recycled materials, if required, as well as product offtake and marketing rights.
The founding directors of HyProMag, comprising Professor Emeritus Rex Harris, former Head of the MMG, Professor Allan Walton, current Head of the MMG, and two Honorary Fellows, Dr John Speight and Mr David Kennedy, are leading world experts in the field of rare earth magnetic materials, alloys and hydrogen technology, and have significant industry experience.
Maginito is continuing to evaluate new downstream opportunities relating to the rare earths supply chain. Mkango retains a 75.5% interest in Maginito.
Page 14 Mkango Resources Ltd
SELECTED CONSOLIDATED FINANCIAL INFORMATION
During the year ended December 31, 2019, the Company was focused on advancing the Songwe Hill project in addition to its other projects in Malawi. Information discussed herein reflects the Company as a consolidated entity.
Financial Position
The following financial data is derived from the Company’s consolidated statements of financial position as at December 31, 2019, 2018 and 2017:
| ecember 31, 2019, 2018 and 2017: | |||
|---|---|---|---|
| As at December 31, | 2019 | 2018 | 2017 |
| Total assets | 9,830,234 | 2,685,561 | 997,869 |
| Total non-current liabilities | - | - | 1,505,561 |
| Shareholders’ equity (deficit)ofparent | 12,225,788 | 3,348,605 | (1,253,363) |
Total assets
Total assets were $9,830,234 as at December 31, 2019 as compared to $2,685,561 as at December 31, 2018. Total assets increased by $7,144,673, primarily due to a $7,129,315 increase in the amount of cash held.
At January 1, 2019, the Company had an opening cash position of $2,400,702. Cash received during the year ended December 31, 2019 was $10,829,931. This was received from three sources. First, on March 28, 2019, $9,067,027 was received from Talaxis (net of share issue expenses of $188,826) representing the third tranche of investment in Lancaster BVI. Second, $1,687,093 was received when warrants of the Company were exercised. Third, $75,811 was received when stock options were exercised. Cash used in operations was $3,571,152 and the effect of exchange rate changes on cash was a reduction of $79,114 during the year for a closing cash position of $9,530,017.
In comparison, at January 1, 2018, the Company had an opening cash position of $691,276. Cash received during the year ended December 31, 2018 was $9,058,863. This was comprised from two sources. First, during January 2018, net cash of $8,139,497 was received from Talaxis for its investments in Lancaster BVI and Maginito. Second, $919,366 was received from the exercise of warrants. Cash used in operations was $7,272,167, use of funds to purchase assets was $83,908 and the effect of exchange rate changes on cash was an increase of $6,638 during the year for a closing cash position of $2,400,702.
Total assets were $2,685,561 as at December 31, 2018 as compared to $997,689 as at December 31, 2017. Total assets increased by $1,687,872, primarily due to a $1,709,426 increase in the amount of cash held:
In comparison, at January 1, 2017, the Company had an opening cash position of $388,678. Cash received during the year ended December 31, 2017 was $609,448 for a share placement, which closed on December 30, 2016. Cash used in operations was $786,542 and the effect of exchange rate changes on cash was an increase of $108 during the year for a closing cash position of $691,276.
Total shareholders’ equity (deficit) of parent
Total shareholders’ equity was $12,225,788 as at December 31, 2019 compared to $3,348,605 as at December 31, 2018. The shareholder’ equity at December 31, 2018 has been restated from $5,038,140, a reduction of $1,689,535 to reflect the proportion of equity retained by Talaxis on investment directly in shares in Lancaster BVI and Maginito Limited of $1,372,910 and $316,625 respectively. The increase of $8,877,183 is due to the recognition of a gain on recognition of non-controlling interests of $8,406,447 following further investment by Talaxis in Lancaster BVI, and the issue of $1,921,800 in equity following the exercise of warrants and share options during the year, offset by the loss attributable to common shareholders of $1,668,652.
Total shareholders’ equity was $3,348,605 as at December 31, 2018 compared to a deficit of $1,253,363 as at December 31, 2017. The increase of $4,601,968 is due to the recognition of a gain on recognition of non-controlling interests of $8,893,437 following the initial investment by Talaxis in Lancaster BVI and Maginito, and the issue of $1,297,752 in equity following the exercise of warrants during the year, offset by the loss attributable to the common shareholders of $5,721,889.
Page 15 Mkango Resources Ltd
Summary Results of Operations
The following financial data is derived from the Company’s condensed interim consolidated financial statements as at December 31, 2019, 2018 and 2017:
| Year | ended December | ended December | ended December | 31, | ||
|---|---|---|---|---|---|---|
| 2019 | 2018 | 2017 | ||||
| Mineral exploration and research and development | 1,747,499 | 4,949,232 | 243,329 | |||
| Other expenditures* | 1,992,205 | 2,549,353 | 2,285,861 | |||
| Other items** | (700,468) | (322,457) | ||||
| Total net loss | 3,039,236 | 7,176,128 | 2,529,181 | |||
| Total net loss attributable to non-controllinginterest | 1,370,584 | 1,454,239 | - | |||
| Total net loss attributable to the common shareholders | 1,668,652 | 5,721,889 | 2,529,181 | |||
| Basic and diluted lossper share*** | $ (0.013) | $ (0.053) | $ (0.029) | |||
| Weighted average number of common shares (basic and | ||||||
| diluted) | 124,173,150 |
108,903,807 | 86,996,808 | |||
| Distributions or Dividends | $ | Nil | $Nil | $Nil |
-
Other expenditures represent all other expenditures, other than mineral exploration, research and development expenditure, disclosed in the statement of comprehensive loss and includes non-cash items.
-
** Other items are gains on the revaluation of warrants and interest income.
-
*** Loss per share for 2018 has been restated to reflect the correct calculation using the net loss attributable to the common shareholders rather than the total net loss.
The net loss for the year ended December 31, 2019 was $3,039,236 compared to the net loss reported for the year ended December 31, 2018 of $7,176,128. The net loss decreased by $4,136,892 for the comparable periods. The significant items contributing to the change include:
-
The Maginito research and development expenses decreased by $384,423 as no significant payments were required during the period to advance the collaborative research programme with Metalysis.
-
A $378,927 decrease in warrant revaluation expense for the year ended December 31, 2019 because all outstanding warrants expired or were exercised during the year.
-
A $415,627 decrease in foreign exchange loss, which resulted from the revaluation of cash balances held in currencies other than the US dollar at the end of the period.
-
A $2,817,310 decrease in exploration expenses resulting from the significant costs incurred during the year ended December 31, 2018 when the Songwe Hill project drilling program was underway. The Company incurred $546,732 in expenses for the Technical Studies during the year ended December 31, 2019
-
General and administrative expenses decreased by $247,209 for the year ended December 31, 2019 mainly as a result of lower legal costs related to the Talaxis investment agreement signed in 2018 and a reduction in Director and Officer compensation as no retirement payments were made in 2019.
The net loss for the year ended December 31, 2018 was $7,176,128 compared to the net loss reported for the year ended December 31, 2017 of $2,529,181. Net loss increased by $4,646,947 for the comparable periods. The significant items contributing to the change include:
-
General and administrative expenses were $1,024,011 higher for the year ended December 31, 2018 as a result of an increase to salaries and activities related to negotiating and preparing the Talaxis definitive agreements.
-
Mineral exploration expenditures were $4,295,730 higher for the year ended December 31, 2018 as the Company undertook the drilling program for the Songwe Hill project during that period.
-
$410,173 was spent to advance the collaborative research and development programme with Metalysis.
Page 16 Mkango Resources Ltd
RESULTS OF OPERATIONS
The selected period information and summary of financial results below is derived from and should be read in conjunction with the Company’s consolidated financial statements for the year ended December 31, 2019.
SUMMARY OF QUARTERLY FINANCIAL RESULTS
The following is selected financial data from the company’s quarterly financial statements for the last eight quarters ending with the most recently completed quarter, being the quarter ended December 31, 2019:
| 019: | ||||||||
|---|---|---|---|---|---|---|---|---|
| Total Operations Attributable to common shareholders |
Q4 | Q3 | 2019 Q2 |
Q1 | Q4 | 2018 Q3 Q2 |
Q1 | |
| Expenses Other items Warrant fair value loss (gain) Net income (loss) for period Lossper share - basic and diluted |
632,417 (187,311) 17,337 (462,443) $(0.003) |
356,632 192,129 3,038 (551,799) $(0.005) |
425,946 171,823 (450,299) (147,470) $(0.001) |
662,267 115,118 (270,446) (506,939) $(0.004) |
1,447,454 (197,969) (452,955) (796,655) $(0.021) |
2,159,919 79,217 13,395 (2,252,425) $(0.022) |
1,159,075 635,496 (21,137) (1,773,370) $(0.015) |
735,090 7,860 139,255 (899,439) $(0.008) |
The financial data for the eight periods reported have been prepared in accordance with International Financial Reporting Standards (“ IFRS ”) as issued by the International Accounting Standards Board (“ IASB ) and interpretations issued by the International Financial Reporting Interpretations Committee (“ IFRIC ”), in effect on December 31, 2019. The financial data does not include the non-controlling interest (“ NCI ”) share of net loss for the period. The Company’s principal activities require expenditures which include both exploration and general and administrative expenses.
FOURTH QUARTER 2019 COMPARED TO FOURTH QUARTER 2018
The Company recognized a net loss attributable to common shareholders of $462,443 and $796,655 for the three months ended December 31, 2019 and 2018, respectively. The decrease of $334,212 in net loss attributable to common shareholders for the three months ended December 31, 2019 compared to the same period in 2018 reflects the increase in the non-controlling interest in Consolidated Lancaster from 20% to 49% and is comprised of a decrease of $151,185 in general and administrative expenses, a decrease of $271,027 in foreign exchange losses, a decrease of $385,526 in mineral exploration expenses and an increase of $464,053 from the revaluation of warrants. The decrease in mineral exploration expenses is due to exploration activities and the ESHIA which were undertaken in Malawi and work in relation to the feasibility study for the three months ended December 31, 2018. In comparison, the Company focused on technical studies in connection with the Feasibility Study in the three months ended December 31, 2019. The increase in unrealized foreign exchange loss was due to the Company’s holdings of foreign denominated currencies in bank accounts, which were revalued for reporting purposes as at the end of each reporting period.
THIRD QUARTER 2019 COMPARED TO THIRD QUARTER 2018
The Company recognized a net loss attributable to common shareholders of $551,799 and $2,252,425 for the three months ended September 30, 2019 and 2018, respectively. The decrease of $1,700,626 in net loss attributable to common shareholders for the three months ended September 30, 2019 compared to the same period in 2018 reflects the increase in the non-controlling interest in Consolidated Lancaster from 20% to 49% and is comprised of a decrease of $135,655 in general and administrative expenses, a decrease of $174,391 in foreign exchange loss, a decrease of $1,777,682 in mineral exploration expenses and an increase of $60,019 of stock based compensation expense. The decrease in mineral exploration expenses is due to exploration activities and the ESHIA which were undertaken in Malawi and work in relation to the feasibility study for the three months ended September 30, 2018. In comparison, very little exploration activity was undertaken during for the three months ended September 30, 2019. The increase in unrealized foreign exchange loss was due to the Company’s holdings of foreign denominated currencies in bank accounts, which were revalued for reporting purposes as at the end of each reporting period.
Page 17 Mkango Resources Ltd
SECOND QUARTER 2019 COMPARED TO SECOND QUARTER 2018
The Company recognized a net loss attributable to common shareholders of $147,470 and $1,773,370 for the three months ended June 30, 2019 and 2018, respectively. The decrease of $1,625,900 in net loss attributable to common shareholders for the three months ended June 30, 2019 compared to the same period in 2018 is comprised of a decrease of $21,137 in warrant revaluation expense, an increase of $313,157 in general and administrative expenses, an increase of $455,602 in foreign exchange loss, an increase of $820,258 in mineral exploration expenses and an increase of $27,194 of stock based compensation expense. The decrease in the warrant revaluation expense is a result of all the outstanding warrants held by common shareholders either expiring or being exercised for the three months ended June 30, 2019. The increase in mineral exploration expenses is due to exploration activities and the ESHIA underway in Malawi and work in relation to the feasibility study for the three months ended June 30, 2018. In comparison, very little exploration activity was undertaken during for the three months ended June 30, 2019. The increase in unrealized foreign exchange loss was due to the Company’s holdings of foreign denominated currencies in bank accounts, which were revalued for reporting purposes as at the end of each reporting period.
FIRST QUARTER 2019 COMPARED TO FIRST QUARTER 2018
The Company recognized a net loss attributable to common shareholders of $506,939 and $897,105 for the three months ended March 31, 2019 and 2018, respectively. The decrease of $390,166 in net loss attributable to common shareholders for the three months ended March 31, 2019 compared to the same period in 2018 is comprised of a $409,701 decrease in warrant revaluation expense, a $277,855 decrease in the Maginito research and development expense, offset by an increase of $132,361 in foreign exchange loss and an increase of $102,622 in mineral exploration expenses. The decrease in the warrant revaluation expense is a result of the following: 1,136,363 warrants were exercised, 5,420,867 warrants expired and the time to expiry decreased. The remaining warrants held by common shareholders are scheduled to expire on June 15, 2019. The Maginito research and development expense is significantly lower for the three months ended March 31, 2019 because no additional funding was required to advance the collaborative research work with Metalysis. The increase in mineral exploration expenses is due to exploration activities and the ESHIA underway in Malawi and work in relation to feasibility study for the three months ended March 31, 2018. In comparison, very little exploration activity was undertaken during for the three months ended March 31, 2019. The increase in unrealized foreign exchange loss was due to the Company’s holdings of foreign denominated currencies in bank accounts, which were revalued for reporting purposes as at the end of each reporting period.
RELATED PARTY TRANSACTIONS AND BALANCES
-
a) Leo Mining Exploration Ltd. (“Leo Mining”) is considered related by virtue of common directors and officers who have an ownership in, and exercise significant influence over, both companies. The Company and Leo Mining have formalized their relationship with respect to services provided by Leo Mining. A written agreement sets out the types of services, which may be provided, and the costs associated with such services. The Company repays the disbursements made by Leo Mining on its behalf. During the year ended December 31, 2019, the Company had incurred costs of $78,821 (December 31, 2018 - $79,415) for administrative services. As of December 31, 2019, the Company has an outstanding payable to Leo Mining of $4,177 (December 31, 2018 – $12,496). The amount is unsecured and due on demand.
-
b) Talaxis is considered an insider as it holds more than 10% of the shares of the Company. Transactions and balances with Talaxis are disclosed throughout this document and the consolidated financial statements.
-
c) Zenith Advisory Services Pty Ltd. (“Zenith”) is considered a related party because a Director of the Company is a principal of Zenith. Transactions and balances with Zenith are disclosed throughout the consolidated financial statements. During the year ended December 31, 2019, the Company incurred costs of $191,403 (December 31, 2018 - $168,823) for advisory services related to the Talaxis investments. As of December 31, 2019 no amounts were outstanding to Zenith (December 31, 2018 – $nil).
-
d) The Company incurred costs of $741,666 inclusive of share-based payments (December 31, 2018 – $774,406) for key management fees and director fees for the year ended December 31, 2019. The non-executive Directors of the Company are each entitled to a fee of $16,000 per year and the Chairman of the Board is entitled to a fee of $40,000 per year. As of December 31, 2019, the Company has an outstanding payable due to directors and officers of $53,556 (December 31, 2018 – $97,792). The current liabilities due to related parties are unsecured, due on demand and non-interest bearing. The Company recorded a gain on deferral of related party consulting
Page 18 Mkango Resources Ltd
fees at the time of the initial deferral and upon deferral of each monthly amount. Accretion was recorded at an effective interest rate of 20% of the consulting fees payable. At December 31, 2018 the amounts were payable on demand and the remainder of the deferred consulting fees were paid to the executive directors in February and May 2019. The following table provides a reconciliation of amounts reflected in the consolidated financial statements for the year ended December 31, 2019 and 2018:
| he year ended December 31, 2019 and 2018: | |||
|---|---|---|---|
| December 31, | 2019 | 2018 | |
| Balance, beginning of period | $ 225,516 | $ 448,380 | |
| Consulting fees paid during the period | (d) | (226,941) | (244,969) |
| Loss on deferral of consulting fees | - | 7,960 | |
| Accretion | - | 24,512 | |
| Foreign exchange loss | 1,425 | (10,367) | |
| Balance,end ofperiod | $- | $225,516 | |
| Due to related parties with common directors | (a) | 4,177 | 12,496 |
| Due to keymanagement and directors | (d) | 53,556 | 97,792 |
| Total due to relatedparties | $57,733 | $335,804 |
Page 19 Mkango Resources Ltd
EXPENDITURES
| XPENDITURES | ||||||
|---|---|---|---|---|---|---|
| Total expenses attributable to common shareholders and NCI |
For the year ended December 31, 2019 2018 |
Change | For the three months ended December 31, 2019 2018 |
Change | ||
| General and administrative Audit and tax management Legal fees Director and Officer salaries Salaries and consulting fees Rent, storage, telephone and insurance Travel Investor relations and marketing |
88,546 220,568 487,213 252,588 125,140 80,302 259,692 |
61,340 357,879 642,203 288,768 99,031 72,779 239,258 |
27,206 (137,311) (154,990) (36,180) 26,109 7,523 20,434 |
60,286 111,718 122,993 86,943 45,535 30,551 81,474 |
42,890 294,136 123,562 105,374 44,283 28,477 51,963 |
17,396 (182,418) (569) (18,431) 1,252 2,074 29,511 |
| Sub total - General and administrative | 1,514,049 | 1,761,258 | (247,209) | 539,500 | 690,685 | (151,185) |
| Mineral exploration expenditures Songwe Hill Project Mineral extraction development Government fees ESHIA Grant refund Drilling programme Technical studies Consulting fees Malawi office and camp expenses Thambani project Mchinji project Chimimbe project Other |
519,109 17,226 161,960 (115,113) 35,907 546,732 249,260 166,583 112,992 16,454 7,979 2,660 |
588,549 36,023 342,238 - 2,571,917 - 181,175 812,959 2,782 - 3,416 - |
(69,440) (18,797) (180,278) (115,113) (2,536,010) 546,732 68,085 (646,376) 110,210 16,454 4,563 2,660 |
177,039 (34,921) 9,323 (58,885) - 296,290 61,139 69,043 29,969 12,053 (10,290) |
250,461 22,259 164,411 - 562,750 - (97,768) 30,911 1,904 - 1,358 |
(73,422) (57,180) (155,088) (58,885) (562,750) 296,290 158,907 38,132 28,065 12,053 (11,648) |
| Sub total - Mineral exploration | 1,721,749 | 4,539,059 | (2,817,310) | 550,760 | 936,286 | (385,526) |
| Research and development Maginito research and development |
25,750 | 410,173 | (384,423) | 286 | 121,657 | (121,371) |
| Sub total - Research and development | 25,750 | 410,173 | (384,423) | 286 | 121,657 | (121,371) |
| Other Expenses Share-based payments Accretion Depreciation AIM listing expense Gain on deferral of salaries Foreign exchange (gain) loss Warrant revaluation |
265,087 - 29,829 95,830 - 87,409 (700,369) |
136,976 24,512 25,906 89,703 7,960 503,036 (321,442) |
128,111 (24,512) 3,923 6,127 (7,960) (415,627) (378,927) |
90,912 - 10,989 23,439 - (386,836) 11,098 |
53,246 (8,187) 13,334 21,674 7,960 (115,809) (452,955) |
37,666 8,187 (2,345) 1,765 (7,960) (271,027) 464,053 |
| Total Expenses | $3,039,334 | $7,177,141 | $(4,137,807) | $840,148 | $1,267,891 | $(427,743) |
Year ended December 31, 2019 compared to the year ended December 31, 2018
Total expenses include those attributable to both the common shareholders and to the NCI. Total expenses decreased by $4,137,807 from $7,177,141 for the year ended December 31, 2018 to $3,039,334 for the year ended December 31, 2019, as a result of the following:
- a) General and administrative: General and administrative expenses were $247,209 lower for the year ended December 31, 2019 compared to the year ended December 31, 2018. There was a $154,990 reduction in expenses attributable to Director and officer compensation primarily as a result of a retirement payment made to two former Directors during the year ended December 31, 2018. Salaries and consulting fees were $36,180 lower due to a reclassification of two consultants’ fees to mineral exploration expenditures for the year ended December 31, 2019. Legal fees were $137,311 lower for the year ended December 31, 2019 as a result of legal costs incurred during 2018 for the investment agreement with Talaxis. Office and associated expenses $26,109 higher for the year ended December 31, 2019 and investor relations expenses were $20,434 higher for the year ended December 31, 2019.
Page 20 Mkango Resources Ltd
-
b) Mineral Exploration: Mineral exploration expenses were $2,817,310 lower for the year ended December 31, 2019 compared to the year ended December 31, 2018, primarily as a result of the completion of the drilling programme in 2018. Drilling programme expenses were $2,536,010 lower and Malawi office and camp expenses were $646,376 lower for the year ended December 31, 2019. Operational activity was higher during the year ended December 31, 2018 due to the major drilling program undertaken in Malawi. In comparison, the Company only incurred decommissioning of drilling equipment expenses during the year ended December 31, 2019 in relation to drilling and Malawi camp costs. The Company is focusing its current work efforts on completion of the Feasibility Study, with technical studies expenditures of $546,732 for the year ended December 31, 2019. The mineral extraction process research expenses were $69,440 lower and ESHIA expenses were $180,278 lower due to the completion of the environmental baseline studies and more corporate social responsibility projects carried out in 2018. The company incurred $131,227 of additional expenses as it began to advance its exploration work on the Thambani, Mchinji and Chimimbe license areas during the year ended December 31, 2019. The Company recognized $115,113 of grant funds for expenditures incurred related to the HiTech AlkCarb program, credited against mineral exploration expenses for the year ended December 31, 2019.
-
c) Research and Development: Research and development expenses were $384,423 lower for the year ended December 31, 2019 compared to the year ended December 31, 2018. The expenses were lower because no additional payments were required during the period to advance the collaborative research programme. The expenditure of $25,750 during the year ended December 31, 2019 was for an exclusivity fee for a proposed investment in HyProMag Limited to establish a Rare Earth magnet recycling facility in the UK. Further details of this proposed investment are discussed in subsequent events above.
-
d) Warrant Revaluation: The warrant revaluation expense decreased by $378,927 for the year ended December 31, 2019 compared to the year ended December 31, 2018. The value of the warrants decreased because all the outstanding warrants held by common shareholders were exercised or expired during the year ended December 31, 2019.
-
e) Foreign Exchange Loss: The foreign exchange loss for the year ended December 31, 2019 was $415,627 lower than the expense recognized for the year ended December 31, 2018 due to exchange gains on cash held in foreign currencies other than the US Dollar.
Three months ended December 31, 2019 compared to the three months ended December 31, 2018
Total expenses decreased by $427,743 from $1,267,891 for the three months ended December 31, 2019 to $840,148 for the three months ended December 31, 2018, as a result of the following:
-
a) General and administrative: General and administrative expenses were $151,185 lower for the three months ended December 31, 2019 compared to the three months ended December 31, 2018. The main reason for the decrease is reduced legal expenses as a result of fees incurred in the three months ended December 31, 2018 in connection with the investment agreement with Talaxis.
-
b) Mineral Exploration: Mineral exploration expenses were $385,526 lower for the three months ended December 31, 2019 compared to the three months ended December 31, 2018. The mineral extraction process research expenses were $73,422 lower and the technical studies expenses were $296,290 higher, compared to those expenses reported for the three months ended December 31, 2018. The company is focusing on these work efforts in order to complete the Feasibility Study. There were no drilling programme expenses for the three months ended December 31, 2019 compared to $562,750 for the three months ended December 31, 2018. The company incurred expenses of $31,732 related to advancing exploration work on the Thambani, Mchinji and Chimimbe license areas for the three months ended December 31, 2019.
-
c) Research and Development: There were no research and development expenses during the three months ended December 31, 2019 as no additional payments were required to advance the collaborative research programme compared to $121,657 during the three months ended December 31, 2018.
-
d) Warrant Revaluation: The warrant revaluation expense decreased by $464,053 for the three months ended December 31, 2019 compared to the three months ended December 31, 2018. The value of the warrants decreased because all the outstanding warrants held by common shareholders had expired or been exercised by December 31, 2019.
Page 21 Mkango Resources Ltd
- e) Foreign Exchange Differences: The foreign exchange gain for the three months ended December 31, 2019 was $271,027 higher than the gain recognized for the three months ended December 31, 2018 due to an increase in cash held by the Company in foreign currencies, which were revalued at the end of each period for reporting purposes.
DISCLOSURE CONTROLS AND PROCEDURES
In connection with National Instrument 52-109 (Certificate of Disclosure in Issuer’s Annual and Interim Filings) (“ NI 52-109 ”), the Chief Executive Officer and Chief Financial Officer of the Company have filed a Venture Issuer Basic Certificate with respect to the financial information contained in the condensed interim consolidated financial statements for the three and twelve months ended December 31, 2019 and this accompanying MD&A (together, the “ Interim Filings ”).
In contrast to the full certificate under NI 52-109, the Venture Issuer Basic Certificate does not include representations relating to the establishment and maintenance of disclosure controls and procedures and internal control over financial reporting, as defined in NI 52-109. For further information the reader should refer to the Venture Issuer Basic Certificates filed by the Company with the Interim Filings on SEDAR at www.sedar.com.
COMMITMENTS
The Company holds four licenses in Malawi with commitments to pay annual licensing fees and to meet spending commitments for exploration expenses every two years. As of the date of this report, all licenses were in good standing with the Malawi government.
The Company is continuing to meet the terms and conditions of its four exploration licences and provides updates to Malawi’s Ministry of Mining on a regular basis regarding progress of its work programs.
ISSUED AND OUTSTANDING SHARE INFORMATION
As at the date of this report, the Company has 133,000,721 Common Shares and 13,200,000 warrants issued. The Company has 13,025,000 stock options issued.
OFF BALANCE SHEET ARRANGEMENTS
The Company is not party to any off balance sheet arrangements or transactions.
ACCOUNTING POLICIES AND ESTIMATES
Management is required to make judgments, assumptions and estimates in the application of IFRS that have a significant impact on the financial results of the Company. Details outlining Mkango’s accounting policies are contained in the notes to the consolidated audited financial statements for the year ended December 31, 2019.
RISK FACTORS
Environmental Risk
The Company is subject to substantial environmental requirements. The current and anticipated future operations and exploration activities of the Company in Malawi require permits from various governmental authorities and such operations and exploration activities are and will be governed by local laws and regulations governing various elements of the mining industry including, without limitation, land use, the protection of the environment, prospecting, development, production, exports, taxes, labour standards, occupational health, waste disposal, toxic substances, and other matters. Globally, environmental legislation is evolving towards stricter standards and enforcement, more stringent environmental impact assessments of new mining projects and increasing liability exposure for companies and their directors and officers. There is no assurance that future environmental regulations will not adversely affect the Company’s operations.
Exploration and Commercial Viability Risk
The Company does not currently produce rare earth elements from Songwe Hill where it is currently engaged in a Feasibility Study. While the Company has produced a Pre-feasibility Study, there is no assurance that the Feasibility Study will demonstrate the commercial viability of the project. Some of the factors that affect the financial viability of a given mineral deposit include its size, grade and proximity to infrastructure and the realizable value of the minerals extracted. These factors include, but are not limited to, government approval for mining licences and exploration
Page 22 Mkango Resources Ltd
licence extensions applications, government regulations, taxes, royalties, land tenure, land use, environmental protection and reclamation and closure obligations. All or some of these factors may have an impact on the economic viability of Songwe Hill.
Macroeconomic Risk
From a macroeconomic perspective, ongoing global market uncertainty has led to a significant reduction in risk appetite with respect to funding investment into mining companies. The ability for mining companies to access capital through traditional means may be significantly diminished, with the possible long-term result that projects may take longer to develop or may not be developed at all.
Foreign Countries and Political Policy Risk
The Company has interests in properties that are located in the developing country of Malawi. The Company’s mineral exploration may be affected in varying degrees by political instability and government regulations relating to foreign investment and the mining industry. Changes, if any, in mining or investment policies or shifts in political attitude in Malawi may adversely affect the Company’s operations. Operations may be affected in varying degrees by government regulations with respect to, but not limited to, restrictions on production, price controls, export controls, currency remittance, direct and indirect taxes, tax assessments, royalties, expropriation of property, foreign investment, maintenance of claims, environmental legislation, land use, land claims of local people, water use and mine safety. Failure to comply with applicable laws, regulations, and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory of judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions.
Resource and Reserve Risk
Estimates of reserves and resources are inherently uncertain. There is a degree of uncertainty attributable to the calculation of reserves, resources and corresponding grades being mined or dedicated to future production. Until reserves or resources are actually mined and processed, the quantity of reserves or resources and grades must be considered as estimates only. In addition, the quantity of reserves or resources may vary depending on rare earth prices, operating costs and mining efficiency. Any material change in the quantity of reserves, resources or grade may affect the economic viability of Songwe Hill.
Mining Risks
The mining industry has been subject to considerable price volatility, over which companies have little control, and a material decline in the price of rare earth elements could result in a significant decrease in the Company's future anticipated revenues. The mining industry has inherent business risks and there is no assurance that products can continue to be produced at economical rates or that produced reserves will be replaced.
Readers are cautioned that the foregoing is a summary only of certain risk factors and is not exhaustive and is qualified in its entirety by reference to, and must be read in conjunction with the additional information on these and other factors that could affect Mkango’s operations and financial results that are included in reports on file with Canadian securities regulatory authorities and may be accessed through the SEDAR website (www.sedar.com).
FINANCIAL INSTRUMENTS AND RISK MANAGEMENT
All financial instruments are initially recognized at fair value on initial recognition of the instrument. Measurement in subsequent periods depends on whether the financial instrument has been classified as fair value through profit or loss (“ FVTPL ”), held for trading, loans and receivables, financial assets available-for-sale, financial assets held-tomaturity, and other financial liabilities.
Financial assets and financial liabilities classified as FVTPL are measured at fair value with changes in fair value recognized in net earnings or loss. Financial assets, available-for-sale, are measured at fair value, with changes in fair value recognized in other comprehensive income. Financial assets held-to-maturity, loans and receivables and other financial liabilities are measured at amortized cost using the effective interest method of amortization.
Cash is designated as FVTPL and is measured at carrying value, which approximates fair value due to the short-term nature of these instruments. Accounts receivable is designated as loans and receivables. Accounts payable and accrued liabilities and due to related parties are designated as other financial liabilities.
Page 23 Mkango Resources Ltd
The fair value of cash, accounts receivable, accounts payable and amounts due to related party approximates the carrying value. Financial instruments and share-based payment transactions are measured at fair value. The main financial risks affecting the Company are discussed below:
Fair values
Financial assets and liabilities have been classified into categories that determine their basis of measurement and for items measured at fair value, whether changes in fair value are recognized in the consolidated statement of comprehensive loss. Those categories are fair value through profit or loss; loans and receivables; and, for most liabilities, other financial liabilities.
In establishing fair value, the Company used a fair value hierarchy based on levels defined below:
-
Level 1 - quoted prices in active markets for identical assets or liabilities;
-
Level 2 - inputs other than quoted prices included in Level 1 that are observable for the asset or liability, either directly or indirectly; and
-
Level 3 - inputs for the asset or liability that are not based on observable market data.
Cash are measured at level 1; warrant derivative financial instruments are measured at level 2.
The carrying value of accounts receivable, subscriptions receivable, accounts payable and accrued liabilities and current liabilities due to related parties, approximates the fair value due to their short-term nature and maturity. Warrants with an exercise price in a currency other than the functional currency are recorded as a derivative liability and carried at fair value.
The Company has issued share purchase warrants to common shareholders, exercisable for common shares. The exercise price of the share purchase warrants is fixed in British Pounds Sterling and the functional currency of the Company is the US dollar. Therefore, warrants are considered a derivative, as a variable amount of cash in the Company’s functional currency will be received on exercise. The category “Warrants issued” below does not include warrants issued to brokers and agents since they fall under the scope of IFRS 2, share-based payments.
The value of the warrants outstanding to common shareholders decreased for the year ended December 31, 2019 as a result of warrants either expiring or being exercised. As of December 31, 2019, there are no longer any warrants outstanding to common shareholders.
Credit risk
Credit risk is the risk of loss associated with counterparty’s inability to fulfill its payment obligations. The Company's credit risk is primarily attributable to cash, receivables and the receipt of the second tranche of financing from Talaxis under the Agreement and the receipt of the remainder of the grant funding from the University of Exeter.
Concentration risk
The majority of the Company’s cash is held by one major international bank. Deposits held with this bank may exceed the amount of insurance provided on such deposits. Generally, these deposits may be redeemed upon demand and bear minimal risk.
The fair value of each warrant issued is determined at each reporting period using the Black-Scholes pricing model. In order to determine the fair value of the Company’s outstanding warrants assumptions are made with regards to the future value of the risk free interest rate, the Company’s share price volatility, the Company’s share price and the foreign exchange rate. Therefore, the fair value of the outstanding warrants is an estimate.
Page 24 Mkango Resources Ltd
| Weighted Average Exercise Price (GBP) Weighted Average Years Remaining Number of Warrants |
Amount |
|---|---|
| Balance at December 31,2017 £ 0.066 1.27 41,775,799 |
$1,698,267 |
| Warrants exercised 0.066 1.05 (7,555,679) Warrants expired - - (5,864,758) Foreign exchange effect - - - Realized fair value change - - - Unrealized fair value change - - - |
(521,458) - (63,246) 166,032 (487,474) |
| Balance at December 31,2018 £ 0.066 0.40 28,355,362 |
$792,121 |
| Warrants exercised 0.066 0.40 (20,081,533) Warrants expired - - (8,273,829) Foreign exchange effect - - - Realized fair value change - - - Unrealized fair value change - - - |
(89,073) - (2,679) (8,280) (692,089) |
| Balance at December 31,2019 - - - |
$- |
Foreign currency rate risk
The functional and reporting currency of the Company is the United States dollar. The Company enters into transactions denominated in Canadian dollars, the United States dollar, the British sterling, the Australian dollar, South African rand and Malawian kwacha. The Company raises its equity in British sterling and Canadian dollars and then purchases Euros, British sterling, United States dollars, Australian dollar, South African Rand and Malawi Kwacha funds to settle liabilities. The Company minimizes exposure to foreign exchange loss by converting funds to the appropriate currencies upon receipt of funding based on the expected use of the various foreign currencies.
The Company’s exposure to foreign currency risk as at December 31, 2019 and 2018, is most significantly influenced by the following cash amounts held in foreign currencies (amounts shown in US dollars):
| Cash: Canadian dollars United States dollars Pound Sterling Euro Malawi Kwacha Australian dollar Warrants – derivative financial instruments Due to related parties |
December 31,2019 December 31,2018 |
|---|---|
| $ 78,622 $ 66,138 2,435,854 4,530 4,131,522 2,203,377 476,002 - 34,168 126,657 2,373,849 - - (792,121) (57,733) (335,804) |
|
| $9,472,284 $1,272,777 |
The value of cash held by the Company has been adjusted for the valuations of derivative financial instruments and amounts due to related parties.
A 5% reduction in the value of the Canadian dollar, Euro and British sterling in comparison to the United States dollar would cause a net loss of approximately $350,000 (2018: $113,000). A 5% change in the value of the Malawian Kwacha in relationship to the United States dollar would not cause a material change in net loss.
Liquidity Risk
Liquidity risk includes the risk that, as a result of the Company’s operational liquidity requirements:
Page 25 Mkango Resources Ltd
-
The Company will not have sufficient funds to settle a transaction on the due date;
-
The Company will be forced to sell financial assets at a value which is less than what they are worth; or
-
The Company may be unable to settle or recover a financial asset at all.
The Company’s operating cash requirements, including amounts projected to complete the Company’s existing capital expenditure program and the Feasibility Study are continuously monitored and adjusted as input variables change. As these variables change, liquidity risks may require the Company to conduct equity issues or obtain project debt financing.
The Company has in the past relied on equity financings to fund its activities. However, given the Definitive Agreements, the Company does not anticipate the need to raise additional equity capital in the short term. Should it, however, need to raise additional funds and while it has been successful in raising funds in the past, there is no guarantee that adequate funds will be available in the future.
The following table outlines the maturities of the Company’s financial liabilities as at December 31, 2019:
| Contractual Cash Flows | Less than 1 Year | Greater than 1 Year | |
|---|---|---|---|
| Accounts payable and accrued liabilities | $ 410,645 | $ 410,645 | $ - |
| Due to relatedparties | $57,733 | $57,733 | $- |
Capital Risk
The Company’s objective when managing capital is to maintain a flexible capital structure which will allow it to execute its capital expenditure program, which includes expenditures in mining activities which may or may not be successful. The Company has no externally imposed capital requirements. Prior to the Talaxis transaction, the Company depended on equity placements to remain solvent. Should it need to do so again in the future, cash from these placements may or may not be available depending on market or other conditions.
LIQUIDITY AND CAPITAL RESOURCES
As of December 31, 2019, the Company had a working capital surplus of $9,217,893 (December 31, 2018 – $1,065,068) and retained earnings deficit attributable to the shareholders of the Company of $4,413,119 (December 31, 2018 - $11,150,914).
The operations of the Company are currently being funded by cash received from the following sources:
-
$9,067,027 in net investment proceeds received from Talaxis by Lancaster BVI, on March 28, 2019.
-
The exercise of 1,620,000 stock options during January 2019 for total cash consideration of $75,811.
-
Proceeds received upon the exercise of warrants, for total cash consideration of $1,687,093.
As of December 31, 2019, the Company no longer has outstanding warrants held by common shareholders. There are 13,200,000 advisory warrants held by Talaxis and Zenith, which remain outstanding as of the date of this report.
In addition, the Company has received €131,707 from the University of Exeter to advance the HiTech AlkCarb program, as of the date of this report. The Company expects to receive up to a total of €168,553. Expenses associated with building exploration expertise in hi-tech raw materials, improving and developing interpretation of geophysical and down-hole data have qualified for use of the grant funding.
While investments by Talaxis are in subsidiaries of Mkango, the Company has agreed with Talaxis that certain expenses of Mkango will be reimbursed by funds held by Lancaster BVI and Maginito in return for Mkango’s management of the subsidiaries.
Therefore, the Company expects that funding received from Talaxis, funds received from the exercise of warrants, funds received from the exercise of stock options and from the University of Exeter grant, will be sufficient to fund Mkango’s operations in the near term.
The Company’s consolidated cash balance at December 31, 2019 was $9,530,017 (December 31, 2018 - $2,400,702).
Page 26 Mkango Resources Ltd
Other than as disclosed herein, the Company is not aware of any trends, uncertainties, demands, commitments or events, which are reasonably likely to have a material effect on the Company’s business, financial condition or results of operations.
DIRECTORS AND OFFICERS
William Dawes, Director and Chief Executive Officer Alexander Lemon, Director and President Derek Linfield, Chairman of the Board of Directors Shaun Treacy, Director (Audit Committee Chairman) Sandra du Toit, Director (Audit Committee, Remuneration Committee) Susan Muir, Director (Audit Committee, Corporate Secretary and Remuneration Committee Chairman) Adrian Reynolds, Director (Remuneration Committee) Tim Slater, Chief Financial Officer
Page 27 Mkango Resources Ltd
APPENDIX A
The full set of TREO results for the Songwe Hill exploration program are as follows:
==> picture [468 x 181] intentionally omitted <==
==> picture [468 x 114] intentionally omitted <==
==> picture [468 x 106] intentionally omitted <==
==> picture [468 x 113] intentionally omitted <==
Page 28 Mkango Resources Ltd
==> picture [468 x 277] intentionally omitted <==
==> picture [468 x 203] intentionally omitted <==
==> picture [468 x 113] intentionally omitted <==
Page 29 Mkango Resources Ltd
==> picture [468 x 232] intentionally omitted <==
==> picture [468 x 165] intentionally omitted <==
==> picture [468 x 54] intentionally omitted <==
==> picture [468 x 158] intentionally omitted <==
Page 30 Mkango Resources Ltd
==> picture [468 x 113] intentionally omitted <==
==> picture [468 x 106] intentionally omitted <==
==> picture [468 x 91] intentionally omitted <==
These intervals are reported as down hole widths and do not necessarily represent true thicknesses and attitude of the mineralised zones, the estimation of which requires further refining of the geological model.
Page 31 Mkango Resources Ltd