ASX ANNOUNCEMENT

31 July 2013

ACTIVITIES FOR QUARTER ENDING 30 JUNE 2013

Updates on:

  • Mt Forrest Iron Project

ASX Code: MDX ABN: 28 106 866 442

  • Yilgarn Avon JV Uranium Project

  • Yilgarn Avon JV Mortlock Copper Project

Corporate Description

Mindax's Mt Forrest Iron Project is progressing through feasibility with a view to mining at the end of 2014.

Mindax is also the greenfields discoverer of a new uranium province near Mukinbudin, Western Australia.

  • Meekatharra North JV Gold Project

  • Tenure & Tenements

  • Corporate.

Mindax also has exploration projects based in Western Australia which involve Gold and Copper.

Through technically advanced exploration and an eye for detail, Mindax has successfully built a significant portfolio of 34 mineral exploration and mining tenements covering over 2,600 square kilometres. In addition, Mindax has applications in place for water and infrastructure covering over 2,400 square kilometres in support of the Mt Forrest Iron Project development.

Mindax aims to develop strategic resources through innovative exploration. Projects will be moved to production including via strategic partnerships.

Key Projects

Mt Forrest
Yilgarn-Avon JV
Mortlock JV
Iron
Sedimentary Uranium
Copper-Gold
Meekatharra JV Gold
Address
Level 2, 25 Richardson Street
West Perth WA 6005
Telephone:
+61 8 9485 2600
Facsimile: +61 8 9485 2500
Email: [email protected]
Investor Enquiries
Steve Ward
Investor Enquiries
Steve Ward
Managing Director and Chief Executive Officer
Telephone:
Email:
+61 8 9485 2600
[email protected]
Media Enquiries
David Utting
Mobile: +61 416 187 462
Email: [email protected]

Highlights include:

  • Significant progress with overall Mt Forrest Iron Project Optimised Scoping Study.

  • Mt Forrest drilling program confirms the presence of four significant beds of Detrital iron mineralisation.

  • Mt Forrest Project team expanded to add additional expertise which is now required.

  • Final discussions with Perpetual Mining Holding Limited (PMHL) in progress for Mt Forrest Joint Venture following successful Due Diligence by PMHL.

  • Uranium project drill programs and geological interpretation completed. Mukinbudin Project highly prospective. Quairading and Kellerberrin remain of interest.

  • Copper anomaly confirmed at Mortlock.

  • Preparation for Meekatharra North Gold Project drill program completed.

  • New non-executive director, Mr Yonggang Li, appointed to Board.

  • Cash balance of $3.46M at the end of the quarter.

Page 1 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

MT FORREST PROJECT

==> picture [212 x 248] intentionally omitted <==

Overview

Good progress has been made with all aspects for the Optimised Scoping Study program and for other important items which fall on the longer term project critical path.

Engineering, environmental and metallurgical resources have been increased to manage and progress the broader based project work program. There has been considerable interaction with all stakeholders.

Drilling

Detrital Drilling

Three detrital targets defined by previous drilling and gravity surveying were drill tested. Four main detrital iron areas that host a continuous bed of iron mineralisation were defined (refer to Figure 1).

The drilling was split into two campaigns to enable approved work to take place whilst approvals were sought for subsequent activities. Campaign one drilling completed in May comprised 79 holes for 1,294m was designed to confirm the thickness and grade of the mineralised beds. During June campaign two drilling was completed consisting of 45 holes for 521m and this defined the extents of the Detrital areas. Assaying for all samples and DGPS pick up of collar locations is complete. Significant drill results reporting above a 40% Fe cut-off are appended in Table 1. The collar tables are appended in Table 2. Geological interpretation and modelling of the beds is in progress.

Drill results returned indicate the Detrital area to the southwest is quite thick, up to 42m and has higher grade iron at depth. Best results include MFC0505 12m @ 40.0% Fe from 0m and 19m @ 43.7% Fe from 23m. The prospect is the largest Detrital area spanning some 1,500m length by 250m width with an average depth of 15m.

The North western Detrital has grown and returned better grades, although it is still deeper. Best results include drill hole MFC0607 14m @ 45.3%Fe from 0m. The overall scale of this bed is 1,300m long by 200m width and 8m thickness.

The North eastern Detrital is present in two sections. The northern section scale is 450m length by 300m width with an average depth of 3m. The southern section scale is larger with 970m

Page 2 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

length by 300m width and 4m depth and includes higher grade Canga iron, intersected in MFC0551 5m @ 53.3% Fe from 0m.

Regolith Mineralisation

A further 6 holes for 238m were drilled during June at Currawong testing for southern extensions of the near surface hematite and goethite mineralisation identified during the previous drilling programme conducted in October 2010. The holes intersected a package of interbedded basalt and magnetite dominant BIF with only minor development of microplatey hematite. Geological interpretation of the results are still on-going (refer to Figure1).

Water Exploration

Four holes were completed exploring for groundwater and intersected reasonable volumes of relatively fresh, near potable ground water. These holes were also geologically logged and some drill holes were sampled for iron. Assays for these holes are pending.

Metallurgical Testwork

Composite representative samples from key air-core drill holes have been selected for bulk metallurgical test work. These samples have been chosen on grade range and visual composition to test the beneficiation limits and identify a suitable lower cut–off grade for mineral resource estimation. The metallurgical test work is on-going. In addition, 2 representative diamond drill holes will be drilled during July in order to obtain a bulk sample for the metallurgical test work.

Heritage

The Koara Peoples conducted a ground clearance programme prior to the proposed drilling commencing to ensure the protection of aboriginal heritage. During June a representative from the Kalgoorlie branch of the Department of Aboriginal Affairs spent 3 days on-site inspecting 13 selected registered heritage sites within the project area to ensure that no sites had been impacted by any of the company’s exploration activities.

Although the company has not received any formal feedback from the audit the verbal feedback given at the completion of the audit was positive.

Engineering

A layout for site infrastructure required for production was created to define areas of disturbance and optimal location for ore haul to the ROM pad for processing. This includes the siting of the tailings facility, mine operations facility, the power station, fuel storage and the accommodation camp.

A desktop water resource study was undertaken to advise on the most prospective areas for a water exploration drilling program within the existing mining leases. Pipeline and services pathways were mapped from the potential bore field area to the accommodation camp and process plant.

Page 3 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Mining methods and haul paths to the process plant were considered for the Regolith and Detrital ore bodies and also took into account future mining requirements associated with the magnetite ore bodies.

Logistics

A detailed assessment was undertaken of the proposed haul road route from site to the rail at Menzies. The objective is to maximise the tonnes hauled per truck and reduce the amount of truck movements on the road. This will reduce costs and improve safety for all road users.

Discussions with other Yilgarn miners were conducted and a cooperative approach agreed for a single rail loadout facility to be located eight kilometres south of Menzies. The company will continue to engage with both the above and below ground rail operators as the project schedule progresses.

Discussions with the Shire of Menzies were undertaken relating to the siting of the rail load out facility, a new light industrial area and provision for accommodating the haulage contractors’ employees in the town.

The Company continues to be engaged fully in the Esperance Port expansion process. Meetings were held with the selected port shortlisted proponents.

Environmental

Autumn environmental surveys were undertaken to complete the second season survey requirements in the lead up to submitting our project referral submission to the EPA. The draft report for the flora survey has been received whilst the fauna survey is still outstanding.

There are minor targeted surveys planned for the next quarter based upon infrastructure locations which will substantially complete the environmental survey works.

Preparatory work for regulatory approval submissions has commenced.

Stakeholder Engagement

Discussions were undertaken with the DEC in Kalgoorlie and the Conservation Council in Perth to update them on our environmental surveys and project progress.

Regular discussions were undertaken with the Shire of Menzies regarding the potential impact on the town of the mine development and potential government support for additional infrastructure required with this increased activity.

Page 4 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Figure 1: Mt Forrest - detrital areas with May 2013 drill collar location

==> picture [466 x 677] intentionally omitted <==

Page 5 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

YAJV URANIUM (Uranium)

Mukinbudin, Kellerberrin, Quairading Projects comprising 1,485 km[2] .

Mindax Energy Pty Ltd (77%) and operator with Quasar Resources Pty Ltd (23%).

Overview

The 2013 field programme was completed with Scout drilling conducted in the Mukinbudin project area. Assay results from the four metre composite samples and 1m re-assays have been received for each of the project areas; Quairading, Kellerberrin and Mukinbudin. Geological interpretation of results has been completed.

The scout programme was designed to test for downstream variations in geology and water chemistry in the palaeochannel and to identify those sections that have the best geological conditions to allow uranium to be deposited.

==> picture [259 x 304] intentionally omitted <==

This work has identified 3 new high priority targets at the Mukinbudin Project which is extremely prospective and now contains 5 prospects over a 100km length of palaeochannel.

The Kellerberrin and Quairading Projects are less prospective, but remain of interest. Widespread modestly elevated levels of uranium (generally 20 -30 ppm Uranium) were found at Kellerberrin. No uranium occurrences were found at Quairading, but three untested areas of interest remain.

Quairading Project

All 56 scout drill holes that were drilled in March (refer to Figure 2) were completely sampled on a 4m composite basis producing a total of 680 samples, with the results being received during May (refer to the announcement dated 22 May 2013). No significant uranium results were returned, with all samples reporting less than 20ppm Uranium. Due to the poor results, no additional 1m samples were taken. Utilizing the data gained from the scout programme, the geological model of the project area was refined and 3 new areas of interest have been identified that are yet to be tested. Rehabilitation of all drill sites was completed during the period including disposal of all drill spoil, back filling of all drill sumps and collection of postdrilling radiation readings.

Page 6 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Figure 2: Quairading Project– Interpreted Channel with 2013 drill collar location and new exploration targets.

==> picture [316 x 335] intentionally omitted <==

Kellerberrin Project

All 38 scout drill holes completed in March 2013 (refer to Figure 3) were completely sampled on a 4m composite basis and results were received in May (refer to the announcement dated 23 May 2013). The initial results were encouraging with a total of 14 composites from 8 drill holes returning anomalous grades of greater than 20ppm U. The best results received included 16m @ 29ppm U in hole YAA0448 and 8m @ 32ppm U in hole YAA0460. All anomalous samples were re-sampled on a 1m basis and submitted for re-assay generating a total of 51 1m samples for which results were received in June (refer to announcement dated 1 July 2013). The results were generally low grade, in the 20-30ppm U range, and only a single sample showed any significant upgrade from the parent 4m composite – YAA0460 1m @ 63ppm U. This was also the only sample greater than 50ppm U. The 1m samples reporting above a 20ppm U are appended in Table 3 and drill collars in Table 4.

The presence of wide spread, low grade uranium and generally oxidized redox conditions suggest that the uranium may be remaining in solution and passing through the drilled area to be deposited elsewhere in the palaeochannel system. Revision of the geological model of the project area and generation of new drill targets is ongoing. Rehabilitation of all drill sites was completed during the period including disposal of all drill spoil, back filling of all drill sumps and collection of post-drilling radiation readings.

Page 7 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Figure 3: Kellerberrin Project– Interpreted Channel with 2013 drill collar location and new exploration targets.

==> picture [263 x 367] intentionally omitted <==

Mukinbudin Project

Scout drilling was completed on 26[th] April (refer to announcement dated 30 April 2013) with 87 holes for 7,603m being completed (refer Figure 4). All holes were completely sampled on a 4m composite basis with 2,006 samples collected and results received in May (refer to the announcement dated 30 May 2013). Results of these initial samples were very encouraging with 144 composites from 45 drill holes returning anomalous grades greater than 20ppm Uranium including best results of 4m @ 233ppm U in YAA0481, 4m @ 109ppm U in YAA0529 and 4m @ 104ppm U in YAA0545. A total of 87 composite samples grading greater than 25ppm Uranium were selected for re-assaying producing 340 1m samples for assay with results being received in June (refer to the announcement dated 28 June 2013).

Fourteen samples returned uranium grades greater than 100ppm Uranium including best results of 1m @ 882ppm Uranium in YAA0481 and 1m @ 406ppm Uranium in YAA0545. The 1m samples reporting above a 100ppm U cut-off are appended in Table 5. The 1m samples reporting between a 50-100ppm U cut-off are appended in Table 6 and the drill collars in appended Table 7.

Page 8 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

These results have identified 3 new areas which are extremely prospective where high grade uranium was returned from multiple drillholes on adjacent drill traverses. The Mukinbudin Project now has 5 individual prospects within a 100km length of prospective palaoechannel each of which could potentially host a uranium deposit. Planning for future exploration within these prospects is currently on-going.

Results of Mindax’s exploration programme have shown that the prospective paleochannel system is not located within the bounds of tenements E70/4062 and E70/3662 and consequently on 5[th] June both tenements were voluntarily surrendered.

Rehabilitation of all drill sites was completed during the period including disposal of all drill spoil, back filling of drill sumps and collection of post-drilling radiation readings.

Figure 4: Mukinbudin Project– Interpreted Channel with 2013 drill collar location and new exploration targets

==> picture [358 x 444] intentionally omitted <==

Page 9 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

YAJV MORTLOCK (Copper, Gold)

Mortlock project comprising nine tenements covering 571km[2] .

Mindax Energy Pty Ltd (77%) and operator with Quasar Resources Pty Ltd (23%) (includes SIPA JV E70/2518-19/21 - YAJV 51% and operator)

==> picture [240 x 232] intentionally omitted <==

A total of 58 drillholes for 2,748m were previously completed between February 27[th] and March 3[rd] 2013 at the Centre Forrest prospect on E70/3266.

Encouraging 4 metre assay results were received for a number of holes, with the best result intersected in drill hole CFA0072 of 12 metres at 0.65%Cu from 32m downhole, including 4 metres at 1.01%Cu from 32m downhole. The adjacent drillhole CFA0074, located 50m along strike to the south, intersected 8 metres at 0.50%Cu from 24m downhole. The assay results have been interpreted as two zones of supergene copper enrichment offset approximately

500m by a large fault. The footprint of these two zones covers approximately 700x500m and 600x300m respectively and could indicate the existence of a larger mineralising system at depth. Please refer to announcement of 8 May 2013.

Selected one metre samples were sent for further assay (results were announced on 22 July 2013). Further interpretation and future work planning is now in progress. The 1m samples reporting above a 1000ppm Cu cut-off are appended in Table 8 and the drill collars in Table 9.

MEEKATHARRA NORTH JV (Gold)

Mindax 100% and operator (JV earn-in phase commenced)

The Meekatharra North Project is located along strike from the Paddy’s Flat gold field (where 2.5 million ounces have been produced) and immediately south from Doray Minerals Limited (ASX: DRM) high grade Andy Well gold project (831,000t @ 12.7g/t for 338,000 contained ounces – ASX 30th July 2012). Work by Doray suggests that the mineralised structures encountered to date continue southwards. Doray has recently commenced mining. Geological interpretation of the Sub Audio Magnetics (SAM) survey conducted in the previous quarter was completed with 6 target areas being defined for drill testing and a 6,000m aircore/RC drill programme designed to test the first of these targets. Preparations for drilling are nearly complete. Drilling will commence upon completion of a heritage survey which will be conducted in the first week of July,

==> picture [174 x 208] intentionally omitted <==

Page 10 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

The highest priority targets and the planned drill lines are shown below. This work is fully funded by the $2.5M farm-in agreement with Messrs Zhuang (announced 10 October 2012). Please note that Drilling was in progress at the time of posting of this report.

Figure 5: 2013 SAM survey with exploration targets (polygons), planned drill traverses (pink lines) and existing drillholes.

==> picture [473 x 290] intentionally omitted <==

TENURE

A total of 52 Tenements covering 5,062.6 km2 were held as at 30 June 2013.

41 are granted titles: 7 mining leases, 27 exploration licences and 7 miscellaneous licences.

11 are applications for miscellaneous licences related to the Mt Forrest Iron Project.

TENEMENTS

Tenements Applications:

Nil.

Tenements Granted:

Nil

Tenements Surrendered:

Two tenements: E70/3662 and E70/4062 were surrendered on 5 June 2013.

Page 11 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

CORPORATE

Cash Reserves and Capital Raisings

As at 28 June 2013 the Company held cash reserves of approximately $3.46 million to apply to the Company’s project activities and to provide working capital.

Movements in Capital Structure

Exercise of unlisted options

On 21 June 2013 the Company allotted two (2) fully paid ordinary shares as a result of the exercise of unlisted options expiring on 31 May 2015, with an exercise price of $0.35 each.

Lapse of unlisted employee options

On 3 June 2013, the Company announced that in accordance with clause 5.6 of the Company’s Employee Option Scheme the following unlisted employee options lapsed without exercise at 5:00pm (AWST) Friday 31 May 2013:

  • 650,000 options with an exercise price of $0.45; and

  • 650,000 options with an exercise price of $0.60.

Changes in associated holdings

On 3 April 2013, the Company was notified by two of its substantial shareholders that they, along with a third non-substantial shareholder, were to be considered ‘associates’ in relation to Mindax’s affairs. The associated shareholding is summarised as follows:

Name No of Shares % of issued capital
Mr Qi Lin 5,900,000 2.34%
Mr Chenfei Zhuang 19,844,956 7.87%
Mr Zhensheng Zhuang 23,295,522 9.23%
Total 49,040,478 19.44%

Board Appointment

On 18 April 2013 the Company announced the appointment of an additional non-executive director to its Board.

The new director, Mr Yonggang Li, was nominated by the aforementioned group of associated Mindax shareholders. Mr Li was appointed with immediate effect and will offer himself for election at the Company’s next Annual General Meeting of shareholders.

Mr Li is a widely experienced Chinese businessman who has significant exposure to iron ore mining and the Chinese market in general.

On the same date, Mr Li appointed Mr Chenfei Zhuang as his alternate director. Mr Zhuang is a substantial shareholder in Mindax and a JV partner with Mindax in the Meekatharra North Gold Project. However, on 29 June 2013 Mr Li terminated Mr Zhuang’s appointment as Mr Li

Page 12 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

felt he could now personally dedicate the time required in full for his directorial responsibilities to the Company.

Strategic Partnership for the Mt Forrest Iron Project

Following the Company’s announcement, on 26 March 2013 regarding a proposed strategic partnership with Perpetual Mining Holding Limited ( PMHL ) for the further exploration and development of the Mt Forrest Iron Project ( the Joint Venture ), PMHL undertook a due diligence review of the project and the Company.

Following their due diligence review, on 15 May 2013 PMHL issued the Company with a preliminary notice of their intention to proceed with the Joint Venture. The notice was subject to formal PMHL Board approval within four weeks to proceed with the Transaction. Subsequently, on 11 June 2013, PMHL issued to formal notice advising that their Board had formally issued its approval to proceed with the Transaction.

The Transaction remains subject to negotiation and execution of a binding formal joint venture agreement as well as any statutory approvals required to proceed with the strategic partnership.

Joint Venture Agreement negotiations have commenced (and are continuing as at the date of this report) taking into consideration the Memorandum of Understanding previously agreed between PMHL and Mindax.

Capital Structure

The current issued capital of the Company is as follows:

Number Quoted Class
252,303,570 Fully paid ordinary shares.
Number Not
Quoted
Class
1,100,000 Employee options with an exercise price of $0.45 per option, expiring
30 September 2013.
1,100,000 Employee options with an exercise price of $0.60 per option, expiring
30 September 2014.
2,321 Options with an exercise price of $0.35 per option, expiring 31 May
2015.
4,000,000 Employee options issued to the Company’s Managing Director &
CEO, with an exercise price of $0.108 per option, expiring 9
November 2015.
2,500,000 Non-executive director options, with an exercise price of $0.11 per
option, expiring 10 December 2015.

Page 13 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Top 20 Shareholders

The current top 20 shareholders of the Company are as follows:

Rank Name Units % of Units
1 LAP Exploration Pte Ltd 32,034,616 12.697
2 Mr Andrew Tsang 30,794,133 12.205
3 HSBC Custody Nominees (Australia) Limited 24,068,366 9.539
4 Mr Zhensheng Zhuang 23,295,522 9.233
5 Mr Chenfei Zhuang 19,844,956 7.866
6 Ms Lai You 15,534,431 6.157
7 Jupiter Mines Limited 13,213,579 5.237
8 Mr Guo Xiong Zeng 6,148,971 2.437
9 Mr Qi Lin 5,900,000 2.338
10 Citicorp Nominees Pty Limited 5,666,643 2.246
11 Ms Lici Zeng 5,097,151 2.020
12 Mr Jian Cai Chen 5,000,000 1.982
13 Sherryland Investments Pty Ltd 4,999,000 1.981
14 Chipingi Pty Ltd 4,840,000 1.918
15 Mr Gilbert Charles George 3,639,413 1.442
16 Mr Yuanwen Zhu 3,139,706 1.244
17 Mr Chengze Yu 2,398,789 0.951
18 Ms Mei Ying Yang 1,764,706 0.699
19 Ms Lixuan Zeng 1,547,900 0.614
20 Mr Chaohui Zhang 1,499,000 0.594
Totals 210,426,882 83.402%

ASX Announcements

The announcements lodged by the Company with the ASX since the commencement of the last quarter are listed as follows:

Date Title
3/04/2013 Change in substantial holding (x 2).
9/04/2013 Mt Forrest Iron Project - Due Diligence.
10/04/2013 New areas of iron mineralisation identified at Mt Forrest.
18/04/2013 Board Appointments.
19/04/2013 Initial Director's Interest Notice (x2).

Page 14 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Date Title
29/04/2013 Quarterly Cashflow Report.
29/04/2013 Quarterly Activities Report.
30/04/2013 Uranium Project Drilling Completed at Mukinbudin.
8/05/2013 Elevated copper assays received from drilling at Mortlock.
15/05/2013 Mt Forrest Project - Notice of intention received from PMHL.
17/05/2013 BRR Webcast - Mindax moves closer to securing JV with PMHL.
20/05/2013 Second phase drilling commences at the Mt Forrest Project.
22/05/2013 Scout drilling completed on Quairading Uranium Project.
23/05/2013 Scout drilling completed on Kellerberrin Uranium Project.
30/05/2013 Encouraging drill results for Mukinbudin Uranium Project.
31/05/2013 Unlisted employee options lapse.
11/06/2013 PMHL agree to proceed with final joint venture negotiations.
21/06/2013 Exercise of Unlisted Options.
28/06/2013 Mukinbudin - Three new high grade uranium anomalies confirmed.
1/07/2013 Final Director's Interest Notice - Mr C Zhuang.
1/07/2013 Termination of Alternate Director appointment - Mr C Zhuang.
1/07/2013 Assaying completed on Kellerberrin Uranium Project.
17/07/2013 Change of Director's Interest Notice
17/07/2013 Change of Director's Interest Notice (2nd notice)
17/07/2013 Response to ASX Query
22/07/2013 Assay results from 1M samples received for Mortlock Project
23/07/2013 Exploration drilling commences at Meekatharra North Project
30/07/2013 New areas of iron mineralisation confirmed at Mt Forrest

ASX Codes

MDX – listed ordinary shares.

Page 15 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

COMPETENT PERSONS’ STATEMENT

In relation to the YAJV, Dr Katrin Kärner is a member of the Australasian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which she is undertaking to qualify as a competent person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr Kärner is a full-time employee of Optiro Pty Ltd, and the Company holds a prior consent to include the matters based on her information in the context in which it appears in this report.

In relation to the Mt Forrest Iron Project, the information in this report that relates to Mineralisation, Exploration and Drilling Results is based on information compiled by Mr John Vinar who is a member of the Australasian Institute of Mining and Metallurgy, with more than 5 years’ experience in the field of activity being reported on. Mr Vinar is a full-time employee of the Company and has sufficient experience which is relevant to the style of mineralisation and type of deposit and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. The Company holds a prior consent from Mr Vinar to include the matters based on his information in the context in which it appears in this report.

Also in relation to the Mt Forrest Iron Project, the mineral estimates have been completed by Mr Michael Andrew who is a member of the Australasian Institute of Mining and Metallurgy (MAusIMM) and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity to which he is undertaking to qualify as a competent person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Andrew is a full-time employee of Optiro Pty Ltd, and the Company holds a prior consent to include the matters based on his information in the context in which it appears in this report.

Page 16 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

APPENDIX

Mt Forrest Iron Project

Table 1: Mt Forrest - Drill Assays above ~40%cut-off

Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off
Depth
To
Hole ID Depth From Fe% SiO2 % **Al2O3% ** P% S% LOI%
MFC0371 0 1 43.1 21.2 11.6 0.02 0.04 5.1
MFC0371 1 2 43.7 22.4 10.0 0.02 0.03 4.3
MFC0373 0 1 45.7 17.5 11.0 0.02 0.04 4.4
MFC0373 1 2 45.0 19.1 10.6 0.02 0.03 4.2
MFC0373 2 3 45.6 18.2 10.6 0.02 0.03 4.1
MFC0373 3 4 41.5 23.0 11.3 0.02 0.03 4.5
MFC0374 0 1 46.5 16.2 11.5 0.02 0.04 4.7
MFC0374 2 3 47.4 16.0 10.8 0.02 0.03 4.2
MFC0376 0 1 41.3 25.5 9.9 0.02 0.04 4.6
MFC0376 1 2 43.6 22.2 9.9 0.02 0.04 4.5
MFC0376 2 3 42.7 22.9 9.9 0.02 0.04 4.5
MFC0378 4 5 40.0 25.5 10.6 0.02 0.03 4.9
MFC0378 5 6 40.0 25.2 11.6 0.01 0.03 4.8
MFC0379 2 3 40.4 25.2 10.7 0.02 0.03 4.7
MFC0379 4 5 39.9 25.5 10.6 0.02 0.03 4.8
MFC0379 5 6 39.8 24.5 11.5 0.01 0.03 4.8
MFC0386 3 4 39.7 27.3 10.5 0.02 0.02 5.2
MFC0386 4 5 43.2 23.4 9.4 0.02 0.03 4.6
MFC0387 0 1 50.6 12.6 10.1 0.01 0.03 4.3
MFC0387 1 2 47.4 15.2 10.9 0.01 0.02 4.7
MFC0387 2 3 43.1 18.5 12.9 0.01 0.02 5.7
MFC0387 8 9 46.1 8.7 15.1 0.01 0.10 7.5
MFC0387 9 10 51.9 6.5 10.6 0.01 0.05 5.8
MFC0387 10 11 47.0 10.3 11.5 0.01 0.05 7.8
MFC0387 11 12 41.4 15.3 14.3 0.01 0.04 8.7
MFC0388 0 1 48.5 11.7 12.2 0.01 0.06 5.3
MFC0388 1 2 46.2 13.9 12.3 0.01 0.03 5.5
MFC0388 2 3 45.6 15.0 12.2 0.01 0.03 5.7
MFC0388 3 4 46.0 15.0 10.8 0.01 0.02 5.2
MFC0388 4 5 42.5 15.6 14.3 0.01 0.02 6.9
MFC0388 5 6 40.7 15.3 15.2 0.01 0.02 7.5
MFC0388 6 7 41.0 15.1 15.4 0.01 0.02 7.2
MFC0388 7 8 43.0 13.2 14.2 0.01 0.02 7.6
MFC0388 8 9 47.1 10.8 11.5 0.01 0.03 6.6
MFC0388 9 10 49.9 9.0 9.1 0.01 0.03 6.2
MFC0388 10 11 42.9 13.2 12.8 0.01 0.03 8.6

Page 17 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 1: Mt Forrest - Drill Assays above ~40%cut-off

Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off
Depth
To
Hole ID Depth From Fe% SiO2 % **Al2O3% ** P% S% LOI%
MFC0390 0 1 42.7 21.3 10.7 0.02 0.04 5.1
MFC0390 1 2 43.5 22.0 9.5 0.02 0.04 4.7
MFC0390 12 13 41.4 17.7 15.3 0.01 0.04 6.3
MFC0390 13 14 41.8 16.9 15.5 0.01 0.05 6.6
MFC0391 0 1 42.4 21.4 10.9 0.01 0.04 5.6
MFC0391 1 2 43.7 21.6 9.9 0.02 0.04 5.4
MFC0391 2 3 45.9 19.6 8.8 0.01 0.04 4.7
MFC0391 3 4 43.9 20.2 9.5 0.01 0.03 5.9
MFC0391 4 5 46.6 18.9 8.5 0.02 0.03 4.5
MFC0391 5 6 43.8 21.1 8.6 0.02 0.03 5.2
MFC0391 6 7 44.0 22.1 8.8 0.01 0.03 5.0
MFC0391 11 12 39.8 17.6 16.0 0.01 0.07 7.5
MFC0391 12 13 40.6 14.6 16.2 0.01 0.33 8.2
MFC0391 13 14 43.9 8.5 17.8 0.01 0.19 9.2
MFC0391 14 15 43.1 8.9 16.6 0.01 0.65 9.7
MFC0391 15 16 44.9 8.8 13.6 0.01 0.34 8.0
MFC0392 13 14 41.2 11.9 19.2 0.01 0.08 7.3
MFC0392 14 15 40.0 14.3 17.6 0.01 0.06 7.4
MFC0394 2 3 40.2 25.4 10.6 0.02 0.03 5.1
MFC0394 7 8 40.3 20.3 14.6 0.01 0.03 6.0
MFC0394 10 11 41.1 9.5 19.8 0.01 0.14 9.3
MFC0395 1 2 48.3 17.7 7.4 <DET 0.05 4.3
MFC0395 2 3 42.7 22.3 9.7 <DET 0.05 5.5
MFC0395 4 5 40.2 22.0 12.5 0.00 0.04 6.2
MFC0395 5 6 42.0 19.0 12.8 <DET 0.03 6.1
MFC0395 6 7 44.4 15.7 13.1 <DET 0.04 6.0
MFC0395 9 10 42.6 13.0 12.3 <DET 0.07 9.1
MFC0399 0 1 44.6 21.3 9.9 <DET 0.03 4.3
MFC0410 3 4 40.7 22.2 12.2 <DET 0.03 5.5
MFC0412 3 4 40.9 21.4 12.5 <DET 0.02 5.5
MFC0412 4 5 43.6 20.5 11.1 <DET 0.02 4.8
MFC0412 5 6 45.0 19.6 10.4 <DET 0.02 4.5
MFC0412 7 8 42.4 21.2 11.9 <DET 0.03 5.6
MFC0412 8 9 41.7 21.5 12.0 <DET 0.03 5.5
MFC0412 9 10 40.2 22.0 12.3 <DET 0.02 5.7
MFC0412 10 11 40.7 22.0 12.5 <DET 0.02 5.8
MFC0412 11 12 41.0 21.4 12.6 <DET 0.02 6.4
MFC0412 12 13 43.1 18.9 12.5 <DET 0.02 5.6
MFC0412 13 14 41.5 19.9 12.5 <DET 0.02 5.8

Page 18 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 1: Mt Forrest - Drill Assays above ~40%cut-off

Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off
Depth
To
Hole ID Depth From Fe% SiO2 % **Al2O3% ** P% S% LOI%
MFC0412 14 15 40.8 22.0 13.1 <DET 0.02 6.0
MFC0412 15 16 43.5 19.2 10.9 <DET 0.02 5.6
MFC0412 18 19 40.7 24.5 11.6 0.01 0.02 5.4
MFC0412 28 29 40.4 18.2 15.2 0.00 0.01 7.0
MFC0412 29 30 42.4 14.8 15.2 0.00 0.01 6.6
MFC0412 30 31 41.4 12.8 14.1 0.00 0.06 11.9
MFC0413 1 2 40.4 21.9 12.3 0.01 0.04 5.7
MFC0413 2 3 39.8 23.1 12.8 0.00 0.04 5.8
MFC0413 3 4 40.5 20.9 13.3 0.01 0.04 5.9
MFC0413 4 5 41.8 21.5 12.3 <DET 0.04 5.6
MFC0413 5 6 41.3 22.0 12.2 0.01 0.04 5.7
MFC0413 6 7 41.0 23.0 10.9 0.01 0.04 5.8
MFC0413 7 8 39.7 22.9 13.1 0.00 0.05 6.7
MFC0413 8 9 45.2 17.7 11.3 <DET 0.04 5.3
MFC0413 9 10 42.5 20.3 11.9 0.01 0.04 5.5
MFC0413 10 11 40.5 21.0 12.0 <DET 0.04 5.9
MFC0413 11 12 41.3 21.5 11.8 0.01 0.04 5.6
MFC0413 12 13 43.8 19.4 11.8 0.00 0.03 5.3
MFC0413 13 14 42.7 19.9 11.7 0.00 0.03 5.2
MFC0417 1 2 39.8 24.0 12.9 0.03 0.03 5.5
MFC0418 0 1 39.9 22.4 12.7 0.03 0.05 6.4
MFC0418 1 2 41.5 22.3 12.7 0.02 0.03 5.3
MFC0418 2 3 41.3 22.3 12.4 0.03 0.03 5.4
MFC0418 3 4 42.1 22.1 11.9 0.03 0.03 5.3
MFC0418 6 7 41.9 21.6 12.4 0.03 0.03 5.3
MFC0418 7 8 39.8 24.1 12.0 0.02 0.03 5.8
MFC0418 30 31 40.1 21.9 12.6 0.03 0.01 5.5
MFC0418 31 32 43.5 19.9 11.8 <DET 0.01 5.2
MFC0418 32 33 42.9 18.7 11.1 <DET 0.01 5.6
MFC0418 33 34 45.4 17.5 10.2 <DET 0.01 5.3
MFC0418 34 35 51.0 12.5 7.9 <DET 0.01 4.3
MFC0418 35 36 45.7 15.6 10.6 <DET 0.02 6.3
MFC0418 36 37 43.9 14.9 11.7 <DET 0.02 7.1
MFC0418 37 38 44.2 14.9 11.8 <DET 0.03 7.8
MFC0419 4 5 39.7 24.0 11.8 0.03 0.02 5.6
MFC0419 5 6 40.0 24.2 11.2 0.04 0.02 5.8
MFC0419 11 12 40.5 23.5 10.7 <DET 0.02 5.6
MFC0419 12 13 41.5 22.5 11.1 0.03 0.02 5.5
MFC0419 13 14 42.3 21.1 11.2 <DET 0.02 5.3

Page 19 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 1: Mt Forrest - Drill Assays above ~40%cut-off

Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off
Depth
To
Hole ID Depth From Fe% SiO2 % **Al2O3% ** P% S% LOI%
MFC0419 14 15 41.3 24.0 10.9 0.05 0.02 5.4
MFC0419 15 16 41.1 23.8 10.2 <DET 0.02 5.4
MFC0419 24 25 40.7 21.3 13.2 0.06 0.01 6.3
MFC0419 25 26 42.8 17.4 12.5 0.05 0.01 5.9
MFC0419 26 27 45.6 16.2 11.8 0.05 0.01 5.5
MFC0419 27 28 47.7 13.7 11.4 0.05 0.01 5.5
MFC0419 28 29 45.4 17.6 10.8 0.08 0.02 6.1
MFC0419 29 30 47.0 15.7 9.6 0.06 0.02 6.0
MFC0419 30 31 46.3 15.4 11.6 0.04 0.01 5.6
MFC0419 31 32 50.1 12.7 9.5 0.05 0.01 4.2
MFC0419 32 33 51.3 11.2 8.7 0.07 0.02 4.9
MFC0419 34 35 41.5 13.0 14.6 0.05 0.03 11.4
MFC0429 3 4 42.4 19.3 12.9 0.01 0.03 5.7
MFC0429 15 16 39.9 19.3 13.2 0.04 0.04 7.7
MFC0432 2 3 40.0 24.6 11.5 0.02 0.03 5.5
MFC0436 3 4 39.8 26.7 10.4 0.03 0.02 4.8
MFC0437 4 5 41.2 24.3 10.2 0.03 0.02 4.4
MFC0437 5 6 40.9 24.6 11.1 0.02 0.02 4.9
MFC0438 3 4 40.4 22.9 12.5 0.02 0.03 5.8
MFC0438 4 5 41.7 21.3 12.3 0.02 0.03 5.6
MFC0438 5 6 42.2 21.1 11.9 0.02 0.03 4.9
MFC0439 4 5 41.0 24.5 10.6 0.02 0.02 4.9
MFC0439 5 6 43.5 22.6 9.4 0.02 0.02 4.6
MFC0439 6 7 39.8 25.1 10.6 0.02 0.02 5.3
MFC0439 7 8 41.1 23.9 11.2 0.02 0.02 5.3
MFC0440 1 2 40.6 28.1 7.1 0.03 0.04 5.1
MFC0442 1 2 44.2 17.5 12.2 0.01 0.03 5.5
MFC0443 0 1 46.8 14.3 12.1 0.02 0.06 6.0
MFC0444 0 1 42.7 19.8 12.1 0.30 0.04 6.0
MFC0444 1 2 42.7 20.6 12.2 0.36 0.03 6.0
MFC0444 2 3 46.3 17.6 10.5 0.03 0.03 5.5
MFC0444 3 4 44.6 18.9 11.8 0.03 0.03 5.7
MFC0444 4 5 46.2 17.2 11.8 0.02 0.03 5.4
MFC0444 5 6 44.8 18.3 12.0 0.02 0.03 5.2
MFC0444 6 7 42.3 21.2 11.4 0.02 0.03 5.8
MFC0444 7 8 39.7 24.7 10.8 0.02 0.03 6.1
MFC0445 0 1 43.5 22.3 10.4 0.04 0.03 5.0
MFC0445 1 2 44.3 20.2 10.7 0.04 0.03 4.7
MFC0445 2 3 40.6 22.6 12.6 0.04 0.03 5.9

Page 20 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 1: Mt Forrest - Drill Assays above ~40%cut-off

Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off
Depth
To
Hole ID Depth From Fe% SiO2 % **Al2O3% ** P% S% LOI%
MFC0445 3 4 42.8 20.1 11.7 0.03 0.03 5.1
MFC0446 1 2 45.4 19.0 9.7 0.04 0.03 5.4
MFC0446 2 3 44.1 20.6 9.8 0.04 0.02 5.5
MFC0447 1 2 44.7 20.6 10.1 0.03 0.03 4.6
MFC0448 0 1 41.7 24.5 10.1 0.04 0.03 5.1
MFC0449 0 1 41.0 25.8 9.6 0.04 0.03 5.2
MFC0450 0 1 42.5 22.7 10.8 0.03 0.03 5.4
MFC0450 1 2 43.8 22.0 9.9 0.03 0.02 4.7
MFC0450 2 3 44.2 21.8 9.9 0.03 0.02 4.9
MFC0450 3 4 47.1 19.0 9.1 0.04 0.02 4.4
MFC0451 0 1 44.2 19.4 9.4 0.03 0.06 6.3
MFC0452 0 1 46.3 18.4 8.9 0.03 0.03 4.3
MFC0452 1 2 43.7 18.9 11.4 0.02 0.03 5.8
MFC0452 2 3 45.7 17.1 10.7 0.02 0.03 5.5
MFC0452 3 4 47.7 15.6 9.6 0.01 0.03 5.0
MFC0452 4 5 49.0 14.6 8.8 0.02 0.03 4.7
MFC0452 5 6 50.7 13.0 9.2 0.01 0.03 4.4
MFC0452 6 7 48.5 14.8 9.8 <DET 0.02 4.5
MFC0452 7 8 48.6 14.9 9.7 <DET 0.02 4.6
MFC0452 10 11 42.0 18.3 11.7 0.00 0.02 5.6
MFC0452 11 12 45.8 11.9 10.1 0.01 0.30 7.9
MFC0452 12 13 43.2 11.1 12.0 <DET 0.34 11.2
MFC0453 0 1 41.4 22.0 12.3 0.01 0.02 6.1
MFC0453 1 2 41.3 21.9 11.6 0.01 0.02 6.0
MFC0453 2 3 49.0 14.5 9.8 <DET 0.03 5.1
MFC0453 3 4 49.1 14.4 9.4 0.02 0.03 4.6
MFC0453 4 5 46.3 17.1 10.1 0.02 0.03 5.0
MFC0453 5 6 49.2 14.0 10.0 0.01 0.03 4.8
MFC0453 6 7 51.0 12.1 9.1 0.01 0.03 4.2
MFC0454 0 1 51.0 12.2 8.6 <DET 0.05 4.3
MFC0454 1 2 41.5 20.1 11.9 0.06 0.12 6.9
MFC0454 2 3 40.8 22.4 11.6 0.01 0.12 7.0
MFC0454 3 4 45.0 20.1 10.4 0.07 0.06 5.1
MFC0454 4 5 48.6 15.8 9.3 <DET 0.04 4.3
MFC0454 5 6 41.7 24.1 10.9 <DET 0.02 5.2
MFC0454 6 7 40.5 25.0 11.1 <DET 0.02 5.6
MFC0454 7 8 43.7 19.5 11.0 0.01 0.02 5.5
MFC0454 8 9 40.3 23.6 12.0 <DET 0.01 5.7
MFC0456 1 2 48.3 17.4 8.8 0.03 0.03 4.2

Page 21 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 1: Mt Forrest - Drill Assays above ~40%cut-off

Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off
Depth
To
Hole ID Depth From Fe% SiO2 % **Al2O3% ** P% S% LOI%
MFC0456 2 3 44.5 21.9 8.7 0.02 0.02 4.4
MFC0459 2 3 40.0 26.8 10.0 0.01 0.02 4.9
MFC0460 0 1 49.1 12.8 10.4 0.01 0.06 4.9
MFC0461 7 8 41.0 22.5 11.8 0.01 0.02 5.4
MFC0462 0 1 43.7 22.8 8.9 0.02 0.04 4.8
MFC0463 0 1 41.3 26.1 9.2 0.01 0.04 4.7
MFC0465 13 14 43.5 21.5 10.7 <DET 0.02 4.7
MFC0465 14 15 44.5 16.5 10.7 <DET 0.03 7.1
MFC0465 15 16 43.3 13.7 10.6 <DET 0.04 11.3
MFC0467 0 1 44.3 21.1 9.9 <DET 0.03 4.5
MFC0467 1 2 41.4 22.2 11.7 <DET 0.03 5.4
MFC0468 0 1 42.2 24.0 10.1 <DET 0.04 4.8
MFC0468 1 2 39.9 26.1 10.3 <DET 0.03 5.0
MFC0468 2 3 46.5 17.9 10.1 <DET 0.03 4.6
MFC0468 3 4 42.3 20.5 11.9 <DET 0.03 5.4
MFC0474 3 4 39.9 25.3 10.5 0.02 0.03 5.1
MFC0474 4 5 40.4 24.4 10.9 0.02 0.03 5.7
MFC0474 4 5 40.1 25.1 10.5 0.02 0.03 5.8
MFC0474 5 6 43.2 20.8 10.3 0.02 0.02 5.5
MFC0474 6 7 43.9 19.9 9.7 0.01 0.02 4.9
MFC0474 7 8 44.8 18.2 10.0 0.02 0.02 5.3
MFC0474 8 9 46.0 17.6 10.0 0.02 0.02 5.1
MFC0474 9 10 46.5 16.7 9.0 0.02 0.03 5.2
MFC0474 10 11 42.3 17.9 11.6 0.01 0.04 6.9
MFC0480 2 3 46.1 16.8 10.5 0.01 0.03 4.7
MFC0480 3 4 52.0 10.1 9.2 <DET 0.11 4.2
MFC0480 4 5 55.0 6.7 8.4 0.00 0.11 3.7
MFC0480 5 6 56.8 5.8 7.8 0.00 0.06 3.5
MFC0481 0 1 43.9 20.2 9.4 0.00 0.03 4.9
MFC0482 0 1 45.8 19.6 9.1 0.00 0.03 4.2
MFC0484 0 1 47.1 17.3 9.5 <DET 0.04 4.1
MFC0484 1 2 45.8 19.5 9.8 <DET 0.03 4.2
MFC0484 2 3 46.5 19.4 9.5 <DET 0.03 3.9
MFC0484 3 4 45.4 21.4 9.2 <DET 0.03 4.2
MFC0485 0 1 44.4 16.2 12.9 <DET 0.06 5.6
MFC0485 1 2 42.2 22.5 10.3 <DET 0.04 5.5
MFC0485 2 3 42.0 23.5 9.0 <DET 0.03 5.1
MFC0485 3 4 45.7 18.6 8.9 <DET 0.02 4.6
MFC0485 3 4 44.5 19.8 9.2 <DET 0.02 4.8

Page 22 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 1: Mt Forrest - Drill Assays above ~40%cut-off

Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off Table 1: Mt Forrest - Drill Assays above ~40%cut-off
Depth
To
Hole ID Depth From Fe% SiO2 % **Al2O3% ** P% S% LOI%
MFC0485 4 5 41.2 24.6 10.0 <DET 0.03 4.9
MFC0486 0 1 42.6 24.8 9.5 <DET 0.03 3.9
MFC0487 0 1 41.7 26.7 8.1 0.02 0.03 4.7
MFC0488 2 3 41.2 19.8 12.1 0.01 0.05 6.2
MFC0488 3 4 41.5 20.3 12.3 0.01 0.04 6.2
MFC0488 4 5 44.9 17.9 10.1 0.01 0.05 5.0
MFC0488 5 6 46.3 17.0 10.3 0.01 0.04 4.9
MFC0488 5 6 45.0 18.7 11.0 <DET 0.04 5.3
MFC0488 6 7 45.5 19.0 9.3 0.01 0.03 5.0
MFC0488 7 8 45.2 21.4 8.6 0.01 0.06 4.8
MFC0488 8 9 43.6 21.2 10.2 0.01 0.04 5.1
MFC0488 14 15 44.0 18.9 10.3 <DET 0.04 5.4
MFC0489 0 1 44.3 19.1 10.1 <DET 0.05 5.3
MFC0489 1 2 43.8 20.3 10.3 <DET 0.05 5.2
MFC0489 2 3 43.6 18.3 11.6 <DET 0.05 6.2
MFC0489 3 4 47.2 15.5 10.9 <DET 0.04 5.0
MFC0489 4 5 48.2 15.2 10.3 <DET 0.04 4.8
MFC0489 5 6 46.2 18.3 9.6 <DET 0.04 5.0
MFC0489 6 7 44.0 21.6 9.5 <DET 0.04 5.2
MFC0489 7 8 44.3 20.6 9.0 0.01 0.05 4.7
MFC0490 0 1 43.6 18.9 11.8 0.01 0.15 6.1
MFC0490 1 2 46.3 16.4 10.4 <DET 0.06 5.9
MFC0490 2 3 47.5 15.8 10.1 <DET 0.05 4.5
MFC0490 3 4 49.9 14.4 8.2 0.01 0.05 4.0
MFC0490 4 5 48.7 16.6 7.9 0.01 0.05 4.2
MFC0490 5 6 48.5 17.3 7.7 0.01 0.04 4.1
MFC0490 6 7 44.7 21.4 8.0 <DET 0.04 4.3
MFC0491 0 1 41.0 22.7 11.4 0.01 0.05 5.3
MFC0491 1 2 45.5 18.2 10.6 0.01 0.05 5.3
MFC0491 2 3 45.8 17.7 10.3 0.01 0.05 5.0
MFC0491 3 4 48.9 16.0 8.6 <DET 0.04 4.2
MFC0491 4 5 49.5 16.2 7.2 0.01 0.04 3.9
MFC0491 5 6 49.7 16.7 7.6 <DET 0.05 3.9
MFC0491 6 7 44.0 20.8 9.6 0.01 0.05 4.9

Page 23 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 2: Mt Forrest - Drill Collar Details

Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details
Easting
MGA94
Northing
MGA94
Total
Depth (m)
Hole ID RL (m) Survey Method Dip Azimuth
MFC0369 786011 6817810 493 GPS -90 360 22
MFC0370 786102 6817795 496 GPS -90 360 29
MFC0371 786117 6817501 491 GPS -90 360 18
MFC0372 786121 6817201 486 GPS -90 360 17
MFC0373 786020 6817049 487 GPS -90 360 12
MFC0374 786125 6816904 483 GPS -90 360 15
MFC0375 786030 6816714 480 GPS -90 360 14
MFC0376 786133 6816593 482 GPS -90 360 11
MFC0377 786022 6816508 478 GPS -90 360 5
MFC0378 786142 6816354 477 GPS -90 360 10
MFC0379 786255 6816459 484 GPS -90 360 9
MFC0380 786352 6816473 489 GPS -90 360 16
MFC0381 786470 6816477 493 GPS -90 360 22
MFC0382 786588 6816450 485 GPS -90 360 6
MFC0383 786665 6816444 489 GPS -90 360 15
MFC0384 786688 6816523 491 GPS -90 360 14
MFC0385 786697 6816338 491 GPS -90 360 22
MFC0386 787119 6816326 519 GPS -90 360 8
MFC0387 786945 6816436 499 GPS -90 360 16
MFC0388 787032 6816441 511 GPS -90 360 12
MFC0389 786798 6816462 481 GPS -90 360 18
MFC0390 786848 6816642 501 GPS -90 360 35
MFC0391 786836 6816798 511 GPS -90 360 26
MFC0392 786714 6816853 496 GPS -90 360 22
MFC0393 786768 6816929 500 GPS -90 360 24
MFC0394 786816 6816929 509 GPS -90 360 18
MFC0395 786852 6816930 512 GPS -90 360 19
MFC0396 786601 6816599 492 GPS -90 360 12
MFC0397 786244 6816593 487 GPS -90 360 12
MFC0398 786348 6816599 487 GPS -90 360 16
MFC0399 786503 6816596 495 GPS -90 360 20
MFC0400 786259 6816750 488 GPS -90 360 12
MFC0401 786423 6816761 494 GPS -90 360 18
MFC0402 786510 6816745 501 GPS -90 360 16
MFC0403 786594 6816749 494 GPS -90 360 16
MFC0404 786641 6816754 490 GPS -90 360 11
MFC0405 786246 6816893 489 GPS -90 360 12
MFC0406 786370 6816905 495 GPS -90 360 12
MFC0407 786493 6816896 505 GPS -90 360 18
MFC0408 786260 6817001 490 GPS -90 360 10
MFC0409 786368 6816997 496 GPS -90 360 12
MFC0410 786510 6817008 503 GPS -90 360 16
MFC0411 786574 6816999 505 GPS -90 360 16
MFC0412 786582 6817224 513 GPS -90 360 35
MFC0413 786577 6817130 516 GPS -90 360 26
MFC0414 786252 6817203 496 GPS -90 360 10

Page 24 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 2: Mt Forrest - Drill Collar Details

Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details
Easting
MGA94
Northing
MGA94
Total
Depth (m)
Hole ID RL (m) Survey Method Dip Azimuth
MFC0415 786351 6817187 505 GPS -90 360 11
MFC0416 786369 6817242 504 GPS -90 360 4
MFC0417 786342 6817391 498 GPS -90 360 11
MFC0418 786508 6817409 511 GPS -90 360 38
MFC0419 786579 6817414 517 GPS -90 360 36
MFC0420 786215 6817996 513 GPS -90 360 11
MFC0421 786415 6818021 514 GPS -90 360 6
MFC0422 786505 6818043 513 GPS -90 360 6
MFC0423 786565 6818056 516 GPS -90 360 6
MFC0424 786352 6817792 501 GPS -90 360 18
MFC0425 786478 6817866 510 GPS -90 360 6
MFC0426 786407 6818223 507 GPS -90 360 6
MFC0427 786053 6819180 496 GPS -90 360 6
MFC0428 786212 6819096 497 GPS -90 360 6
MFC0429 786404 6819145 515 GPS -90 360 20
MFC0430 786549 6819173 509 GPS -90 360 6
MFC0431 786152 6819364 493 GPS -90 360 10
MFC0432 786329 6819506 494 GPS -90 360 10
MFC0433 786396 6819368 500 GPS -90 360 15
MFC0434 790298 6825156 478 GPS -90 360 18
MFC0435 790541 6825346 460 GPS -90 360 8
MFC0436 790711 6825336 455 GPS -90 360 12
MFC0437 790830 6825355 452 GPS -90 360 10
MFC0438 790544 6825196 461 GPS -90 360 12
MFC0439 790842 6825194 453 GPS -90 360 12
MFC0440 790751 6825026 455 GPS -90 360 10
MFC0441 790250 6824932 480 GPS -90 360 11
MFC0442 790354 6824923 471 GPS -90 360 7
MFC0443 790277 6824523 488 GPS -90 360 3.5
MFC0444 790384 6824579 479 GPS -90 360 16
MFC0445 790498 6824711 475 GPS -90 360 12
MFC0446 790497 6824598 474 GPS -90 360 18
MFC0447 790645 6824597 465 GPS -90 360 11
MFC0448 790793 6824711 461 GPS -90 360 8
MFC0449 790797 6824605 463 GPS -90 360 8
MFC0450 790699 6824693 461 GPS -90 360 10
MFC0451 790292 6824297 489 GPS -90 360 10
MFC0452 790427 6824307 479 GPS -90 360 17
MFC0453 790456 6824397 479 GPS -90 360 18
MFC0454 790501 6824273 472 GPS -90 360 18
MFC0455 790609 6824403 471 GPS -90 360 30
MFC0456 790807 6824403 465 GPS -90 360 30
MFC0457 791183 6824401 457 GPS -90 360 24
MFC0458 791392 6824399 451 GPS -90 360 24
MFC0459 791600 6824402 444 GPS -90 360 24
MFC0460 790301 6824075 482 GPS -90 360 6

Page 25 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 2: Mt Forrest - Drill Collar Details

Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details Table 2: Mt Forrest - Drill Collar Details
Easting
MGA94
Northing
MGA94
Total
Depth (m)
Hole ID RL (m) Survey Method Dip Azimuth
MFC0461 790460 6824127 478 GPS -90 360 24
MFC0462 790640 6824195 467 GPS -90 360 14
MFC0463 790867 6824201 464 GPS -90 360 12
MFC0464 790979 6824194 460 GPS -90 360 12
MFC0465 790431 6823912 487 GPS -90 360 18
MFC0466 790541 6823950 482 GPS -90 360 11
MFC0467 790702 6824095 472 GPS -90 360 16
MFC0468 790696 6823990 472 GPS -90 360 12
MFC0469 790702 6823902 469 GPS -90 360 8
MFC0470 790892 6824001 466 GPS -90 360 11
MFC0471 790901 6823909 466 GPS -90 360 6
MFC0472 791049 6824006 459 GPS -90 360 8
MFC0473 790537 6823856 476 GPS -90 360 24
MFC0474 790496 6823743 472 GPS -90 360 14
MFC0475 790685 6823764 465 GPS -90 360 6
MFC0476 790844 6823747 460 GPS -90 360 4
MFC0477 788795 6823705 482 GPS -90 360 3
MFC0478 788866 6823754 482 GPS -90 360 6
MFC0479 788904 6823794 481 GPS -90 360 6
MFC0480 789004 6823797 481 GPS -90 360 10
MFC0481 788710 6824004 482 GPS -90 360 5
MFC0482 788804 6824008 484 GPS -90 360 12
MFC0483 788927 6823998 486 GPS -90 360 12
MFC0484 788980 6824004 491 GPS -90 360 16
MFC0485 789107 6823998 497 GPS -90 360 24
MFC0486 788950 6824142 491 GPS -90 360 12
MFC0487 788998 6824131 491 GPS -90 360 18
MFC0488 789099 6824141 491 GPS -90 360 18
MFC0489 789234 6824558 505 GPS -90 360 18
MFC0490 789293 6824558 512 GPS -90 360 18
MFC0491 789218 6824451 501 GPS -90 360 18

Page 26 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Uranium Projects

Table 3: Kellerberrin Project-Anomalous uranium 1m re-assay results from March 2013 scout drilling reporting above a 20ppm cut-off.

Uranium
Grade
(ppm)
Depth
From (m)
Depth To
(m)
Thickness
(m)
Hole ID
YAA0437 40 48 8 26
YAA0448 40 56 16 27
YAA0451 12 16 4 28
YAA0451 61 63 2 22
YAA0457 24 26 2 23
YAA0460 18 23 5 36
Incl. 19 20 1 63
YAA0463 76 79 3 25
YAA0464 80 81 1 26

Note:

  • 20ppm uranium cut-off.

  • All assays conducted by LabWest Laboratories in Malaga, WA.

  • Assay technique involves multi-acid microwave digestion followed by ICP-OES/ICP-MS finish.

Table 4: Kellerberrin Project -Drill Collar information for holes that were subject to selective 1m re-sampling.

Hole ID Easting
GDA94
Northing
GDA94
RL (m) Survey
Method
Dip Azimuth End of Hole
Depth (m)
YAA0437 608007 6492313 261 GPS -90 360 48
YAA0448 604397 6492353 266 GPS -90 360 58
YAA0451 604127 6498845 232 GPS -90 360 63
YAA0457 603701 6502716 253 GPS -90 360 26
YAA0460 604491 6502672 251 GPS -90 360 37
YAA0462 604537 6494601 266 GPS -90 360 61
YAA0463 604341 6494601 270 GPS -90 360 81
YAA0464 604144 6494602 272 GPS -90 360 82

Page 27 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 5: Mukinbudin Project -1m re-assay results from March –April 2013 Scout Drilling reporting above a 100ppmU cut-off.

Uranium
Grade
(ppm)
Depth
From (m)
Depth To
(m)
Thickness
(m)
Hole ID
YAA0481 47 48 1 882
YAA0485 93 94 1 97
YAA0489 85 86 1 221
YAA0511 67 69 2 133
YAA0512 54 58 4 130
includes 54 55 1 210
YAA0513 47 48 1 111
YAA0529 60 61 1 140
YAA0529 63 64 1 114
YAA0542 87 88 1 181
YAA0545 71 72 1 406
YAA0545 87 90 3 186
includes 87 88 1 295

Note:

  • 100ppm U cut-off.

  • All assays conducted by LabWest Laboratories in Malaga, WA.

  • Assay technique involves multi-acid microwave digestion followed by ICP-OES/ICP-MS finish.

Table 6: Mukinbudin Project -1m re-assay results from March –April 2013 Scout Drilling reporting between 50ppm - 100ppm U.

Uranium
Grade
(ppm)
Depth
From (m)
Depth To
(m)
Thickness
(m)
Hole ID
YAA0483 88 89 1 93
YAA0489 88 89 1 58
YAA0508 85 86 1 53
YAA0508 87 88 1 50
YAA0508 88 89 1 53
YAA0511 45 46 1 67
YAA0511 51 53 2 56
YAA0511 58 59 1 51
YAA0511 64 65 1 67
YAA0511 66 67 1 75

Page 28 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Uranium
Grade
(ppm)
Depth
From (m)
Depth To
(m)
Thickness
(m)
Hole ID
YAA0511 69 70 1 55
YAA0512 50 51 1 52
YAA0512 52 53 1 52
YAA0512 58 62 4 75
YAA0512 64 66 2 79
YAA0512 69 70 1 54
YAA0512 71 72 1 61
YAA0513 46 47 1 79
YAA0513 52 53 1 68
YAA0513 60 62 2 62
YAA0518 48 49 1 59
YAA0521 60 61 1 65
YAA0521 63 65 2 66
YAA0526 62 63 1 58
YAA0528 60 61 1 64
YAA0528 65 66 1 61
YAA0534 66 67 1 58
YAA0542 99 100 1 77
YAA0545 86 87 1 75
YAA0547 37 38 1 52
YAA0547 43 44 1 58
YAA0548 40 41 1 63
YAA0550 54 55 1 57
YAA0551 51 54 3 57
YAA0551 57 58 1 75
YAA0551 70 72 2 65
YAA0552 37 38 1 80
YAA0552 46 50 4 58
YAA0552 72 73 1 56
YAA0552 75 76 1 57
YAA0552 82 83 1 61

Note:

  • 50ppm U cut-off.

  • All assays conducted by LabWest Laboratories in Malaga, WA.

  • Assay technique involves multi-acid microwave digestion followed by ICP-OES/ICP-MS finish.

Page 29 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 7: Mukinbudin Project - Drill Collars for March – April 2013 Scout Drilling holes that were subject to selective 1m sampling

Easting
GDA94
Northing Survey End of Hole
Depth (m)
Hole ID
GDA94 RL (m) Method Dip Azimuth
YAA0469 633388 6555969 286 GPS -90 360 99
YAA0481 604150 6555655 286 GPS -90 360 90
YAA0483 604138 6556389 286 GPS -90 360 128
YAA0485 606390 6557509 284 GPS -90 360 120
YAA0489 606302 6557577 280 GPS -90 360 106
YAA0506 619037 6588580 309 GPS -90 360 111
YAA0507 619294 6588577 314 GPS -90 360 101
YAA0508 619496 6588575 314 GPS -90 360 105
YAA0511 620198 6588726 315 GPS -90 360 102
YAA0512 620394 6588721 308 GPS -90 360 81
YAA0513 620607 6588718 310 GPS -90 360 99
YAA0514 620806 6588718 314 GPS -90 360 81
YAA0518 620000 6588725 308 GPS -90 360 90
YAA0520 646790 6612705 348 GPS -90 360 97
YAA0521 647003 6612700 355 GPS -90 360 108
YAA0526 620507 6587583 307 GPS -90 360 69
YAA0527 620511 6587806 307 GPS -90 360 69
YAA0528 620513 6587999 311 GPS -90 360 78
YAA0529 620516 6588142 313 GPS -90 360 90
YAA0534 643211 6613203 362 GPS -90 360 86
YAA0542 645275 6611848 354 GPS -90 360 117
YAA0543 645273 6612053 356 GPS -90 360 88
YAA0544 645273 6611958 347 GPS -90 360 95
YAA0545 645267 6612000 347 GPS -90 360 94
YAA0547 658485 6617059 377 GPS -90 360 105
YAA0548 658321 6616943 377 GPS -90 360 126
YAA0549 658173 6616859 377 GPS -90 360 120
YAA0550 658286 6616622 377 GPS -90 360 124
YAA0551 658287 6616434 377 GPS -90 360 131
YAA0552 658281 6616252 377 GPS -90 360 88

Page 30 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Mortlock Copper

Table 8: Mortlock Project- Centre Forest - Significant Intersections reported above 1000ppm Cu cut-off

Hole ID Depth
From
(m)
Intersection
Thickness
(m)
Average
Copper
(ppm)
Maximum
Copper
(ppm)
Average
Gold
(ppb)
Maximum
Gold
(ppb)
CFA0056 36 4 1,040 1,040 5.9 5.9
CFA0058 32 8 1,750 2,030 40.3 77.7
CFA0059 36 4 1,410 1,410 4.8 4.8
CFA0061 16 4 1,090 1,090 ND ND
CFA0063 4 4 1,160 1,160 1.6 1.6
CFA0063 12 4 1,100 1,100 ND ND
CFA0066 12 8 1,330 1,410 1.4 1.7
CFA0066 28 4 1,550 1,550 155 155
CFA0069 24 4 1,400 1,400 ND ND
CFA0071 24 4 1,260 1,260 1.6 1.6
CFA0072 32 20 4,374 10,100 38.9 77.9
CFA0074 8 4 1,010 1,010 1 1
CFA0074 20 16 3,423 5,860 28.6 86.8
CFA0078 40 4 1,460 1,460 6.4 6.4
CFA0081 28 4 1,090 1,090 28.7 28.7
CFA0082 28 4 1,530 1,530 17.8 17.8
CFA0083 32 4 1,340 1,340 22.4 22.4
CFA0084 24 20 1,278 1,390 1.06 1.4
CFA0085 36 4 1,020 1,020 2.2 2.2
CFA0086 36 8 1,570 1,600 9.1 9.8
CFA0087 32 4 1,190 1,190 2.5 2.5
CFA0088 24 8 1,750 2,130 ND ND
CFA0102 24 4 1,430 1,430 1.1 1.1
CFA0102 68 2 2,430 2,430 2.1 2.1
CFA0103 24 8 1,465 1,840 7.9 8.6
CFA0103 36 4 1,000 1,000 5.4 5.4
CFA0104 12 4 1,110 1,110 0.6 0.6
CFA0110 12 20 2,190 3,510 1.8 3.9

Notes:

  1. 1,000ppm Cu cutoff

  2. No internal dilution

  3. ND = Not Detected

  4. Assaying completed by LabWest of Perth using aqua regia digest and ICP-MS finish

Page 31 of 32

MINDAX LIMITED | www.mindax.com.au

ASX Announcement Activities For Quarter Ending 30 June 2013 31 July 2013

Table 9: Mortlock Project - Drill Collars for 2013 Scout Drilling holes

Easting
MGA94
Northing
MGA94
Survey
Method
Total
Depth (m)
Hole ID RL (m) Dip Azimuth
CFA0053 483998 6515377 272 GPS -60 245 62
CFA0054 484050 6515394 267 GPS -60 245 65
CFA0055 484095 6515417 265 GPS -60 245 61
CFA0056 484022 6515329 268 GPS -60 245 45
CFA0057 484114 6515366 265 GPS -60 245 55
CFA0058 484049 6515282 267 GPS -60 245 62
CFA0059 484096 6515308 267 GPS -60 245 59
CFA0060 484128 6515335 268 GPS -60 245 67
CFA0061 483991 6515086 266 GPS -60 245 28
CFA0062 484030 6515112 266 GPS -60 245 32
CFA0063 484074 6515134 268 GPS -60 245 26
CFA0064 484005 6515046 263 GPS -60 245 30
CFA0065 484097 6515088 269 GPS -60 245 37
CFA0066 484027 6515000 269 GPS -60 245 35
CFA0067 484073 6515024 267 GPS -60 245 47
CFA0068 484118 6515046 266 GPS -60 245 25
CFA0069 483793 6515015 260 GPS -60 245 31
CFA0070 483841 6515030 262 GPS -60 245 39
CFA0071 483890 6515048 265 GPS -60 245 36
CFA0072 483817 6514964 264 GPS -60 245 58
CFA0073 483906 6515009 266 GPS -60 245 35
CFA0074 483839 6514919 263 GPS -60 245 49
CFA0075 483882 6514939 264 GPS -60 245 52
CFA0076 483928 6514965 261 GPS -60 245 28
CFA0077 483901 6514788 261 GPS -60 245 56
CFA0078 483941 6514803 257 GPS -60 245 55
CFA0079 483989 6514824 259 GPS -60 245 53
CFA0080 484032 6514842 265 GPS -60 245 32
CFA0081 484073 6514857 263 GPS -60 245 37
CFA0082 483920 6514735 255 GPS -60 245 46
CFA0083 484009 6514776 263 GPS -60 245 58
CFA0084 484098 6514810 248 GPS -60 245 67
CFA0085 483931 6514692 248 GPS -60 245 45
CFA0086 483978 6514706 259 GPS -60 245 51
CFA0087 484024 6514729 258 GPS -60 245 46

End of Report

For further information contact:

Steve Ward, Managing Director Mindax Limited Telephone: +61 8 9485 2600

Media:

David Utting David Utting Corporate Telephone: +61 416 187 462

Page 32 of 32

MINDAX LIMITED | www.mindax.com.au