ASX ANNOUNCEMENT
11 February 2026
----- End of picture text -----

Pilot Plant Delivering Outstanding Recoveries and MREC Production

Meteoric Resources NL ( ASX: MEI ) ( Meteoric or the Company ) is pleased to provide an update on the production performance at its recently commissioned Mixed Rare Earth Carbonate (MREC) Pilot Plant at the Caldeira Rare Earth Project ( Caldeira Project or Project ) located in Minas Gerais, Brazil.

Highlights

  • Achieved 70% average magnet rare earth recovery to MREC, matching ANSTO’s continuous test work, validating the process flowsheet.

  • Achieved nameplate MREC production capacity of ~2.0kg per day (dry) with recent production up to 2.6kg per day .

  • Heavy magnetic recoveries higher than ANSTO piloting while all other results are in line

  • MREC production include 32.7% magnetic rare earth oxide with 1.0% dysprosium and terbium oxides

  • MREC samples being provided for product qualification by offtake partners.

  • Water and ammonium sulfate recovery systems operating in accordance with plan

  • Continues to de-risk the Caldeira Project flowsheet and provides a basis to support further downstream processing in Brazil

Managing Director, Stuart Gale, said: “Following the successful construction and commissioning of the Pilot Plant in Poços de Caldas, the team have done an amazing job in maintaining and improving operational performance over the last month.

Results achieved at the Pilot Plant to date have bettered the extensive test work conducted by ANSTO which is a great credit to our team who have spent significant time developing Meteoric’s understanding of the Caldeira Ionic Clay deposits.

The Pilot Plant is part of our strategic initiative creating a unique opportunity to provide product to offtake partners, support downstream processing and further optimise the MREC production process leading to commercial production. All of this continues to de-risk the Caldeira Project as we work towards completion of the definitive feasibility study, construction licencing and ultimately the final investment decision.”

Pilot Plant Update

Meteoric’s Brazilian Pilot Plant in Poços de Caldas has been able to consistently produce MREC at or above nameplate capacity since completion of commissioning. The output achieved during continuous processing operations, at the large scale Pilot Plant, are consistent with the results from independent pilot testing conducted by ANSTO through-out 2024 and 2025.

Meteoric Resources NL I ACN 143 493 118 | Level 1, 35 Ventnor Avenue, West Perth WA 6005

==> picture [596 x 67] intentionally omitted <==

These results validate the process undertaken by Meteoric’s metallurgy and engineering teams who utilised ANSTO information to design a flowsheet, select, acquire and build equipment to efficiently and effectively design and build the Pilot Plant.

Output from the Pilot Plant will be used to de-risk the proposed commercial plant design, provide to key offtake customers and used to consider further downstream processing options in Brazil.

Samples from the Pilot Plant have been assayed at SGS’ laboratory in Belo Horizonte. Overall magnet rare earth and total rare earth oxide recoveries achieved at the pilot plant in Poços de Caldas are consistent or better than previous independent ANSTO pilot testing on Capão do Mel ore. Key results include:

  • Average magnet rare earth element recoveries 70% ( consistent with ANSTO).

  • Average magnet rare earth recoveries by element are excellent, demonstrating strong and consistent recovery of both light and heavy magnet rare earth elements under steady-state pilot plant operating conditions. They include:

  • 70% for neodymium (Nd)

  • 71% for praseodymium (Pr)

  • 56% for dysprosium (Dy) v ANSTO result of 49%

  • 61% for terbium (Tb) v ANSTO result of 57%

  • Recycling approximately 85% of all water;

  • Recovering approximately 90% of ammonium sulfate for re-use in the process;

  • MREC impurity levels of 2.3% aligned with prior ANSTO piloting;

  • Competency handling of spent clays supports a smooth backfilling and rehabilitation process;

  • Results achieved while processing a blend of Capão do Mel and Soberbo ionic clay material with typical head grades of 4,000–5,000 ppm TREE;

  • Capital and operating costs are tracking in line with budget.

The pilot plant processing will continue with further optimisation trials and testing of additional tenements within the current resource, as well as selected tenements outside the life-of-mine resource, including Dona Maria 1 & 2 and Cupim Vermelho Norte.

Figure 1: 11.7kg (12.55kg with packaging) of dry MREC produced over 4.5 days, i.e. 2.6kg/ day vs nameplate design of 1.8kg per day

==> picture [286 x 191] intentionally omitted <==

Meteoric Resources NL I ACN 143 493 118 | Level 1, 35 Ventnor Avenue, West Perth WA 6005

==> picture [596 x 67] intentionally omitted <==

Figure 2 - Left Foreground - MREC produced over 4.5 days at 11.7 kg (dry) Right Foreground – White MREC bed (~20cm high) shown in thickener.

==> picture [499 x 333] intentionally omitted <==

This release has been approved by the Board of Meteoric Resources NL.

For further information, please contact:

Stuart Gale Michael Vaughan
Managing Director Investor and Media Relations
Meteoric Resources NL Fivemark
E [email protected] E [email protected]
T +61 8 6166 9112 T +61 422 602 720

Some statements in this document may be forward-looking statements. Such statements include, but are not limited to, statements with regard to capacity, future production and grades, projections for sales growth, estimated revenues and reserves, targets for cost savings, the construction cost of new projects, projected capital expenditures, the timing of new projects, future cash flow and debt levels, the outlook for minerals prices, the outlook for economic recovery and trends in the trading environment and may be (but are not necessarily) identified by the use of phrases such as “will”, “expect”, “anticipate”, “believe” and “envisage”.

By their nature, forward-looking statements involve risk and uncertainty because they relate to events and depend on circumstances that will occur in the future and may be outside Meteoric’s control. Actual results and developments may differ materially from those expressed or implied in such statements because of a number of factors, including levels of demand and market prices, the ability to produce and transport products profitably, the impact of foreign currency exchange rates on market prices and operating costs, operational problems, political uncertainty and economic conditions in relevant areas of the world, the actions of competitors, activities by governmental authorities such as changes in taxation or regulation.

Meteoric Resources NL I ACN 143 493 118 | Level 1, 35 Ventnor Avenue, West Perth WA 6005

==> picture [596 x 67] intentionally omitted <==

The information in this announcement that relates to exploration results is based on information reviewed, collated and fairly represented by Dr Carvalho a Competent Person and aa Member of the Australasian Institute of Mining and Metallurgy and an Executive Director of Meteoric Resources NL. Dr. Carvalho has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity which has been undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr. Carvalho consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

The information in this announcement that relates to the metallurgical results were compiled by Tony Hadley who is an employee of Meteoric resources and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr. Hadley has sufficient experience that is relevant to the metallurgical testwork which was undertaken to qualify as a Competent Person as defined in the 2012 JORC Code. Mr. Hadley consents to the inclusion in this announcement of the matters based on the information in the form and context in which it appears.

Meteoric Resources NL I ACN 143 493 118 | Level 1, 35 Ventnor Avenue, West Perth WA 6005

==> picture [596 x 67] intentionally omitted <==

APPENDIX 1 - JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

Criteria Commentary
Sampling
techniques

For powered Auger drill holes, tarpaulins were placed on either side of the hole
and samples of soil and saprolite where collected every 1m of advance, logged,
photographed with subsequent bagging of the sample in plastic bags.

For Aircore drill holes, two (2) metre composite samples are collected from the
cyclone of the rig in plastic buckets. The material from the plastic buckets is passed
through a single tier, riffle splitter which generates a 50/50 split. One half is bagged
and numbered for submission to the laboratory, and the other half bagged and
given the same number, then stored as a duplicate at the core facility in Poços de
Caldas.
Drilling
techniques

Powered auger drilling employed a motorised post hole digger with a 4 inch
diameter. All holes were drilled vertical. The maximum depth achievable was 20m,
providing the hole did not encounter fragments of rocks/boulders within the
weathered profile and/or excessive water. Final depths were recorded according
to the length of rods in the hole.

Aircore drilling was completed using a HANJIN 8D Multipurpose Track Mounted
Drill Rig, configured to drill 3-inch Aircore holes. The rig is supported by an Atlas
Copco XRHS800 compressor which supplies sufficient air to keep the sample dry
down to the current deepest depth of 73m. Drilling is stopped at 'blade refusal'
when the rotating bit is unable to cut the ground any further. This generally occurs
in the transition zones (below clay zone and above fresh rock).

All holes are drilled vertical.
Drill sample
recovery

For powered Auger, recovery was estimated visually based on the amount of
sample recovered per 1m interval drilled. Recoveries were generally in a range
from 75% - 100%. If estimates dropped below 75% recovery in a 1m interval, the
field crew aborted the drill hole and redrilled the hole.

For Aircore, every 2m composite sample is collected in plastic buckets and
weighed. Each sample averages approximately 12kg. This is considered
acceptablegiven the hole diameter and specific densityof the material.
Logging
For powered Auguer, material is described in a drilling bulletin every 1m and
photographed. The description is made according to the tactile-visual
characteristics, such as material (soil, colluvium, saprolite, rock fragments);
material color; predominant particle size; presence of moisture; indicator minerals;
extra observations.

For Aircore, material is logged at the drill rig by a geologist. Logging focused on
soil (humic) horizon, saprolite/clay zones and transition boundaries. Other
parameters recorded includes: grainsize, texture and colour, which can help to
identify the parent rock before weathering.

The chip trays of all drilled holes have a digital photographic record and are
retained at a Core facilityin Poços de Caldas.
Sub-sampling
techniques and
sample
preparation

Plant feed composite material (ROM) is generated at several‑day intervals by
applying cone‑and‑quartering of selected Aircore and powered Auger samples,
comingled using shovels and rakes, ensuring the final blend met the target head
grade of 4,000–5,000 ppm TREE.

Only clay material was considered.
Quality of assay
data and
laboratory tests
Pilot Plant Samples

Laboratory used: All samples were analysed by SGS Geosol (Brazil), an
ISO/IEC 17025‑accredited facility listed in the Inmetro RBLE laboratory
accreditation register.

Analytical methods: SGS operates under globally standardized
geochemistry procedures, including validated analytical methods, SOPs,
and consistent workflows enforced through the SGS Laboratory
Information Management System (SLIM).

Internal laboratory QA/QC: The lab applies routine internal quality
controls, including certified reference materials (CRMs), blanks,
preparation duplicates,reagent blanks,and statisticalprocess‑control

Meteoric Resources NL I ACN 143 493 118 | Level 1, 35 Ventnor Avenue, West Perth WA 6005

==> picture [596 x 67] intentionally omitted <==

Criteria Commentary
checks to monitor accuracy, precision, and contamination throughout
sample preparation and analysis.

Appropriateness of methods: All analytical methods used by SGS are
internationally recognised and appropriate for the sample matrix and
target analytes.

Head and Leach Residue (REE extractions) were determined by Lithium
metaborate fusion followed by inductively coupled plasma mass spectrometry
(ICPMS) or ICP optical emission spectrometry (ICPOES), as appropriate.

Sulfate levels in the Spent Clay were determined by a hydrochloric acid digest
followed by ICP-OES.
MREC Samples

The concentrations of the rare earth elements (REE) and impurity elements were
determined using an aqua regia digest followed by inductively coupled plasma
mass spectrometry (ICPMS) or ICP optical emission spectrometry (ICPOES), as
appropriate.

Loss on ignition was determined on the sample by, firstly, drying slowly over 48
hours at 70°C followed by slow heating to 1000°C with a hold time at temperature
of two hours.
Verification of
sampling and
assaying

All data is in digital format and stored in a cloud server, also the company maintains
a backup in a desktop computer to assure that the data could be restored if any
problem occurs with the cloud or with the desktop server.

Raw assays that are received as Elemental data (ppm) from SGS Geosol
laboratories are converted to Element Oxide data using the following conversion
factors:
Symbol Conversion Factor Oxide Species
La
1.1728
La2O3
Ce
1.2284
CeO2
Pr
1.2082
Pr6O11
Nd
1.1664
Nd2O3
Sm
1.1596
Sm2O3
Eu
1.1579
Eu2O3
Gd
1.1526
Gd2O3
Tb
1.1762
Tb4O7
Dy
1.1477
Dy2O3
Ho
1.1455
Ho2O3
Er
1.1435
Er2O3
Tm
1.1421
Tm2O3
Yb
1.1387
Yb2O3
Lu
1.1372
Lu2O3
Y
1.2699
Y2O3
Sc
1.5338
Sc2O3
Location of data
points

The ROM material comes from powered Auger and Aircore samples from the
Capão do Mel and Soberbo deposits.
Data spacing and
distribution

Samples were selected from >100 drill holes to be representative of optimised Pits
at Capão do Mel and Soberbo, which represent the first 3-5 years of processing in
the Caldera PrefeasibilityStudy (PFS). Material >4,000ppm TREO was targeted.

Meteoric Resources NL I ACN 143 493 118 | Level 1, 35 Ventnor Avenue, West Perth WA 6005

==> picture [596 x 67] intentionally omitted <==

Criteria Commentary
Orientation of
data in relation to
geological
structure

The mineralisation is flat lying and occurs within the saprolite/clay zone of a deeply
developed regolith (reflecting topography and weathering). Vertical sampling from
the drilling is appropriate.
Sample security
Samples were recovered from Core Shed or the Meteoric sample farm and
transported to the Pilot Plant facility to be prepared.
Audits or reviews
No independent audit of mixing techniques used in the Pilot Plant has been
completed.

Section 2 Reporting of Exploration Results

Criteria Commentary Commentary
Mineral tenement No change since reported in Quarterly Activities Report on 27 January 2026.
and land tenure Given the rich history of mining and current mining activity in the Poços de
status Caldas there appears to be no impediments to obtaining a License to operate in
the area.
Exploration done Licenses under the TOGNI Agreement: significant previous exploration exists in
by other parties the form of surface geochem across 30 granted mining concessions, plus:
geologic mapping, topographic surveys, and powered auger (1,396 holes for
12,963 samples).
MEI performed Due Diligence on historic exploration and are satisfied the data
is accurate and correct (refer ASX Release 13 March 2023 for a discussion).
Licenses under VAGINHA and RAJ Agreements: no previous exploration exists
for REEs.
Geology The Alkaline Complex of Poços de Caldas represents in Brazil one of the most
important geological terrain which hosts deposits of ETR, bauxite, clay, uranium,
zirconium, rare earths and leucite. The different types of mineralization are
products of a history of post-magmatic alteration and weathering, in the last
stages of its evolution (Schorscher & Shea, 1992; Ulbrich et al., 2005), The REE
mineralisation discussed in this release is of the Ionic Clay type as evidenced by
development within the saprolite/clay zone of the weathering profile of the
Alkaline syenite basement as well as enriched HREE composition.
Drill hole Samples were selected from more than 100 powered Auger and Aircore drill
Information holes, determined to be representative of Clay ore material from optimised Pits
at Capão do Mel and Soberbo. This Clay material represent the first 3-5 years of
processingin the Caldera PrefeasibilityStudy (PFS).
Data aggregation Mineralised Intercepts are reported with a minimum of 4m width, lower cut-off
methods 1000ppm TREO, with a maximum of 2m internal dilution.
High-Grade Intercepts reported as “including” are reported with a minimum of
2m width, lower cut-off 3000 ppm TREO, with a maximum of 1m internal
dilution.
Ultra High-Grade Intercepts reported as “with” are reported with a minimum of
2m width, lower cut-off 10,000 ppm TREO, with a maximum of 1m internal
dilution.
Mineralisation All holes are vertical and mineralisation is developed in a flat lying clay and
widths and transition zone within the regolith. As such, reported widths are considered to
intercept lengths equal true widths.
Diagrams Photos provided in the body of the text.
Balanced reporting
Highlights of the Mineralised Intercepts are reported in the body of the text with
available results from every drill hole drilled in the period reported in the
Mineralised Intercept table for balanced reporting.
Other substantive A maiden Inferred resource was published to the ASX on May 1st2023
exploration data estimated from 1,379 drill holes for 13,309m to a maximum depth of 20m.
Subsequent updated resources were published to the ASX for Soberbo, Capão
do Mel and Figueira deposits on 13 May 2024,12 June 2024, and 04 August
2024 respectively. Updated resources werepublished to the ASX for Dona

Meteoric Resources NL I ACN 143 493 118 | Level 1, 35 Ventnor Avenue, West Perth WA 6005

==> picture [596 x 67] intentionally omitted <==

Maria 1 & 2 and Cupim Vermelho Norte deposits on 12 March 2025. A maiden
resource estimate at Barra do Pacu waspublished on ASX on 15 April 2025.
Further work Proposed work is discussed in the body of the text.