Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX RELEASE 4 JULY 2017

==> picture [180 x 56] intentionally omitted <==

RENISON TAILINGS RETREATMENT PROJECT (“RENTAILS”) UPDATED DFS CONFIRMS HIGH MARGIN PROJECT

HIGHLIGHTS

  • Robust economics:

  • NPV8% of A$260M (pre-tax) and IRR of 37%[1] ;

  • Cash operating cost of A$13,400/t Sn (net of copper credits) providing operating cash margin of approximately A$12,600/t Sn at prevailing tin price of A$26,000[2] /t Sn;

  • Construction capital cost of A$205 million.

  • Average annual production of approximately 5,400 tonnes of Sn & 2,200 tonnes of Cu;

  • Project life of 11 years at 2 million tonne per annum ( tpa ) treatment rate with further upside opportunity for treatment of additional tailings and intermediate streams.

The information in this announcement relates to 100% of Rentails. Metals X Limited ( Metals X or the Company ) owns a 50% share of the Renison Tin Operations through the Bluestone Mines Tasmania Joint Venture ( BMTJV ).

SUMMARY

Metals X is pleased to announce the results of the updated Definitive Feasibility Study ( DFS Update ) for its Renison Tailings Retreatment Project ( Rentails or the Project ).

Rentails provides the opportunity to expand production at the Renison Tin Operations ( Renison ), by approximately 5,400 tonnes of tin (Sn) and 2,200 tonnes of copper (Cu) per year, through the re-processing and recovery of tin and copper from the existing historical tailings at Renison.

Renison produces approximately 7,000 tonnes of Sn in tin concentrate per year. The operation currently is being expanded through the introduction of ore sorting which is expected to increase production to between 8,000 and 8,500 tonnes of Sn per year. When combined with Rentails the total operation will produce approximately 13,400 - 13,900 tonnes of Sn per year which is approximately 3.75% of the global primary tin supply. The All-In Sustaining Costs ( AISC ) for the combined operation is anticipated to be less than A$17,000 per tonne which compares favourably to the prevailing tin price of approximately A$26,000 per tonne.

On the basis of the compelling economics summarised below, Metals X and the BMTJV have commenced discussions with various parties in relation to financing options and establishing the timing of long lead time items, final approvals and the capacity of suppliers to service Rentails.

The DFS Update provides a strong business case for Rentails[1] :

  • Net present value (NPV), at an 8% discount rate, of A$260 million pre-tax;

  • Internal rate of return (IRR) of 37% pre-tax;

  • 1 Calculations are for 100% of the project at an assumed Sn price of US$20,000/t, Cu price of US$5,000/t and 0.75 USD/AUD exchange rate for Sn price of A$26,667/t and Cu price of A$6,667/t.

  • 2 Tin price averaged approximately A$26,000/t Sn during June 2017.

Level 3, 18–32 Parliament Place [email protected] West Perth WA 6005 www.metalsx.com.au

ASX Code: MLX

Australia

  • Annual revenue of A$161 million;

  • Annual operating cash margin of A$73 million;

  • Upfront capital of A$205 million;

  • Break-even tin price of US$14,000/t (A$18,700/t) compared to the average tin price year-to-date of approximately US$20,000/t (A$26,500/t).

The sensitivity of key financial metrics to tin price assumptions, shown below in Table 1, demonstrates the high margins and upside price exposure of the Project.

Table 1. Forecast Financial Metrics for Rentails (Total 11 Year Life)

==> picture [466 x 49] intentionally omitted <==

----- Start of picture text -----

Tin price assumption $/t Sn (FX assumption 0.75)
Financial metric Unit US$18,000/t US$20,000/t US$22,000/t US$24,000/t
A$24,000/t A$26,667/t A$29,333/t A$32,000/t
----- End of picture text -----

Financial metric Unit Tinprice assumption $/t Sn (FX assumption 0.75) Tinprice assumption $/t Sn (FX assumption 0.75) Tinprice assumption $/t Sn (FX assumption 0.75) Tinprice assumption $/t Sn (FX assumption 0.75)
US$18,000/t US$20,000/t US$22,000/t US$24,000/t
A$24,000/t A$26,667/t A$29,333/t A$32,000/t
Revenue * A$M 1,608 1,768 1,929 2,089
Construction capital A$M 205 205 205 205
Total capital(life of mine) A$M 243 243 243 243
Operatingcost ** A$M 958 970 982 993
Cash operatingmargin A$M 650 798 947 1,096
Operatingcost(before Cu credits) A$/t Sn 15,929 16,138 16,328 16,518
Operatingcost(after Cu credits)*** A$/t Sn 13,184 13,393 13,583 13,773
Cash operatingmargin A$/t Sn 10,816 13,274 15,751 18,227
NPV(pre-tax)at 8% discount rate A$M 171 260 350 440
IRR(pre-tax) % 27% 37% 47% 56%
Payback(undiscounted) years 4.0 3.2 2.7 2.3
  • Includes copper revenue calculated assuming US$5,000/t Cu. At US$20,000/t Sn, Cu revenue comprises 9% of total revenue. ** Including royalties, excluding Cu credits.

  • ***Cu credits of A$2,745/t Sn.

In addition to the expected NPV, there is the opportunity for substantial potential upside by extending the life of the Project through further integration with the current Renison operation and regional tin and zinc projects.

DETAILS

Background

The opportunity for Rentails is based on the retreatment of approximately 21.6 million tonnes of historical tailings at an average grade of 0.45% Sn and 0.23% Cu.

In 2008 WorleyParsons completed a metallurgical review including test work and pilot trials. The results of the WorleyParsons work were incorporated into a 2009 DFS published by GR Engineering Services.

The DFS Update builds on the original DFS, incorporating updated capital and operating cost estimates and potential additional streams of feed from the Renison concentrator.

RENTAILS UPDATED DFS CONFIRMS HIGH MARGIN PROJECT 2 ASX RELEASE

Location

The Rentails operation is planned to be located approximately 1.5 kilometres north west of the existing Renison Tin Concentrator and adjacent to the existing tailing storage facility, Dam C (Figure 1).

==> picture [469 x 214] intentionally omitted <==

----- Start of picture text -----

Rentails Project
(planned)
Renison Mine & Infrastructure
----- End of picture text -----

Figure 1. Proposed location of Rentails at the Renison Tin Mine

Mineral Resources and Ore Reserves

The current Mineral Resource estimate is comprised within the 3 existing TSF’s; Dam A, B and C have combined contained metal of approximately 100,443 tonnes of tin and 50,619 tonnes of copper (refer to the 30 June 2016 estimate, compliant with JORC 2012 Code, as disclosed on ASX on 18 August 2016).

Table 2. Rentails Mineral Resource Statement at 30 June 2016

==> picture [427 x 257] intentionally omitted <==

----- Start of picture text -----

Grade Tin Grade Copper
Tailings Dam Category t
% Sn tonnes % Cu tonnes
Measured 3,005,694 0.46% 13,892 0.20% 6,119
Indicated - - - - -
A
Inferred - - - - -
Total 3,005,694 0.46% 13,982 0.20% 6,119
Measured 3,378,719 0.44% 14,931 0.21% 7,136
Indicated - - - - -
B
Inferred - - - - -
Total 3,378,719 0.44% 14,391 0.21% 7,136
Measured 16,119,057 0.44% 71,621 0.23% 37,363
Indicated - - - - -
C
Inferred - - - - -
Total 16,119,057 0.44% 71,621 0.23% 37,363
Measured 22,503,470 0.45% 100,443 0.22% 50,619
Indicated - - - - -
TOTAL RENTAILS
Inferred - - - - -
Total 22,503,470 0.45% 100,443 0.22% 50,619
----- End of picture text -----

Note: 0% Sn cut off-grade

RENTAILS UPDATED DFS CONFIRMS HIGH MARGIN PROJECT 3 ASX RELEASE

The current Ore Reserve estimate has contained metal of approximately 96,500 tonnes of tin and 48,700 tonnes of copper (refer to the 30 June 2016 estimate, compliant with JORC 2012 Code, as disclosed on ASX on 18 August 2016).

Table 3. Rentails Ore Reserve Statement at 30 June 2016

==> picture [431 x 200] intentionally omitted <==

----- Start of picture text -----

Grade Tin Grade Copper
Tailings Dam Category t
% Sn tonnes % Cu tonnes
Proved - - - - -
A Probable 2,782,371 0.46% 12,860 0.20% 5,665
Total 2,782,371 0.46% 12,860 0.20% 5,665
Proved - - - - -
B Probable 3,209,783 0.44% 14,184 0.21% 6,780
Total 3,209,783 0.44% 14,184 0.21% 6,780
Proved - - - - -
C Probable 15,635,485 0.44% 69,473 0.23% 36,243
Total 15,635,485 0.44% 69,473 0.23% 36,243
Proved - - - - -
TOTAL RENTAILS Probable 21,627,639 0.45% 96,516 0.23% 48,687
Total 21,627,639 0.45% 96,516 0.23% 48,687
----- End of picture text -----

Existing Ore Reserves at Rentails are planned to be augmented by ongoing tailings production from the existing Renison Concentrator to Dams A and B, with the expected Rentails feed at November 2018 calculated as 23.2 million tonnes at 0.44% Sn & 0.23% Cu for 102,700 tonnes of contained Sn and 52,600 tonnes of contained Cu.

Processing

The planned tailings treatment rate is nominally 2 million tonnes per year over 11 years. Ramp-up to 2 million tonne per annum rate expected over 4 months, with an average dredge recovery of approximately 97%.

A mine schedule has been developed to allow flexible start up mining, and practical dam deconstruction and is outlined in Table 4.

Table 4. Tailings Treatment Profile

Tails Tonnes Sn (%) Sn (t) Cu (%) Cu (t) P80 (mm) S (%) S (t) As (%) As (t) Dredge
Recovery
Material
Recovered by
Dredge
Year 0
Month 1
Month 2
Month 3
Month 4
75,000
108,333
144,978
166,667

0.49

0.49
0.49
0.49

368

531
711
817

0.24

0.24
0.24
0.24

182

263
352
405

95

95
95
95

6.90

6.90
6.90
6.90

5,177

7,478
10,008
11,505

1.42

1.42
1.42
1.42

1,065

1,539
2,059
2,367

1.00

1.00
1.00
1.00
75,000

108,333
144,978
166,667
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Year 8
Year 9
Year 10
Year 11
2,000,000
2,115,433
2,020,676
2,050,907
2,126,766
2,160,042
2,289,690
2,231,672
2,047,153
2,040,170

1,639,049
0.49
0.48
0.49
0.47
0.42
0.40
0.40
0.40
0.41
0.45

0.45
9,803
10,199
9,947
9,654
8,931
8,553
9,268
8,998
8,452

9,213

7,307
0.24
0.26
0.27
0.26
0.21
0.19
0.20
0.26

0.25

0.17

0.16
4,858
5,497
5,423
5,324
4,516
4,155
4,666
5,880

5,030

3,428

2,623
95
68
73
68
63
61
66
83

89

90

94
6.90
17.5
20.9

21.1
20.4
20.7

19.5

14.1
13.1
19.0
19.1
138,062
369,492
421,368

433,508
432,936
447,520

445,393

314,883
268,550
388,343
312,338
1.42
1.07
1.12

1.04
0.88
0.84

0.87

1.03
0.98
0.82
0.79
28,404

22,548
22,700

21,404
18,670
18,090

19,848

23,053
20,114
16,660
12,904
1.00

1.00
1.00

0.99
0.96
0.95

0.90

0.92
0.99
0.99
0.93
2,000,000

2,110,282
2,015,082

2,020,907
2,043,880
2,047,765

2,049,898

2,049,367
2,032,786
2,011,490
1,530,436
Total 23,216,535
0.44
102,750 0.23
52,601
77
17.3 4,006,561 1.00 231,425 0.97 22,406,870

In addition to the tailings feed, the DFS update includes the treatment of the Renison UF Falcon tails (UF tails) stream which has a grade of approximately 2.39% Sn and 0.06% Cu. The UF tails is proposed to be fed directly to tin flotation feed with an expected recovery of 60% Sn. Production of tin from this stream is estimated to be approximately 140 tonnes Sn per year which comprises 2.6% of the total forecast Rentails tin production.

RENTAILS UPDATED DFS CONFIRMS HIGH MARGIN PROJECT 4 ASX RELEASE

The Rentails process flowsheet consists of fine grinding, sulphide flotation, Ultra Fine (UF) gravity separation, tin flotation and tin fuming as follows:

  • Fine grinding of tailings feed using IsaMill technology, with a target P80 of approximately 38 µm, which results in significantly improved cassiterite liberation compared to historic processing methods;

  • Copper flotation to realise copper value and provide a sulfidising agent to the fuming furnace;

  • Ultra-fine gravity separation utilising UF Falcon centrifugal concentrator technology to scavenge ultra-fine tin which would be otherwise lost;

  • Tin flotation to produce a low grade tin concentrate suitable for fuming; and

  • Tin fuming utilising Top Submersible Lance (TSL) technology of tin flotation concentrate to produce a high grade tin fume product and copper matte as a co-product.

==> picture [465 x 209] intentionally omitted <==

----- Start of picture text -----

Tailings Reclaim and
Feed Preparation
Primary Grinding
To Atmosphere
Copper Concentrate
Copper Flotation
Dewatering
Sulfide Concentrate Sulfide Flotation
Gas Cleaning
Classification and
Gravity Tails
Gravity Separation
Tin Concentrate Fumer Feed
Tin Flotation Tails Tin Flotation Tin Fumer
Dewatering Preparation
Coal
Limestone Tin Fume Copper Matte
Product Product
To Tailings Magnetite
Disposal
----- End of picture text -----

Figure 2. Rentails Process Plant – Simplified Flow Sheet

Rentails will produce a high grade tin fume (approximately 72% Sn) and a high grade copper matte (approximately 70% Cu), both “premium” products that are readily saleable.

The average recovery of tin from tails feed to tin fume product is expected to be 59% Sn, with average annual production of 7,400 tonnes tin fume (approximately 5,400 tonnes per year of Sn contained in fume). Fume is suited to conventional smelting/refining to tin metal.

The average recovery of copper from tails feed to copper matte product is expected to be 49%, with average annual production of 3,150 tonnes of copper matte (approximately 2,200 tonnes per year of Cu contained in matte). Copper matte is suited to conventional smelting/refining to copper metal.

Net revenue after deduction of transport, treatment and smelting/refining charges is estimated at 94% LME for tin and 75% LME for copper.

RENTAILS UPDATED DFS CONFIRMS HIGH MARGIN PROJECT 5 ASX RELEASE

Capital and Operating Expenditure

Estimated total construction capital is A$205m, at an estimate level of accuracy of +/- 15%, plus working capital of A$15M and sustaining capital (TSF) over the life of the operation of A$23M.

Table 5. Rentails Upfront Capital Cost Estimate

==> picture [371 x 290] intentionally omitted <==

----- Start of picture text -----

Category Capital item AUD $M
Direct costs Tailings mining capital 1.6
Concentrator processing 68.4
Tin fuming processing 41
Air compressors 5.4
Piping and reticulation 10.5
Power and reticulation 16.7
Plant site bulk earthworks 4.7
Tailings disposal, water storage, sewage 7.8
Plant building, workshop, trades 4.4
Total direct costs 160.6
EPCM & owners cost Contractors equipment 6.1
Engineering 22.9
Commissioning 3.3
Preliminary, initial fills & general 4.3
Insurance spares 3.2
Owners cost 4.2
Total EPCM and owners cost 43.9
Total construction capital 204.6
----- End of picture text -----

The estimated annual cash operating cost of Rentails is A$13,393 per tonne of Sn in tin fume (net of copper revenue), equivalent to US$10,045/t Sn at an exchange rate assumption of 0.75 USD/AUD.

Table 6. Rentails Operating Cost Estimate

==> picture [456 x 181] intentionally omitted <==

----- Start of picture text -----

AUD $M AUD $M $/t Sn in fume $/t Sn in fume
Item per year 11 years AUD USD (FX 0.75)
Tailings mining 4.6 51 845 634
Processing plant 42.7 470 7,812 5,859
Fuming plant 18.6 205 3,410 2,557
Tin fume transport & smelting 8.8 97 1,610 1,208
Copper matte transport & smelting 3.8 41 686 515
Administration 2.0 22 360 270
Royalties 7.7 85 1,414 1,060
Total cash operating costs 88.2 970 16,138 12,104
Copper revenue * (15) (165) (2,745) (2,059)
Total cash operating cost (net of Cu revenue) 73.2 805 13,393 10,045
----- End of picture text -----**

Note:

* Copper revenue calculated assuming copper price of US$5,000/t Cu

** Royalties calculated at tin price of US$20,000/t Sn (FX rate of 0.75) and copper price of US$5,000/t Cu

RENTAILS UPDATED DFS CONFIRMS HIGH MARGIN PROJECT 6 ASX RELEASE

Global Tin Market

Shortages of new mine production are expected to keep global tin stocks low over the medium term. Consensus price forecasts are for the tin price to average US$20,000 - $30,000/t Sn over the next 5 years.

==> picture [219 x 199] intentionally omitted <==

==> picture [216 x 197] intentionally omitted <==

Figure 3. Historic Tin Price and LME Tin Stocks

Global tin use currently is approximately 350,000 tonnes per year. LME tin stocks 2017 year-to-date have ranged between 2 and 6 days’ consumption.

In addition to the further upside from the integration of additional low grade streams from the current operations, regional resources and third party tin and zinc projects, in particular historical slags and tailings, and low grade concentrates offer further potential upside by extending Project life and increasing tin production.

Implementation Schedule

The Company is considering financing options currently with its joint venture partner and determining the timing of long lead time items, final approvals and the capacity of suppliers to service Rentails.

COMPETENT PERSON STATEMENTS

The information in this report that relates to Mineral Resources has been compiled by Metals X Limited technical employees under the supervision of Mr Jake Russell BSc. (Hons), who is a member of the Australasian Institute of Geoscientists. Mr Russell is a contractor to Metals X Limited at the date of the Mineral Resource estimate and has sufficient experience which is relevant to the style of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Russell consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Ore Reserves has been compiled by Metals X Limited technical employees under the supervision of Mr Michael Poepjes BEng Mining Engineering), MSc (Min. Econ), MAusIMM. Mr Poepjes is a full time employee of the Company. Mr Poepjes has sufficient experience which is relevant to the style of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Poepjes consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. Mr Poepjes is eligible to participate in the Company’s short and long term incentive plan and holds performance rights in the Company as has been previously disclosed.

ENQUIRIES

Warren Hallam Stephen Robinson Managing Director Executive Director e: [email protected] e: [email protected]

RENTAILS UPDATED DFS CONFIRMS HIGH MARGIN PROJECT 7 ASX RELEASE