Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

METALS AUSTRALIA LTD Capital/Financing Update 2017

Mar 28, 2017

65344_rns_2017-03-28_95c69e67-a75b-4855-aca4-85c75e9f4a7c.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 69] intentionally omitted <==

ASX Announcement

29 March 2017

Metals Australia Acquires High Grade Cobalt Project in Quebec

==> picture [465 x 10] intentionally omitted <==

Highlights:

  • Metals has executed an agreement to acquire the Lac du Marcheur Cobalt Project (the “Project”) in the cobalt endowed Laurentian region of southern Quebec, Canada

  • The Project is an outstanding high grade cobalt project and complements Metals’ existing portfolio of lithium and graphite projects in Quebec

  • The Project contains the Lac Pauze and Lac Pauze-Ouest cobalt-copper-nickel prospects and is on strike with a number of other documented prospects containing high grade cobalt-copper-nickel

  • Various local prospects, within and in close proximity to the Project, containing pyrrhotite, pentlandite and chalcopyrite mineralisation have returned assays of up to 0.25% cobalt, 1.11% copper, 1.23% nickel and 12.7 g/t silver in surface grab and trench samples

  • Trench samples taken from the Lac Pauze area of the Project returned assays up to 0.18% cobalt, 0.23% copper and 0.34% Ni

  • Hinterland Metals ’ (TSX-V: HMI) Chilton Cobalt property lies between, and borders the north and south blocks of the Project

  • Previous work in the area includes geological mapping, geochemical sampling and an airborne EM survey carried out by the Ministère de l’Énergie et des Ressources Naturelles and the Geological Survey of Canada

  • The price of cobalt metal has recently increased to over US$54,000/t as global shortages of this vital input in the production of lithium-ion batteries has forced offtake customers and end-users to source new production opportunities

  • The escalation in demand for lithium-ion batteries across the globe has created a significant requirement for high grade cobalt, with a particular focus on sourcing ‘clean’ production from safe operating jurisdictions, such as Quebec

  • The importance of cobalt metal is growing due to the mass global adoption of lithium-ion batteries as an energy storage solution and the transformational shift to renewable energy sources

==> picture [459 x 10] intentionally omitted <==

Diversified metals exploration company, Metals Australia Ltd (ASX: MLS ) is pleased to announce that the Company has executed an agreement to acquire the high grade Lac du Marcheur Cobalt Project, located in Quebec, Canada, thereby continuing its technological metals focus.

==> picture [595 x 54] intentionally omitted <==

==> picture [595 x 69] intentionally omitted <==

The Lac du Marcheur Cobalt Project is located in the geologically rich cobalt endowed Laurentian region, located in southern Quebec, Canada.

The Lac du Marcheur Cobalt Project covers an area of 1,780 hectares representing 35 mineral claims and is situated north and south of Hinterland Metals (TSX-V: HMI) Chilton Cobalt Project.

The global focus on renewable energy and the associated mass adoption of lithium-ion batteries as an energy storage medium has meant that the immediate inputs required for the manufacture of lithium-ion batteries are gaining significant attention with offtake partners, investors and mining exploration companies. Through the acquisition of high grade cobalt projects such as Lac du Marcheur, MLS is positioning itself to be at the forefront of this transformational technological revolution.

Commenting on the acquisition of the Lac du Marcheur Cobalt Project, Director of MLS, Mr Gino D’Anna stated:

“ This is an outstanding opportunity for MLS as we continue to enhance our asset portfolio which is aligned to technologically advanced metals, being cobalt, lithium and graphite. The agreement to acquire the Project was a natural decision for MLS given our current landholding and strategic position in Quebec and our desire to be at the forefront of the technological revolution that is the lithium-ion battery.

Trench sample assays at our Lac Pauze cobalt occurrence within the Project have returned results of up to 0.18% Co, positioning our Lac du Marcheur Cobalt Project as one of the highest-grade cobalt projects in the world. This area is host to numerous high grade cobalt occurrences and developing projects such as Hinterland Metals Chilton Cobalt Project.

The strike length of the mineralised zone within the North Block is over 5 kilometres, north-south, whilst the strike length of the mineralised zone within the South Block is just under 6 kilometres, northwest-southeast.

A field work program designed to identify extensive cobalt mineralisation on the property is due to commence within 4 weeks from the completion of the acquisition. Our proposed exploration program will consist of prospecting, detailed mapping, ground geophysics (using existing airborne survey documentation as a guide) and diamond drilling.

The price of cobalt metal has recently increased to over US$54,000/t as global shortages of this vital input in the production of lithium-ion batteries has pressured offtake partners and end-users to secure new sources of cobalt production. How could we ignore this burgeoning global opportunity and this energised focus on cobalt.”

Lac du Marcheur Cobalt Project

The Lac du Marcheur Cobalt Project consists of two discrete contiguous groups of claims, being the North Block and the South Block which are approximately 1 kilometre apart, totaling 1,780 hectares or 17.8 km[2] . They form a north-south trending corridor that extends south from the village of Notre-Dame-de-la-Merci.

The Project is made up of 35 granted mineral claims and is located approximately 70 kilometres northeast of Montreal and is easily accessible via a paved highway (Provincial Route 125) and a network of secondary roads. The favorable location of the project means that exploration and mobilisation costs will be lower in comparison to more remote projects. It is less than 90 minutes by car from Montreal.

==> picture [595 x 69] intentionally omitted <==

The 11-claim (579 ha) North Block is located in Chilton Township and abuts the south side of the village of Notre-Dame-de-la-Merci. The 24-claim (1,201 ha) South Block lies 5 km south of the village and is located in parts of three townships; Chilton, Chertsy and Wexford.

Hinterland Metals ’ Chilton Cobalt property lies between, and borders the north and south blocks of the Lac du Marcheur Cobalt Project.

==> picture [456 x 280] intentionally omitted <==

----- Start of picture text -----

Lac du Marcheur
Cobalt Project
----- End of picture text -----

Figure 1: Location Map of Lac du Marcheur Cobalt Project

Geology and Mineralisation

Geologically, the rocks of the Lac du Marcheur Cobalt Project are within the Grenville Province of the Canadian Shield. The project is underlain by the same north-south trending package of gabbroic to anorthositic rocks (Morin Intrusive Suite) that underlie the Hinterland Metals 100% owned Chilton Cobalt Project.

The Lac du Marcheur Cobalt Project contains the Lac Pauze and Lac Pauze-Ouest cobalt-coppernickel showings and is on strike with a number of other documented cobalt-copper-nickel showings, including (from north to south) SC-95-02, Lac Baume, Chilton Nickel, Lac Sicotte, Lac du Marcheur and Lac Sicotte-Est. The eastern extension of the Lac du Marcheur showing is located on the northern border of the South Block of the newly acquired Lac du Marcheur Cobalt Project .

According to the Ministère de l'Énergie et des Ressources Naturelles ("MERNQ") database (http://sigeom.mines.gouv.qc.ca), these various local showings, with variable amounts of pyrrhotite, pentlandite and chalcopyrite mineralisation have returned assays of up to 2,500 ppm (0.25%) cobalt, 1.11% copper, 1.23% nickel and 12.7 g/t silver in surface grab and trench samples associated with gabbros, gabbroic anorthosites and quartzites.

The mineralisation is in the form of disseminated sulphides and stockworks (veins and veinlets) of massive sulphides filling fractures in the anorthositic gabbros, commonly at or near contacts with quartzites. Grab samples taken from the Lac du Marcheur Cobalt Project - Lac Pauze showing

==> picture [595 x 69] intentionally omitted <==

(located in Chertsy Township) returned assays up to 1,765 ppm (0.18%) cobalt, 0.23% copper and 0.34% Ni (MERNQ GM 54214, GM 54928, GM 55347, and GM 55906).

The mineralisation is in the form of disseminated sulphides and stockworks (veins and veinlets) of massive sulphides filling fractures in the anorthositic gabbros, commonly at or near contacts with quartzites.

Similar sulphide-bearing mafic to ultramafic zones, associated with anorthositic intrusions, have generated significant amounts of interest, such as the Lac St-Jean and the Manicouagan complexes, and the Ma in Plutonic Suite (Voisey’s Bay ).

A field work program designed to identify extensive cobalt mineralisation on the property is proposed to commence within 4 weeks from the completion of the acquisition. Our proposed exploration program will consist of prospecting, detailed mapping, ground geophysics (using existing airborne survey documentation as a guide) and diamond drilling.

==> picture [453 x 351] intentionally omitted <==

----- Start of picture text -----

SC-95-02 Outcrop:
Lac Baume Outcrop:
2,180 ppm Cu and
3,907 ppm Ni and 2,406 ppm Cu and
772 ppm Co 2,730 ppm Ni and
920 ppm Co
Chilton Nickel
Outcrop: Lac du Marcheur
Outcrop:
12,300 ppm Ni and
3,300 ppm Cu and 1,482 ppm Cu and
2,500 ppm Co 2,876 ppm Ni and
529 ppm Co
6,800 ppm Ni and
1,400 ppm Cu and
1,300 ppm Co
Lac Sicotte-Est
Outcrop:
1,679 ppm Cu and
1,922 ppm Ni and
Lac Sicotte Outcrop: 322 ppm Co
1,848 ppm Cu and
1,874 ppm Ni and Lac Pauze-Ouest
1,742 ppm Co Outcrop:
1,186 ppm Cu and
1,389 ppm Ni and
393 ppm Co
Lac Pauze Outcrop:
1,765 ppm Co and
2,300 ppm Cu and
3,400 ppm Ni
----- End of picture text -----

Figure 2: Geology Map of Lac du Marcheur Cobalt Project and Assay Results of Local Outcrops

The strike length of the favorable mineralised zone within the North Block is over 5 kilometres, north-south, whilst the strike length of the favorable mineralised zone within the South Block is just under 6 kilometres, northwest-southeast.

==> picture [595 x 69] intentionally omitted <==

Historical Exploration at Lac du Marcheur Cobalt Project

Previous work in the area surrounding the Lac du Marcheur Cobalt Project includes geological mapping and geochemical sampling surveys by the MERNQ, geological mapping and an airborne magnetic survey by the Geological Survey of Canada and various exploration programs undertaken by a number of exploration companies.

Most of the exploration carried out in the area was directed at the magnetite-ilmenite mineralisation associated with the anorthositic intrusion, most of which are located in the area surrounding NotreDame-de-la-Merci.

The previous work completed on the most significant occurrences of oxides and sulphides consists mainly of surface prospecting, trenching, ground magnetic and self-potential surveys and occasional shallow drilling[1] . The best sample result reported from the area is 0.33% copper, 1.23% nickel and 0.25% cobalt at the Chilton Nickel Occurrence from an “undefined” sample from a trench. Significantly, no reported exploration work was specifically aimed at the cobalt-bearing New Glasgow troctolite-gabbro intrusive suite.

In the summer of 1995, Virginia Gold Mines Inc. explored a mineralised corridor of 5 to 9 kilometres wide and approximately 50 kilometres long. It extends, from north to south, from the town of NotreDame-de-la- Merci to the town of New Glasgow. One of the objectives of Virginia’s work was to determine if there might be geological similarities with the geological environment of the Voisey Bay nickel-copper-cobalt deposit. Virginia concluded that considering the relative abundance of mineralised and rusted zones, further prospecting would most likely result in the discovery of numerous other mineralised deposits.

Similar sulphide-bearing mafic to ultramafic zones, associated with anorthositic intrusions, have generated significant amounts of interest, such as the Lac St-Jean and the Manicouagan complexes, and the Ma in Plutonic Suite (Voisey’s Bay ).

Cobalt Projects Peer Comparison

In terms of supply, two countries dominate the cobalt market. The Democratic Republic of Congo (DRC), a politically unstable country, is responsible for 65 percent of cobalt mine production, whilst China is responsible for over 50 percent of refined cobalt production.

Cobalt is typically mined as a low-grade by-product of copper or nickel. With nickel and copper prices under pressure and forecast to remain weak this by-product is an uncertain and reduced source of supply.

There has also been considerable pressure from major electronics companies to secure their raw materials from ethical sources, and reduce materials from artisanal mines associated with child labour and human rights abuses. ‘Clean’ jurisdictions such as Canada are expected to benefit from this supply-chain shift.

Increasing political and consumer focus on environmental issues will continue to propel demand for non-carbon energy solutions. The automotive industry is undergoing a transformative evolution from the internal combustion engine to automotive electrification. In addition, lithium-ion batteries are now being manufactured for use in stationary storage, enabling the use of renewable power generation from wind and solar and off-peak charging from the electrical grid. A lithium-ion battery contains graphite in its cathode, often the graphite content being substantially greater than the lithium content.

1 Summarised in a work report “Rapport d’évaluation de la Propriété du Marcheur” by J. Marchand, 1989 (GM 48617)

==> picture [595 x 69] intentionally omitted <==

Outside of the Democratic Republic of Congo (DRC) and discrete locations such as Ontario (Canada), global cobalt projects have demonstrated grades of less than 0.6% Co as highlighted in the table below:

Name Ticker Cobalt Project name Location Development
Stage
Co grade (%) Other metals in
cobalt project
MetalsTech Limited MTC Bay Lake Cobalt Project Ontario, Canada Exploration Historical down-shaft assays of 15.36% Ag, Cu
Equator Resources EQU Cobalt camp projects Ontario, Canada Exploration Assay results average 5.84% Ni, Ag
Nzuri NZC Kalongwe DR Congo JORC Resource 0.62% Cu
Barra Resources BAR Mt Thirsty Norseman, WA JORC Resource 0.13% Ni, Mn
Corazon Mining CZN Mt Gillmore North-East NSW Exploration - Cu, Au
Cobalt Blue COB Thackaringa Broken Hill, NSW JORC Resource 0.08% Ni, Pt, Fe
Conico CNJ Mt Thirsty Norseman, WA JORC Resource 0.13% Ni, Mn
Riva Resources RIR Tabac Project Western Australia Exploration - Au
Alloy Resources AYR Ophara Project Broken Hill, NSW Exploration - Au, Cu
Celsius Resources CLA Opuwo Project Namibia Exploration - Cu
Berkut Minerals BMT Kobald Mineral Projects Scandinavia Exploration Historic mining records - 0.26% Ni, Bi, Ag, As
Hammer Metals HMX Millenium Project North-West QLD JORC Resource 0.11% Cu, Au
Cohiba CHK Cobalt X Mt Isa, QLD Exploration - Cu

Source: IRESS, company announcements

Trench samples taken from the Lac Pauze showing within the Project returned assays up to 0.18% cobalt, 0.23% copper and 0.34% Ni (MERNQ GM 54214, GM 54928, GM 55347, and GM 55906).

In addition, assays at other cobalt occurrences in close proximity to and surrounding the Lac du Marcheur Cobalt Project have returned results of 0.25% cobalt, 1.11% copper, 1.23% nickel and 12.7 g/t silver.

The limited historical exploration conducted on the surface occurrences within and surrounding the Project area demonstrates the potential for the Lac du Marcheur Cobalt Project to exhibit results which place it amongst the highest grade outside of the DRC.

The chart below demonstrates the significant and sustained rise in the price of cobalt metal.

==> picture [454 x 268] intentionally omitted <==

– Figure 3: Cobalt Metal Price (March 2016 March 2017), source: Bloomberg Financial L.P.

==> picture [595 x 69] intentionally omitted <==

Acquisition Terms

Metals has signed an Acquisition Agreement to acquire 100% of the Lac du Marcheur Cobalt Project which contains the Lac Pauze and Lac Pauze-Ouest cobalt occurrences. Appendix A provides a list of the mineral claims that comprise the Lac du Marcheur Cobalt Project.

The Acquisition Agreement provides MLS with a due diligence period of 15 business days to complete legal and technical due diligence, prior to proceeding with the acquisition.

Should the Company proceed with the acquisition, MLS has agreed to issue the Vendor 12,500,000 fully paid ordinary shares (" Consideration Shares ” ). The Vendor will also retain a 2% Net Smelter Royalty (NSR) on all cobalt metal mined and sold at the Lac du Marcheur Cobalt Project.

Of the Consideration Shares being issued, the Vendor has agreed to have 50% held in escrow for 12 months from the date of issue whilst the other 50% remain un-escrowed. The Vendor is already a major shareholder of MLS and has agreed to sell the Lac du Marcheur Cobalt Project for a comparatively low consideration because of his shareholding and the retention of a 2% NSR, which illustrates his belief in the potential of the Project.

The Vendor realises the significant value that exists in offering an opportunity such as the Lac du Marcheur Cobalt Project to MLS, and remains excited both about the future of the Company and the opportunity to see a potentially world-class project developed.

The Agreement contains other standard clauses for an agreement of this nature.

Summary

We are excited to have acquired the high-grade Lac du Marcheur Cobalt Project. It represents an outstanding opportunity for MLS as we continue to embark on enhancing our asset portfolio, which is aligned to technologically advanced metals, being cobalt, lithium and graphite. The acquisition was a natural decision for MLS given our other tenements held in Quebec and our desire to be at the forefront of the technological revolution that is the lithium-ion battery.

The price of cobalt metal has recently increased to over US$54,000/t as global shortages of this vital input in the production of lithium-ion batteries has forced offtake customers and end-users to source new production opportunities.

The escalation in demand for lithium-ion batteries across the globe has created a significant requirement for high grade cobalt, with a particular focus on sourcing consistent production for safe operating jurisdictions, such as Quebec.

The importance of cobalt metal is growing due to the mass global adoption of lithium-ion batteries as an energy storage solution and the transformational shift to renewable energy sources.

Metals is continuing to evaluate further exploration project opportunities in the complementary zinc, lithium, cobalt and graphite sectors.

For more information, please contact:

Gino D’Anna Director Metals Australia Ltd Phone: +61 400 408 878

==> picture [595 x 69] intentionally omitted <==

Competent Person Statement

Mr Glenn S Griesbach, P.Geo, a qualified person under NI 43-101, has reviewed and verified the technical information provided in this announcement. Any information in this announcement that relates to historical resources, resource estimates or exploration results, is based on information compiled by Mr Glenn S Griesbach, P.Geo, who is a Member of the Association of Professional Engineers and Geoscientists of Saskatchewan (a Recognised Overseas Professional Organisation (‘ROPO’) included in a list promulgat ed by the ASX from time to time). Mr Griesbach is a Consultant Geologist to and a shareholder of Metals Australia Ltd. Mr Griesbach has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Griesbach consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

==> picture [595 x 69] intentionally omitted <==

– Appendix A: Schedule of Claims Lac du Marcheur Cobalt Project

Count Licenses
application
number
SNRC
Map
sheet
Cell
polygon
(row and
column) All
in map
sheet 31J01
Claim
number
(CDC series)
Area
(ha.)
License
Expiry
License owners. With prospectors
permit number and percentage held
1 1606901 31J01 X0023 0052 CDC2473803 59,55 Jan 26,2019 G.Griesbach:50%, J. TedyAsihto:50%
2 1606901 31J01 X00240052 CDC2473804 59,54 Jan 26,2019 G.Griesbach:50%, J. TedyAsihto:50%
3 1606901 31J01 X0025 0052 CDC2473805 59,53 Jan 26,2019 G.Griesbach:50%, J. TedyAsihto:50%
4 1606901 31J01 X0025 0053 CDC2473806 59,53 Jan 26,2019 G.Griesbach:50%, J. TedyAsihto:50%
5 1606901 31J01 X0026 0053 CDC2473807 59,53 Jan 26,2019 G.Griesbach:50%, J. TedyAsihto:50%
6 1606901 31J01 X0027 0054 CDC 2473808 59,52 Jan 26,2019 G. Griesbach: 50%,J. TedyAsihto: 50%
7 1606901 31J01 X0018 0057 CDC2477461 59,55 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
8 1606901 31J01 X0018 0058 CDC2477462 56,91 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
9 1606901 31J01 X0019 0055 CDC2477463 8,83 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
10 1606901 31J01 X0019 0056 CDC2477464 46,28 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
11 1606901 31J01 X0019 0057 CDC2477465 49,94 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
12 1606901 31J01 X0019 0058 CDC 2477466 10,88 Feb 6,2019 G. Griesbach: 50%,J. TedyAsihto: 50%
13 1606901 31J01 X0020 0054 CDC2477467 23,53 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
14 1606901 31J01 X0020 0055 CDC2477468 56,87 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
15 1606901 31J01 X0020 0057 CDC2477469 9,58 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
16 1606901 31J01 X00220052 CDC2477470 54,20 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
17 1606901 31J01 X0025 0054 CDC2477471 41,03 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
18 1606901 31J01 X0026 0054 CDC 2477472 55,11 Feb 6,2019 G. Griesbach: 50%,J. TedyAsihto: 50%
19 1606901 31J01 X0026 0055 CDC2477473 18,90 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
20 1606901 31J01 X00270055 CDC2477474 35,87 Feb 6,2019 G.Griesbach:50%, J. TedyAsihto:50%
21 1607257 31J01 X0018 0060 CDC pending 59,60 pending G.Griesbach:50%, J. TedyAsihto:50%
22 1607257 31J01 X00170059 CDC pending 59,61 pending G.Griesbach:50%, J. TedyAsihto:50%
23 1607257 31J01 X00170060 CDC pending 59,61 pending G.Griesbach:50%, J. TedyAsihto:50%
24 1607257 31J01 X0018 0056 CDCpending 59,60 pending G. Griesbach: 50%,J. TedyAsihto: 50%
25 1607257 31J01 X0018 0059 CDC pending 59,60 pending G.Griesbach:50%, J. TedyAsihto:50%
26 1607257 31J01 X00170057 CDC pending 59,61 pending G.Griesbach:50%, J. TedyAsihto:50%
27 1607257 31J01 X00170056 CDC pending 59,61 pending G.Griesbach:50%, J. TedyAsihto:50%
28 1607257 31J01 X00170058 CDC pending 59,61 pending G.Griesbach:50%, J. TedyAsihto:50%
29 1607257 31I04 X0018 0001 CDC pending 59,60 pending G.Griesbach:50%, J. TedyAsihto:50%
30 1607257 31I04 X0018 0060 CDCpending 59,60 pending G. Griesbach: 50%,J. TedyAsihto: 50%
31 1606799 31I04 X00170002 CDC pending 59,61 pending G.Griesbach: 100%
32 1606799 31I04 X00170001 CDC pending 59,61 pending G.Griesbach: 100%
33 1606799 31J01 X00210056 CDC pending 59,57 pending G.Griesbach: 100%
34 1606799 31J01 X00220055 CDC pending 59,56 pending G.Griesbach: 100%
35 1606799 31J01 X0020 0056 CDCpending 59,58 pending G. Griesbach: 100%
1778,7

==> picture [595 x 69] intentionally omitted <==

Appendix B: Table of Results

Occurrence Easting Northing Co (ppm) Ni (ppm) Cu (ppm)
SC-95-02 Occurrence 573045E 5516493N 772 3,907 2,180
Lac Baume Occurrence 574468E 5115650N 920 2,730 2,406
Chilton Nickel Occurrence 572613E 5115243N 2,500 12,300 3,300
Lac du Marcheur Occurrence 574002E 5113650N 529 2,876 1,482
Lac du Marcheur Occurrence 574002E 5113650N 1,300 6,800 1,400
Lac Sicotte-Est 574723E 5112782N 322 1,922 1,679
Lac Sicotte 572514E 5113929N 1,742 1,874 1,848
Lac Pauze 578419E 5109811N 1,765 3,400 2,300
Lac Pauze-Ouest 577638E 5109553N 393 1,389 1,186

==> picture [596 x 69] intentionally omitted <==

– JORC Code, 2012 Edition Table 1

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation JORC Code explanation Commentary
Sampling Nature and quality of sampling (eg cut channels, random chips, or specific specialised No drilling completed to date.
techniques industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.
Rock samples comprise multiple chips considered to be representative of the horizon
Include reference to measures taken to ensure sample representivity and the or outcrop being sampled.
appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.
In cases where ‘industry standard’ work has been done this would be relatively simple
Samples submitted for assay typically weigh 2-3 kg.
(eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation Continuous channel sampling of trenching ensures the samples are representative.
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
Entire 2-3 kg sample is submitted for sample preparation.
warrant disclosure of detailed information.
Drilling Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, No drilling completed.
techniques Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
_what method, etc). _
Drill sample Method of recording and assessing core and chip sample recoveries and results Not applicable.
assessed.
recovery Measures taken to maximise sample recovery and ensure representative nature of the
samples.
Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due topreferential loss/gain of fine/coarse material.
Logging Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
All trenches sampled are logged continuously from start to finish with key geological
observations recorded.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography. Logging is quantitative, based on visual field estimates.
The total length andpercentage of the relevant intersections logged.
Sub-sampling If core, whether cut or sawn and whether quarter, half or all core taken. Sample preparation follows industry best practice standards and is conducted by
techniques
sample
and
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and appropriateness of the sample preparation

internationally recognised laboratories Activation Laboratories Ltd in Val d’Or, Quebec.
preparation technique. Oven drying, jaw crushing and pulverising so that 85% passes 75 microns.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
Blanks have been submitted every 50 samples to ensure there is no cross
contamination from sample preparation.
Whether sample sizes are appropriate to thegrain size of the material being sampled.

==> picture [594 x 69] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
Measures taken include (a) systematic sampling across whole outcrop zone; (b)
comparison of actual assays for blanks with theoretical values.
Sample size (2-3 kg) accepted as general industry standard.
Quality of assay
data
and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
Assay and laboratory procedures have been selected following a review of techniques
provided by internationally certified laboratories. In addition, the sample preparation
laboratory in Quebec is regularly visited to ensure high standards are being maintained.
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
Samples are submitted for multi-element analysis by Activation Laboratories. Where
results exceeded upper detection limits for Li and/or Ta, samples are re-assayed.
The final techniques used are total.
None used.
Barren granitic material is submitted every 50 samples as a control.
Comparison of results indicates good levels of accuracy and precision. No external
laboratory checks have been used.
Verification
of
The verification of significant intersections by either independent or alternative None undertaken.
sampling and company personnel.
The use of twinned holes.
assaying Documentation of primary data, data entry procedures, data verification, data storage Not applicable.
(physical and electronic) protocols.
Discuss any adjustment to assay data. All field data is manually collected, entered into excel spreadsheets, validated and
loaded into an Access database.
Electronic data is stored in Quebec. Data is exported from Access for processing by a
number of different software packages.
All electronic data is routinely backed up.
No hard copy data is retained.
None required.

==> picture [594 x 69] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
Location of data Accuracy and quality of surveys used to locate drill holes (collar and down-hole All trench start points and geochemical samples are located using a hand held GPS.
points surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used. Trenches are surveyed using hand held compass and clinometer.
Quality and adequacy of topographic control.
The grid system used is UTM. However, for reporting purposes and to maintain
confidentiality, local coordinates are used for reporting.
Nominal RL’s based on topographic datasets are used initially, however, these will be
updated if DGPS coordinates are collected.
Data spacing and Data spacing for reporting of Exploration Results. Only reconnaissance trenching and sampling completed–spacing variable and based
distribution Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
on outcrop location and degree of exposure.
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied. Not applicable.
None undertaken.
Orientation of Whether the orientation of sampling achieves unbiased sampling of possible structures Sampling completed at right angles to interpreted trend of pegmatite units.
data in relation to
geological
and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
None observed.
structure and reported if material.
Sample security The measures taken to ensure sample security. Geological team supervises all sampling and subsequent storage in the field. The same
geological team delivers the samples to Activation Laboratories or SGS Laboratories
and receives an official receipt of delivery.
Audits or reviews The results of any audits or reviews of sampling techniques and data. None completed.

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
Metals Australia Limited will be the 100% owner of the Lac du Marcheur Cobalt Project
pursuant to the acquisition agreement.
The security of the tenure held at the time of reporting along with any known There are no other material issues affectingthe tenements.

==> picture [594 x 69] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
impediments to obtaining a licence to operate in the area.
All tenements are in good standing and have been legally validated by a Quebec
lawyer specialising in the field.
Exploration done Acknowledgment and appraisal of exploration by other parties. No modern exploration has been conducted.
by other parties
Government mapping records multiple cobalt bearing outcrops within the project areas
but no other data is available.
Geology Deposit type, geological setting and style of mineralisation. Lac du Marcheur Cobalt Project
Geologically, the rocks of the Lac du Marcheur Cobalt Project are within the Grenville
Province of the Canadian Shield. The project is underlain by the same north-south
trending package of gabbroic to anorthositic rocks (Morin Intrusive Suite) that underlie
the Hinterland Metals 100% owned Chilton Cobalt Project.
The Lac du Marcheur Cobalt Project contains the Lac Pauze and Lac Pauze-Ouest
cobalt-copper-nickel showings and is on strike with a number of other documented
cobalt-copper-nickel showings, including (from north to south) SC-95-02, Lac Baume,
Chilton Nickel, Lac Sicotte, Lac du Marcheur and Lac Sicotte-Est. The eastern
extension of the Lac du Marcheur showing is located on the northern border of the
South Block of the newly acquired Lac du Marcheur Cobalt Project.
According to the Ministère de l'Énergie et des Ressources Naturelles ("MERNQ")
database (http://sigeom.mines.gouv.qc.ca), these various local showings, with various
amounts of pyrrhotite, pentlandite and chalcopyrite mineralisation have returned assays
of up to 2,500 ppm (0.25%) cobalt, 1.11% copper, 1.23% nickel and 12.7 g/t silver in
surface grab and trench samples associated with gabbros, gabbroic anorthosites and
quartzites.
The mineralisation is in the form of disseminated sulphides and stockworks (veins and
veinlets) of massive sulphides filling fractures in the anorthositic gabbros, commonly at
or near contacts with quartzites. Grab samples taken from the Lac du Marcheur Cobalt
Project - Lac Pauze showing (located in Chertsy Township) returned assays up to
1,765 ppm (0.18%) cobalt, 0.23% copper and 0.34% Ni (MERNQ GM 54214, GM
54928,GM 55347,and GM 55906).

==> picture [594 x 69] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
The mineralisation is in the form of disseminated sulphides and stockworks (veins and
veinlets) of massive sulphides filling fractures in the anorthositic gabbros, commonly at
or near contacts with quartzites.
Similar sulphide-bearing mafic to ultramafic zones, associated with anorthositic
intrusions, have generated significant amounts of interest, such as the Lac St-Jean and
the Manicouagan complexes, and the Main Plutonic Suite (Voisey’s Bay).
A field work program designed to identify extensive cobalt mineralisation on the
property is proposed to commence within 4 weeks from the completion of the
acquisition. The strike length of the favourable mineralised zone within the North Block
is over 5 kilometres, north-south, whilst the strike length of the favourable mineralised
zone within the South Block is just under 6 kilometres, northwest-southeast. Our
proposed exploration program will consist of prospecting, detailed mapping, ground
geophysics (using existing airborne survey documentation as a guide) and diamond
drilling.
Drill
Information
hole A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
See tables and / or appendices attached to this report.
o
elevation or RL (Reduced Level– elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
Data aggregation In reporting Exploration Results, weighting averaging techniques, maximum and/or Intercepts are calculated on a per sample basis according to the results from the
methods minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
laboratory with no bottom cut-off grade and no top cut-off grades.
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated Short intervals of high grade that have a material impact on overall intersection are
and some typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be clearly
highlighted separately.
stated.
None reported.
Relationship These relationships are particularly important in the reporting of Exploration Results. The relationship between true widths and the width of mineralised zones intersected in
between
mineralisation

If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole lengths are reported, there should be a clear
trenching has not yet been determined due to lack of structural data (i.e. dip).

==> picture [594 x 69] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
widths and statement to this effect (eg ‘down hole length, true width not known’).
intercept lengths
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
None included.
limited to aplan view of drill hole collar locations and appropriate sectional views.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.
Results for all sampling completed are listed in Appendix A attached to the body of this
report.
Other substantive
exploration data
Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples– size and method of treatment; metallurgical test results; bulk

All meaningful and material data is reported.
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the main
Detailed geochemistry and geology mapping to determine trends of known mineralised
zones and to delineate other Li and Ta anomalies.
geological interpretations and future drilling areas, provided this information is not
commercially sensitive. Further trenching to determine structural orientation of pegmatites.
Drilling.