MATSA RESOURCES LIMITED — Investor Presentation 2021
May 3, 2021
65296_rns_2021-05-03_015cb7c9-77cb-4684-a9f5-fdd949599ab6.pdf
Investor Presentation
Open in viewerOpens in your device viewer
RIU Resources Roundup Sydney 4 May 2021
Paul Poli
Disclaimer and Forward Looking Statements
This presentation has been prepared by Matsa Resources Limited (“Matsa” or the “Company”). It should not be considered as an offer or invitation or inducement to subscribe for or the purchase of any securities in the Company. This presentation may contain certain “forward-looking statements” which may not have been based solely on historical facts, but rather may be based on Matsa’s current expectations about future events and results. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. Actual results and developments may differ materially from those expressed or implied.
The material in this presentation is intended to be a summary of current and proposed activities, selected geological data and Mineral Resource estimates. This data is based on information available to at the time. It does not include all available information and should not be used in isolation as a basis to invest in the Company. This overview of Matsa does not purport to be all-inclusive or to contain all information which its recipients may require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation before making any investment decision.
This presentation includes information and graphics relating to a conceptual mining study, completed Mineral Resource estimate and a scoping study and includes “forward looking statements” which include, without limitation, estimates of gold production based on mineral resources that are currently being evaluated.
Any potential investor should refer to publicly available reports on the ASX website and seek independent advice before considering investing in the Company.
Production Targets and Forecast Financial Information
The information in this presentation that relates to production targets and financial information is extracted from ASX announcements dated 22 January 2021 (Concept Study 600,000tpa Treatment Plant Lake Carey Project) and 14 April 2021 (Devon Pit Scoping Study Delivers Excellent Results). Matsa confirms that all material assumptions underpinning the production targets and forecast financial information derived from production targets set out in those announcements, including the cost and pricing assumptions, continue to apply and have not materially changed.
Competent Persons Statements
The information contained within this presentation that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on, and fairly represents information prepared by Mr Pascal Blampain, a Competent Person who is a Member of the Australian Institute of Mining and Metallurgy (AusIMM) and Australian Institute of Geoscientists (AIG). Mr Blampain is a Director of Matsa Resources Ltd and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Blampain consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears.
While the Company has a reasonable basis on which to express these estimates, any forward looking statement is subject to risks, uncertainties, assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Risks include, without limitation, gold metal prices, foreign exchange rate movements, project funding capacity and estimates of future capital and operating costs. The Company does not undertake to release publicly any revisions to forward looking statements included in this report to reflect events or results after the date of this presentation, except as may be required under applicable securities regulations.
2
Who is Matsa?
Matsa is a Developer with Huge Exploration Potential
Easily said, so let me explain
Matsa has:
-
Put together a formidable land package
-
Developed and mined the Fortitude Trial mine and from that, completed a 2 year fully permitted Stage 2 future operation study with a $55.4M positive cash flow
-
Acquired, planned and mined Red Dog, made over $5M in just 12 weeks, laid the way forward and have the skill set for future Matsa open pit mines
-
Purchased, rejuvenated, grown underground resources at Red October, recommenced mining with our own mining fleet and staff, opened new headings ready for future mining
-
Produced a highly attractive model for Fortitude Stage 2 and now Devon Pit showing a combined A$95,000,000 positive cash flow, mineable within a 36 month period*
-
Through exploration, grown gold resources 48% in the last 12 months
Matsa has more opportunities coming
* Based on Devon Pit scoping study and concept study for Matsa 600,000tpa processing plant (refer ASX announcements 22 January 2021 and 14 April 2021)
3
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
What has Matsa got?
==> picture [122 x 68] intentionally omitted <==
SIGNIFICANT RESOURCE AND GROWING
8MT @ 2.6g/t for 654,000oz in Mineral Resource and growing, with upgrades expected at Red October following 2020 drilling and numerous unmodelled satellites at Fortitude and Devon
==> picture [122 x 68] intentionally omitted <==
*CASHFLOW POTENTIAL OF +A$90M OVER a 36mth PERIOD
Positive economic assessment for Devon and Fortitude, enhanced if utilising Matsa owned and operated 600,000tpa processing plant. Significant costs savings to be gained at Red October and Fortitude
==> picture [122 x 67] intentionally omitted <==
WORLD CLASS EXPLORATION POTENTIAL
Fantastic landholding in Laverton Gold Field – 503km[2] of highly prospective Lake Carey district hosting Sunrise Dam, Granny Smith, Wallaby and Red October
==> picture [122 x 68] intentionally omitted <==
STRATEGY AND PLAN
Matsa is well placed to execute and deliver on strategy to explore and develop sufficient resources to support construction and operation of new local processing plant
==> picture [122 x 68] intentionally omitted <==
THE RIGHT TEAM AND MOU
Matsa has developed the skills set to successfully operate OP and UG mines, explore efficiently and has built strong neighbour relationships and has MOU in place to deliver strategic benefits
- Based on Devon Pit scoping study and concept study for Matsa 600,000tpa processing plant (refer ASX announcements 22 Jan2021 and 14 April 2021)
4
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
654,000 ounces Gold in Resource and Growing
Significant Resource Growth to be delivered in 2021/22
-
48% increase since 2020 Annual Report
-
Underpinned by Red October, Fortitude and Devon at healthy grades
-
Updating Red October
-
Bindah, Fortitude North and other area updates to follow
| Cutoff g/t Au |
('000t) g/t Au Measured |
('000t) g/t Au Indicated |
('000t) g/t Au Inferred |
('000t) g/t Au ('000 oz) Total Resource |
|
|---|---|---|---|---|---|
| Red October Red October UG |
2.0 | 71 8.8 |
445 5.0 |
416 6.1 |
932 5.8 173 |
| Red October Subtotal | 71 8.8 |
445 5.0 |
416 6.1 |
932 5.8 173 |
|
| Devon Devon Pit (OP) Olympic (OP) Hill East (OP) |
1.0 1.0 1.0 |
- - - - - - |
341 4.8 - - - - |
102 3.6 171 2.8 633 1.7 |
443 4.6 65 171 2.8 15 633 1.7 35 |
| Devon Subtotal | - - |
341 4.8 |
906 2.1 |
1247 2.9 115 |
|
| Fortitude Fortitude Stage 2 (OP) Gallant (OP) |
1.0 1.0 |
- - - - |
2,945 1.8 - - |
2,503 2.1 341 2.1 |
5,449 2.0 343 341 2.1 23 |
| Fortitude Subtotal | - | 2945 1.8 |
2,844 2.1 |
5,790 2.0 366 |
|
| Total | 71 8.8 |
3,731 2.5 |
4,166 3.4 |
7,969 2.6 654 |
- As of 29 April 2021, up 27% on 31 Dec 2020 (515koz)
5
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Matsa’s Exploration Targets*
| EXPLORATION TARGETS* | EXPLORATION TARGETS* | EXPLORATION TARGETS* | ||||
|---|---|---|---|---|---|---|
| Lower Case Target | Upper Case | Target | ||||
| EXPLORATION TARGET | ||||||
| Tonnes | Grade | Ounces Gold | Tonnes | Grade | Ounces Gold | |
| Red October | 900,000 | 6.9 | 200,000 | 1,740,000 | 6.1 | 340,000 |
| Devon | 1,040,000 | 3.0 | 100,000 | 2,600,000 | 3.0 | 250,000 |
| Olympic | 180,000 | 4 | 20,000 | 560,000 | 6 | 110,000 |
| Fortitude North Supergene | 1,130,000 | 4.7 | 170,000 | 2,020,000 | 4.7 | 310,000 |
| Fortitude North Primary | 1,350,000 | 3.2 | 140,000 | 2,810,000 | 3.2 | 290,000 |
| Hill East (HE 1) | 60,000 | 1.7 | 3,000 | 120,000 | 1.7 | 6,000 |
| Hill East Exploration Target | 252,000 | 1.7 | 13,000 | 470,000 | 1.7 | 26,000 |
| Gallant | 280,000 | 2.2 | 20,000 | 350,000 | 2.2 | 25,000 |
| TOTALS | 5,190,000 | 4.0 | 666,000 | 10,670,000 | 3.9 | 1,357,000 |
ASX Announcement 18 August 2020*
The Exploration Target is an important tool whereby available information can be used to guide exploration and prioritise drill hole planning. The potential quantity and grade of an Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource .
6
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Exploration and Development Pipeline
==> picture [336 x 469] intentionally omitted <==
- 503km[2] high quality historically under explored
tenement package
-
Significant pipeline of 30 exploration projects
-
Favourable structural settings along major faults
-
Salt lakes have seen little previous exploration
-
Matsa’s new discoveries include
BE 1, BE 4, FF1 and Fortitude North
- Barnicoat East Fault trend is 69km long
Kerringal to the north - Fortitude to the south
- 2[nd] and 3[rd] order structures host Sunrise Dam, Red
October and Wallaby
7
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Regional setting and hubs
==> picture [588 x 379] intentionally omitted <==
Hubs: Red October (red) Devon (blue)
Fortitude (yellow) Lake Carey South (orange)
Lake Carey North (pink) Lake Carey Central (green)
8
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Matsa Resources Limited
Company wants –
-
Profitable, safe production, growth
-
Leading environmental and social practices
Investor wants –
-
Company to deliver on strategy
-
ROI (share price to go up & dividends)
-
Operate in an environmentally and socially responsible way (ESG)
We want our share price to reflect our success
It does not today, but not for long
9
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
A New Way with a New Strategy
==> picture [229 x 297] intentionally omitted <==
• Develop a profitable business
-
Build Matsa owned 600,000tpa plant
-
Mine Fortitude Stage 2 and Devon Pit
-
Drillout Red October then resume mining it
-
Develop Olympic, Hill East and Gallant
-
Explore Devon hub and Fortitude North
-
Find new gold Resources to give treatment plant long life
-
Talk with neighbours to process their ore, potential 4M
tonnes of ore already identifiable
- Grow Lake Carey Gold Project into a world class gold camp
10
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Matsa Can do attitude
Address Cashflow
-
Select options to generate short term cash
-
Do deals - we have proven ability
-
Wind down mining operations at Red October
Execute 2yr Exploration Plan
==> picture [86 x 86] intentionally omitted <==
-
Explore and grow resources
-
Complete mining studies and establish reserves
-
Develop sustainable, profitable and safe mine schedules for all sites
Build the mill
==> picture [86 x 85] intentionally omitted <==
-
Mine and process Matsa resources
-
Opportunity to increase plant capacity and leverage 3[rd] party ore
11
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
A Mill is the Key to Long Term Value
==> picture [570 x 336] intentionally omitted <==
----- Start of picture text -----
Fortitude
Hill East Stage 2 [1] Gallant [3]
prospects [4]
Olympic &
Devon UG [4]
Bindah [3]
Devon
pit [3] Fortitude
Nth [4]
Proposed
Red Matsa
October [2] Processing 3rd
Plant
party
ores
----- End of picture text -----
Strategic pathway to production
* Aggressive exploration planned for resource growth, 1 – mining studies completed & fully permitted project, 2 – current operation, 3 – currently modelling, 4 – exploration ongoing
12
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
The Way Forward – Fortitude
==> picture [127 x 105] intentionally omitted <==
Resource
-
366,000 oz
-
UG resource extension remains open
-
Gallant and Bindah OP resources to be evaluated for mining
==> picture [127 x 106] intentionally omitted <==
Status
-
Fully permitted and costed mine on granted ML
-
Matsa trial mine provides performance data for Stage 2
-
Satellite deposits to be economically assessed
==> picture [127 x 105] intentionally omitted <==
Opportunity
-
Significant exploration potential
-
Fortitude North ~ 1.8km anomaly only partially drill tested
-
Bindah to Gallant trend remains under explored
13
MATSA RESOURCES AUSTRALIAN ENERGY & MINERALS INVESTOR CONFERENCE MARCH 20 21
The Way Forward – Devon
==> picture [136 x 105] intentionally omitted <==
Resource
-
115,000 oz
-
Numerous satellite mineral systems yet to be modelled
-
Upcoming drilling
==> picture [136 x 104] intentionally omitted <==
Status
-
Opportunity to generate early cashflow at strong margin
-
Scoping study demonstrates +$40M operating return
-
Progressing studies to obtain approvals to mine
==> picture [136 x 104] intentionally omitted <==
Opportunity
-
Huge exploration potential
-
Historical HG workings with little recent exploration
-
Treat ore at Matsa owned plant
14
MATSA RESOURCES AUSTRALIAN ENERGY & MINERALS INVESTOR CONFERENCE MARCH 20 21
The Way Forward – Red October
==> picture [122 x 102] intentionally omitted <==
Resource
-
173,000 oz
-
Updating Lion Fish, Marlin and Nemo models
-
Exploration and resource drill out designed
==> picture [122 x 102] intentionally omitted <==
Status
-
Designs underway for Long Term Mine Plan
-
Currently ore is trucked to SDGM under Ore purchase
-
Haulage and processing cost too high
==> picture [122 x 102] intentionally omitted <==
Opportunity
-
Huge exploration potential
-
Generate +5yr mine life
-
Treat ore at Matsa owned plant
15
MATSA RESOURCES AUSTRALIAN ENERGY & MINERALS INVESTOR CONFERENCE MARCH 20 21
Matsa Can do attitude
The components of production success through a Matsa treatment facility is having access to 3M tonnes of ore over 5 years;
-
Devon Pit in hand
-
• Fortitude Stage 2 in hand
-
Red October in hand
-
Olympic
-
Low grade stockpiles in hand
-
Hill East in hand
-
Gallant
-
Fortitude North
-
Deals with neighbouring stranded deposits suited to our mill
16
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Red October Gold Mine
-
173,000oz @ 5.8 g/t Au
-
Red October is a high-grade structurally controlled narrow vein gold deposit with significant exploration potential
-
Matsa’s Mar 2021 quarter production of 1,987 oz gold at C1 cash costs of A$1,222 oz and AISC A$2,150 oz sets a good scene proves profitable mining can occur
-
Production is winding down to allow for major exploration programs to build long life mine plan
-
Development for exploration reduced mining will continue with some gold production
-
Mining fleet, surface and underground equipment 100% Matsa owned and remain insitu for immediate restart
17
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Red October – why wind down?
-
Focus on building reserves to plan sustainable long term mine life
-
Future potentially comprises multiple new mining fronts that requires new mine infrastructure
-
Business need to understand “the whole”
-
Matching future production rates to processing throughput based on multiple mining operations feeding centralised mill
-
Provide time for exploration to catch up
-
Provide time to develop an optimised mining strategy for Red October
==> picture [342 x 362] intentionally omitted <==
18
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Red October Gold Mine is an asset
-
Why 18 months and approx. $8,000,000
-
173,000 oz gold in resource previously 85,000 oz
-
Profitable months occurred previously economics were unknown
-
Excellent understanding of met recoveries, previously little reliable knowledge due to blending
-
Exploration identified new high grade targets previously few known high priority targets
-
Developed narrow vein mining techniques previously bulk mining techniques used
-
Developed the North decline previously shallow and abandoned
-
Good understanding of grades previously drilling very sparse and open
-
Deepened decline to access new resources previously down to level 842
==> picture [348 x 289] intentionally omitted <==
-
All underground pumps refurbished previously pumps condition unknown
-
Developed Matsa owned fleet and management previously no fleet or staff
Matsa now has an excellent opportunity confirmed
19
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Red October Gold Mine
==> picture [356 x 294] intentionally omitted <==
Matsa now has the blueprint
This now means that Red October can be advanced with confidence through specific 2 year exploration and grade control drillout which has been fully costed to develop a long term mine plan which will deliver high margin ore to a own Matsa owned plant
Previously 40,000 ounces of gold were produced per annum from Red October underground
20
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Fortitude Stage 2 – fully permitted
-
Cash surplus of A$55.4M* at A$2,500/oz
-
Expected 22-month mine life
-
Fully permitted and ready to go
-
Previous trial mine provides high level of
confidence
-
Production of 54,400 oz gold at 93% recovery with potential to increase
-
Capital outlay of A$6.6M which includes pre-
stripping
-
Maximum cash exposure A$8.4M
-
Operating cash cost of A$1,483/oz gold
-
Further improvements expected
==> picture [341 x 289] intentionally omitted <==
----- Start of picture text -----
Month Surplus and Cash Flow
$12,000,000 $60,000,000
$10,000,000 $50,000,000
$8,000,000 $40,000,000
$6,000,000 $30,000,000
$4,000,000 $20,000,000
$2,000,000 $10,000,000
$0 $-
1 2 3 4 5 6 7 8 9 10111213141516171819202122
-$2,000,000 $(10,000,000)
-$4,000,000 $(20,000,000)
----- End of picture text -----
Significant upside potential exists
- Based on concept study for Matsa 600,000tpa processing plant refer ASX announcement 22 Jan 2021
21
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Devon Pit – rapidly advancing
==> picture [217 x 238] intentionally omitted <==
-
Cash surplus of A$40.75M* at A$2,250/oz
-
Expected 12-month mine life
-
Granted mining lease
-
Previous GME mine provides high level of
confidence
- Production of 36,737 oz gold at 93%
recovery with potential to increase
- Early access to ore
==> picture [401 x 232] intentionally omitted <==
-
Existing haul roads and misc licences
-
Operating cash cost of A$1,144/oz
-
Further improvements expected
Significant upside potential exists
* Refer Devon pit scoping study ASX announcement 14 April 2021
22
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Devon Hub Exploration
==> picture [339 x 457] intentionally omitted <==
-
115koz resource across 3 prospects
-
Fantastic widespread gold in soil anomalism
-
Limited drilling into fresh rock
-
38 Structural targets identified in SAM survey
-
3 high priority targets for drill testing in May
-
LIN1 (Au+Te+As+TFEM anomalism)
-
HE1-HE2 (SAM anomaly+known Au)
-
HE5 (SAM anomaly+known Au)
-
Region contains widespread historical shallow workings
23
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
LIN 1- Newly Discovered Target
-
Drilling this week
-
LIN1 – A strong 1.1km coincident Au, As, Te, TFEM anomaly
-
Limited historical drilling with healthy grades (1m @ 4.35g/t and 1m @ 3.04g/t)
Drilled in wrong direction!
Te
==> picture [241 x 355] intentionally omitted <==
----- Start of picture text -----
As
----- End of picture text -----
==> picture [242 x 341] intentionally omitted <==
TFEM (SAM)
24
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
Corporate Overview
CORPORATE SNAPSHOT
| TICKER | SHARES ON ISSUE | UNLISTED OPTIONS | LISTED OPTIONS | MARKET CAPITALISATION | CASH AND LIQUIDS |
|---|---|---|---|---|---|
| ASX:MAT | 313.76 | 77.48M | 28.12M | A$23.53M | A$4.52M |
| @ $0.17 - $0.35 | @ $0.17 | @ $0.075 (30 Apr 2021) | (31 Mar 2021) |
==> picture [79 x 134] intentionally omitted <==
==> picture [132 x 111] intentionally omitted <==
==> picture [149 x 114] intentionally omitted <==
==> picture [157 x 82] intentionally omitted <==
==> picture [83 x 89] intentionally omitted <==
==> picture [72 x 89] intentionally omitted <==
==> picture [113 x 40] intentionally omitted <==
KEY SHAREHOLDERS (AS AT 30 April 20 21)
| JP Morgan Ltd | 15.18 % |
|---|---|
| BNP Paribas Nominees | 11.17 % |
| Sparta AG (Deutsche Balaton) | 7.56 % |
| Paul Poli | 4.35 % |
| Top 20 Shareholders | ~53.26 % |
DIRECTORS
Paul Poli Executive Chairman, Managing Director Pascal Blampain Executive Director Frank Sibbel Non Executive Director Andrew Chapman Executive Director & Company Secretary
25
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
What is Matsa
==> picture [229 x 297] intentionally omitted <==
A Strong Future is Forming
Matsa is developing a highly attractive model for our own 600,000tpa gold ore treatment facility starting with Devon pit and then Fortitude Stage 2.
Combined plans shows $95,000,000* positive cash flow from only the first 2 pits capable of completion within a 36 month period. Red October and other areas will add to this significantly.
* refer ASX announcements 22 Jan 2021 and 14 April 2021
26
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21
==> picture [88 x 77] intentionally omitted <==
27
MATSA RESOURCES Sydney RIU Resources Roundup 4 May 20 21